Activities in progress (1a):
Functions adopted in the applications
(scheme based on all the subset 108 listed change requests, with
indication of the adopted ones with or without modifications)
The following list is referred on the CRs impacting track side
The list is considered open � additional change requests, i.e. the ones for the SRS 3.0.0., in case have been adopted (or is planned their adoption) in some application existing or future application (realized when 2.3.0 is in force), can be proposed by the interested railways when they will fill the list)
The latest issue at 2.0.1. has not been released tothe Users Group
73
OUTEEIG ref 02Q079: Acknowledgement of STM transitions
OT70
NAEEIG ref 02Q090: Acceptance of "List of balises forSH areas" in SH mode
OT69
comment NID_STM in packet 72OT58
INImmediate level 2 transitionOT55
Telegram or Message CounterOT49
position report in case of passing an unlinked balisegroup
OT40
OUTMeaning of M_ERROR special valuesOT38
INpermitted maximum number of balise groups in the packet "Linking"
OT34
Clarification of termsOT31
Editorial clarificationsOT30
Pending communication sessionOT20
INNetwork address formatOT16
NID-C descriptionT15
Supervision of sequenceOT12
Message flow during termination of a communication session
OT10
INCrossing GSM-R network borderOT7
NAInterface KM centre and OBU6
Message namesOT5
NoteDeviation from agreed solution
or no solution availableClHeadlineO/T
CR
INImpossibility to shift location reference for messages15 & 34
OT207
M DRIVERACTIONS - ambiguous values182
Texts without reference179
End of Information packet by RadioOT172
EEIG ref 062: Indication of track conditionsOT170
EEIG ref 058: NID OPERATIONALOT166
INEEIG ref 056: Revocation of TSR in Level 1OT164
INEEIG ref 048: Types of radio messagesOT158
INEEIG ref 038: Eddy current brake switch offOT151
INEEIG ref 033: TSR sOT146
INEEIG ref 032: Establishment of radio sessionOT145
Position report in level transition142
Q EMERGENCYSTOP definitionOT137
Waiting for train data ack by RBC132
INEEIG ref 02Q1182-: Train Awakening procedureOT126
OUTEEIG ref 02Q073: Passing a signal in SR modeOT124
OUTEEIG ref 02Q064: TSROT123
Emergency Message regarding transmission errorOT96
INHigh priority channel (2)OT94
Specific engineering ruleT86
Repetition of data sent to RBC, but no acknowledgement received
318
OUTFailure of Packet 51 "ASP"OT317
INEngineering (Track Condition; Route Suitability)OT315
OUTPacket 39 Track Condition Change of traction PowerOT311
Contradiction of dimensioning dataT302
OUTEEIG 088 Version compatibility checkOT299
L MESSAGE size291
SRS version reference update289
Version updating error288
OUTTrain running number acquisition258
Last eight reported BG identities stored on board with regard to deletion of stored position data in SoMprocedure.
OT257
Minimum distance between balise groups250
INMinimum distance between the 1st balise of a balisegroup and the EoA
OT248
EEIG 074 ERTMS system version managementOT242
EEIG 073 RBC/RBC interface specificationT241
INWhich value for Q LINKACC shall be used On-boardOT226
INInfill and level transitionT215
INInfill Location ReferenceOT214
INRepositioningOT213
INList of common optional packetsOT209
OUTEEIG119 Level crossing modificationOT413
OUTEEIG108 Gradients and traffic capacityOT409
RBC Identification406
EEIG116 Management of UIC variablesOT400
Message 153OT399
INSpecial value of L_TRAIN = "Unknown"OT398
OUTConditions for Start/End of Text IndicationOT397
Length of M_LOADINGGAUGE395
Definition of DriverAction "Not Used" in SUBSET027394
Message "JRU State"393
INNon Continuous Profile DataOT387
Special Position Report386
OUTKey Management documentation scope is unclear.385
Transmission media for packet 12 is not only baliseOT383
INOptional packet 49 possible in message 3 but not in messages 9, 33, 37
OT382
Storage of and text interpretation forQ_SLEEPSESSION
OT336
M_VOLTAGE variable331
Length of MA information during RBC handover322
Speed supervision behind LOAOT320
LRBG orientation for special position report319
INDefault information also for LoopT489
OUTImpossibility to discriminate MA request reasonOT487
INProposed Engineering rule for discussionT483
Balise detect function482
OUTEEIG ref 134: Supervision of the Radio LinkOT481
EEIG ref 127: Insufficient test spec for togglingOT480
INManagement of renewed RV distance476
INEngineering rules extracted from Safety paperT475
INDefinition of variable Q_FRONTOT460
OUTNational values sent by radio during SoM459
INMeaning and use of Q_DIR of packet 135OT458
Linking to unknown orientation is not possibleOT452
Delete Cold Movement detector from TI FIS448
OUTImprovements of Reverse Movement444
INSupervision of former EoA in SR mode linked toOverride procedure
441
OUTUse of N_ITEROT437
Remembering to update SRS system versionOT428
Names NC_DIFF and V_DIFFOT423
Comment on variables Q_DIRLRBG and Q_DLRBG422
Application rules for packetsOT414
OUTEEIG156: Triple DES ciphering537
OUTEEIG155: ETCS ID identifier byte536
NAEEIG152: Door control supervisionOT535
INEEIG130: Conditional level transition orderOT534
Reporting of fatal error by Sleeping and Non leadingengines.
