Prepared ByRevDate
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
2.1
2.2
2.3
2.4
2.5
2.6 Exercise
Data Requirements
THN,TAT, MAY, MZQ, BRD
Harmonic Source Modeling
Harmonic Load Flow / Frequency Scan
Parameter Settings / Adjustments
Report / Alerts / Plots
1. PROTECTION DEVICES COORDINATION (5‐ Oct‐2015 to 7‐Oct ‐2015 @ 2 Hr./Day ) + 1 Hr. Practice after 6 PM
Data Requirements
ETAP ADVANCE MODULE TRAINING( COURSE CONTENTS )
SOH Approved By: THN022‐Sep‐15
Sr No.
1. PROTECTION DEVICES COORDINATION (5‐ Oct‐2015 to 7‐Oct ‐2015 @ 2 Hr./Day ) + 1 Hr. Practice after 6 PM
THN,TAT, MAY, MZQ, BRD
Prerequisites:‐ An Intermediate knowledge of Electrical Basics and Design‐ Familiarity with Windows‐based applications
Participents Modules
Protection and Selectivity Concepts
Parameter Settings / Adjustments
Display Options‐Star
Sequence of Operation Study
Study / Device Settings Reports
Exercise
Protection Equipment Library