Workshop Use Only: Pre-Decisional
ESMD SI Workshop:Day 2 Calibration
SI Options & Splinter Analysis
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 2SI Workshop
ESMD SE&I Strategy TeamBenchmarking Workshop Process
InvitedOrientation
Briefings
End StateOption
Synthesis 2
Contract Type,Teaming Structure,
Incentive DesignAssessment
Statutory, Regulatory,Policy
Assessment
Transition,Cost and Schedule
Tactical Assessment
ReadAheads
Session Briefouts Adjourn
Evaluate Options for
Day 2 Focus
SE&I Strategy
TeamExecutive Session
Pre-Workshop Wed 15Dec AM Wed PM Thu 16Dec
• NRC Report• Strategy Team Options
• Benchmarking Site Visit Summaries
SplinterTeam
Briefouts
EvaluationCriteria
Development
End StateOption
Synthesis 1
Splinter 1
Splinter 2
Splinter 3
Policy Splinter
Transition Splinter
Acquisition Splinter
Thu PM
Tue 14Dec PM
SE&I Strategy Team
AdditionalInputs
Opt
ion
Eva
luat
ion
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 3SI Workshop
Workshop Agenda –Thursday Morning, 16 Dec 04
Thursday December 16, 2004
Time (PST) Session Description (all plenary sessions in Salon III) Speaker
7:30 am Continental Breakfast – Ritz Carlton Foyer
8:00 am Day 2 Splinter Session Orientation – Salon III1.We will summarize results of evaluating the End State Options identified on Day 1, and provide one or two options for consideration during Day 2 splinter team discussions.
Craig Cornelius
8:30 am Parallel Splinter Sessions:Evaluate Option Strengths/Weaknesses and Provide Solutions for
Enabling Options
• Option 1: Apollo Model – Tier A-C SETA, “Prime of Primes”• Option 2: Tier A-D SETA with HW Partial Exclusion• Option 3: Tier A-D Independent Organization SETA• Option 4: NAVSEA “Nested” MAIT Model
Facilitators and Recorders: The Colonnade Room Betsy Park (facilitator)Richard Beatty (recorder)
Salon III Chris Crumbly (facilitator)Robert Shishko (recorder)
The Plaza RoomDale Thomas (facilitator)Louise Hamlin (recorder)
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 4SI Workshop
Workshop Agenda –Thursday Morning, 16 Dec 04
Thursday December 16, 2004
Time (PST) Session Description (all plenary sessions in Salon III) Speaker
10:30 am Break
10:45 am Parallel Splinter Sessions:
•Policy Splinter – this team will identify policy, regulatory, and statutory issues associated with the target End State Option(s) identified during the orientation.
•Program Transition Impacts Splinter – this team will identify key aspects for NASA to consider in transitioning from the Near/Mid-Term SoSE&I organization to the End State Option. These aspects could include anticipated cost and schedule drivers and specific tasks/tactics that NASA should plan for. A key consideration to be discussed is how NASA can retain the corporate knowledge and experienced personnel built up during the Near/Mid-Term five year time frame.
•Acquisition Strategy Splinter – this team will identify key aspects of the acquisition strategy NASA should pursue to implement the End State Option. These aspects should include, at a minimum, recommended contract and solicitation type, desirable industry partnering/teaming arrangements, contractor hardware exclusions (full, partial, none), and design of incentives.
