Environmental Monitoring Report Semi-Annual Environmental Monitoring Report No. 6 (July – December 2016) May 2017
VIE: Central Mekong Delta Region Connectivity
Project
Annex 4 (CW1A, CW1B, CW1C) (2nd of 3 files)
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Prepared by Detailed Design and Implementation Support Consultant: Joint Venture of CDM Smith, WSP Finland Limited and Yooshin Engineering Corporation for the Ministry of Transport and the Asian Development Bank.
CMDRCP SEMR July - December 2016
Revision February 2017
ANNEX 4
Environmental Inspection Reports
CW1A
ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers
13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES
Mr. Nguyen Van Cuong – CW1A EO
No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor
001 Location: CRBC batching
plant
The sludge of concrete
waste is full in the
temperary disposal storage
on site.
Necessary action:
Contractor need to remove
this waste to the disposal
area. Alternatively,
contractor need to fully
barricade this area before
removing.
Full concrete waste in CRBC office Date of action:
002 Location: Thang Long
fabrication yards
Some fuel drums are not
properly stored.
Necessary action:
Contractor need to provide
hazardous waste area for
hazardous area (particularly
these empty fuel drums).
No storage for empty fuel drums Date of action:
003 Location: Thang Long
fabrication yards
The fuel equipment leak fuel
to the steel.
Necessary action:
Contractor need to provide
drip tray or drip pan for this
equipment.
No drip tray for fuel equipment Date of action:
004 Location: Tinh Thoi bridge –
Hoang An site
There is no collection of
empty bentonite bags on
site.
Necessary action:
Contractor must collect
these empty bags to
hazardous waste storage.
No storage for empty bentonite bags Date of action:
005 Location: Tinh Thoi bridge –
Hoang An site
Missing roof for hazardous
material storage.
Necessary action:
Contractor must provide
additional roof to fully cover
the storage to avoid the
weather impact.
Missing roof of hazardous materials storage Date of action:
006 Location: Tuan Loc
subcontractor office
Many fuel drums locates on
site without any
environmental protection.
Necessary action: Either
contractor must remove
these fuel drums to
hazardous materials/waste
storage or provide the
environmental protection
for this material (e.g. drip
tray).
No storage for fuel drums Date of action:
007 Location: Linh Son batching
plant
The settling pond in Linh
Son batching plant contain
only 1 pond without any
outlet.
Necessary action:
Contractor need to repair
this settling pond system for
batching plant operation.
The settling pond should
contain at least 3 ponds and
outlet to the public water
source.
Wrong design of settling pond Date of action:
008 Location: Dinh Chung
fabrication yards
Fuel tank leak fuel to the
ground.
Necessary action:
Contractor must provide the
adsorbant materials for fuel
leakage. The contaminated
materials should be
collected for hazardous
waste treatment company.
Fuel leakage to the ground Date of action:
ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers
13 July 2016 20 July 2016 CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES
Mr. Nguyen Van Cuong – CW1AEO
No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor
001 Location:CRBC batching
plant
The sludge of concrete
waste is full in the
temperary disposal storage
on site.
Necessary action:
Contractor need to remove
this waste to the disposal
area. Alternatively,
contractor need to fully
barricade this area before
removing.
Full concrete waste in CRBC office Date of action: 20 July 2016
Transport cement waste from mixing plant to level the site
002 Location:Thang Long
fabrication yards
Some fuel drums are not
properly stored.
Necessary action:
Contractor need to provide
hazardous waste area for
hazardous area (particularly
these empty fuel drums).
No storage for empty fuel drums Date of action: 14 July 2016
Fuel drums was collectors put into the archive
003 Location:Thang Long
fabrication yards
The fuel equipment leak fuel
to the steel.
Necessary action:
Contractor need to provide
drip tray or drip pan for this
equipment.
No drip tray for fuel equipment Date of action: 15 July 2016
Employees collection, cleanup the spill fuel out outside
004 Location:Tinh Thoi bridge –
Hoang An site
There is no collection of
empty bentonite bags on
site.
Necessary action:
Contractor must collect
these empty bags to
hazardous waste storage.
No storage for empty bentonite bags Date of action: 19 July 2016
Employees collection packaging bentonite
005 Location:Tinh Thoi bridge –
Hoang An site
Missing roof for hazardous
material storage.
Necessary action:
Contractor must provide
additional roof to fully cover
the storage to avoid the
weather impact.
Missing roof of hazardous materials storage Date of action: 18 July 2016
Contractors were building additional roof
006 Location:Tuan Loc
subcontractor office
Many fuel drums locates on
site without any
environmental protection.
Necessary action: Either
contractor must remove
these fuel drums to
hazardous materials/waste
storage or provide the
environmental protection for
this material (e.g. drip tray).
No storage for fuel drums Date of action: 20 July 2016
Fuel was collectors put into the archive
007 Location:Linh Son batching
plant
The settling pond in Linh Son
batching plant contain only 1
pond without any outlet.
Necessary action:Contractor
need to repair this settling
pond system for batching
plant operation. The settling
pond should contain at least
3 ponds and outlet to the
public water source.
Wrong design of settling pond Date of action:
008 Location: Dinh Chung
fabrication yards
Fuel tank leak fuel to the
ground.
Necessary action:
Contractor must provide the
adsorbant materials for fuel
leakage. The contaminated
materials should be collected
for hazardous waste
treatment company.
Fuel leakage to the ground Date of action: 17 July 2016
For employees cleans all fuel spills to the ground
CDI\Ilth Sml
Central Mekong Delta Connectivity Project- (CMDCP)
TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE
COM Smith- WSP -Yooshin Consultant JV セ@ Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam
セ@ WSP .... • Tel: (84) 067-3881-255; Fax: (84) 067-3881-256 <;-' oos/:.:-...
Ref. No. : DDIS/CW1N0872
Date : 15 August 2016
To: Mr. Dang Xuan Lich Contractor's Kepresentat1ve
Contractor's Office: No. 97, Chi Lang street, Ward 03, Cao Lanh city Dong Thap Tel : (84) 0673 535 466 ; Fax: 0673 535 466
Subject: Package CW1A- Environmental Inspection Report 10 Aug 2016
Dear Mr. Lich,
After our DDIS environmental inspection dated 10 August 2016, we hereby give you the inspection
report for your action. The deadline of your closed-observations is 20 August 2016. If you fail to
rectify, we will issue the Notice to Correct via official letter after 10 days issuing this letter.
Your prompt action is highly recommended.
Cc: - As above - Cao Lanh Bridge Project Manager, CIPM
Site Construction Team, CIPM - File: DO IS Consultant JV Office
..-------·
Page 1 ofl
Attachment: Environmental Inspection Report 10 Aug 2016
..
Dự án Kết nối khu vực trung tâm Đồng bằng sông Cửu Long - (CMDCP) TA 7822-VIE, Khoản vay 3013-VIE, Khoản viện trợ 0353-VIE
Liên danh Tư vấn CDM Smith - WSP –Yooshin Tổ 5, p Tân Tịch, Xã Tịnh Thới, TP Cao Lãnh, Tỉnh Đồng Tháp, Việt Nam
ĐT: (84) 067-3881-255 ; Fax: (84) 067-3881-256
__________________________________________________________
Trang 1 / 1
Kính gửi: Ông Lịch
Sau khi chuyên gia môi trường Tư V n kiểm tra công trường ngày 10/08/2016, nay chúng tôi xin gửi báo cáo để các ông thực hiện. Thời hạn chót để các ông xem xét thực hiện là ngày 20/08/2016. Nếu các ông không thực hiện công tác điều chỉnh theo yêu cầu, chúng tôi sẽ phát hành thông báo sửa chữa bằng văn b n chính thức 10 ngày kể từ ngày ban hành văn b n này.
Trân trọng,
{Đã ký}
Victoriano L. Hamlig
Kỹ sư thường trú
Cc: - Như trên - Giám đốc gói đường - dự án Cầu Cao Lãnh, CIPM - Nhóm qu n lý công trường, CIPM - Lưu: Liên danh TVGS - DDIS
Đính kèm:
- Báo cáo kiểm tra môi trường ngày 10/08/2016
Số thư : DDIS/CW1A/0872 Ngày : 15/08/2016 Gửi đến: Ông Đặng Xuân Lịch
Đại diện Nhà thầu
VPDA: 97 đường Chi Lăng- Phường 03 – TP Cao Lãnh, Tỉnh Đồng Tháp
ĐT: +(84) 0673 535 466 ; Fax: 0673 535 466
Chủ đề: Gói CW1A – Báo Cáo Kiểm Tra Môi Trường ngày 10/08/2016
ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers
10 August 2016 20 August
2016
CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES
Mr. Le Anh Tin – NES
Mr. Nguyen Van Cuong – CW1A EO
No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor
007 Location: Linh Son batching
plant
The settling pond in Linh
Son batching plant contain
only 1 pond without any
outlet.
Necessary action:
Contractor need to repair
this settling pond system for
batching plant operation.
The settling pond should
contain at least 3 ponds and
outlet to the public water
source.
Wrong design of settling pond Date of action:
009 Location: Dinh Chung
fabrication yards
Some metal wastes are not
properly collected and
stored in storage.
Necessary action:
Contractor need to provide
storage for this metal waste
and remove the metal to its
storage.
No storage for metal waste Date of action:
010 Location: Dinh Chung
fabrication yards
Concrete pile head was not
stored in its designated
area.
Necessary action:
Contractor need to remove
this concrete pile head to
the storage of concrete
waste in the designated
disposal area.
Concrete pile head on site Date of action:
011 Location: Dinh Chung
fabrication yards
No drip tray for fuel spillage.
Necessary action:
Contractor must provide drip
tray as requirement.
No drip tray for fuel spillage Date of action:
012 Location: Dinh Chung
fabrication yards
Solid waste near by the fuel
tank.
Necessary action:
Contractor must remove this
domestic waste to avoid the
hazard of buring materials
when this waste locates
near by fuel tank.
No collection of domestic waste near by fuel tank Date of action:
013 Location: Linh Son batching
plant
Concrete waste and
wastewater spead out of the
access way to Linh Son
batching pant.
Necessary action:
Contractor need to create a
dranage system for
wastewater and concrete
waste treatment before
discharge to outside.
No drainage system for Linh Son CBP Date of action:
014 Location: Linh Son batching
plant
The settling pond in Linh
Son batching plant contain
only 1 pond without any
outlet.
Necessary action:
Contractor need to repair
this settling pond system for
batching plant operation.
The settling pond should
contain at least 3 ponds and
outlet to the public water
source.
Wrong design of settling pond Date of action:
015 Location: Tinh Thoi bridge
Concrete pile head was not
stored in its designated
area.
Necessary action:
Contractor need to remove
this concrete pile head to
the storage of concrete
waste in the designated
disposal area.
Concrete pile heads on site Date of action:
016 Location: Linh Son batching
plant
Many fuel drums locates on
site without any
environmental protection.
Necessary action: Either
contractor must remove
these fuel drums to
hazardous materials/waste
storage or provide the
environmental protection
for this material (e.g. drip
tray).
No storage for fuel drums Date of action:
017 Location: Hoang An
batching plant
The settling pond in Hoang
An batching plant is full of
concrete sludge.
Necessary action:
Contractor need to remove
the concrete sludge in the
settling tank system.
Full of concrete sludge in settling tank Date of action:
018 Location: Hoang An
batching plant
No domestic waste near in
Hoang An batching plant.
Necessary action:
Contractor need to provide
domestic waste trash-bin
and transfer these wastes in
the transbin to domestic
waste collection company.
No domestic waste collection Date of action:
CLOSED - ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers
10 August 2016 and
17 August 2016 20 August
2016
CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES
Mr. Le Anh Tin – NES
Mr. Nguyen Van Cuong – CW1A EO
Mr. Nguyen Van Kien - HSO
No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor
007 Location: Linh Son batching
plant
The settling pond in Linh
Son batching plant contain
only 1 pond without any
outlet.
Necessary
action:Contractor need to
repair this settling pond
system for batching plant
operation. The settling pond
should contain at least 3
ponds and outlet to the
public water source.
Wrong design of settling pond Date of action:
009 Location: Dinh Chung
fabrication yards
Some metal wastes are not
properly collected and stored
in storage.
Necessary action:
Contractor need to provide
storage for this metal waste
and remove the metal to its
storage.
No storage for metal waste Date of action: 17 August 2016
Workers collected and cleanup metal waste
010 Location: Dinh Chung
fabrication yards
Concrete pile head was not
stored in its designated area.
Necessary action:
Contractor need to remove
this concrete pile head to the
storage of concrete waste in
the designated disposal
area.
Concrete pile head on site Date of action:
011 Location: Dinh Chung
fabrication yards
No drip tray for fuel
spillage.
Necessary action:
Contractor must provide
drip tray as requirement.
No drip tray for fuel spillage Date of action:
012 Location: Dinh Chung
fabrication yards
Solid waste near by the fuel
tank.
Necessary action:
Contractor must remove this
domestic waste to avoid the
hazard of buring materials
when this waste locates near
by fuel tank.
No collection of domestic waste near by fuel tank Date of action: 15 August 2016
Domestic waste is collected
013 Location: Linh Son batching
plant
Concrete waste and
wastewater spead out of the
access way to Linh Son
batching pant.
Necessary action:
Contractor need to create a
dranage system for
wastewater and concrete
waste treatment before
discharge to outside.
No drainage system for Linh Son CBP Date of action: 18 August 2016
Laying stone to prevent from drainage
014 Location: Linh Son batching
plant
The settling pond in Linh
Son batching plant contain
only 1 pond without any
outlet.
Necessary
action:Contractor need to
repair this settling pond
system for batching plant
operation. The settling pond
should contain at least 3
ponds and outlet to the
public water source.
Wrong design of settling pond
015 Location: Tinh Thoibridge
Concrete pile head was not
stored in its designated area.
Necessary action:
Contractor need to remove
this concrete pile head to the
storage of concrete waste in
the designated disposal
area.
Concrete pile heads on site Date of action:
016 Location: Linh Son batching
plant
Many fuel drums locates on
site without any
environmental protection.
Necessary action: Either
contractor must remove
these fuel drums to
hazardous materials/waste
storage or provide the
environmental protection for
this material (e.g. drip tray).
No storage for fuel drums Date of action: 14 August 2016
Workers collect empty tank in to the storage
017 Location: Hoang An
batching plant
The settling pond in Hoang
An batching plant is full of
concrete sludge.
Necessary action:
Contractor need toremove
the concrete sludge in the
settling tank system.
Full of concrete sludge in settling tank Date of action: 17 August 2016
Backhole dredge the mud from concrete
018 Location: Hoang An
batching plant
No domestic waste near in
Hoang An batching plant.
Necessary action:
Contractor need toprovide
domestic waste trash-bin
and transfer these wastes in
the transbin to domestic
waste collection company.
No domestic waste collection Date of action: 15 August 2016
Workers domestic waste collection
019 Location: Pier 1 CaoLanh
Bridge
The concrete waste dumped
within the project site.
Necessaryaction:
Contractor remove this
concrete waste from project
site and dump on the
designated area for solid
waste.This action should
not be repeated again.
Wrong design of settling pond Date of action: 20 August 2016
Backhole dredge the waste from concrete
CDMth Sml
Central Mekong Delta Connectivity Project - (CMDCP)
TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE
CDM Smith - WSP -Yooshin Consultant JV セ@ Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam
セ@ WSP .. • Tel: (84) 067-3881-255; Fax: {84) 067-3881-256 <?oo,.h..:....
