1 www.frunze.com.uaDecember | 2013 ENERGY STANDART GROUP
ESTABLISHED IN 1896
SUMY FRUNZE NPO
INTEGRATED SOLUTIONS | OIL & GAS
2 www.frunze.com.uaDecember | 2013
WE ARE A PRIVATE COMPANY THAT BELONGS TO FINANCIAL AND INVESTMENT GROUP “Energy Standard Group S.A.” WITH ASSETS IN INDUSTRIAL ENGINEERING, POWER DISTRIBUTION, REAL ESTATE DEVELOPMENT AND RIVER FREIGHT FORWARDING BUSINESS
OUR EXPERIENCE IN INDUSTRIAL ENGINEERING AND PRODUCTION GOES BACK TO 1896
ABOUT US
Established in 1896
Headquarters and manufacturing facilities: Ukraine, 40004, Sumy, Gorky Str. 58
Branch offices: Moscow (Russia) Kiev (Ukraine) Ashgabat (Turkmenistan) Baku (Azerbaijan)
Belongs to private investment company “The Energy Standard Group”
Fully private investment company managing investments in a variety of assets located primarily in Ukraine and Russia
Locations: Moscow, Kiev, Zurich, Zaporozhye Corporate headcount is 120 professionals
Social responsibility:• 2 local recreation sites• Seaside recreation site• Training courses• Healthcare facilities• Sport facilities• Owned soccer team• Youth organization• Local orphanage sponsorship• Partnership with local technical higher
schools for staff qualification enhancement
ESTABLISHED IN 1896
3 www.frunze.com.uaDecember | 2013 ENERGY STANDART GROUP
ABOUT ENERGY STANDARD GROUP
ShareholdersCore industries
Key figuresEnergy Standard Group (ESG)
Fully private investment company managing investments in a variety of assets located primarily in Ukraine and Russia
Locations: Kiev, Zaporozhe, Moscow, Zurich
Corporate headcount is 120 professionals
Ultimate shareholders: 3 businessmen
Above $ 2 bln – aggregate turnover of the companies controlled by ESG in 2012
Industrial engineering and manufacturingElectricity distributionFreight forwardingReal estate
Energy Standard GroupCorporate management
Real Estate • Developing projects, mostly in
Ukraine
Electrical Distribution • 2 power utilities (DNO) in Ukraine• Investments in distributing companies in
Uzbekistan
Industrial Division
• FRUNZE • ZTR (Power transfromer OEM)• Drill collars and kellys plant• others
River and Sea transport
• Marine freight carrier company “UkrRechFlot”
4 www.frunze.com.uaDecember | 2013
6,500 production staff
750 duly qualified design & engineering staff
Affiliate engineering company “UKRKHIMPROEKT”, 250 staff
420 installation & commissioning team
4 product-focused manufacturing sites:• Turbo compressors & turbo generators manufacturing site• Pumping equipment manufacturing site• Fixed equipment manufacturing site • Blank Production
Hydraulic, pneumatic, balancing and full load string test benches
2,100 machinery units & CNC centers
Cranes, indoor & outdoor railway infrastructure
Owned truck fleet
OUR RESOURSES & CAPABILITIES
SUPERIOR VERTICAL INTEGRATION AND HIGH MANEUVREBILITY DUE TO OWN RESOURCES ALLOWS US TO IMPLEMENT THE MOST CHALLENGING PROJECTS AT 1,5-2 TIGHTER TERMS
5 www.frunze.com.uaDecember | 2013
2010 2011 2012 2013F
0
100
200
300
400
500
600
318
477511
546
Revenue
OUR KEY FIGURES
62%
28%
3%1%3%3%1%
Turbocompressors
Oil & Gas Process Equipment
Pumps
Ball Valves
Chemical Process Equipment
Reciprocating Compressors
Misc
68%
16%
13%
2%
Russia
Middle Asia
Overseas
CIS
2012 Sales Breakdown by Products
2012 Sales Breakdown by Regions Overall Sales Geography
