DISTRIBUTION GENERATION
PROJECTS IN RIHAND REGION
ENGINEERING
Knowledge Management System
ELECTRICAL ENGG.
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 2/27
Distributed Generation
Projects
inRihand Region
B.K.Sinha
NTPC Limited, Rihand
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 3/27
10 KVAPower Conditioning Unit (PCU)
193 houses + 37 street lights +Commercial load (BatteryCharging + Irrigation Pump)
Area covered & Electrified (Actual)
233 houses + 30 street lights +commercial load as per DPR
Area to be Covered & Electrified
1 + 1 dayBack up for no sun shine period
5.5 Kms. against proposed 2.0
Kms.
Length of Distribution Network
120 V / 600 AHBattery
11.9 KwCapacity
Approx. 14 KmsDistance from Main plant
Jarha-Chetwa VillageLocation
SPV Project At Village Jarha-Chetwa
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 4/27
Tarriff / Service Charge for various application
Initial Charges : Rs. 500 per house in 4 instalments
First Instalment before connection : Rs. 250 per house
Rs. 10-15 / per chargingBattery charging
Rs. 20/- per hourIrrigation Pump
Rs. NilStreet lightsRs. 30 / point / monthDomestic Lighting
Tarrif / Service ChargeEnergy Service
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 5/27
22.02.2005VEC Registration
22.12.2004Certificate Issued by RESPO
24.11.2004Land Finalisation
16.10.2004First Gram Sabha Held
05.06.2005Charging of All the Feeders
30.05.2005Commissioning of system with Battery & PCU
28.03.2005Test Lighting with PV Modules only
25.09.2004Award of Contract to BHEL
15.07.2004Award of Contract to TERI as PIA
03.06.2004Letter for Implementation of DG Project at JarhaChetwa
Dates of Important Activities
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 6/27
L
Pothipather
86/ 69/ 62
Hadwadia
63 / 10 / 5
Khamarbahra46 / 40 / 28
Harijan Basti98 /33/10
Ambadand92 /41 /32
Biyar Basti59
Bardand70
From Rihand
To Mahuli
Hamlets of Jarha-Chetwa
L – Plant Location 1/2/3 - FeedersX / Y / Z – Total / houses Covered by Net work /Connected To Feeders
1
23
500 M 1200 M
1200 M
200 M500 M
500 M
Chetwa More
25
200 M
To Murdhawa
17
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 7/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 8/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 9/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 10/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 11/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 12/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 13/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 14/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 15/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 16/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 17/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 18/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 19/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 20/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 21/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 22/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 23/27
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 24/27
Important Parameters For Sustainability of DGProject
1. Effective Social Engineering
2. Proper coordination
3. Capacity Building of villagers to own the project
4. Capacity Building of VEC to manage the Project
5. Maintenance
6. Income Generation Schemes
7. Revenue Collection
8. Transparency
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 25/27
480
160
183
250
No of
houses tobebenefited
60
25
20
18
Distance
fromRhSTPP
100
25
30
40
Capacity
(Kw)
69.65Supachua
39.18Piprahar
39.77Mahuli
50.62Biyar Basti
Estimated
ProjectCost (Rs inlacs)
Village
Biomass Projects in Rihand Region
7/31/2019 Dist Generation
http://slidepdf.com/reader/full/dist-generation 26/27
Critical Points for Biomass DG Projects
1. Vendors for social Engineering
2. Vendors for Main Equipment
3. Specification
4. Sharing of Information related with Bio mass