Ref. No. : DDIS/CW1N0895
Date : 01 September 2016
To: Mr. Dang Xuan Lich Contractor's Representative
Contractor's Office: No. 97, Chi Lang street, Ward 03, Cao Lanh city Dong Thap Tel: (84) 0673 535 466; Fax: 0673 535 466
Subject: Package CW1A - Notice to Correct: Outstanding environmental issues and Environmental Inspection Report 25 Aug 2016
Dear Mr. Lich,
We refer your letter no. CW1NDDIS/081 0 dated 23 August 2016 for your site improvement, we had
inspected your site in 25 August 2016. We appreciated your prompt action and improvement on site
condition; however, there still remain many outstanding issues as followings:
1. No waste disposing activity on site though many concrete pile head and excavated soil
locates on site which are reminded by DDIS for removal since 2015.
2. No change of Linh Son settling pond system in Linh Son batching plant. This issue is
reminded through several ADB Mission in 2016. [substantially important]
3. No drip tray or drip pan for fuel equipment on site.
4. No hazardous waste storage (e.g. empty bentonite bags)
Please see detail outstanding issues in the attachment. The ADS External Environmental Specialist
will revisit and check your site from 12 September 2016, we expect your significant improvement in
your site condition. We hereby remind you to take strong action for those remaining items to expedite
no later than 10 September 2016.
Cc: - As above
Cao Lanh Bridge Project Manager, CIPM - Site Construction Team, CIPM
File: DDIS Consultant JV Office
Page 1 ofl
Attachment: Environmental Inspection Report 25 August 2016.
CDMth Smt
01,1' an k セ エ@ n6i khu VI,J'C trung tam £>6ng 「 セ ョ ァ@ song C.:Vu Long - (CMDCP) TA 7822-VIE, Khoan vay 3013-VIE, Khoan カゥセョ@ trQ' 0353-VIE
a.WSP セ@
Lien danh TLP v§n COM Smith - WSP -Yooshin T6 5, Ap Tan Tjch, Xa Tinh Th&i, TP Cao Lanh, Tinh £>6ng Thap, Vi$t Nam
£>T: (84) 067-3881-255 ; Fax: (84) 067-3881 -256 ,..- qOC> .. セ@
S6 thU' : DDIS/CW1N0895 Ngay : 01/09/2016
GLI'i 、セョ Z@ 6ng ヲIセョァ@ Xuan L!ch Xセゥ@ di$n Nha エィセオ@
Van phong dl! an: 97 dU'<Yng Chi Lang- PhU'<Yng 03- TP Cao Lanh, Tinh 86ng Thap
f)T: +(84) 0673 535 466; Fax: 0673 535 466
chu d@: G6i CW1A- Thong Sao St'Pa Chifa: Cac Van D@ Moi TrU'6'ng Ttm Dong va Sao cao K i@m Tra Moi TrU'6'ng ngay 25/08/2016 .
Kinh gU>i: 6ng Ljch,
Sau khi tham 」ィゥセオ@ thU' cua Nha tィセオ@ s6 CW1NDDIS/0810 ngay 23/08/2016 カセ@ cai thi$n tlnh hlnh
cong tru<Yng, chung toi da kit§m tra cong tru<Yng cua cac eng ngay 25/08/2016. Chung toi danh gia
cao Vi$C thl,l'C hi$n kip thcYi CUa CaC eng va cai thi$n 、ゥセu@ ki$n tren cong trU'cYng, tuy nhien van con Nセ@ セ@ ). ). h
nh1eu van de ton dong n U' sau:
1. Khong c6 ィッセエ@ dong d6 thai tren cong trU'<Yng ュセ」@ du ョィゥセオ@ cong tac 、セオ@ coc be tong va cong
tac dao 、セエ@ ョィゥセオ@ vi tri tren cong tru<Yng da dU'Q'C DDIS nhac nh& ャッセゥ@ bo tl.r nam 2015.
2. Khong cai エ ィゥ セ ョ@ ィセ@ th6ng 「 セ@ lang (y エイセュ@ tr(>n Linh SO'n. Van d@ nay da dlPQ'C doan ォ ゥ セ ュ@
tra ADS dU'Q'C nh.ic nha vai lan nam 2016. ( van d@ quan trQng)
3. Khong c6 khay 16t 、セオ@ dcSi v&i cac dt,mg c1,1 chll'a nhien lieu tren cong trU'<Yng.
4. Khong c6 kho chll'a 」ィセエ@ thai doc ィセゥ@ (vi d1,1 nhU' bao chll'a bentonite rong).
Xin vui long xem bang dfnh kem cac カセョ@ 、セ@ t6n dong. Chuyen gia moi trU'<Yng noi ADB se kit§m
tra ャセゥ@ エセゥ@ cong trU'cYng cua cac eng tl.r ngay 12/09/2016, chung toi mong rang cac eng c6 cai thi$n
dang kt§ tlnh hlnh cong tru<Yng cua cac eng. Nay chung toi xin nhac nh& cac eng phai thl,l'C hi$n
nghiem tUc dt§ giai アオケセエ@ CaC vセョ@、セ@ tbn dong nay trU'OC ngay 10/09/2016.
Chung toi danh gia cao Sl,l' hqp tac cua cac eng.
Tran trong,
{EJa kyJ Victoriano L. Hamlig
Ky sU' thU'<Yng tru
Cc: - NhU' tren
Giam d6c g6i dU'O'ng - dl,J' an Ct3u Cao U!nh, CIPM - Nh6m quan ly cong trU'O'ng, CIPM - LU'u: Lien danh TVGS - DDIS
Trang 1/1
Drnh kem:
Bao cao kit§m tra moi tru<Yng ngay
25/08/2016
ENVIRONMENTAL INSPECTION REPORT Period observation Deadline Package Location Weather Observers
25 August 2016 10 September
2016
CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES
No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor
007 Location: Linh Son batching
plant
The settling pond in Linh
Son batching plant contain
only 1 pond without any
outlet.
Necessary action:
Contractor need to repair
this settling pond system for
batching plant operation.
The settling pond should
contain at least 3 ponds and
outlet to the public water
source.
Wrong design of settling pond Date of action:
010 Location: Dinh Chung
fabrication yards
Concrete pile head was not
stored in its designated
area.
Necessary action:
Contractor need to remove
this concrete pile head to
the storage of concrete
waste in the designated
disposal area.
Concrete pile head on site Date of action:
011 Location: Dinh Chung
fabrication yards
No drip tray for fuel spillage.
Necessary action:
Contractor must provide drip
tray as requirement.
No drip tray for fuel spillage Date of action:
014 Location: Tinh Thoi bridge
The dirty working
environment on site due to
poor housekeeping and no
proper drainage and storage
for excavated spoil.
Necessary action:
Contractor arrange all
materials for good
housekeeping and create
the efficient drainage for
rainstorm run-off and
wastewater from
excavation. The spoil of
excavation process will be
temperarily stored on site
with good barricades.
Wrong design of settling pond Date of action:
015 Location: Tinh Thoi bridge
Concrete pile head was not
stored in its designated
area.
Necessary action:
Contractor need to remove
this concrete pile head to
the storage of concrete
waste in the designated
disposal area.
Concrete pile heads on site Date of action:
020 Location: Hoang An
batching plant
Some concrete debrises
locates in front of the Hoang
An batching plant without
any collection.
Necessary action:
Contractor must transfer
this waste to the desginated
area for concrete waste
storage.
No proper concrete waste storage Date of action:
021 Location: Tinh Thoi bridge –
Hoang An site
There is no collection of
empty bentonite bags on
site.
Necessary action:
Contractor must collect
these empty bags to
hazardous waste storage.
No storage for empty bentonite bags Date of action:
022 Location: Thang Long site
The poor drainage system in
the Thang Long site cause
the floating resulting the
damage to access road in
this section.
Necessary action:
Contractor need to improve
the drainage system for
waterstorm run-off avoiding
the floating on the access
road.
Poor drainage system during rainy day Date of action:
CLOSED - ENVIRONMENTAL INSPECTION REPORT
Period observation Deadline Package Location Weather Observers
25 August 2016 10 September 2016 CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES
No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor
007 Location: Linh Son batching
plant
The settling pond in Linh
Son batching plant contain
only 1 pond without any
outlet.
Necessary
action:Contractor need to
repair this settling pond
system for batching plant
operation. The settling pond
should contain at least 3
ponds and outlet to the
public water source.
Wrong design of settling pond Date of action:
010 Location: Dinh Chung
fabrication yards
Concrete pile head was not
stored in its designated area.
Necessary action: Contractor
need to remove this concrete
pile head to the storage of
concrete waste in the
designated disposal area.
Concrete pile head on site Date of action:
011 Location: Dinh Chung
fabrication yards
No drip tray for fuel
spillage.
Necessary action:
Contractor must provide
drip tray as requirement.
No drip tray for fuel spillage Date of action:
014 Location: Linh Son bridge
The dirty working
environment on site due to
poor housekeeping and no
proper drainage and storage
for excavated spoil.
Necessary action:
Contractor arrange all
materials for good
housekeeping and create
the efficient drainage for
rainstorm run-off and
wastewater from
excavation. The spoil of
excavation process will be
temperarily stored on site
with good barricades.
Wrong design of settling pond Date of action: 04 september 2016
Arrangement materials clean and tidy
015 Location: Tinh Thoibridge
Concrete pile head was not
stored in its designated area.
Necessary action:
Contractor need to remove
this concrete pile head to the
storage of concrete waste in
the designated disposal
area.
Concrete pile heads on site Date of action: 06 september 2016
Concrete pile is collected and transported to make
temporary bridge foundations
020 Location: Hoang An
batching plant
Some concrete debrises
locates in front of the Hoang
An batching plant without
any collection.
Necessary action:
Contractor must transfer
this waste to the desginated
area for concrete waste
storage.
No proper concrete waste storage Date of action: 08 September 2016
Concrete waste is collected and transported
021 Location: Tinh Thoi bridge –
Hoang An site
There is no collection of
empty bentonite bags on
site.
Necessary action:
Contractor must collect
these empty bags to
hazardous waste storage.
No storage for empty bentonite bags Date of action: 10 September 2016
Packaging bentonite is collected, clean
022 Location: Thang Long site
The poor drainage system in
the Thang Long site cause
the floating resulting the
damage to access road in
this section.
Necessary action:
Contractor need to improve
the drainage system for
waterstorm run-off avoiding
the floating on the access
road.
Poor drainage system during rainy day Date of action: 06 September 2016
Water drainage trenching next to roadside
ENVIRONMENTAL INSPECTION REPORT A. Repeated Observations
No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor
007 Location: Linh Son batching
plant
Obervation in
Environmental Inspection
Report dated dated 13 July
2016 and reminded in 10
and 25 August 2016 (Ref:
DDIS/CW1A/0895 dated 01
September2016)
Ref: item 10b, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to repair this settling
pond system for batching plant operation. The settling
pond should contain at least 3 ponds and outlet to the
public water source.
Contractor reply date:
Wrong design of settling pond Status: unclose
010 Location: Dinh Chung
fabrication yards
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016)
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
Contractor reply date:
Concrete pile head on site Status: unclose
011 Location: Dinh Chung
fabrication yards
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016)
Ref: item 7g and 7h, table 1,
EMP of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor must provide drip tray as
requirement.
Contractor reply date:
No drip tray for fuel spillage Status: unclose
015 Location: Tinh Thoi bridge
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016)
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
According to the close-report by contractor Ref.
CW1A/DDIS/0834 dated 13 September 2016, the close-
observation is not accepted since the bridge foundation
is not designated for temperary storage of concrete
waste. The temperary storage should contain separate
area with barricade. The last desination of concrete
storage should be in the approved disposal area by
DDIS.
Contractor reply date:
Concrete pile heads on site Status: unclose
020 Location: Hoang An
batching plant
Obervation in
Environmental Inspection
Report dated 25 August
2016 (Ref: DDIS/CW1A/0895
dated 01 September2016)
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: Contractor must transfer this waste to
the desginated area for concrete waste storage.
Contractor reply date:
No proper concrete waste storage Status: unclose
ENVIRONMENTAL INSPECTION REPORTPeriod observation Deadline Package Location Weather Observers
05 October 2016 24 O to er 2016
CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES
Mr. Nguyen Van Cuong – EO
New observations
022 Location: Thang Long site –
Rach Mieu access road
Ref: Clause 4.15a, contractor
CW1A (4213A/CIPM-HDKT)
DDIS comments:Contractor frequent repair and
maintain the good access road for transportation along
the project alignment.
No access road Status: unclose
023 Location: Linh Son bridge –
Tuan Loc site
There is no collection of
empty bentonite bags on
site.
Ref: item 7f and 7o table 1,
EMP of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor must collect these empty
bags to hazardous waste storage.
No storage for empty bentonite bags Status: unclose
024 Location: Tuan Loc site –
Linh Son bridge
Ref: item 6, table 1, EMP of
contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: Contractor record and inform to DDIS
of your spoil/ecavated soil for dilivery to disposal area.
No recording of excavated soil transportation Status: unclose
ENVIRONMENTAL INSPECTION REPORT
No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor
007 Location: Linh Son batching
plant
Obrvation in environmental
inspection report dated13
July 2016 and reminded in
10 and 25 August 2016 (Ref:
DDIS/CW1A/0895 dated 01
September 2016)
Ref: item 10b, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS Comments:Contractor need to repair this settling
pond sytem for batching plant operation. The settling
pond should contain at least 3 ponds and putlet to the
public water source.
Contractor reply date:
Wrong design of settling pond Status: unclose
010 Location: Dinh Chung
fabrication yards
Obrvation in environmental
inspection report dated 10
and reminded in 25 August
2016
(Ref: DDIS/CW1A/0895
dated 01 September 2016)
Ref: item 10f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
Concrete pile head on site Contractor reply date: 10 October 2016
The concrete pile head is moved on the storage
011 Location: Dinh Chung
fabrication yards
Obrvation in environmental
inspection report dated 10
and reminded in 25 August
2016
(Ref: DDIS/CW1A/0895
dated 01 September 2016)
Ref: item 7g and 7h,table 1,
EMP of contractor CW1A
(4213A/CIPM-HDKT)
No drip tray for fuel spillage Contractor reply date: 25 October 201
Building the roof in order to avoid fuel spillage into the
the outside environment.
015 Location: Tinh Thoibridge
Obrvation in environmental
inspection report dated 10
and reminded in 25 August
2016
(Ref: DDIS/CW1A/0895
dated 01 September 2016)
Ref: item 11f,table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: contractor need to remove this
concrete pile head to the storage of concrete waste
in the designated disposal area.
According to the close-report by contractor
Ref.CW1A/DDIS/0834 dated 13 september 2016,
the close-observation is not accepted since the
bridge foundation is not designated for temperary
storage of concrete waste. The temperary storage
should contain separate area with barricade. The
last desination of concrete storage should be in the
approved disposal area by DDIS
Concrete pile heads on site Status: unclose
020 Location: Hoang An
batching plant
Obrvation in environmental
inspection report 25 August
2016
(Ref: DDIS/CW1A/0895
dated 01 September 2016)
Ref: item 11f,table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
No proper concrete waste storage Contractor reply date: 28 October 2016
The conctrete waste are collected and moved on the
storage.
