1
BIO-DATA OF CHIEF OF ORGANIZATION
NAME : ABID HUSAIN
DESIGNATION : Proprietor
DATE OF BIRTH : 12/09/1954
NATIONALITY : Indian
QUALIFICATION : B.Sc. Engineering (Mechanical) from
A.M.U., Aligarh) 1980.
EXPERIENCE : (i) One year with M/S ENCON Services
New Delhi, as design Asstt. for steel
Rolling Mills (1981-1982).
(ii) 14 years with M/s Gupta Consultants a leading
HVAC Consultants in India, as a Senior Design
Engineer (1982-1995).
(iii) Now working as an independent Consultant for
System Design and Project planning
in HVAC, Electrical and Connecting Services,
Plumbing and Fire Fighting Services and BMS.
(1995 onwards).
MEMBERSHIP : Life Member ISHRAE, India.
: American Society of Heating, Refrigeration &
Airconditioning Engineers
USA M - 5206500
: Consulting Engineers Association of India
(CEAI) M - 210
2
LIST OF STAFF
Sl.
No.
Name Designation Qualification Year of
Passing
1 Mr. Abid Husain Principal Consultant B. Sc (Engg.) 1980
2 Mr. Mohd. Shahan Subhani Sr. Design Engineer B.E. (Mech.) 2004
3 Mr. Mohammed Ruman Abid Sr. Design Engineer B. Tech (Mech.) 2006
4 Mr. Syed Mazhar Hasnain Sr. Design Engineer B.E. (Mech.) 2005
5 Mr. Sarhan Abbas Sr. Design Engineer B.E. (Mech.) 2005
6 Mr. Abhishek Kumar Sharma Design Engineer B. Tech (Mech.) 2011
7 Mr. Mohammed Adnan Design Engineer B. Tech (Mech.) 2012
8 Mr. Yogesh Bhardwaj Design Enginner B. Tech (Mech.) 2013
9 Ms. Gulshan Bano Office Executive M.A (Economics) 1998
10 Mr. Mohd. Asif Design Calculation &
Quantity Surveyor
M.Sc.
(Mathematics)
2002
11 Mr. Zia-Ur-Rehman Design Enginner B. Tech (Mech.) 2013
12 Mr. Jaman Ali Khan AutoCAD
Sr. Draughtsman
Diploma
(Mechanical)
1997
13 Mr. Mohd. Shahzad AutoCAD
Sr. Draughtsman
Diploma
(Mechanical)
2004
14 Mr. Wasiullah AutoCAD
Sr. Draughtsman
Diploma
(Mechanical)
2000
15 Mr. Neyaz Ahmad AutoCAD Draughtsman I.T.I (Mechanical) 2000
16 Mr. Mohd. Asif AutoCAD Draughtsman I.T.I (Mechanical) 2010
17 Mr. Mohd. Asif AutoCAD Draughtsman APEX Auto Cad
Drafting
2008
18 Mr. Hemant Kumar AutoCAD Draughtsman Diploma
(Mechanical)
2012
19 Mr. Mohammed Faizan Meraj AutoCAD Draughtsman Diploma
(Mechanical)
2013
20 Mr. Arsh Hussain AutoCAD Draughtsman Diploma
(Mechanical)
2015
21 Mrs. Nahid Khan Computer Operator B.A 2001
22 Mrs Taramani Receptionist M.A (Sociology) 2003
23 Mr. Arshad Ayyub Accountant M.Com 2010
24 Mr. Rizwan Ahmad Office Assistant Matric 1999
25 Mr. Ramdas Office Assistant Matric 1984
3
LIST OF HVAC PROJECTS
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
1. Industrial Projects
1.1 Hero Honda Motors
Gurgaon
Hero Honda Motors Ltd.
(Motorcycle Industry)
50 1,00,000 Completed
(2007)
1.2 Hero Honda Motors
Dharuhera
Hero Honda Motors Ltd.
(Motorcycle Industry)
500 50,000 Completed
(2007)
1.3 Hero Honda Motors
Haridwar
Hero Honda Motors Ltd.
(Motorcycle Industry)
2500 50,00,000 Completed
(2008)
1.4 R&D Centre
Hero Honda Motors
Gurgaon
Hero Honda Motors Ltd.
(Motorcycle Industry)
150 50,000 Completed
(2007)
1.5 R&D Centre
Hero Honda Motors
Dharuhera
Hero Honda Motors Ltd.
(Motorcycle Industry)
350 75,000 Completed
(2007)
1.6 ITD Centre
Maruti Udyog Ltd.
Gurgaon
Aadharshila Designs Pvt. Ltd.
New Delhi
(Car Accessories Industry)
100 25,000 Completed
(2008)
1.7 Maruti Udyog Ltd.
Gurgaon
Aadharshila Designs Pvt. Ltd.
New Delhi
(Car Accessories Industry)
250 1,00,000 Completed
(2008)
1.8 Magneti Marelli
ECU Plant
Manesar
Aadharshila Designs Pvt. Ltd.
New Delhi
(Car Accessories Industry)
225 50,000 Completed
(2009)
1.9 Unitech Machines Ltd. Aadharshila Designs Pvt. Ltd.
New Delhi
400 1,50,000 Completed
(2009)
1.10 Inergy Factory Building
Manesar
Aadharshila Designs Pvt. Ltd.
New Delhi
100 50,000 Completed
(2009)
1.11 Neolite ZKW Factory Building
Bahadurgarh
Saby Sen & Associates
New Delhi
600 2,00,000 Completed
(2011)
1.12 New Holland Tractors
Greater Noida
Ceacon Consultants
New Delhi
(Tractors Industry)
100 50,000 Completed
(2009)
1.13 Nippon Denso Factory
Surajpur
Nippon Denso India Ltd.
(Car Accessories Industry)
50 20,000 Completed
(2008)
1.14 HAL
Lucknow
Hindustan Aeronautics Ltd.
(Fighter Aircraft Industry)
100 50,000 Completed
(2007)
1.15 HAL
Korwa
Hindustan Aeronautics Ltd.
(Fighter Aircraft Industry)
125 50,000 Completed
(2006)
1.16 Jindal Steel Factory
Hissar
Jindal Steel & Power Ltd.
(Steel Industry)
150 60,000 Completed
(2006)
1.17 Jindal Steel Factory
Tamnar
Jindal Steel & Power Ltd.
(Steel Industry)
100 40,000 Completed
(2006)
1.18 Minda Factory
Greater Noida
Minda HUF
(Car Accessories Industry)
75 30,000 Completed
(2006)
1.19 Fena Factory
Roorkee
Nirman Consultants Pvt. Ltd.
New Delhi (Soap Factory)
60 50,000 Completed
(2007)
1.20 X O TRONIC LTD.
Gurgaon
IT Industry 100 50,000 Completed
(2007)
4
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
1.21 Shivam
Faridabad
Garments Industry 40 1,00,000 Completed
(2006)
1.22 Bikanervala Factory
Faridabad
Bikanervala Food Pvt. Ltd. 200 50,000 Completed
(2009)
1.23 Timex Factory
Noida
Designaxis 100 50,000 Completed
(2009)
2. Commercial Buildings
2.1 Redevelopment of Nauroji Nagar
New Delhi
Sikka & Associates
New Delhi
15000 50,00,000 Running
2.2 Scope Office Complex
New Delhi
Scope
New Delhi
2500 7,00,000 Completed
(2008)
2.3 DLF W – Block (Bldg – 6) Gurgaon Hafeez Contractor
Mumbai
8000 12,00,000 Completed
(2008)
2.4 Scope Minar
Delhi
Scope
New Delhi
1100 5,00,000 Completed
(2000)
2.5 Supreme Court Complex Thimphu
Bhutan.
Benninger Architects
USA Inc.
500 5,00,000 Completed
(2008)
2.6 Indira Gandhi Pratisthan
Lucknow
Sikka & Associates
New Delhi
750 2,50,000 Completed
(2007)
2.7 Bapu Bhawan
Lucknow
U.P.R.N.N. Ltd.
Lucknow
450 2,00,000 Completed
(2006)
2.8 City Court, DLF Sikanderpur
Gurgaon
Hafeez Contractor
Mumbai
1600 2,50,000 Completed
(2007)
2.9 SPLM
Lucknow
D.S. Bhui
Lucknow
700 1,50,000 Completed
(2007)
2.10 Kisan Mandi Bhawan
Lucknow
U.P.R.N.N. Ltd.
