September 2018
ROTARY & TURBINE GAS METERFátima Gouveia, Product Manager
AN EYE TO THE PAST
DELTA SE PACKAGINGFormer packaging
Improved packaging (from July/2018)
AN EYE TO THE FUTURE
DN80 NEW FLOW STRAIGHTENER What will change?
• New Flow straightener• Wheel MU 60° will be replaced• Wheel 45° remains unchanged
Why change (advantages)?• Improve conformity with EN12261:2002 Annex B (Perturbation
testing).• Improve linearity on HP calibration• Eliminate the need to rework the turbine wheel as today,
improving FPY and reducing cost related to operation “Optimization” for HPcalibration
• To be confirmed the possibility to get high accuracy for all DN80
When change?• New MID certificate release by end of October • By the end of the year
DN80 NEW FLOW STRAIGHTENER
• Customer approval ?!!!
• New flow straightener not compatible with today MUs.
• Spare part list will reflect the change. • New flow straightener code• New MU code• 651-180-00, 500 pcs will be kept in stock for possible
replacements (sales = 1200 pcs from 2004 / 2018)
TURBINES UNIVERSAL TOTALIZER SEALING• With the renewed MID certification, Delta sealing plan will be applied for TZ
TodayFuture
TURBINES HF3/2 PLUG SEALING
Will be removed on the next revision of MID certificate
Will be removed on the next revision of MID certificate
70 MILLION AND COUNTING