District 10 2018 Outreach
Joseph P. Dubovi, III., P. E.District Executive
2018 Outreach Agenda
Resources
District Profile
Leslie S. Richards, Secretary of Transportation
Construction Projects
Projects in Design
County Maintenance
Innovation & Improvements
Upcoming Programs
District 10 Profile
INTERESTING TO KNOW:
PA has roughly as many state-maintained miles of highway as New
England, New York, & New Jersey combined (40,000).
PA has the 5th largest roadway system & the 3rd largest number of
bridges in the country.
Back to Agenda
Feature Armstrong Butler Clarion Indiana Jefferson Total
Population 66,486 186,847 38,513 86,364 44,073 422,283
-Townships 28 33 22 24 23 130
-Boroughs 16 23 12 14 11 76
-Cities 1 1 0 0 0 2
State Highway
(Linear Miles) 664 670 476 813 559 3,182
State Highway
(Lane Miles)1,382 1,496 1,006 1,728 1,173 6,785
Interstate Miles 0 29 28 0 24 81
National Highway
System Miles68 107 45 113 39 372
State Routes
ADT >2000103 230 84 112 83 612
State Routes
ADT <2000492 304 319 588 413 2116
Bridges (over 8' span) 372 355 208 430 265 1630
PennDOT Vision
PennDOT Mission
County Accreditation
PennDOT Connects
Road MaP
Diversity
Leslie S. Richards, Secretary of Transportation
Back to Agenda
TOPICS
PennDOT Vision
A better quality of life built on
transportation excellence.
Back to Agenda Back to Secretary’s Topics
PennDOT Mission
To provide a sustainable transportation system and quality services that are
embraced by our communities and add value to our customers.
Back to Agenda Back to Secretary’s Topics
• Truck Skills Rodeo
• Safety Stand Down Days
• Training Videos
• School Awareness
County Accreditation – Best Practices
Touch-A-Truck Event
Truck Skills Rodeo
Safety First
Back to Agenda Back to Secretary’s Topics
• Safety Innovation Presentations
• Rolling Roadblock Sign Setting
• Cone Setting Platform
• Seal Coat Signing Pilot
• Flashing Yellow Arrow
County Accreditation – Best Practices
I-80 Rolling Roadblock
Cone Setting Insert
Flashing Yellow Arrow
Safety First
Back to Agenda Back to Secretary’s Topics
County Accreditation – Best Practices
• Asset: People
– Forming effective partnerships
– Recruitment, training, retention
• Asset: Roads
– Sectional Cycle Maintenance
– 5-year Paving Plans
• Asset: Bridges
– Maintenance & preservation
– Rehabilitation or replacement of structurally-deficient (SD) bridges
• Asset: Equipment & Materials
– Equipment sharing between Counties and other Districts
– Efficient procurement & use of winter supplies
Asset Management
Back to Secretary’s TopicsBack to Agenda
Structurally Deficient Bridges
2008 2018
Statewide 6,034 3,114
District 10 580 283
PennDOT Connects
Back to Agenda Back to Secretary’s Topics
Road MaP
Road Maintenance and Preservation
ROAD MaP - Overview
• Funding & Allocation
– Act 89
– Decade of Investment
– Capital Projects
– Preservation & Reconstruction
• Innovation
– RAP
– Equipment Sharing
Back to Agenda Back to Secretary’s Topics
Road MaP
Maintenance
• RAP (Recycled Asphalt Paving)
– Environmentally Conscious
– Ideal for less-traveled roads
• Department Force vs. Outsourcing
• 18-year Sign Life Management
• Sectional Cycle Maintenance
– Increased from 4 to 5 years
• Equipment Sharing
Back to Agenda Back to Secretary’s Topics
Diversity
• Diversity
– All-inclusive Workforce
– Stimulates Innovation
– Sparks Creativity
– Strengthens the Organization
• Recruitment
– Identifying Target Audiences
– Incorporating Results-Driven Strategies
– Participating in Community Outreach
• Retention
– Inclusion Committees
– Training & Organizational Support
Back to Agenda Back to Secretary’s Topics
CONSTRUCTION
Paul F. Koza, Jr., P.E.
