BUILDING DETAILS Total Plot Area 8.22acre Builtup area 50336sqm No of Beds 448 Operation Theatres
16
Incoming Electrical
2 Sources 11KVA
Generators 1250KVA *3nos Transformer 2000KVA*4nos Chiller Plant 433TR*2nos
UPS 200KVA *3nos(UPS are in parallel load with ATS), 120KVA *3Nos.
Fuel PNG from AGL, HSD
Fortis Hospital Mohali Establishes in 2001, Approx 2000
sqf/cardiac ICU bed instead of the normal 800-900 sqf/in
Indian healthcare. Hospital set on sprawling 8.22 acres, with built up area of 50336 square meters.
FHM is a 360(448) bedded, JCI and NABH certified multi specialty tertiary care hospital,
Fortis Hospital, Mohali has won several awards, including; Best Design Award from American Institute of Architects,1999
Number of Buildings: 3
• IPD Block (A block)
• OPD Block (B block)
• Rehabilitation Centre
• Fortis Cancer Institute
FORTIS INN BUILDING BUILDING B
BUILDING A
ONCO BLOCK
OVERVIEW OF HOSPITAL
Inaugurated
on
June 28, 2001
JCI,
2007
NABH,
2008
NABH Blood Bank,
2010
FCI Inauguration 2014
History & Growth
Multi-Speciality Hospital, 2002
Change of
ownership
to IHH
2018
NATURAL ENERGY USAGE FOR LIGHTING
Glass type Direction Double Glaze Unit NW
Low-U Double Glaze Unit SW
Fortis Hospital Mohali
Parameter Baseline Glass specs as per AHRAE 90.1
Normal DGU Glass (North-east)
Low e Glass (South-west)
U Value (Btu/hr-sqft *F)
1.2 0.49 0.35
SHGC 0.25 0.35 0.23
ARCHITECTURAL DETAILS OF FORTIS MOHALI WITH RESPECT TO ENERGY EFFICIENCY
Low window to wall ratio
(WWR).It reduce the
building cooling load.
As per ECBC 2007,WWR
should not exceed 60%
and preferred in
between 40% to 60%.A
building with higher
WWR will transfer more
heat than a building with
lesser WWR
65% area have day- lighting. It reduce
the artificial lighting requirement. It
reduce 5% of energy consumption
Solar PV panel installed on roof-
top. It reduce cooling load. It
reduce 0.5% to 0.75% energy
consumption
Green Central court yard to reduce
heat load of building. It reduce energy
consumption as well as feel good for
patients
Thermal Resistance glazing to
reduce heat load of building. It
reduce 2.5% to 3.5% of energy
consumption.
Natural Lighting
“Often design strategies for energy efficiency can
also have direct benefits for patient outcomes.
A recent study has found that daylight in patient
rooms helped surgery patients maintain lower
stress levels and feel less pain resulting in use
of less pain medication and reducing medication
costs for these patients by 22%.”
– Jeffrey Walch, University of Pittsburgh Montefiore Hospital
FIRST OF ITS KIND PROJECTS IN HOSPITAL
PNG for Boilers
Best Design Award from American
Institute of Architects,1999
Solar Photovoltaic
Panels
Solar Water Heating System
Energy Efficient LED Lights Phase II
Chillers on VSD
1999
2016
2017
2018 Power Optimizer for reduction of kVAR
Kitchen Waste Composting
MBBR Based STP
& ETP
2019 Automatic Chiller
tube cleaning system
PNG for Kitchen
VFD operated Pumps/Motors
1999
Best Design Award from American Institute of Architects
2017
1. Replacement of Old Vacuum . Pumps with new VFD operated . Vacuum Pumps
2. Solar Photovoltaic Panel Parking . and lift mumty
3. Hot water generation through . solar water heating system
2018
1. Chillers on VSD
2. PNG for Boilers
3. Installation of ETP and ….reutilization of Water
4. VFD operated Air compressor
2019
1. Automatic Chiller Tube …..cleaning System
2. PNG for Kitchen
3. Replacement of ….Conventional AHU's with ….VFD operated AHU's
4. Additional Automatic ….power factor controller
5. STP Modification with UV
Our Encon Journey …
2017 EPI 126
2018 EPI 116
2019 EPI 111
BEE National Benchmark 200
BENCHMARKING – ENERGY USAGE- OUR CHALLENGES Current – Consumption patterns ,Perpetual growth in facilities, diagnostic equipment's, additional beds thus
increased Energy.
Consumption patterns aren’t fixed, they vary depending on the number of occupied beds, the footfalls & the local weather conditions. Increasing energy & Maintenance costs.
Hospital are energy guzzlers. They not only adds to the operational costs but also to emissions that contribute to the anthropogenic green house gases
Equipment Avg.