Facilitators and Recorders: The Colonnade Room Betsy Park (facilitator)Richard Beatty (recorder)
Salon III Chris Crumbly (facilitator)Robert Shishko (recorder)
The Plaza RoomDale Thomas (facilitator)Louise Hamlin (recorder)
12:00 n Lunch Break – Viennese Ballroom
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 5SI Workshop
Workshop Agenda – Thursday Morning & Afternoon, 16 Dec 04
Thursday, December 16, 2004Time (PST) Session Description (All plenary Sessions in Salon III) Speaker
Option Evaluation Splinter Team Briefouts to Full Group – Salon III
Each splinter team briefs out strengths/weaknesses and enabling solutions for Options 1-4
2:30 PM Afternoon Break – Ritz Carlton FoyerPolicy/Transition/Acquisition Strategy Splinter Team Briefouts to Full Group -- Salon III
Each splinter team briefs out major considerations in focus areas, with possible ties to Options 1-4Workshop Summary
Full group dialog on key findings, evaluations, forward work
5:00 pm Adjourn
4:00 PMAll - Facilitated by Craig Cornelius
1:00 PM
One spokesperson per splinter team, nominated from the attendees
3:00 PM
One spokesperson per splinter team, nominated from the attendees
Workshop Use Only: Pre-Decisional
8:00 am Thursday 16 Dec 04Options Evaluation Splinter Session Orientation
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 7SI Workshop
Splinter Session: Options EvaluationThe Promenade Room, The Plaza, Salon III
1. Session objectives: This team will evaluate strengths/weaknesses of Options 1-4, and will propose actions that can be taken to ensure that these options are enabled.
• Option 1: Apollo Model – Tier A-C SETA, “Prime of Primes”• Option 2: Tier A-D SETA with HW Partial Exclusion• Option 3: Tier A-D Independent Organization SETA• Option 4: NAVSEA “Nested” MAIT Model
2. Session leadership:a. The Promenade
1) Betsy Park (facilitator)2) Richard Beatty (recorder
b. Salon III1) Chris Crumbly (facilitator)2) Robert Shishko (recorder)
c. The Plaza1) Dale Thomas (facilitator)2) Louise Hamlin (recorder)
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 8SI Workshop
Transit and Launch Systems
CrewTransport
Launch
CrewSupport
Supporting Research
Resource Identificationand Characterization
Biomedical Countermeasuresand Limits
Surface and Orbital Systems
LandingSystems
SurfaceMobility
Comm/Nav
Commonality/EvolvabilityFor Future Missions
MarsCandidates
TelescopeCandidates
Outer Moons Candidates
Technology Options
Long-DurationHabitation
Surface Power andResource Utilization
Pre-PositionedPropellants
The Human: an Essential Element of the
System of Systems
Vision Requires System-of-Systems Integration
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 9SI Workshop
Constellation Definition
1. Develop, demonstrate, and deploy successive generations of capabilities to enable the sustained human and robotic exploration of the Moon, Mars, and beyond.
2. Capability to be developed will form a system-of-systems that includes:a. Crew Transportation Systems
1) Crew Exploration Vehicle (CEV)2) CEV Launch Vehicle
b. Cargo Transportation Systemsc. Surface Systemsd. In-Space Systemse. Ground Systemsf. Humans as a Critical System
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 10SI Workshop
Option 1 (Apollo Model)Tier A-C: Centralized Gov’t with SETA / Tier D: “Prime of Primes”
ESMD Tier AAgency Alignment
ESMD Tier BDiv Integration & Req’s Validation
ESMD Tier CDevelopment DivProg. Integration
ESMD Tier DConstellation
Spiral 1Program
Spiral 2Program
Prime of Primes
SupportingIntegrationContractor
(Bellcom-Type
SETA)
Prime
Prime
Prime
ProjectOffice
ProjectOffice
ProjectOffice
ProjectOffice
LOCATED @ NASA HQ
LOCATED @ NASA Centers
LOCATED @ DC Metro Area
LOCATED @ Contractor Facilities
Prg ContSE&ITestOpsS&MA
Prg ContSE&ITestOpsS&MA
Prg ContSE&ITestOpsS&MA
Common FunctionalOffice Structure
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 11SI Workshop
Option 2Tier A-D: Centralized Gov’t with HW Partial-Excluded SETA
ESMD Tier AAgency Alignment
ESMD Tier BDiv Integration & Req’s Validation
ESMD Tier CDevelopment DivProg. Integration
