451 S. TEJON ST., DENVER CO 80223
MECHANICAL ENGINEERS, INC. 9777 Pyramid Court, Suite 120Englewood, Colorado 80112Tel- 303/688-0223Fax- 303/688-3584Project # 015-030
DPS COOING ENHANCEMENTRISHEL ELEMENTARY SCHOOL
Contact: JAY FERRARE
CONSTRUCTION DOCUMENTSDate: March 11, 2016
APPLICABLE CODES2015 INTERNATIONAL BUILDING CODE2015 INTERNATIONAL FIRE CODE2012 INTERNATIONAL PLUMBING CODE
ARCHITECTURALSHEET SHEET NAME
20152014
INTERNATIONAL MECHANICAL CODENATIONAL ELECTRIC CODE
MECHANICAL / PLUMBINGSHEET SHEET NAME
ELECTRICALSHEET SHEET NAMEE-100
M-101 FIRST FLOOR MECHANICAL PLAN
2015 INTERNATIONAL ENERGY EFFICIENCY CODE
SHEET INDEX
M-103 MECHANICAL ROOF PLANM-102 SECOND FLOOR MECHANICAL PLAN
M-001 MECHANICAL LEGENDS, SCHEDULES
VICINITY MAP
RISHEL ELEMENTARY SCHOOL
E-101LOWER & FIRST FLOOR ELECTRICAL PLANSSECOND FLOOR & ROOF ELECTRICAL PLAN
M-100 LOWER MECHANICAL PLAN
M-200 MECHANICAL DETAILS
# SHEET NUMBER * REFERENCE NUMBER
REVISION NUMBER
REFERENCE BUBBLE
CONNECT NEW TO EXISTING
* SECTION SECTION OR ELEVATION BUBBLE
PLUMBING ISOMETRIC BUBBLE
# DRAWING NUMBER
#
#*
#*
#*
#
DRAWING NOTE
DEMOLITION NOTE
DRAWING NOTE, ALTERNATE
DEMOLITION NOTE, ALTERNATE#
#
#
SYMBOL DESCRIPTION
GENERAL
* LETTER # DRAWING NUMBER
CHR
LPCPC
LPS
SYMBOLCHS
AIR DUCT DOWN
AIR DUCT UP
RECT RETURN/EXH
RECT RETURN/EXH
AIR DUCT DOWN
BLOW-OFF VALVE
UNION
IN-LINE PUMP/CIRC. PUMP
AIR DUCT UPRECTANGULAR SUPPLY
RECTANGULAR SUPPLY
PRESSURE/TEMPERATURE TAP
FLOW SWITCH
SHUT-OFF VALVE
GLOBE VALVE
CHECK VALVE
BALL VALVE
BUTTERFLY VALVE
STRAINER
STRAINER WITH
HOSE END DRAIN VALVE
P/T
CHILLED WATER RETURN
INDICATES PIPE SLOPE DOWN
CONTROL VALVE
CONTROL VALVE
SOLENOID VALVE
COMBINATION FLOW MEASURINGDEVICE AND BALANCING VALVE
AUTOMATIC 2-WAY TEMPERATURE
AUTOMATIC 3-WAY TEMPERATURE
PRESSURE REDUCING VALVE
PIPING UP
PIPING DOWN
PIPING CAP
BOTTOM OF PIPE CONN.
CONCENTRIC REDUCER
ECCENTRIC REDUCER
WALL MOUNTED THERMOSTAT
SWITCH
FIRE DAMPER
DAMPER
UNIT MOUNTED THERMOSTAT
COMBINATION FIRE/SMOKE
MANUAL VOLUME DAMPERW/LOCKING QUADRANT
MOTORIZED DAMPER
DIRECTION OF FLOW
T
S
LOW PRESSURE CONDENSATELOW PRESSURE STEAM
PUMPED CONDENSATEEQUIPMENT DRAIND
HVAC LEGENDALL SYMBOLS MAY NOT BE USED
CHILLED WATER SUPPLYDESCRIPTION
CONICAL SPIN-INFITTING
CONICAL SPIN-IN
FLEXIBLE DUCT
FITTING W/DAMPER
GRILLE W/SOUND BOOT24x24 CEILING RETURN
LINEAR SLOT DIFFUSER
RADIUS ELBOW
DUCT TRANSITION
WITH TURNING VANES
RECTANGULAR/ROUND DUCT
FLEX CONNECTION
FLEXIBLE DUCT TAKE-OFF
MANUAL VOLUME DAMPERW/LOCKING QUADRANTRIGID DUCTWORK W/
ROUND DUCT UP
ROUND DUCT DOWN
BRANCH DUCT 45° TAKE-OFF
RECTANGULAR DUCT ELBOW
T
X
S
24x12 CEILING RETURNGRILLE W/SOUND BOOT
CEILING DIFFUSER
RETURN GRILLE24x12 CEILING
24x24 CEILINGRETURN GRILLE
INDICATES ITEMS TO BE REMOVED
WALL MOUNTED TEMPERATURE SENSORS
WALL MOUNTED CO2 SENSORS C
HVAC ABBREVIATIONSSYMBOL DESCRIPTION