ENVIRONMENTAL INSPECTION REPORT
Period observation Deadline Package Location Weather Observers
05 October 2016 24 September 2016 CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES
Mr. Nguyen Van Cuong - EO
New observations
022 Location: Thang Long site –
Rach Mieu access road
Ref: clause 4.15a, contracor
CW1A (4213/CIPM-HDKT)
No access road Contractor reply date: 30 October 2016
Regularly dredging and spreading stones to avoid mud
on the access road
023 Location: Linh Son bridge –
Tuan Loc site
There is no collection of
empty bentonite bags on site.
Ref: item 7f and 7o table 1,
EMP of contractor CW1A
(4213/CIPM-HDKT)
No storage for empty bentonite bags Contractor reply date: 25 October 2016
The betonite bags are collected on the site
024 Location: Tuan Loc site –
Linh Son bridge
Ref: item 6, table 1, EMP of
contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: contractor record and inform to DDIS
of your spoil/ecavated soil for dilivery to disposal area.
No recording of excavated soil transportation Status: unclose
ENVIRONMENTAL INSPECTION REPORT A. Repeated Observations
No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor
007 Location: Linh Son batching
plant
Obervation in
Environmental Inspection
Report dated dated 13 July
2016 and reminded in 10
and 25 August 2016 (Ref:
DDIS/CW1A/0895 dated 01
September2016 and
DDIS/CW1A/0939 dated 21
October 2016)
Ref: item 10b, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to repair this settling
pond system for batching plant operation. The settling
pond should contain at least 3 ponds and outlet to the
public water source.
Contractor reply date:
Wrong design of settling pond Status: unclose
010 Location: Dinh Chung
fabrication yards
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016
and DDIS/CW1A/0939 dated
21 October 2016)
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
According to the close-report by contractor Ref.
CW1A/DDIS/0 dated 10 October 2016, the close-
observation is not accepted since the bridge foundation
is not designated for temperary storage of concrete
waste. The temperary storage should contain separate
area with barricade. The last desination of concrete
storage should be in the approved disposal area by
DDIS.
Contractor reply date:
Concrete pile head on site Status: unclose
011 Location: Tuan Loc site -
Dinh Chung fabrication
yards
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016
and DDIS/CW1A/0939 dated
21 October 2016)
Ref: item 7g and 7h, table 1,
EMP of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor must provide drip tray or
bund wall as requirement.
According to the close-report by contractor Ref.
CW1A/DDIS/0 dated 25 October 2016, the close-
observation is not accepted since there is still no bund
wall or drip tray for oil tank.
Contractor reply date:
No drip tray for fuel spillage Status: unclose
015 Location: Hoang An site -
Tinh Thoi bridge
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016
and DDIS/CW1A/0939 dated
21 October 2016)
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
According to the close-report by contractor Ref.
CW1A/DDIS/0834 dated 13 September 2016, the close-
observation is not accepted since the bridge foundation
is not designated for temperary storage of concrete
waste. The temperary storage should contain separate
area with barricade. The last desination of concrete
storage should be in the approved disposal area by
DDIS.
Contractor reply date:
Concrete pile heads on site Status: unclose
024 Location: Tuan Loc site –
Linh Son bridge
Obervation in
Environmental Inspection
Report dated October 2016
(Ref: DDIS/CW1A/0939
dated 21 October 2016)
Ref: item 6, table 1, EMP of
contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: Contractor record and inform to DDIS
of your spoil/ecavated soil for dilivery to disposal area.
No recording of excavated soil transportation Status: unclose
ENVIRONMENTAL INSPECTION REPORT
Period observation Deadline Package Location Weather Observers
15 November 2016 30 November
2016
CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES
Mr. Nguyen Van Cuong – EO
New observations
025 Location: Linh Son bridge
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
Contractor reply date:
No recording of excavated soil transportation Status: unclose
026 Location: Linh Son batching
plant
Ref: item 11 and 13, table 1,
EMP of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: Contractor collect the waste and
create a effient drainage system.
No recording of excavated soil transportation Status: unclose
027 Location: Hoang An site –
Tinh Thoi bridge
Ref: item 6, table 1, EMP of
contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: Contractor record and inform to DDIS
of your spoil/ecavated soil for dilivery to disposal area.
No recording of excavated soil transportation Status: unclose
028 Location: Hoang An
batching plant
Ref: item 11, table 1, EMP of
contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: Contractor must regularly desludge the
accumulated concrete waste in the settling ponds and
maintain the good condition of this settling system.
No recording of excavated soil transportation Status: unclose
029 Location: Hoang An site –
Tinh Thoi bridge
Ref: item 7e, table 1, EMP of
contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: Contractor should provide roof to
avoid the rainy water.
No recording of excavated soil transportation Status: unclose
ENVIRONMENTAL INSPECTION REPORT A. Repeated Observations
No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor
007 Location: Linh Son batching
plant
Obervation in
Environmental Inspection
Report dated dated 13 July
2016 and reminded in 10
and 25 August 2016 (Ref:
DDIS/CW1A/0895 dated 01
September2016 and
DDIS/CW1A/0939 dated 21
October 2016)
Ref: item 10b, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to repair this settling
pond system for batching plant operation. The settling
pond should contain at least 3 ponds and outlet to the
public water source.
Contractor reply date:
Wrong design of settling pond Status: unclose
010 Location: Dinh Chung
fabrication yards
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016
and DDIS/CW1A/0939 dated
21 October 2016)
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
According to the close-report by contractor Ref.
CW1A/DDIS/0878 dated 07 November 2016, the close-
observation is not accepted since the bridge foundation
is not designated for temperary storage of concrete
waste. The temperary storage should contain separate
area with barricade. The last desination of concrete
storage should be in the approved disposal area by
DDIS.
Contractor reply date:
Concrete pile head on site Status: unclose
011 Location: Tuan Loc site -
Dinh Chung fabrication
yards
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016
and DDIS/CW1A/0939 dated
21 October 2016)
Ref: item 7g and 7h, table 1,
EMP of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor must provide drip tray or
bund wall as requirement.
According to the close-report by contractor Ref.
CW1A/DDIS/0878 dated 07 November 2016, the close-
observation is not accepted since there is still no bund
wall or drip tray for oil tank.
Contractor reply date:
No drip tray for fuel spillage Status: unclose
015 Location: Hoang An site -
Tinh Thoi bridge
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016
and DDIS/CW1A/0939 dated
21 October 2016)
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
According to the close-report by contractor Ref.
CW1A/DDIS/0834 dated 13 September 2016, the close-
observation is not accepted since the bridge foundation
is not designated for temperary storage of concrete
waste. The temperary storage should contain separate
area with barricade. The last desination of concrete
storage should be in the approved disposal area by
DDIS.
Contractor reply date:
Concrete pile heads on site Status: unclose
024 Location: Tuan Loc site –
Linh Son bridge
Obervation in
Environmental Inspection
Report dated October 2016
(Ref: DDIS/CW1A/0939
dated 21 October 2016)
Ref: item 6, table 1, EMP of
contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: Contractor record and inform to DDIS
of your spoil/ecavated soil for dilivery to disposal area.
No recording of excavated soil transportation Status: unclose
ENVIRONMENTAL INSPECTION REPORT
Period observation Deadline Package Location Weather Observers
15 November 2016 30 November 2016 CW1A 0 - 3+800 Sunny Ms. Le Thi Phuong Loan – NES
Mr. Nguyen Van Cuong – EO
New observations
025 Location: Linh Son bridge
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
Contractor reply date:
Concrete pile heads Status: unclose
026 Location: Linh Son batching
plant
Ref: item 11 and 13, table 1,
EMP of contractor CW1A
(4213A/CIPM-HDKT)
Dust Collect the waste and concreting anti flooded
027 Location: Hoang An site –
Tinh Thoi bridge
Ref: item 6, table 1, EMP of
contractor CW1A
(4213A/CIPM-HDKT)
Fuel drums without protection measures Fuel drums was collectors put into the archive
028 Location: Hoang An
batching plant
Ref: item 11, table 1, EMP of
contractor CW1A
(4213A/CIPM-HDKT)
Full concrete sludge in settling pond system Dredging settling ponds for water flow
029 Location: Hoang An site –
Tinh Thoi bridge
Ref: item 7e, table 1, EMP of
contractor CW1A
(4213A/CIPM-HDKT)
No roof protection for fuel storage Rebuilding roof for fuel storage
ENVIRONMENTAL INSPECTION REPORT A. Repeated Observations
No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor
007 Location: Linh Son batching
plant
Obervation in
Environmental Inspection
Report dated dated 13 July
2016 and reminded in 10
and 25 August 2016 (Ref:
DDIS/CW1A/0895 dated 01
September2016 and
DDIS/CW1A/0939 dated 21
October 2016)
Ref: item 10b, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to repair this settling
pond system for batching plant operation. The settling
pond should contain at least 3 ponds and outlet to the
public water source.
Contractor reply date:
Wrong design of settling pond Status: unclose
010 Location: Dinh Chung
fabrication yards
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016
and DDIS/CW1A/0939 dated
21 October 2016)
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
According to the close-report by contractor Ref.
CW1A/DDIS/0878 dated 07 November 2016, the close-
observation is not accepted since the bridge foundation
is not designated for temperary storage of concrete
waste. The temperary storage should contain separate
area with barricade. The last desination of concrete
storage should be in the approved disposal area by
DDIS.
Contractor reply date:
Concrete pile head on site Status: unclose
011 Location: Tuan Loc site -
Dinh Chung fabrication
yards
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016
and DDIS/CW1A/0939 dated
21 October 2016)
Ref: item 7g and 7h, table 1,
EMP of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor must provide drip tray or
bund wall as requirement.
According to the close-report by contractor Ref.
CW1A/DDIS/0878 dated 07 November 2016, the close-
observation is not accepted since there is still no bund
wall or drip tray for oil tank.
Contractor reply date:
No drip tray for fuel spillage Status: unclose
015 Location: Hoang An site -
Tinh Thoi bridge
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016
and DDIS/CW1A/0939 dated
21 October 2016)
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
According to the close-report by contractor Ref.
CW1A/DDIS/0834 dated 13 September 2016, the close-
observation is not accepted since the bridge foundation
is not designated for temperary storage of concrete
waste. The temperary storage should contain separate
area with barricade. The last desination of concrete
storage should be in the approved disposal area by
DDIS.
Contractor reply date:
Concrete pile heads on site Status: unclose
024 Location: Tuan Loc site –
Linh Son bridge
Obervation in
Environmental Inspection
Report dated October 2016
(Ref: DDIS/CW1A/0939
dated 21 October 2016)
Ref: item 6, table 1, EMP of
contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: Contractor record and inform to DDIS
of your spoil/ecavated soil for dilivery to disposal area.
No recording of excavated soil transportation Status: unclose
025 Location: Linh Son bridge
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
Contractor reply date:
Concrete pile heads Status: unclose
028 Location: Hoang An
batching plant
Ref: item 11, table 1, EMP of
contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: Contractor must regularly desludge the
accumulated concrete waste in the settling ponds and
maintain the good condition of this settling system.
According to the close-report by contractor Ref.
CW1A/DDIS/0913 dated 02 December 2016, the close-
observation is not accepted. In fact, the concrete sludge
is not removed yet.
Full concrete sludge in settling pond system Status: unclose
ENVIRONMENTAL INSPECTION REPORT
Period observation Deadline Package Location Weather Observers
12 December 2016 20 December
2016
CW1A 0 - 3+800 Rainy &
cloudy
Ms. Le Thi Phuong Loan – NES
Mr. Nguyen Van Cuong – EO
New observations
030 Location: Dinh Chung bridge
area
DDIS comments: Contractor should remove the waste to
waste-bin.
No collection of domestic waste Status: unclose
031 Location: Linh Son
temperary bridge area
DDIS comments: Contractor should provide the drip tray
with bund-wall under the concrete pump machine and
the contaminated waste should be collected for
treatment.
Fuel leakage on the ground Status: unclose
032 Location: Dinh Chung bridge
area
DDIS comments: Contractor collect the emty bags of
materials to waste storage and clean this area
Full of empty bags waste Status: unclose
033 Location: Tinh Thoi bridge
area
DDIS comments: Contractor collect the emty bags of
materials to hazardous waste storage.
Full concrete sludge in settling pond system Status: unclose
034 Location: Dinh Chung bridge
area
DDIS comments: Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
No storage of concrete pile heads Status: unclose
035 Location: Tinh Thoi bridge
area
DDIS comments: The rain causes muddy condition for
access road. Contractor must repair the road condition
to avoid the sliperary transport on this service road.
Full concrete sludge in settling pond system Status: unclose
ENVIRONMENTAL INSPECTION REPORT A. Repeated Observations
No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor
007 Location: Linh Son batching
plant
Obervation in
Environmental Inspection
Report dated dated 13 July
2016 and reminded in 10
and 25 August 2016 (Ref:
DDIS/CW1A/0895 dated 01
September2016 and
DDIS/CW1A/0939 dated 21
October 2016)
Ref: item 10b, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to repair this settling
pond system for batching plant operation. The settling
pond should contain at least 3 ponds and outlet to the
public water source.
Contractor reply date:
Wrong design of settling pond Status: unclose
010 Location: Dinh Chung
fabrication yards
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016
and DDIS/CW1A/0939 dated
21 October 2016)
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
According to the close-report by contractor Ref.
CW1A/DDIS/0878 dated 07 November 2016, the close-
observation is not accepted since the bridge foundation
is not designated for temperary storage of concrete
waste. The temperary storage should contain separate
area with barricade. The last desination of concrete
storage should be in the approved disposal area by
DDIS.
Contractor reply date:
Concrete pile head on site Status: unclose
011 Location: Tuan Loc site -
Dinh Chung fabrication
yards
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016
and DDIS/CW1A/0939 dated
21 October 2016)
Ref: item 7g and 7h, table 1,
EMP of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor must provide drip tray or
bund wall as requirement.
According to the close-report by contractor Ref.
CW1A/DDIS/0878 dated 07 November 2016, the close-
observation is not accepted since there is still no bund
wall or drip tray for oil tank.
Contractor reply date:
No drip tray for fuel spillage Status: unclose
015 Location: Hoang An site -
Tinh Thoi bridge
Obervation in
Environmental Inspection
Report dated 10 and
reminded in 25 August 2016
(Ref: DDIS/CW1A/0895
dated 01 September2016
and DDIS/CW1A/0939 dated
21 October 2016)
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
According to the close-report by contractor Ref.
CW1A/DDIS/0834 dated 13 September 2016, the close-
observation is not accepted since the bridge foundation
is not designated for temperary storage of concrete
waste. The temperary storage should contain separate
area with barricade. The last desination of concrete
storage should be in the approved disposal area by
DDIS.
Contractor reply date:
Concrete pile heads on site Status: unclose
024 Location: Tuan Loc site –
Linh Son bridge
Obervation in
Environmental Inspection
Report dated October 2016
(Ref: DDIS/CW1A/0939
dated 21 October 2016)
Ref: item 6, table 1, EMP of
contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments: Contractor record and inform to DDIS
of your spoil/ecavated soil for dilivery to disposal area.