ESMD Tier DConstellation
Spiral 1Program
Spiral 2Program
Prime
SupportingIntegrationContractor
(SETA with Partial HWExclusion)
Prime
Prime
Prime
ProjectOffice
ProjectOffice
ProjectOffice
ProjectOffice
LOCATED @ NASA HQ
LOCATED @ NASA Centers
LOCATED @ DC Metro Area
LOCATED @ Contractor Facilities
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 12SI Workshop
Option 3Tier A-D: Centralized Gov’t with Independent Org SETA
ESMD Tier AAgency Alignment
ESMD Tier BDiv Integration & Req’s Validation
ESMD Tier CDevelopment DivProg. Integration
ESMD Tier DConstellation
Spiral 1Program
Spiral 2Program
Prime
IndependentEstablishedOrganization
(UARC)Or
(FFRDC)
Prime
Prime
Prime
ProjectOffice
ProjectOffice
ProjectOffice
ProjectOffice
LOCATED @ NASA HQ
LOCATED @ NASA Centers
LOCATED @ DC Metro Area
LOCATED @ Contractor Facilities
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 13SI Workshop
Option 4 (Virginia Class NAVSEA Model)Tier A-D: “Nested” Major-Area Integration Teams
ESMD Tier AAgency Alignment
ESMD Tier BDiv Integration & Req’s Validation
ESMD Tier CDevelopment DivProg. Integration
ESMD Tier DConstellation
Spiral 1Program
Spiral 2Program
Prime
Prime
Prime
Prime
ProjectOffice
ProjectOffice
ProjectOffice
ProjectOffice
LOCATED @ NASA HQ
LOCATED @ NASA Centers
Segment MAIT “Virtual”SI Decision Teams
Primes LOCATED @ Contractor Facilities
PO
PO
PO
PO
Pri
Pri
Pri
Pri
S-o-S Design/Build MAIT
Segment 1MAIT
Segment 2MAIT
S-o-S MAITLOCATED @ DC Metro Area
ESMD MAITTier ATier BTier CTier D
S-o-S MAIT
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 14SI Workshop
SYSTEM INTEGRATION SYSTEM INTEGRATION TEAMSTEAMS
MAJOR AREA MAJOR AREA TEAMSTEAMS
Sail
Command & Control Systems Module
Habitability
Auxiliary Machinery Room
Weapons Stowage & Handling
Non-Pressure Hull
Pressure Hull
Stern
Option 4 Example
*Ref: presentation by George M. Drakeley, Deputy Program Manager, Virginia Class Submarine Program Office, to the Constellation Organization Discipline Team, 15-May-2004.
Workshop Use Only: Pre-Decisional
8:00 am Thursday 16 Dec 04Policy/Transition/Acq Strategy Splinter Session Orientation
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 16SI Workshop
Splinter Session: Policy Splinter The Promenade Room
1. Session objectives: this team will identify policy, regulatory, and statutory issues associated with the target End State Option(s) identified during the orientation.
a. What are the obstacles that lie in the path to standing up the End State organization?
b. What new authorities, if any, will NASA require in order to establish the End State SoSE&I organization? The more specific, the better!
c. Are there other organizations that have executed a similar transition, or which have obtained and implemented such policies/authorities? What successes and problems were encountered?
2. Session leadership:a. Betsy Park (facilitator)b. Richard Beatty (recorder)
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 17SI Workshop
Policy
Thursday Morning Policy Splinter SessionThe PromenadeAttendees OrganizationRichard Beatty (Recorder) Jet Propulsion LaboratoryHarry Cikanek Glenn Research CenterDoug Cooke ESMD-HQSteve Cook Marshall Space Flight CenterParker Counts BAE SystemsJohn Hall Teledyne BrownMaj. Gen. Bill Hoover, USAF (Ret.) National Academies (NRC)Rick Kadunc ESMD-HQJohn Kohut RaytheonWilliam Kosmann Orbital SciencesDr. Gary Mather Booz Allen HamiltonRichard McGinnis ESMD-HQBetsy Park (Facilitator) ESMD-HQDr. George Paulikas National Academies (NRC)Gary Pulliam Aerospace CorporationChuck Roof BD SystemsTerry Schilling Orbital SciencesJim Stewart Dryden Flight Research CenterTroy Thrash Futron CorporationJim Trapnell HoneywellRichard Webb KT EngineeringDoug Young Northrop-Grumman
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 18SI Workshop
Splinter Session: Program Transition Impacts Splinter Salon III
1. Session objectives: this team will identify key aspects for NASA to consider in transitioning from the Near/Mid-Term SoSE&I organization to the End State Option(s).
