Diff btw waterfall model and spiral model
Waterfall model spiral model
In this, the customer is not involved In this, the customer is involved in the s/w dvlpmnt
from the word go.
When the development process shifts to the next
stage, there is no going back.
Since there are different iterations, it is rather
easier to change the design and make the s/w
feasible.
Waterfall allows no such scope. Here, one can revisit the diff phases of s/w dvlpmnt
as mny tyms as poss.
Has sequential progression, with clear
documentation of the entire process.
Has complex model.
Least flexible model. The most flexible model.
It is document driven. Does not require document.In Waterfall model each step is distinct. In spiral model we dont define everything in detail
at very beginning.
The output is not known unless all stages are over. The final output is known from the beginning.
s/w developer knows the actual problem. s/w developer does not know the problem.
Has five main phases namely; requirement, design,
implementation, verification and maintenance.
Has four main stages which are objectives, identity,
dvlpmnt and planning.