Assistant District Engineer for Construction
724-357-2812
Back to Agenda
Outreach 2018 – Jefferson County
Back to Agenda
Margiotti Bridge
• ECMS #74336
• SR 436
• Jefferson County
– Punxsutawney Borough
• Bridge Replacement
• Glenn O. Hawbaker, Inc.
• Cost: $12,655,698
• Let: 1/28/16
• Fall 2018 Completion
Back to Agenda
PA 36 Exit 78 Concrete Repair
• ECMS #106383
• SR 36
• Jefferson County
– Brookville
• Concrete Pavement Rehabilitation
• Francis J. Palo, Inc.
• Cost: $2,659,594
• Let: 7/13/17
• Fall 2018 Completion
Back to Agenda
Lanes Mills Bridge #4
• ECMS #101117
• SR 1008
• Jefferson County
– Snyder Twp.
• Bridge Replacement
• Kukurin Contracting, Inc.
• Cost: $1,490,431
• Let: 7/27/17
• Temporary Signal
Back to Agenda
SR 949 Resurfacing #2
• ECMS #91386
• SR 949
• Jefferson County
– Clover Twp.
• Resurfacing/Overlay
• Cost: $0.5 to $1.0M
• Let: 4/12/18
Back to Agenda
SR 2011 Indiana County to PA 36 Resurfacing
• ECMS #100236
• SR 2011
• Jefferson County
– Bell Twp.
• Resurfacing/Overlay
• Cost: $1.0 to $2.5M
• Let: 4/12/18
Back to Agenda
SR 4003 Resurfacing
• ECMS #110015
• SR 4003
• Jefferson County
– Brookville
• Resurfacing/Overlay
• Cost: $0.5 to $1.0M
• Let: 6/7/18
Back to Agenda
Indiana Hill Bridge
• ECMS #74335
• SR 119
• Jefferson County
– Punxsutawney Borough
• Bridge Replacement
• Cost: $2.5 to $5.0M
• Let: 6/21/18
• Detour
Back to Agenda
2018 District Wide Contracts
• 2018 RPM: ECMS #110105
– Cost: $300,000
– Let: 4/12/18
• 2018 Small Paint: ECMS #110106
– Cost: $300,000
– Let: 6/7/18
• Guiderail Contracts:
– Armstrong: ECMS #110870, Cost $200,000
– Butler: ECMS #110871, Cost $250,000
– Clarion: ECMS #110872, Cost $225,000
– Indiana: ECMS #110873, Cost $250,000
– Jefferson: ECMS #110874, Cost $225,000
– Let: 6/7/18
Back to Agenda
Plenary Walsh Keystone Partners – P3 Bridges
– Cloe Bridge #1 SR 36 Bell Twp.
• JV 391
• Detour
– Foxburg Bridge SR 2003 Big Run Borough
• JV 392
• Detour
– Stump Creek Bridge #2 SR 2008 Henderson Twp
• JV 393
• Detour
– http://parapidbridges.com
Back to Agenda
DESIGN
James. R. Andrews, P.E.
Assistant District Engineer for Design
724-357-2805
Back to Agenda
2018 Jefferson County Outreach
Back to Agenda
Brookville 2nd Street Bridge
• Route 3033
• Superstructure Replacement
• Brookville Borough
• Over Sandy Lick Creek
• Phased Construction
• Construction in 2019
• Estimate: $2.5M - $5M
Back to Agenda
PA 28/US 322 Intersection
• Routes 28 and 322
• Intersection Improvement
• Brookville Borough & Pine Creek Twp.
• Construction in 2019
• Estimate: $5M - $7.5M
Back to Agenda
US 219 SR 1008 to PA 28
• Route 219
• Resurfacing
• Snyder Twp. & Brockway Borough
• Construction in 2019
• Estimate: $1M - $2.5M
Photos
or map
showing
project
Back to Agenda
PA 36 Brookville North PM
• Route 36
• Resurfacing
• Brookville Borough and Rose & Eldred Twps.