Consumption
HVAC (heating, ventilation,
& air conditioning) 38%
Lighting 13%
Medical Equipment 22%
Boilers 10%
Water Systems 8.5%
DG Sets (Diesel generator) 1%
Laundry 3%
Medical Gases 2%
STP (sewage treatment plant) 2.5%
HVAC (heating, ventilation, & air
conditioning)
Lighting
Medical Equipment
Boilers
Water Systems
DG Sets (Diesel generator)
Laundry
Medical Gases STP (sewage treatment plant)
Energy Consumption Overview
SEC:- There is a reduction of 11.90% compared to 2017-18 Energy Consumption:-Reduction of 12.43% compared to 2017-18 kWh/Bed:- Reduction of 14.97% since 2017-18
Parameter 2017-18 2018-19 2019-20 KWH 6362423 5860805 5571526
SEC in kWh/M2 126 116 111 kWh/Bed 14626 13082 12436
No. Of Beds 435 448 448
Average Occupancy 89% 88% 89% Built Up area 50336 50336 50336
90
110
130
150
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
141 137
130 126
116 111
SEC in kWh/M2
Reduction of 11.90% compared to 2017-18
10000
12000
14000
16000
18000
20000
22000 20111
16014 15100 14626
13082 12436
Total kWh/Bed Reduction of 14.97% compared to 2017-18
Unit consumption in 2018-19 is 58.61 LkWh
Anticipated unit consumption 2019-20 due to load increase 63.18 LkWh
Actual Unit consumption 2019-20 55.72 LkWh
Total savings FY 2019-20 is 7.46 LkWh which is 13.39% over 2018-19
Thermal Energy Consumption Overview
HSD+PNG/M2:- There is a reduction of 17.57% compared to 2017-18 HSD+PNG Consumption:- Reduction of 17.57% compared to 2017-18 HSD+PNG/BED:- There is a reduction of 19.96% compared to 2017-18
Parameter 2017-18 2018-19 2019-20 HSD /PNG 268785 124960+136790 (261750) 221570 HSD Ltrs/M2 5.34 5.20 4.40 HSD Ltrs/Bed 618 584 495 No. Of Beds 435 448 448 Average Occupancy 89 88 89 Built Up area 50336 50336 50336
0.00
2.00
4.00
6.00
2017-18 2018-19 2019-20
5.34 5.20 4.40
HSD Ltrs/M2
0
100
200
300
2017-18 2018-19 2019-20
269 262 222
HSD/PNG (KL/CBM)
137
125
0
200
400
600
800
2017-18 2018-19 2019-20
618 584 495
HSD Ltrs/Bed
Reference A report on Energy efficient hospitals survey by CII, Schneider and S.L.Raheja
NATIONAL
BENCHMARKING
INTERNATIONAL
BENCHMARKING
0
50
100
150
200
250
300 263
225 205
143 111
205
Specific Energy Consumption - kWh/SqMtrs/year
Comparison of building energy benchmarks in Serbia, UK and Germany (CIBSE TM 46), (EnEv)----- KWH/M2
0
50
100
150
200
250
300
350 312 304 285 269 258
214 212 210 208 196 168
111
200
Specific Energy Consumption - kWh/SqMtrs/year
EPI Index across Fortis Hospitals
Energy performance Index for Fortis Group Hospitals All Weather
0
50
100
150
200
250
300
350
400
198
108
238
111
172
199 204 194
242
186
395
212
334
218
310
244
146 143
221
Energy performance Index
ELECTRICAL LOAD DISTRIBUTION(%)
2019-20 2018-19
Area 2018-19 2019-20 Remarks
HVAC 40 38 Reduction of 5% kWh due to Automatic tube cleaning system and VFD operated AHU’s , Dehumidifier and FCU replacement.
Lighting 13.5 13 Reduction due to the LED replacement & motion sensors and rest due to the addition of other loads
Medical Equipment's 18 22 Increased by 22% due to the new equipment’s
Water System 8 8.5 Slightly Increased by 0.5% due to the new equipment’s
Laundry 2.5 3 Increased by 1% due to the new equipment’s
40%
13%
18%
10%
8%
2%
3% 3% 3%
HVAC Lighting Medical Equipment Boilers Water Systems DG Sets Laundry Medical Gases STP
38%
13% 22%
10%
8.5% 1% 2% 2% 3%
HVAC Lighting Medical Equipment
Boilers Water Systems DG Sets
Laundry Medical Gases STP
7520 7695
7720 7810
130
126 116
111
2016-17 2017-18 2018-19 2019-20
100
105
110
115
120
125
130
135
5400
7200
9000
CO
NN
ECTE
D L
OA
D IN
KW
H
----CONNECTED LOAD IN KWH --SEC
Additional Load & Specific Energy Consumption YOY
SEC
(K
WH
/SQ
M)
131
How to further nullify the effect?
New Machines MRI 3 TESLA
Robotic OT and Biomedical
Equipment's/ Eating Joint &
BMT Programme
Energy excellence frame work-FHM
Energy
Efficient
Equipments
Energy
management
structure
Total
Employee
Involvement
Monitoring
and review
systems
Energy
Audits
Bench
Marking
Energy
management
planning
Energy
excellence
ENERGY CONSERVATION PROJECTS
New Technology
Renewable Energy
Substitution
• Solar Photovoltaic Lighting
• PNG for Boilers
• Hot Water generation
through Solar water heater
system
• Water conservation
• STP Modification with
UV/UF
• HSD consumption reduction
• PNG for Kitchen
Automatic Chiller Tube cleaning
System
Waste Heat Recovery
(Condensate/Process)
VFD on Identified AHU’s
Sharing one AHU for two OT’s
during night hours
Power factor improvement
Reduction in ripple factor &PF
improvement
AHU's with 100% Fresh Air in OT
• Replacement of Fluorescent tube/lights
with LED Lights
• Chillers on VSD
• Installation of VFD drives with water
pumps
• Replacement of vacuum pumps with
energy efficient VFD operated vacuum
pumps
• Humidity & Temperature in LINAC
List of EnCon Project with Zero Investment
Sr. No. Title of Project Year Of Implementation
Annual Electrical Savings (Kwh)
Annual Thermal Saving (Quantity) KL
Total Annual Savings (Rs. Lakhs)
CO2e Reduction (MT)
1 Modification of Lighting circuit - Across the Hospital 2019-20 9250 0 0.74 8
2 Modification of the diverter plunger in shower mixers. 2019-20 15000 25 1.4 13
3 Thermal recycling at laundry 2019-20 25000 250 1.82 27
4 Cath Labs and Lab UPS shut down in night hours 2018-19 73000 0 0.584 60
5 OPTIMIZATION IN LIGHTING 2018-19 16000 0 1.28 13
6 BMS monitoring increased 2018-19 20000 0 1.6 16
7 Chiller set point adjusted as per night demand 2018-19 20000 0 1.6 16
8 Condensate recovery from boilers as increase in boiler steam 2017-18 0 0.25 2.7 1
9 Chillers Condenser tubes and Strainer cleaning 2017-18 80000 0 6.5 66
10 Cooling Tower maintenance and cleaning 2017-18 20000 0 1.5 16
11 Boilers Tube descaling 2017-18 0 0.17 1 0
12 AHU and FCU Coil cleaning and descaling 2017-18 56000 0 4.5 46
13 Gas range burner cleaning and leak testing 2017-18 18600 0 1.5 15
352850 275.42 26.724 297
List of EnCon Project with Investment (2017- 18)
These projects have been replicated in other units
Sr.
No. Title of Project
Year Of
Implementati
on
Annual Electrical Savings (Kwh)
Annual Thermal Saving
(Ton/Year)
Annual Savings
(Rs. Million)
Investment Made (Rs. Million)
Pay Back (Months)
CO2e Reduction (MT)
1 Condensate recovery from boilers 2017-2018 25000 12 0.27 0 0 52
2
Replacement of Old Vacuum Pumps with new VFD operated Vacuum Pumps 2017-2018 30000 0 0.26 1.4 64 25
3 LED Replacement for balance CFL Lights 2017-2018 50000 0 0.393 1 35 41
4 VFD on identified AHU's 2017-2018 70000 0 0.55 0.5 12 57
5 Water conservation 2017-2018 10000 1 0.1286 0.7 66 11
6 Solar Photovoltaic Panels in Parking and lift mumty
2017-2018 250000 0 1.965 9 54 205
435000 13 3.5666 12.6 391
List of EnCon Project with Investment (2018-19)
Sr.