Lucknow
600 1,25,000 Completed
(2007)
2.11 IRCON International
New Delhi
Sikka & Associates
New Delhi
650 1,25,000 Completed
(2007)
2.12 Office Complex for Pahwa International Aadharshila Designs Pvt. Ltd.
New Delhi
550 1,00,000 Completed
(2008)
2.13 National Institute of Biological
Noida
HSCC
New Delhi
350 1,25,000 Completed
(2009)
2.14 The Statesman Building
Gurgaon
The Guild of Architects
New Delhi
300 1,00,000 Completed
(2009)
2.15 Power Finance Corporation
New Delhi
Kothari Associates
New Delhi
250 80,000 Completed
(2010)
2.16 Indian National Science Academy
New Delhi
Anshu Mahajan
New Delhi
250 75,000 Completed
(2010)
2.17 Rock Search Office Facility
Noida
SWBI Architects
New Delhi
200 1,00,000 Completed
(2011)
2.18 Bestech Corporate Office
Gurgaon
Interior Designers
New Delhi
700 50,000 Completed
(2008)
2.19 Triburg
Gurgaon
SPA Design
New Delhi
2500 65,000 Completed
(2009)
2.20 Cairns Energy
Gurgaon
Framework Interiors
New Delhi
100 75,000 Completed
(2007)
2.21 Delhi Stock Exchange
New Delhi
Design Team
New Delhi
100 40,000 Completed
(2006)
5
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
2.22 Indomag, Steel Technology
New Delhi
Framework Interiors
New Delhi
80 60,000 Completed
(2006)
2.23 New United Nations House Thimphu,
Bhutan
Benninger Architects
USA Inc.
300 20,000 Completed
(2008)
2.24 Office Building for Oriental Structural
Engg. Ltd. Gurgaon
Sikka & Associates
New Delhi
150 50,000 Completed
(2007)
2.25 Asian News International
New Delhi
The Guild of Architects
New Delhi
175 50,000 Completed
(2007)
2.26 Quadrant Infotech
Gurgaon
Space Design Group
New Delhi
150 40,000 Completed
(2006)
2.27 Bestech Chamber
Gurgaon
Vastukriti Architects
New Delhi
300 30,000 Completed
(2007)
2.28 Socio Culture Centre
Delhi
Pradeep Sachdeva Design
Associates, New Delhi
150 50,000 Completed
(2007)
2.29 IREDA
New Delhi
Aadharshila Designs Pvt. Ltd.
New Delhi
100 30,000 Completed
(2007)
2.30 Hindustan Thomson Limited
New Delhi
S. Sen Architects
New Delhi
120 40,000 Completed
(2006)
2.31 Regus Jasola Framework Interiors
New Delhi
50 20,000 Completed
(2007)
2.32 ARCI Technical Centre
Gurgaon
Aadharshila Designs Pvt. Ltd.
New Delhi
80 25,000 Completed
(2009)
2.33 Bestech Corporate Office
Plot - 90, Gurgaon
Bestech Group 300 30,000 Completed
(2008)
2.34 Pentaserv
Gurgaon
Space Design Group
New Delhi
30 10,000 Completed
(2008)
2.35 ISBT Kashmiri Gate
Delhi
Sikka & Associates
New Delhi
900 2,50,000 Completed
(2010)
2.36 Vipul Business Park
Gurgaon
Sikka & Associates
New Delhi
400 2,00,000 Completed
(2008)
2.37 R & D Centre for IOCL
Faridabad
Satish Khanna Architect
New Delhi
75 30,000 Completed
(2008)
2.38 GMR Office
New Delhi
Habitat Architects
New Delhi
450 1,50,000 Completed
(2009)
2.39 TV Today Office
Noida
Jyoti Rath Associates
New Delhi
600 1,60,000 Completed
(2009)
2.40 WTT (World Trade Tower)
Noida
ET Infra Developers Pvt. Ltd. 2000 10,00,000 Completed
(2012)
3. Labs / Institutes / School /
Computer Centre / University
3.1 Redevelopment of Nauroji Nagar
New Delhi
Sikka & Associates
New Delhi
15000 50,00,000 Running
3.2 NIT
Rourkela
Arch-En Design
Lucknow
1200 3,00,000 Completed
(2012)
3.3 BDF School Aumgroup Architects
New Delhi
250 1,00,000 Completed
(2010)
6
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
3.4 National Institute of Coal Management
Ranchi
Span Consultants
New Delhi
250 80,000 Completed
(2011)
3.5 TNI Transit Campus
New Delhi
Space Design Group
New Delhi
175 65,000 Completed
(2009)
3.6 British Primary School
New Delhi
Framework Interiors
New Delhi
100 25,000 Completed
(2008)
3.7 Research Centre
Bhopal
HSCC Bhopal 120 40,000 Completed
(2009)
3.8 Ranbaxy Laboratories
Gurgaon
Civtech Consultants
New Delhi
150 20,000 Completed
(2008)
3.9 Laboratory Building
Modipuram
Span Consultants
New Delhi
50 10,000 Completed
(2007)
3.10 Asia Pacific Institute of Management Moti Bahri Architects
New Delhi
100 25,000 Completed
(2008)
3.11 Women College
Jammu (J&K)
-- 60 20,000 Completed
(2006)
3.12 BPCL
Noida
-- 100 50,000 Completed
(2005)
3.13 Birbal Sahney Institute of Palaebotany
Lucknow
-- 50 10,000 Completed
(2005)
3.14 Balibhadra Institute
Greater Noida
-- 150 50,000 Completed
(2006)
3.15 Pearl Academy of Fashion
New Delhi
-- 60 25,000 Completed
(2006)
3.17 Jaypee Institute of Engineering Guna
(M.P.)
Plural Design
New Delhi
300 1,20,000 Completed
(2008)
3.18 ICAT
Gurgaon
Aadharshila Designs Pvt. Ltd.
New Delhi
60 25,000 Completed
(2010)
3.19 Galaxy Global Institute
Ambala
Vijay Gupta Architects
New Delhi
1200 5,00,000 Completed
(2008)
3.20 KCC Institute
Greater Noida
Vijay Gupta Architects
New Delhi
150 60,000 Completed
(2008)
3.21 Scottish High School
Gurgaon
Vijay Gupta Architects
New Delhi
300 75,000 Completed
(2010)
3.22 Central University
Jammu
Sikka & Associates
New Delhi
1000 5,00,000 Completed
(2012)
3.23 IIT Ropar Sikka & Associates
New Delhi
800 3,00,000 Running
3.24 IIT Jodhpur Sikka & Associates
New Delhi
600 2,00,000 Running
3.25 IIIT Delhi Sikka & Associates
New Delhi
600 2,00,000 Running
3.26 IIM Rohtak Upal Ghosh & Associates 1200 4,00,000 Running
3.27 IISER Bhopal Upal Ghosh & Associates 1500 5,00,000 Completed
(2014)
3.28 Shiv Nadar University Dadri HCL 5000 3,00,000 Running
3.29 O.P. Jindal Law University SPA Design Pvt. Ltd. 7500 4,00,000 Running
3.30 Rajiv Gandhi National University of Law
Patiala, Punjab
Kothari Associates
New Delhi
750 2,50,000 Completed
(2010)
7
S.No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
4. Hospitals
4.1 CAPFIMS CPWD 7000 15,00,000 Running
4.2 Goodwill Hospital
Noida
Suresh Arora Associates
New Delhi
50 20,000 Completed
(2006)
4.3 Military Hospital
Bareilly
Arch-En Design
Lucknow
150 60,000 Completed
(2008)
Military Hospital
Udhampur
Arch-En Design
Lucknow
1500 3,00,000 Running
4.4 LNJP Hospital
New Delhi
Sikka & Associates
New Delhi
600 1,50,000 Completed
(2009)
4.5 Arthymia Centre G.B. Pant Hospital
New Delhi
Sikka & Associates
New Delhi
125 50,000 Completed
(2007)
4.6 Dharamshila Cancer Research Foundation
New Delhi
Achal Kataria
New Delhi
70 25,000 Completed
(2003)
4.7 300 Bed Hospital
Bhopal
HSCC
New Delhi
200 75,000 Completed
(2004)
4.8 S.G.P.G.I.
Lucknow
U.P.R.N.N
Lucknow
900 3,50,000 Completed
(2002)
4.9 Jaipur Golden Hospital
Jaipur
Planners Group Pvt. Ltd.
Gurgaon
300 1,20,000 Completed
(2008)
4.10 Balaji Hospital
New Delhi
Planners Group Pvt. Ltd.
