30-03 06-10 13-17 20-24 27-01 04-08 11-15 18-22 25-29 01-05 08-12 15-19 22-26 29-02 05-09 12-16 19-23 26-30 03-07 10-14 17-21 24-28 31-04 07-11 14-18 21-25 28-02 05-09 12-16 19-23 26-30JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER

8.0 INSTALL REFURBISHED RSEs

8.2 FLORIDA

8.2.3 SAIC Installation Support

9.0 BOX-SHIP MICHIGAN RSE SPARES019.1-2 Inventory-Box Michigan RSE Spares

039.3 Ship & Receive Michigan RSE Spares 08

10.0 ITS WORLD CONGRESS

16 20

11.0 DECOMISSION RSEs

& RETURN TO USDOT

EXHIBITOROPERATIONAL

TESTS & DRY RUNS

SYSTEM TESTING

12Test Readiness Review (TRR)

FDOT Installs GPSI-4

FDOT Receives Shipment of 5.9 Ghz Antennas (25

QTY)

FDOT Installs 13 RSEs (Priority to 9 SPaT Sites)

FDOT Installs 1 RSE at

Convention Lot

SWRI Prelim.

HIA Test on I-4

SAIC Ships

Test Bed Vehicle

to FDOT

USDOT & FDOT Vehicle

Use Agrmnt

KAPSCH Radio Survey & SPaT

Test Bed Vehicle w/ OBE & HIAs

Verify Tests

2922

22

29

18

Recommended