No recording of excavated soil transportation Status: unclose
025 Location: Linh Son bridge
Ref: item 11f, table 1, EMP
of contractor CW1A
(4213A/CIPM-HDKT)
DDIS comments:Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
Contractor reply date:
Concrete pile heads Status: unclose
028 Location: Hoang An
batching plant
Ref: item 11, table 1, EMP of
contractor CW1A
(4213A/CIPM-HDKT)
Full concrete sludge in settling pond system 22 December 2016
Dredging settling ponds for water flow
ENVIRONMENTAL INSPECTION REPORT
Period observation Deadline Package Location Weather Observers
12 December 2016 20 December
2016
CW1A 0 - 3+800 Rainy &
cloudy
Ms. Le Thi Phuong Loan – NES
Mr. Nguyen Van Cuong – EO
New observations
030 Location: Dinh Chung bridge
area
No collection of domestic waste 15 Decemer 2016
Employees collection, cleanup
031 Location: Linh Son
temperary bridge area
DDIS comments: Contractor should provide the drip tray
with bund-wall under the concrete pump machine and
the contaminated waste should be collected for
treatment.
Fuel leakage on the ground Status: unclose
032 Location: Dinh Chung bridge
area
Full of empty bags waste 15 Decemer 2016
Employees collection, cleanup
033 Location: Tinh Thoi bridge
area
Full concrete sludge in settling pond system 17 December 2016
Employees collection, cleanup
034 Location: Dinh Chung bridge
area
DDIS comments: Contractor need to remove this
concrete pile head to the storage of concrete waste in
the designated disposal area.
No storage of concrete pile heads Status: unclose
CW1B
CDIVIth sm•
Central Mekong Delta Connectivity Project - (CMDCP)
TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE
CDMSmith- WSP -YooshinConsultant JV
セwspセ@セ \xN^ sセ@
Group 5, Tan Tich Hamlet, TinhThoi Commune, Gao Lanh City, Dong Thap Province, Vietnam
Tel: (84) 067-3881-255; Fax: (84) 067-3881-256
Ref. No. : DD1S/CW1B/1443
Date : 15 August 2016
To: Mr. Xue Zhi Guo Acting Project Manager Contractor's Representative
Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thai Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel: (84) 067-3881-255; Fax: (84) 067-3881-256
Subject: Package CW18- Environmental Inspection Report 13 Aug 2016
Dear Mr. Xue,
After our DDlS environmental inspection dated 10 and 13 August 2016, we hereby give you the
inspection report for your action. The deadline of your closed-observations is 25 August 2016. If you
fail to rectify, we will issue the Notice to Correct via official letter after 10 days issuing this letter.
Your prompt action is highly recommended.
Cc: - As above
Cao Lanh Bridge Project Manager, CIPM - Site Construction Team, CIPM
File: DDIS Consultant JV Office
Page 1 ofl
Attachment: Environmental Inspection Report 13 Aug 2016
Dự án Kết nối khu vực trung tâm Đồng bằng sông Cửu Long - (CMDCP)
TA 7822-VIE, Khoản vay 3013-VIE, Khoản viện trợ 0353-VIE
Liên danh Tư vấn CDM Smith - WSP –Yooshin Tổ 5, p Tân Tịch, Xã Tịnh Thới, TP Cao Lãnh, Tỉnh Đồng Tháp, Việt Nam
ĐT: (84) 067-3881-255; Fax: (84) 067-3881-256
__________________________________________________________
Trang 1 / 1
Số thư : DDIS/CW1B/1443 Ngày : 15/08/2016
Gửi đến: Ông Xue Zhi Guo Quyền Giám Đốc Dự án Đại diện Nhà thầu
VP Dự án: Tổ 5, p Tân Tịch, Xã Tịnh Thới, TP Cao Lãnh, Tỉnh Đồng Tháp, Việt Nam ĐT: (84) 067.352.6868 Fax: (84) 067.352.6969
Chủ đề: Gói CW1B – Báo cáo Kiểm tra Môi trường ngày 13/08/2016
Kính gửi ông Xue,
Sau khi Tư v n DDIS thực hiện kiểm tra môi trường ngày 10 và 13/08/2016, Tư v n gửi theo thư báo
cáo kiểm tra để Nhà thầu thực hiện. Hạn cuối để kết thúc việc thực hiện của Nhà thầu là ngày
25/08/2016. Nếu Nhà thầu không hoàn thành chỉnh sửa, Tư v n sẽ phát hành Thông báo Chỉnh sửa
bằng văn b n chính thức sau 10 ngày phát hành thư này.
Đề nghị Nhà thầu khẩn trương thực hiện.
Trân trọng,
{Đã ký}
Victoriano L. Hamlig
Kỹ Sư Thường Trú
Cc: - Như trên - Giám đốc dự án Cầu Cao Lãnh, CIPM - Nhóm qu n lý công trường, CIPM - Lưu: Liên danh TVGS - DDIS
Đính kèm: Báo cáo Kiểm tra Môi trường ngày 13/8/2016
Period observation Deadline Package Location Weather Observers
10, 13 August 2016 25 August
2016
CW1B 3+800 - 6+200 Cloudy Ms. Le Thi Phuong Loan – NES
Mr. Le Anh Tin – NES
Mr. Ngo Quoc Cuong – CW1B staff
No. Observation Issued Pictures by DDIS Environment Team Corrective pictures by Contractor
007 Location: Bridge 12
fabrication yards
Many metal wastes were
not stored properly.
Necessary action:
Contractor need to remove
this waste to outside of
contruction area.
Alternatively, contractor
need to provide the roof to
cover the weather impact
cause eroded metal to the
ground.
Many metals wastes locates on site without any
protection measure in Bridge 12 fabrication yards.
Date of action:
014 Location: Bridge #12
batching plant
Metal waste was not stored
properly in font of the Tuan
Loc subcontractor.
Necessary action:
Contractor need to remove
this metal to proper metal
waste storage. If this metal
still use on site, please
barricade and use
notification board for
information.
Metal waste on site in Tuan Loc office Date of action:
015 Location: Bridge #12 worker
accommodation
Many plastic wastes were
not collected to waste-bin.
Necessary action:
Contractor need to provide
waste-bin for solid waste in
this area and regularly
collect waste to waste-bin.
Waste in 624 worker accommodation Date of action:
016 Location: 624 worker
accommodation
Contractor did not remove
waste for waste collection.
Necessary action:
Contractor need to provide
additional waste-bin for
solid waste in this area and
regularly collect waste to
waste-bin.
Full waste in the waste-bin Date of action:
017 Location: 624 worker
accommodation
There is not efficient
drainage sytem in the
worker accomodation due
to the wastewater discharge
from CRBC office.
Necessary action:
Contractor CRBC must use
the tube to avoid the
discharge of wastewater
clogging.
Water spreading the 624 worker accommodation Date of action:
018 Location: Bridge 12 office
NO proper waste-bin for
waste collection.
Necessary action:
Contractor should remove
these wastes to proper
storage.
Full waste in the bridge 12 office Date of action:
019 Location: Bridge 12 worker
accommodation
Many water tanks for
washing and showering
contain many mosses which
is unsafe for worker health.
Necessary action:
Contractor should require to
regularly clean and remove
mosses in the bottom of
water tank.
Water tank is dirty in Bridge 12 worker
accommodation.
Date of action:
020 Location: Tuan Loc
subcontractor office
Many fuel drums were not
protected with roof and
impermable layer to avoid
leaking and spillage.
Necessary action:
Contractor must provide the
roof and drip tray/pan to
avoid leakage and spillage
due to mishandling or
weather impact.
No drip tray or drip pan Date of action:
021 Location: Bridge 12 office
Tuan Loc worker
accomodation keep good
housekeeping and clean
environment for worker
living area.
Good performance - No action necessary
Clean living area for workers
022 Location: Tuan Loc worker
accommodation
The drainage area in front of
toilets are efficient and
maintain clean. The water
tank was removed the dirt
and algea in the bottom.
The Tuan Loc subcontractor
should maintain this good
performance.
Good performance - No action necessary
Clean water tank and toilets area
023 Location: Bridge#12 worker
accommodation
The fence had installed
between the worker living
area and local residentials.
Good performance - No action necessary
New fence installation
1/2zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA
- As above;
- Cao Lanh Bridge Project Manager, Cuu Long CIPM;
- Site Construction Team of CIPM;
- File: CWIB Contractor JV Office.
cc:
Attached: Environmental reply file posterior to corrective actions (3 copies)
anager of Package CWIB, Central Mekong Delta Region Connectivity Project
l~
Pursuant to the Engineer's letterzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBANo.DDIS/CWIB/1443 dated 15 August 2016 dated Environmental
Inspection Report 13 Aug 2016, the Contractor has corrected the mentioned environmental issues and
now would like to respond to you as in the attachment.
Your review and instruction will be highly appreciated.
Yours sincerely,
Dear Sir,
Subject: Pacl{age CW1B, Central Mekong Delta Region Connectivity Project
Reply to the Letter on Checking the Environmental Report Dated 10-13 August 2016
JV CONSULTANT OF CDM SMITH ASSOCIATES INC. - WSP FINLAND LIMITED
YOOSHIN ENGINEERING CORPORATION (JV OF CDM, WSP & YOOSHINGroup 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam
Cc: Mr. Anders Loof - Project Manager
To: Mr. Victoriano Hamlig - Resident Engineer
Date: August 24,20] 6Ref. No.: CWIB/DDISIl378
CHINA ROAD AND BRIDGE CORPORATION AND VINACONEX E&C
JOINT VENTURE (CRBC-VINACONEX E&C JV)
2/2
- Nhutren;- Gi{uTIzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBAd6e du an du Cao Lanh, Ciru Long CIPM;
- Nh6m quan Iy cong tnrong cua CIPM;
Luu: Van phong Thftu ehinh CW1B.
CC:
XUEZHIGUO
Quyen Giam 06c D\l' an G6i ThAu CWIB, D\l' An K~t N6i KI1U V\rc Trung Tam D6ng B~ng Me Kong
Dlnh kern: File hlnh anh h6i Gapmoi tnrong sau khi khac phuc (3 ban)
{Da ky}
Q. Ciam d6c dl}' an
Tran trong,
Nha thau danh gia cao SlJ xem xet va cua eng,
Thua ong,
Tham chieu thu s6 DDIS/CWIBI1443 ngay 15 thang 8 nam 2016 cua Tu vc1nv~ viec bao cao cong tac
kiSm tra l110itruong ngay 10-13 thang 8 narn 2016, Nha thau oa ti~n hanh kh~c phuc cac v~n o~duoc
neu ra trong thu va nay xin h6i dap lai ong rum trong file dinh kern.
V/v: G6i Thfiu CWIB, DO'An K~t N&iKim VO'c Trung Tam Bang B~ng Me Kong
Hai Bap thu' Ki~m Tra Bao Cao Moi Tru'o'ng Ngay 10 -13 Thang 8 Nam 2016
CDM Smith - WSP - Yooshin Consultant JVT6 5, Ap Tan Tieh, xs Tinh Thai, TP Cao Lanh, Tinh D6ng Thap, Vi~t NaillDT: (84) 067-3881-255; Fax: (84) 067-3881.-256
Cc: Ong. Anders Loof - Giam d&c d\l' an
B~n: Ong. Victoriano Hamlig - Ky su' thuong tru
Ngay: 24/08/2016TIm s6: CWIB/DDISI1378
CHINA ROAD AND BRIDGE CORPORATION AND VINACONEX E&C.~
~ JOINT VENTURE (CRBC-VINACONEX E&C JV)
CHINA ROAD AND BRIDGE CORPORATION AND VINACONEX E&C
JOINT VENTURE CRBC-VINACONEX E&C JV
1/4
Period observation Deadline Package Location Weather Observation
10, 13 August 2016 25 August
2016
CW1B 3+800 -
6+200
Cloudy Ms. Le Thi Phuong Loan –
NES
Mr. Le Anh Tin – NES
Mr. Ngo Quoc Cuong –
CW1B staff
Observation Issued Pictures by DDIS Environment
Team
Corrective pictures by Contractor
Location: Bridge
12 fabrication
yards
Many metal wastes
were not stored
properly.
Necessary action:
Contractor need to
remove this waste
to outside of
contruction area.
Alternatively,
contractor need to
provide the roof to
cover the weather
impact cause
eroded metal to
the ground.
Many metals wastes locates on site
without any protection measure in Bridge
12 fabrication yards.
Date of action: 18th August 2016
Location: Bridge
#12 batching plant
Metal waste was
not stored properly
in font of the Tuan
Loc subcontractor.
Necessary action:
Contractor need to
remove this metal
to proper metal
waste storage. If
this metal still use
on site, please
barricade and use
notification board
for information.
Metal waste on site in Tuan
Loc office
Date of action: 18th August 2016
CHINA ROAD AND BRIDGE CORPORATION AND VINACONEX E&C
JOINT VENTURE CRBC-VINACONEX E&C JV
2/4
Location: Bridge
#12 worker
accommodation
Many plastic
wastes were not
collected to waste-
bin.
Necessary action:
Contractor need to
provide waste-bin
for solid waste in
this area and
regularly collect
waste to waste-bin.
Waste in 624 worker accommodation Date of action: 18th August 2016
Location: 624
worker
accommodation
Contractor did not
remove waste for
waste collection.
Necessary action:
Contractor need to
provide additional
waste-bin for solid
waste in this area
and regularly
collect waste to
waste-bin.
Full waste in the waste-bin Date of action: 18th August 2016
Location: 624
worker
accommodation
There is not
efficient drainage
sytem in the
worker
accomodation due
to the wastewater
discharge from
CRBC office.
Necessary action:
Contractor CRBC
must use the tube
to avoid the
discharge of
wastewater
clogging.
Water spreading the 624 worker
accommodation
Date of action: 18th August 2016
CHINA ROAD AND BRIDGE CORPORATION AND VINACONEX E&C
JOINT VENTURE CRBC-VINACONEX E&C JV
3/4
Location: Bridge
12 office
NO proper waste-
bin for waste
collection.
Necessary action:
Contractor should
remove these
wastes to proper
storage.
Full waste in the bridge 12 office Date of action: 18th August 2016
Location: Bridge
12 worker
accommodation
Many water tanks
for washing and
showering contain
many mosses
which is unsafe for
worker health.
Necessary action:
Contractor should
require to
regularly clean
and remove
mosses in the
bottom of water
tank.
Water tank is dirty in Bridge 12 worker
accommodation.
Date of action: 17th August 2016
Location: Tuan
Loc subcontractor
office
Many fuel drums
were not protected
with roof and
impermable layer
to avoid leaking
and spillage.
Necessary action:
Contractor must
provide the roof
and drip tray/pan
to avoid leakage
and spillage due to
mishandling or
weather impact.
Not finish yet. The subcontractor on improve
it, when finish will reply to consultant
No drip tray or drip pan Date of action:
CHINA ROAD AND BRIDGE CORPORATION AND VINACONEX E&C
JOINT VENTURE CRBC-VINACONEX E&C JV
4/4
Location: Bridge
12 office
Tuan Loc worker
accomodation keep
good
housekeeping and
clean environment
for worker living
area.
Good performance - No action necessary
Clean living area for workers
Location: Tuan
Loc worker
accommodation
The drainage area
in front of toilets
are efficient and
maintain clean.
The water tank
was removed the
dirt and algea in
the bottom. The
Tuan Loc
subcontractor
should maintain
this good
performance.
Clean water tank and toilets area Dade of action: 18th August 2016
Location:
Bridge#12 worker
accommodation
The fence had
installed between
the worker living
area and local
residentials.