Sales 2010 – 2013, m USD
STABLE GROWTH IS PROVIDED BY SECURE MARKET POSITIONING AND VAST INSTALLED POOL OF PRODUCTS THAT PROVIDES CONSIDERABLE AFTER SALES MARKET
6 www.frunze.com.uaDecember | 2013
FRUNZE PRODUCT LIST INCLUDES NOT ONLY A VAST RANGE OF PROCESS EQUIPMENT FOR OIL, GAS, PETROCHEMICAL AND POWER GENERATION INDUSTRIES BUT ALSO COMPLETE SOLUTIONS WITH OWN PRODUCTS IN THE CORE ACCOPMANIED BY ENGINEERING, INSTALLATION, COMMISSIONING AND AFTER SALES SERVICE
Reciprocating compressors, API 618
Gas ball valves, API 6D
Gas turbo generators SC, CHP, CCP
Industrial pumps, API 610
Pumps for nuclear power plants
Process equipment for chemical production plants
Turbo compressors 6.3-25 MW up to 550 bar
Oil & Gas process equipment*
* KO drums, pressure vessels, separators, gas coolers
OUR PRODUCTS
7 www.frunze.com.uaDecember | 2013
WE PROVIDE INTEGRATED SOLUTIONS USING OWN ENGINEERING, MANUFACTURING AND INSTALLATION/COMMISSIONING POTENTIAL PROVIDING UP TO 90% SELF-FABRICATED PRODUCTS WITHIN THE SCOPE
WE IMPLEMENT PROJECTS IN 1,5-2 TIGHTER TERMS, WE TAKE SINGLE SOURCE RESPONSIBILITY FOR MAINTENANCE
Power plants (Simple cycle, CHP, Combined cycle)
Gas process units (treatment of APG to extract NGLs)
Complete lines for chemical production*
Complete gas treatment plants (“dry” HP methane + stable condensate)
* Soda ash, weak nitric acid, helium concentrate, ethylene, propylene, spirits, lubricants
Complete gas compressor stations (booster, gas mains, injection, reinjection)
INTEGRATED SOLUTIONS
8 www.frunze.com.uaDecember | 2013
OUR CLIENTS ARE WORLD’S MAJOR OIL, GAS, ENERGY COMPANIES AS WELL AS SOLUTION PROVIDERS &
OUR PRODUCTS SHOW TROUBLE-FREE PERFORMANCE IN ALMOST 40 COUNTIRES WORLDWIDE
CIS
Latin America
Europe
Middle East
325
29
990
325
29
500
325
29
500
325
29
500
23 910
274
990
Installed Pool of Turbo Compressors and Turbo Generators, MW
Gubkinskoye field
CS Tarutino
Tarasovskoye fieldSevero Komsomolskoye field
CS Daryalyk
CS KhazarCS Astara CS Western Shatlyk
CS Severnaya CS Yilanly
References for EPC Projects (CIS, Middle Asia)
OUR KEY CLIENTS
9 www.frunze.com.uaDecember | 2013
TEST FACILITIES
• Benches for string tests of centrifugal compressors and rotor bundles
• Bench for tests of 6,3 MW turbo compressor trains
• Bench for tests of 16-25 MW assembled turbo compressor trains
• Schenck vacuum balancing chamber for compressor rotors
• Reciprocating compressors and refrigerating machines test benches
• CNG stations test bench
• Power generating equipment test bench
• Valves climatic test bench
• R&D benches
10 www.frunze.com.uaDecember | 2013
EPC Projects team
Construction | Commissioning | Service
Installation team Subcontractors
Design DepartmentProcess Department
Process Development Design documentation development
Project documentation development
Affiliate company
“Ukrkhimproject”PM Team
Project Management
БЭО КЦ
Панели резервного управления (ПРУ)
ГПА1...6
ET200
S7- 400
ET200ET200
ET200
ПРУ КЦ
МСКУ 5000-02
Физ
. лин
ии
Физ
. лин
ии
Физ
. Лин
ии к
БЭ
О К
Ц
Пульт управления
Устройство серверное УС
Розетка Ethernet Раб. станция
АСП КЦ
ET200
ET200
ГПА-1
S7- 400
МСКУ 5000-01
МСКУ 5000-01
ПК5000
(для ГПА1)
SDCentilion 1200
PC CAPOPOWER RS - 232C
Bay Networks
READYALARMRESET
ПСУ ГПА и КЦ
УПИ АСП КЦ
ПК5000
(для ГПА6)
`
WinCCОPС Устройство