OT524
Misleading sentences for RBC/RBC announcement.T522
INEEIG ref 146: Release speedOT517
INEEIG ref 144: Repositioning informationOT516
INDeactivation of T_NVCONTACT supervision in case of degraded RBC/RBC Handover
OT508
INUnwanted mode transition during train trip inhibitionOT507
Update of ETCS Safety Analyses needed506
Network address format at fixed interface / interfaceto GSM-R
OT503
NALoss of performance regarding release speed502
INEEIG ref 131: Conditional emergency stopOT499
Repetition of information between an in-fill balisegroup and the related main balise group
T497
Restriction of capacity within the Route RelatedInformation Request
T495
Communication of SR balise list on the RBC/RBCinterface
T494
Removal of Emergency Stop data from Route Related Information
T493
Missing information in the pre-announcementmessage
T492
Acknowledgement of the Route Related InformationT491
Shortening of track description – SSP and gradientprofile must not have “open end”
605
INEEIG ref 186: Use of MA request at entry into level 2OT600
NAEEIG ref 170: Braking curve calculationO595
EEIG ref 174: Speed definitionsOT594
OUTEEIG ref 171: Awakening on loopsOT593
NAEEIG ref 141: Track condition inhibit tiltOT587
EEIG ref 137: DMI planning areaOT586
Follow up from CR 257580
OUTRelease speed578
OUTShort Balise Telegram and National Value Packet577
OUTNew Message 45 'Assignment of coordinate system'568
OUTReporting / recording of balise errorsOT565
Missing Parameter in the Route Related Informationmessage
T564
Release Speed Warning Limit562
No End of mission reporting when no communicationestablished
560
Inconsistencies in procedure “Shunting initiated bydriver”
559
CEDEX JRU problem list553
Unclear definition of big metal masses544
OUTEEIG118: OS mode profileOT542
NADanger for Shunting in Level 0647
Values of V_TRAIN and TRAIN_POSITION for eventlogging in the JRU
643
EEIG ref 201: Overpass EOA speed642
EEIG ref 200: Local time641
EEIG ref 199: DMI indication of default values640
Backward movement and already in FS/OS mode639
OUTSelection of Static Speed Profile according to TrainCategories
638
OUTLimited Supervision637
System Start-up / Execution of Self-Tests636
Extension of MA following TAF not clear635
OUTQ_EMERGENCYSTOP variable not in line withCLR91 and CLR532
634
Inconsistencies in stored/not stored info betweenA3.4 and 4.10
632
Backward movement after entry in FS/OS mode625
Use of variable Q_TRACKDEL unclearly defined622
INMessage counter (M_MCOUNT) rules and associated reaction unclear
OT620
Message Acknowledgement619
Inconsistencies between Subset 035 and Subset 026
618
Informing the RBC when track description has been614
Emergency stop revocation after level transition613
Shunting request information to be displayed in UN mode
607
Inconsistency in override procedure during SOM 659
OUTUpdate of Track Conditions (issue from CEDEX)658
OUTUnsuitability of RBC-RBC handover procedure in case of radio network change
657
OUTFollow-up of CR 126656
INLevel Transitions involving STM Levels655
Unsuited wording of variable description654
Contradiction Level transition immediately in PT653
Impossibility to perform mode transition PT => FS/OS in Level 1
652
Availability of "Shunting request" input for driver651
Train movement in L1 SB without Train Data650
Inconsistency in position report specification and Active Functions Table
649
Roll away protection when coasting648
Activities in progress (1b):
Functions adopted in the applications
(scheme based on all the subset 108 listed change requests, with
indication of the adopted ones with or without modifications)
The following list is referred on the CRs impacting on board
The list is considered open � additional change requests, i.e. the ones for the SRS 3.0.0., in case have been adopted (or is planned their adoption) in some application existing or future application (realized when 2.3.0 is in force), can be proposed by the interested railways when they will fill the list)
INOverride request from Driver in PTO46
specific output in case of braking due to unexpectedbalise messages
O44
INMA after reverse movementO43
position report in every train-to-track telegramO41
position report in case of passing an unlinked balisegroup
OT40
restricted use of duplicated balisesO39
OUTMeaning of M_ERROR special valuesOT38
failure on implementation side withrestriction for trackside
INOnboard deletion of data in case of overwriting anLTA
O36
failure on implementation sideINDriver Information when onboard commands the SB or EB due to a balise data inconsistency
