Elementary school for 15 classes
Zero emission school
Municipality of Valsamoggia (BO)
Location:
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION:
North
Bazzano
Monteveglio
Bologna
School
Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Appearance:
North
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Ground floor plan:
N
servizi foyer
classroom
refectory
lab.
lab.
lab.
lab.
lab.
lab.
15 classes + 7 lab.UTA 2
lab.
lab.
services
UTA 1
UTA 3
PdC
Layout
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION:
classroom
classroom
classroom
classroom
classroom
classroom
classroom
classroom
classroom
classroom
classroom
classroom
classroom
classroom
Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Fronts:
West
East
Courtyard
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Views:
rendering - west
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Views:
Photo - WEST
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
LOCATION latitude, longitude: 44°28’34 N, 11°05’58 E
Altitude: 108 m (slm)
DIMENSIONS
Total Net Area (heated):
m² 2.756
Gross Floor Area (heated):
m² 3.115
Total Net Volume (heated):
m³ 15.231
Building envelope (S):
m² 8.275
Surface area to volume (S/V) ratio: 1/m 0,54
KEY DATA:
N
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Structures : REINFORCED CONCRETE – ANTI-SEISMIC
Infill wall: thermal brick, sp. 30 cm
Exterior insulation and finishing system (EIFS) walls: EPS with graphite, 24 cm (thikness)floors: XPS, 25 cmroof: XPS, 25 cm
Windows: wood / aluminium frame glasses 4.4/14Argon/Ks4/14Argon/44.1BE
Systems:Heating and cooling system: heat and cooling pumps: power 140 kW – NO GAS
radiant ceiling panel
Ventilating system: energy recovery ventilation (ERV) efficency > 90%
Lighting: LED Lamps Photovoltaic system: 40 kWp [coverage of electricity needs = 100%]Special system: Building automation (BACS)
CONSTRUCTION FEATURES and PLANTS:
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
SEZIONE
A B
WALL: U = 0,12 W/m² K
Nodo attacco a terramuro perimetrale/fondazioneSezione verticale Nodo attacco a terra
parete divisoria/pavimentoSezione verticale
FLOOR: U = 0,15 W/m² K
BA
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Insulation of Foundation Structure (12 cm XPS)
Nodo attacco a terramuro perimetrale/fondazioneSezione verticale
A
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
Floor insulation (25 cm XPS)
Nodo attacco a terramuro perimetrale/fondazioneSezione verticale
A
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
Thermal brick (30 cm)
Nodo attacco a terramuro perimetrale/fondazioneSezione verticale
A
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
24 cm EPS
Nodo attacco a terramuro perimetrale/fondazioneSezione verticale
A
Wall: U = 0,12 W/m² K
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
24 cm EPS
Nodo attacco a terramuro perimetrale/fondazioneSezione verticale
A
Wall: U = 0,12 W/m² K
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
24 cm EPS
Nodo attacco a terramuro perimetrale/fondazioneSezione verticale
A
Wall: U = 0,12 W/m² K
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
SEZIONE
C D
Attacco Muro/solaio/sporto coperturaSezione verticale
Roof: U = 0,11 W/m² K
DC
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
Attacco Muro/solaio/sporto coperturaSezione verticale
Roof: U = 0,11 W/m² K
D
Intrados insulation: 12 cm EPS
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
Attacco Muro/solaio/sporto coperturaSezione verticale
Roof: U = 0,11 W/m² K
D
Extrados insulation: 25 cm EPS
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
Attacco Muro/solaio/sporto coperturaSezione verticale
Roof: U = 0,11 W/m² K
D
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
Extrados insulation: 25 cm EPS
Attacco Muro/solaio/sporto coperturaSezione verticale
Roof: U = 0,11 W/m² K
D
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
Extrados insulation: 25 cm EPS
SEZIONE
E
Attacco a terra, serramentoSezione verticale
Windows: UW = 0,80 W/m² K
Ug= 0,6 W/m2K
E
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
Attacco a terra, serramentoSezione verticale
UW = 0,80 W/m² K
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
Wooden Counterframes, polyurethane foam sealing
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
Windproof tape
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
Remooved thermal bridge
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
Systems:
Heat and cooling pumps:
Power:
140 KW
NO GAS!
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Heat and Cooling:
Radiant ceiling panel
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Systems:
Ventilating system (Energy recovery ventilation (ERV) efficency >90%):
UTA 1: 5.050 mc/h
UTA 2: 6.050 mc/h
UTA 3: 6.500 mc/h
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Systems:
Photovoltaic system: 40 kWp (annual production > 42.000 kWh)
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Systems:
BUILDING AUTOMATION and Control System
BACS
perfomance: Class II (Advanced)
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Systems:
Energy performance (Emilia Romagna system):
Architectural Shell + Systems
EPtot= 1,175 kWh/m3a(energy performance index)
1,17kWh/m3/anno
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Energy saving:
EPtot= 1,175 kWh/m3a(energy performance index)
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
CO2 Emission:
Rispetto alle prestazioni limite minime che lo stesso fabbricato avrebbe dovuto rispettare secondo la normativa Regionale vigente, può essere calcolata la riduzione delle emissioni di anidride carbonica determinata dal raggiungimento della classe energetica ottenuta:
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Zero emission:
La produzione di
energia elettrica annua
da conversione
fotovoltaica compensa
il consumo elettrico
annuo per
riscaldamento e per
illuminazione.
La scuola, dal punto di
vista energetico, può
essere definito un
intervento a impatto
e emissione zero.
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Energy Performance KlimaHaus:
Architectural Shell Performance
8,57 kWh/m2a(Energy performance index KlimaHaus)
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Construction cost: 3.816.460,35 €
Impact of cost:
(Gross area): 1.225 €/ m²
(Net area): 1.385 €/ m²
Construction cost:
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager Ing. Davide Bedogni - Installations Ing. Enrico Rombi - Structures
Thanks for your attention