European Commission initiatives on Smart M2M AppliancesEuropean Commission initiatives on Smart M2M Appliances
Svetoslav [email protected]
DG CONNECT Sustainable and Secure SocietySmart Cities and Sustainability
44thth DG CONNECT & ETSI Workshop On Smart M2M AppliancesDG CONNECT & ETSI Workshop On Smart M2M Appliances0101stst April 2015April 2015
2
• DG CONNECT Unit H5 priorities• Interoperability of Energy Data in
Buildings• The market/Costs of the connectivity• Scope of the DG CNECT initiative• DG ENER Ecodesign Preparatory Study on
Smart Appliances• What's ahead?
AgendaAgenda
3
Smart GridsSmart Grids
Water &Waste
Water &Waste
TransportITS, Automation,
EV
TransportITS, Automation,
EV
Energy Efficient Buildings/homes
Smart M2M Appliances
Energy Efficient Buildings/homes
Smart M2M Appliances
Resource Efficient
Infrastructures
Resource Efficient
Infrastructures
City LivingSmart CitiesCity Living
Smart Cities
The two priorities The two priorities are closely linked.are closely linked.
European Innovation Partnership
European Innovation Partnership
Horizon 2020
Horizon 2020
Large scale lighthouse projects
Large scale lighthouse projects
CSAsCSAs
ActionClusterActionClusterActionClusterActionClusterActionClusterActionClusterActionClusterActionClusterActionClusterActionCluster
Using ICT as a tool in meeting the EU's climate and energy targets.
DataCentres
DataCentres
4
Interoperability of Energy Interoperability of Energy Data in BuildingsData in Buildings
Facility management
BEMS
Buildings lifecycle
Architectural design Construction
CAD systemEE add-ons
BIM
CAD
ProjectManagementEnergy performancetests
Sensors/Actuators
HVAC and White Goods
Micro – renewables
Automation systems
Lighting system
Trade energy / Smart Grid
ESCos
SMARTHOME
BEMSEnergy Box
Construction materialsand elements
COMMON FIRST DRIVER IS COMMON FIRST DRIVER IS ENERGY EFFICIENCYENERGY EFFICIENCYLater, shared with eHealth, Later, shared with eHealth, Surveillance, eInclusion, etc.Surveillance, eInclusion, etc.
5
The market/Costs of The market/Costs of the connectivitythe connectivity
One "language" to the external world, one ONTOLOGY
ANY APPLIANCE•Internal language up to the manufacturer•Software loaded at factory or at connecting•Same concept as "plug and play" driver
ANY SERVICE
• Ad hoc circuits with existing network solutions; 100.000's; > 50 EUR per appliance
• Simple consumer devices; energy plugs; > 10 EUR per appliance• A universal appliances chip; billions (250 million dwellings in Europe, many
appliances each); < 1 EUR per appliance. "Any appliance to any service" embedded system.
6
Scope of DG CNECTScope of DG CNECTinitiativeinitiative
Hello, can you hear me? Do you speak Smart Appliances M2M?
Loud and clear!
Commissioned
by EC DG CNECT
7
• Launch October 2014, Duration: 24 months • Explore all technical, economic , environmental and societal aspects
related to the deployment of smart appliances (horizontal approach)• Deliver key elements for potential implementing measures
(Ecodesign/Energy labelling)• Focus on functionalities (strong focus on demand response); possible
positive and negative impacts of these functionalities on the environment, consumers, industry etc.; interoperability issues
• Smart meters will be mainly assessed in terms of their energy consumption
• Objective is to define, acknowledge and support smart appliances and interoperability while considering environmental impacts
• First Stakeholder Meeting 10 March 2015, focused on the scope of the study, interoperability (between smart appliances, the central energy manager "smart box" and beyond) and standardisation
• The next Stakeholder Meeting will take place after Summer.
DG ENER DG ENER Ecodesign Ecodesign Preparatory Study on Smart Preparatory Study on Smart
Appliances Appliances
8
What's ahead?What's ahead?
9
Thank you for your attention!
Any questions?
Follow us on Twitter@EU_SmartCities