New fence installation
CDMth sm•
Central Mekong Delta Connectivity Project - (CMDCP)
TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE
COM Smith - WSP-YooshinConsultant JV
ィwspセ@\ヲG ッッ ウセ@
Group 5, Tan Tich Hamlet, TinhThoi Commune, Cao Lanh City, Dong Thap Province, Vietnam
Tel: (84) 067-3881-255; Fax: (84) 067-3881 -256
Ref. No. : DDIS/CW1 B/1505
Date : 15 October 2016
To: Mr. Xue Zhi Guo Acting Project Manager Contractor's Representative
Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel: (84) 067-3881-255; Fax: (84) 067-3881 -256
Subject: Package CW18 - Environmental Inspection Report 05 Oct 2016
Dear Mr. Xue,
During the DDIS Environmental Team's visit and inspection to your construction site on the above
date, was witnessed that you fail to comply with your obligations and is evidenced by the attached
Environmental Inspection Report:
A - Repeat Observations - Notice to Correct
This letter serves as a notice to correct the repeat observation in the attached Environmental
Inspection Report, in accordance with sub-clause 15.1 of the General Condition of Contract:
Observation Nos: 007,014,015,020 - 008 in Ref. No. DDIS/CW1B/1443 dated 15 August
2016
These observations were issued in a prior Environmental Inspection Report but you have not taken
the required action. You are required to make good the failure and remedy it within 7 days.
8 - New Observations
During the DDIS visit and inspection to your construction site, the DDIS Environmental Tea·m also
made new observations as per the attached:
Observation Nos: 024 - 034
We will appreciate your cooperation to timely correct as per these comments and your report to our
office within the requested deadline. Your prompt actions on the matter would be highly appreciated.
Cc: - As above
Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM File: DDIS Consultant JV Office
Page 1 ofl
Attachment: Environmental Inspection Report 05 Oct 2016
CDIVIth Sm1
Dl;P an kセエ@ n6i khu Vl;J'C trung tam Df>ng 「セョァ@ song CU>u Long - (CMDCP)
TA 7822-VIE, Khoan vay 3013-VIE, Khoan カゥセョ@ trq 0353-VIE
Lien danh TU' カセョ@ COM Smith - WSP-Yooshin
セwspセ@T6 5, Ap Tan Tich, Xa Tinh Th&i, TP Cao Lanh, Tinh 8ong Thap, Vi$t Nam
<?oos/:;.....
s6thU'
Ngay
Gui den:
: DDIS/CW18/1505
: 15/10/2016
Ong Xue Zhi Guo qオケセョ@ Giam 86c Dl,J' an 8c;ii di$n Nha th§u
8T: (84) 067-3881-255; Fax: (84) 067-3881 -256
VP Dl,J' an: T6 5, Ap Tan Tich, Xa Tinh Th&i, TP Cao Lanh, Tinh 86ng Thap, Vi$t Nam
8T: (84) 067.352.6868 Fax: (84) 067.352.6969
Chu 、セZ@ G6i CW1B- Bao cao kゥセュ@ tra M6i tnvO>ng ngay 05/10/2016
Kinh gui 6ng Xue,
Trong thai gian doi ngO nhan vien m6i trU'ang TU' v!in den kiem tra hi$n trU'ang thi c6ng cua Nha th§u :
vao ngay neu tren, chung t6i phat hi$n Nha th§u kh6ng thl,J'C hi$n theo nghia Vl:J cua Nha th§u va dU'Q'C
chung minh v&i Bao cao Kiem tra M6i trU'ang dinh kern:
A- nィセ」@ ャセゥ@ cac van 、セ@ theo doi- Thong bao Chinh sll'a
Van ban nay nhU' Ia mot thong bao chinh sua cac vfln 、セ@ theo d6i dU'Q'C nhac lc;ii trong Bao cao Kiem
tra M6i trU'ang dinh kern theo tieu khoan 15.1 thuoc 8i€!u khoan chung cua Hqp dbng:
Vfln d€! s6: 007,014,015,020-008 trong van ban s6 DDIS/CW1B/1443 ky ngay 15/08/2016
NhO>ng vfln d€! nay da phat hanh trong Bao cao Kiem tra M6i tmang trU'&c d6 nhU'ng Nha th§u カセョ@
kh6ng tien hanh thl,J'c hi$n theo yeu du. Xセ@ nghi Nha th§u dam bao thl,J'c hi$n t6t cac v!in d€! chU'a hoan
thanh va chinh sua trong vong 07 ngay.
B - Cac van 、セ@ theo doi m&i
Trong khi TU' v!in den kiem tra hi$n tmang thi c6ng cua Nha th§u, nh6m nhan vien m6i trU'ang TU' v!in
cOng l;fip mot s6 vfln d€! m&i nhU' dinh kern:
Vfln d€! s6: 024 - 034
Chung t6i se danh gia cao Sl,J' hqp tac cua Nha th§u khi thl,J'C hi$n chinh sua dung hc;in cac y kien nay
va trlnh bao cao cua Nha th§u den van phong TU' vfln trong thai hc;in yeu c§u. 8€! nghi Nha thau ォィセョ@
trU'O'ng thl,J'C hi$n vfln d€! nay.
T ran trc;>ng ,
{£Jtj ky}
nァオケセョ@ tィセ@ Vli'O'ng Ph6 Giam d6c Dl,J' an
Cc: - Nhll' tren
Giam doc dtY an c§u Cao Uinh, CIPM - Nh6m quan IY cong tmcmg, CIPM - LU'u: Lien danh TVGS - DDIS
8inh kern: Bao cao ォゥ セ ュ@ tra moi trll'cmg ngay 05/10/2016
Trang 1/1
A. Repeated observations
No. Observations Comments and Resolution
007 Location: Bridge 12
fabrication yards
Obervation in
Environmental Inspection
Report dated dated 12 July
2016 and reminded in 10
and 13 August 2016 (Ref:
DDIS/CW1B/1443 dated 15
August 2016)
Ref: item 11, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor need to remove this waste
to outside of contruction area. Alternatively, contractor
need to provide the roof to cover the weather impact
cause eroded metal to the ground.
Contractor reply date:
Many metals wastes locates on site without any
protection measure in Bridge 12 fabrication yards.
Status: unclose
014 Location: Bridge #12
batching plant
Obervation in
Environmental Inspection
Report dated 10 and 13
August 2016 (Ref:
DDIS/CW1B/1443 dated 15
August 2016)
DDIS comments: Contractor need to remove this metal
to proper metal waste storage. If this metal still use on
site, please barricade and use notification board for
information.
Contractor reply date:
Ref: item 11, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
Metal waste on site in Bridge 12 batching plant Status: unclose
015 Location: Bridge #12 worker
accommodation
Obervation in
Environmental Inspection
Report dated 10 and 13
August 2016 (Ref:
DDIS/CW1B/1443 dated 15
August 2016)
Ref: item 11f and 17q, table
1, EMP of contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor need to provide waste-bin
for solid waste in this area and regularly collect waste to
waste-bin.
Contractor reply date:
Waste in 624 worker accommodation Status: unclose
020 Location: Tuan Loc
subcontractor office
Obervation in
Environmental Inspection
Report dated 10 and 13
August 2016 (Ref:
DDIS/CW1B/1443 dated 15
August 2016)
Ref: item 7g, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must provide the roof and
drip tray/pan to avoid leakage and spillage due to
mishandling or weather impact.
Contractor reply date:
No drip tray or drip pan Status: unclose
Period observation Deadline Package Location Weather Observers
05 October 2016 24 Oct 2016 CW1B 3+800 - 6+200 Cloudy Ms. Le Thi Phuong Loan – NES
Mr. Le Anh Tin – NES
Mr. Ngo Quoc Cuong – Contractor staff
B. New observations
No. Observation Issued Pictures by DDIS Environment Team Resolution
024 Location: Bridge 12 site near
Pier 22
There are many materials
and debris waste on site.
Ref: item 11f, table 1, EMP
of contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor need to rearrange
materials and remove the debris out of site.
Contractor reply date:
Poor housekeeping Status: unclose
025 Location: Bridge 12 site near
Pier 23 and fabrication yard
Some fuel leakages on the
ground cause the soil
contamination.
Ref: item 7h, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must collect this
contanimated waste to the hazardous waste storage
and treat by authorized hazardous treatment company.
Contractor reply date:
Soil contamination by fuel leakage Status: unclose
026 Location: Bridge 12
fabrication yard
After heavy rain, the access
road to fabrication is slipery
and migh cause danger for
workers.
Ref: Clause 4.15a, contractor
CW1B (3712A/CIPM-HDKT)
DDIS comments: Contractor should repair the access
road to avoid slipery condition during rainy season.
Contractor reply date:
Slipery access to Bridge 12 fabrication yard Status: unclose
027 Location: Bridge 12 batching
plant
The settling tank is full of
concrete sludge.
Ref: item 10c, table 1, EMP
of contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor should remove this
concrete waste in the settling tank.
Contractor reply date:
Full concrete sludge in Bridge 12 settling tank Status: unclose
028 Location: Bridge 12 batching
plant
The wastewater from
washing of concrete truck
run to the adjacent area.
Ref: item 10b, table 1, EMP
of contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must close the access of
wastewater to the adjacent area. All contaminated
wastewater in this area should be recollect to the
settling tank.
Contractor reply date:
Improper discharge of wastewater Status: unclose
029 Location: Bridge 12 worker
accomodation
Many domestic wastes are
not collected to the waste
storage area.
Ref: item 11f and 17q, table
1, EMP of contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor remove all domestic to
waste-bin, in order to keep good housekeeping.
Contractor reply date:
Full domestic waste in worker accomodation Status: unclose
030 Location: Bridge 12 worker
accomodation
Burning waste is prohibited.
Ref: item 3m, table 1, EMP
of contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must clean the burning
waste and re-train for workers of project environmental
regulations.
Contractor reply date:
Burning waste Status: unclose
031 Location: Bridge#12 office
Fuel spillage to water
drainage in bridge 12 office.
Ref: item 7h, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must check the fuel spillage
and treat of contaminated wastewater in the drainage
before entering to public waterbody.
Contractor reply date:
Water contamination Status: unclose
032 Location: Bridge 12
fabrication yard
Some pieces of roof are
missing.
Ref: item 5l, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor should maintain and fully
cover the roof of the fuel tank storage.
Contractor reply date:
Inadequate roof of hazardous fuel storage Status: unclose
033 Location: Tuan Loc site near
Pier 17 and Pier 18
Contractor wash the
concrete basket in the Tien
river.
Ref: item 10, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor should not wash the
remaining concrete waste and its wastewater to the
Tien river. These wastes should be clean and remove to
settling tank for treatment.
Contractor reply date:
Clean water tank and toilets area Status: unclose
034 Location: Tuan Loc site near
Pier 17 and Pier 18
Fuel spillage and leakage
from crane spead on the
barges and might
contaminate the river water.
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must check the crane
function to avoid fuel leakage. The drip pan/tray must
be avaiable on site for any equipment using fuel.
Contractor must clean this fuel leakage by rags and
these rags are collected as hazardous waste.
Contractor reply date:
Clean water tank and toilets area Status: unclose
CHINA ROAD AND BRIDGE CORPORATION AND VINACONEX E&C
JOINT VENTURE (CRBC-VINACONEX E&C JV)
Ref. No.: CWIBIDDISI1453 Date: October 22, 2016
To; Mr. Victoriauo Hamlig - Resident Engineer
Cc; Mr. Anders Loof - Project Manager
JY CONSULT ANT OF CDM SMITH ASSOCIATES INC. - WSP FINLAND LIMITED
VOOSHIN ENGINEERING CORPORATION (JY OF CDM, WSP & YOOSHIN) Group 5, Tan Tich Hamlet, Tjnh Thai Commune, Cao Lanh City, Dong Thap Province, Vietnam
Subject: Package CWIB, Central Mekong Delta Region Connectivitv Project
Reply to the Letter on Checking the Environmental Rerort Dated 05 October 2016
Dear Sir,
Pursuant to the Engineer's letter No.DDIS/CW1B!1505 dated 15 October 2016 regarding
Environmental Inspection Report on 05 October 2016, the Contractor has corrected the mentioned
environmental issues and now would like to respond to you as in the attached file.
Your review and further instruction will be highly appreciated.
Yours sincerely,
Acting Project Manager iセ@
セL@
セ@ェォh ゥNゥB@ ゥhBセc B BGPZGIセ01( uiセ@ f IJITHA ;.
セ@ . 1 !O x • >'i XA) \ ).'
|セPBL@ Wi;ll セ j N IG i o@ . . . . セLiM」 N@ £tJng ·fl:.oj0ct Manager of Package CW lB, Central Mekong Delta Region ConnectIvIty Project
:;-". ⦅ゥGNセQQ@ ェMセB@ .;Y .,- -- <:;/
Attached: Reply to the Letter on Checking the Environmental Report Dated 05 October 2016 (3 copies)
cc:
- As above;
- Cao Lanh Bridge Project Manager, Cuu Long CIPM;
- Site Construction Team of CIPM;
- File: CW! B Contractor JV Office.
1/2
CHINA aOAI) AND fJRIDC£ CQl"tPOHATlON AND V INACO.N£X E&C
JOI NT VENTURI': (CRnCNINACON£X £&C JV)
Thlf S5: CWl ll/DDISII4S} Ngay: 2211 0120 16
dセョ Z@ Ong. Victoriano HflUllig - Kji suo thm"rng tn!
C c: Ong. Andel's Loof - Giam d6c dl.r an
CDM Smith - WSI' - Yooshin Consultant JV T6.5, Ap Tiin Tieh, X:\ Tinh Th&i, TP C IO L1\nh, Tinh D6ng, Thflp, Vi?1 Naill
DT: (84 ) 067-388 ! -255; Fax: (84) 067-3881-256
V/v : G6i ThAu_ CWIB, Du' An Ket N6i Kim VlfC Trung Tfim D6ng B:1ng Me Kong
H6i IHp thu' kゥセュ@ Tnt Bao Cao MOi TI'u'<mg Ngny 05 Thang 10 Ni'im 2016
Thua 6ng,
TlIam chiEu tlm sa DDIS/CWIBI150S ngay 15 thang 10 nilm 2016 cua Tu vfin カセ@ カ ゥ セ」@ bac CflO c6ng tac ki€m tra mai tmang ngay 05 thang 10 nam 2016, Nha thAu eta エゥ セ ョ@ hanh kllaCph\-lc cae vfi n dS dll'Q'c
m!u ra trong tbu va nay xin h6i Gap l;:ti ang nhu trong file dfnh kemo
Nha thill (tanh gia cao sv xem xet va chi 、セッ@ them Clla 6ng,
Tran t.n;mg,
Q. Gi3In d6c dl)° an
{Oaky)
XUEZHIGUO Quy€n Giam d6c OI,l" an G6i Thau CW IB, Dv An KSt N6i Khu V!fC Trung Tam D6ng Bimg Me Kong
Olnh kem; H6i dap 1Iur ki&nl Ira baa cao m6i tll1ang ngay 05 Ih{lllg lO nam 20 16 (03 ban)
cc:
Nhu Iren;
Giam d6e d\f an cAl! Cao Uinh , Cuu Long CJPM;
Nh6m quo'lIl Iy e6ng Lnn'mg eua CIPM;
Luu: Vtin phbng Thau ehlnh CWI B,
212
A. Repeated observations No. Observations Comments and Resolution 007 Location: Bridge 12
fabrication yards Obervation in Environmental Inspection Report dated dated 12 July 2016 and reminded in 10 and 13 August 2016 (Ref: DDIS/CW1B/1443 dated 15 August 2016) Ref: item 11, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT)
DDIS comments: Contractor need to remove this waste to outside of contruction area. Alternatively, contractor need to provide the roof to cover the weather impact cause eroded metal to the ground.
