Online Consent Management & Monitoring System (OCMMS)for State Pollution Control Boards
By
NIC, New Delhi
Enhance transparency in the existing processing of application.
Reduce the processing time of application and related paper work
System will overall improve the functioning and performance of the SPCB
Citizen Centric
Objective
Application Features
A highly interactive menu driven, user friendly customized package for non specialist end users at local level
Online Industry Registration
Online Submission of Application, Approval, Clarification and other activities for CTE/CTO for all category of Industries/Institutions
Online Scheme Monitoring and Evaluation System
User management at all level, reviewers and approvals
Online Workflow Management
Decision Support System – Guidelines, Alert/Notifications, Issues and Risk Management
Reports / Query
Download Facility – Forms, Documents etc.
Multi level Security Enabled System
Role based application access
State Specific Customization
Modules/Sub-Systems
Consent Management- Consent To Establish for Red , Orange & Green Industries Including; Mines, Bio-medical Institutions/
Hospitals for Small, Medium and Large size industries.
- Consent To Operate for Red , Orange & Green Industries Including; Mines, Bio-medical Institutions/ Hospitals for Small, Medium and Large size industries.
Waste Management System (BMW, HWM, MSW)
CESS Administration System
Laboratory Management System
Monitoring & Evaluation System
Delivery System
- Information, Alert and Notification through eMail etc.
Advisory System – Bulletin Board, News etc.
Report/Queries
Frequently Asked Questions (FAQ)
Process Diagram - Workflow Management
Select “State->Define Workflow”
Select Industry Category (Red/ Orange/ Green)
Select Industry Type(Small / Medium/ Large)
Select Process Type(CTE/ CTO etc)
Process Type:· Consent to Establish· Consent to Operate· Inspection Process· CESS Management etc
Industry type could be Small/Medium/ Large etc.
Click “Create Workflow” (Sequntial/ Parallel)
· Role will be picked from master list; containing cumulative list of roles applicable to all states·
Assign User profile with the role. (EmailID and Phone
details will be used for alert/notifications)
Email ID and Phone details of user profile will be used by application for alerts and notifications.
Select Role-> Enter Level Sequence for Approval / Rejection / Clarification
Business Process Workflow Management
Technology Stack
Open Source Technology Stack
- Apache/Tomcat 5.5
- Jdk 1.5
- PostGRE SQL8.2
Data Requirement- Organization Structure
- List of Tehsil: District wise
- Roles & Activities: Admin and other roles
- Legacy Industry Data
Configuration
- Create Workflow- Create Profile and Roles
- Assign Activity and Forwarding Rights
- GO LIVE
Application Rollout Requirement
OCMMS Home Page
Capacity Building
SPCB1
SPCB2
SPCB3
SPCBn
Setup CPM Team at NIC- HQ
Development/ Customization on the
basis of changes required by SPCBs
Deployment of customized OCMMS at
SPCB Server
2 Asst. Programmers to be deployed at
SPCB HQ
Training Provide to the SPCBs staff at State
HQ
Training to the trainer in order to train people
at regional level
Implementation Process
Financial Estimation (per state)
SNo Description Cost (in Rs.)
1 Hardware Cost ( 260000)
1.1 1 Desktop 35000
1.2 1 UPS 5000
1.3 1 Scanner + Printer + Fax 20000
1.4 Server 200000
2 Network Connectivity Infrastructure Cost ( 275000)
2.1 At SPCB office, minimum 2 Mbps, Router, Layer 2 Switch - Leaseline 200000
2.2 At RO/Do level, minimum 512Kbps - Broadband 75000
3 OCMMS Customization Cost ( 655250)
3.1 1 Team Leader five man months@46000/- per man month
230000
3.2 1 Sr. Developer for five months@ 33000/- per month
165000
3.3 2 Programmers for five months @26025/- per man-month
260250
4 Implementation & Training Cost per SPCB(636000)
4.1
4.2
2 Assistant Programmers at SPCB HQ for 1 year@16000/- per month
1 Assistant Programmer at each RO office for 1 year @16000/- per month
384000
192000/-
4.2 Travel Cost 60000
Total 1826250
Thanks