details of dpwh’s programs/projects 695
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
15. Region XII (Including Maguindanao) 80,000,000
16. Region XIII 80,000,000
17. Central Office 400,000,000
18. Regionwide/Nationwide 4,367,031,000
a. Roads 2,213,531,000
1. National Road Traffic Survey Program (NRTSP) 122,000,000
a. Automated Traffic Data Collection Program 118,000,000
1. Cordillera Administrative Region 6,300,0002. Region I 10,500,0003. Region II 6,800,0004. Region III 10,700,0005. Region IV-A 11,700,0006. Region IV-B 5,100,0007. Region V 8,800,0008. Region VI 11,300,0009. Region VII 7,400,00010. Region VIII 8,100,00011. Region IX 5,200,00012. Region X 9,100,00013. Region XI 5,900,00014. Region XII 4,900,00015. Region XIII 6,200,000
b. Central Office 4,000,000
2. 202,000,000
a. Road Inventory Surveys, Special Surveys and Technology Enhancement 87,000,000
1. National Capital Region 4,100,0002. Region I 4,400,0003. Cordillera Administrative Region 4,800,0004. Region II 4,900,0005. Region III 6,200,0006. Region IV-A 6,800,0007. Region IV-B 4,300,0008. Region V 6,500,0009. Region VI 6,900,00010. Region VII 6,400,00011. Region VIII 6,100,00012. Region IX 4,200,00013. Region X 5,400,00014. Region XI 4,000,00015. Region XII 3,900,00016. Region XIII 4,100,00017. Central Office 4,000,000
b. Visual Road Condition Assessment Program 70,000,000
c. National Road Roughness Index Program 45,000,000
3. Pavement Management System (PMS) Calibration, Assessment, and Validation Program 20,355,000
a. National Capital Region 688,000b. Region I 688,000c. Cordillera Administrative Region 688,000d. Region II 1,238,000e. Region III 1,238,000f. Region IV-A 825,000g. Region IV-B 1,238,000h. Region V 1,238,000i. Region VI 1,238,000j. Region VII 825,000k. Region VIII 825,000l. Region IX 1,238,000m. Region X 1,238,000n. Region XI 550,000o. Region XII 550,000p. Region XIII 550,000q. Central Office 5,500,000
4. Bridge Management System (BMS) Assessment and Validation Program 47,000,000
a. National Capital Region 2,281,000b. Region I 3,098,000c. Cordillera Administrative Region 1,677,000d. Region II 2,645,000e. Region III 3,735,000f. Region IV-A 2,810,000g. Region IV-B 2,829,000h. Region V 2,863,000i. Region VI 3,737,000j. Region VII 2,746,000k. Region VIII 4,206,000l. Region IX 1,542,000m. Region X 2,072,000n. Region XI 1,561,000o. Region XII 1,539,000p. Region XIII 2,159,000q. Central Office 5,500,000
5. Multi Year Programming Scheduling (MYPS) Project 20,000,000
Road Condition and Inventory Surveys, Roughness Surveys and Technology Enhancement for RBIA
Page 3 of 5
696 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
6. Results Monitoring and Evaluation System including Travel Time Survey Program 10,650,000
a. Results Monitoring and Evaluation System 7,650,000
1. National Capital Region 450,0002. Region I 450,0003. Cordillera Administrative Region 450,0004. Region II 450,0005. Region III 450,0006. Region IV-A 450,0007. Region IV-B 450,0008. Region V 450,0009. Region VI 450,00010. Region VII 450,00011. Region VIII 450,00012. Region IX 450,00013. Region X 450,00014. Region XI 450,00015. Region XII 450,00016. Region XIII 450,00017. Central Office 450,000
b. Travel Time Survey Program 3,000,000
7. 375,000,000
a. National Capital Region 10,250,000b. Region II 50,500,000c. Region III 25,500,000d. Region V 32,500,000e. Region VI 32,250,000f. Region VII 50,250,000g. Region VIII 32,500,000h. Region X 32,500,000i. Region XI 500,000j. Region XII 32,500,000k. Region XIII 70,250,000l. Central Office 5,500,000
8. Preliminary and Detailed Engineering for Roads Projects in the MTPIP 630,000,000
a. 100,000,000
b. Feasibility Study of By-Passes/Diversion Roads 100,000,000
c. Feasibility Study of Flyovers, Interchanges, Underpasses, other National Roads 200,000,000
d. Preliminary and Detailed Engineering Design for National Road Projects 230,000,000
9. 100,000,000
10. 100,000,000
11. Preliminary and Detailed Engineering for National Bridge Construction/Replacement Program 100,000,000
12. Preliminary and Detailed Engineering for Mindanao Logistics Infrastructure Network (MLIN) 100,000,000
13. Project Development and Engineering Services for Autonomous Region in Muslim Mindanao 100,000,000
14. 286,526,000
b. Flood Control 1,216,000,000
1. Feasibility Study for Major/Principal River Basins 510,000,000
2. Feasibility Study of Flood Control and Drainage Management in Urban Centers 300,000,000
3. 6,000,000
4. Detailed Engineering Design for Flood Mitigation Structures 400,000,000
c. Others 937,500,000
1. Research on Construction Materials 100,000,000
3. Feasibility Studies of National Septage & Sewerage Management Program 10,000,000
4. Environmental Impact Assessment (EIA) and Social Safeguards Training Program 2,500,000
5. National Septage & Sewerage Management Program 2,000,000
6. Gender and Development (GAD) Integration Framework in Road Infrastructure Sector 30,000,000
7. 350,000,000
a. National Capital Region 20,000,000b. Region I 20,000,000c. Cordillera Administrative Region 20,000,000d. Region II 20,000,000e. Region III 20,000,000f. Region IV-A 20,000,000g. Region IV-B 20,000,000h. Region V 20,000,000
Sustainability Program on Road Maintenance and Bridge Maintenance after Completion of TCP-II
Feasibility Study/Business Case Study for Potential Private-Public-Partnership (PPP) Projects and other High Standard Highways
Preliminary and Detailed Engineering for Access Road Projects leading to Airports, Seaports, and Declared Tourism Destinations
Preliminary and Detailed Engineering for Road Opening Projects including Newly Converted Roads
Consultancy Services for Construction Supervision for National Bridge Construction/Replacement Program (Design & Build)
Road Slope Management and Implementation of Pilot Projects (RSMS) - Conduct of Inventory and Validation of Road Slope Management
Parcellary Surveys, Geo-Tagging and Land Titling of National Roads, Bridges, and Other Infrastructures
Page 4 of 5
details of dpwh’s programs/projects 697
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
i. Region VI 20,000,000j. Region VII 20,000,000k. Region VIII 20,000,000l. Region IX 20,000,000m. Region X 20,000,000n. Region XI 20,000,000o. Region XII 20,000,000p. Region XIII 20,000,000q. Central Office 30,000,000