Gurgaon
500 2,00,000 Completed
(2006)
4.11 Manav Sevarth Hospital
New Delhi
Planners Group Pvt. Ltd.
Gurgaon
450 1,25,000 Completed
(2007)
4.12 Rajiv Gandhi Cancer Institute
New Delhi
Planners Group Pvt. Ltd.
Gurgaon
450 1,50,000 Completed
(2006)
4.13 SMS Hospital
Jaipur
RUIDP 100 40,000 Completed
(2008)
4.14 Rama Krishna Care Hospital
Raipur
Creative Designers
New Delhi
150 60,000 Completed
(2007)
4.15 Moolchand Hospital
Bikaner
Creative Designers
New Delhi
175 75,000 Completed
(2007)
4.16 Medical College
Srinagar
-- 100 2,50,000 Completed
(2008)
4.17 Modern Medical Institute
Raipur
-- 100 20,000 Completed
(2006)
4.18 S. P. Mother & Child Health, Jaipur -- 50 20,000 Completed
(2006)
4.19 Maharaja Agarsen Hospital
New Delhi
-- 250 70,000 Completed
(2010)
4.20 Medical College
Kannauj (U.P.)
Rajiv Kumar & Associates
Lucknow
1000 2,00,000 Completed
(2012)
4.21 ESIC Hospital
Baddi
School of Planning &
Architecture
New Delhi
100 25,000 Completed
(2013)
4.22 Sadar Hospital
Ranchi
Arch-En Design
Lucknow
1000 2,00,000 Completed
(2011)
8
S.No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
4.23 KGMC
Lucknow
Arch-En Design
Lucknow
900 2,00,000 Completed
(2012)
4.24 Banda Medical College
Banda
Arch-En Design
Lucknow
1600 3,00,000 Completed
(2012)
4.25 SMGS Hospital
Jammu
-- 50 10,000 Completed
(2012)
4.26 All India Institute of Ayurveda
Sarita Vihar, New Delhi
Kothari Associates
New Delhi
900 1,50,000 Completed
(2014)
4.27 Indra Gandhi Memorial Hospital
Maldives
ESIC 400 1,00,000 Completed
(2016)
4.28 ESIC Hospital
Chandigarh
ESIC 300 85,000 Completed
4.29 Jindal Hospital
Hissar
N.C. Jindal Charitable Trust 412.5 1,10,000 Completed
4.30 Jaipur Golden Hospital
Rohini
Jaipur Golden Trust 487.5 1,30,000 Completed
4.31 B.L. Kapoor
Multi-Speciality Hospital
New Delhi
Planners Group Pvt. Ltd.
Gurgaon
18.75 50,000 Completed
4.32 B.L. Kapoor
Multi-Speciality Hospital
New Delhi
Planners Group Pvt. Ltd.
Gurgaon
1500 4,00,000 Running
4.33 Human Care Hospital
Dwarka
New Delhi
Manipal Group of Hospitals
1600 3,00,000 Running
4.34 Nanavati Hospital
Mumbai
Planners Group Pvt. Ltd.
Gurgaon
1825 4,00,000 Running
5. Hotels
5.1 Hotel Taj Ganges
Varanasi
Pradeep Sachdeva Design Associates,
New Delhi
40 10,000 Completed
5.2 Taj Exotica
Goa
Pradeep Sachdeva Design Associates,
New Delhi
12 3,000 Completed
5.3 Hotel Ambassador
New Delhi
Pradeep Sachdeva Design Associates,
New Delhi
262.5 70,000 Completed
5.4 Taj Nadesar Palace
Varanasi
Pradeep Sachdeva Design Associates,
New Delhi
48.75 13,000 Completed
5.5 Taj Lake-End
Udaipur
Pradeep Sachdeva Design Associates,
New Delhi
228.75 61,000 Running
5.6 Lemon Tree Hotel
Pune
The Guild of Architects
New Delhi
210 56,000 Completed
5.7 Lemon Tree Hotel
Hinjawadi, Pune
The Guild of Architects
New Delhi
202.5 54,000 Completed
5.8 Lemon Tree Hotel
Chennai
The Guild of Architects
New Delhi
202.5 54,000 Completed
5.9 Lemon Tree Hotel
Hyderabad
The Guild of Architects
New Delhi
450 1,20,000 Completed
9
S.No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
5.10 Lemon Tree Hotel
Ahmedabad
The Guild of Architects
New Delhi
180 48,000 Completed
5.11 Lemon Tree Hotel
Indore
The Guild of Architects
New Delhi
150 40,000 Completed
5.12 Lemon Tree Hotel
Bangalore
The Guild of Architects
New Delhi
18.75 50,000 Completed
5.13 Lemon Tree Hotel
Bangalore Electronic City
The Guild of Architects
New Delhi
225 60,000 Completed
5.14 Lemon Tree Hotel
Aurangabad
The Guild of Architects
New Delhi
225 60,000 Completed
5.15 Hotel Costa Nicola
Goa
The Guild of Architects
New Delhi
18.75 50,000 Completed
5.16 Lemon Tree Hotel-1
Gurgaon
The Guild of Architects
New Delhi
112 30,000 Completed
5.17 Lemon Tree Hotel-2
Gurgaon
The Guild of Architects
New Delhi
225 75,000 Completed
5.18 Lemon Tree Hotel
Gachibaoli (Hyderabad)
Lemon Tree 240 85,000 Completed
5.19 Lemon Tree Hotel
Jammu
Lemon Tree 225 30,000 Running
5.20 Crowbrough Hotel
Shillong
Vijay Rawal Associates
New Delhi
75 1,00,000 Completed
5.21 Palace Hotel (7Star)
Mumbai
Royal Palms India (P) Ltd.
Mumbai
3500 3,00,000 Completed
5.22 4-Star Hotel
Mumbai
Royal Palms India (P) Ltd.
Mumbai
1600 1,40,000 Completed
5.23 3-Star Hotel
Mumbai
Royal Palms India (P) Ltd.
Mumbai
1500 1,60,000 Completed
5.24 2-Star Hotel
Mumbai
Royal Palms India (P) Ltd.
Mumbai
1300 1,60,000 Completed
5.25 Budget Hotel
Mumbai
Royal Palms India (P) Ltd.
Mumbai
1000 1,20,000 Completed
5.26 Villa Hotel
Mumbai
Royal Palms India (P) Ltd.
Mumbai
450 1,20,000 Completed
5.27 Convention Centre
Mumbai
Royal Palms India (P) Ltd.
Mumbai
1200 90,000 Completed
5.28 Savoy Suits
Noida
Anil Sharma Architects
New Delhi
255 68000
Completed
5.29 Hotel Hans Plaza
New Delhi
ABM
Mumbai
450 1,20,000 Completed
5.30 Anya Hotel
Gurgaon
Hans Hotels 225 60,000 Completed
5.31 Aircraft Hotel
Mumbai
Royal Palms India (P) Ltd.
Mumbai
400 40,000 Completed
5.32 Grand Laxmi Vilas Palace
Udaipur
Kothari Associates
New Delhi
270 72,000 Completed
5.33 Convention Centre
Janakpuri, New Delhi
Gian P. Mathur Associates
New Delhi
225 60,000 Completed
10
S.No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
5.34 Hotel at Cottonpet Road
Bangalore
Kothari Associates
New Delhi
75 75,000 Completed
5.35 Pushkar Hotel
Pushkar
Ajmer Foods Pvt. Ltd. 500 50,000 Running
5.36 Red Fox Hotel
Hyderabad
The Guild of Architects
New Delhi
300 80,000 Completed
5.37 Red Fox Hotel
Kondli
The Guild of Architects
New Delhi
450 1,20,000 Completed
5.38 Red Fox Hotel
Jaipur
The Guild of Architects
New Delhi
225 60,000 Completed
5.39 Gracemount
Mussourie
Plural Design
New Delhi
125 13,000 Completed
5.40 Ambrosia Resorts
Haridwar
Habitat Architects
New Delhi
225 60,000 Completed
5.41 Manali Resort
Manali
Addies Architects
New Delhi
150 40,000 Completed
5.42 Fortune Hotel
Gurgaon
The Guild of Architects
New Delhi
150 40,000 Completed
5.43 Hotel Jurs Plaza
Haridwar
Space Combine Architects 375 1,00,000 Running
5.44 Short Break Resort
Roorkee
Nirman Consultants Pvt. Ltd.