коммуникационное УК
P
Канал связи с системой верхнего уровня
САД
`
OSM
SD
SPOKANE, WA ®
800-555-4567
`
Рабочие станции
P P
P
ET200
ET200
ПК5000
(для КЦ)
Аппаратная
БЭО
S7- 400
БЭО
ГПА-6
К ПРУ
БА БА
Операторная
АВО газа
ЛИС АВО газа
S7- 300
БлокЭлектротех-нический
ЛИС АВО газа
S7- 300
БлокЭлектротех-нический
Условные обозначения:
0 Ethernet (по кабелю «витая пара кат. 5")
Ethernet (по оптическому кабелю)
Profibus (по специализированному кабелю Profibus 6XV1830-0EN20)
Profibus(по оптическому кабелю)
P
Физические связи (по контрольному кабелю)
Связь RS 422/485/232 (по кабелю «витая пара» типа КИПЭВ или МКЭВшв)
PACKAGED FACILITIES & EPC PROJECTS
11 www.frunze.com.uaDecember | 2013
Certificates of conformity
PJSC Sumy Frunze NPO has all necessary and supporting documents for its products to be presented at world market
Approvals for operation
• Approvals for operation of products manufactured as per Specifications within GOST R, UkrSepro certification system.
• Approvals for operation of production lot (for delivery contract) in GOST R certification system .
• RB approvals for manufacturing and operation of the equipment for gas main pipelines and petrochemical industry.
• ISO 9001:2008 quality management certificate.
• OHSAS 18001:2007 occupational health and safety management certificate.
• ISO 14001:2004 Environmental management system certificate.
• Gazprom Company Standard 9001-2006 quality management certificate.
• ASME «U» & «РР» certificates.
• API certificates.
CERTIFICATES AND APPROVALS
12 www.frunze.com.uaDecember | 2013
INTERNATIONAL STANDARDS
EN 13455 – Pressure vessels
ASME section VIII – Pressure vessels
ASME section II – Water boilers and steam generators
ASME PTC-10 – test of centrifugal compressors
API-617 – centrifugal compressors
API-614 – lube systems
API 613 – gearboxes
API 671 – couplings
API-670 – vibration measurement systems
API-618 – reciprocal compressors
API-6D – pipeline valves
API-610 – centrifugal pumps (bb4)
We observe following standards while design and fabrication of items:
13 www.frunze.com.uaDecember | 2013
CS process equipment
Booster CS Gas treatment facility
…
Booster CSPlant process equipment
Gas main CS
Gas Turbine Compressor
GAS FIELD GAS PROCESS PLANT GAS PUMPING LINE
GAS COMPRESSOR STATION (CS)
- 80% self made- 20% upon 3rd party design
documentation
Natural gas Natural gas
MarketableNatural gas liquids,condensate
MarketableNatural gas liquids,condensate
Procured
Marketable natural gas
Natural gas
INTEGRATED SOLUTIONS FOR GAS INDUSTRY
14 www.frunze.com.uaDecember | 2013
Primary separation unit
Oil pumping unitRefinery process
equipment
Booster CSGas treatment plant
Power generation unit
Gaslift CS
INTEGRATED SOLUTIONS FOR OIL INDUSTRY
Associated petroleum gas
Dewatered, desalted, degased oil
BOOSTER PUMPING STATION REFINERY
Marketable products
Marketable oil
MarketableNatural gas liquids,condensate
Marketableelectric power
OIL FIELD
Subvendors
Tank battery
CRUDE RECEIVING TERMINAL
Subvendors Subvendors
- 80% self made- 20% upon 3rd party design
documentation
70% of the total scope:- 50% own products- 20%upon 3rd party
design documentation
15 www.frunze.com.uaDecember | 2013
2-3 times shortened construction and commissioning terms due to parallel performance of engineering, development of design documentation, procurement of materials for equipment manufacturing