8. Detailed Engineering Design of Various DPWH Infrastructure Projects 150,000,000
9. 293,000,000
b. Payments of Right-of-Way (ROW) 10,900,000,000
1. Various Projects, Nationwide 8,000,000,0002. 2,500,000,000
3. Payment of Utility Relocation including Electric Cooperatives, MERALCO, and Others 400,000,000
c. Payments of Contractual Obligations, VAT and Other Taxes 285,000,000
Various Projects, Nationwide - Projects with Private Sector participation (Includes Mindanao Avenue to NLEX) Commonwealth Avenue to NLEX - Pres. Garcia Avenue (CP Garcia to Letre) Segment 9 and 10 (NLEX to Letre), including Harbor Link Project
Quality Assurance for Civil Works including Capability Improvement for Safety, Quality Assurance, Research and Standards
Page 5 of 5
698 eXpeNditUre program fY 2016 VolUme ii
3. Operations 246,064,542,000.00
a. MFO 1 : NATIONAL ROAD NETWORK SERVICES 160,992,631,000.00
1. Asset Preservation of National Roads 32,889,879,000.00
A. Preventive Maintenance based on Pavement Management System/ Highway 5,083,052,000.00 Development and Management-4 (HDM-4) (Intermittent Sections)
1. Primary Roads 1,790,370,000.00
I. Central Office 10,000,000.00
a. Nationwide 10,000,000.001. Central Office 10,000,000.00
a. NATIONWIDE 10,000,000.001. Preventive Maintenance - Primary Roads 10,000,000.00
II. Regional Office 1,780,370,000.00
a. National Capital Region 95,598,000.001. Metro Manila 1st DEO 29,082,000.00
a a. MANDALUYONG CITY (LONE DISTRICT) 4,822,000.001. Ortigas Ave - 4,822,000.00
Chainage 358 - Chainage 652 4,822,000.00
b b. PASIG CITY (LONE DISTRICT) 16,257,000.001. Ortigas Ave - 16,257,000.00
K0013+1046-K0014+469 16,257,000.00
c c. SAN JUAN CITY (LONE DISTRICT) 8,003,000.001. Ortigas Ave - 8,003,000.00
Chainage 2124 - Chainage 2612 8,003,000.00
2. Metro Manila 3rd DEO 62,275,000.00a a. VALENZUELA CITY (FIRST DISTRICT) 30,310,000.00
1. MacArthur H-way - 30,310,000.00K0013+441-K0013+925, K0014+432-K0014+785, K0015+0-K0015+878, K0017+111-K0017+388,
b b. VALENZUELA CITY (SECOND DISTRICT) 31,965,000.001. MacArthur H-way - 31,965,000.00
K0013+-137-K0013+193, K0013+-1835-K0013+-987, K0013+-1984-K0013+-1835, K0013+-2284-K0013+-1984, K0013+-987-K0013+-694,
-
3. Quezon City 1st DEO 4,241,000.00a a. QUEZON CITY (FIRST DISTRICT) 4,241,000.00
1. Cloverleaf - 4,241,000.00Chainage 0 - Chainage 211 4,241,000.00
b. Region I 73,166,000.001. Ilocos Sur 1st DEO 28,959,000.00
a a. ILOCOS SUR (FIRST DISTRICT) 28,959,000.001. Manila North Rd - 28,959,000.00
K0414+000-K0416+000, K0404+0-K0404+473, 21,200,000.00
2. Pangasinan 3rd DEO 18,138,000.00a a. PANGASINAN (SIXTH DISTRICT) 18,138,000.00
1. Pangasinan-Nueva Vizcaya Rd - 18,138,000.00K0173+851-K0174+373, K0174+404-K0175+000, 8,511,000.00
9,627,000.00
3. Pangasinan 4th DEO 26,069,000.00a a. PANGASINAN (THIRD DISTRICT) 26,069,000.00
1. Urdaneta Jct-Dagupan Rd - 26,069,000.00Kennon Rd -
c. Region II 161,625,000.001. Isabela 1st DEO 27,000,000.00
a a. ISABELA (FIRST DISTRICT) 27,000,000.001. Daang Maharlika (LZ) - 27,000,000.00
K0396+1425-K0396+1605, K0406+342-K0407+216, K0410+000-K0410+600,
2,949,000.00
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
details of dpwh’s programs/projects 699
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
2. Isabela 2nd DEO 23,848,000.00a a. ISABELA (SECOND DISTRICT) 23,848,000.00
1. Santiago-Tuguegarao Rd - 14,105,000.00K0396+484-K0397+000, K0406+876-K0407+56, K0407+56-K0407+456, K0408+0-K0408+598,
4,240,000.00
2. Daang Maharlika (LZ) - 9,743,000.00K0387+000-K0387+749, 5,692,000.00
4,051,000.003. Isabela 4th DEO 26,952,000.00
a a. ISABELA (FOURTH DISTRICT) 26,952,000.001. Daang Maharlika (LZ) - 26,952,000.00
K0309+-915-K0309+-614, K0316+949-K0318+131, 22,010,000.004,942,000.00
4. Nueva Vizcaya 1st DEO 40,386,000.00a a. NUEVA VIZCAYA (LONE DISTRICT) 40,386,000.00
1. Daang Maharlika (LZ) - 40,386,000.00K0242+-645-K0242+0, K0253+753-K0254+0, K0259+0-K0259+510, K0260+-488-K0260+51, K0292+487-K0292+710, K0293+236-K0293+363, K0293+363-K0293+375, K0294+676-K0295+297, K0295+297-K0295+953, K0295+297-K0296+0, K0301+-10-K0301+000, K0301+636-K0302+0, K0301+-65-K0301+-10, K0303+0-K0303+645,
-
5. Nueva Vizcaya 2nd DEO 43,439,000.00a a. NUEVA VIZCAYA (LONE DISTRICT) 43,439,000.00
1. Daang Maharlika (LZ) - 43,439,000.00K0209+-896-K0209+0, K0212+0-K0213+0, K0213+0-K0213+500, K0213+500-K0214+0, K0215+400-K0215+700, K0218+942-K0219+429, K0237+908-K0238+903,
d. Region III 141,023,000.001. Bataan 1st DEO 16,918,000.00
a a. BATAAN (FIRST DISTRICT) 16,918,000.001. Gapan-Sn Fernando-Olongapo Rd - 16,918,000.00
K0111+767-K0112+333, K0117+0-K0117+708, 11,537,000.005,381,000.00
2. Bulacan 1st DEO 20,844,000.00a a. BULACAN (SECOND DISTRICT) 20,844,000.00
1. Daang Maharlika (LZ) - 20,844,000.00K0037+0-K0038+42 20,844,000.00
3. Bulacan 2nd DEO 20,000,000.00a a. BULACAN (FOURTH DISTRICT) 20,000,000.00
1. Manila North Rd - 20,000,000.00K0018+-636-K0018+-297, K0019+000-K0019+366, K0020+1059-K0021+046,
-
4. Nueva Ecija 1st DEO 24,469,000.00a a. NUEVA ECIJA (SECOND DISTRICT) 24,469,000.00
1. Sn Jose-Lupao Rd - 24,469,000.00K0160+-827-K0160+-327, K0165+000-K0166+000, 8,200,000.00
5. Nueva Ecija 2nd DEO 6,074,000.00a a. NUEVA ECIJA (FOURTH DISTRICT) 6,074,000.00
1. Daang Maharlika (LZ) - 6,074,000.00K0100+547-K0101+119 6,074,000.00
6. Pampanga 1st DEO 18,801,000.00a a. PAMPANGA (THIRD DISTRICT) 18,801,000.00
1. Gapan-Sn Fernando-Olongapo Rd - 18,801,000.00K0071+83-K0072+000, K0073+868-K0074+804,
7. Pampanga 3rd DEO 5,618,000.00a a. PAMPANGA (FIRST DISTRICT) 5,618,000.00
1. Manila North Rd - 5,618,000.00K0087+501-K0088+0 5,618,000.00
8. Tarlac 1st DEO 8,500,000.00a a. TARLAC (SECOND DISTRICT) 8,500,000.00
1. Romulo H-way - 8,500,000.00K0133+216-K0134+334, K0135+0-K0136+0, 8,500,000.00
9. Zambales 2nd DEO 19,799,000.00a a. ZAMBALES (FIRST DISTRICT) 19,799,000.00
1. Gapan-Sn Fernando-Olongapo Rd - 19,799,000.00K0118+-250-K0118+000, K0118+000-K0118+735, 14,774,000.00
e. Region IV-A 187,278,000.001. Batangas 2nd DEO 11,204,000.00
a a. BATANGAS (SECOND DISTRICT) 11,204,000.001. Manila-Batangas Rd - 11,204,000.00
K0101+000-K0102+049 11,204,000.00
700 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
2. Batangas 3rd DEO 42,276,000.00a a. BATANGAS (THIRD DISTRICT) 42,276,000.00
1. Daang Maharlika (LZ) - 19,387,000.00K0058+92-K0059+-134, K0059+-134-K0059+383, K0060+144-K0060+567,
9,423,000.00