ABOVEAIR CONDITIONER/CONDITIONINGABOVE FINISHED FLOORACCESS PANELALTITUDEAIR PRESSURE DROPAPPROXIMATE, APPROXIMATELYARCHITECT, ARCHITECTURALBELOWBRITISH THERMAL UNITS PER HOURCAPACITYCUBIC FEET PER MINUTECEILINGCHANGE IN TEMPERATURE DEGREES FAHRENHEITCONCRETECONTINUECONSTRUCT, CONSTRUCTIONCOORDINATEDIRECT DIGITAL CONTROLDIAMETERDOWNENTERING AIR TEMPERATUREENTERING WATER TEMPERATUREEACHELECTRICAL CONTRACTORELECTRIC, ELECTRICALELEVATIONEXISTINGEXTERNAL STATIC PRESSUREDEGREES FAHRENHEITFEETFLOORGENERAL CONTRACTORGALLONS PER MINUTEHERTZHORIZONTALHORSEPOWERINCHESLEAVING AIR TEMPERATUREPOUNDSLEAVING WATER TEMPERATUREMAXIMUM1,000 BTUHMANUFACTURERMECHANICAL CONTRACTORMINIMUM CIRCUIT AMPACITYMINIMUMMOUNTEDNEWNORMALLY CLOSED, NOISE CRITERIANORMALLY OPENNOT TO SCALEOUTSIDE AIROUTSIDE AIR TEMPERATUREOPPOSED BLADE DAMPERPOUNDS PER SQUARE INCH GAUGEPRESSURE DROPPRESSURE REDUCING VALVERETURN AIRREFRIGERANT LIQUIDREFRIGERANT SUCTIONREVOLUTIONS PER MINUTEROUND, PHASESUPPLY AIRSEASONAL ENERGY EFFICIENCY RATINGSEA LEVELSTAINLESS STEELTEMPERATURE CONTROL CONTRACTORTEMPERATURETOTAL STATIC PRESSURETHERMOSTATTYPICALVARIABLE AIR VOLUMEVARIABLE FREQUENCY DRIVEVOLTSWATER COLUMNWATER PRESSURE DROPWEIGHT
ABVACAFFAPALTAPDAPPROXARCHBLWBTUHCAPCFMCLGΔT F°CONCCONTCONSTCOORDDDCDIADNEATEWTEAECELECELEV(E)ESP°FFTFLRGCGPMHZHORIZHPINLATLBSLWTMAXMBHMFGMCMCAMINMTD(N)NCNONTSOAOATOBDPSIGPDPRVRARLRSRPMØSASEERSLSSTCCTEMPTSPT'STATTYPVAVVFDVWCWPDWT
1. ALL INFORMATION SHOWN ON THESE DRAWINGS INCLUDING LOCATION ANDSIZES ARE BASED ON THE BEST INFORMATION AVAILABLE. INFORMATIONSHOWN IS TO INDICATE THE INTENT OF THE MECHANICAL SYSTEM WORKBUT MAY NOT REFLECT THE EXACT ROUTING AND LOCATION. IT IS THERESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY EXISTINGEQUIPMENT, PIPING, DUCTWORK, STRUCTURE, ELECTRICAL, LIGHTING ANDARCHITECTURAL INFLUENCES PRIOR TO INSTALLATION OF THE NEW WORKTO AVOID ANY CONFLICTS WITH SYSTEMS REQUIRING MODIFICATIONS.NOTIFY ENGINEER OF ANY CONFLICTS, PRIOR TO PERFORMING WORK.
2. PROVIDE NEW EQUIPMENT, DUCTWORK, AIR DEVICES, PIPING, CONTROLS,ETC. AS REQUIRED FOR COMPLETE AND OPERATIONAL SYSTEMS. THEINTENT OF THE DRAWINGS IS TO PROVIDE A COMPLETE WORKINGMECHANICAL SYSTEM FOR THE BUILDING. INCLUDE ALL ITEMS REQUIRED TOPROVIDE COMPLETE WORKING MECHANICAL SYSTEMS.
3. ALL AIR DEVICE NECK SIZES SHALL BE SAME AS RUNOUT SIZE UNLESSNOTED OTHERWISE.
4. ALL DUCTWORK SIZES SHOWN ARE INSIDE DIMENSIONS. FOR DUCTINSULATION REQUIREMENTS SEE SPECIFICATIONS.
5. SEE DETAILS AND SPECIFICATIONS FOR MORE INSTALLATION INFORMATIONAND REQUIREMENTS.
6. INSTALL ALL EQUIPMENT PER MANUFACTURER'S RECOMMENDED SERVICECLEARANCES AND INSTALLATION INSTRUCTIONS. PROVIDE ACCESS DOORSAS REQUIRED TO PROVIDE SERVICE AND MAINTENANCE FOR ALLEQUIPMENT.
7. REVIEW THE DETAILS ON SHEETS M-600H PRIOR TO INSTALLATION OF THEMECHANICAL SYSTEMS. NOT ALL DETAILS ARE CALLED OUT BY DRAWINGNOTES.
8. PROVIDE TURNING VANES AT ALL DUCT SUPPLY AND RETURN 90° ELBOWS.
9. DESIGN AND LAYOUT OF EQUIPMENT BASED ON MANUFACTURER SPECIFIEDIN SCHEDULES. ANY MODIFICATIONS OR ALTERATIONS REQUIRED FORINSTALLATION OF AN APPROVED SUBSTITUTION TO THAT SPECIFIED IS THERESPONSIBILITY OF THE INSTALLING CONTRACTOR.
10. AN AIR BALANCE REPORT SHALL BE PROVIDED TO THE MECHANICALINSPECTOR TO ASSURE THAT PROPER AIR FLOWS AND SYSTEM BALANCE ISACHIEVED AT TIME OF FINAL INSPECTION.
11. PIPING SHALL BE INSTALLED SO AS TO PREVENT DETRIMENTAL STRAINSAND STRESSES IN THE PIPE PER 2006 IMC 1206.9.
12. ALL MATERIALS IN THE PLENUM SPACE SHALL MEET THE FLAME SPREADAND SMOKE DEVELOPMENT INDEX PER IMC/2006-SECTION 602.2.1.