Sole process equipment supplier
Responsibility to the Customer for quality and operability of the whole complex of supplied equipment
Spare parts maximum commonality
Components uniformity and minimum number of components manufacturers
Prompt solution of cooperation issues at all construction phases
Agreed strategy of the plant operation during the whole equipment service life
Maintenance from single supplier equipment
Plant operation services
ADVANTAGES & BENEFITS WE BRING
16 www.frunze.com.uaDecember | 2013
FRUNZE PRODUCTS AND PACKAGES: INSIGHT
COMPRESSOR AND PUMPING STATIONS
GAS TREATMENT PLANT (FACILITY) REFINERY POWER GENERATION SET
Gas main CS CS for UGS*
Gas-lift CS CS for “cycling-process” Booster CS
Transport CS (for APG)
* Underground gas storages
We design, fabricate and construct CSs for all known applications
17 www.frunze.com.uaDecember | 2013
FRUNZE PRODUCTS AND PACKAGES: INSIGHT
Turbo compressor trains for gas main pipelines
P = 54,9 – 100 Bar, compression rate = 1,35 – 1,5; N= 4,0 – 25,0 МW
Turbo compressor trains for booster stations and underground gas storages
P= 210 Bar, compression rate = 1,7 – 8,0; N= 6,3 – 25,0 MW
Turbo compressor trains for oil industry (gathering and processing of APG, oil gaslift)
P=12,5 – 120 Bar, compression rate = 4,0 – 30,0 and more; N= 6,3 – 16,0 MW
Turbo compressor trains for reinjection of gas for producing gas condensate using “cycling process”
P= 550 Bar, compression rate = 4,0 – 5,5, N= 16 MW
Modular units for booster and gas main compressor stations with electric motor drive
N= 1,0 – 6,3 MW
Vast bank of basic compressor models allows us to provide flexible performance ranges of turbo compressors
COMPRESSOR AND PUMPING STATIONS
GAS TREATMENT PLANT (FACILITY) REFINERY POWER GENERATION SET
18 www.frunze.com.uaDecember | 2013
FRUNZE PRODUCTS AND PACKAGES: INSIGHT
COMPRESSOR AND PUMPING STATIONS
GAS TREATMENT PLANT (FACILITY) REFINERY POWER GENERATION SET
Scrubbers
Capacity, m3/h 2,08x105 1,04x106
Working pressure, bar 18 – 90
Working temperature, oC 60 – 80
Weight, ton 10 – 34
Filtering efficiency, %
40 µm 100
20 µm 99
10 µm 70
Filter-separators
Capacity, SCMH2,08x105 – 1,04x106
Working pressure, bar 90
Working temperature, oC – 60 up to +80
Weight, ton 10 – 30
Filtering efficiency, % up to 100
Hydraulic resistance, bar 0,5
Fuel, start and impulse gas treatment unitsCooled medium pressure, bar 6-160
Area of heat-transfer surface, m2 105-15420
Length of finned pipe, m 1,5-12,2
Fan motor power, Kw 7,5-37
Diameter of fan wheel, m 0,8-4,45
Quantity of fans 1-10
Gas cooling equipment
Capacity, kg/h 650-40000150-12600
Suction pressure, bar
2,4-8,25 0,8-7,6
Discharge pressure, bar
2,4-3,00,25-0,5
Weight, kg 800-23500
We design and manufacture the whole scope of auxiliary equipment for a compressor station
19 www.frunze.com.uaDecember | 2013
FRUNZE PRODUCTS AND PACKAGES: INSIGHT
FRUNZE designs and manufactures Booster Pumping Stations for transportation of oil through pipelines
Specification:
Capacity, m³/min 28,08
Head, m 823
Inlet pressure, MPa - minimum 0,196 - maximum 1,47
Inlet temperature: - minimum 0°C - maximum 60°C
Rotation speed, rpm 2 985
Consumed power, kW 4 034
Weight, kg: Pump – 11 600 Unit – 30 000