2. Manila-Batangas Rd - 22,889,000.00K0061+716-K0062+436, K0062+436-K0063+0, K0065+856-K0066+115,
-
3. Cavite DEO 16,869,000.00a a. CAVITE (FIRST DISTRICT) 8,162,000.00
1. Manila-Cavite (NCR Bdry-Jct Cavite City Sect) - 6,010,000.00K0021+10-K0021+577
2. Noveleta-Rosario Div Rd - 2,152,000.00K0027+100-K0027+303 2,152,000.00
b b. CAVITE (FOURTH DISTRICT) 5,500,000.001. Dasmariñas-Carmona Rd - 5,500,000.00
K0038+937-K0039+452 5,500,000.00c c. CAVITE (FIFTH DISTRICT) 3,207,000.00
1. Dasmariñas-Carmona Rd - 3,207,000.00K0036+550-K0037+111 3,207,000.00
4. Laguna 2nd DEO 108,915,000.00a a. LAGUNA (FIRST DISTRICT) 92,581,000.00
1. Manila South Rd - 92,581,000.00K0036+550-K0040+968 92,581,000.00
b b. LAGUNA (SECOND DISTRICT) 16,334,000.001. Daang Maharlika (LZ) - 16,334,000.00
K0053+231-K0054+000 16,334,000.005. Quezon 4th DEO 2,067,000.00
a a. QUEZON (FOURTH DISTRICT) 2,067,000.001. Quirino H-way - 2,067,000.00
K0279+728-K0279+1000 2,067,000.006. Rizal 1st DEO 5,947,000.00
a a. ANTIPOLO CITY (FIRST DISTRICT) 5,947,000.001. Sumulong Highway - 5,947,000.00
K0026+000-K0026+561 5,947,000.00
f. Region V 70,969,000.001. Albay 2nd DEO 27,310,000.00
a a. ALBAY (SECOND DISTRICT) 27,310,000.001. Daang Maharlika (LZ) - 27,310,000.00
K0529+000-K0529+318, K0530+000-K0530+346, K0530+346-K0530+759, K0532+000-K0532+880, K0533+000-K0533+619,
3,371,000.00
2. Camarines Norte DEO 33,377,000.00a a. CAMARINES NORTE (SECOND DISTRICT) 33,377,000.00
1. Daang Maharlika (LZ) - 33,377,000.00K0364+0-K0364+482, K0364+482-K0364+563, K0364+632-K0365+0, K0366+406-K0367+0, K0367+0-K0367+704, K0367+723-K0368+0, K0368+0-K0368+659,
-
3. Camarines Sur 5th DEO 8,003,000.00a a. CAMARINES SUR (FIRST DISTRICT) 8,003,000.00
1. Rolando A Andaya Highway - 8,003,000.00K0295+54-K0295+542 8,003,000.00
4. Sorsogon 1st DEO 2,279,000.00a a. SORSOGON (FIRST DISTRICT) 2,279,000.00
1. Daang Maharlika (LZ) - 2,279,000.00K0556+853-K0557+065 2,279,000.00
g. Region VI 146,594,000.001. Capiz 1st DEO 17,038,000.00
a a. CAPIZ (FIRST DISTRICT) 17,038,000.001. Iloilo-Capiz Rd (New Route) - 17,038,000.00
K0107+700-K0108+000, K0112+304-K0113+225 10,000,000.002. Iloilo 2nd DEO 14,090,000.00
a a. ILOILO (FOURTH DISTRICT) 14,090,000.001. Iloilo-Capiz (New Route) - 14,090,000.00
K0048+565-K0049+259 14,090,000.003. Negros Occidental 1st DEO 68,505,000.00
a a. NEGROS OCCIDENTAL (FIRST DISTRICT) 39,381,000.001. Bacolod North Rd - 39,381,000.00
K0121+000-K0121+967, K0156+263-K0156+965, K0156+965-K0157+500,
19,437,000.00
b b. NEGROS OCCIDENTAL (THIRD DISTRICT) 29,124,000.001. Bacolod North Rd - 29,124,000.00
K0035+442-K0036+000, K0016+900-K0017+539, K0017+681-K0018+200, K0036+0-K0036+902,
11,437,000.00
details of dpwh’s programs/projects 701
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
4. Negros Occidental 2nd DEO 26,801,000.00a a. NEGROS OCCIDENTAL (FIFTH DISTRICT) 26,801,000.00
1. Bacolod South Rd - 26,801,000.00K0046+-547-K0046+000, K0049+0-K0049+117, K0049+117-K0050+0, K0051+0-K0051+472, K0052+480-K0053+0, K0056+0-K0056+520, K0058+0-K0058+275,
5,005,000.00
5. Negros Occidental 3rd DEO 20,160,000.00a a. NEGROS OCCIDENTAL (SIXTH DISTRICT) 20,160,000.00
1. Kabankalan-Bais Rd - 20,160,000.00K0089+000-K0090+000 20,160,000.00
h. Region VII 117,333,000.001. Cebu 3rd DEO 40,774,000.00
a a. CEBU (THIRD DISTRICT) 40,774,000.001. Cebu-Toledo Wharf Rd (Uling-Toledo Wharf) - 40,774,000.00
K0053+026-K0053+965, K0054+0-K0055+97, -2. Cebu 5th DEO 41,838,000.00
a a. CEBU (FIFTH DISTRICT) 41,838,000.001. Cebu North Hagnaya Wharf Rd - 41,838,000.00
K0015+-142-K0015+-53, K0020+0-K0020+816, K0023+555-K0023+865, K0024+794-K0025+0, K0026+0-K0026+231, K0026+231-K0026+662,
1,789,000.00
3. Cebu 6th DEO 11,216,000.00a a. CEBU (SIXTH DISTRICT) 11,216,000.00
1. Cebu North Hagnaya Wharf Rd - 11,216,000.00Chainage 193 - Chainage 751 11,216,000.00
4. Cebu City DEO 2,894,000.00a a. CEBU CITY (FIRST DISTRICT) 2,894,000.00
1. Fuente Osmeña Rd - 2,894,000.00Chainage 0 - Chainage 144 2,894,000.00
5. Negros Oriental 2nd DEO 10,838,000.00a a. NEGROS ORIENTAL (SECOND DISTRICT) 10,838,000.00
1. Dumaguete South Rd - 3,831,000.00K0000+502-K0000+1006 3,831,000.00
1. Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) - 7,007,000.00K0036+20-K0037+000 7,007,000.00
6. Negros Oriental 3rd DEO 9,773,000.00a a. NEGROS ORIENTAL (THIRD DISTRICT) 9,773,000.00
1. Dumaguete South Rd - 9,773,000.00K0048+000-K0048+590, K0064+550-K0065+051, 5,289,000.00
i. Region VIII 236,074,000.001. Leyte 4th DEO 15,147,000.00
a a. LEYTE (FOURTH DISTRICT) 15,147,000.001. Palo-Carigara-Ormoc Rd - 15,147,000.00
K0991+661-K0992+000, K0995+0-K0995+824, 2,789,000.002. Leyte 5th DEO 150,000,000.00
a a. LEYTE (FIFTH DISTRICT) 150,000,000.001. Daang Maharlika (LT) -
K0959+-205-K0977+000 150,000,000.00
3. Samar 1st DEO 33,833,000.00a a. SAMAR (FIRST DISTRICT) 33,833,000.00
1. Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - 33,833,000.00K0731+420-K0732+000, K0771+0-K0771+521, K0772+0-K0772+170, K0778+0-K0779+0, K0779+0-K0779+904,
6,190,000.00
4. Samar 2nd DEO 27,381,000.00a a. SAMAR (SECOND DISTRICT) 27,381,000.00
1. Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - 27,381,000.00K0819+000-K0819+1000, K0846+0-K0846+670, 16,400,000.00
1. Daang Maharlika (LT) -5. Tacloban City DEO 9,713,000.00
a a. LEYTE (FIRST DISTRICT) 9,713,000.001. Daang Maharlika (LT) - 9,713,000.00
K0901+211-K0902+146, K0902+708-K0903+000, 7,418,000.002,295,000.00
j. Region IX 74,945,000.001. Zamboanga del Norte 2nd DEO 16,285,000.00
a a. ZAMBOANGA DEL NORTE (THIRD DISTRICT) 16,285,000.001. Liloy-Ipil Rd - 16,285,000.00
K1981+000-K1982+000 16,285,000.00
2. Zamboanga del Norte 3rd DEO 3,876,000.00a a. ZAMBOANGA DEL NORTE (FIRST DISTRICT) 3,876,000.00
1. Dipolog-Punta-Dansullan-S Osmeña-Zambo N/Sur Bdry - 3,876,000.00K1893+265-K1893+775 3,876,000.00
702 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
3. Zamboanga del Sur 1st DEO 29,505,000.00a a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 29,505,000.00
Jct Aurora-Ozamis City Rd -1. Lanao-Pagadian-Zamboanga City Rd - 29,505,000.00
K1648+000-K1649+000, K1653+143-K1655+000, 8,681,000.0020,824,000.00
4. Zamboanga del Sur 2nd DEO 10,409,000.00a a. ZAMBOANGA DEL SUR (SECOND DISTRICT) 10,409,000.00
1. Pagadian City-Zamboanga City Rd - 10,409,000.00K1676+774-K1677+432, K1677+432-K1677+840, 6,084,000.00