13. ALL WORK SHALL COMPLY WITH IMC 2006 AND IECC 2006.
HVAC GENERAL NOTES
M-001
03/10/2016
RISHEL COMMUNITY CAMPUS
Date:
Drawn By:
Checked By:
Project Number
Sheet Name
COPYRIGHT: ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF ENVISION MECHANICAL ENGINEERS
DENVER PUBLIC SCHOOLS
F O R D P S U S E O N L Y
Designed By:DENVER PUBLIC SCHOOLS
DEPARTMENT OFFACILITIES MANAGEMENT
APPROVED CONTRACT DOCUMENT
Date
DATENO. DESCRIPTION OF REVISION
DEPARTMENT OF FACILITIES MANAGEMENT
AUTHORITY MADE APPRV'D
SHEET:
OF:
MARK DESCRIPTION DATE
MECHANICAL ENGINEERS, INC. 9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303/688-0223Fax- 303/688-3584Project # 015-009
SITE NO. 123 DENVER, COLORADOSCHOOL DISTRICT NO. 1
PP#: 2457 COOLING ENHANCEMENT451 S. TEJON STDenver, Colorado
015-009
JKBJALPAF
03/10/161 CONSTRUCTION DOCUMENTS
123-
2457
-ME-
MECHANICAL LEGENDSAND SCHEDULES
(E) HV-8(E) HV-7
T
T
T
T
T
T
T
(E) HV-9
(E) HV-10
3 3
3
T
2
2
2
2
T
T
(E) HV-5
(E) HV-6
1
1
1
(E) LVR
48 x
12
(E) UV
(E) UV
(E) UV
(E) UV
(E) LVR
(E) ER
48 x12
3
3
54(E) CG
3
HV-5
HV-6
2 (E) UV
2 (E) UV
2 (E) UV
2 (E) UV
1
(E) ER
(E) PNEUMATIC CONTROL PANNEL6
DRAWING NOTES1. REFURBISH EXISTING FIRE/SMOKE DAMPER IN THROUGH-WALL TRANSFER AIR DUCT. REFER TO FIRE
ALARM/ELECTRICAL DRAWINGS FOR FIRE ALARM INTERLOCK AND SHUTDOWN.
2. EXISTING UNIT VENTILATOR. REVISE EXISTING SEQUENCE OF OPERATION TO INCLUDE BUILDINGPRE-OCCUPANCY PURGE PER DETAIL 1/M-200. REFER TO ELECTRICAL/FIRE ALARM FOR FIRE ALARM INTERLOCKAND SHUTDOWN.
3. EXISTING HEATING AND VENTILATING UNIT. REVISE EXISTING SEQUENCE OF OPERATION TO INCLUDE BUILDINGPRE-OCCUPANCY PURGE PER DETAIL 4/M-200. REFER TO ELECTRICAL/FIRE ALARM FOR FIRE ALARM INTERLOCKAND SHUTDOWN.
4. EXISTING 36"x36" CEILING GRILLE CONNECTED TO 36"x17" DUCT. CLEAN AND REPAIR AIR DEVICE.
5. EXISTING 36"x17" DUCT UP TO FLOOR ABOVE. SEE SHEET, M-101 FOR CONTINUATION.
6. NEW DDC CONTROL PANEL. PROVIDE NEW PANEL FRONT END AND EXTEND TO EXISTING PNEUMATIC CONTROLS.
XGENERAL NOTES1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL REVIEW EQUIPMENT CONDITION AND NOTIFY DENVER PUBLIC
SCHOOLS PROJECT MANAGER OF ANY EQUIPMENT WHICH IS BEYOND REPAIR.
2. LOCATIONS AND SIZES FOR ALL ITEMS ARE BASED ON THE BEST INFORMATION AVAILABLE. SOME ITEMS SHOWNARE TO INDICATE THE INTENT OF THE MECHANICAL SYSTEMS BUT MAY NOT NECESSARILY REFLECT THE EXACTROUTING AND LOCATIONS. IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL LOCATIONS AND SIZESOF THOSE ITEMS REQUIRING MODIFICATIONS.
3. IF SUSPECTED ASBESTOS CONTAINING MATERIALS ARE FOUND, THE CONTRACTORS SHALL NOTIFY THE OWNERAND STOP ALL WORK IN THE AREA IMMEDIATELY. IF THE SUSPECTED MATERIALS PROVE TO CONTAIN ASBESTOS,THE OWNER WILL ARRANGE TO HAVE THE MATERIALS ABATED IN A TIMELY MANNER.
M-100
03/10/2016
RISHEL COMMUNITY CAMPUS
Date:
Drawn By:
Checked By:
Project Number
Sheet Name
COPYRIGHT: ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF ENVISION MECHANICAL ENGINEERS
DENVER PUBLIC SCHOOLS
F O R D P S U S E O N L Y
Designed By:DENVER PUBLIC SCHOOLS
DEPARTMENT OFFACILITIES MANAGEMENT
APPROVED CONTRACT DOCUMENT
Date
DATENO. DESCRIPTION OF REVISION
DEPARTMENT OF FACILITIES MANAGEMENT
AUTHORITY MADE APPRV'D
SHEET:
OF:
MARK DESCRIPTION DATE
MECHANICAL ENGINEERS, INC. 9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303/688-0223Fax- 303/688-3584Project # 015-009
SITE NO. 123 DENVER, COLORADOSCHOOL DISTRICT NO. 1
PP#: 2457 COOLING ENHANCEMENT451 S. TEJON STDenver, Colorado
015-009
JKBJALPAF
03/10/161 CONSTRUCTION DOCUMENTS
123-
2457
-ME-
NO
RT
H
LOWER LEVEL MECHANICAL PLAN1/16" = 1' - 0"1 8'0 4' 16' 24' 32'
LOWER LEVELMECHANICAL PLAN
T
4
6
1
2
2
2
T
T
T
2
3
3
(E) HV-11
(E) HV-12
2 2 2 2 2 2
T T T T
T T T T
2 2 2 2 2 2 2 2
T T T
T 18x18 18x18
8x6
8x6
40x1
0
12x10
T
T
T
(E) UV(E) UV(E) UV(E) UV(E) UV
(E) UV
(E) UV(E) UV(E) UV(E) UV(E) UV(E) UV(E) UV
(E) UV (E) UV (E) UV (E) UV
(E) UV
(E) ER 56
7
(E) CG
(E) ER (E) ER
(E) ER
8
(E) ER
9
10
11
(E) CG
(E) CG
(E) ER
(E) ER 12
H&V-1
H&V-2
HV-12
HV-11
(E) ER
(E) ER
13
11 1
1 1
4
1 1 1
1
1
15
2 (E) UV
1
1 15
(E) UV2
(E) UV2
T
DRAWING NOTES1. REFURBISH EXISTING FIRE/SMOKE DAMPER IN THROUGH-WALL TRANSFER AIR DUCT. REFER TO FIRE
ALARM/ELECTRICAL DRAWINGS FOR FIRE ALARM INTERLOCK AND SHUTDOWN.