O35
INpermitted maximum number of balise groups in the packet "Linking"
OT34
Clarification of termsOT31
Editorial clarificationsOT30
Pending communication sessionOT20
INNetwork address formatOT16
Supervision of sequenceOT12
Message flow during termination of a communication session
OT10
INCrossing GSM-R network borderOT7
NAInterface KM centre and OBU6
Message namesOT5
NoteDeviation from agreed solution
or no solution availableImplemente
dClHeadlineO/T
CR
EEIG ref 02Q070: Odometry inaccuracy at exit of speed restriction
O78
EEIG ref 02Q068: Splitting of an ERTMS trainO76
EEIG ref 02Q062: STM speed supervisionO75
Subset Number the same as for the JRU FFFISO74
The latest issue at 2.0.1. has not been released tothe Users Group
73
EEIG ref 02Q074: Insertion of packet 0 in allmessages from train to RBC
O71
OUTEEIG ref 02Q079: Acknowledgement of STM transitions
OT70
NAEEIG ref 02Q090: Acceptance of "List of balises forSH areas" in SH mode
OT69
EEIG ref 02Q089: Reporting mode changes to the RBC
O68
EEIG ref 02Q083: Non relevant information for driverO66
EEIG ref 02Q082: default shunting speedO65
failure on implementation sideINOdo inaccuracy with track conditionsO63
comment NID_STM in packet 72OT58
Mode related speed restriction in SHO57
Reserved values in M DRIVERACTIONSO56
INImmediate level 2 transitionOT55
Position Report in RV modeO51
INSession Management in SH rejectedO50
Telegram or Message CounterOT49
provides a way out which wouldotherwise be a deadlock
missing transition from TR, PT to SLO47
OUTEEIG ref 02Q064: TSROT123
INTrack Condition Change of traction powerO120
Non leading is endedO119
INTransition failureO115
INRepositioning and cross talkO110
Output informationO107
Availability of Acknowledgement buttonO105
There is no acceleration data specified as specifictrain data.
O103
INCommunication session establishmentO102
Permitted speed in RVO101
MMI versus mode tableO100
MMI versus internal informationO99
INHandling of Default Balise TelegramO98
Emergency Message regarding transmission errorOT96
INHigh priority channel insertion of MAO95
INHigh priority channel (2)OT94
INSpace Critical EMO91
High Priority channel (3)O90
INAdditional linking reactionO88
Transition to non fitted SE/SNO83
INEEIG ref 038: Eddy current brake switch offOT151
NAEEIG ref 036: TIMS data missingO149
EEIG ref 035: Leaving Isolation modeO148
INEEIG ref 033: TSR sOT146
INEEIG ref 032: Establishment of radio sessionOT145
INBalise Group Message Consistency check in SRO144
INStaff Responsible distance supervisionO143
Position report in level transition142
Geographical position in SHO141
Reversing distance sent by the RBCO140
Brakes release after max reversing distanceoverpassed
O138
Q EMERGENCYSTOP definitionOT137
INTransition SR>OS for further loc.O136
L_MAMODE for a shunting areaO134
Requirement doesn't belong to the chapterO133
Waiting for train data ack by RBC132
Confusing definition of Tamt.O130
Short number programmed in balise identification.O128
INEEIG ref 02Q1182-: Train Awakening procedureOT126
OUTEEIG ref 02Q073: Passing a signal in SR modeOT124
INUnconditional Emergency Stop in SRO197
EoMission during RBC HandoverO187
Message 42 further deletionsO186
Data from single balise groupsO183
M DRIVERACTIONS - ambiguous values182
Braking without indication of reason at standstillsupervision
O180
Texts without reference179
Loss of End of Profile elementsO177
INReq. for Nat. Values unclearO174
End of Information packet by RadioOT172
EEIG ref 062: Indication of track conditionsOT170
NAEEIG ref 061: Non stopping informationO169
EEIG ref 060: MA requestO168
EEIG ref 058: NID OPERATIONALOT166
INEEIG ref 056: Revocation of TSR in Level 1OT164
EEIG ref 052: KER interfaceO160
INEEIG ref 048: Types of radio messagesOT158
EEIG ref 047: Valid direction for Reverse MovementProtection in SR
O157
INOverride EOA inconsistencyO155
EEIG ref 044: Text message inconsistencyO154
EEIG 043: Unknown text messageO232
INTransitions from SN/SE/UN to SRO231
INWhich value for Q LINKACC shall be used On-boardOT226
Table of Supported Levels must be restored at Start of Mission
O223
failure on implementation sideINShunting ordered by tracksideO219
failure on implementation sideINState chart for OS procedure is partly incorrect & mode transition conditions 34 & 40 unclear
O218
Transition TR/SNO217
ambiguity of distance information in profile dataO216
INInfill Location ReferenceOT214
INRepositioningOT213
Requirement for Data Entry Request and Train Data Input Information to be Active/Available Post Trip Technical Mode.
