Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
GITA Seminar on:GITA Seminar on:New Construction Project New Construction Project
LifecycleLifecycle
GITA Seminar on:GITA Seminar on:New Construction Project New Construction Project
LifecycleLifecycle
JW MarriottHouston, TXSeptember 20, 2004
Lonnie Lister, ChiefGas Branch 3
Office of Energy ProjectsFederal Energy Regulatory Commission
Washington, DC
The FERC Staff Approach to GISThe FERC Staff Approach to GIS
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
What is FERC?What is FERC?&&
What Does FERC Do?What Does FERC Do?
Regulates the interstate transmission of natural gas, oil, and electricity, and the siting, construction, and operation of natural gas and hydropower projects.
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
...and What Does FERC ...and What Does FERC NOTNOT Do?Do?
• LDC regulation, electricity generation, transmission or distribution facilities; oil pipeline facilities
• Water Quality Certifications
• Pipeline safety or pipeline safety and transportation on OCS
• Easement compensation
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
Pipelines Certificated 01/2002 thru Pipelines Certificated 01/2002 thru 07/200407/2004
11.2 BCF/D Total2,770 Miles
Transco(323) Southern (330)
Kern River
(886)
5
North Baja (500)
Tuscarora(96)
Northwest(162,113)
KernRiver (282)
Iroquois(70)
TETCO(250)
Northwest(224)
NFS/DTI(150)
GeorgiaStraits (96)
1. Algonquin (285) 2. Islander East (285) 3. Iroquois (85) 4. Columbia (135,270)
SCG Pipeline (190)
12
3
4
Northwest(191)
East Tennessee (510)
Tennessee (320)
TETCO (197)
Greenbrier (600)
El Paso (320)
WBI(80)
ANR(220,107)
El Paso (140)
TETCO(223)
Cove Point(445)
Ocean Express(842)
6 CheyennePlains (560)
8
5. CIG (282,92) 6. CIG (118) 7. TransColorado (125) 8. WIC (116)
7
Calypso(832)
Discovery (150)
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
Existing and Existing and Proposed North Proposed North
AmericanAmericanLNG TerminalsLNG Terminals
As ofJuly 2004
A
C
1 3 5
2 4
33
728
15
6
25
29
9
198
27
22
21
3436
35
37
20
30
31
1124
1012
17
13
B
3226
14
39
40
16
3823
18 D41
US Jurisdiction
FERC
US Coast Guard
42
4443
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
Major FERC InitiativesMajor FERC Initiatives
• E-Government (electronic filing)• Pre-Filing Process• Outreach
(Involving GIS)(Involving GIS)
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
The Pre-Filing ProcessThe Pre-Filing Process
To encourage the pipeline industry to engage in early project-development involvement with the public and agencies, as contemplated by the National Environmental Policy Act (NEPA) and the Council on Environmental Quality regulations
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
Pre-Filing RequestsPre-Filing Requests
• Why Needed?• Other Agencies On-Board?• Stakeholders Identified?• 3rd-Party Contractor Support• Complete Application to be Filed• Public Participation Plan
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
FERC Staff’s RoleFERC Staff’s Role
• Written Acceptance; PF Docket Established• Flexible Process for Staff Involvement• Scoping Notice/Meetings/Site Visits• Review Draft Resource Reports• Begin Preparation of NEPA Document
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
Processing TimelinesProcessing TimelinesTraditional vs. Pre-Traditional vs. Pre-FilingFiling
Develop
StudyCorrido
r
DevelopStudy
Corridor
Pre-Filing Accepted & Begin Scoping
Conduct
Scoping
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
FERC Staff Reviews Draft
Resource Reports
& Prepare DEIS
DraftEIS
DraftEIS
FileAt
FERC
IssueOrder
IssueOrder
FileAt
FERC
Prepare ResourceReports
Prepare ResourceReports
FinalEIS
FinalEIS
(months)
Traditional
NEPA Pre-Filing
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
The E-Filing InitiativeThe E-Filing Initiative
Supports FERC compliance with the Government Paperwork Elimination Act (GPEA) requiring Federal agencies to provide for the option of:
“. . . electronic maintenance, submission or disclosure of information, when practicable as a substitute for paper. . . “
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
Filing CategoriesFiling Categories
• Public• Non-Public/Privileged Information• NIP (Non-Internet Public)• CEII (Critical Energy Infrastructure Information)
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
All GIS Data is CEIIAll GIS Data is CEII((CCritical ritical EEnergy nergy IInfrastructurenfrastructure IInformation)nformation)
• Requires a Special Request to Obtain• Not Subject to FOIA• Requires a “Need” and “Use” Statement• Requires a “Non-Disclosure” Agreement• Subject to Approval by FERC’s CEII Officer
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
Guidelines for CD-ROM Guidelines for CD-ROM FilingsFilings
• General Requirements• Acceptable/Preferred Formats• Attribute data• Accuracy Requirements• Metadata
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
GIS Filings at FERCGIS Filings at FERC
• Hi-Res Aerial Alignment Sheets/Photos• Facility Locations & Areas of Disturbance• Required Environmental Resource Data• Data Supporting Alternative Siting/Routing Analyses
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
OEP’s Approach to GISOEP’s Approach to GIS
• Webviewer™ (ArcIMS application)
• Working w/INGAA on Filing Specs
• Intent to Coordinate Specs w/DOT Requirements
• New Filing Regulations Likely
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
What are the Benefits?What are the Benefits?
For Industry: • Faster Processing of Pipeline Certificates• Fewer Data Requests• Cost Savings on Filings & Updates
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
What are the Benefits?What are the Benefits?
For FERC: • Electronic Filing• Multi-User Capability• Faster Assessments of Complaints
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission
...and Down the Road?...and Down the Road?
• Paperless Filings (?)• Mapped Resource Data• Compliance Tracking
– Post-Certificate Filings– Field Inspections
• Wireless Access (?)
Federal Energy Regulatory CommissionFederal Energy Regulatory Commission