2. EXISTING UNIT VENTILATOR. REVISE EXISTING SEQUENCE OF OPERATION TO INCLUDE BUILDINGPRE-OCCUPANCY PURGE PER DETAIL 1/M-200. REFER TO ELECTRICAL/FIRE ALARM FOR FIRE ALARMINTERLOCK AND SHUTDOWN.
3. EXISTING HEATING AND VENTILATING UNIT. REVISE EXISTING SEQUENCE OF OPERATION TO INCLUDEBUILDING PRE-OCCUPANCY PURGE PER DETAIL 4/M-200. REFER TO ELECTRICAL/FIRE ALARM FOR FIREALARM INTERLOCK AND SHUTDOWN.
4. REFURBISH EXISTING 18"x18" FIRE/SMOKE DAMPER IN THROUGH WALL TRANSFER AIR DUCT. REFER TOFIRE ALARM/ELECTRICAL DRAWINGS FOR FIRE ALARM INTERLOCK AND SHUTDOWN.
5. EXISTING 96"x36" SIDEWALL EXHAUST GRILLE CONNECTED TO 96"x12" DUCT UP TO SECOND FLOOR. SEESHEET M-102 FOR CONTINUATION. CLEAN AND REPAIR AIR DEVICE.
6. EXISTING 40"x36" CEILING GRILLE CONNECTED TO 40"x10" DUCT UP TO FLOOR ABOVE. SEE SHEET M-102FOR CONTINUATION. CLEAN AND REPAIR AIR DEVICE.
7. 40"x10" DUCT UP TO FLOOR ABOVE. SEE SHEET M-102 FOR CONTINUATION.
8. EXISTING 16"x16" EXHAUST UP TO EXISTING EF-29.
9. EXISTING 16"x16" EXHAUST UP TO FLOOR ABOVE. SEE SHEET M-102 FOR CONTINUATION.
10. EXISTING 12"x12" EXHAUST DUCT UP TO EXISTING EF-36.
11. EXISTING 12"x12" EXHAUST DUCT UP TO EXISTING EF-38.
12. EXISTING 36"x36" SIDEWALL EXHAUST GRILLE CONNECT TO 36"x17" DUCT UP TO FLOOR ABOVE. SEE SHEETM-102 FOR CONTINUATION.
13. EXISTING 36"x20" OUTSIDE AIR DUCT UP TO INTAKE HOOD.
14. EXISTING 12"x12" EXHAUST DUCT UP TO EXISTING EF-15.
15. EXISTING 12"x6" DUCT UP TO FLOOR ABOVE. SEE SHEET M-102 FOR CONTINUATION.
XGENERAL NOTES1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL REVIEW EQUIPMENT CONDITION AND NOTIFY DENVER PUBLIC
SCHOOLS PROJECT MANAGER OF ANY EQUIPMENT WHICH IS BEYOND REPAIR.
2. LOCATIONS AND SIZES FOR ALL ITEMS ARE BASED ON THE BEST INFORMATION AVAILABLE. SOME ITEMS SHOWNARE TO INDICATE THE INTENT OF THE MECHANICAL SYSTEMS BUT MAY NOT NECESSARILY REFLECT THE EXACTROUTING AND LOCATIONS. IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL LOCATIONS AND SIZESOF THOSE ITEMS REQUIRING MODIFICATIONS.
3. IF SUSPECTED ASBESTOS CONTAINING MATERIALS ARE FOUND, THE CONTRACTORS SHALL NOTIFY THE OWNERAND STOP ALL WORK IN THE AREA IMMEDIATELY. IF THE SUSPECTED MATERIALS PROVE TO CONTAIN ASBESTOS,THE OWNER WILL ARRANGE TO HAVE THE MATERIALS ABATED IN A TIMELY MANNER.