Overall dimensions of the unit, mm 8000x2000x2000
COMPRESSOR AND PUMPING STATIONS
GAS TREATMENT PLANT (FACILITY) REFINERY POWER GENERATION SET
20 www.frunze.com.uaDecember | 2013
FRUNZE PRODUCTS AND PACKAGES: INSIGHT
COMPRESSOR AND PUMPING STATIONS
GAS TREATMENT PLANT (REFINERY) REFINERY POWER GENERATION SET
• dry gas• ethane• propane • butane• degased condensate
Gas Field
Booster CSClient
Raw gas Marketable products
We supply 100% packages for a gas plant based on own (up to 80%) and 3 rd party (20%) design documentation
GAS TREATMENT PLANT | 10 BCMA
Total Scope FRUNZE scope
Raw gas CS 1
Gas drying unit 1
Low temperature separation unit 1
Gas fractioning unit 1
Dry gas CS 1
Tank battery 1
Auxiliaries 1
21 www.frunze.com.uaDecember | 2013
FRUNZE PRODUCTS AND PACKAGES: INSIGHT
COMPRESSOR AND PUMPING STATIONS
GAS TREATMENT PLANT (REFINERY) REFINERY POWER GENERATION SET
Up to 70% of total scope of a refinery process equipment can be fabricated by FRUNZE
• A-95, A98 petrol• A-1 jet fuel• Diesel • Basic lube oil (group 3)• Bitumen• Petroleum gases etc
Pumping station
Oil fieldClient
Primarily treated crude Marketable products
REFINERY | 10 MMTPA
Total Scope, up to 30 process units, including:FRUNZE
scope
Atmospheric & vacuum distillation 1
Catalytic reforming 1
Catalytic cracking 1
Fractioning of saturated hydrocarbons 1
Fractioning of unsaturated hydrocarbons 1
Dehydration 1
Methyl tertiary butyl ether 1
Isomerization 1
Hydrocracking 1
Carbonization 1
Asphalt & bitumen 1
22 www.frunze.com.uaDecember | 2013
FRUNZE PRODUCTS AND PACKAGES: INSIGHT
COMPRESSOR AND PUMPING STATIONS
GAS TREATMENT PLANT (REFINERY) REFINERY POWER GENERATION SET
Items designed and fabricated by FRUNZE Items designed by 3rd party fabricated by
FRUNZE
Columns
Heat exchangers
Vessels
Separators
Pumps
Compressors
Filters
Centrifuges
Valves
Reactors
Electric dehydrators
Drum heaters
Isomerization columns
Stripping column
23 www.frunze.com.uaDecember | 2013
FRUNZE PRODUCTS AND PACKAGES: INSIGHT
COMPRESSOR STATIONS GAS TREATMENT PLANT (REFINERY) REFINERY POWER GENERATION SET
Vertical cylindrical design
Steel tanks provide safe storage of oil and oil products with
saturated steams pressure not more than 93.3 kPa at
temperature 20°C
Size ranging from 100 to 50 000 m³
Density of fluids up to 1.015 t/m³
Fluids maximum temperature up to 90°C
Internal excessive pressure up to 2 kPa
Vacuum no less than 0.2 kPa
Seismic category up to 9 Richter Magnitude scale
Oil storage tanks designed by 3rd party can be fabricated by FRUNZE
24 www.frunze.com.uaDecember | 2013
FRUNZE PRODUCTS AND PACKAGES: INSIGHT
COMPRESSOR STATIONS GAS TREATMENT PLANT (REFINERY) REFINERY POWER GENERATION SET
Products:
Simple Cycle gen sets: 6-25 MW
Combined Heat & Power gen sets: 6-25 MW
Combined cycle gen sets: 6-25 MW GT + 4-6 MW ST
Applications:
Associated petroleum gas recovery
Own needs & commercial generation
Remote areas stable power supply
Generation of emergency stand-by power
Heating of residential buildings and housing settlements
25 www.frunze.com.uaDecember | 2013
FRUNZE PRODUCTS AND PACKAGES: INSIGHT
COMPRESSOR STATIONS GAS TREATMENT PLANT (REFINERY) REFINERY POWER GENERATION SET
CHP gen set conceptual diagram (w/intake chiller)Combined cycle gen set conceptual diagram
Item FRUNZESub
vendor Item FRUNZESub