No. Title of Project
Year Of
Implementa
tion
Annual Electrical Savings (Kwh)
Annual Thermal Saving (Ton/Year)
Annual Savings (Rs. Million)
Investment Made (Rs. Million)
Pay Back (Months)
CO2e Reduction (MT)
1 PNG (Piped Natural Gas) for boilers 2018-2019 28800 137 9.32 0.75 2 385
2 PNG (Piped Natural Gas) for Kitchen 2018-2019 0 0 0 0.07 0 0
3 Chillers on VSD 2018-2019 140000 0 1.12 3.5 36 115
4 VFD on Identified AHU's 2018-2019 90000 0 0.72 1.5 24 74
5 VFD operated Air Compressor 2018-2019 60000 0 0.48 1.1 27 49
6 Shutting off One AHU instead of 2 during night operations 2018-2019 24000 0 0.0192 0.001 1 20
7 Splits AC's for night 2018-2019 70000 0 0.56 0.05 1 57
8 LED Replacement (Phase 3) 2018-2019 99000 0 0.792 1 15 81
9 Energy efficient motors 2018-2019 25000 0 0.2 0.55 33 21
10 Use of foam flow in taps 2018-2019 20000 1 0.21 0.07 0 19
11 Installation of ETP and reutilization of water 2018-2019 60000 5 0.73 1 15 62
Total 616800 143 14.15 9.591 883
These projects have been replicated in other units
List of EnCon Project with Investment (2019-20)
Sr. No. Title of Project Year Of Implementation
Annual Electrical Savings (Kwh)
Annual Thermal Saving (Ton/Year)
Annual Savings (Rs. Million)
Investment Made (Rs. Million)
Pay Back (Months)
CO2e Reduction (MT)
1 Automatic Chiller Tube cleaning System 2019-2020 62272 0 0.51 1 23.35 51 2 Replacement of Conventional AHU's with VFD operated
AHU's, Replacement of Damaged AHU Coils and Replacement of Old Damaged FCU with new FCU
2019-2020 77200 0 0.64 0.992 18.69
63 3 AHU's with 100% Fresh Air in OT Designed Heat Recovery
Wheels in OR AHU's for energy conservation. 2019-2020 67640 0 0.56 0.12 2.58
55 4 Additional Automatic power factor controller 2019-2020 73000 0 0.60 0.9 17.94 60 5 Powa Trim 2019-2020 55000 0 0.45 0.2 5.29 45 6 Replacement of Chiller conventional pumps with VFD
operated Primary and secondary pumps 2019-2020 201000 0 1.65 1 7.27
165 7 Project to Control the Humidity & Temperature in LINAC
Area 2019-2020 72485 0 0.60 0.3 6.02
59 8 Modification in HVAC Cooling towers, IE4 motors for
cooling towers, STP blowers etc 2019-2020 53200 0 0.44 0.55 15.03
44 9 HYDROPATH 2019-2020 20000 45 0.20 0.2 12.31 18
10 STP Modification with UV/UF 2019-2020 15000 0 0.12 0.175 16.94 12 11 Agnisumukh Gas Burner 2019-2020 0 350 1.05 0.1 1.14 9 12 PNG (Piped natural gas) for Balance Boilers/Kitchen 2019-2020 0 0 1.48 0.7 5.67 20
Total 696797 395 8.30 6.24 582
Energy Savings Project Implemented in 2019-20
REPLACEMENT OF CONVENTIONAL AHU’S
AUTOMATIC POWER FACTOR CONTROLLER
AUTOMATIC chiller tube cleaning system
UV/UF filtration in STP HYDROPATH
Desiccant Dehumidifier PNG & AGNISUMUKH Burner in Kitchen
Savings of 7.46LkWh Power
Units & 630MT CO2e
Energy Efficient Pumps/Motors
Energy Savings Project Implemented in 2018-19
Chillers on VSD
VFD on AHU's VFD operated Air Compressor
Splits AC's for night
LED Lights Energy Efficient Motors
PNG for boilers
Savings of 7.45LkWh Power
Units & 988MT CO2e
Energy Savings Project Implemented in 2017-18
Cooling Towers Replacement STP Modification
Solar Panels at Roof Top Solar water heating
PowaTRIM Savings of 6.85LkWh Power
Units & 545MT CO2e
Solar Panels in car parking
SUMMARY OF PROJECT IMPLEMENTED IN LAST THREE YEARS
11 15 15
50.67
95.91 62.4
126.00 144.96
86.98
2017-18 2018-19 2019-20
No. Of Proposals Investments (INR Lacs) Savings (INR Lacs)
Year No. Of Proposals Investments (INR
Lacs) Savings (INR Lacs)
Energy Savings (LkWh)
CO2e MT reduction
2017-18 11 50.67 126 6.10 535
2018-19 15 95.91 144.96 7.46 988
2019-20 15 62.4 86.98 7.46 630
Total 41 208.98 357.94 21.02 2153
Energy conservation is the buzz now and it implies not only exposing the possibility of clean energy besides money saving thus ultimately contributing to low environmental emissions & greater efficiency in running the operations.. Thus decided 1. LPG replaced with PNG 2. Replacement of energy efficient /Eco friendly burners in cooking .
PNG (PIPED NATURAL GAS) FOR MAIN KITCHENS
Trigger for implementing the project
Statement: Main Hospital Kitchens were using steam from boilers for making Rice and LPG for
day today operations, thereby posing increaser risks of keeping large numbers of LPG Cylinders
bank to cater 24x7 needs. Cost Benefit Analysis
Cost Savings Rs.14.82Lacs/Year Investment 7.0 Lacs Payback 5.7 Months
Innovative Project (1)
Fortis Saving Sheet - LPG Fuel Unit
Gross Calorific Value
Cost of Fuel Cost (Rs / 1000
Kcal) Combustion
Efficiency Indirect Cost
Net Cost To User (Rs/1000Kcal)
Savings (Rs/1000Kcal)
% Savings
(A) (B) (C) = (B/A)*1000 (D) (E) (F) = C/D+E*C (G) (H) = G/F
LPG Kgs 11000 ₹ 69.63 6.33 95% 1.00% 6.73 - - NG SCM 9000 ₹ 45.48 5.05 95% 0.00% 5.32 1.41 20.92
Fuel
Cyl/day Unit/day Unit/Cost
Act. Unit Cost Inc
Efficiency Factors(D)
FuelCost/Day Savings/Day Savings/Month Savings/Year
LPG 14 266.00 ₹ 69.63 ₹ 73.99 ₹ 19,682.06 - -
NG - 325.11 ₹ 45.48 ₹ 47.87 ₹ 15,564.27 ₹ 4,117.80 ₹ 123,533.86 ₹ 1,482,406.36
Natural Gas vs LPG
Savings and Results
1. NG is lighter than air, in case of leak it rises and disperses into air.
2. LPG comes in cylinders, there is a chance of pilferage besides some LPG is left in cylinder after use.
3. LPG is heavier than air, whenever there is sudden drawing of gas from LPG cylinders or during . .
. winters there is icing issue thereby wasting energy in heating.