M-101
03/10/2016
RISHEL COMMUNITY CAMPUS
Date:
Drawn By:
Checked By:
Project Number
Sheet Name
COPYRIGHT: ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF ENVISION MECHANICAL ENGINEERS
DENVER PUBLIC SCHOOLS
F O R D P S U S E O N L Y
Designed By:DENVER PUBLIC SCHOOLS
DEPARTMENT OFFACILITIES MANAGEMENT
APPROVED CONTRACT DOCUMENT
Date
DATENO. DESCRIPTION OF REVISION
DEPARTMENT OF FACILITIES MANAGEMENT
AUTHORITY MADE APPRV'D
SHEET:
OF:
MARK DESCRIPTION DATE
MECHANICAL ENGINEERS, INC. 9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303/688-0223Fax- 303/688-3584Project # 015-009
SITE NO. 123 DENVER, COLORADOSCHOOL DISTRICT NO. 1
PP#: 2457 COOLING ENHANCEMENT451 S. TEJON STDenver, Colorado
015-009
JKBJALPAF
03/10/161 CONSTRUCTION DOCUMENTS
123-
2457
-ME-
NO
RT
H
FIRST FLOOR MECHANICAL PLAN1/16" = 1' - 0"1 8'0 4' 16' 24' 32'
FIRST FLOORMECHANICAL PLAN
T
T
T
T
T
T
2
1
6
1
1
1
1
1
1
1
2
2
TT
T
3(E) HV-2
3(E) HV-1
2 2
2 2 2 2
TTT T
T T
36x12
36x12
36x12
36x12
2 2 2 2 2 2
T T T T
T T T T
14x9 12x6
2
T
11
4
5 5
(E) UV
(E) UV(E) UV(E) UV(E) UV(E) UV
(E) UV(E) UV
(E) UV
(E) UV(E) UV(E) UV(E) UV(E) UV(E) UV(E) UV
9
1011
5(E) CG(E) CG(E) CG
(E) CG
(E) CG 12
(E) ER(E) ER(E) ER
13
14
15
15
2 (E) UV 2 (E) UV 2 (E) UV 2 (E) UV
16
17
17
18
17
17
1 1 1 1 1 1
19
(E) ER
12x12
20
8(E) ER
(E) CG 12
(E) CG 12
(E) CG 12
(E) CG 16
(E) CG 16
(E) CG 16
(E) CG 16
(E) CG16
(E) CG 16
5(E) CG
7
(E) ER
(E) ER(E) ER
21
(E) UV2
(E) UV2
(E) UV2
(E) UV2
(E) UV2
(E) UV2
(E) CG16
DRAWING NOTES1. REFURBISH EXISTING FIRE/SMOKE DAMPER IN THROUGH-WALL TRANSFER AIR DUCT. REFER TO FIRE
ALARM/ELECTRICAL DRAWINGS FOR FIRE ALARM INTERLOCK AND SHUTDOWN.
2. EXISTING UNIT VENTILATOR. REVISE EXISTING SEQUENCE OF OPERATION TO INCLUDE BUILDINGPRE-OCCUPANCY PURGE PER DETAIL 1/M-200. REFER TO ELECTRICAL/FIRE ALARM FOR FIRE ALARM INTERLOCKAND SHUTDOWN.
3. EXISTING HEATING AND VENTILATING UNIT. REVISE EXISTING SEQUENCE OF OPERATION TO INCLUDE BUILDINGPRE-OCCUPANCY PURGE PER DETAIL 4/M-200. REFER TO ELECTRICAL/FIRE ALARM FOR FIRE ALARM INTERLOCKAND SHUTDOWN.
4. EXISTING 16"x16" EXHAUST DUCT UP TO EXISTING EF-35.
5. EXISTING 24"x36" EXHAUST GRILLE AND 14"x36" DUCT UP TO EXISTING RELIEF HOOD. CLEAN AND REPAIR AIRDEVICE.
6. REFURBISH EXISTING 18"x18" FIRE/SMOKE DAMPER IN THROUGH WALL TRANSFER AIR DUCT. REFER TO FIREALARM/ELECTRICAL DRAWINGS FOR FIRE ALARM INTERLOCK AND SHUTDOWN.
7. 12"x12" EXHAUST DUCT UP TO EXISTING EF-7.
8. 36"x36" SIDEWALL REGISTER AND 24"x36" RELIEF DUCT UP TO FLOOR ABOVE. SEE SHEET M-103 FORCONTINUATION.
9. EXISTING DUCT UP TO VENTILATOR.
10. EXISTING 96"x12" RELIEF DUCT UP FROM BELOW.
11. EXISTING 36"x36" DUCT UP TO EXISTING RELIEF HOOD.
12. CLEAN AND REPAIR EXISTING 48"x48" EXHAUST GRILLE AND 48"x30" DUCT UP TO EXISTING RELIEF HOOD. SEESHEET M-103 FOR CONTINUATION.
13. CLEAN AND REPAIR EXISTING 40"x36" RELIEF GRILLE.
14. EXISTING 40"x10" DUCT IN CHASE UP TO FLOOR ABOVE. SEE SHEET M-103 FOR CONTINUATION.
15. EXISTING 36"x36" DUCT UP TO EXISTING RELIEF HOOD. SEE SHEET M-103 FOR CONTINUATION.
16. CLEAN AND REPAIR EXISTING 30"x30" RELIEF GRILLE.
17. EXISTING 20"x20" GRAVITY RELIEF DUCT UP THRU ROOF TO HOOD.
18. EXISTING 16"x16" GRAVITY RELIEF DUCT UP THRU ROOF TO HOOD.
19. 12"x12" EXHAUST DUCT UP TO EXISTING EF-21.
20. 12"x12" EXHAUST DUCT UP TO EXISTING EF-25.
21. 16"x16" EXHAUST DUCT UP TO EXISTING EF-23.
XGENERAL NOTES1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL REVIEW EQUIPMENT CONDITION AND NOTIFY DENVER PUBLIC
SCHOOLS PROJECT MANAGER OF ANY EQUIPMENT WHICH IS BEYOND REPAIR.
2. LOCATIONS AND SIZES FOR ALL ITEMS ARE BASED ON THE BEST INFORMATION AVAILABLE. SOME ITEMS SHOWNARE TO INDICATE THE INTENT OF THE MECHANICAL SYSTEMS BUT MAY NOT NECESSARILY REFLECT THE EXACTROUTING AND LOCATIONS. IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL LOCATIONS AND SIZESOF THOSE ITEMS REQUIRING MODIFICATIONS.
3. IF SUSPECTED ASBESTOS CONTAINING MATERIALS ARE FOUND, THE CONTRACTORS SHALL NOTIFY THE OWNERAND STOP ALL WORK IN THE AREA IMMEDIATELY. IF THE SUSPECTED MATERIALS PROVE TO CONTAIN ASBESTOS,THE OWNER WILL ARRANGE TO HAVE THE MATERIALS ABATED IN A TIMELY MANNER.