O211
failure on implementation sideINTransitions form Post Trip mode to Non-Leadingmode
O210
INList of common optional packetsOT209
INImpossibility to shift location reference for messages15 & 34
OT207
Note to be removedO205
Report of train position when change of trainorientation
O204
Default gradient of TSR forgottenO203
Memorised balise groups for special position reportnot mentioned in table 4.10.1.3
O202
Supervision of radio link : unclear requirementO201
Revocation of Emergency Stop in SRO198
Indication of supervision limits in SR modeO264
Length of DRIVER IDO262
Transition from PT to SH when ordered by tracksideO259
OUTTrain running number acquisition258
Last eight reported BG identities stored on board with regard to deletion of stored position data in SoMprocedure.
OT257
INAck window different for OS and SHO256
Procedure Train Trip : coexistence of a conditionalemergency stop and a trip due to a different reason
O254
INValidity direction of transmitted information : requirement 3.6.3.1.3 too restrictive and inconsistentwith figure 11
O253
INPriority problem between mode transitions [39] & [44]
O252
Minimum distance between balise groups250
INMinimum distance between the 1st balise of a balisegroup and the EoA
OT248
List of expected balises in SR modeO247
EEIG 074 ERTMS system version managementOT242
EEIG 072 JRU changesO240
EEIG 070 Train data on TIUO239
EEIG 069 Shifted reference locationO238
EEIG 067 Service Brake T NVCONTACTO237
EEIG 065 Train data after loss of radio communication
O235
INEEIG 064 Override EOA and stop in SRO234
OUTEEIG 050: Managing track conditionsO233
INcorrection of mode transition tableO314
Level Transition at estimated - or maximum safefront end
O312
OUTPacket 39 Track Condition Change of traction PowerOT311
RBC transition order analog to level transition orderO309
INInhibition of transition to the trip mode for OverrideEoA
O308
ETCS functions access by the STM in SL ModeO301
OUTEEIG 088 Version compatibility checkOT299
EEIG 087 Level selection by driverO298
EEIG 086 Override requestO297
EEIG 085 Linking reaction info to RBC.O296
EEIG 083 Indication to braking curve areaO294
End of MissionO293
L MESSAGE size291
SRS version reference update289
Version updating error288
Smooth transition and continuous supervision at the level Transition
O285
ETCS accepted information from STM X (SE)O284
Transition SB-->SN after ACK [58]O269
End of mission: terminate communication session, ifcomm. session exists
O268
Information to driver about reason of train tripO265
OUTKey Management documentation scope is unclear.385
Transmission media for packet 12 is not only baliseOT383
INOptional packet 49 possible in message 3 but not in messages 9, 33, 37
OT382
Display of maximum shunting speedO381
INEOM possible from RV modeO379
NAEEIG111 Position accuracyO378
INEEIG104 Rejection of info after not ignored Em stopO375
EEIG103 Reason for TR on DMIO374
EEIG097 Mixed level transition announcementO373
NAEEIG095 FIS EVC - EIRENE Voice RadioO372
Some Errors in Active Functions TableO338
Storage of and text interpretation forQ_SLEEPSESSION
OT336
M_VOLTAGE variable331
Length of MA information during RBC handover322
failure on implementation sideSpeed supervision behind LOAOT320
LRBG orientation for special position report319
Repetition of data sent to RBC, but no acknowledgement received
318
OUTFailure of Packet 51 "ASP"OT317
failure on implementation sideLevel Tr. for which on-board not fittedO316
INEngineering (Track Condition; Route Suitability)OT315
EEIG113 STM transition in trip situationO411
NAEEIG112 Shunting in STM areasO410
OUTEEIG108 Gradients and traffic capacityOT409
Brake application and revocation by the samesystem
O408
RBC Identification406
Ack of train data also in TR and PTO403
When is linking used onboardO402
EEIG116 Management of UIC variablesOT400
Message 153OT399
INSpecial value of L_TRAIN = "Unknown"OT398
OUTConditions for Start/End of Text IndicationOT397
OBU can receive MA and other information after End of Mission
O396
Length of M_LOADINGGAUGE395
Definition of DriverAction "Not Used" in SUBSET027394
Message "JRU State"393
Ambiguity: SSP and gradient must cover "the full length of the MA"
O392
failure on implementation sideBalise consistency check in RV modeO390
INOverride in SB mode regarding shuntingO389
INNon Continuous Profile DataOT387
Special Position Report386
OUTImprovements of Reverse Movement444
INSession management and ack of term of commsessto be immediately accepted if received fromaccepting RBC.