4,325,000.005. Zamboanga Sibugay 1st DEO 8,671,000.00
a a. ZAMBOANGA SIBUGAY (FIRST DISTRICT) 8,671,000.001. Lanao-Pagadian-Zamboanga City Rd - 8,671,000.00
K1724+647-K1725+031, K1726+000-K1726+309, 5,396,000.003,275,000.00
6. Zamboanga Sibugay 2nd DEO 6,199,000.00a a. ZAMBOANGA SIBUGAY (SECOND DISTRICT) 6,199,000.00
1. Ipil-Liloy-Sindangan Rd - 6,199,000.00K2013+000-K2013+378 6,199,000.00
k. Region X 266,755,000.001. Bukidnon 1st DEO 14,691,000.00
a a. BUKIDNON (SECOND DISTRICT) 14,691,000.001. Sayre Highway - 14,691,000.00
K1490+122-K1491+015, K1493+821-K1494+873 6,817,000.00
3,937,000.002. Bukidnon 2nd DEO 24,427,000.00
a a. BUKIDNON (THIRD DISTRICT) 24,427,000.001. Sayre Highway - 13,508,000.00
K1554+603-K1554+804, K1554+804-K1555+272, K1557+0-K1557+509, K1557+509-K1558+30,
-
2. Bukidnon-Davao City Rd - 10,919,000.00K1581+702-K1582+000, K1587+714-K1588+0, K1596+863-K1597+50, K1604+648-K1604+916,
3,106,000.00
3. Bukidnon 3rd DEO 31,986,000.00a a. BUKIDNON (FIRST DISTRICT) 31,986,000.00
1. Sayre Highway - 31,986,000.00K1474+430-K1474+1013, K1445+190-K1446+0, K1445+73-K1445+190, K1468+572-K1469+48, K1469+48-K1469+552, K1469+552-K1470+0, K1470+530-K1471+27,
-
4. Lanao del Norte 1st DEO 46,814,000.00a a. LANAO DEL NORTE (FIRST DISTRICT) 13,984,000.00
1. Iligan City-Marawi City Rd - 13,984,000.00K1549+000-K1549+842, K1552+0-K1553+0, 6,399,000.00
b b. LANAO DEL NORTE (SECOND DISTRICT) 32,830,000.001. Linamon-Zamboanga Rd - 32,830,000.00
K1613+000-K1614+000, K1615+306-K1616+0, K1618+0-K1619+0, K1619+0-K1620+0, K1620+0-K1620+349,
9,758,000.00
5. Lanao del Norte 2nd DEO 46,623,000.00a a. ILIGAN CITY (LONE DISTRICT) 10,707,000.00
1. Misamis Oriental-Ma Cristina Bdry Rd - 10,707,000.00K1515+000-K1515+099, K1516+801-K1517+0, K1528+510-K1529+362, K1531+56-K1531+173, K1532+-841-K1532+-782,
1,919,000.00
b b. LANAO DEL NORTE (FIRST DISTRICT) 35,916,000.001. Linamon-Zamboanga Rd - 35,916,000.00
K1570+99-K1570+265, K1585+967-K1586+920, K1588+137-K1589+0, K1590+69-K1590+872, K1590+872-K1591+415, K1592+0-K1593+0,
3,412,000.00
6. Misamis Occidental 2nd DEO 33,910,000.00a a. MISAMIS OCCIDENTAL (SECOND DISTRICT) 33,910,000.00
1. Ozamis-Pagadian Rd - 10,229,000.00K1699+143-K1699+950, K1699+950-K1700+493, 6,133,000.00
2. Ozamis-Oroquieta Rd - 23,681,000.00K1702+907-K1703+447, K1701+0-K1701+675, K1714+0-K1714+839, K1715+391-K1715+764,
5,703,000.00
7. Misamis Oriental 1st DEO 33,503,000.00a a. MISAMIS ORIENTAL (FIRST DISTRICT) 33,503,000.00
1. Butuan City-Cagayan de Oro City-Iligan City Rd - 33,503,000.00
details of dpwh’s programs/projects 703
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
K1329+-1589-K1329+-1200, K1367+500-K1368+41, K1368+41-K1369+0, K1380+223-K1380+709, K1380+709-K1381+300, K1397+0-K1397+718, K1397+718-K1398+298,
4,120,000.00
704 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
8. Misamis Oriental 2nd DEO 34,801,000.00a a. MISAMIS ORIENTAL (SECOND DISTRICT) 34,801,000.00
1. Butuan City-Cagayan de Oro City-Iligan City Rd - 34,801,000.00K1404+0-K1404+889, K1410+0-K1411+0, K1448+451-K1449+0, K1493+970-K1494+477, K1494+49-K1494+477, K1497+486-K1498+0, K1504+0-K1504+720,
-
l. Region XI 60,164,000.001. Compostela Valley DEO 16,388,000.00
a a. COMPOSTELA VALLEY (FIRST DISTRICT) 16,388,000.001. Daang Maharlika (MN) - 16,388,000.00
K1379+912-K1380+000, K1380+0-K1380+372, K1380+488-K1380+688, K1381+635-K1381+804, K1381+804-K1381+984, K1382+84-K1382+600,
1,156,000.00
2. Davao City 2nd DEO 3,869,000.00a a. DAVAO CITY (THIRD DISTRICT) 3,869,000.00
1. Davao-Cotabato Rd (Davao City-Jct Digos Sect) - 3,869,000.00K1531+570-K1531+740, K1531+800-K1532+0, 1,802,000.00
3. Davao del Sur 1st DEO 33,903,000.00a a. DAVAO DEL SUR (LONE DISTRICT) 33,903,000.00
1. Davao-Cotabato Rd (Davao City-Jct Digos Sect) - 33,903,000.00K1534+-983-K1534+-381, K1539+0-K1539+802, K1542+657-K1542+705, K1542+705-K1542+883, K1544+526-K1545+0, K1554+294-K1555+0,
-
4. Davao del Sur 2nd DEO 6,004,000.00a a. DAVAO OCCIDENTAL (LONE DISTRICT) 6,004,000.00
1. Digos-Makar Rd - 6,004,000.00K1585+813-K1586+600 6,004,000.00
m. Region XII 29,113,000.001. Sarangani DEO 29,113,000.00
a a. SARANGANI (LONE DISTRICT) 29,113,000.001. Digos-Makar Rd - 29,113,000.00
K1605+698-K1606+245, K1606+245-K1606+389, K1623+397-K1624+0, K1624+0-K1624+151,
10,995,000.00
m. Region XIII 119,733,000.001. Agusan del Sur 2nd DEO 9,683,000.00
a a. AGUSAN DEL SUR (SECOND DISTRICT) 9,683,000.001. Daang Maharlika (Agusan-Davao Sect) - 9,683,000.00
K1317+555-K1318+056, K1376+123-K1376+896, 3,808,000.00
5,875,000.002. Butuan City DEO 110,050,000.00
a a. AGUSAN DEL NORTE (FIRST DISTRICT) 110,050,000.001. Butuan-Cagayan de Oro-Iligan (Agusan-Misamis Or) - 110,050,000.00
K1233+225-K1233+323, K1233+980-K1235+000, K1235+000-K1238+343, K1246+905-K1247+000, K1247+944-K1249+461,
1,470,000.00
details of dpwh’s programs/projects 705
2. Secondary Roads 1,941,027,000.00
I. Central Office 10,000,000.00
a. Nationwide 10,000,000.00 1 Central Office 10,000,000.00
a. NATIONWIDE 10,000,000.00 1. Preventive Maintenance - Secondary Roads 10,000,000.00
II. Regional Office 303,800,000.00
a. Region III 89,900,000.00 1 Bataan 2nd DEO 89,900 89,900,000.00
a. BATAAN (SECOND DISTRICT) 89,900 89,900,000.001. Roman Expressway - 89,900 89,900,000.00
K0119+-367-K0119+504, K0119+504-K0119+923, K0120+0-K0120+665, K0120+942-K0121+0, K0122+531-K0122+857, K0128+0-K0128+65, K0131+0-K0131+857, K0131+857-K0132+669, K0135+959-K0137+246, 14,284
21,998b. Region IV-A 0 64,777,000.00
1 Batangas 2nd DEO 64,777,000.00a. BATANGAS (SECOND DISTRICT) 64,777,000.00
1. Batangas-Tabangao-Lobo Rd - 64,777 64,777,000.00K0110+38-K0111+0, K0115+114-K0116+0, K0116+0-K0116+918, K0118+154-K0119+0, K0121+891-K0122+702, K0126+100-K0126+681, K0127+794-K0128+472, K0136+444-K0137+363, 0
c. Region IV-B 52,151,000.001 Mindoro Occidental DEO 52,151 52,151,000.00
a. MINDORO OCCIDENTAL (LONE DISTRICT) 52,151 52,151,000.001. Mindoro West Coastal Rd - 52,151 52,151,000.00
K0229+681-K0230+197, K0230+197-K0230+899, K0280+837-K0281+396, K0281+396-K0282+226, K0440+237-K0440+521, K0442+505-K0443+0, K0443+171-K0444+0, K0407+-364-K0407+259, 4,342
d. Region VI 96,972,000.002 Aklan DEO 96,972 96,972,000.00
a. AKLAN (LONE DISTRICT) 96,972 96,972,000.001. Aklan East Rd - 96,972 96,972,000.00