• Construction in 2019
• Estimate: $2.5M - $5M
Back to Agenda
SR 3007 Resurfacing
• Route 3007
• Resurfacing
• Beaver, Clover & Rose Twps., Summerville Borough
• Construction in 2019
• Estimate: $1M - $2.5M
Photos
or map
showing
project
Back to Agenda
Richardsville Bridge
• Route 4005
• Bridge Replacement
• Warsaw Township
• Over North Fork Creek
• Phased Construction
• Construction in 2019
• Estimate: $1M - $2.5M
Back to Agenda
SR 1830 Mill Creek Bridge
• Route 1830
• Bridge Replacement
• Washington Twp.
• Over Mill Creek
• Detour
• Construction in 2019
• Estimate: $1M - $2.5M
Back to Agenda
Thompson Run Bridge No. 1
• Route 28
• Bridge Replacement
• Clover Twp.
• Over Thompson Run
• Maintain 2 Lanes of Traffic
• Construction in 2020
• Estimate: $2.5M - $5M
Back to Agenda
East Dora Bridge No. 1
• Route 3004
• Bridge Replacement
• Ringgold Twp.
• Over Pine Run
• Detour
• Construction in 2020
• Estimate: $1M - $2.5M
Back to Agenda
PA 410 Resurfacing
• Route 410
• Resurfacing
• Henderson Twp.
• Construction in 2020
• Estimate: $1M - $2.5M
Photos
or map
showing
project
Back to Agenda
Falls Creek Bridge No. 1
• Route 830
• Bridge Replacement
• Falls Creek Borough
• Over Falls Creek
• Phased Construction
• Construction in 2020
• Estimate: $1M - $2.5M
Back to Agenda
US 322 Clarion County Line to Roseville
• Route 322
• Resurfacing
• Corsica Borough & Union Twp.
• Construction in 2022
• Estimate: $1M - $2.5M
Back to Agenda
PA 36 Hudson PM
• Route 36 - Resurfacing
• Gaskill Twp.
• Construction in 2021
• Estimate: $2.5M - $5M
Back to Agenda
US 322 Seg 300 to PA 950
• Route 322
• Resurfacing
• Pine Creek & Winslow Twps., and Reynoldsville Borough
• Construction in 2021
• Estimate: $1M - $2.5M
Back to Agenda
Simpson Run Bridge
• Route 28
• Bridge Replacement
• Clover Twp.
• Over Simpson Run
• Construction in 2022
• Estimate: $1M to $2.5M
Back to Agenda
Jefferson Short Span Group Bridges
• Routes 949 and 1013
• Bridge Replacements
• Eldred, Heath & Washington Twps.
• Mill Run, Pine Run & Keys Run
• Construction in 2022
• Estimate: $2.5M - $5M
Back to Agenda
Coder Run Bridge
• Route 28
• Bridge Replacement
• Rose Twp.
• Over Clement Run
• Construction not funded
• Estimate: $1M to $2.5M
Back to Agenda
Beech Hollow Bridge
• Route 3039
• Bridge Replacement
• Knox Twp.
• Over Tributary to Five Mile Run
• Detour
• Construction not funded
• Estimate: $500k - $1M
Back to Agenda
Ugly Run Bridge
• 2001
• Bridge Replacement
• Gaskill Twp.
• Over Ugly Run
• Detour
• Construction not funded
• Estimate: 500,000 - $1M
Back to Agenda
MAINTENANCE
Brian N. Allen, P.E.
Assistant District Engineer for Maintenance
724-357-2809
Back to Agenda
2018 Jefferson County Maintenance
• Matthew Burkett County Maintenance Manager
• Aaron Emhoff Assistant County Manager
• Karen Burkett Assistant County Manager
• Paul Greenawalt Equipment Manager
• Steve Vasbinder Roadway Programs Coordinator
• Cindy Gemmell Adopt-A-Highway Coordinator
205 Witherow StreetPunxsutawney, PA 15767
814-372-4532
Back to Agenda
Jefferson County Winter
2017-2018 Jefferson County Winter Budget (operations & personnel) $2,887,000
Salt (5-year average in tons) 16,255
Anti-Skid (5-year average in tons) 12,781
Brine (5-year average in gallons) 59,409
Back to Agenda
2018 Jefferson Cycle Maintenance
Back to Agenda
2018 Planned Pipe Replacement
3,000 feet of Pipe Replacement 2018
2,040 feet completed in 2017
Back to Agenda
Paving
Back to Agenda
2018 Planned:Full overlay shoulder to shoulder paving on SR 2025 (Fuller Rd.) Knoxdale to SR 322
and SR 2011 (Cloe Rossiter Rd.) from SR 36 to the
Indiana County line.