Contractor reply date: 20th October 2016
Many metals wastes locates on site without any protection measure in Bridge 12 fabrication yards.
Status: unclose
014 Location: Bridge #12 batching plant Obervation in Environmental Inspection Report dated 10 and 13 August 2016 (Ref: DDIS/CW1B/1443 dated 15 August 2016) Ref: item 11, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT)
DDIS comments: Contractor need to remove this metal to proper metal waste storage. If this metal still use on site, please barricade and use notification board for information.
Contractor reply date: 20th October 2016
Metal waste on site in Bridge 12 batching plant Status: unclose
015 Location: Bridge #12 worker accommodation Obervation in Environmental Inspection Report dated 10 and 13 August 2016 (Ref: DDIS/CW1B/1443 dated 15 August 2016) Ref: item 11f and 17q, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT)
DDIS comments: Contractor need to provide waste‐bin for solid waste in this area and regularly collect waste to waste‐bin.
Contractor reply date:20th October 2016 Waste in 624 worker accommodation Status: unclose
020 Location: Tuan Loc subcontractor office Obervation in Environmental Inspection Report dated 10 and 13 August 2016 (Ref: DDIS/CW1B/1443 dated 15 August 2016) Ref: item 7g, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT)
DDIS comments: Contractor must provide the roof and drip tray/pan to avoid leakage and spillage due to mishandling or weather impact. Contractor reply date:
No drip tray or drip pan Status: unclose
Period observation Deadline Package Location Weather Observers 05 October 2016 24 Oct 2016 CW1B 3+800 ‐ 6+200 Cloudy Ms. Le Thi Phuong Loan – NES
Mr. Le Anh Tin – NES Mr. Ngo Quoc Cuong – Contractor staff
B. New observations No. Observation Issued Pictures by DDIS Environment Team Resolution 024 Location: Bridge 12 site near
Pier 22 There are many materials and debris waste on site. Ref: item 11f, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT)
DDIS comments: Contractor need to rearrange materials and remove the debris out of site. Contractor reply date:
Poor housekeeping Status: unclose 025 Location: Bridge 12 site near
Pier 23 and fabrication yard Some fuel leakages on the ground cause the soil contamination. Ref: item 7h, table 1, EMP of
DDIS comments: Contractor must collect this contanimated waste to the hazardous waste storage and treat by authorized hazardous treatment company. Contractor reply date: 20th October 2016
contractor CW1B (3712A/CIPM‐HDKT)
Soil contamination by fuel leakage Status: unclose 026 Location: Bridge 12
fabrication yard After heavy rain, the access road to fabrication is slipery and migh cause danger for workers. Ref: Clause 4.15a, contractor CW1B (3712A/CIPM‐HDKT)
DDIS comments: Contractor should repair the access road to avoid slipery condition during rainy season.
Contractor reply date: 20th October 2016
Slipery access to Bridge 12 fabrication yard Status: unclose
027 Location: Bridge 12 batching plant The settling tank is full of concrete sludge. Ref: item 10c, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT)
DDIS comments: Contractor should remove this concrete waste in the settling tank. Contractor reply date: 20th October 2016
Full concrete sludge in Bridge 12 settling tank Status: unclose 028 Location: Bridge 12 batching
plant The wastewater from washing of concrete truck run to the adjacent area. Ref: item 10b, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT)
DDIS comments: Contractor must close the access of wastewater to the adjacent area. All contaminated wastewater in this area should be recollect to the settling tank.
Contractor reply date: 20th October 2016
Improper discharge of wastewater Status: unclose
029 Location: Bridge 12 worker accomodation Many domestic wastes are not collected to the waste storage area. Ref: item 11f and 17q, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT)
DDIS comments: Contractor remove all domestic to waste‐bin, in order to keep good housekeeping.
Contractor reply date: 2oth October 2016
Full domestic waste in worker accomodation Status: unclose
030 Location: Bridge 12 worker accomodation Burning waste is prohibited. Ref: item 3m, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT)
DDIS comments: Contractor must clean the burning waste and re‐train for workers of project environmental regulations. Contractor reply date: 20th October 2016
Burning waste Status: unclose 031 Location: Bridge#12 office
Fuel spillage to water drainage in bridge 12 office. Ref: item 7h, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT)
DDIS comments: Contractor must check the fuel spillage and treat of contaminated wastewater in the drainage before entering to public waterbody. Contractor reply date: 20th October 2016
Water contamination Status: unclose
032 Location: Bridge 12 fabrication yard Some pieces of roof are missing. Ref: item 5l, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT)
DDIS comments: Contractor should maintain and fully cover the roof of the fuel tank storage. Contractor reply date: 20th October 2016
Inadequate roof of hazardous fuel storage Status: unclose
033 Location: Tuan Loc site near Pier 17 and Pier 18 Contractor wash the concrete basket in the Tien river. Ref: item 10, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT)
DDIS comments: Contractor should not wash the remaining concrete waste and its wastewater to the Tien river. These wastes should be clean and remove to settling tank for treatment.
Contractor reply date: 20th October 2016
Clean water tank and toilets area Status: unclose
034 Location: Tuan Loc site near Pier 17 and Pier 18 Fuel spillage and leakage from crane spead on the barges and might contaminate the river water. Ref: item 7, table 1, EMP of contractor CW1B (3712A/CIPM‐HDKT)
DDIS comments: Contractor must check the crane function to avoid fuel leakage. The drip pan/tray must be avaiable on site for any equipment using fuel. Contractor must clean this fuel leakage by rags and these rags are collected as hazardous waste.
Contractor reply date: 18th October 2016
Clean water tank and toilets area Status: unclose
CDM.th Sma
Central Mekong Delta Connectivity Project- (CMDCP)
TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE
CDMSmith- WSP -YooshinConsultant JV
セ [キウp@ 0 !AI- <? <><>sh:-...
Group 5, Tan Tich Hamlet, TinhThoi Commune, Cao Lanh City, Dong Thap Province, Vietnam
Tiil: (Sr1) 067-3881 -:155; F11:v.: (8t1) 067-181il1-:156
Ref. No. : DDIS/CW1 B/1554
Date : 22 November 2016
To: Mr. Xue Zhi Guo Acting Project Manager Contractor's Representative
Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel: (84) 067-3881-255; Fax: (84) 067-3881-256
Subject: Package CW1B- Environmental Inspection Report 16 Nov 2016
Dear Mr. Xue,
During the DDIS Environmental Team's visit and inspection to your construction site on the above
date, was witnessed that you fail to comply with your obligations and is evidenced by the attached
Environmental Inspection Report:
A- Repeat Observations- Notice to Correct
This letter serves as a notice to correct the repeat observation in the attached Environmental
Inspection Report, in accordance with sub-clause 15.1 of the General Condition of Contract:
Observation Nos: 007,014, 015, 020, 026, 027, 028, 033, 034
These observations were issued in a prior Environmental Inspection Report but you have not taken
the required action. You are required to make good the failure and remedy it within 7 days.
B - New Observations
During the DDIS visit and inspection to your construction site, the DDIS Environmental Team also
made new observations as per the attached:
Observ.ation Nos: 035 - 044
We will appreciate your cooperation to timely correct as per these comments and your report to our
office within the requested deadline. Your prompt actions on the matter would be highly appreciated.
(
Cc: - As above
Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM File: DDIS Consultant JV Office
Page 1 of l
Attachment: Environmental Inspection Report 16 Nov 2016
CDIVIth Smt
Olf an kセエ@ n6i khu VlfC trung tam D6ng 「 セ ョ ァ@ song Ctvu Long - (CMDCP)
TA 7822-VIE, Khoan vay 3013-VIE, Khoan カゥセョ@ tr9' 0353-VIE
Li€m danh TU' カセョ@ CDM Smith- WSP -Yooshin
ィ ws p セ@T6 5, Ap Tan Tich, Xa Tinh Th&i, TP Cao U inh, Tinh £>6ng Thap, Vl$t Nam
セ oc^sセ@
S6 thU' : DDIS/CW1 S/1554
Ngay : 22/11/2016
Gii'i 、セョ Z@ 6ng Xue Zhi Guo Quyen Giam 86c Dl! an 8<;1i di$n Nha エィセオ@
£>T: (84) 067-3881-255; Fax: (84) 067-3881-256
VP Dl! an: To 5, Ap Tan Tjch, Xa Tinh Th&i, TP Cao Lanh, Tinh 86ng Thap, Vi$t Nam
8T: (84) 067.352.6868 Fax: (84) 067.352.6969
Chu 、セZ@ G6i CW18 - Bao cao kゥセュ@ tra Moi trU'cYng ngay 16/11/2016
Kinh gii'i 6ng Xue,
Trong thai gian doi ngG nhan vien moi trU'ang TU' vim 、セョ@ ォ ゥ セュ@ tra ィゥセュ@ trlfang thi cong cua Nha エィセオ@
vao ngay neu tren, Chung t6i phat hi$n Nha エィセオ@ kh6ng thl!C ィゥ セ ュ@ theo nghia VI) cua Nha エィセオ@ va dU'Q'C
ch(rng minh v&i Sao cao k ゥ セュ@ tra M6i trlfang dinh kern:
A - Nhac ャセゥ@ cac van 、セ@ theo doi - Thong bao Chinh si.Pa
Van ban nay nhlf Ia mot thong bao chinh sii'a cac カセョ@ de theo doi dU'Q'C nhac lc;1i trong Sao cao kゥセュ@
tra M6i trlfang dinh kern theo エゥセオ@ khoan 15.1 thuoc Xゥセオ@ khoan chung cua Hqp dbng:
カセョ@ de so: oo7,014, 015, 020. 026, 027, 028, 033, 034
NhCmg カセョ@ de nay da phat hanh trong Sao cao kゥセュ@ tra Moi trlfang trU'&c d6 nhlfng Nha エィセオ@ カセョ@
khong エゥセョ@ hanh thl!c hi$n theo yeu 」セオN@ Be nghi Nha エィセオ@ dam bao thl!c hi$n t6t cac カセョ@ de chlfa hoan
thanh va chinh sii'a trong vong 07 ngay.
8 - Cac van 、セ@ theo doi m&i
Trong khi TU' vim 、セョ@ ォゥセュ@ tra hi$n trU'ang thi c6ng cua Nha エィセオ N@ nh6m nhan vien m6i trlfang TU' カセョ@
cGng ャセー@ mot so カセョ@ de m&i nhlf dinh kern:
van de so: o35 - 044
Chung t6i se danh gia cao Sl! hqp tac cua Nha エィセオ@ khi thl!C hi$n chinh sii'a dung h<;in cac y ォゥセョ@ nay
va trinh bao cao cua Nha エィセオ@ 、セョ@ van phong TU' van trong thai hc;1n yeu 」セオ N@ 8e nghi Nha エィセオ@ khfln
trll'O'ng thl!C hi$n van de nay.
Tran trQng,
{Da k9J
nァオケセョ@tィセ@ VU'O'ng Ph6 Giam doc Dl! an
Cc: - Nhll' tren - Giam 66c dV' an c セオ@ Cao Lanh, CIPM - Nh6m quan ly cong trll'ang, CIPM - LU'u: Lien danh TVGS - DDIS
£>fnh kern: Bao cao ォゥ セ ュ@ tra moi tmcmg ngay 16/11/2016
Trang 1/1
--------------------- ·------------------- ·------------------- -
A. Repeated observations
No. Observations Comments and Resolution
007 Location: Bridge 12
fabrication yards
Obervation in
Environmental Inspection
Report dated dated 12 July
2016 and reminded in 10
and 13 August 2016 (Ref:
DDIS/CW1B/1443 dated 15
August 2016), and in 05 Oct
2016 (Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 11, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor need to remove this waste
to outside of contruction area. Alternatively, contractor
need to provide the roof to cover the weather impact
cause eroded metal to the ground.
Contractor reply date:
Unprotected metal waste Status: unclose
014 Location: Bridge #12
batching plant
Obervation in
Environmental Inspection
Report dated 10 and 13
August 2016 (Ref:
DDIS/CW1B/1443 dated 15
August 2016), and in 05 Oct
2016 (Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
DDIS comments: Contractor need to remove this metal
to proper metal waste storage. If this metal still use on
site, please barricade and use notification board for
information.
Contractor reply date:
Metal waste on site in Bridge 12 batching plant Status: unclose
Ref: item 11, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
015 Location: Bridge #12 worker
accommodation
Obervation in
Environmental Inspection
Report dated 10 and 13
August 2016 (Ref:
DDIS/CW1B/1443 dated 15
August 2016), and in 05 Oct
2016 (Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 11f and 17q, table
1, EMP of contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor need to provide waste-bin
for solid waste in this area and regularly collect waste to
waste-bin.
Contractor reply date:
Waste in 624 worker accommodation Status: unclose
020 Location: Tuan Loc
subcontractor office
Obervation in
Environmental Inspection
Report dated 10 and 13
August 2016 (Ref:
DDIS/CW1B/1443 dated 15
August 2016), and in 05 Oct
2016 (Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 7g, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must provide the roof and
drip tray/pan to avoid leakage and spillage due to
mishandling or weather impact.
Contractor reply date:
No drip tray or drip pan Status: unclose
026 Location: Bridge 12
fabrication yard
Obervation in
Environmental Inspection
Report dated 05 Oct 2016
(Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: Clause 4.15a, contractor
CW1B (3712A/CIPM-HDKT)
DDIS comments: Contractor should repair the access
road to avoid slipery condition during rainy season.
Contractor reply date:
Slipery access to Bridge 12 fabrication yard Status: unclose
027 Location: Bridge 12 batching
plant
Obervation in
Environmental Inspection
Report dated 05 Oct 2016
(Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 10c, table 1, EMP
of contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor should remove this
concrete waste in the settling tank.
Contractor reply date:
Full concrete sludge in Bridge 12 settling tank Status: unclose
028 Location: Bridge 12 batching
plant
Obervation in
Environmental Inspection
Report dated 05 Oct 2016
(Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 10b, table 1, EMP
of contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must close the access of
wastewater to the adjacent area. All contaminated
wastewater in this area should be recollect to the
settling tank.
Contractor reply date:
Improper discharge of wastewater Status: unclose
033 Location: Tuan Loc site near
Pier 17 and Pier 18
Obervation in
Environmental Inspection
Report dated 05 Oct 2016
(Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 10, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor should not wash the
remaining concrete waste and its wastewater to the
Tien river. These wastes should be clean and remove to
settling tank for treatment.
Contractor reply date:
Clean water tank and toilets area Status: unclose
034 Location: Tuan Loc site near
Pier 17 and Pier 18
Obervation in
Environmental Inspection
Report dated 05 Oct 2016
(Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must check the crane
function to avoid fuel leakage. The drip pan/tray must
be avaiable on site for any equipment using fuel.
Contractor must clean this fuel leakage by rags and
these rags are collected as hazardous waste.
Contractor reply date:
Clean water tank and toilets area Status: unclose
Period observation Deadline Package Location Weather Observers
16 November 2016 24 November
2016
CW1B 3+800 - 6+200 Sunny Ms. Le Thi Phuong Loan – NES
Mr. Nguyen Trung Kien– Safety Officer
Mr. Nguyen Huu Tue – Safety Officer
B. New observations
No. Observation Issued Pictures by DDIS Environment Team Resolution
035 Location: Song Da worker
camp near Pier 10
Ref: item 11, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor collect this domestic waste
to the domestic waste storage and transfer to the
licenced waste collection company.
