8/3/2019 EQ 3.1 - IAQ Mgt Plan - During Construction
1/3
LEED-NC 2.2 Submit tal Template | Last Modified: Apri l
LEED-NC 2.2 Submittal Template
EQ Credi t 3.1: Construction IAQ Management Plan:During Construction
I, , from
verify that the information provided below is accurate, to the best of my knowledge.
(Company Name)(Responsible Individual)
CREDIT COMPLIANCE
A copy of the project's Construct ion Indoor Air Quality (IAQ) Management Plan has been uploaded. The plan hasbeen developed following the recommended Design Approaches of the Sheet Metal and Air Condit ioning National
Contractors Association (SMACNA) IAQ Guideline for Occupied Buildings under Construction, 1995, Chapter 3.
The project's air handling units were operated during construction.
Photos highlighting the IAQ Management Plan practices have been uploaded. The photos havebeen labeled to identify the highlighted approach.
If the air handling units were operated during construction, please provide a listing of the installed fi lters and their locations
in the table below.
Yes No
Yes No
Fil ter Manufacturer
FilterIdentification
(Model #)
Filter MERV
Rating
Location of
Installed Fil ter
Fil ter was ReplacedImmediately
Prior To Occupancy
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
8/3/2019 EQ 3.1 - IAQ Mgt Plan - During Construction
2/3
LEED-NC 2.2 Submit tal Template | Last Modified: Apri l
LEED-NC 2.2 Submittal Template
EQ Credi t 3.1: Construction IAQ Management Plan:During Construction
Fil ter Manufacturer
FilterIdentification
(Model #)
Filter MERV
Rating
Location of
Installed Fil ter
Fil ter was ReplacedImmediately
Prior To Occupancy
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
NARRATIVE (Optional)
Please provide any addit ional comments or notes regarding special circumstances or considerat ions regarding the
project's credit approach.
The project is seeking point(s) for this credit using an alternate compliance approach. The compliance approach,
including references to any applicable Credit Interpretation Rulings is fully documented in the narrative above. (Indicatethe number of points documented in the field below).
Alternative Compliance Points Documented
8/3/2019 EQ 3.1 - IAQ Mgt Plan - During Construction
3/3
LEED-NC 2.2 Submit tal Template | Last Modified: Apri l
LEED-NC 2.2 Submittal Template
EQ Credi t 3.1: Construction IAQ Management Plan:During Construction
Credit: Points Documented:
Project Name:
First Name Last Name
READY TO SAVE THIS TEMPLATE TO LEED-ONLINE?Please enter your first name, last name and today's date below, followed by yourLEED-Online Username and Password associated with the Project listed above to confirm submission of this template.
Date Username (Email Address) Password
Letter Template Version .
EQ Credit 3.1: Construct ion IAQ Management Plan: During Construction 0
Stavros Niarchos Found'n Cultural Centre
Chris Nunn [email protected]
SAVE TEMPLATE TO LEED-ONLINE PRINT TEMPLATE
A11000045