vendor Item FRUNZESub
vendor
Turbine + generator + Power transformers + Frames and metalworks +
GT air filters+ 0.4 kV distributing gear +
Water treatment and fuel feed systems
+
Steam Turbine + Cooling towers (dry) +Lube oil tanks and circulation system
+
Water boiler / Steam generator
+Noise suppression system
+Fire fighting and gas control systems
+
Control system +GT intake & exhaust ducts
+ Water circulation pumping station +
26 www.frunze.com.uaDecember | 2013
1. Capacity, MMSCMD 21,5
2. Suction pressure, kgf/cm2 44,7
3. Discharge pressure, kgf/cm2 76,0
4. Pressure ratio 1,7
5. Shaft rotation, rpm 5200
6. Power capacity, MW 16000
7. Magnetic bearings VNIIEM, Russia»
8 Efficiency 87
Project: ZAPOLIARNOYE FIELD, RussiaScope: Turbo compressor trains GPA-C3-16S/76-1.7М CC-2.3Q-ty: 12Client: JSC «GAZPROM»
REFERENCES FOR SELECTED PROJECTS
27 www.frunze.com.uaDecember | 2013
1. Capacity, MMSCMD 12,3
2. Suction pressure, kgf/cm2 43,3
3. Discharge pressure, kgf/cm2 102
4. Pressure ratio 2,32
5. Shaft rotation, rpm 5200
6. Power capacity, MW 16000
7. Magnetic bearings «WAUKESHA MAGNETIC BEARING»
8 Efficiency, % 82
REFERENCES FOR SELECTED PROJECTS
Project: CS NAKHODKINSKAYA, RussiaScope: Turbo compressor trains GPA-C-16/102-2.32М with magnetic bearings Client: JSC «LUKOIL»
28 www.frunze.com.uaDecember | 2013
1. Capacity, kg/sec 35,32
2. Suction pressure, kgf/cm2 110
3. Discharge pressure, kgf/cm2 505
4. Temperature at suction, 0C 40
5. Temperature at discharge, 0C 107
6. Power capacity, MW 16,0
Only 4 OEMs are capable to provide such a product:
• FRUNZE• MAN• Dresser Rand• GE (Nuovo Pignone)
No analogues in CIS
REFERENCES FOR SELECTED PROJECTS
Project: CS TIMOFEYEVSKAYA, UkraineScope: Turbo compressor trains ТКА-C-16/500 Application: injection, “cycling process”Client: “Ukrgazdobycha”
29 www.frunze.com.uaDecember | 2013
1. Capacity, MMSCMD 1,37
2. Suction pressure, kgf/cm2 3,7
3. Discharge pressure, kgf/cm2 147
4. Pressure ratio 40
5. Shaft rotation, rpm 11500
6. Power capacity, MW 16,0
LP Casing, (5 stages)Compressor 193GC1-276/3,6-16М26
Medium Pressure Casing, (6 stages)Compressor 173GC1-67/15-50М26
High Pressure Casing, (7 stages)Compressor 184GC1-19/48-150М25
Project: TALAKANSKOYE FIELD, RussiaScope: Turbo compressor trains ТКА-C-16/0.37-14.2Application: associated petroleum gasClient: JSC “Surgutneftegas”
REFERENCES FOR SELECTED PROJECTS
30 www.frunze.com.uaDecember | 2013
Turbo-compressor packageТКА-C-25SD/0.58-5.5М1
Operation in «winter» mode
Operation in «summer» mode
Winter Summer
1. Capacity, MMSCMD 5,4 13,5
2. Suction pressure, kgf/cm2 6 24
3. Discharge pressure, kgf/cm2 56
4. Compression ratio 9,4 2,27
5. Rotor speed, rpm 7500 7100
6. Power capacity, MW 25,0
Dual mode “back to back” centrifugal compressor The tender was won at MAN and Dresser Rand
No analogues in CIS
Project: GAZLI FIELD, UzbekistanScope: Turbo compressor trains ТКА-C-25SD/0.58-5.5М1Application: Underground Gas StorageClient: Uzbekneftegas
REFERENCES FOR SELECTED PROJECTS
31 www.frunze.com.uaDecember | 2013
Compressor station (CS) for associated oil gas recovery of Talakanskoye field, JSC «Surgutneftegaz», Russia
Commissioning – 2009
Facility is designed to treat, compress, dry (dew point -40 °С) and transport to injectors associated gas of Talakanskoye field.