K0286+000-K0287+000, K0288+0-K0289+0, K0289+0-K0290+0, K0290+0-K0290+131, K0291+0-K0292+0, K0292+0-K0293+0, K0294+0-K0295+0, K0295+0-K0296+0, K0296+0-K0296+942, K0299+0-K0300+0, K0300+0-K0301+0, K0301+0-K0302+0, K0304+0-K0305+0, K0307+0-K0307+634,
7,714
III. District Engineering Office 1,627,227,000.00
a. National Capital Region 220,826 220,826,000.001 Metro Manila 1st DEO 24,864 24,864,000.00
a. MANDALUYONG CITY (LONE DISTRICT) 24,864 24,864,000.001. Shaw Blvd - 24,864 24,864,000.00
K0009+000-K0009+679, K0009+679-K0010+216, 13,6482 Metro Manila 2nd DEO 9,519 9,519,000.00
a. MAKATI CITY (FIRST DISTRICT) 6,544 6,544,000.001. Gil Puyat Ave - 6,544 6,544,000.00
Chainage 831 - Chainage 1230 6,544b. PARANAQUE CITY (FIRST DISTRICT) 2,975 2,975,000.00
1. Ninoy Aquino Ave - 2,975 2,975,000.00K0010+501-K0010+649 2,975
3 Metro Manila 3rd DEO 13,477 13,477,000.00a. KALOOKAN CITY (SECOND DISTRICT) 13,477 13,477,000.00
1. C-3 Road - 10,794 10,794,000.00K0011+-319-K0011+-152, K0011+-152-K0011+218,
7,437
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
706 eXpeNditUre program fY 2016 VolUme ii
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
2. Gen San Miguel St - 2,683 2,683,000.00K0011+-732-K0011+-381, K0011+028-K0011+30, 15
4 North Manila DEO 54,752 54,752,000.00a. MANILA CITY (FIRST DISTRICT) 20,020 20,020,000.00
1. R-10 - 20,020 20,020,000.00K0005+546-K0005+1007, K0006+090-K0006+625, 9,266
b. MANILA CITY (SECOND DISTRICT) 6,512 6,512,000.001. C-2 Road - 6,512 6,512,000.00
Chainage 0 - Chainage 324 6,512c. MANILA CITY (THIRD DISTRICT) 18,130 18,130,000.00
1. CM Recto - 9,045 9,045,000.00K0005+155-K0005+605 9,045
2. AH Lacson - 2,211 2,211,000.00K0009+422-K0009+532 2,211 2,211,000.00
3. Quezon Blvd (LZ) - 6,874 6,874,000.00Chainage 0 - Chainage 324 6,874
d. MANILA CITY (SIXTH DISTRICT) 10,090 10,090,000.001. Nagtahan Bridge Service Rd - 10,090 10,090,000.00
Chainage 0 - Chainage 502 10,0905 Quezon City 1st DEO 87,763 87,763,000.00
a. QUEZON CITY (FIRST DISTRICT) 28,964 28,964,000.001. A Bonifacio Ave - 7,023 7,023,000.00
K0006+153-K0007+000 7,0232. Mindanao Ave - 21,941 21,941,000.00
K0014+000-K0014+708, K0015+9-K0014+0, K0016+515-K0015+9, 5,381
b. QUEZON CITY (SECOND DISTRICT) 38,264 38,264,000.001. Commonwealth Ave - 38,264 38,264,000.00
K0018+000-K0019+000, K0019+0-K0019+809, K0019+809-K0020+382, K0019+0-K0018+0, 20,101
c. QUEZON CITY (SIXTH DISTRICT) 20,535 20,535,000.001. Mindanao Ave - 20,535 20,535,000.00
K0016+000-K0016+515, K0017+0-K0016+0, K0018+408-K0017+0, K0018+-92-K0018+408, K0017+0-K0017+604, 3,914
6 South Manila DEO 30,451 30,451,000.00a. MANILA CITY (FIFTH DISTRICT) 9,929 9,929,000.00
1. Sn Marcelino St - 9,929 9,929,000.00K0003+-417-K0003+077 9,929
b. PASAY CITY (LONE DISTRICT) 20,522 20,522,000.001. Andrew Ave - 20,522 20,522,000.00
K0008+-058-K0008+442, K0008+442-K0009+0, 10,472
b. Region I 175,901 175,901,000.001 Ilocos Sur 1st DEO 23,140 23,140,000.00
a. ILOCOS SUR (FIRST DISTRICT) 23,140 23,140,000.001. Salomague Port Rd - 23,140 23,140,000.00
K0433+-490-K0434+004 23,1402 La Union 2nd DEO 25,090 25,090,000.00
a. LA UNION (SECOND DISTRICT) 25,090 25,090,000.001. Agoo-Baguio City Rd - 21,645 21,645,000.00
K0244+510-K0246+000, K0247+0-K0247+560, 15,7092. Rosario-Pugo Access Rd - 3,445 3,445,000.00
Chainage 0 - Chainage 325 3,4453 Pangasinan 1st DEO 47,181 47,181,000.00
a. PANGASINAN (FIRST DISTRICT) 47,181 47,181,000.001. Pangasinan-Zambales Rd - 41,150 41,150,000.00
K0272+583-K0273+082K0296+0-K0297+0K0305+0-K0305+880K0313+837-K0314+364K0314+364-K0315+0K0338+1004-K0339+300
5,3012. Alaminos-Lucap Rd - 6,031 6,031,000.00
K0321+894-K0322+446, 6,0314 Pangasinan 2nd DEO 23,320 23,320,000.00
a. PANGASINAN (SECOND DISTRICT) 23,320 23,320,000.001. Pangasinan-Zambales Rd - 23,320 23,320,000.00
K0344+000-K0345+456, K0345+456-K0346+195, 15,4125 Pangasinan 3rd DEO 42,680 42,680,000.00
a. PANGASINAN (FIFTH DISTRICT) 42,680 42,680,000.001. Villasis-Malasiqui-Sn Carlos Rd - 26,493 26,493,000.00
K0174+461-K0175+000, K0177+0-K0178+0, K0179+0-K0180+0, K0180+0-K0180+926, 4,165
2. Carmen Jct-Manat Rd - 16,187 16,187,000.00K0174+000-K0175+000 16,187
details of dpwh’s programs/projects 707
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
6 Pangasinan 4th DEO 14,490 14,490,000.00a. PANGASINAN (THIRD DISTRICT) 14,490 14,490,000.00
1. Carmen Jct-Bayambang-Manat Rd - 14,490 14,490,000.00K0206+498-K0207+114, K0207+875-K0208+0, K0208+0-K0208+608, 6,667
c. Region II 60,556 60,556,000.001 Nueva Vizcaya 1st DEO 18,497 18,497,000.00
a. NUEVA VIZCAYA (LONE DISTRICT) 18,497 18,497,000.001. Nueva Vizcaya-Ifugao Rd - 18,497 18,497,000.00
K0284+673-K0285+523, K0285+674-K0286+524, 9,0312 Quirino DEO 42,059 42,059,000.00
a. QUIRINO (LONE DISTRICT) 42,059 42,059,000.00
1.Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) -
42,059 42,059,000.00K0330+000-K0331+640, K0337+653-K0337+694, K0337+739-K0338+319, K0338+572-K0338+739, K0338+784-K0338+896, K0338+932-K0338+978, 26,552
d. Cordillera Administrative Region 23,131 23,131,000.001 Abra DEO 11,943 11,943,000.00
a. ABRA (LONE DISTRICT) 11,943 11,943,000.001. Abra-Ilocos Sur Rd - 11,943 11,943,000.00
K0390+169-K0390+463, K0390+463-K0390+662, K0392+-534-K0393+0, 3,116
2 Baguio City DEO 7,335 7,335,000.00a. BAGUIO CITY (LONE DISTRICT) 7,335 7,335,000.00
1. Magsaysay Ave (Trinidad Rd) East Service Rd - 2,247 2,247,000.00Chainage 0 - Chainage 212 2,247
2. Magsaysay Ave. (Trinidad Rd) - 5,088 5,088,000.00Chainage 0 - Chainage 480 5,088
3 Benguet 2nd DEO 3,853 3,853,000.00a. BENGUET (LONE DISTRICT) 3,853 3,853,000.00
1. Baguio-Bontoc Rd - 3,853 3,853,000.00K0308+710-K0309+217 3,853
e. Region III 36,778 36,778,000.001 Bataan 1st DEO 5,406 5,406,000.00
a. BATAAN (FIRST DISTRICT) 5,406 5,406,000.001. Roman Expressway - 5,406 5,406,000.00
K0101+-160-K0101+350 5,4062 Bataan 2nd DEO 12,932 12,932,000.00
a. BATAAN (SECOND DISTRICT) 12,932 12,932,000.001. Jct Layac-Balanga-Mariveles Port Rd - 12,932 12,932,000.00
K0138+0-K0139+48, K0141+119-K0141+259, K0158+-494-K0158+-56, 0
3 Bulacan 2nd DEO 14,000 14,000,000.00a. BULACAN (FOURTH DISTRICT) 14,000 14,000,000.00
1. Meycauayan-Camalig-Bahay Pari Rd - 14,000 14,000,000.00K0020+-854-K0020+-493, K0020+-493-K0020+-278, K0020+348-K0020+596, 6,133 6,133,000.00
4 Tarlac 2nd DEO 4,440 4,440,000.00a. TARLAC (THIRD DISTRICT) 4,440 4,440,000.00
1. Concepcion-Capas Rd - 4,440 4,440,000.00K0109+-321-K0109+-225, K0109+-225-K0109+125,
