Connecting Dwarka with the NH8, the Expressway will bring Delhi and Gurgaon closer
Currently, only 2 roads of connectivity between Delhi and Gurgaon-MG Road and the NH8
Not enough to tackle the heavily increasing traffic of daily commuters between Delhi and Gurgaon
A whole new corridor of connectivity
With Dwarka Expressway, connectivity becomes smoother, faster and so much easier!
IGI airport - a mere 2.5 kms away
Also bridges the gap between 16 new Residential Sectors
A whole new corridor of connectivity
And this is how Gurgaon will soon look, when the Expressway opens up
The changing face of Gurgaon
Planned around a world of opportunities and development
Dwarka Expressway marks the beginning of a golden era in real estate
Acts as a new channel of business and commerce between Delhi and Gurgaon
World-class infrastructure and facilities to transform lives of residents and investors
A catalyst of change and development
A result of years of planning, research and development by the best brains in real estate
Aided by experts and top professionals in the Corporate and Government sector, a range of exciting projects in the residential and commercial space are already underway
Years of thought and planning
No more toll for commuters between Delhi and Gurgaon!
No more delays and traffic jams at the toll gate on NH8!
All thanks to the toll plaza moving beyond Manesar shortly
No more toll! No more delays!
From power-shortage to power-surplus, Haryana’s power supply improving massively
4 new power plants have been set up by the Haryana Government
Power generation capacity of the state has increased from 1587 MW to 5800 MW in the last 5 years
Power cuts are history
Reputed educational institutions flocking to areas surrounding the Expressway
MatriKiran School under construction
Modern School opening a branch in Sector 91, Gurgaon
Other well-known schools of Delhi are currently looking to expand on this stretch
Exciting opportunities in Education
Nationally and internationally famous healthcare organizations setting up branches around the Dwarka Expressway
Reputed names in healthcare have/in process of finalizing Dwarka Expressway as the location of establishment
Boom in Healthcare
All this adds up to making the Dwarka Expressway a new hub of exciting developments in real estate and the Golden Road!
18 kms long and 150 mtrs wide, with 60 mtrs of greenery on both sides, the Dwarka Expressway is 2x that of the NH8
14 kms out of the 18 kms is already constructed
The widest road in the NCR
Constructed means black-topped and driveable
The double yellow line indicates the
constructed expressway
Dwarka Expressway
From Haryana
From Delhi
Gurgaon - Manesar Urban Complex - 2025 AD
800 mtrs handed over to Indian Railways for construction of Rail over-bridge, with HUDA paying Railways Rs. 38 Crores in advance already (Expected Completion Time: 16 months)
700 mtrs under various HUDA utilities such as HT pillars and water works which HUDA is in the process of shifting (Expected Completion Time: 6 months)
The balance 2.5 kms – has been resolved
The Expressway today: The remaining 4 kms
On 30.9.2013, HUDA announced a
rehabilitation policy which was published in the
Times of India
The latest on the 2.5 kms under stay order
People with built up homes / structures are being offered alternative plots in Sectors 110A and 37C
The plots on offer are of the same size as the plots being taken over
HUDA has already acquired 145 acres in the above 2 Sectors for this purpose
Only 15 acres required to re-settle all the petitioners
As Per Policy Published on 30.09.13
Applicants had till 30.10.2013 to apply under this policy
HUDA has received applications from 80% of the residents on this stretch and is sorting them out
All petitions expected to be resolved under this process in the next 3-4 months
As Per Policy Published on 30.09.13
S.No.
Chainage
LengthClear
Length
StatusConstructed/ NOT
RemarksMonth of Handing
OverFrom To
1 0 468 468 Not Executed Built up Area -2 468 750 282 282 Executed End of Dec 11
3 750 765 15 15 Executed May-13
4 765 900 135 135 Executed Dec-11
5 900 960 60 60 Executed May-13
6 960 2000 1040 1040 Executed End April 117 2000 2050 50 50 Executed End April 11
8 2050 2070 20 20 Executed
9 2070 2120 50 50 Clear WMM II Completed Mid August 13
10 2120 2170 50 Not Executed Stay on Land
11 2170 2260 90 90 Clear WMM II Completed Mid August 13
12 2260 3350 1090 1090 Executed End April 11
Actual availability of stretches (As per Actual Site condition)
S.No.
