EDC States and Application Execution Steps

1. Load USB package.

2. On validating the USB package files successfully, below screen is encountered.

Page 2: EDC_Flow

EDC States and Application Execution Steps

Page 3: EDC_Flow

EDC States and Application Execution Steps

3. After TID entry is done successfully, the application prompts the operator to choose the primary

and secondary connection type. Primary connection is mandatory, secondary connection type is

an optional. The operator can cancel/back the secondary connection type selection.

4. After selecting both primary (mandatory) and secondary connection type, below state is

encountered.

Page 4: EDC_Flow

EDC States and Application Execution Steps

5. If the IP and Port are not updated, below error is encountered.

6. Every configuration is proper, below is the IDLE screen shown to the operator.

Page 5: EDC_Flow

EDC States and Application Execution Steps

7. Screen shots for successful key exchanges.