CHECK LIST DATA ELECTRICAL HEJ/SS-WOR/FO/00/15/007
Job Order No. : MOTOR NAME PLATE :
CUSTOMER : MAKER : TYPE & FRAME : /
Start of Inspection : CAPACITY : PHASE :
EQUIPMENT No : VOLTAGE : INSL CLASS :
Job Description : CURRENT : SERIAL NO :
FREQUENCY : LS BEARING :
SPEED/POLES : / OS BEARING :
1. Resistance test Date : Date :
* Sebelum Overhoul ** Sesudah Overhoul
( - ) = Ω ( - )= Ω
( - ) = Ω ( - )= Ω
( - ) = Ω ( - )= Ω
Standart :
2. Megger Test = VDC;1 mnt Megger Test = VDC;1 mnt
* Sebelum Overhoul ** Sesudah Overhoul
Phase R = Ω Phase R = Ω
Phase R = Ω Phase R = Ω
Phase S = Ω Phase S = Ω
Standart :
3. Accessories
Termistor = Pcs
RTD's = Pcs
Heater = Pcs
3 RUNNING TEST NO LOAD
3.1 Electrik Measurement Running test date:
Time Freq VOLTAGE Ampere Speed Temperature (ºC)
(min) (Hz) R - S R - T S - T R S T Rpm LS Fr OS
5
15
30
60
3.2 Vibration Measurement
Element
D i r e c
t i o n
No Load Load
POSITION POSITION
DE NDE BASE DE NDE BASE
5 30 5 30 5 30 5 30 5 30 5 30
DISP H
(m p-p) V
A
VEL H
(mm/sec) V
A
ACC H
(Thru,O) V
(m/sec²) A ACC H
(OA) V
(m/sec²) A
ACC H
(Peak) V
(m/sec²) A
NOTE:
Measurement By Electrical/Tested Quality Control