New Delhi
150 40,000 Running
5.45 Raas Haveli
Jodhpur
Lotus Design Services
New Delhi
300 30,000 Completed
5.46 Premier Inn
New Delhi
Dalip Thareja Architect
New Delhi
1000 1,00,000 Completed
5.47 IRA Resorts
Jaipur
Planners Group Pvt. Ltd.
Gurgaon
300 80,000 Completed
5.48 Sandy Resorts
Bhubaneshwar
Nirman Consultants Pvt. Ltd.
New Delhi
225 60,000 Completed
5.49 Express Sarovar Potico
Faridabad
Sunil Arora & Associates
New Delhi
700 60,000 Completed
5.50 Hotel Savoy
Mussourie
Plural Design
New Delhi
150 40,000 Completed
5.51 Sangam Resorts
Manali
Addies Architect
New Delhi
75 75,000 Completed
5.52 IISM
Gulmarg
ITDC 40 75,000 Completed
5.53 Pepermint Hotel
Gurgaon
-- 700 60,000 Completed
5.54 Furn Hill palace
Ooty
-- 100 2,00,000 Completed
5.55 Budget Hotel
Kalkaji
-- 150 40,000 Completed
5.56 Holiday Inn
Jaipur
-- 75 75,000 Completed
5.58 Claridges Hotel
New Delhi
-- 1000 60,000 Completed
5.59 Hotel Naini Retreat
Nainital
-- 40 50,000 Completed
11
S.No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
5.60 Manu Maharani Hotel
Nainital
-- 50 60,000 Completed
5.61 Hotel Koti Resort
Shimla
-- 40 50,000 Completed
5.62 Resort at Shillon Bagh
Shimla
-- 50 60,000 Completed
5.63 Retreat Resorts
Ramnagar
-- 40 50,000 Completed
5.64 Lav Laxmi Hotel
Varansi
-- 157.5 42000 Completed
5.65 Ramada Hotel
Gurgaon
A.S. Parvatikar
New Delhi
150 40,000 Completed
5.66 Hotel Diplomate
New Delhi
-- 60 16,000 Completed
5.67 Hotel at Jammu
(J&K)
-- 90 24,000 Completed
5.68 Hotel at Srinagar
Srinagar (J&K)
-- 125 14,000 Completed
5.69 Hotel Hill View
Faridabad, Haryana
Godavari Shilpkala Ltd.
Surajkund, Faridabad
450 1,20,000 Completed
5.70 Hotel cum Shopping Complex
Gurgaon, Haryana
-- 300 80,000 Completed
5.71 Hotel Shanti Palace
New Delhi
-- 187.5 50,000 Completed
5.72 Hotel at Kalkaji
New Delhi
Zee Point
New Delhi
60 16,000 Completed
5.73 Hotel Bilzz
Kanpur
R.K. Saine 120 32,000 Completed
5.74 Vintage Inn Hotel
Nainital
-- 37.5 10,000 Completed
5.75 Jim Corbett Resort
Ram Nagar
Plural Design
New Delhi
262.5 70,000 Completed
5.76 Avas Hotel
Amritsar
ANV Foods Pvt. Ltd. 400 40,000 Completed
5.77 Janpath Hotel
New Delhi
Janpath 262.5 70,000 Completed
5.78 Hotel at Mundra
Gujarat
Lalit Hotels 300 80,000 Running
5.79 Hotel City Heart
Amritsar
City Heart 200 75,000 Completed
5.80 Boutique Hotel
Kolkata
Ravish Mehra Deepak Kalra 300 24,000 Completed
5.81 The Claridges Hotel
Aurangzeb Road, New Delhi
Godavari Shilpkala 1000 80,000 Completed
5.82 The Claridges Hotel
Mussoorie
The Claridges 150 10,000 Completed
5.83 Beekay Plaza
Sevoke Road, Silliguri.
RMDK 240 64,000 Running
5.84 Hardiyesh Hotel, Jim Corbett
Ramnagar
Studio US, New Delhi 225 60,000 Running
12
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
5.85 Clarks Inn
Kathmandu, Nepal
Plural Design 300 80,000 Running
5.86 Raas Devigarh Palace
Udaipur
Walled City Hotels
Pvt. Ltd.
225 60,000 Running
5.87 Lemon Tree Hotel
Kolkata
Lemon Tree Hotels 225 60,000 Running
5.88 The Oberoi
Bandhavgarh Oberoi 1000 60,000 Running
5.89 Abduz Hotel
Ladakh Spic n Span
350 75,000 Running
5.90 Clarks Inn
Kanpur
Plural Design
New Delhi
225 60,000 Completed
5.91 Shiv Niwas Palace
Udaipur
HRH Hotels 650 60,000 Running
6. Auditoriums
6.1 Bipin Chanderpal
Memorial Trust, Auditorium
New Delhi
Barua Sudatto Associates
New Delhi
45 12,000 Completed
6.2 DPS
Noida
Sikka & Associates
New Delhi
97.5 26,000 Completed
6.3 Ishmeet Singh Music Academy
Ludhiana
Neev Architects 90 24,000 Completed
6.4 Harpal Tiwana Music Academy
Patiala
Neev Architects 112.5 30,000 Completed
6.5 FICCI Auditorium
New Delhi
FICCI 48.75 13,000 Completed
7. Show Rooms
7.1 Galaxy Toyota
New Delhi
The Guild of Architects
New Delhi
60 16,000 Completed
7.2 MGF Toyota
Gurgaon
Dalip Thareja
New Delhi
112.5 30,000 Completed
7.3 Galaxy Toyota
Pitampura, New Delhi
Dalip Thareja
New Delhi
112.5 30,000 Completed
7.4 Maruti Show room
Tishazari, New Delhi
Creators
New Delhi
75 20,000 Completed
7.5 Nalli Showroom
Connaught Place
Pradeep Sachdeva Design Associates,
New Delhi
37.5 10,000 Completed
7.6 Nalli Showroom
G.K.-II, M Block, New Delhi
Pradeep Sachdeva Design Associates,
New Delhi
60 16,000 Completed
7.7 Nalli Showroom
Bengaluru
Pradeep Sachdeva Design Associates,
New Delhi
120 32,000 Completed
7.8 Nalli Showroom
Parkland, Chennai
Pradeep Sachdeva Design Associates,
New Delhi
150 40,000 Completed
7.9 United colour of Benetton
New Delhi
-- 10 4,000 Completed
13
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
7.10 Hyundai Showroom
New Delhi
-- 62.5 25,000 Completed
7.11 Hyundai Showroom
Gurgaon
-- 55 22,000 Completed
7.12 Toyota
Ghaziabad
-- 60 25,000 Completed
7.13 Gyan's
New Delhi
-- 10 8,000 Completed
7.14 Heritage Store
South Ext., New Delhi
-- 21 7,000 Completed
8. Restaurants
8.1 Pizza Hut
Kolkata
The Guild of Architects
New Delhi
30 8,000 Completed
8.2 KFC
Connaught Place, New Delhi
Lotus Design Services
New Delhi
37.5 10,000 Completed
8.3 KFC
Shipra Mall, Ghaziabad
Lotus Design Services
New Delhi
37.5 10,000 Completed
8.4 KFC - V3 Mall
Delhi
The Guild of Architects
New Delhi
22.5 6,000 Completed
8.5 KFC
Chandigarh
The Guild of Architects
New Delhi
30 8,000 Completed
8.6 KFC
Rajauri Garden, New Delhi
The Guild of Architects
New Delhi
30 8,000 Completed
8.7 KFC
Pitampura, New Delhi