4. LPG cylinder bank poses risk in case of leakage and is a fire hazard besides statutory licencing.
Cost Benefit Analysis
Thermal Savings 350Ton/year
Cost Savings Rs.10.05Lacs/Year
Investment 10.0 Lacs
Payback 1.14 Months
AGNISUMUKH GAS BURNER FOR UNIFORM HEATING
The burners has been tested and certified by LERC at a thermal efficiency, under IS 14612, between 65-68.9% as against conventional commercial gas burners with efficiency rating between 36-45%. https://www.agnisumukh.com/innovate/
PROJECT TO CONTROL HUMIDITY & TEMPRATURE IN LINAC AREA Statement
Erratic Humidity Control in Linac Machines
Challenge
Ever since the installation at level 2 basement in bunkers , temperature was not much of a concern
but humidity control was an issue ever since the Linear Accelerators were handed over to operations.
Humidity control in Linear Accelerator was a challenge ever since its functioning. Initially 4 additional heaters
of 9Kw each were added during rainy season to control humidity , but the results were erratic so added 2
more heaters & with huge variation. Other option of reducing temperature upto dew point of chiller was also
explored but that came with huge energy costs.Hot water option was also explored.
Hence decided to go with dehumidifier and designed through Bryair as per our needs& in Auto mode & got
rid off 6 electric heaters of 9kw each & humidity reduced from 75% to 55%.
Trigger for implementing the project
Innovative Project (2)
Advantages of Desiccant Dehumidifier over Heater
Desiccant Dehumidifier
1. Reduces Absolute Humidity
2. Less Power Consumption as compared to heater
3. Can reduce relative humidity upto 1%
4. Consistent Performance. Heater
1. Doesn't reduce Absolute Humidity
2. Consume more power
3. Difficult to maintain relative humidity below 50%
4. Performance fails during monsoon season.
Cost Benefit Analysis Energy Savings 72485 kWh/Year Cost Savings Rs.6.0Lacs/Year Investment 3.0 Lacs Payback 6 Months
Operation Principle of Desiccant Dehumidifier
Heat Recovery Wheels in AHU’S WITH 100% FRESH AIR IN OPERATION THEATRES
Our Operation Theatres were designed on 100% fresh air, hence a lot of conditioned air gets exhausted, thereby resulting in huge kWh loses, Thus placed Heat Recovery Wheels
Statement
Since ventilated massive volumes of conditioned indoor air were lost with huge energy losses in running day to day operations in OT's, Heat recovery wheel was considered as its moisture content transfer ability nearly 30-40% of the cost of conditioning is saved by heat recovery wheels. The wheel was designed with the help of OEM. The benefits achieved were pre warmer region temperature is transferred to the colder region, hence recovery reusable heat. Similarly the desiccant coating adsorbs the moisture from high humidity ratio region & releases the lower humidity ratio region hence recovering latent heat
Why innovative
Air must be exchanged at least 25 times hourly and RA is prohibited in Operation Theatres. Thus modified by placing heat recovery wheel to remove the moisture content and this saved 68k units. The project has replica potential and thus suggested to other units as well.
Trigger for implementing the project
Cost Benefit Analysis Energy Savings 67640 kWh/Year Cost Savings Rs.5.6Lacs/Year Investment 1.2 Lacs Payback 2.5 Months
Outdoor Air (O/A)
Supply Air (S/A)
Exhaust Air (E/A)
Return Air
(R/A)
Innovative Project (3)
PowaTRIM
Energy Conversion - Generates current via reactive load produced by site inductive loads. Current is then injected into the
adjacent phases as new, usable power available towards your Main Incomer.
Power Factor - resonance-free power factor correction to reduce the demand of reactive non-power currents.
Phase balancing - of voltage and current to reduce waste, demand, friction and heat in loads.
Harmonic Protection - filtering of non-power currents to reduce the billed kVAh/kWh consumption
In summary: PowaTRIM returns out-of-phase power into your electrical grid. PowaTRIM does this without consuming energy. It
uses the inductive power you’re already consuming and re-introduces this surplus power onto the adjacent phases.
Reducing kVAh based electricity Cost & Consumption
kVAh & kWh By the amount of current that’s magnetically induced into circuit. Approx.70% of savings.
All PowaTRIM savings are determined by the site inductive load profile, typically:
Surges and spikes (IE). “Dirty Power” that’s filtered & re-introduced as usable power. Approx. 20% of savings.
Total harmonic current reduction. Approx. 5% of savings.
I2R losses due to poor power factor. Approx. 5% of total savings
Cost Benefit Analysis
Energy Savings 55000 kWh/Year
Cost Savings Rs.4.5Lacs/Year Investment 2.0 Lacs Payback 5.3 Months
Innovative Project (4)
REPLACEMENT OF CHILLER CONVENTIONAL PUMPS WITH VFD OPERATED PUMPS
Cost Benefit Analysis
Energy Savings 201000 kWh/Year
Cost Savings Rs.16.5Lacs/Year
Investment 10.0 Lacs
Payback 7.25 Months
Statement
Fortis was initially designed for 30 meters head as two more story's were passed and proposed to be constructed as and when beds expansion would be needed, hence Condenser, Primary and Secondary pumps at chiller plant were designed on higher rating , but since it was decided to go horizontally expansion due to purchase of adjacent plot, we proposed to reduce the load and converted the vertical pumps with VFD and IE3 motors resulted in savings.
