Download ppt - Erfurt Cnu2009rev

Transcript
Page 1: Erfurt Cnu2009rev

Cost Savings for Freeway Teardowns

Replace, Prevent, Remove

Prepared by:

Edward W. Erfurt IVUrban DesignerTown Planning and Design

www.ErfurtDesign.com

June 13, 2009

Page 2: Erfurt Cnu2009rev
Page 3: Erfurt Cnu2009rev

FrameworkUnderstanding

Page 4: Erfurt Cnu2009rev
Page 5: Erfurt Cnu2009rev

…The idea of systemic, long lasting,

transformative change.

…The idea of systemic, long lasting,

transformative change.

Suburban Retrofits reintroduce the components of urbanism that were either illegal, undesired, or

missing from much of suburbia.

Suburban Retrofits reintroduce the components of urbanism that were either illegal, undesired, or

missing from much of suburbia.

Page 6: Erfurt Cnu2009rev

Three Types of Freeway RemovalsThree Types of Freeway Removals

2. Remove

3. Prevent

1. Replace

Page 7: Erfurt Cnu2009rev

ReplacementTear Down Types

Page 8: Erfurt Cnu2009rev

• Fundamental Change in Design

• Change in Classification

• Maintenance or Ownership

• Functional Class

• Change in Priority

• Introduction of Transit

• New Community Vision

• Catastrophic Change

• Structural Failure

•Natural Disaster

Replacement

Page 9: Erfurt Cnu2009rev

South Military Highway

Chesapeake, Virginia

Page 10: Erfurt Cnu2009rev

Grade Separation without a Grade ChangeGrade Separation without a Grade Change

Page 11: Erfurt Cnu2009rev
Page 12: Erfurt Cnu2009rev
Page 13: Erfurt Cnu2009rev

13

Existing Street Network

Division

Powell

I - 2

05

82nd

Ave

.

92nd

Ave

.

Station Area Planning: Division Street Station, Powell Street Station:

Portland, OR

Page 14: Erfurt Cnu2009rev

Division

I-205

92nd

Ave

nue

Page 15: Erfurt Cnu2009rev

Division

I-205

92nd

Ave

nue

Page 16: Erfurt Cnu2009rev

16

Division Station

Page 17: Erfurt Cnu2009rev

17

Division Station

Page 18: Erfurt Cnu2009rev

River Front Parkway

Chattanooga, Tennessee

Page 19: Erfurt Cnu2009rev
Page 20: Erfurt Cnu2009rev
Page 21: Erfurt Cnu2009rev
Page 22: Erfurt Cnu2009rev

Removal Tear Down Types

Page 23: Erfurt Cnu2009rev

• Completely Removing a Structure

• Evaporates the Traffic

• Removal or Consolidation of Ramps

• Abandonment of Right of Way

• Untangling a Confluence

• Increasing Access

Removal

Page 24: Erfurt Cnu2009rev
Page 25: Erfurt Cnu2009rev
Page 26: Erfurt Cnu2009rev
Page 27: Erfurt Cnu2009rev
Page 28: Erfurt Cnu2009rev
Page 29: Erfurt Cnu2009rev

Cheonggyecheon

, Seoul, South Korea

Page 30: Erfurt Cnu2009rev

Same corridor after CSS

Page 31: Erfurt Cnu2009rev

PreventionTear Down Types

Page 32: Erfurt Cnu2009rev

• Paper Plans

• Waiting for Funding

• Need for Immediate Change

• Current Traffic Problems

• Safety Issues

• Required Maintenance

Prevention

Page 33: Erfurt Cnu2009rev

Prevention

Montrose Parkway

White Flint, Maryland

Page 34: Erfurt Cnu2009rev
Page 35: Erfurt Cnu2009rev

Cost Savings for Freeway Teardowns

Replace, Prevent, Remove

Prepared by:

Edward W. Erfurt IVUrban DesignerTown Planning and Design

www.ErfurtDesign.com

June 13, 2009

Page 36: Erfurt Cnu2009rev

Recommended