The Guild of Architects
New Delhi
37.5 10,000 Completed
8.8 KFC
Kamlanagar, New Delhi
Lotus Design Services
New Delhi
18.75 5,000 Completed
8.9 KFC
Jallandhar
The Guild of Architects
New Delhi
18.75 5,000 Completed
8.10 YO - CHINA
New Delhi
-- 11.25 3,000 Completed
8.11 Bembos Restaurants Movietime Pvt. Ltd. 22.5 6,000 Completed
8.12 Coffee Shop
Ambassador Hotel
New Delhi
Pradeep Sachdeva Design Associates,
New Delhi
20 3000 Completed
8.13 Keya/Kainoosh Resto Bar DLF
Promenade
New Delhi
Lotus Design Services
New Delhi
30 8,000 Completed
8.14 Gulati Restaurant
Pandara Road
New Delhi
Lotus Design Services
New Delhi
37.5 10,000 Completed
8.15 Restaurant at Jakarta
Indonesia
-- 30 8,000 Completed
8.16 Wimpy's
Kamla Nagar, New Delhi
-- 30 12,000 Completed
14
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
8.17 Nirula's
G.K. II, New Delhi
-- 25 10,000 Completed
8.18 Multiculture Restaurant Shanghai
- CHINA
-- 40 10,000 Completed
8.19 Fast food Restaurant
Gulmarg
-- 24 6,000 Completed
8.20 Pizza Hut
Gurgaon
The Guild of Architect 30 8,000 Completed
8.21 Pizza Hut
Chandigarh
The Guild of Architect 37.5 10,000 Completed
8.22 Bikanervala
Connaught Place, New Delhi
Bikanervala Food Pvt. Ltd. 40 8,000 Completed
8.23 Bikanervala
Preet Vihar, New Delhi
Bikanervala Food Pvt. Ltd. 30 7,500 Completed
8.24 Bikanervala
Lajpat Nagar, New Delhi
Bikanervala Food Pvt. Ltd. 30 12,000 Completed
8.25 Bikanervala
Old Gurgaon
Bikanervala Food Pvt. Ltd. 50 10,000 Completed
8.26 Bikanervala
Ring Road, New Delhi
Bikanervala Food Pvt. Ltd. 35 12,000 Completed
8.27 Vega Restaurant DMS Consultants 37.5 10,000 Completed
8.28 Kaleva Restaurant
Ghaziabad
RMDK 30 8,000 Completed
8.29 Bikanervala
Hyderabad
Bikanervala Food Pvt. Ltd. 30 8,000 Completed
8.30 Bikanervala
Greater Kailash
Bikanervala Food Pvt. Ltd. 45 12,000 Completed
8.31 Bikanervala
Greater Noida
Bikanervala Food Pvt. Ltd. 45 12,000 Completed
8.32 Bikanervala
Rajori Garden
Bikanervala Food Pvt. Ltd. 60 16,000 Completed
8.33 Bikanervala
Bhiwadi
Bikanervala Food Pvt. Ltd. 30 8,000 Completed
8.34 Bikanervala
Naraina
Bikanervala Food Pvt. Ltd. 18.75 5,000 Completed
8.35 Bikanervala
Sohna Road, Gurgaon
Bikanervala Food Pvt. Ltd. 45 12,000 Completed
8.36 Bikanervala
G.T Karnal Road, New Delhi
Bikanervala Food Pvt. Ltd. 30 8,000 Completed
8.37 Bikanervala
Sector-18, Noida
Bikanervala Food Pvt. Ltd. 60 16,000 Completed
8.38 Bikanervala
Jai Road, New Delhi
Bikanervala Food Pvt. Ltd. 37.5 10,000 Completed
8.39 Bikanervala
Jalandhar
Bikanervala Food Pvt. Ltd. 45 12,000 Completed
8.40 Bikanervala
Agra
Bikanervala Food Pvt. Ltd. 45 12,000 Completed
8.41 Bikanervala
Kundli
Bikanervala Food Pvt. Ltd. 45 12,000 Completed
15
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
8.42 Dhaba Kitchen
Saket
The Claridges 40 4,000 Completed
8.43 Dhaba Kitchen
Gurgaon
The Claridges 40 4,000 Completed
8.44 Benihana Restaurant
TDI Mall, Nehru Place,
New Delhi.
Lotus Design Services 45 12,000 Completed
8.45 Wendy’s Restaurant
Sector-29, Gurgaon
Sierra Nevada Restaurants Pvt. Ltd. 50 2,500 Completed
8.46 Wendy’s Restaurant
Ninex Mall, Gurgaon
Sierra Nevada Restaurants Pvt. Ltd. 45 2,500 Running
8.47 Wendy’s Restaurant
DLF Mall of India, Noida
Sierra Nevada Restaurants Pvt. Ltd. 45 2,500 Running
8.48 Wendy’s Restaurant
DLF Cyber Hub, Gurgaon
Sierra Nevada Restaurants Pvt. Ltd. 40 2,000 Running
8.49 Jamie’s Italian Restaurant
Ambience Mall, New Delhi
Dolomite Restaurants Pvt. Ltd. 70 4,500 Completed
8.50 Jamie’s Pizzeria
Ambience Mall, Gurgaon
Dolomite Restaurants Pvt. Ltd. 25 1,500 Completed
8.51 Jamie’s Pizzeria
Pacific Mall, Gurgaon
Dolomite Restaurants Pvt. Ltd. 30 1,500 Completed
9. Refrigeration Work
9.1 Hotel Ambassador
New Delhi
-- 12 -- Completed
9.2 Hotel Taj Ganges
Varansi
-- 15 -- Completed
9.3 Hotel Park Royal
New Delhi
-- 15 -- Completed
9.4 Hotel Murad
Srinagar
-- 12 -- Completed
9.5 Cold Storage
Sharjah
-- 40 -- Completed
10. IT Parks / Software
Industries and Call
Centers
10.1 Bestech Cyber Park
Gurgaon
Bestech India Pvt. Ltd.
New Delhi
4000 4,00,000 Completed
10.2 Orient Bestech Business Tower
Gurgaon
Bestech India Pvt. Ltd.
New Delhi
4000 4,00,000 Completed
10.3 Park View Business Tower
Gurgaon
Bestech India Pvt. Ltd.
New Delhi
5000 5,00,000 Completed
10.4 Vatika INX-Com-12
Gurgaon
Vatika Ltd. 1800 4,80,000 Running
16
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
10.5 Vatika INX-Ret 004
Gurgaon
Vatika Ltd. 450 1,20,000 Running
10.6 Vatika INX-Ret 007
Gurgaon
Vatika Ltd. 487.5 1,30,000 Running
10.7 Discovery Tower Sunil Arora & Associates 3000 8,00,000 Running
10.8 IT Park For Mind
Noida
SM Bagley & Associates
New Delhi
262.5 70,000 Completed
10.9 Hewitt International
Gurgaon
SWBI
New Delhi
600 1,60,000 Completed
10.10 HCL Comnet, A-9
Noida
SWBI
New Delhi
450 1,20,000 Completed
10.11 HCL Comnet, A-2
Noida
SWBI
New Delhi
375 1,00,000 Completed
10.12 DELL International
Gurgaon
Framework Interiors
New Delhi
150 40,000 Completed
10.13 DAMCO
Faridabad
Design Arium
New Delhi
150 40,000 Completed
10.14 INTEX Office Building
Noida
Archohm Architects
New Delhi
187.5 50,000 Completed
10.15 Land Mark Cyber Park
Gurgaon
Christopher Charles Benninger
Architects Pvt. Ltd., Pune
7500 8,00,000 Running
10.16 KRBL Corporate Office
Noida
Nirman Consultants Pvt. Ltd.