Contractor reply date:
Uncollected domestic waste Status: unclose
036 Location: Song Da worker
camp near Pier 10
Ref: item 11, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor collect this domestic waste
to the domestic waste storage and transfer to the
licenced waste collection company.
Contractor reply date:
Uncollected domestic waste Status: unclose
037 Location: Vinaconex site
near Pier 36
Ref: item 13, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must collect this concrete
waste and transfer to your disposal area.
Contractor reply date:
Concrete spilled near by the irrigation water course Status: unclose
038 Location: Vinaconex site
near Pier 36
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must provide the drip tray
to avoid any leak to the ground.
Contractor reply date:
Unprotected oil drums on site Status: unclose
039 Location: Bridge 12 batching
plant
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must remove the concrete
sludge filled in the settling pond and this concrete waste
should be transferred to the disposal site.
Contractor reply date:
Clean water tank and toilets area Status: unclose
040 Location: Bridge 12 batching
plant
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: This area is shallow and be always
stucked by wastewater from batching plant. Contractor
should redesign this area as settling pond system to
treat the wastewater.
Contractor reply date:
Wastewater from batching plant contaminated the
adjacent land area
Status: unclose
041 Location: Bridge 12 batching
plant
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor often dump the wastewater
after cleaning the concrete mixer truck in this area.
Contractor should create a settling pond system for this
area with efficient drainage system.
Contractor reply date:
Contaminated land by wastewater washing from
mixer trucks
Status: unclose
042 Location: Bridge 12 worker
camp
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor should arrange the
quipments to dredge the sewage system in the
adjament canal of the Bridge 12 worker camp.
Contractor reply date:
Clean water tank and toilets area Status: unclose
043 Location: Bridge 12 worker
camp
Ref: item 3, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Burning waste is forbidden in this
project. Contractor must remind this issue to all workers
during environmental and safety re-tranining. The
record of re-training should submit to DDIS.
Contractor reply date:
Burning waste Status: unclose
044 Location: Freyssinet site
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must collect this
contaminated soil to hazardous waste storage and
transfer this waste for licenced hazardous waste
company.
Contractor reply date:
Contaminated soil by fuel leak Status: unclose
CHINA ROAD AND BHIDGE CORPO HATI ON AND VINACONITX IZ&C
JOINT VENTURE. (CIWC-VINACONEX E&C JV)
Ref. No.: CWIB/DDISIl 529 Date: December 14,2016
To: Mr. Victoriano H rulllig - Rcsidcnt Engineer
Cc: MI". Francis G. Flanagan - Pl-Ojcct Manager
JV CONSULTANT OF CDM SMITH ASSOC IATES INC. - WSP FINLAND LIMITED
YOOSHI N ENGINEERING CO RPORATION (JV Of CDM, wsr & YOOSHTN) Group 5, Tan T iel! I-hulilel , T inh Tho. Commune, Coo Lanh City, Dong ThaI' Province, Vietnam
Subject: Package CWIB, Cent ra l Mcl{ong Delta R egion Connectiv ity Projcct
Reply to the LcUC1' on C hecking the Environmental Rcport Dated 16 Novembcl" 2016
Dear Sir,
Pursuant to the Engineer's letter No. DDIS/CW IB/ 1554 dated 22 November 2016 about
Environmental Inspection Report l 6 November 2016, the Contractor has corrected the ment ioned
environmenta l issues and now would like to respond to YOli as in the attachment.
For Your review and morc instruction.
anaget of Package CW 1 B, Centra l Meko ng Delta RegIOn ConnecttVlty PIoject
Auached: Environmentolln spection RepOlt (03 cop ies)
cc:
Maセ。「 ッ カ・[@
- Cao Lanh Bridge Proj ect Manager, CIIIl Long CIPM;
- Si te ConstrucLion Te,un or C1PM;
- File : CW JB Contractor JV o m cc. セᆪeャvfQセ イ@Date: 45:/MfJlt.. ... . .
1/2
CHINA ROAD AND BRIJ)GE CORPORATION ANI) V1NACONEX £&C
JOINT VENTURE (CRO C·VINA CO NEX E&C JV )
ThLr s5: CW IBIDD1SII 529 Ngay : 1411 212016
Den: Ong, Vi do I'ia no Hamlig - Ky su'lhu'(rng tru
Cc; Qng, Ft'ancis G , Flanagan - Giam d6c dt,r セョ@
CDM Smith - WSP -Vooshi n Consu ltant JV T6 5, Ap Tao Tich, Xii Tinh Thai, TP C1l0 U nh, Tlllh W il l:; Thill), v ゥ セ エ@ Nll nl
V/v: G6i tィセオ@ C"VIB, Du' An Kt , N6i Kilu Vu'c Tr'ung Tiim Dang ョセャャZA@ Me Kong
H8i Dap Tilt!' J<iem Tra Bao Cao M8i Trm'rng Ngil)' 16 Tlulng 11 Nam 2016
Thua ang,
Tham ・ ィ ェ セ オ@ thl! s6 DDJ S/CW IB/ l 554 ngay 22 lhang II ョ セ ュ 2016 elm Tu vAn カセ@ カ ゥ セ」@ bilo cao c6ng
hie ォゥセ ュ@ tra moi trua ng ngay 16 1hfmg 11 ョ セ ュ@ 201 6, Nha th§u da ti€n himh khAc ph,lc cac v§n dt duqe
neu ra trong tIm va nay xin h6i da p ャ セ ゥ@ ang nhu trong file dinh kem.,
Nhil 1hAu eM,nh gia cao ウセ イ@ xem xet va chi 、 セッ@ them eua セ ョ ァ N@
Tran w;mg,
(Daky)
XUEZHlGUO qオケセョ@ Gi<lITI d6c d セイ@ an G6i ThAll CW I B, DV An K St N 6i Khu V\fC Trung Tam 86ng bセョァ@ Me Kong
Dinh kem: Sao ctto ki$m Ira rn6; tfll'cmg (3 bon)
cc:
Nhl! エョ セ ョ [@
Giam d6c d\r an c5u Cao Li\nh, Cftu Long C[PM ;
Nh6m qUi'l n I)' cong tmallg CUll C' PM;
LUll : V1in phong Th &u chlnh CW I B.
212
A. Repeated observations
No. Observations Comments and Resolution
007 Location: Bridge 12
fabrication yards
Obervation in
Environmental Inspection
Report dated dated 12 July
2016 and reminded in 10
and 13 August 2016 (Ref:
DDIS/CW1B/1443 dated 15
August 2016), and in 05 Oct
2016 (Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 11, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor need to remove this waste
to outside of contruction area. Alternatively, contractor
need to provide the roof to cover the weather impact
cause eroded metal to the ground.
Contractor reply date:
Unprotected metal waste Status:
014 Location: Bridge #12
batching plant
Obervation in
Environmental Inspection
Report dated 10 and 13
August 2016 (Ref:
DDIS/CW1B/1443 dated 15
August 2016), and in 05 Oct
2016 (Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 11, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor need to remove this metal
to proper metal waste storage. If this metal still use on
site, please barricade and use notification board for
information.
Contractor reply date:
Metal waste on site in Bridge 12 batching plant Status: unclose
015 Location: Bridge #12 worker
accommodation
Obervation in
Environmental Inspection
Report dated 10 and 13
August 2016 (Ref:
DDIS/CW1B/1443 dated 15
August 2016), and in 05 Oct
2016 (Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 11f and 17q, table
DDIS comments: Contractor need to provide waste-bin
for solid waste in this area and regularly collect waste to
waste-bin.
Contractor reply date:
1, EMP of contractor CW1B
(3712A/CIPM-HDKT)
Waste in 624 worker accommodation Status: unclose
020 Location: Tuan Loc
subcontractor office
Obervation in
Environmental Inspection
Report dated 10 and 13
August 2016 (Ref:
DDIS/CW1B/1443 dated 15
August 2016), and in 05 Oct
2016 (Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 7g, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must provide the roof and
drip tray/pan to avoid leakage and spillage due to
mishandling or weather impact.
Contractor reply date:
No drip tray or drip pan Status: unclose
026 Location: Bridge 12
fabrication yard
Obervation in
Environmental Inspection
Report dated 05 Oct 2016
(Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: Clause 4.15a, contractor
CW1B (3712A/CIPM-HDKT)
DDIS comments: Contractor should repair the access
road to avoid slipery condition during rainy season.
Contractor reply date:
Slipery access to Bridge 12 fabrication yard Status: unclose
027 Location: Bridge 12 batching
plant
Obervation in
Environmental Inspection
Report dated 05 Oct 2016
(Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 10c, table 1, EMP
of contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor should remove this
concrete waste in the settling tank.
Contractor reply date:
Full concrete sludge in Bridge 12 settling tank Status: unclose
028 Location: Bridge 12 batching
plant
Obervation in
Environmental Inspection
Report dated 05 Oct 2016
(Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 10b, table 1, EMP
of contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must close the access of
wastewater to the adjacent area. All contaminated
wastewater in this area should be recollect to the
settling tank.
Contractor reply date:
Improper discharge of wastewater Status: unclose
033 Location: Tuan Loc site near
Pier 17 and Pier 18
Obervation in
Environmental Inspection
Report dated 05 Oct 2016
(Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 10, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor should not wash the
remaining concrete waste and its wastewater to the
Tien river. These wastes should be clean and remove to
settling tank for treatment.
Contractor reply date:
This act is haven’t happen again, the contractor when
casting concreate
Clean water tank and toilets area Status: unclose
034 Location: Tuan Loc site near
Pier 17 and Pier 18
Obervation in
Environmental Inspection
Report dated 05 Oct 2016
(Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must check the crane
function to avoid fuel leakage. The drip pan/tray must
be avaiable on site for any equipment using fuel.
Contractor must clean this fuel leakage by rags and
these rags are collected as hazardous waste.
Contractor reply date:
Clean water tank and toilets area Status: unclose
Period observation Deadline Package Location Weather Observers
16 November 2016 24 November
2016
CW1B 3+800 - 6+200 Sunny Ms. Le Thi Phuong Loan – NES
Mr. Nguyen Trung Kien– Safety Officer
Mr. Nguyen Huu Tue – Safety Officer
B. New observations
No. Observation Issued Pictures by DDIS Environment Team Resolution
035 Location: Song Da worker
camp near Pier 10
Ref: item 11, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor collect this domestic waste
to the domestic waste storage and transfer to the
licenced waste collection company.
Contractor reply date:
Uncollected domestic waste Status:
036 Location: Song Da worker
camp near Pier 10
Ref: item 11, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor collect this domestic waste
to the domestic waste storage and transfer to the
licenced waste collection company.
Contractor reply date:
Uncollected domestic waste Status:
037 Location: Vinaconex site
near Pier 36
Ref: item 13, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must collect this concrete
waste and transfer to your disposal area.
Contractor reply date:
Concrete spilled near by the irrigation water course Status: unclose
038 Location: Vinaconex site
near Pier 36
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must provide the drip tray
to avoid any leak to the ground.
Contractor reply date: 4th December 2016
Unprotected oil drums on site Status: empty and removing to the warehouse
039 Location: Bridge 12 batching
plant
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must remove the concrete
sludge filled in the settling pond and this concrete waste
should be transferred to the disposal site.
Contractor reply date:
Clean water tank and toilets area Status: unclose
040 Location: Bridge 12 batching
plant
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: This area is shallow and be always
stucked by wastewater from batching plant. Contractor
should redesign this area as settling pond system to
treat the wastewater.
Contractor reply date:
Wastewater from batching plant contaminated the
adjacent land area
Status: unclose
041 Location: Bridge 12 batching
plant
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor often dump the wastewater
after cleaning the concrete mixer truck in this area.
Contractor should create a settling pond system for this
area with efficient drainage system.
Contractor reply date:
Contaminated land by wastewater washing from
mixer trucks
Status: unclose
042 Location: Bridge 12 worker
camp
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor should arrange the
quipments to dredge the sewage system in the
adjament canal of the Bridge 12 worker camp.
Contractor reply date:
Clean water tank and toilets area Status: unclose
043 Location: Bridge 12 worker
camp
Ref: item 3, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Burning waste is forbidden in this
project. Contractor must remind this issue to all workers
during environmental and safety re-tranining. The
record of re-training should submit to DDIS.
Contractor reply date:
Burning waste Status: unclose
044 Location: Freyssinet site
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must collect this
contaminated soil to hazardous waste storage and
transfer this waste for licenced hazardous waste
company.
Contractor reply date:
Contaminated soil by fuel leak Status: unclose
Central Mekong Delta Connectivity Project- (CMDCP)
TA 7622-VIE, Loan 3013-VIC, Grant 03!i3-VIE
CDMSmith- WSP -YooshinConsultant JV
Group 5, Tan Tich Hamlet, TinhThoi Commune, Cao Lanh City, Dong Thap Province, Vietnam
Tel: (84) 067-3881-255; Fax: (84) 067-3881-256
Ref. No. : DDIS/CW1 B/1580
Date : 16 December 2016
To: Mr. Xue Zhi Guo Acting Project Manager Contractor's Representative
Project Site Office: Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao Lanh City, Dong Thap Province, Vietnam; Tel : (84) 067-3881-255; Fax: (84) 067-3881-256
Subject: Package CW18- Environmental Inspection Report 16 Dec 2016
Dear Mr. Xue,
During the DDIS Environmental Team's visit and inspection to your construction site on the above
date, was witnessed that you fail to comply with your obligations and is evidenced by the attached
Environmental Inspection Report:
A - Repeat Observations - Notice to Correct
This letter serves as a notice to correct the repeat observation in the attached Environmental
Inspection Report, in accordance with sub-clause 15.1 of the General Condition of Contract:
Observation Nos: 007,014, 026, 027, 028, 035, 038, 039, 040, 041, 042, and 043
These observations were issued in a prior Environmental Inspection Report but you have not taken
the required action. You are required to make good the failure and remedy it within 7 days.
8 - New Observations
During the DDIS visit and inspection to your construction site, the DDIS Environmental Team also
made new observations as per the attached:
Observation Nos: 045- 047
We will appreciate your cooperation to timely correct as per these comments and your report to our
office within the requested deadline. Your prompt actions on the matter would be highly appreciated.
Cc: - As above
Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM File: DDIS Consultant JV Office
Pagel ofl
Attachment: Environmental Inspection Report 16 Dec 2016
A. Repeated observations
No. Observations Comments and Resolution
007 Location: Bridge 12
fabrication yards
Obervation in
Environmental Inspection
Report dated dated 12 July
2016 and reminded in 10
and 13 August 2016 (Ref:
DDIS/CW1B/1443 dated 15
August 2016), and in 05 Oct
2016 (Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 11, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor need to remove this waste
to outside of contruction area. Alternatively, contractor
need to provide the roof to cover the weather impact
cause eroded metal to the ground.
According to the close-report by contractor Ref.
CW1B/DDIS/1529 dated 14 December 2016, the close-
observation is not accepted. The real situation has not
change during DDIS inspection.
Contractor reply date:
Unprotected metal waste Status: unclose
014 Location: Bridge #12
batching plant
Obervation in
Environmental Inspection
Report dated 10 and 13
August 2016 (Ref:
DDIS/CW1B/1443 dated 15
August 2016), and in 05 Oct
2016 (Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
DDIS comments: Contractor need to remove this metal
to proper metal waste storage. If this metal still use on
site, please barricade and use notification board for
information.