After Before
BEFORE AFTER
Description QTY KW Head (Fts) KW Head (Fts)
Primary Chilled Water Pump 4 60 45.93 30 25
Secondary Chilled Water Pump 4 67 65.62 48 65
Condenser Water Pump 4 148 82.02 74 55
12 275 Kw 152 Kw
Difference 123 Kw
Cost benefit
analysis for new
pumping system
ENCON PROJECT - 5
AUTOMATIC CHILLER TUBE CLEANING SYSTEM
Before After
Cost Benefit Analysis
Energy Savings 62272 kWh/Year
Cost Savings Rs.5.1Lacs/Year Investment 10.0 Lacs Payback 23 Months
Ball Storage Tank
Condenser Water inlet Ball Arrester
Control Panel
Condenser
Auto Valves
The benefits:
• Improved operating efficiency
• Extended chiller life cycle
• No chiller downtime
• Low cleaning system operating costs
• Lower water treatment costs• Environment friendly
Challenge: Since water entering to cond3ensor through various stages after heat exchange, deposits or
scaling is imminent.
Working: The automatic tube cleaning system features specially developed sponge balls, which are
injected into the chiller condensing water flow to provide continuous tube cleaning while the chiller is in
operation.
Statement: Chiller Operation to remain Efficient
ENCON PROJECT- 6
REPLACEMENT OF CONVENTIONAL AHU’S WITH VFD OPERATED AHU’S
AND OLD DAMAGED FCU’S WITH NEW FCU’S
Cost Benefit Analysis
Energy Savings 77200 kWh/Year
Cost Savings Rs.6.4Lacs/Year Investment 9.92 Lacs Payback 18.7 Months
After 18 years of hospital running it was observed that complaints of temperature and humidity were on the rise, hence an energy audit was carried out and based on that report we decided to replace old inefficient AHU's with VFD operated ahu's. and damaged AHU's old coils were also replaced resulted in units savings. As good practices identified inefficient old FCU's with new ones for better efficiency.
Statement
ENCON PROJECT- 7
STP MODIFICATION WITH UV & UF FILTRATION
Cost Benefit Analysis
Electrical Savings 15000kWh/year
Cost Savings Rs.1.2Lacs/Year Investment 1.75 Lacs Payback 17 Months
Statement
STP NEEDS MODIFICATION TO REUSE ENTIRE WATER
ENCON PROJECT- 8
Challenge : With stricter Regulatory requirements and also to improve ground water table, reuse of water in horticulture , Flushing , Solar Panel cleaning and in Cooling towers was the need of the hour.
MODIFICATION IN HVAC COOLING TOWERS & IE4 MOTORS FOR COOLING TOWER
Cost Benefit Analysis
Energy Savings 53200 kWh/Year
Cost Savings Rs.4.4Lacs/Year Investment 5.5 Lacs Payback 15 Months
Statement
The conventional cooling towers were overhauled and placed VFD in CT fans, fills and nozzle got replaced for best efficiency., 12% reduction in cooling tower motor load
ENCON PROJECT - 9
ENCON PROJECT- 10 HYDROPATH
Statement
This is used in low pressure steam line of laundry. It protect the machines from lime scale build-up and removes exiting lime scale. It fits around pipes and works independent of flow rate. Approx. saving 450 SCM with improvement in machine performance.
Cost Benefit Analysis Energy Savings Thermal Savings
20000 kWh/Year 45Ton/year
Cost Savings Rs.2.0Lacs/Year Investment 2.0 Lacs Payback 12 Months
MODIFICATION OF LIGHTING CIRCUIT – ACROSS THE HOSPITAL
Cost Benefit Analysis
Energy Savings 9250 kWh/Year
Cost Savings Rs.0.74Lacs/Year Investment 0 Lacs Payback 0 Months
Statement
By placing motion sensors and timers for efficient use in LED's.
ENCON PROJECT- 11
MODIFICATION OF THE DIVERTER PLUNGER IN SHOWER MIXTURES
Statement
All the patient rooms washrooms have been retro engineered. This has resulted in a saving of 3% overall in hot water production and circulation pump load
Cost Benefit Analysis
Energy Savings 15000 kWh/Year
Thermal Savings Rs.25 SCM/Year Cost Savings 1.4 Lacs Investment 0 Lacs
ENCON PROJECT- 12
ADDITIONAL AUTOMATIC POWER FACTOR CONTROLLER
Cost Benefit Analysis
Energy Savings 73000 kWh/Year
Cost Savings Rs.6.0Lacs/Year Investment 9.0 Lacs Payback 18 Months
Statement
To maintain PF 1 remains a challenge, saved on extra charges on account of PF
ENCON PROJECT- 13
INSTALLATION OF ENERGY METERS IN ALL ELECTRICAL FEEDERS
Statement
To capture the in time power consumption, installed energy meters in each and every power DB, resulted in real time capturing of data for analysis/ losses and optimization.
ENCON PROJECT- 14
Use of New Technology
Automated Water Taps
Sprinkler System for Irrigation
Automated Urinals
Water Recycling
STP Plant
ETP Plant
UV/SOFTNER in STP
RO Reject Water
Innovation
MGF Backwash
AHU Condensate
Cooling Tower blow down Reuse Efficiency Improvement
Benchmarking
Auditing
Monitoring & Analysis
Improving
Renewable Substitution
Rain Water Harvesting
Municipal Waste Water Treatment and Reprocessing
WATER – CONSERVATION METHODOLOGY
Water Flow Restrictors
Water Less Urinals - Bio Tabs
100
150
200
250
300
350
2015-16 2016-17 2017-18 2018-19 2019-20
345
280
245 235 225
Water Consumption Trend KL/Day
UTILIZATION OF RENEWABLE AND GREEN ENERGY
SNo Description of scheme Amount INR Year Remarks
1 STP Modification with UV/UF 120000 2019-20 Annual saving of 20000 Units
2 Modification of Lighting circuit - Across the Hospital 78500 2019-20 Annual saving of 9250 Units
3 Modification of the diverter plunger in shower mixers. 140000 2019-20 Annual saving of 15000 Units
4 Thermal recycling at laundry 182000 2019-20 Annual saving of 25000 Units
5 Agnisumukh Gas Burner 1482000 2019-20 Annual saving of 00 Units
6 Additional Automatic power factor controller 600000 2019-20 Annual saving of 73000 Units
7 HYDROPATH 200000 2019-20 Annual saving of 20000 Units
8 Use of foam flow in taps 70000 2018-19 Annual saving of 20000 Units
9 Shutting off One AHU instead of 2 during night operations 10000 2018-19 Annual saving of 24000 Units
10 PNG (Piped Natural Gas) for Kitchen 70000 2018-19 Annual saving of 00 Units
11 PNG (Piped Natural Gas) for boilers 750000 2018-19 Annual saving of 28800 Units
12 Installation of ETP and reutilization of water 1000000 2018-19 Annual saving of 60000 Units & Maintain Ground Water table
13 LED Replacemwent (Phase 3) 1000000 2018-19 Annual saving of 99000 Units
14 LED Replacement for balance CFL Lights 100000 2017-18 Annual saving of 50000 Units
15 Solar Photovoltaic Panels in Parking and lift mumty 9000000 2017-18 Annual saving of 275000 Units
Summary Co2 Emission Reduction 590 MT (App) 14682500 Savings 7.19LkWh Units
Results Achieved on Green Initiatives
Green Initiatives4538 Amount Saving
INR (Million) CO2t
Reduction Equivalent to trees planted
Going the LED way 3.39 432 29376 Solar electricity generation Rooftop 0.25 68 4674 Solar water heating 1.98 57 148 Solar electricity generation in car parking
0.2 65 4538
Rain water harvesting pits Improved ground
water security
Going the LED way Solar electricity generation Rooftop
Solar water heating Solar electricity generation in car parking
Rain water harvesting pits
Reduction of 622 CO2t by
these projects
UTILISATION OF RENEWABLE ENERGY SOURCES
Technology (Electrical)
Type of Energy Onsite/Offsite Installed Capacity
(Kw)
Generation (LkWh)
% of Overall electrical Energy
1 Solar PV Panels Onsite 420kW 5.399 9.69%
Technology (Thermal)
Type of Energy Onsite/Offsite Installed Capacity
(kCal) Usage LkCal
% of Overall Thermal Energy
1 Solar Water Heater Onsite 8000 25.55 70%
Grid Power 89
DG 1%
Renewable Energy
10%
ENERGY CONSUMPTION TREND 2019-20
Utilization of waste material
FHM Generates mainly these type of waste
Water, Paper, waste oil and E waste.