Capacity – 1.5 BSCMA
Compressor package:- ТКА-C-16/0.37-14.2 (3 working + 1 standby) with gas-turbine engine NК-16-SТ of 16 МW rated power
Process equipment:- Inlet separator- Adsorption gas dryer- Gas after-coolers- Fuel and start gas treatment unit- Methanol system- Oil supply system- Auxiliary systems
REFERENCES FOR SELECTED PROJECTS
32 www.frunze.com.uaDecember | 2013
MAIN PARAMETERS OF POWER GENERATION UNITS
Drive type NК-16SТ
Generator type Т-16-2RUHL3 ТС 12-2-RUHL3
Electric power, kW 16 12
Fuel gas consumption, kg/sec 1.18 1,0
Client: JSC «Surgutneftegaz», 2005 .This facility is designed to recover associated petroleum gas for
power generatingGas turbine engine NК-16SТ is applied as a drive.Rated capacity of one unit is 12 МW.Every power generation unit consists of : Gas turbine engine Reduction gear Generator Fuel gas treatment unit Engine oil supply system Reduction gear and generator oil supply system Generator cooling system GTE enclosure ventilation system Generator excitation system Fire fighting system Power generation unit ACS
Power generation units for gas turbine power plants, JSC «Surgutneftegaz», Russia
GTPP of Talakanskoye field , the Republic of Sakha-Yakutia
Sheltered version
Modular version
REFERENCES FOR SELECTED PROJECTS
33 www.frunze.com.uaDecember | 2013
Commissioning – 2010.
Facility is designed to collect, carry out the primary treatment and transport associated petroleum gas.
Design capacity – 2.4 BSCMA
BCS “Komsomolskaya” comprises the following process units and structures: Raw gas compressor station, including 4 compressor units (3 working + 1 standby) on
the base of ТКА-C-16/0.3–5.6М1 with gas-turbine engine NК-16-18SТ of 18 МW rated power
Prepared gas compressor station, including 3 compressor units (2 working + 1 standby) on the base of ТКА-C-16/2.1-7.9М1 with gas-turbine engine NК-16-SТ of 16 МW rated power
Gas treatment unit Auxiliary systems
Booster compressor station (BCS) «Komsomolskaya», LLC «RN-Purneftegaz», ROSNEFT, Russia
REFERENCES FOR SELECTED PROJECTS
34 www.frunze.com.uaDecember | 2013
Commissioning – 2012 - 2013.
This facility is designed to increase the pressure of wet natural gas supplied from amine gas sweetening of Mubarek GPP, to dry gas up to dew point -70 °С and extract propane-butane mixture and stabilized condensate from gas before supplying into gas main pipeline system.
Capacity – 12 BSCMA
Scope: Booster compressor station based on ТКА-C-16/73-2.1М1 (3 working + 1 standby) with gas-turbine engine NК-16-18SТ
of 16 МW rated power Absorption gas dryer (3 lines) Propane-butane mixture production unit (3 lines)
To ensure the efficient operation of these facilities the following systems are provided: Fuel and start gas treatment systems Oil supply system Power gas treatment system Auxiliary systems
Propane-butane mixture production plant of «Mubarek GPP», Uzbekistan
REFERENCES FOR SELECTED PROJECTS
35 www.frunze.com.uaDecember | 2013
Commissioning – 2011
This facility is designed to compress associated petroleum gas of «DRAGON OIL» company subsea fields, coming from head onshore facilities and supply it to inlet of gas lift compressor station “Goturdepe”
BCS capacity – 2.0 BSCMACompressor train:
- ТКА-C-16/0.35-2.55 (2 + 1) with gas-turbine engine NК-16-18SТ of 18 МW rated power
Process equipment: Fuel gas treatment system Oil supply system Flare system Gas turbo and diesel power plants Seawater desalination unit Auxiliary equipment
Booster compressor station (BCS) «Khazar», SC «Turkmenneft», Turkmenistan
Commissioning – 2006 This facility is designed to compress associated petroleum gas of
gas-lift oil extraction system and gas transportation systemGLCS capacity – 4.3 BSCMACompressor train:- ТКА-C-16/0.35-5.8 (6 working + 2 standby) with gas-turbine
engine NК-16-18SТ of 18 МW rated powerProcess equipment: Absorption gas dryer Carbon acid production unit Fuel gas treatment system Oil supply system Flare system Auxiliary equipment
Gas-lift compressor station (GLCS) «Goturdepe-2», SC «Turkmenneft», Turkmenistan
REFERENCES FOR SELECTED PROJECTS