3,710
f. Region IV-A 151,468 151,468,000.001 Batangas 2nd DEO 25,490 25,490,000.00
a. BATANGAS (SECOND DISTRICT) 25,490 25,490,000.001. Batangas-Lobo Rd - 25,490 25,490,000.00
K0133+130-K0134+000, K0134+0-K0135+0, K0135+0-K0135+510, K0136+0-K0137+0,
6,9162 Batangas 3rd DEO 15,741 15,741,000.00
a. BATANGAS (THIRD DISTRICT) 15,741 15,741,000.001. Palico-Balayan-Batangas Rd - 3,583 3,583,000.00
K0137+000-K0137+338 3,5832. Banay-Banay-Mojon-Cuenca Rd - 5,936 5,936,000.00
K0097+000-K0097+560 5,9363. Tanauan-Talisay-Tagaytay Rd - 6,222 6,222,000.00
K0077+417-K0078+000 6,2223 Batangas 4th DEO 37,561 37,561,000.00
a. BATANGAS (FOURTH DISTRICT) 37,561 37,561,000.001. Banay-Banay-Mojon-Cuenca Rd - 8,586 8,586,000.00
K0087+973-K0088+475 8,5862. Batangas-Quezon Rd - 1,252 1,252,000.00
Chainage 0 - Chainage 116 1,252
708 eXpeNditUre program fY 2016 VolUme ii
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
3. Fernando Airbase Rd - 5,484 5,484,000.00K0084+-422-K0084+093 5,484
4. Manila-Batangas Poblacion Rd - 22,239 22,239,000.00K0079+-953-K0079+-452, K0079+-452-K0079+400,
8,2414 Cavite DEO 16,000 16,000,000.00
a. CAVITE (FOURTH DISTRICT) 16,000 16,000,000.001. Cavite-Batangas Rd - 16,000 16,000,000.00
K0034+700-K0035+070, K0037+069-K0037+425, K0037+425-K0038+198, 3,951 3,951,000.00
5 Laguna 1st DEO 31,676 31,676,000.00a. LAGUNA (FOURTH DISTRICT) 31,676 31,676,000.00
1. Rizal Bdry-Famy-Quezon Rd - 31,676 31,676,000.00K0067+485-K0067+658, K0072+529-K0073+123, K0085+440-K0085+447, K0085+694-K0086+0, K0096+848-K0097+445, K0100+000-K0100+315, K0110+000-K0111+000, 6,002 6,002,000.00
6 Laguna 2nd DEO 25,000 25,000,000.00a. LAGUNA (FIRST DISTRICT) 25,000 25,000,000.00
1. Sta Rosa-Ulat-Tagaytay Rd - 25,000 25,000,000.00K0040+-950-K0040+-200, K0040+-200-K0040+660, K0040+660-K0041+542, 7,828 7,828,000.00
g. Region IV-B 112,880 112,880,000.001 Marinduque DEO 39,786 39,786,000.00
a. MARINDUQUE (LONE DISTRICT) 39,786 39,786,000.001. Marinduque Circumferential Rd - 39,786 39,786,000.00
K0018+000-K0019+000, K0027+786-K0029+000, K0061+000-K0062+000, K0064+000-K0065+000, K0072+000-K0073+000, 7,622
2 Mindoro Oriental DEO 68,504 68,504,000.00a. MINDORO ORIENTAL (FIRST DISTRICT) 68,504 68,504,000.00
1. Calapan South Rd - 38,951 38,951,000.00K0002+736-K0004+000, K0004+0-K0004+916, K0004+916-K0005+390, 9,710
2. Calapan North Rd - 29,553 29,553,000.00K0014+000-K0014+437, K0015+628-K0016+0, K0049+958-K0050+644, K0050+984-K0051+104,
7,1673 Palawan 3rd DEO 4,590 4,590,000.00
a. PALAWAN (THIRD DISTRICT) 4,590 4,590,000.001. Puerto Princesa South Rd - 4,590 4,590,000.00
K0008+414-K0008+847 4,590
h. Region V 173,592 173,592,000.001 Albay 1st DEO 100,000 100,000,000.00
a. ALBAY (FIRST DISTRICT) 49,020 49,020,000.001. Ligao-Tabaco Rd - 49,020 49,020,000.00
K0516+-844-K0516+-124, K0517+349-K0518+000, K0518+472-K0519+000, K0521+883-K0522+225, K0528+500-K0529+000 12,470 12,470,000.00
2.DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry -
38,420 38,420,000.00K0547+178-K0548+-146, K0557+100-K0559+900 6,970 6,970,000.00
3. Sto Domingo Poblacion Rd - 12,560 12,560,000.00K0541+-074-K0541+540, K0541+540-K0542+152, K0544+1000-K0545+000 7,000 7,000,000.00
2 Camarines Norte DEO 33,104 33,104,000.00a. CAMARINES NORTE (SECOND DISTRICT) 33,104 33,104,000.00
1. Tagas-Daet Poblacion-Magang Rd - 33,104 33,104,000.00K0342+452-K0343+027, K0343+027-K0344+000, K0343+27-K0344+347, K0344+000-K0344+332, K0344+332-K0344+347, 6,498 6,498,000.00
3 Camarines Sur 3rd DEO 9,424 9,424,000.00a. CAMARINES SUR (FOURTH DISTRICT) 9,424 9,424,000.00
1. Pili-Tigaon-Albay Bdry Rd - 9,424 9,424,000.004 Masbate 1st DEO 5,989 5,989,000.00
a. MASBATE (SECOND DISTRICT) 5,989 5,989,000.001. Capitol-Cadre Rd - 5,989 5,989,000.00
K0000+0-K0000+565 5,989
details of dpwh’s programs/projects 709
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
5 Masbate 2nd DEO 7,821 7,821,000.00a. MASBATE (THIRD DISTRICT) 7,821 7,821,000.00
1. Masbate-Cataingan-Placer Rd - 7,821 7,821,000.00K0029+815-K0030+0, K0045+962-K0046+40, K0046+091-K0046+433, 965
6 Sorsogon 1st DEO 17,254 17,254,000.00a. SORSOGON (FIRST DISTRICT) 17,254 17,254,000.00
1. Jct Putiao-Pilar-Donsol Rd - 17,254 17,254,000.00K0550+739-K0552+0, K0558+0-K0559+0,
9,851 9,851,000.00
i. Region VI 256,514 256,514,000.001 Capiz 1st DEO 55,388 55,388,000.00
a. CAPIZ (FIRST DISTRICT) 55,388 55,388,000.001. Iloilo East Coast-Capiz Rd - 9,132 9,132,000.00
K0129+000-K0129+433, K0310+0-K0311+0 3,4602 Jct Natl Rd Cuartero-Tapulang-Maayon Rd - 46,256 46,256,000.00
K0115+-394-K0120+357 46,2562 Guimaras DEO 23,178 23,178,000.00
a. GUIMARAS (LONE DISTRICT) 23,178 23,178,000.00
1.Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) -
9,244 9,244,000.00K0056+774-K0057+634 9,244
2. Guimaras Circumferential Rd - 13,934 13,934,000.00K0019+723-K0020+413, K0020+413-K0020+742, K0021+594-K0022+88, K0037+541-K0037+788, 2,618
3 Iloilo 1st DEO 6,116 6,116,000.00a. ILOILO (FIRST DISTRICT) 6,116 6,116,000.00
1. Iloilo-Antique Rd - 6,116 6,116,000.00K0020+190-K0020+778 6,116
4 Iloilo 2nd DEO 34,942 34,942,000.00a. ILOILO (FOURTH DISTRICT) 34,942 34,942,000.00
1. Iloilo East Coast-Capiz Rd - 17,825 17,825,000.00K0266+170-K0267+000, K0279+580-K0280+147, 11,456
2. Barotac Nuevo-Dumangas-Dacutan Wharf Rd - 17,117 17,117,000.00K0276+964-K0277+821, K0281+483-K0282+0, 10,573
5 Iloilo 4th DEO 14,514 14,514,000.00a. ILOILO (SECOND DISTRICT) 14,514 14,514,000.00
1. Iloilo-Capiz Rd (Old Route) - 14,514 14,514,000.00K0016+355-K0017+000, K0017+0-K0017+797, K0017+907-K0018+93, 3,578
6 Iloilo City DEO 39,639 39,639,000.00a. ILOILO CITY (LONE DISTRICT) 39,639 39,639,000.00
1. Muelle Loney Marginal Wharf Rd - 1,155 1,155,000.00K0001+000-K0001+109 1,155
2. Iloilo-Antique Rd - 35,484 35,484,000.00Chainage 1185 - Chainage 2025, K0001+-925-K0001+000 18,593
3. Iloilo-Capiz Rd (Old Route) - 3,000 3,000,000.00K0004+-550-K0004+-267 3,000
7 Negros Occidental 1st DEO 9,266 9,266,000.00a. NEGROS OCCIDENTAL (SECOND DISTRICT) 9,266 9,266,000.00
1. Jct Natl Rd Sagay-Bato-Dian-Marcelo-Balea Jct Rd - 9,266 9,266,000.00K0094+866-K0095+535 9,266
8 Negros Occidental 4th DEO 12,479 12,479,000.00a. NEGROS OCCIDENTAL (FOURTH DISTRICT) 12,479 12,479,000.00
1. Jct Bagonawa-La Castellana-Isabela Rd - 12,479 12,479,000.00K0042+655-K0043+250, K0045+143-K0045+993, K0056+0-K0056+188, 4,590