O442
INSupervision of former EoA in SR mode linked toOverride procedure
441
Mistake in Active Function Table for SHO438
OUTUse of N_ITEROT437
INReversing area boundaries not clearO436
Linking reaction, logging thereofO433
Remembering to update SRS system versionOT428
SRS reference missingO426
Names NC_DIFF and V_DIFFOT423
Comment on variables Q_DIRLRBG and Q_DLRBG422
INTreatment of inconsistency between duplicatedbalise telegrams.
O421
partly and failure on implementationside
INInconsistencies for stored/accepted infoO419
Target speed & distance output information to driverO418
INRejection of track description information beforerevocation of conditional emergency stop.
O417
"No track condition information will be received" message to the driver in NL mode.
O416
Transition between STM levelsO415
Application rules for packetsOT414
OUTEEIG119 Level crossing modificationOT413
EEIG114 Brake command in NP modeO412
INEoA at the end of the On Sight areaO470
INCompleteness of dataO469
Transition from TR to UNO466
INLocation reference for in-fill informationO464
MA shortening due to change of train dataO463
Inconsistency: Sent train data and acceptAcknowledgement in NL
O461
INDefinition of variable Q_FRONTOT460
OUTNational values sent by radio during SoM459
INMeaning and use of Q_DIR of packet 135OT458
INHandling V_LOA, MA section time outO457
Position report sending when passing level transitionlocation with train rear end
O455
partlyINGeographical positionO454
National/Default valuesO453
Linking to unknown orientation is not possibleOT452
Further changes with reference to CR 66 and CR 91O451
Mode transition condition not correctly wordedO450
INShunting init. by Driver, missing modeO449
Delete Cold Movement detector from TI FIS448
Resuming initial state for non continuous profile dataO446
INTSR deleted when entering SR modeO445
Train Orientation not well definedO505
INRelease Speed after Section TimeoutO504
Network address format at fixed interface / interfaceto GSM-R
OT503
NALoss of performance regarding release speed502
INAccepted information depending on modeO501
OUTEEIG ref 133: Tilting malfunctioningO500
INEEIG ref 131: Conditional emergency stopOT499
Exc. permitted distance in PT modeO490
Geographical position handling in RV modeO488
OUTImpossibility to discriminate MA request reasonOT487
Review of SRS by STM WGO485
Balise detect function482
OUTEEIG ref 134: Supervision of the Radio LinkOT481
EEIG ref 127: Insufficient test spec for togglingOT480
EEIG ref 125: Establishment of Safe Connection -Retries
O478
INEEIG ref 123: Big metal massO477
INManagement of renewed RV distance476
Additional data input by driverO473
INOrder to contact a different RBC from the one currently in session
O472
No acknowledgement of termination of a communication session received
O471
Start of Mission procedure re-engaged when sessionis not terminated.
O531
Reporting of PT mode when no communicationsession established.
O530
Reactivation of Radio link supervision after a radio hole
O529
INContradictionO528
INTAF request is a stored informationO525
Reporting of fatal error by Sleeping and Non leadingengines.
OT524
INAbortion of SoM while in SB mode.O523
Train location function for non leading and sleepingengines
O521
OUTEEIG148: Use of default values after NP modeO519
INEEIG ref 146: Release speedOT517
INEEIG ref 144: Repositioning informationOT516
OUTEEIG ref 138: Cold movement detectionO514
NAEEIG080 Non Leading modeO513
INAccepted information received by radio when the train orientation is unknown
O512
Train speed indication in SB modeO511
INAcceptance of Mode profile when MA is rejected.O510
Confusing reference in table 4.5.2O509
INDeactivation of T_NVCONTACT supervision in case of degraded RBC/RBC Handover
OT508
INUnwanted mode transition during train trip inhibitionOT507
Update of ETCS Safety Analyses needed506
INCriteria for sending position reportO556
INExit of On Sight area to a Shunting areaO555
INEEIG ref 167: MA/track condition in Trip modeO554
CEDEX JRU problem list553
RBC handover, degraded situationsO552
Transition from TR to UN in level 0 when the onboard equipment was previously in SH mode.
O548
INNo reactivation of train trip when passing a baliseout of the SH list when in SH mode.