Water waste is treated by using STP/ETP and reused in
Gardening/Landscaping.
We use identified vendor for paper, waste oil and E waste for
recycling as per state laws.
Condensation recovery in heating water for daily usage
• 500 KLD Sewage Treatment plant with ultra filtration membrane. • 100% Recycled water using for irrigation, cooling tower and flushing system. Zero discharge
• Segregation of dry and wet garbage at kitchen • Kitchen waste being used in making manure. • Dry garbage being composed too and left over being given to authorized persons for making bio gas.
DRY AND WET GARBAGE FROM KITCHEN SEWAGE TREATMENT PLANT
UTILIZATION OF WASTE MATERIAL
Fortis Mohali is committed to GHG reduction not only by reduction of its own facilities but also creating Benchmarks for Indian Buildings as Smart Building. Fortis Mohali Every year allocates Budget for Energy Efficiency program as a corporate initiative and allocate the budget based on Global competition, any project below 5years of pay back qualifies for it, This year Fortis Mohall has allocated approx. 10 Million INR for this program Globally. 2019-20 Project was part of the same corporate budgeting program. Reduction of 2153 Tons of CO2 in last year.
GHG Inventorisation
FORTIS HOSPITAL, MOHALI
POLICY ON GREEN PURCHASE AND CLEAN HOSPITAL
PREPARED BY Head Engineering
APPROVED BY Director
Valid till: 30/6/21
Reviewed on: 1/7/19
FHM - 1B
Page No: 1 of 1
1.0 Purpose
To mitigate ill effects of environment (GREEN) on patients and staff and even hasten the
recovery process through infection free ambience (CLEAN).
2.0 Scope
The entire hospital building (structural Requirement), processes followed and outcome
measured.
3.0 Procedure
3.1 The process shall cover the
a) Environment Management Requirement
b) Structural Requirement
c) Process Requirement
d) Outcome Requirement
4.0 Responsibility
Various departments across FHM FOLLOWING DIFFERENT LAWS AND REGULATIONS
APPLICABLE AS PER STATE, NATIONAL LAWS AND FOLLOWS JCI/NABH/AHPI
GUIDELINES.
5.0 Outcome:-
a. Hospital has established monitoring, review & verification of Procedures
b. Reports ( Third Party Validation)
c. Purchasing green products
5.0 Reference:
http://ahpi.in/AHPI%20Standard%20for%20Green%20&%20Clean%20Hospital.pdf
GHG MITIGATION MEASURES
Landscaping -5Acre Appox. The Hospital consists over 45% of landscapes with over 150 varieties of green plantation of native, less water consumption plants. Hence reduction in water and power consumption which caters to reduction in carbon emission and environmental friendly. All water is being utilized STP water.
Segregation of dry and wet garbage
at kitchen
• Wet garbage 100% recycling
through authorized persons for bio
gas now.
• Dry garbage 100% recycling .
Rain water harvesting pits
Creation of rain water harvesting pit which is having the capacity to percolate over 76% of rain water considering 3 years of average rainfall, Which is environmental friendly as it improves ground water table.
Environmental Monitoring
100% Compliance against the pollution norms:
DG Sets Stack monitoring.
24 hrs Ambient Noise monitoring
DG Sets Noise monitoring.
Monitoring & controlling of waste water parameter.
Monthly drinking water analysis.
Medical Compressed Air Validation as per ISO 8573-1: 2010 (E)
Carbon Footprint Reduction
Reference IFHE : International Federation of Hospital Engineering 2013
0.00
5.00
10.00
15.00
20.00
25.00
20.11
17.87
16.49
13.13 12.38 11.99
10.73 10.20
20.98
CO2
in T
on
s
ANNUAL CO2e/BED IN TONS
2012 -13
2013 -14
2014 -15
2015-16
2016-17
2017-18
2018-19
2019-20
Bench Mark
0
200
400
600
800
1000
1200
1400
1600
0
286.76 351.78 401.10
559.35
754.01
922.90
1334.23
1571.44
Co2 Tonne
Total savings of CO2e is 2153 Tons by reduction of power
consumption
CO2e Calculation for EB units from Central Electricity Authority of India (0.82kg/unit)
CO2e Calculation for PNG from www.epa.Gov/energy/greenhouses (1.95mtCO2/SCM)
CO2e Calculation for HSD from ecoscore.be (2.64kg/litre)
Green Supply Chain a. Information on Projects implemented– Our Housekeeping cleaning Agents & Card Board and
Wooden Packing Boxes are purchased from identified vendor who manufactures with Recycled material.
b. Information on Evaluation done– Different vendors were evaluated and manufacturing
processes and materials used were certified by FHM as per FHM standard before giving clearance for the Boxes.
c. Information on Benefits achieved- 50% reduction in cost and contribution to green initiative
by the company.