Chainage
LengthClear
Length
StatusConstructe
d/ NOTRemarks
Month of Handing OverFrom To
13 3350 3370 20 HSIIDC drain
14 3370 3400 30 30 Executed Jan-13
15 3400 3975 575 575 Executed Reliance SEZ land Jan-13
16 3975 4100 125 125 Executed Feb 12
17 4100 4300 200 200 Executed
18 4300 4315 15 Pataudi Road
19 4315 4425 110 110 Executed
20 4425 4500 75 75 Executed End April 11
21 4500 6620 2120 2120 Executed End April 11
22 6620 7800 1180 Not
Executed/ROB
ROB, Padmini Factory, stay on land
23 7800 8285 485 485 Executed Mid Sep 11
24 8285 8345 60 Not ExecutedHUDA water sump
house
25 8345 8750 405 405 Executed Mid Sep 11
S.No.
Chainage
LengthClear
Length
StatusConstructed
/ NOTRemarks
Month of Handing
OverFrom To
26 8750 8800 50 One side executed
RHS stay on land
27 8800 9820 1020 1020 Executed Mid Oct 11
28 9820 9900 80 Not Executed STP Channel
29 9900 10800 900 900 ExecutedWater logged area
completedLast week of
Jan 13
30 10800 11700 900 900 Executed end April 11
31 11700 11760 60 60 Executed Mid Oct 11
32 11760 12850 1090 1090 Executed Mid Oct 11
33 12850 12900 50 50 Executed Feb-13
34 12900 13000 100 Not Executed Nipon Factory
35 13000 13060 60 60 Executed Feb-13
36 13060 13400 340 340 Executed Nov-11
37 13400 13520 120 120 Executed Nov-11
38 13520 13650 130 130 Executed Nov-11
39 13650 13700 50 50 ClearSlab approach is to be
coming
40 13700 13780 80
Slab culvert over sewer
channel is in progress by
another contractor
Work is stopped from last 2 month i.e on 6th
Sep 2013
41 13780 14320 540 540 Executed
42 14320 14900 580 580 ClearWMM 1st layer
completed
43 14900 15300 400 Not Executed New Palam Vihar – R&R
44 15300 15600 300 Not Executed New Palam Vihar – R&R
45 15600 16000 400 Not Executed New Palam Vihar – R&R
46 16000 16740 740 Not Executed New Palam Vihar – R&R
47 16740 18035 1295 1295 Executed 01-Mar
18035 14092
Clear Stretch 14,092 mtrs.
S.No.
Chainage
LengthClear
Length
StatusConstructed/
NOTRemarks
Month of Handing
OverFrom To
Dwarka Expressway: The Delhi update
Thanks to DDA’s efforts, all issues related to land acquisition on Delhi side, resolved
Remaining stretch of less than a Km to be ready within the next 6 months
Dwarka Expressway: The Delhi update
All land issues on Delhi side resolved
All issues pertaining to 2.5 kms on Gurgaon side soon to be resolved (Expected Timeline – January’2014)
Soon, no more obstacles preventing investing in the Golden Road!
All obstacles soon to vanish
Strike while hot!
(Average rate per sq ft)
Some of the best and most trusted names in real estate singling out the Dwarka Expressway as the preferred location for various visionary projects
Residential or commercial, most of these projects in full swing and nearing completion
Besides, the best developers are building here
Glimpses of the Expressway
Glimpses of the Expressway
The golden road beckons
Members of:
Ethical Consulting Pvt. Ltd.Corporate off: A24/21, DLF Phase-1,Gurgaon, Haryana Ph No: 8860456000 Email: [email protected] Off: Delhi: F-7, 1st Floor, DDA Shopping Complex, Mayur Vihar Ph-1, New Delhi-110091
Contact Person : Shekhar Pratap Singh Email : [email protected] Ph No: 011-47503631
Ranchi: C-127, Harmu Housing Colony, Ranchi 834002
Contact Person : Prashant Pandey Email : [email protected] Ph No: 0651-2244341 Patna: 301,Narayan Plaza,3rd Floor Opp.Luv
Kush Tower Exhibition Road , Patna – 800001 Contact Person : Chandan Email : [email protected]
Email: [email protected]: www.ethicalwealth.in