M-102
03/10/2016
RISHEL COMMUNITY CAMPUS
Date:
Drawn By:
Checked By:
Project Number
Sheet Name
COPYRIGHT: ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF ENVISION MECHANICAL ENGINEERS
DENVER PUBLIC SCHOOLS
F O R D P S U S E O N L Y
Designed By:DENVER PUBLIC SCHOOLS
DEPARTMENT OFFACILITIES MANAGEMENT
APPROVED CONTRACT DOCUMENT
Date
DATENO. DESCRIPTION OF REVISION
DEPARTMENT OF FACILITIES MANAGEMENT
AUTHORITY MADE APPRV'D
SHEET:
OF:
MARK DESCRIPTION DATE
MECHANICAL ENGINEERS, INC. 9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303/688-0223Fax- 303/688-3584Project # 015-009
SITE NO. 123 DENVER, COLORADOSCHOOL DISTRICT NO. 1
PP#: 2457 COOLING ENHANCEMENT451 S. TEJON STDenver, Colorado
015-009
JKBJALPAF
03/10/161 CONSTRUCTION DOCUMENTS
123-
2457
-ME-
NO
RT
H
SECOND FLOOR MECHANICAL PLAN1/16" = 1' - 0"1 8'0 4' 16' 24' 32'
SECOND FLOORMECHANICAL PLAN
(E) EF-36
(E) EF-38
(E) EF-29
(E) EF-35
(E) EF-25
(E) EF-15
(E) EF-28
(E) EF-21
(E) RH/EH (E) IH
(E) RH
(E) RH 2
2
2
1
(E) RH 2
(E) RH
(E) RH
(E) RH
(E) RH 2 (E) RH 2 (E) RH 2
2
2
(E) RH 2
(E) RH 2
(E) RH 2
(E) RH 2
(E) RH 2
(E) RH 2
(E) RH 2
(E) RH 2
(E) RH 2
3
(E) IH 3
4
4
4
4
4
4
4
4
(E) EF-23 4
DRAWING NOTES XGENERAL NOTES1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL REVIEW EQUIPMENT CONDITION AND NOTIFY DENVER PUBLIC
SCHOOLS PROJECT MANAGER OF ANY EQUIPMENT WHICH IS BEYOND REPAIR.
2. LOCATIONS AND SIZES FOR ALL ITEMS ARE BASED ON THE BEST INFORMATION AVAILABLE. SOME ITEMS SHOWNARE TO INDICATE THE INTENT OF THE MECHANICAL SYSTEMS BUT MAY NOT NECESSARILY REFLECT THE EXACTROUTING AND LOCATIONS. IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL LOCATIONS AND SIZESOF THOSE ITEMS REQUIRING MODIFICATIONS.
3. IF SUSPECTED ASBESTOS CONTAINING MATERIALS ARE FOUND, THE CONTRACTORS SHALL NOTIFY THE OWNERAND STOP ALL WORK IN THE AREA IMMEDIATELY. IF THE SUSPECTED MATERIALS PROVE TO CONTAIN ASBESTOS,THE OWNER WILL ARRANGE TO HAVE THE MATERIALS ABATED IN A TIMELY MANNER.
1. EXISTING VENTILATOR.
2. REFURBISH EXISTING RELIEF HOOD AND ENSURE PROPER OPERATION. CLEAN, LUBRICATE AND REPAIR THEBIRD-SCREEN AND BAROMETRIC DAMPER.
3. REFURBISH EXISTING INTAKE HOOD AND ENSURE PROPER OPERATION. CLEAN AND REPAIR THE BIRD-SCREEN.
4. EXISTING EXHAUST FAN. REVISE EXISTING SEQUENCE OF OPERATION TO INCLUDE BUILDING PRE-OCCUPANCYPURGE PER DETAIL 2/M-200.
M-103
03/10/2016
RISHEL COMMUNITY CAMPUS
Date:
Drawn By:
Checked By:
Project Number
Sheet Name
COPYRIGHT: ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF ENVISION MECHANICAL ENGINEERS
DENVER PUBLIC SCHOOLS
F O R D P S U S E O N L Y
Designed By:DENVER PUBLIC SCHOOLS
DEPARTMENT OFFACILITIES MANAGEMENT
APPROVED CONTRACT DOCUMENT
Date
DATENO. DESCRIPTION OF REVISION
DEPARTMENT OF FACILITIES MANAGEMENT
AUTHORITY MADE APPRV'D
SHEET:
OF:
MARK DESCRIPTION DATE
MECHANICAL ENGINEERS, INC. 9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303/688-0223Fax- 303/688-3584Project # 015-009
SITE NO. 123 DENVER, COLORADOSCHOOL DISTRICT NO. 1
PP#: 2457 COOLING ENHANCEMENT451 S. TEJON STDenver, Colorado
015-009
JKBJALPAF
03/10/161 CONSTRUCTION DOCUMENTS
123-
2457
-ME-
NO
RT
H
MECHANICAL ROOF PLAN1/16" = 1' - 0"1 8'0 4' 16' 24' 32'
MECHANICAL ROOF PLAN
WALL
SEALANT
ACTUATOR
CORRIDOR(E) GRILLE IN
COMBINATION FIRE/SMOKEDAMPER WELD, BOLT ORSCREW TO SLEEVE.