j. Region VII 219,777 219,777,000.001 Bohol 1st DEO 46,108 46,108,000.00
a. BOHOL (FIRST DISTRICT) 46,108 46,108,000.001. Tagbilaran North Rd (Tagbilaran-Jetafe Sect) - 46,108 46,108,000.00
K0001+685-K0002+193, K0007+-750-K0007+-155, K0008+0-K0008+603, K0013+656-K0013+677, K0015+592-K0016+426, K0016+426-K0017+0,
3,8842 Bohol 2nd DEO 57,492 57,492,000.00
a. BOHOL (SECOND DISTRICT) 57,492 57,492,000.001. Tagbilaran East Rd (Tagbilaran-Jagna) - 20,034 20,034,000.00
K0136+685-K0138+294 20,0342. Loay Interior Rd - 37,458 37,458,000.00
K0130+000-K0132+000, K0138+0-K0139+0, 21,189
710 eXpeNditUre program fY 2016 VolUme ii
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
3 Cebu 2nd DEO 37,472 37,472,000.00a. CEBU (FIRST DISTRICT) 37,472 37,472,000.00
1. Cebu South Coastal Rd - 13,946 13,946,000.00K0012+430-K0013+000, K0013+0-K0013+743, K0015+712-K0016+372, 4,317
2. Cebu-Toledo Wharf Rd (Jct Naga-Uling) - 6,460 6,460,000.00K0015+000-K0015+252, K0015+252-K0015+850, 1,915
3. Carcar-Barili-Mantayupan Rd - 17,066 17,066,000.00K0043+158-K0044+000, K0046+188-K0047+0, 8,798
4 Cebu 4th DEO 8,120 8,120,000.00a. CEBU (SECOND DISTRICT) 8,120 8,120,000.00
1. Santander-Barili-Toledo Rd - 8,120 8,120,000.00K0207+471-K0208+010 8,120
5 Cebu 5th DEO 33,065 33,065,000.00a. CEBU (FIFTH DISTRICT) 33,065 33,065,000.00
1. Cebu North Hagnaya Wharf Rd - 33,065 33,065,000.00K0035+970-K0036+551, K0040+0-K0040+200, K0047+849-K0047+895, K0049+817-K0050+448, K0073+802-K0074+0, 11,597
6 Cebu City DEO 26,323 26,323,000.00a. CEBU CITY (FIRST DISTRICT) 26,323 26,323,000.00
1. Cebu-Balamban Transcentral Highway - 26,323 26,323,000.00K0007+003-K0007+598, K0008+633-K0008+875, K0008+875-K0008+1003, K0009+222-K0009+338, K0009+573-K0009+788, K0009+788-K0010+000, K0018+000-K0018+386, K0018+660-K0018+700, K0018+743-K0018+765, 11,959
7 Negros Oriental 3rd DEO 11,197 11,197,000.00a. NEGROS ORIENTAL (THIRD DISTRICT) 11,197 11,197,000.00
1. Dumaguete South Rd - 11,197 11,197,000.00K0104+102-K0104+471, K0121+000-K0121+314, 6,052
k. Region VIII 95,219 95,219,000.001 Biliran DEO 26,045 26,045,000.00
a. BILIRAN (LONE DISTRICT) 26,045 26,045,000.001. Biliran Circumferential Rd - 10,769 10,769,000.00
K1083+500-K1084+891 10,7692. Naval-Caibiran Cross Country Rd - 15,276 15,276,000.00
K1040+000-K1041+000, K1041+0-K1042+0, 7,6152 Eastern Samar DEO 50,000 50,000,000.00
a. EASTERN SAMAR (LONE DISTRICT) 50,000 50,000,000.001. Jct Buenavista-Lawaan-Marabut Rd - 10,000 10,000,000.00
K0991+320-K0991+630, K0991+630-K0993+485, K0993+653-K0995+000, K0996+000-K0996+238 10,000
1. Jct Buenavista-Lawaan-Marabut Rd - 40,000 40,000,000.00K0923+000-K0924+000, K0927+000-K0927+124, K0927+197-K0928+000, K0929+000-K0932+000, K0933+000-K0933+312, K0934+000-K0937+000, K0938+000-K0941+000, K0944+000-K0945+000, K0946+298-K0950+000, K0946+298-K0950+000, K0959+541-K0961+124, K0962+000-K0963+906 40,000
3 Tacloban City DEO 7,174 7,174,000.00a. LEYTE (FIRST DISTRICT) 7,174 7,174,000.00
1. Picas-Sn Jose DZR Airport Rd - 7,174 7,174,000.00K0910+-1100-K0910+-750, K0910+-750-K0910+-178,
2,6604,347
l. Region IX 48,768 48,768,000.001 Isabela City DEO 18,235 18,235,000.00
a. ISABELA CITY (LONE DISTRICT) 18,235 18,235,000.001. Basilan Circumferential Rd - 18,235 18,235,000.00
K0005+553-K0006+869, K0008+714-K0009+120, K0009+120-K0009+222, K0009+222-K0009+494, 0
2 Zamboanga del Norte 3rd DEO 2,873 2,873,000.00a. ZAMBOANGA DEL NORTE (FIRST DISTRICT) 2,873 2,873,000.00
1. Jct Polo-Dapitan Park Natl Rd - 2,873 2,873,000.00K1825+654-K1826+000, K1830+222-K1830+355, 1,463
3 Zamboanga Sibugay 2nd DEO 27,660 27,660,000.00a. ZAMBOANGA SIBUGAY (SECOND DISTRICT) 27,660 27,660,000.00
1. Ipil-Magdaup Wharf Rd - 27,660 27,660,000.00K2016+000-K2017+593 27,660
m. Region X 6,460 6,460,000.001 Bukidnon 2nd DEO 6,460 6,460,000.00
a. BUKIDNON (THIRD DISTRICT) 6,460 6,460,000.00Maramag-Maradugao Rd - 6,460K1576+000-K1576+850 6,460
n. Region XI 27,560 27,560,000.00
details of dpwh’s programs/projects 711
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
1 Davao City DEO 23,829 23,829,000.00a. DAVAO CITY (FIRST DISTRICT) 23,829 23,829,000.00
1. Davao City Div Rd - 1,640K1513+936-K1514+050 1,640
2. Magsaysay Ave - 22,189 22,189,000.00K1510+-499-K1510+000, K1510+0-K1510+641, K1510+641-K1511+34, 10,512
2 Davao Oriental 1st DEO 3,731 3,731,000.00a. DAVAO ORIENTAL (FIRST DISTRICT) 3,731 3,731,000.00
1. Surigao del Sur Bdry-Davao Or Coastal Rd - 3,731 3,731,000.00K1529+286-K1529+638 3,731
o. Region XII 9,840 9,840,000.001 Sarangani DEO 9,840 9,840,000.00
a. SARANGANI (LONE DISTRICT) 9,840 9,840,000.001. Sarangani-Davao Del Sur Coastal Rd - 9,840 9,840,000.00
K1682+013-K1682+613 9,840
p. Region XIII 7,957 7,957,000.001 Agusan del Norte DEO 3,541 3,541,000.00
a. AGUSAN DEL NORTE (SECOND DISTRICT) 3,541 3,541,000.001. Nasipit Port Rd - 3,541 3,541,000.00
K1264+000-K1264+334 3,5412 Agusan del Sur 2nd DEO 4,416 4,416,000.00
a. AGUSAN DEL SUR (SECOND DISTRICT) 4,416 4,416,000.001. NRJ Cuevas-Sampaguita Rd - 4,416 4,416,000.00
K1387+756-K1388+300 4,416
712 eXpeNditUre program fY 2016 VolUme ii
3. Tertiary Roads 1,351,655,000.00
I. Central Office 10,000,000.00
a. Nationwide 10,000,000.00 1. Central Office 10,000,000.00
a. NATIONWIDE 10,000,000.00 1. Preventive Maintenance - Tertiary Roads 10,000,000.00
II. Regional Office 119,551,000.00
a. Region III 7.797 119,551,000.001. Bataan 2nd DEO 3.937 64,865,000.00
a. BATAAN (SECOND DISTRICT) 3.937 64,865,000.001. Jct Layac-Balanga-Mariveles Port Rd - 3.937 64,865,000.00
K0123+1250-K0123+1600, K0125+000-K0126+000, K0128+172-K0128+706, K0130+000-K0130+980, K0133+1000-K0133+1778, 0.350
2. Bulacan 2nd DEO 3.860 54,686,000.00a. SAN JOSE CITY (LONE DISTRICT) 3.860 54,686,000.00
1. Bocaue-Sn Jose Rd - 3.860 54,686,000.00K0034+932-K0036+000, K0037+000-K0037+514, K0038+000-K0040+000, K0041+417-K0042+010, 0.978
III. District Engineering Office 1,222,104,000.00
a. National Capital Region 14.621 223,474,000.001. Malabon-Navotas DEO 0.614 4,667,000.00
a. MALABON CITY (LONE DISTRICT) 0.308 2,341,000.001. C Arellano St - 0.308 2,341,000.00
K0012+197-K0012+505 0.308b. NAVOTAS CITY (LONE DISTRICT) 0.306 2,326,000.00
1. North Bay Blvd - 0.306 2,326,000.00K0008+242-K0008+267, K0008+608-K0009+000, 0.025
2. Metro Manila 1st DEO 2.711 45,626,000.00a. MANDALUYONG CITY (LONE DISTRICT) 0.842 13,815,000.00