New Delhi
187.5 50,000 Running
10.17 NCR
Gurgaon
SWBI Architects
New Delhi
60 16,000 Completed
10.18 HFO
Gurgaon
Framework Interiors
New Delhi
86.25 23,000 Completed
10.19 Samsung Engineers
Mohan Cooperative
New Delhi
Insukcha Architects
New Delhi
52.5 14,000 Completed
10.20 Samsung Engineers
Eros Tower
New Delhi
Insukcha Architects
New Delhi
52.5 14,000 Completed
10.21 Samsung Engineers
Logix Park, 8th Floor
New Delhi
Insukcha Architects
New Delhi
87 23,200 Completed
10.22 Samsung Engineers Park Center
New Delhi
Insukcha Architects
New Delhi
22.5 6,000 Completed
10.23 Everest Office
Mohan Cooperative
New Delhi
Insukcha Architects
New Delhi
37.5 10,000 Completed
10.24 KLG – II
Gurgaon
Space Design Consultants
New Delhi
75 75,000 Completed
10.25 HCL Comnet
Noida
SWBI
New Delhi
337.5 90,000 Completed
10.26 ATS Services
New Delhi
-- 183.7 49,000 Completed
10.27 Hughes Software
Gurgaon
-- 93.75 25,000 Completed
17
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
10.28 N.Y. Dox
Gurgaon
-- 135 36,000 Completed
10.29 Hitech Winfosys
Gurgaon
-- Completed
10.30 Parsec Technologies
Gurgaon
-- 78.75 21,000 Completed
10.31 BAANI Technologies
Gurgaon
-- 360
96,000 Completed
10.32 Compudyne Winfosys
Bangalore
-- 67.5 18,000 Completed
10.33 G.E. Capital
Gurgaon
-- Completed
10.34 KLG Systel
Gurgaon
-- 67.5 18,000 Completed
10.35 Quadrant Infotech
Gurgaon
-- 135 36,000 Completed
10.36 V-Customer
DEL-2, New Delhi
-- 150 40,000 Completed
10.37 V-Customer
DEL-3, New Delhi
-- 202.5 54,000 Completed
10.38 Hewlett Packard India Pvt. Ltd.
Gurgaon
-- 210 56,000 Completed
10.39 Perfexa Solutions
Gurgaon
-- 67.5 18,000 Completed
10.40 MCMI
Gurgaon
Encore Capital Group 300 80,000 Completed
10.41 Convergys
Gurgaon
-- 150 40,000 Completed
10.42 Worldzen
Gurgaon
-- 135 36,000 Completed
10.43 Global Vantedge
Gurgaon
-- 90 24,000 Completed
10.44 CSAV
Gurgaon
-- 30 8,000 Completed
10.45 Honeywell
Gurgaon
-- 37.5 10,000 Completed
10.46 Religare
Gurgaon
Framework Interiors
New Delhi
300 80,000 Completed
10.47 Primordial System
Gurgaon
Vistasp Associates 112.5 30,000 Running
10.48 PHFI
New Delhi
Ashok B. Lall
New Delhi
75 75,000 Running
10.49 Redifussion
Gurgaon
Framework Interiors
New Delhi
75 75,000 Completed
10.50 Walmart Office
Gurgaon
Framework Interiors
New Delhi
225 60,000 Completed
10.51 Samsung Engineers
Logix Park, Ist Floor,
Tower-C, Noida
Insukcha Architects
New Delhi
87 23,200 Completed
18
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
10.52 Samsung Engineers
Logix Park, IInd Floor,
Tower-C, Noida
Insukcha Architects
New Delhi
82.5 22,000 Completed
10.53 Samsung Engineers
Logix Park, IIIrd Floor,
Tower-C, Noida
Insukcha Architects
New Delhi
82.5 22,000 Completed
10.54 World Trade Tower
Noida
ETT Infratech 3000 8,00,000 Running
10.55 Sugal & Damani
Gurgaon
Sugal & Damani Group
112.5 30,000
Completed
10.56 Eastern dedicated freight corridor
Operational Control Centre Indian
Railways
Allahabad
Alstom Pvt. Ltd.
New Delhi
225 60,000 Running
10.57 MMOPL-DN Nagar Depot
Mumbai
MMOPL
Mumbai
1125 3,00,000 Completed
11. Shopping Complex /
Multiplex/ Big Stores
Ware Houses
11.1 Welcome Metro Station Mall
Delhi
Gian P. Mathur Associates
New Delhi
1350 3,60,000
Completed
11.2 Multiplex
Laxmi Nagar, New Delhi
Gian P. Mathur Associates
New Delhi
1350 3,60,000
Completed
11.3 Multiplex
Parsvnath, Faridabad
Gian P. Mathur Associates
New Delhi
675 1,80,000 Completed
11.4 Shopping cum Commercial
Building, IMT - Manesar,
Gurgaon
Space Design Group
New Delhi
1125 3,00,000 Completed
11.5 Mall Cum Multiplex
Jurs Plaza, Haridwar
Space Combine Architects
New Delhi
750 2,00,000 Running
11.6 Delhi Haat
Jankpuri
Archohm Architects
New Delhi
600 1,60,000 Running
11.7 Delhi Haat
Pitampura
Pradeep Sachdeva Design
Associates, New Delhi
45 12,000 Completed
11.8 Jumbo Hyper Mall
Delhi
Gian P. Mathur Associates
New Delhi
975 2,60,000 Completed
11.9 Shopping Mall
Mangalam Palace, New Delhi
Gian P. Mathur Associates
New Delhi
825 2,20,000 Completed
11.10 Parsvnath City Centre
Bhiwadi
Nirman Consultants Pvt. Ltd.
New Delhi
825 2,20,000 Completed
11.11 Shopping cum Office Complex
Wazirpur, New Delhi
Gian P. Mathur Associates
New Delhi
750 2,00,000 Completed
11.12 North Square
New Delhi
Gian P. Mathur Associates
New Delhi
270 72,000 Completed
11.13 Multiplex at KP Block
Pitampura, New Delhi
Gian P. Mathur Associates
New Delhi
270 72,000 Completed
19
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
11.14 Movietime Multiplex-I
Faridabad
Movietime Multiplex Pvt. Ltd 112.5 30,000 Completed
11.15 Movietime Multiplex-II
Faridabad
Movietime Multiplex Pvt. Ltd 112.5 30,000 Completed
11.16 Movietime Multiplex
Karnal
Movietime Multiplex Pvt. Ltd 112.5 30,000 Completed
11.17 Movietime Multiplex
Noida
Movietime Multiplex Pvt. Ltd 90 24,000 Running
11.18 Kaushambi Mall
Ghaziabad
Space Design Group
New Delhi
300 80,000 Completed
11.19 Shopping Complex
Chandigarh
Gian P. Mathur Associates
New Delhi
150 40,000 Completed
11.20 ISBT
Shimla
Addies Architectes
New Delhi
82.5 22,000 Completed
11.21 Bharti Corporate Office
Ambi Mall, Vasant Kunj
New Delhi
The Karigars, The Interior Designers
New Delhi
487.5 1,30,000 Completed
11.22 Fun City
New Delhi
Gian P. Mathur Associates
New Delhi
270 72,000 Completed
11.23 V3S
New Delhi
Gian P. Mathur Associates
New Delhi
270 72,000 Completed
11.24 1st Mall Dwarka
New Delhi
4th Dimension
New Delhi
195 52,000 Completed
11.25 Shopping cum Multiplex
Karnal
Design Associates
New Delhi
270 72,000 Completed
11.26 City Mall
Lucknow
Gian P. Mathur Associates
New Delhi
600 1,60,000 Completed
11.27 R.G Trade Tower
New Delhi
4th Dimension
New Delhi
450 1,20,000 Completed
11.28 Best Sky Tower
New Delhi
4th Dimension
New Delhi
468.75 1,25,000 Completed
11.29 Shopping Complex
Janakpuri, New Delhi
Gian P. Mathur Associates
New Delhi
412.5 1,10,000 Completed
11.30 Express Mall
Shaktikhand, Ghaziabad
Space Design Group
New Delhi
450 1,20,000 Completed
11.31 Jaipuria Sunrise Multiplex
Indirapuram, Ghaziabad
Gian P. Mathur Associates
New Delhi
1125 3,00,000 Completed
11.32 V3S - Mangalam Palace
(Plot No. 21), Rohini
New Delhi
Gian P. Mathur Associates
New Delhi
825 2,20,000 Completed
11.33 Shopping Mall
Dhanbad
Gian P. Mathur Associates
New Delhi
1500 4,00,000 Running
11.34 Vardhman Premium Mall
New Delhi
Gian P. Mathur Associates
New Delhi
300 80,000 Completed
11.35 Omaxe
Gurgaon
Moti Bahri Architects
New Delhi
375 1,00,000 Completed
11.36 Omaxe
Jasola, New Delhi
Moti Bahri Architects
New Delhi
412.5 1,10,000 Completed
11.37 Shopping Mall
CDB, Shahadra, Delhi
Space Design Group
New Delhi
375 1,00,000 Completed
20
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
11.38 Metro Station Mall
Azadpur, New Delhi
Gian P. Mathur Associates
New Delhi
450 1,20,000 Completed
11.39 Commercial Complex at
Barbil Orissa
Rajeev Agarwal Architects
New Delhi
225 60,000 Completed
11.40 S.D. Shopping Arcade
Sector-9, Rohini, New Delhi
4th Dimension
New Delhi
150 40,000 Completed
11.41 Parsvnath Shopping Mall
Moradabad
Gian P. Mathur Associates
New Delhi
412.5 1,10,000 Completed