O547
No train data in shunting and non leadingO546
Unclear definition of big metal masses544
Driver information missingO543
OUTEEIG118: OS mode profileOT542
EEIG151: SR mode acknowledgementO540
NAEEIG096: Set speed indication for driverO539
INEEIG152: Geographical position in SE modeO538
OUTEEIG156: Triple DES ciphering537
OUTEEIG155: ETCS ID identifier byte536
NAEEIG152: Door control supervisionOT535
INEEIG130: Conditional level transition orderOT534
NAEEIG124: Availability of speedometer display in IS mode
O533
INAcknowledgement of Emergency Stop message.O532
NAEEIG154: JRU failureO589
NAEEIG ref 141: Track condition inhibit tiltOT587
EEIG ref 137: DMI planning areaOT586
EEIG ref 132: STM max speedO584
EEIG ref 068: Indications on DMI in SR/OS modeO583
Permitted speed in UN modeO582
INM_VERSION spare valuesO581
Follow up from CR 257580
Target speed at target distanceO579
OUTRelease speed578
OUTShort Balise Telegram and National Value Packet577
OUTNew Message 45 'Assignment of coordinate system'568
OUTReporting / recording of balise errorsOT565
MA request if section timer expiresO563
Release Speed Warning Limit562
Availability of "Start" button in SE/SN modeO561
No End of mission reporting when no communicationestablished
560
Inconsistencies in procedure “Shunting initiated bydriver”
559
Wording inconsistencies for linkingO558
Reset of MA request parameters and position reportparameters
O557
INMessage counter (M_MCOUNT) rules and associated reaction unclear
OT620
Message Acknowledgement619
Inconsistencies between Subset 035 and Subset 026
618
INTwo communication sessions between OBU and the same RBC.
O616
INContradiction between 4.4.2.2. and 4.6.2O615
Informing the RBC when track description has been614
Emergency stop revocation after level transition613
Shunting request information to be displayed in UN mode
607
Shortening of track description – SSP and gradientprofile must not have “open end”
605
EEIG ref 181: Override procedureO604
EEIG ref 192: OS acknowledgementO601
INEEIG ref 186: Use of MA request at entry into level 2OT600
EEIG ref 191: Reconnection after unexpected radio hole
O599
EEIG ref 184: Communication session in SL modeO597
NAEEIG ref 170: Braking curve calculationO595
EEIG ref 174: Speed definitionsOT594
OUTEEIG ref 171: Awakening on loopsOT593
OUTEEIG ref 172: Managing route suitabilityO592
EEIG ref 169: Change of train lengthO591
Train movement in L1 SB without Train Data650
Inconsistency in position report specification and Active Functions Table
649
Roll away protection when coasting648
NADanger for Shunting in Level 0647
INEEIG ref 203: Beginning of SR distanceO645
Values of V_TRAIN and TRAIN_POSITION for eventlogging in the JRU
643
EEIG ref 201: Overpass EOA speed642
EEIG ref 200: Local time641
EEIG ref 199: DMI indication of default values640
Backward movement and already in FS/OS mode639
OUTSelection of Static Speed Profile according to TrainCategories
638
OUTLimited Supervision637
System Start-up / Execution of Self-Tests636
Extension of MA following TAF not clear635
OUTQ_EMERGENCYSTOP variable not in line withCLR91 and CLR532
634
INRepetition of packet 254 in a balise group messageO633
Inconsistencies in stored/not stored info betweenA3.4 and 4.10
632
Backward movement after entry in FS/OS mode625
Use of variable Q_TRACKDEL unclearly defined622
INClarify use of M_DUP and P44O621
forbidden in baseline 2.3.0OUT
included in baseline 2.3.0IN
not applicableNA
LEGEND
……
……
Inconsistency in override procedure during SOM 659
OUTUpdate of Track Conditions (issue from CEDEX)658
OUTUnsuitability of RBC-RBC handover procedure in case of radio network change
657
OUTFollow-up of CR 126656
INLevel Transitions involving STM Levels655
Unsuited wording of variable description654
Contradiction Level transition immediately in PT653
Impossibility to perform mode transition PT => FS/OS in Level 1
652
Availability of "Shunting request" input for driver651
Activities in progress (1c):
Tested Functions and related
(scheme of the tests with indication of the tests done and the criticalities found in these tests, indicating also the adopted solutions to solve the found criticalities)
The list is considered open � additional tests can be proposed by the interested railways when they will fill the list)
testedRemarksimpacts by operation/specification[difference
or selection]
testedFunctionality
......