FUSIBLE LINK
FIRE/SMOKE DAMPER DETAILNOT TO SCALE3
NOT TO SCALEUNIT VENTILATOR CONTROL DIAGRAM & SEQUENCE
DEVICEPLUG-IN COMMUNICATION
LINE
ANALOGINPUT
RETURN AIR SMOKE ALARM
INPUTDIGITAL
CONTROLLER(S)
CONTROLLER
UNITVENTILATOR
DDC EQUIPMENT
BY E.C.120 VOLT POWER
FAN START/STOP
#
123
#
1
OUTPUTDIGITAL
ANALOGOUTPUT
#
1
1
L1 L2
#
CURRENT SWITCH FOR FAN ALARM
SEQUENCE OF OPERATIONOCCUPIED/UNOCCUPIED MODE OF OPERATION IS DETERMINED BY SCHEDULES BROADCASTFROM THE FX60 NETWORK MANAGER.
OCCUPIED MODE: THE NEW DDC CONTROLLER INITIATES AN OCCUPIED MODE TO THEEXISTING PNEUMATIC CONTROL SYSTEM. UNIT VENTILATOR OPERATES TO MAINTAINBUILDING STATIC PRESSURE.
UNOCCUPIED MODE: THE UNIT VENTILATORS ARE OFF. THE NEW DDC CONTROLLERINITIATES AN UNOCCUPIED MODE TO THE EXISTING PNEUMATIC CONTROL SYSTEM.
NIGHT PURGE MODE: THE NEW DDC CONTROLLER INITIATES AND OCCUPIED MODE TO THEEXISTING PNEUMATIC CONTROL SYSTEM. THE UNIT VENTILATORS ARE ENABLED TO 100%SPEED. THE FANS ARE TO RUN TO PRE-COOL THE SPACE TO REDUCED SPACETEMPERATURE OF 65°F (ADJ.).
MORNING WARM UP: THE NEW DDC CONTROLLER INITIATES AN OCCUPIED/WARM-UPCOMMAND TO THE EXISTING PNEUMATIC CONTROL SYSTEM. UNIT VENTILATORS CIRCULATEROOM AIR ONLY.
SAFETIES: THE EXISTING FIRE DETECTION SYSTEM WILL SHUT DOWN THE EXISTING UNITVENTILATORS AND INITIATE AN ALARM TO THE NETWORK MANAGER. SHUT DOWN SHALL BEACCOMPLISHED BY DISCONNECTING POWER TO THE PNEUMATIC CONTROL AIRCOMPRESSOR AND ASSOCIATED PNEUMATIC CONTROL SYSTEM.
FRONT END NOTES:PROVIDE (N) BAS FRONT END AND CONTROLLER FOR BUILDING SYSTEM.FRONT END AND CONTROLLERS SHALL INCLUDE OCCUPIED/UNOCCUPIEDPROGRAMMING FUNCTIONS, PNEUMATIC INTEGRATION TO EXISTINGPNEUMATIC SYSTEM FOR SCHEDULING, AND OUTSIDE AIR TEMPERATUREFUNCTIONS. BAS INTEGRATION SHALL BE INCLUDED.
2
OUTDOORSINDOORS
DP
1
INDOORS
TS
OUTDOORS(NORTH SIDE)
COMMON BUILDING SENSOR(SENSOR SHOWN FOR REFERENCE SINGLE SENSOR USED FOR ALLSYSTEM O.A.T)
OUTDOOR AIR TEMPERATURE2BUILDING STATIC PRESSURE
1
COMMON BUILDING PRESSURE SENSOR(SENSOR SHOWN FOR REFERENCE)
1BY DIVISION 26
1MS
NOT TO SCALERELIEF FAN CONTROL DIAGRAM & SEQUENCE
DEVICEPLUG-IN COMMUNICATION
LINE
ANALOGINPUT
RELIEF AIR SMOKE ALARM
INPUTDIGITAL
CONTROLLER(S)
CONTROLLER
RELIEF AIRFAN(E)
DDC EQUIPMENT
BY E.C.120 VOLT POWER
RELIEF FAN START/STOP
#
123
#
1
OUTPUTDIGITAL
ANALOGOUTPUT
#
1
1
L1 L2
#
CURRENT SWITCH FOR RELIEF FAN ALARM
FRONT END NOTES:PROVIDE (N) BAS FRONT END AND CONTROLLER FOR BUILDING SYSTEM.FRONT END AND CONTROLLERS SHALL INCLUDE OCCUPIED/UNOCCUPIEDPROGRAMMING FUNCTIONS, PNEUMATIC INTEGRATION TO EXISTINGPNEUMATIC SYSTEM FOR SCHEDULING, AND OUTSIDE AIR TEMPERATUREFUNCTIONS. BAS INTEGRATION SHALL BE INCLUDED.
2
OUTDOORSINDOORS
DP
1
INDOORS
TS
OUTDOORS(NORTH SIDE)
COMMON BUILDING SENSOR(SENSOR SHOWN FOR REFERENCE SINGLE SENSOR USED FOR ALLSYSTEM O.A.T)
OUTDOOR AIR TEMPERATURE2BUILDING STATIC PRESSURE
2
COMMON BUILDING PRESSURE SENSOR(SENSOR SHOWN FOR REFERENCE)
1BY DIVISION 26
1MS
SEQUENCE OF OPERATIONOCCUPIED/UNOCCUPIED MODE OF OPERATION IS DETERMINED BY SCHEDULES BROADCASTFROM THE FX60 NETWORK MANAGER.
OCCUPIED MODE: THE NEW DDC CONTROLLER INITIATES AN OCCUPIED MODE TO THEEXISTING PNEUMATIC CONTROL SYSTEM. RELIEF AIR FAN OPERATES TO MAINTAIN BUILDINGSTATIC PRESSURE.
UNOCCUPIED MODE: THE RELIEF FANS ARE OFF. THE NEW DDC CONTROLLER INITIATES ANUNOCCUPIED MODE TO THE EXISTING PNEUMATIC CONTROL SYSTEM.
NIGHT PURGE MODE: THE NEW DDC CONTROLLER INITIATES AND OCCUPIED MODE TO THEEXISTING PNEUMATIC CONTROL SYSTEM. THE RELIEF AIR FANS ARE ENABLED TO 100%SPEED. THE FANS ARE TO RUN TO PRE-COOL THE SPACE TO REDUCED SPACETEMPERATURES.