11.42 R.G. City Mall
Lawrence Road
4th Dimension
New Delhi
375 1,00,000 Completed
11.43 Eleganzza Mall & Multiplex
Dehradun
Gian P. Mathur Associates
New Delhi
375 1,00,000 Completed
11.44 Singapore Mall
Lucknow
Gian P. Mathur Associates
New Delhi
487.5 1,30,000 Completed
11.45 Daffodil Plaza, Multiplex
Jagadhri
Gian P. Mathur Associates
New Delhi
281.25 75,000 Completed
11.46 Mall at Zirakpur
Delhi
4th Dimension
New Delhi
825 2,20,000 Completed
11.47 Parsvnath Metro Mall
Kashmere Gate, New Delhi
Gian P. Mathur Associates
New Delhi
300 80,000 Completed
11.48 Sara Plaza
Srinagar
Concept Planners
New Delhi
Completed
11.49 Shopping cum Multiplex
Allahabad
Gian P. Mathur Associates
New Delhi
510 1,36,000 Completed
11.50 Shopping cum Office Complex
Bhiwadi
Rajeev Agarwal Architects
New Delhi
300 80,000 Completed
11.51 Wonder Mall
Ghaziabad
Gian P. Mathur Associates
New Delhi
225 60,000 Completed
11.52 Maiden Mall cum Multiplex
Amritsar
Gian P. Mathur Associates
New Delhi
712.5 1,90,000 Completed
11.53 Kalpana Mall
Ranchi
Archohm Architects
New Delhi
450 1,20,000 Completed
11.54 Shopping cum Office Complex
Manesar
-- 450 1,20,000 Completed
11.55 I-MG Road
New Delhi
-- 225 60,000 Completed
11.56 Sonia Cineplex
New Delhi
-- 300 80,000 Completed
11.57 Multiplex for Grandley
Entertainment, N.F.C., New Delhi
-- 180 48,000 Completed
11.58 Multiplex for Vardhman
Properties, Faridabad
-- 675 1,80,000 Completed
11.59 Central Square Shopping Mall
New Delhi
-- 375 1,00,000 Completed
11.60 Diamond Plaza
Barbil, Orrissa
Rajeev Agarwal Architects
New Delhi
525 1,40,000 Completed
11.61 Walmart
Zirakpur
Framework Interiors
New Delhi
150 40,000 Completed
21
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
11.62 Walmart
Jallandhar
Framework Interiors
New Delhi
225 60,000 Completed
11.63 Walmart
Jabalpur
Framework Interiors
New Delhi
150 40,000 Completed
11.64 Walmart
Lucknow
Framework Interiors
New Delhi
150 40,000 Completed
11.65 Walmart
Vadodara Yamuna Mill
Framework Interiors
New Delhi
150 40,000 Completed
11.66 Walmart
Amritsar
Framework Interiors
New Delhi
150 40,000 Completed
11.67 Hyper Store-Bharti
Hyderabad
Framework Interiors
New Delhi
150 40,000 Completed
11.68 Walmart
Anand, Gujrat
Framework Interiors
New Delhi
150 40,000 Completed
11.69 Distribution Centre-Bharti
Hapur (UP)
Framework Interiors
New Delhi
1 Lakh
Sq.ft.
Running
11.70 Walmart
Bhatinda
Framework Interiors
New Delhi
150 40,000 Completed
11.71 Walmart
Dehradun
Framework Interiors
New Delhi
150 40,000 Completed
11.72 Vishal Mega Mart-Stores
(Various Locations)
Framework Interiors
New Delhi
25,000
Sq.ft.
Completed
11.73 Walmart
Guntur
Framework Interiors
New Delhi
150 40,000 Completed
11.74 Walmart
Agra
Framework Interiors
New Delhi
150 40,000 Completed
11.75 Walmart
Kanpur
Framework Interiors
New Delhi
150 40,000 Completed
11.76 Majestic Stadia Mall
Jodhpur
MASS Architects
New Delhi
600 1,60,000 Running
11.77 Mall at Kathmandu
Nepal
Plural Design
New Delhi
150 40,000 Running
11.78 Global Foyer at Palam Vihar
Gurgaon
Global Reality Group 750 2,00,0000 Completed
11.79 Earth Iconic
Gurgaon
Earth Infra 600 1,60,000 Running
11.80 Infospace
Gurgaon
Brookfields Multiplex 825 2,20,000 Running
11.81 Infospace
Noida
Brookfields 1875 5,00,000 Running
11.82 Global Foyer at Golf Course
Gurgaon
Global Reality Group 1125 3,00,000 Running
11.83 Omaxesun at Sector-79
Faridabad Omaxe Ltd.
New Delhi
577.5 1,54,000 Running
11.84 Hi-Fun at Sector-79
Faridabad
Omaxe Ltd.
New Delhi
876 2,33,600 Running
22
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
12. Airports & Hangers
12.1 Vijayawada Airport Airports Authority of India
Directorate of Planning
1500 4,00,000 Running
12.2 Patna Airport Airports Authority of India
Directorate of Planning
3000 7,70,000 Running
12.3 Bhubaneswar Airport Airports Authority of India
Directorate of Planning
2400 6,50,000 Running
12.4 Khajuraho Airport
Khajuraho
Airports Authority of India
Directorate of Planning
1000 1,20,000 Completed
12.5 Mysore Airport
Mysore
Airports Authority of India
Directorate of Planning
150 40,000 Completed
12.6 Shillong Airport
Shillong
Airports Authority of India
Directorate of Planning
100 25,000 Completed
12.7 Chandigarh Airport
Chandigarh
Airports Authority of India
Directorate of Planning
3000 1,00,000 Completed
12.8 Dehradun Airport
Dehradun
Airports Authority of India
Directorate of Planning
350 40,000 Completed
12.9 Kadapah Airport
Kadapah
Airports Authority of India
Directorate of Planning
250 34000 Completed
12.10 Safdarjung Airport
New Delhi
Airports Authority of India
Directorate of Planning
8 25,000 Completed
12.11 Netaji Subash Changer Bose
Integrated Airport, Kolkata
Airports Authority of India
Directorate of Planning
9000 24,00,000 Completed
12.12 ATS Building
Mangalore Airport
Airports Authority of India
Directorate of Planning
225 60,000 Completed
12.13 Jaipur Airport
(Phase - II)
Airports Authority of India
Directorate of Planning
1350 3,60,000 Completed
12.14 Jolly Grant Airport
Dehradun
Airports Authority of India
Directorate of Planning
200 50,000 Completed
12.15 Jaipur Airport
(Phase - III)
Airports Authority of India
Directorate of Planning
1350 3,60,000 Completed
12.16 Chandigarh Integrated Airport
(Phase – I, II, & III)
Chandigarh
Airports Authority of India
Directorate of Planning
4725 12,60,000 Phase I
Completed
12.17 Bullet Train Terminal
Ahemdabad
National High Speed
Rail Corporation Ltd.
1500 4,00,000 Running
13. Banks
13.1 ABN AMRO
New Delhi
Framework Interiors
New Delhi
45 12,000 Completed
13.2 ABN AMRO
Jodhpur
Framework Interiors
New Delhi
37.5 10,000 Completed
13.3 ABN AMRO
Agra
Framework Interiors
New Delhi
37.5 10,000 Completed
23
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
13.4 Citi Bank
Ahmedabad
Framework Interiors
New Delhi
90 24,000 Completed
13.5 Citi Bank
Hyderabad
Framework Interiors
New Delhi
93.75 25,000 Completed
13.6 Citi Bank
Vadodra
Framework Interiors
New Delhi
30 8,000 Completed
14. Residence & Farm House
14.1 Redevelopmnet of Ayurvigyan
Nagar, New Delhi
Sikka & Associates
New Delhi
2500 20,00,000 Running
14.2 Ruia House
New Delhi
Miglani Associates 30 8,000 Completed
14.3 MICL Bungalow for Sterling
Biotech, Baroda
Casa Paradox 270 72,000 Completed
14.4 Mrs. Anita Jain’s Farm House
New Delhi
The Guild of Architects
New Delhi
105 28,000 Running
14.5 Mr. Varun Arora Residence
New Delhi
The Guild of Architects
New Delhi
67.5 18,000 Running
14.6 Mr. Subodh Gupta
DLF Aralias, New Delhi
Lotus Design Services
New Delhi
37.5 10,000 Completed
14.7 Birla House
New Delhi
Vaishali Kamdar Associates 15 4,000 Completed
14.8 Mr. Raseel A. Gujral House
New Delhi
Casa Paradox 90 24,000 Completed
14.9 Bungalow for Dilip Lalwani
New Delhi
Ravish Mehra & Deepak Kalra 82.5 22,000 Running
14.10 Mr. Gaurav Arora Residence
New Delhi
The Guild of Architects
New Delhi
56.25 15,000 Running
14.11 Mrs. Priyanka Swarup Residence,
New Delhi
The Guild of Architects
New Delhi
37.5 10,000 Running
14.12 Mr. Sukhdev Singh Residence
New Delhi
Aadharshila Designs Pvt. Ltd.