…..
ytwo mobils
yymaintaining Radio Communication Session with RBC
Maintaining Radio Communication Session
nnTermination of Radio Communication Session with RIU
ycould only be tested in laboratory
yTermination of Radio Communication Session with RBC
Termination of Radio Communication Session
none mobil
ntwo mobils
nnInitiated by RBC
nCR is proposed toUNISIG and will beinside version 2.3.0
if the radio connaction tothe new RBC is notestablished (failure toGSM-R or elsewhere) trainis not superviced due toT_NVCONTACT
Management RBC-RBC transion with one mobile with a separat timer
ynational solutionSolution of Italysolved by a addional on-board timer
Management RBC-RBC transion with one mobile without supervisen by ETCS as specification
yyone mobil
yytwo mobils
yyEstablish Communication Session to RBC
nnEstablish Communication session with RIU
yyInitiated by Onboard
Establishing Radio Communication Session
Radio Communication
testedRemarksimpacts by operation/specification[difference
or selection]
tested
Functionality
nnTransitions to Reversing Mode
in atto per omologazio
ne SSB
national system withbehavior of STM
yTransitions to STM National Mode
nnTransitions to STM European Mode
yspecial button at the OBUyTransitions to Isolation Mode
yyTransitions to System Failure Mode
yyTransitions to Post Trip Mode
yyTransitions to Trip Mode
yused if NE is not availablediff.yTransitions to Unfitted Mode
nnTransitions to Non Leading Mode
nnTransitions to Sleeping Mode
nwill be activated by a special signal (Zs7/11)
yTransitions to On Sight Mode
ywill be activated by a special signal (Zs1) or action by driver
yTransitions to Staff Responsible Mode
ywill be activated by a master signal (Hp 0 or 1or 2)
yTransitions to Full Supervision Mode
nnTransitions to Shunting Mode
yyTransitions to Stand By Mode
yyTransitions to No Power Mode
……
The listed test pattern concerns about 200 scenariosList shall be performed at each supplier subdivided toOBU and RBC or LEU; result will be indicated to a matrix
Activities in progress (2):
Interfaces (Trackside and on board) list proposal
(list based on the Unisig architecture with indication for eachone of the interest of different railways to agreed / define a standard)
The list is considered open � additional interfaces can be proposed by the railways that will fill the scheme
( F I S )
M M I T I U
F I S F F F I S
F F F I S F F F I S
F I S F I S F F F I S
( F F F I S )
F I S
F F F I S
( F F F I S )
E T C S
O n b o a r d
E T C S T r a c k s i d e
F I S
F I S
F I S
F I S
E U R O R A D I O
E U R O R A D I O B T M L T M
K e r n e l O d o m e t r y
J u r . R e c o r d i n g
G S M - M o b i l e
G S M f i x e d n e t w o r k
R B C 1
R B C 2
K e y M a n a g e m e n t
C e n t r e
E U R O B A L I S E E U R O L O O P
I n t e r l o c k i n g a n d L E U
S T M
C o n t r o l C e n t r e
N a t io n a l S y s t e m
D r i v e r T r a i n J R U
D o w n l o a d i n g t o o l
R a d i o in f i l l u n i t
E U R O - R A D I O
ETCS lay ETCS lay -- outout
PrioRFIPrioDB AG CER Cr
intendedTSI
requirementCommentsInterfaces
Yeson-boardExisting spec. to be improvedEVC - TIU (Diagnostic;
Automatic speed control; Pantho management)
on-board97E881-6(G?)EVC - Pneumatic brake
YesYesYeson-board / track-side
KMC
YesYesYeson-boardGaderos (FP5)GPS information
YesYesYeson-boardEVC - service
YesYesYeson-boardEVC - BTM/LTM or Antennae
YesYesYeson-boardIndex 55JRU - Downloading
YesYesYesFRSon-boardEirene, 99E5362EVC - GSM-R
YesYesYeson-boardIndex 55EVC - JRU
YesYesYesCCS Annex A (FIS)
on-boardEEIG 97E267 - to be checkedEVC/STM - Odometry
Yesshallshall
YesHS RST (4.2.7.15, 4.3.5.40)
on-board05E446 (EEIG); TS 50459; UIC
612-01,02,06; including DEDMI -Driver
YesshallYesYesHS RST (4.2.7.15, 4.3.5.40)
on-board
FFFIS based on WG12, MODTRAIN/MODCONTROL FIS
on interface ETCS - DDU (Driver-Display-Unit = DCPU)
EVC-DMIh
On Board interfaces
PrioRFIPrioDB AG CER Crintended
TSI requirement
CommentsInterfaces
Yestrack-sideRIU, Encoder, EurobaliseTrackside-tracksideobjects
track-sideETCS Regional,
Eurointerlocking (for LX, Switches (signals))
RBC/IL - Track-sideobjects
YesYestrack-sideto be investigated by BVRBC-RBC national
track-sideRBC -IL
Track side interfaces
Links with SBB, OBB and Banverket are in progress, and will start the links with other railways (France, Spanish, Holland, …) As a first step all the platform attending railways could add their own column on these tables filling their data and eventually adding other Interfaces (track side and on board), that they consider to be standardized.
