Page 1: Extension to the evaluation using visual rationale

Extension to the evaluation using visual rationale

D Mott

30th Mar 2009

Page 2: Extension to the evaluation using visual rationale

Add visual rationale to BN2 plan (basic CE)

Page 3: Extension to the evaluation using visual rationale

Add visual rationale to BN2 plan (high CE)

Page 4: Extension to the evaluation using visual rationale

Add visual rationale to BN2 plan (mixed)

Page 5: Extension to the evaluation using visual rationale

Adding rationale for minimum duration of SECURE Enemy Bank

Note this was invented to link

the visual rationale and the

evaluation

Page 6: Extension to the evaluation using visual rationale

Rationale for minimum duration of r2

Page 7: Extension to the evaluation using visual rationale

Rationale for earliest start

Page 8: Extension to the evaluation using visual rationale

Rationale for latest start

Page 9: Extension to the evaluation using visual rationale

Rationale for earliest finish

Page 10: Extension to the evaluation using visual rationale

Rationale for latest finish

Page 11: Extension to the evaluation using visual rationale

Artypro inconsistency

Page 12: Extension to the evaluation using visual rationale

Importing inconsistency back to BN2

Note the min dur of RR Arty1

was added by

hand

Page 13: Extension to the evaluation using visual rationale

Rationale for Inconsistency