According to the close-report by contractor Ref.
CW1B/DDIS/1529 dated 14 December 2016, the close-
observation is not accepted. The real situation has not
change during DDIS inspection.
Contractor reply date:
Metal waste on site in Bridge 12 batching plant Status: unclose
Ref: item 11, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
026 Location: Bridge 12
fabrication yard
Obervation in
Environmental Inspection
Report dated 05 Oct 2016
(Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: Clause 4.15a, contractor
CW1B (3712A/CIPM-HDKT)
DDIS comments: Contractor should repair the access
road to avoid slipery condition during rainy season.
According to the close-report by contractor Ref.
CW1B/DDIS/1529 dated 14 December 2016, the close-
observation is not accepted. The real situation has not
change during DDIS inspection.
Contractor reply date:
Slipery access to Bridge 12 fabrication yard Status: unclose
027 Location: Bridge 12 batching
plant
Obervation in
Environmental Inspection
Report dated 05 Oct 2016
(Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 10c, table 1, EMP
of contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor should remove this
concrete waste in the settling tank.
According to the close-report by contractor Ref.
CW1B/DDIS/1529 dated 14 December 2016, the close-
observation is not accepted. The real situation has not
change during DDIS inspection.
Contractor reply date:
Full concrete sludge in Bridge 12 settling tank Status: unclose
028 Location: Bridge 12 batching
plant
Obervation in
Environmental Inspection
Report dated 05 Oct 2016
(Ref. DDIS/CW1B/1505
dated 15 Oct 2016)
Ref: item 10b, table 1, EMP
of contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must close the access of
wastewater to the adjacent area. All contaminated
wastewater in this area should be recollect to the
settling tank.
According to the close-report by contractor Ref.
CW1B/DDIS/1529 dated 14 December 2016, the close-
observation is not accepted. The real situation has not
change during DDIS inspection.
Contractor reply date:
Improper discharge of wastewater Status: unclose
035 Location: Song Da – 624
worker camp near Pier 10
(fabrication yard)
Obervation in
Environmental Inspection
Report dated 16 Nov 2016
(Ref. DDIS/CW1B/1554
dated 22 Nov 2016)
Ref: item 11, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor collect this domestic waste
to the domestic waste storage and transfer to the
licenced waste collection company.
According to the close-report by contractor Ref.
CW1B/DDIS/1529 dated 14 December 2016, the close-
observation is not accepted. The real situation has not
change during DDIS inspection.
Contractor reply date:
Uncollected domestic waste Status: unclose
038 Location: Vinaconex site
(624 working area) near Pier
36
Obervation in
Environmental Inspection
Report dated 16 Nov 2016
(Ref. DDIS/CW1B/1554
dated 22 Nov 2016)
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must provide the drip tray
to avoid any leak to the ground.
According to the close-report by contractor Ref.
CW1B/DDIS/1529 dated 14 December 2016, the close-
observation is not accepted. The real situation has not
change during DDIS inspection.
Contractor reply date:
Unprotected oil drums on site Status: unclose
039 Location: Bridge 12 batching
plant
Obervation in
Environmental Inspection
Report dated 16 Nov 2016
(Ref. DDIS/CW1B/1554
dated 22 Nov 2016)
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor must remove the concrete
sludge filled in the settling pond and this concrete waste
should be transferred to the disposal site.
According to the close-report by contractor Ref.
CW1B/DDIS/1529 dated 14 December 2016, the close-
observation is not accepted. The real situation has not
change during DDIS inspection.
Contractor reply date:
Clean water tank and toilets area Status: unclose
040 Location: Bridge 12 batching
plant
Obervation in
Environmental Inspection
Report dated 16 Nov 2016
(Ref. DDIS/CW1B/1554
dated 22 Nov 2016)
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: This area is shallow and be always
stucked by wastewater from batching plant. Contractor
should redesign this area as settling pond system to
treat the wastewater.
According to the close-report by contractor Ref.
CW1B/DDIS/1529 dated 14 December 2016, the close-
observation is not accepted. The real situation has not
change during DDIS inspection.
Contractor reply date:
Wastewater from batching plant contaminated the
adjacent land area
Status: unclose
041 Location: Bridge 12 batching
plant
Obervation in
Environmental Inspection
Report dated 16 Nov 2016
(Ref. DDIS/CW1B/1554
dated 22 Nov 2016)
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor often dump the wastewater
after cleaning the concrete mixer truck in this area.
Contractor should create a settling pond system for this
area with efficient drainage system.
According to the close-report by contractor Ref.
CW1B/DDIS/1529 dated 14 December 2016, the close-
observation is not accepted. The real situation has not
change during DDIS inspection.
Contractor reply date:
Contaminated land by wastewater washing from
mixer trucks
Status: unclose
042 Location: Bridge 12 worker
camp
Obervation in
Environmental Inspection
Report dated 16 Nov 2016
(Ref. DDIS/CW1B/1554
dated 22 Nov 2016)
Ref: item 7, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Contractor should arrange the
quipments to dredge the sewage system in the
adjament canal of the Bridge 12 worker camp.
According to the close-report by contractor Ref.
CW1B/DDIS/1529 dated 14 December 2016, the close-
observation is not accepted. Building a fence is not
effective for this pollutant canal. The real situation has
not change during DDIS inspection.
Contractor reply date:
Clean water tank and toilets area Status: unclose
043 Location: Bridge 12 worker
camp
Obervation in
Environmental Inspection
Report dated 16 Nov 2016
(Ref. DDIS/CW1B/1554
dated 22 Nov 2016)
Ref: item 3, table 1, EMP of
contractor CW1B
(3712A/CIPM-HDKT)
DDIS comments: Burning waste is forbidden in this
project. Contractor must remind this issue to all workers
during environmental and safety re-tranining. The
record of re-training should submit to DDIS.
Furtheremore, contractor should build a barbecue grill
equipment which distant from the ground.
According to the close-report by contractor Ref.
CW1B/DDIS/1529 dated 14 December 2016, the close-
observation is not accepted. The real situation has not
change during DDIS inspection.
Contractor reply date:
Burning waste Status: unclose
Period observation Deadline Package Location Weather Observers
14 - 16 December 2016 22 December
2016
CW1B 3+800 - 6+200 Rainy Ms. Le Thi Phuong Loan – NES
Mr. Ngo Quoc Cuong– Contractor Staff
B. New observations
No. Observation Issued Pictures by DDIS Environment Team Resolution
045 Location: Access road in
North and South sides
DDIS comments: Contractor either create an effective
drainage system for this access road.
Contractor reply date:
Uncollected domestic waste Status: unclose
046 Location: Song Da and 624
worker camp
DDIS comments: Contractor must collect the domestic
waste from the adjment canal and store in the domestic
storage for collection and treatment.
Contractor reply date:
Contaminated soil by fuel leak Status: unclose
047 Location: Song Da and 624
worker camp
DDIS comments: Contractor must collect the domestic
waste from the adjment canal and store in the domestic
storage for collection and treatment. Furthermore,
contractor should provide additional waste-bin to store
the domestic waste in worker camp.
Contractor reply date:
Contaminated soil by fuel leak Status: unclose
CDMth Sml
01:1' an kセエ@ n6i khu VI:"C t rung tam fl6ng 「セョァ@ song CU>u Long - (CMDCP)
TA 7822-VIE, Khoan vay 3013-VIE, Khoan カゥセョ@ trc;» 0353-VIE
Lien danh TU' v§n COM Smith - WSP -Yooshin
セwspセ@To 5, Ap Tan T!ch, Xa T!nh Th&i, TP Cao Lanh, Tinh Bong Thap, Vi$t Nam
yG ッッ ウ セ@
S6 thU' : DDIS/CW1S/1580
Ngay : 16/12/2016
GLI'i 、セョZ@ 6ng Xue Zhi Guo Quy§n Giam 86c Dl,l' an bセ ゥ@ di$n Nha エィセiu@
8T: (84) 067-3881-255; Fax: (84) 067-3881-256
VP Dl,l' an: T6 5, Ap Tan Tjch, Xa Tjnh Th&i, TP Cao Lanh, Tinh Bong Thap, Vi$t Nam
BT: (84) 067.352.6868 Fax: (84) 067.352.6969
Chu 、セZ@ G6i CW18- Sao cao kゥセュ@ tra M6i t rus<Yng ngay 16/12/2016
Kinh gll'i 6ng Xue,
Trong thai gian d9i ngu nhan vien m6i trU'ang TU' van 、セョ@ kiE§m tra hi$n trU'ang thi c6ng cua Nha エィセオ@
vao ngay neu tren, chung t6i phat hi$n Nha thau kh6ng thl,I'C hi$n theo nghia Vl,l cua Nha thau va dU'Q'C
chung minh v&i Bao cao KiE§m tra M6i trU'ang dinh kem:
A- Nhac lf1li cac van 、セ@ theo doi- Thong bao Chinh slJ.sa
Van ban nay nhU' Ia m<)t thong bao chinh sll'a cac van d§ theo doi dU'Q'C nhac ャセゥ@ trong Sao cao KiE§m
tra M6i tmang dlnh kern theo エゥセオ@ khoan 15.1 thu<)c 8ieu khoan chung cua Hqp dong:
Van d§ s6: 007,014, 026, 027, 028, 035, 038, 039, 040, 041 , 042, va 043
NhCmg van de nay da phat hanh trong Sao cao kゥセュ@ tra M6i trU'ang trU'&c d6 nhU'ng Nha thau カセョ@
khong エゥセョ@ hanh thl,I'C hi$n theo yeu cau. f)e nghj Nha thau dam bao thl,J'C hi$n t6t cac van de chU'a hoan
thanh va chinh sll'a trong vong 07 ngay.
8 - Cac van 、セ@ theo doi m&i
Trong khi TU' van 、セョ@ kiE§m tra hi$n trU'ang thi cong cua Nha thau, nh6m nhan vien moi trU'ang TU' van
cung ャセー@ m9t s6 van de m&i nhU' dinh kern:
Van de s6: 045- 047
Chung t6i se danh gia cao Sl,l' hqp tac cua Nha thau khi thl,I'C hi$n chinh sll'a dung ィセョ@ theo cac y ォゥセョ@
nay va trlnh bao cao cua Nha thau 、セョ@ van phong TU' van trong thai ィセョ@ yeu 」セオ N@ 8§ nghi Nha エィセオ@
ォィセョ@ trU'O'ng thl,I'C hi$n van de nay.
Tran trQng,
{Da kyJ
Victoriano L. Hamlig Ky sU' thU'ang tru
Cc: - Nhll' tren - Giam d6c dl! an C§u Cao U1nh, CIPM - Nh6m qufm ly cong trU"ang , CIPM - LU'u: Lien danh TVGS - DDIS
£>inh kern: Bao cao kiem tra moi trU"O>ng ngay 16/12/2016
Trang 1/1
CW1C
CDMth Sml
Central Mekong Delta Connectivity Project - (CMDCP)
TA 7822-VIE, Loan 3013-VIE, Grant 0353-VIE
COM Smith - WSP - Yooshin Consultant JV
セwspセ@Group 5, Tan Tich Hamlet, Tinh Thoi Commune, Cao lanh City, Dong Thap Province, Vietnam
Tel: (84) 067-3881 -255 ; Fax: (84) 067-3881 -256 \NヲGッッ ウ セ@
Ref. No. : DDIS/CW1 C/0445
Date : 15 August 2016
To: Mr. Nguyen Van Huang Contractor's Representative
Contract Office: No.61 -Provincial Road 848, Tan Trang Village, Tan My Commune, Lap Vo District, Dong Thap Province
Tel: (84) 043 7830856; Fax: (84) 043 7830859
Subject: Package CW1C - Environmental Inspection Report 10 Aug 2016
Dear Mr. Huang,
After our DDIS environmental inspection dated 10 August 2016, we hereby give you the inspection
report for your action. The deadline of your closed-observations is 20 August 2016. If you fail to
rectify, we will issue the Notice to Correct via official letter after 1 0 days issuing this letter.
Your prompt action is highly recommended.
(
L.Hamlig
Cc: - As above
Cao Lanh Bridge Project Manager, CIPM Site Construction Team, CIPM File: DDIS Consultant JV Office
Page 1 ofl
Attachment: Environmental Inspection Report 10 Aug 2016
10 August 2016
Location: Tan My botching plant
No drainage system for the
Tan My batching plant.
Necessary action:
Contractor need to create
effective drainage system
for Tan My botching plant.
002 I Location: Tan My botching
plant
No collection and removal
of concrete and metal
waste.
Necessary action:
Contractor need to provide
storage for these metal
waste and concrete waste.
These unused materials
should be transferred to the
designate area aftermath.
ENVIRONMENTAL INSPECTION REPORT
20 August
2016
CWlC 6+200- 7+800 Rainy Ms. Le Thi Phuong Loan- NES
Mr. Le Anh Tin- NES
Vinh- CW1C EO
003 I Location: Tan My botching plant
The settling pond system is
ineffective.
Necessary action:
Contractor need to re-design
and replace this ineffective
settling pond system.
004 I Location: Tan My botching plant
No domestic waste
collection.
Necessary action:
Contractor must provide
domestic waste trash-bin for
this waste.
005 I Location: Transimexco office
Two fuel tanks are on site
without any environmental
protection.
Necessary action:
Contractor must provide the
roof and drip tray to avoid
fuel leakage to the ground.
Dự án Kết nối khu vực trung tâm Đồng bằng sông Cửu Long - (CMDCP)
TA 7822-VIE, Khoản vay 3013-VIE, Khoản viện trợ 0353-VIE
Liên danh Tư vấn CDM Smith - WSP –Yooshin Tổ 5, p Tân Tịch, Xã Tịnh Thới, TP Cao Lãnh, Tỉnh Đồng Tháp, Việt Nam
ĐT: (84) 067-3881-255; Fax: (84) 067-3881-256
__________________________________________________________
Trang 1 / 1
Số thư : DDIS/CW1C/0445 Ngày : 15/08/2016 Gửi đến: Ông Nguyễn Văn Hưởng
Đại diện Nhà thầu
VP: số 61- Đường liên tỉnh 848, p Tân Trong, Xã Tân Mỹ, Huyện L p Vò, Tỉnh Đồng Tháp
ĐT: (84) 043 7830856 Fax: (84) 043 7830859
Chủ đề: Gói CW1C – Báo cáo Kiểm tra Môi trường ngày 10/08/2016
Kính gửi ông Hưởng,
Sau khi Tư v n DDIS thực hiện kiểm tra môi trường ngày 10/08/2016, Tư v n gửi theo thư báo cáo
kiểm tra để Nhà thầu thực hiện. Hạn cuối để kết thúc việc thực hiện của Nhà thầu là ngày
20/08/2016. Nếu Nhà thầu không hoàn thành chỉnh sửa, Tư v n sẽ phát hành Thông báo Chỉnh
sửa bằng văn b n chính thức sau 10 ngày phát hành thư này.
Đề nghị Nhà thầu khẩn trương thực hiện.
Trân trọng,
{Đã ký}
Victoriano L. Hamlig Kỹ sư thường trú
Cc: - Như trên - Giám đốc dự án Cầu Cao Lãnh, CIPM - Nhóm qu n lý công trường, CIPM - Lưu: Liên danh TVGS - DDIS
Đính kèm:
Báo cáo Kiểm tra Môi trường ngày 10/8/2016