a. These aspects could include anticipated cost and schedule drivers and specific tasks/tactics that NASA should plan for.
b. A key consideration to be discussed is how NASA can retain the corporate knowledge and experienced personnel built up during the Near/Mid-Term five year time frame.
c. What is the level of participation with the government team necessary to ensure a good handoff of SoSE&I responsibilities?
d. Are there other organizations that have executed a similar transition? What successes and problems were encountered?
2. Session leadership:a. Chris Crumbly (facilitator)b. Robert Shishko (recorder)
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 19SI Workshop
Program Transition Impacts
Thursday Morning Program Transition Impacts Splinter SessionSalon IIIAttendees OrganizationTerry Allard ESMD-HQDoug Allen SchaferAlan Angleman National Academies (NRC)Mike Bagham Boeing Phantom WorksChris Crumbly (Facilitator) ESMD-HQAndrew Dean SverdrupJim Duffy Orbital SciencesStan Farkas Ames Research CenterJeryl Hill Langley Research CenterJohn Hutt ESMD-HQChris King RaytheonTedd Lima Hamilton SunstrandDr. Mark Maier (Speaker) Aerospace CorporationDon Monell ESMD-HQJohn Mulholland IBMOlu Olofinboba HoneywellMike Sander Jet Propulsion LaboratoryBud Schurmeier National Academies (NRC)Robert Shishko (Recorder) Jet Propulsion LaboratoryPhilip Smith CA Space Grant FoundationJohn Stevens SM&ARandy Sweet Lockheed MartinRichard Taylor United Space Alliance
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 20SI Workshop
Splinter Session: Acquisition Strategy Splinter The Plaza Room
1. Session objectives: this team will identify key aspects of the acquisition strategy NASA should pursue to implement the End State Option(s). These aspects should include, at a minimum:
a. Recommended contract and solicitation type;b. Desirable industry partnering/teaming arrangements;c. Contractor hardware exclusions (full, partial, none), and specific features or
such exclusions (the more detail here the better!);d. Arrangements for SoSE&I organization/contractor handling of Exploration
system/element hardware prime contractor proprietary/sensitive data;e. Design of incentives.f. Transition strategy.
2. Session leadership:a. Dale Thomas (facilitator)b. Louise Hamlin (recorder)
EXPLORATION SYSTEMS MISSION DIRECTORATE
** Workshop Use Only: Pre-Decisional ** Plenary Session.16Dec04Page 21SI Workshop
Acquisition Strategy
Thursday Morning Acquisition Stragtegy Splinter SessionThe PlazaAttendees OrganizationBill Bastedo Booz Allen HamiltonBarry Boswell Johnson Space CenterWilliam Breen National Academies (NRC)Robert Bruce Stennis Space CenterJerry Cook Marshall Space Flight CenterDaniel Dean SchaferRajiv Doreswamy ESMD-HQKeith Everett Lockheed MartinBob Feconda Orbital SciencesTom Gormley Gormley & AssociatesRoger Goulette SM&ABill Gregory HoneywellLouise Hamlin (Recorder) Jet Propulsion LaboratoryLt. Gen. Vald Heiberg III, US Army (Ret.) National Academies (NRC)Greg Horvath Kennedy Space CenterMike Johnson Goddard Space Flight CenterKevin Langan SAICJerry Lefebvre SAICGeorge Levin National Academies (NRC)Cory Logan United Space AllianceJack Maguire Aerospace CorporationStewart Moses Northrop-GrummanDale Thomas (Facilitator) Marshall Space Flight CenterChuck Vedane BD SystemsJohn Warren ESMD-HQDennis Wingo Skycorp