MORNING WARM UP: THE NEW DDC CONTROLLER INITIATES AN OCCUPIED/WARM-UPCOMMAND TO THE EXISTING PNEUMATIC CONTROL SYSTEM. RELIEF FANS ARE OFF.
SAFETIES: THE EXISTING FIRE DETECTION SYSTEM WILL SHUT DOWN THE FANS ANDEXISTING UNIT VENTILATORS AND INITIATE AN ALARM TO THE NETWORK MANAGER. SHUTDOWN SHALL BE ACCOMPLISHED BY DISCONNECTING POWER TO THE PNEUMATIC CONTROLAIR COMPRESSOR AND ASSOCIATED PNEUMATIC CONTROL SYSTEM.
NOT TO SCALE
FILTER
DM
1
DM
1
2
TS
COILSTEAM
2
LLTS *
SUPPLY FAN
2
MS BY DIVISION 26
1
OUTSIDE AIR
SUPPLY AIR
RETURN AIR
SET POINT ADJUSTMENT
ZONE TEMP
SPACE TEMPERATURE SENSOR
S43
DEVICEPLUG-IN COMMUNICATION
LINE
LOW LIMIT TEMPERATURE SWITCH (FREEZE STAT)
SUPPLY AIR TEMPERATURE
ANALOGINPUT
INPUTDIGITAL
CONTROLLER(S)
OSA / RA DAMPER MOTOR
CONTROLLER
TYPICALH&V UNIT
DDC EQUIPMENT
SUPPLY FAN START/STOP
BY E.C.120 VOLT POWER
#
12CURRENT SWITCH FOR SUPPLY FAN ALARM
#
1234
OUTPUTDIGITAL
ANALOGOUTPUT
#
12
12
L1 L2
#
UNIT ENTERING AIR TEMPERATURE COIL CONTROL VALVE
1
SPACE TEMPERATURESPACE TEMPERATURE ADJUSTMENT
1
TS
H&V UNIT CONTROL DIAGRAM AND SEQUENCE OF OPERATION4
SEQUENCE OF OPERATION ADDITION
NIGHT PURGE MODE: THE NEW DDC CONTROLLER INITIATES AND OCCUPIED MODETO THE EXISTING PNEUMATIC CONTROL SYSTEM. THE UNIT VENTILATORS AREENABLED TO 100% SPEED. THE FANS ARE TO RUN TO PRE-COOL THE SPACE TOREDUCED SPACE TEMPERATURE OF 65°F (ADJ.).
SAFETIES: THE EXISTING FIRE DETECTION SYSTEM WILL SHUT DOWN THE EXISTINGUNIT VENTILATORS AND INITIATE AN ALARM TO THE NETWORK MANAGER. SHUTDOWN SHALL BE ACCOMPLISHED BY DISCONNECTING POWER TO THE PNEUMATICCONTROL AIR COMPRESSOR AND ASSOCIATED PNEUMATIC CONTROL SYSTEM.
03/10/2016
RISHEL COMMUNITY CAMPUS
Date:
Drawn By:
Checked By:
Project Number
Sheet Name
COPYRIGHT: ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF ENVISION MECHANICAL ENGINEERS
DENVER PUBLIC SCHOOLS
F O R D P S U S E O N L Y
Designed By:DENVER PUBLIC SCHOOLS
DEPARTMENT OFFACILITIES MANAGEMENT
APPROVED CONTRACT DOCUMENT
Date
DATENO. DESCRIPTION OF REVISION
DEPARTMENT OF FACILITIES MANAGEMENT
AUTHORITY MADE APPRV'D
SHEET:
OF:
MARK DESCRIPTION DATE
MECHANICAL ENGINEERS, INC. 9777 Pyramid Court, Suite 120Englewood, CO 80112Tel- 303/688-0223Fax- 303/688-3584Project # 015-009
SITE NO. 123 DENVER, COLORADOSCHOOL DISTRICT NO. 1
PP#: 2457 COOLING ENHANCEMENT451 S. TEJON STDenver, Colorado
015-009
JKBJALPAF
03/10/161 CONSTRUCTION DOCUMENTS
M-200
MECHANICALDETAILS
123-
2457
-ME-
E-100
03/10/2016
RISHEL COMMUNITY CAMPUS
Date:
Drawn By:
Checked By:
Project Number
Sheet Name
COPYRIGHT: ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF JSH AND ASSOC.
DENVER PUBLIC SCHOOLS
Designed By:DENVER PUBLIC SCHOOLS
DEPARTMENT OFFACILITIES MANAGEMENT
APPROVED CONTRACT DOCUMENT
Date
DATENO.
SHEET:
OF:
MARK DESCRIPTION DATE
PP#: 2457 COOLING ENHANCEMENT
015-009/2015-29A
JSHICNJSH
F O R D P S U S E O N L Y
03/10/161
123-
2457
-EE-
LOWER LEVEL & 1ST FLOORELECTRICAL PLANS
E-101
03/10/2016
RISHEL COMMUNITY CAMPUS
Date:
Drawn By:
Checked By:
Project Number
Sheet Name
COPYRIGHT: ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE DUPLICATED, DISCLOSED OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT OF JSH AND ASSOC.
DENVER PUBLIC SCHOOLS
Designed By:DENVER PUBLIC SCHOOLS
DEPARTMENT OFFACILITIES MANAGEMENT
APPROVED CONTRACT DOCUMENT
Date
DATENO.
SHEET:
OF:
MARK DESCRIPTION DATE
PP#: 2457 COOLING ENHANCEMENT
015-009/2015-29A
JSHICNJSH
F O R D P S U S E O N L Y
03/10/161
123-
2457
-EE-