Segregation of dry and wet garbage at kitchen Wet garbage 100% recycling through AGA for piggery
Our Green chillers provide air conditioning comfort with lowest electrical energy
Minimize exposure of building
occupants and cleaning
personnel to potentially
hazardous chemical, biological
and particulate contaminants
Education imparted to customers, vendors & associates segregation of waste to minimize land pollution
Cafeteria Food Waste Pantry Waste Dry Waste
WET GARBAGEE
DRY GARWAGE
PSMC APPROVED VENDOR
PSMC APPROVED VENDOR
E W
ASTE
PLA
STIC
GLA
SSES
PAPER
META
LS
•Natural lighting in patient areas
•Green house keeping
•Better Indoor Air Quality
•Sound Reduction
•Mercury free hospital
•20t-40% Energy savings
•35-40% water savings
•Good day lighting
•No sick building syndrome
•Faster patient recovery
BEST PRACTICES FOLLOWED
THE NEW WAY FORWARD
• Initiated and implemented ERC (Energy Review Committee) management system for measuring and
benchmarking for Conservation of energy and water .
• ERC committee consists of facility manager & building managers to monitor, control and optimize power and
water consumption.
• Added the responsibility as part of KRA’s of annual performance appraisals.
• Have set targets month wise , quarter wise and annually by effective implementation of metering system,
EMS and BMS.
• Formed sub teams for building supervisors & technicians to create healthy competition among the teams for
enhanced performance and focus.
• Award and Reward systems implemented for innovative and creative ideas.
Involvement of Employees, Team work in Encon, Monitoring
& Reporting formats and Implementation Methodologies
Involvement of Employees, Team Work in Encon
Suggestion from all levels of employees on energy conservation Implementation of R&R scheme for energy & water conservation project. Training /awareness for contract labour/Office staff on energy conservation. Conducting technical training in the area of Energy conservation. Sharing of best practices among the industries Objectives are set for employees on reduction in energy & water FHM Top management committee involved in Swatch Bharat Campaign conducted in
Hospital for employees and stake holders. FHM Top management committee involved in planting of trees in Hospital premises
on world environment day
MEASURING AND MONITORING
Morning Meet with all HOD & GM
Daily HLP consumption compared to last year
Online energy data capturing system
Online HVAC monitoring system (BMS)
Energy meters for load capturing
Engineering Executive Meet
Compare and analyze deviation in shift, shift-wise
Daily energy report
Monthly report on the energy indices
Monthly performance review
Energy trends analysis
Engineering Staff level meet
Action plan for any deviation
17-Jun-16
Today Budg. MTD Act.MTD Budg.YTD Act.YTD
%Var
MTD
%VarY
TD 17/06/2015 MTD Diff. MTD. Jun-15
Energy consumed for the day units 24870 378533 413070 1605533 1730785 -9.12 -7.80 25830 397650 15420 720045
Total Day unit 14505 244610 1024835
Total Night unit 10365 168460 705950
D.G. unit 0 7987 34181 0 5211 2776 8742
Total unit 24870 421057 1764966 25830 402861 18196 728787
Power factor 0.99 0.99
H.S.D.Consumption in Boilers(Ltrs) 700 12215 56065 695 12435 -220 21710
H.S.D.Consumption in D.G.(Ltrs) 0 2216 9495 0 1425 791 2419
Total H.S.D. Consumption (Ltrs) 700 16433 14431 76439 65560 12.18 14.23 695 13860 571 24129
Medical Gas Oxygen Consumption 1310 22417 104558
Medical Gas Nitrous oxide Cons. 0 7 24
Energy consumed for Chiller TR 1 4320 57840 203520 4320 41280 16560 95760
Energy consumed for Chiller TR 2 1200 18960 68880 1200 20160 -1200 36480
Energy consumed for Chiller M/C 4 2093 49953 197975 3293 61353 -11400 101936
Total unit 7613 126753 470375 8813 122793 3960 234176
Oncology block Consumption 2317 34250 144699 2293 35666 -1416 64143
Energy consumed MRI Unit 570 9960 46020
Energy consumed for Laundry 262 4350 19334
Energy consumed for CSSD 168 2344 12680
Energy consumed for Rehab 664 11216 44976
Energy Genrated by Solar System 69 1273 6482
Energy consumed for PET CT 100 1745 7915
Energy consumed for LINAC 104 1780 7752
Raw Water total production(KL) 640 11430 46090
Raw Water Consumption (KL) 497 8481 27637
Municipal Corporation water (KL) 13 201 947Solar water system Cons.(KL) 25 533 2107
Running time of Equip. (hrs)Running time
of Equip. (hrs.)Running time of Equip. (hrs.)
Running time
of Equip. (hrs.)YTD Budget
Running
time of
Equip.
(hrs.)