Activities in progress (3):
Definition of a costs scheme for the (trackside and on board) costs allocation
(The already known SubSystems Brekdown Structure of the Roma Naples application, has been improved. A verification of its usability and also the data confidence is planned using the same approach for the Torino Novara application. In parallel some French colleagues started the assessment for the usability of this or similar approach in applications using the level 1 solution, over posed or not on existing systems)
The scheme (s) for the different situations will be considered a proposal to be improved / modified to be finalized after the platform railways agreement on the usability of it for the allocation of the known costs of existing application.A significant progress will be the use of the same scheme to drive the definition of the costs for the future applications, at least for a part of the whole costs, clearly defined in the scheme, that can be considered indipendent from the application.
CCS System Cost AnalysisCase Study: Roma-Napoli High Speed Line
• The information are normally strictly confidential
• The proposed “Cost Analysis” approach concerns a “Turn-Key” system and takes into account all the technologies related with the CCS system (such as: SCC, TLC, Interlocking, etc.)
• The Cost Analysis data and elements have been derived from the contract for the design and construction of the complete Roma-Napoli High Speed line, managed by an unique General Contractor totally responsible of the whole project
CCS Sub-System Cost AnalysisCase Study: Roma-Napoli High Speed Line
• The structure of the system under consideration is based on the “Work Breakdown Structure (WBS)” defined in the contract
• The data concerning the costs are referred to the date of contract drawing up. The up today cost adjustment can be obtained multiplying each cost by the adjustment factor (in our case the factor value is K= 1,2223)
Vital Routing Equipments, Indoor FieldLocations, (NVP)
ISSEGNALAMENTO
Field (Switching stations and Full Line)
MV/LV POWER STATION
Power Supplying, Central Office UPS & Diesel Generator
Air-conditioning, Central Office
Antintrusion, Central Office
Fire Fighting, Central Office
SISTEMA TELEFONICO
ST
Long Distance TLC (LD), central office
LD
GSM-R (Wayside - Train) TLC, central office
TTERTMS Telecommunications
Comandi protetti
Telecomunications Control System
Energy Control System
Alarm Monitoring, Diagnostic & Maintenance
Traffic control,
GDCommand and Control Centre (SCC)
VMMI SIL4
Apparecchiature e finiture
Funzioni Aggiuntive RBC
ISRadio Block Centre (RBC)
Local Central Office (PCS)
Groups (3)Equipments (2)Sub-Systems (1)
First 3 First 3 levelslevels
(complete data available till 5° level.some 4° level haveto be consideredfor the costsallocation)
Activities in progress (4):
Braking status of the art and additional elements derived from the existing applications adopted solutions.
Elements to consider in order to guaratee a real interoperable behaviour (Trackside and on board conditions to fulfill), referenced both to the documents EEIG, UIC, … and to the choice done in existing applications.
The most important result should be to separate the constraints for the trains and the ones for the track side subsystem. The track conditions have to be clearly stated in the applications and the trains can run there only if they comply with this conditions (at least have to comply with the defined train constraints for the interoperability,
Activities in progress (5):
STM – current situation, foreseen needs, possible strategies
Elements to consider concern where and when and in which form should be available the STMs.
The most useful STM is the lower cost modular one, whit a standardized interface to the ETCS.The activities to collect the experiences related to the existing applications, mostly based on an integrated solution, started. The goal is to demonstrate the advantages and the problems derived from these solutions in order to establish the best future approach for this question.
Summary:
For some of the previous activities (Adopted functions, interfaces, Costs) is ready a first draft scheme, perhaps to upgrade with the contribution of the platform raiways. The agreed schemes will be the form to which the platform railways will address the data available.
Other activities (braking, STM) started at national level , to collect the reference documents and the use of them on the Rome – Naples).
Before the next platform, the schemes should be improved, distributed and filled by the railways with their available data.
A dedicated workshop concerning the finalization of this first sA dedicated workshop concerning the finalization of this first step and the tep and the definition of the following steps will be organized in a proper definition of the following steps will be organized in a proper time, inviting time, inviting the interested bodies (at least the ones in red in the followingthe interested bodies (at least the ones in red in the following slide) in order slide) in order to allow, in the next platform, to have some first basic resultsto allow, in the next platform, to have some first basic results..
Interoperability interested bodies and linkssemplified scheme
Art 21Art 21
UICUIC
ERTMS Platform UICERTMS Platform UIC
ERTMS Platform RFI Mirror Group
ERAERA
CERCER
EIMEIM
Safety Platform UIC
Corr. C Corr. D Corr. E Corr. FCorr. B
Steering Steering MoUMoU (EC (EC MigrationMigration CoordinatorCoordinator))
UN
ISIG
UN
ISIG
EEIGEEIG
Executive Board Management Commitee
Project Managers
Executive Board Management Commitee
Project Managers
Corr. A
Europea JournalEuropea Journal
MinistersMinisters I MI M