Mill & Fill
2018 Planned: 16,000 tons
Back to Agenda
Shoulder Cutting
2018 Planned: 220 miles
2017 Completed: 223 miles
Back to Agenda
2018 Safety Initiative
SR 3011/90: On both sides of the road cut the bank back and install U-drains and rock lining to re-establish the ditch line to eliminate the road washouts and icing during winter.
BEFORE BEFORE
Back to Agenda
2018 Safety Initiative
SR 2031: Install inlet box and parallel pipe to eliminate icing on the north side of the roadway. A ditch was redirected on the south side of the roadway at the same location.
AFTERAFTER
Back to Agenda
2018 Safety Initiative
SR 28: Install combination storm sewer pipe and tie into existing inlet to eliminate water on right side or heading south up three lanes. Estimated completion date: May 2018
BEFORE
Back to Agenda
Sealcoat
2018 Planned: 432,000 gallons100 miles of Roadway
2017 Completed: 326,204 gallons85 miles of Roadway
Back to Agenda
Crack Sealing
2018 Planned: 40 miles
2017 Completed: 61 miles
Back to Agenda
Department Force Bridge Replaced in 2017
2017 Jefferson County DFB
SR 3031 in Oliver Township, Segment 0060/Offset 2241
River Road over Sandy Creek
BEFORE AFTER
Back to Agenda
Department Force Bridge
Nye Run Bridge- 2018 Jefferson County DFBSR 3001 Dora Road- Porter Township
Segment 10/Offset 3281 to Segment 20/Offset 108
Back to Agenda
Planned for Replacement in 2018
New Ideas
Asphalt Float-Skid Steer Attachment Easier to use than the widener in isolated areas
Designed to lay asphalt or other materials for paving or widen existing roadways
Easier than using hand tools to level material which greatly increases production
More cost effective then using larger equipment for smaller jobs
Click on the photo below and >play button to play short video
Back to Agenda
AGILITY
2018 Cooperatives
• Union Township
– Work plan in negotiations.
• Young Township
– Negotiating future work plans.
• Rose Township
– Painting lines in exchange for cleaning inlets
• PSP – Punxsutawney Barracks
– Winter services exchanged for traffic control on I-80 for paint operations
• Oliver Township
– Negotiating future work plans.
Back to Agenda
Innovation & Improvements
BUTLER VO-TECH, JUDGE’S PICK
Keystone Area (Clarion) Facebook Fan Favorite
Back to Agenda
Innovation & Improvement
ALL ABOUT
SAFETY• Slower Speeds• 90% Reduction in Fatal
Crashes• 75% Reduction in Injury
Crashes• 30-40% Reduction in
Pedestrian Crashes• 10% Reduction in
Bicycle Crashes
CAPACITY• Reduces Delays• 30% Increase in Vehicle
Accommodation
• Increased Traffic Flow
• Click HERE for Roundabout Video
Back to Agenda
Upcoming Programs
• Rural Commercial Routes Program
– Low volume route improvements
– Pavement treatments
• Recycled asphalt
• Flexible base
• Warm mix asphalt with higher recycled asphalt percentage
• Municipal Bridge Improvement Program
– Component of Road MaP
– Bundling for cost savings
– Partnering with local government agencies
Back to Agenda
Resources – Customer Care Center
www.penndot.gov
Back to Agenda
Resources - Alerts
• Incidents
• Construction
• Winter road conditions
• Weather forecasts
• Weather alerts
• Plow truck locations
• Zoom to your region
Back to Agenda
Resources – Customer Surveys
www.penndot.govRegional Offices, D10
Customer Service Surveys
Winter Survey – live during the winter
storm season.
Construction Survey – live between mid-
November and the end of December.
Back to Agenda