Running time
for Eqpt. (hrs)
Act.MTD
2015
Act.YTD
2015-16
PSEB power fail 0.00 NA 9.05 NA 35.35 0.00 5.40 37.20
Chiller no-1 0.00 NA 0.30 NA 0.40 0.00 5.40 7.50
Chiller no-2 0.00 NA 0.50 NA 0.50 1.30 5.55 7.50
Chiller no-3 14.15 NA 162.55 NA 543.25 9.45 77.40 489.00
Chiller no-4 8.20 NA 195.50 NA 777.05 13.00 242.15 761.25
HW Generators-2 0.00 NA 0.00 NA 0.00
Boiler no-1 11.55 NA 152.20 NA 628.89
Boiler no-2 13.07 NA 155.64 NA 626.16
Boiler no-3 0.72 NA 114.63 NA 389.22
Boiler no-4 0.00 NA 5.60 NA 318.75
DG-1 0.00 NA 5.35 NA 25.05
DG-2 0.00 NA 1.00 NA 11.05
DG-3 0.00 NA 7.35 NA 20.40
BOREWELL-1 9.75 NA 192.92 NA 648.37
BOREWELL-3 3.00 NA 29.45 NA 298.20
RO- WTP 25.00 NA 376.00 NA 1471.20
AIR COMPRESSOR-1 0.00 NA 0.00 NA 0.00
AIR COMPRESSOR-2 0.00 NA 0.00 NA 0.00
AIR COMPRESSOR-3 0.00 NA 75.00 NA 294.00
AIR COMPRESSOR-4 6.83 NA 107.48 NA 539.15
AIR COMPRESSOR-5 5.55 NA 48.58 NA 316.22
VACUUM PUMP-1 0.00 NA 23.07 NA 729.90
VACUUM PUMP-2 11.44 NA 197.16 NA 874.12
VACUUM PUMP-3 12.00 NA 166.50 NA 166.50
VACUUM PUMP-4 0.00 NA 20.53 NA 54.87
VACUUM PUMP-5 1.91 NA 21.23 NA 51.54
AGSS 20.00 NA 212.67 NA 919.77
ELECTRICIAN
• Recording Units shift wise
SHIFT ENGINEER
• Formatting Daily Report
CHIEF ENGINEER
• Discussing and Analyzing with All HOD’s and Engineers
ENCON – O&M BEST PRACTICES Practice FORTIS,
MOHALI
Adaption of Energy Management System Yes
Adaption of Environmental Management System Yes
Use of automated building Management System Yes
Use of Energy performance Indicator (KWH/Pax, KWH/TR ) Yes
Metering of Tenant energy Yes
Reporting of carbon emission to CDP Yes
Conduct energy audits Yes
Internal & External Stakeholder engagement Yes
Cleaning of Air Filters in AHUs and FCUs. Yes
Timers & Motion sensors for external & Corridors Lighting Yes
Chemical Treatment for make up water Yes
Mapping & reduction of carbon emission as per ACA Yes
Automatic Scheduling for AHUs and Ventilation fans. Yes
De-scaling of Water Cooled condenser tube and cleaning of Air Cooled condensers. Yes
Set point of chillers are manually controlled based on ambient condition. Yes
Sharing of best practices with others hospitals Yes
Use of renewal energy for day to day operations Yes
WHERE WE ARE TODAY
Benchmarks 17762 KWh/Bed & 200kWh/m2 (By Bureau of Energy Efficiency,
Govt. of India ECO-III project)
Reduction of CO2e by 2153MT (2017-20)
141 137 130 126 116 111
20111 16014 15100 14626 13082 12436
348 425 435 435 448 448
1
10
100
1000
10000
100000
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
SEC in kWh/M2 Total kWh/Bed No. Of Beds
Long Term Vision On Energy Efficiency We aim at bringing down our SEC of 111 to double digit figure in the future.
Zero CFC gas emissions from any system at the facility.
Maximum clean Energy use at the facility through renewables
100% recycling of paper and plastic waste.
Accreditation from IGBC/ISO50001, BEE, AHPI etc.
SUPPORT NEEDED:
Technical:
Further hiring the right consultants for other Energy conservation activities at the facility in any form (Building construction, resource conservation etc.).
Financial support:
The investment, Par of the monetary Energy saving is given to FHM that is further used for sustainable activities at the hospital
Supplier Engagement:
Need consultant for IGBC/ISO50001 certification
Energy managers and technical support available for FHM
ENCON Roadmap – Sustaining continual
improvement
Condensate
recovery from
Boilers
25000units & 12 tons HSD per
Annum
Energy Efficient LED Lights Phase II
50000 units/annum
Biomass
Gassifier
2ton HSD/Annum VFD Operated
Vacuum Pumps
70000 Units/Annum Solar Water Heating
System
50000 units and 42 MT of CO2
REDUCTION
Geo Thermal System
for HVAC
250000 units & 211MT of CO2 REDUCTION
Solar
Photovoltaic
Lighting
300000Units & 253 MT of CO2 EMISSION
REDUCTION
Right now % Renewable
Electrical 10 %
PNG for Boilers
469 MT of CO2 reduction
ENCON Roadmap – Sustaining Improvement
16% by 2021
Solar PV Panels –
Balance for Façade and
Parking space
225000Units & 185 MT of CO2 EMISSION REDUCTION
Clean and Green Energy 19 %
Renewable
Energy
FUTURE ENCON PROJECTS FY 2020-23
Year Description
2020-21 VFD’s on Identified AHU’s for Patients wards
2020-21 Geo Thermal system to stop usage of Cooling Towers for water cooled Chillers
2020-21 Solar PV Panels – Balance for Façade and Parking space
2021-22 Heat Pump for Hot Water
2021-22 Power Optimizer for Chiller Machines
2022-23 Harnessing Wind Energy
2022-23 Renewable Energy through Online Power Trading
Going forward
130
By 2017
126 By 2018
116
Yesterday
111 Today
107
By 2021
EPI REDUCTION BY 11% & CO2 Reduction by more than 15%
99 By 2022
QUALITY ACTIVITIES
BMW
Management
Hand Hygiene
Patient Safety
Medication
Safety
• Free Treatment of Acid Attack
Survivors
• Patient Support Groups
• Rotary Heart line project
• Hands On Heart Club
• Free Checkup and Screening
Camps
• Organ Donation
• School Buddies Program
SOCIAL ACTIVITIES
List of Certifications Received Over the years..
NABH 2008 NABL
2002
NABH(NURSING
EXCELLENCE) 2016 NABH 2011
NABH 2014 NABH(BLOOD
BANK) 2013 YEARLY
REACCREDITATION
Certificate No. : M-
0038
NABH 2017
NABH(NURSING
EXCELLENCE) 2018
JCI 2007
JCI 2010
JCI 2013
JCI 2016
NABH(BLOOD
BANK) 2010
NABH(BLOOD
BANK) 2016
JCI 2019 NABH 2020 NABH(BLOOD
BANK) 2019
FHM Awards & Recognition
BEE NATIONAL ENERGY CONSERVATION AWARD 2015
Doc n Doc Gammex Saviour - Best Multispecialty Hospital - 2014
Indian Health & Wellness Awards 2016
Pan Fortis Innovation Award - 2014
Intel Embedded Challenge Award for
Innovation in Industry (Catheter
reprocessing) 2014
Best Sustainable Hospital Project
Award by HBII-MEDGATE - 2014
AHPI Award for Quality Beyond
Accreditation - 2015
State Energy Conservation Award PEDA-2019
No. 1 Private Multispecialty Hospital
in Chandigarh – The Week – Nielsen
Best Hospitals Survey -2015
Asia Pacific Hand Hygiene Excellence Award- 2015
AHPI Award for Best Green Hospital- 2019
NABH Nursing Excellence- 2016
NABH Nursing Excellence- 2016
Multispecialty Hospital in Chandigarh – The Week – Nielsen Best Hospitals Survey – 2015, 2014
CII National award for Excellence in Energy Management- 2016, 2017,2018
AHPI Award for Quality Beyond Accreditation - 2019
Not just lives, but saving the earth as well.