Lidwala Consulting Engineers (SA) (Pty) Ltd
Hendrina Ash Dam EIA: Draft Scoping Report 2 June 2011 Chapter 4: Project Alternatives EIA Ref Number: 12/12/20/2175
4-14
Figure 4.6: Combined Social Sensitivity (Max Wins)
Figure 4.7: Combined Social Sensitivity (no factor)
Lidwala Consulting Engineers (SA) (Pty) Ltd
Hendrina Ash Dam EIA: Draft Scoping Report 2 June 2011 Chapter 4: Project Alternatives EIA Ref Number: 12/12/20/2175
4-15
• Final Combined Sensitivity Maps
Figure 4.8 to 4.13 are the results of overlaying the social, biophysical and technical input
maps together, thereby illustrating the overall environmental sensitivity of the area. These
maps have been done both with and without the influence of the technical / cost layer in order
to ensure that this aspect did not overshadow / influence the outcome of the mapping
process.
Figure 4.8: Overall Environmental Sensitivity (Max Wins – without technical / cost)