New Delhi
37.5 10,000 Completed
14.14 Mrs. Nandita Jain’s Residence
New Delhi
The Guild of Architects
New Delhi
90 24,000 Completed
14.15 Farm House for Jagjeet Inds.
Hameera
The Guild of Architects
New Delhi
24 6,400 Completed
14.16 Magnolia’s Apartment (Fitout)
Gurgaon
RM Design & Vijay Kapur
New Delhi
15 3,500 Completed
14.17 Mr. Minda Residence
Gurgaon
The Guild of Architects
New Delhi
65.25 17,400 Completed
14.18 Mr. Minda Residence
Vasant Vihar, New Delhi
The Guild of Architects
New Delhi
97.5 26,000 Completed
14.19 Mr. Goel Residence Dhampur
Sugar Mills New Delhi
Romi Khosla Design Studio,
New Delhi
56.25 15,000
Completed
14.20 Mrs. Savneet Anand’s Farm
House, New Delhi
The Guild of Architects
New Delhi
60 16,000 Completed
14.21 Mrs. OM Kumari Khanna’s
Residence, New Delhi
Ar criti Architects
New Delhi
37.5 10,000 Completed
24
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
14.22 Punj House
New Delhi
Space Design Consultants
New Delhi
60 16,000 Running
14.23 Mr. S.K. Jain’s Farm House
New Delhi
The Guild of Architects
New Delhi
82.5 22,000 Running
14.24 Mr. Yadur Kapoor’s
Farm House, New Delhi
The Guild of Architects
New Delhi
37.5 10,000 Completed
14.25 Farm House at Mandi
New Delhi
Zee Point
New Delhi
37.5 10,000 Completed
14.26 Mr. Rajat Sharma’s Residence
New Delhi
The Guild of Architects
New Delhi
75 75,000 Completed
14.28 Mr. Umesh Talwar Residence
New Delhi
Avesna
New Delhi
45 12,000 Completed
14.29 Dr. Bansal’s Residence
Gurgaon
The Guild of Architects
New Delhi
18 4,800 Completed
14.30 Mr. Vivek Jindal
New Delhi
The Guild of Architects
New Delhi
45 12,000 Completed
14.31 Mr. Burman Residence
New Delhi
Avesna
New Delhi
123 32,800 Completed
14.32 Mr. Kanwar Residence
New Delhi
Kaimal Chaterjee & Associates, New
Delhi
48 12,800 Completed
14.33 Mr. Chandok Residence
New Delhi
The Guild of Architects
New Delhi
52.5 14,000 Completed
15. Data Centers
15.1 Dell Tech Square
Gurgaon
Dell India Pvt. Ltd.
Gurgaon
60 16,000 Completed
15.2 Maruti Udyog Ltd.
Gurgaon
Maruti Udyog Ltd.
Gurgaon
54 14,400 Completed
15.3 Tata Teleservices
New Delhi
Tata Communications Ltd.
New Delhi
99 26,400 Completed
15.4 Mentor Graphics
Noida
Mentor Graphics
Noida
22.5 6,000 Completed
15.5 Hindustan Computers Ltd. Noida HCL 39 10,400 Completed
15.6 Bharti Corporate Office
New Delhi
Bharti Ltd.
New Delhi
27 7,200 Completed
15.7 ITC Master Facility (LRBD)
Manesar
ITC Ltd. 21 5500 Completed
15.8 TV Today Studio Cum Office
Office Facility
Noida
TV Today
Noida
58.5 15,600 Completed
15.9 Eastern dedicated freight corridor
Operational Control Centre Indian
Railways, Allahabad
Alstom Pvt. Ltd.
New Delhi
99 26,400 Running
25
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
16. Group Housing / Apartments
16.1 Vatika Lifestyle Homes
Gurgaon
Vatika Ltd.
Gurgaon
330 3,00,000 Completed
16.2 Vatika City Homes
Gurgaon
Vatika Ltd.
Gurgaon
250 2,50,000 Completed
16.3 Vatika Gurgaon - 21
Gurgaon
Vatika Ltd.
Gurgaon
425 3,25,000
16.4 Vatika Sovereign Next
Gurgaon
Vatika Ltd.
Gurgaon
1450 AC-
3,27,000
Vent.
2,25,000
Running
16.5 Vatika Sovereign Park
Gurgaon
Vatika Ltd.
Gurgaon
2600 AC-
4,95,000
Vent.
4,00,000
Running
16.6 Vatika Seven Elemenets
Gurgaon
Vatika Ltd.
Gurgaon
3990 AC-
7,45,000
Vent.
6,10,000
Running
16.7 Vatika Turning Point
Gurgaon
Vatika Ltd.
Gurgaon
4300 AC-
7,45,000
Vent.
6,40,000
Running
16.8 Vatika Tranquil Height
Gurgaon
Vatika Ltd.
Gurgaon
4000 AC-
7,12,000
Vent.
8,00,000
Running
16.9 GPL Eden Heights
Gurgaon
Gupta Promoters Ltd.
Gurgaon
150 3,00,000 Running
16.10 Celebrity Garden
Lucknow
Ansal Properties &
Infrastructure Ltd.
350 Running
16.11 Celebrity Greens
Lucknow
Ansal Properties &
Infrastructure Ltd.
350 3,50,000 Running
16.12 Greens Escape
Sonipat
Ansal Properties &
Infrastructure Ltd.
400 5,80,000 Running
16.13 Orchard County
Mohali
Ansal Properties &
Infrastructure Ltd.
1,50,000 Running
16.14 Jaypee Greens Kosmos, B-43
Noida
Jaypee Infratech Ltd. 1505 13,00,000 Running
16.15 Jaypee Greens Kosmos, B-37
Noida
Jaypee Infratech Ltd. 540 5,00,000 Running
16.16 Jaypee Greens Kosmos, B-36
Noida
Jaypee Infratech Ltd. 850 7,00,000 Running
16.17 Jaypee Greens Klassic Height,
B-34 A, Noida
Jaypee Infratech Ltd. 530 5,00,000 Running
16.18 Cosmocourt, Gurgaon Planners Group Pvt. Ltd.
Gurgaon
110 1,15,000 Running
26
S. No. Name of Project Architects/Client Value
(lakhs)
Area
(Sqft.)
Status
16.19 Cosmocity, Gurgaon Planners Group Pvt. Ltd.
Gurgaon
135 1,50,000 Running
16.20 Tashee Housing
Gurgaon
Tashee Group 3,00,000 Running
16.21 Housing at Yamuna ExpresswayGurgaon Orris Infra Pvt. Ltd. 150,000 Running
16.22 Z-Estate Bhubneshwar SRS Advisors 220,000 Running
16.23 Apex Meadows
Vishakapatnam
SRS Advisors 1,30,000 Running
16.24 Solitairian City Tower
Yamuna Expressway
Confluence Consultant 6,50,000 Running
17. Embassies
17.1 Bhutan Embassy
New Delhi
Embassy Of Bhutan
New Delhi
90 24,000 Completed
17.2 Turkish Embassy
New Delhi
Embassy Of Turkey
New Delhi
60 16,000 Completed
17.3 UAE Embassy
New Delhi
UAE Embassy
New Delhi
120 32,000 Completed
17.4 Uzbekistan Embassy
New Delhi
Embassy of The Republic of
Uzbekistan in India
90 24,000 Completed
17.5 British Embassy
Kathmandu
British Embassy
55 15,000 Completed
17.6 The Royal Netherland Embassy
New Delhi
Royal Haskoning DHV
Dubai
50 15,000 Completed
17.7 The Royal Norwegian Embassy, New
Delhi
Plural Design
New Delhi
232.5 62000 Completed
17.8 Malaysian Embassy
New Delhi
Malaysian High Commission
New Delhi
1200 1,00,000 Completed
18. Transit Projects
18.1 Bullet Train Sabarmati Terminal Highway Speed Railway 2000 12,00,000 Running
18.2 Mumbai Metro OCC Metro 3200 15,00,000 Running
18.3 Mumbai Metro Depot Metro 1200 6,00,000 Completed
18.4 Estern Freight dedicated Corridor OCC Indian Railway 300 2,00,000 Running
18.5 Southern Railways OCC Indian Railway 200 1,50,000 Running
18.6 Integrated Tranist Corridor
Pragati Maidan Tunnel
New Delhi
Roads & Tunnels 1200 --- Running
18.7 Mumbai Coastal Road Roads & Tunnels 1000 --- Running