Transcript
  • Explanation

    ?

    ?

    ? ?

    ? ?

    Intersectionof UU - UU'

    Intersectionof ZZ - ZZ'

    Intersectionof CC - CC'

    Fill – granular

    Fill – Group I (soil)

    CNS concrete

    WLS fill concrete

    1.5 1 1

    1

    1.5 1

    EENorth

    EE'South

    Turbine Building(non-seismic)

    RadwasteBuilding

    (non-seismic)

    Unit 1(SC-1)

    First Bay (SC-II)

    Yard Grade

    B-83AP

    B-152P(proj. 32 ft.)

    B-218(proj. 32 ft.)

    B-224(proj. 32 ft.)

    B-90P(proj. 32 ft.)

    B-1007(proj. 28 ft.)

    B-239(proj. 35 ft.)

    B-1010(proj. 32 ft.)

    B-246(proj. 55 ft.)

    B-1004(proj. 32 ft.)

    Intersectionof BB - BB'

    ??

    Residual soil/saprolite

    Residual soil/saprolitePartially weathered rock

    B-1001(proj. 32 ft.)

    0 50 feet0

    25 feet

    ScaleVertical exaggeration 2X

    N12°W

    Continuous rock

    Continuous rock Continuous rock

    Existinggroundsurface

    Existinggroundsurface

    Originalgroundsurface

    Originalgroundsurface

    4

    1?? ?

    B-1004A(proj. 10 ft.

    trend N20°W, 34°from vertical)

    B-2001

    B-2003

    Elev

    atio

    n (fe

    et)

    620

    640

    660

    600

    580

    560

    520

    540

    500

    480

    460

    440

    420

    400

    380

    360

    340

    320

    300

    280

    Elev

    atio

    n (fe

    et)

    620

    640

    660

    600

    580

    560

    520

    540

    500

    480

    460

    440

    420

    400

    380

    360

    340

    320

    300

    280FIGURE 2.5.4-262

    NUCLEAR STATION UNITS 1 & 2WILLIAM STATES LEE III

    Planned Excavation Profile,Geologic Cross Section EE-EE'

    WLS COL 2.5-6WLS COL 2.5-7

    Rev 7