1. Correctional Institute Rd - 0.282 4,625,000.00Chainage 267 - Chainage 549 0.282 4,625,000.00
2. Psychopathic Hospital Rd - 0.560 9,190,000.00Chainage 1160 - Chainage 1720 0.560 9,190,000.00
a. PASIG CITY (LONE DISTRICT) 0.850 13,948,000.001. Pasig-Santolan Rd - 0.235 3,854,000.00
K0015+164-K0015+399 0.2352. Amang Rodriguez Rd - 0.615 10,094,000.00
K0018+000-K0018+615 0.615a. SAN JUAN CITY (LONE DISTRICT) 0.708 11,612,000.00
1. F Manalo - 0.416 6,823,000.00Chainage 0 - Chainage 416 0.416 6,823,000.00
2. San Juan-Santolan Rd - 0.292 4,789,000.00K0009+-869-K0009+-577 0.292
a. TAGUIG (SECOND DISTRICT) 0.311 6,251,000.001. Libingan ng mga Bayani - 0.311 6,251,000.00
Chainage 0 - Chainage 147, K0013+73-K0013+237, 0.147 2,955,000.00
3. Metro Manila 2nd DEO 0.342 5,609,000.00a. PARANAQUE CITY (FIRST DISTRICT) 0.342 5,609,000.00
1. Tomas Claudio - 0.342 5,609,000.00Chainage 0 - Chainage 342 0.342 5,609,000.00
PROGRAMS / ACTIVITIES / PROJECTS TARGET AMOUNT (Php)
details of dpwh’s programs/projects 713
PROGRAMS / ACTIVITIES / PROJECTS TARGET AMOUNT (Php)
4. Metro Manila 3rd DEO 2.758 49,127,000.00a. KALOOKAN CITY (FIRST DISTRICT) 1.117 16,133,000.00
1. Deparo-Camarin Rd - 1.117 16,133,000.00K0020+383-K0020+016, K0025+88-K0025+594 ,K0025+88-K0025+594, 0.611
a. KALOOKAN CITY (SECOND DISTRICT) 0.403 8,100,000.001. B Serrano St - 0.403 8,100,000.00
K0010+668-K0010+1071 0.403a. VALENZUELA CITY (SECOND DISTRICT) 1.238 24,894,000.00
1. Gen T de Leon St - 1.238 24,894,000.00K0013+-366-K0014+000, K0014+000-K0014+242, 0.996
5. North Manila DEO 2.647 31,184,000.00a. MANILA CITY (FIRST DISTRICT) 0.884 6,718,000.00
1. Moriones - 0.884 6,718,000.00Chainage 0 - Chainage 884 0.884 6,718,000.00
b. MANILA CITY (SECOND DISTRICT) 0.878 6,673,000.001. A Rivera St - 0.878 6,673,000.00
Chainage 0 - Chainage 878 0.878 6,673,000.00c. MANILA CITY (THIRD DISTRICT) 0.574 11,542,000.00
1. Quezon Blvd (LZ) - 0.574 11,542,000.00Chainage 0 - Chainage 574 0.574 11,542,000.00
d. MANILA CITY (SECOND DISTRICT) 0.311 6,251,000.001. G Tuazon St - 0.311 6,251,000.00
Chainage 869 - Chainage 1180 0.311 6,251,000.006. Quezon City 1st DEO 2.241 31,036,000.00
a. QUEZON CITY (FIRST DISTRICT) 0.650 4,940,000.001. Kanlaon St - 0.650 4,940,000.00
K0006+-442-K0006+208 0.650b. QUEZON CITY (FIFTH DISTRICT) 0.410 6,724,000.00
1. Regalado Avenue (South) - 0.410 6,724,000.00K0023+481-K0023+891 0.410
c. QUEZON CITY (SIXTH DISTRICT) 1.181 19,372,000.001. Visayas Ave - 0.589 9,660,000.00
K0012+-79-K0012+510 0.5892. Tandang Sora Ave - 0.592 9,712,000.00
Chainage 3541 - Chainage 4114, Chainage 4114 - Chainage 4133, 0.573 9,397,000.00
7. Quezon City 2nd DEO 0.515 8,446,000.00a. QUEZON CITY (FOURTH DISTRICT) 0.515 8,446,000.00
1. Mother Ignacia St - 0.515 8,446,000.00K0009+-1116-K0009+-877, K0009+-728-K0009+-452,
0.2398. South Manila DEO 2.793 47,779,000.00
a. MANILA CITY (FIFTH DISTRICT) 1.289 23,101,000.001. Cortabitarte St - 0.166 3,337,000.00
Chainage 0 - Chainage 166 0.166 3,337,000.002. A Mabini St - 0.599 9,824,000.00
K0002+-837-K0002+-238 0.5993. Plaza Lawton Rd - 0.223 4,482,000.00
Chainage 0 - Chainage 223 0.223 4,482,000.004. G Del Pilar - 0.141 2,834,000.00
K0005+-863-K0005+-722 0.1415. Pedro Gil (Herran) - 0.160 2,624,000.00
K0002+000-K0002+160 0.160a. MANILA CITY (SIXTH DISTRICT) 0.783 12,849,000.00
1. Pedro Gil (Herran) - 0.783 12,849,000.00K0003+679-K0004+423 0.783
a. PASAY CITY (LONE DISTRICT) 0.721 11,829,000.001. Antonio Arnaiz Ave - 0.721 11,829,000.00
K0005+-809-K0005+-088 0.721
b. Region I 3.457 75,547,000.002. Ilocos Norte 2nd DEO 1.915 17,345,000.00
a. ILOCOS NORTE (SECOND DISTRICT) 1.915 17,345,000.001. Pias-Currimao-Balaccad Rd - 0.479 5,074,000.00
K0461+52-K0462+531 0.479
714 eXpeNditUre program fY 2016 VolUme ii
PROGRAMS / ACTIVITIES / PROJECTS TARGET AMOUNT (Php)
2. Ilocos Norte-Apayao Rd - 0.799 7,430,000.00K0499+-348-K0499+000, K0500+863-K0501+314, 0.451
3. Ilocos Norte-Abra Rd - 0.637 4,841,000.00K0506+421-K0507+000 0.637
3. Pangasinan 3rd DEO 1.542 58,202,000.00a. PANGASINAN (FIFTH DISTRICT) 1.542 11,721,000.00
1. Binalonan-Asingan-Santa Maria Rd - 1.542 11,721,000.00K0191+000-K0191+960, K0193+129-K0193+711, 0.960
b. PANGASINAN (SIXTH DISTRICT) 2.944 46,481,000.001. Pangasinan-Nueva Vizcaya Rd - 2.944 46,481,000.00
K0183+500-K0185+000, K0185+000-K0186+000, K0193+000-K0193+456, 1.483
c. Region II 4.236 46,854,000.001. Isabela 1st DEO 1.973 20,800,000.00
a. ISABELA (FIRST DISTRICT) 1.973 20,800,000.001. Calamagui-Ilagan Rd - 1.973 20,800,000.00
K0398+-425-K0398+202, K0398+302-K0398+576, K0399+00026-K0399+198, K0399+600-K0399+637, K0399+637-K0399+752, K0400+645-K0401+147, K0401+147-K0401+367, 0.627
0.2742. Isabela 2nd DEO 1.219 12,923,000.00
a. ISABELA (SECOND DISTRICT) 1.219 12,923,000.001. Naguilian-Sn Mariano Rd - 1.219 12,923,000.00
K0396+280-K0397+000, K0397+000-K0397+480, 0.7393. Isabela 3rd DEO 0.356 5,838,000.00
a. ISABELA (THIRD DISTRICT) 0.356 5,838,000.001. Cauayan-Poblacion Rd - 0.356 5,838,000.00
K0369+-16-K0369+340 0.3564. Nueva Vizcaya 1st DEO 0.688 7,293,000.00
a. NUEVA VIZCAYA (LONE DISTRICT) 0.688 7,293,000.001. Daang Maharlika By-Pass Rd - 0.688 7,293,000.00
K0265+963-K0265+1651 0.688
d. Cordillera Administrative Region 1.094 11,596,000.001. Baguio City DEO 1.094 11,596,000.00
a. BAGUIO CITY (LONE DISTRICT) 1.094 11,596,000.001. Chuntug #1 - 0.218 2,311,000.00
Chainage 0 - Chainage 218 0.218 2,311,000.002. Chanum St - 0.490 5,194,000.00
Chainage 0 - Chainage 490 0.490 5,194,000.003. Manuel Roxas Rd - 0.386 4,091,000.00
K0252+-517-K0252+-131 0.386
e. Region III 29.088 341,235,000.001. Bulacan 1st DEO 1.671 17,018,000.00
a. BULACAN (FIRST DISTRICT) 0.331 3,362,000.001. Plaridel-Pulilan Div Rd - 0.331 3,362,000.00
K0042+821-K0042+870, K0044+000-K0044+282, 0.282
a. BULACAN (SECOND DISTRICT) 1.340 13,656,000.001. Gen Alejo Santos Highway - 0.826 8,203,000.00
K0042+000-K0042+642, K0042+642-K0043+000, 0.6422. Old Cagayan Valley Rd - 0.514 5,453,000.00
K0045+000-K0045+514 0.5142. Bulacan 2nd DEO 13.987 164,063,000.00
a. BULACAN (THIRD DISTRICT) 1.482 19,844,000.001. NCR/Bulacan Bdry-Bigte-Ipo Dam Rd - 0.713 11,693,000.00
K0044+287-K0044+1000 0.7132. Old Cagayan Valley Rd - 0.769 8,151,000.00
K0054+000-K0054+529 0.769
details of dpwh’s programs/projects 715
PROGRAMS / ACTIVITIES / PROJECTS TARGET AMOUNT (Php)
b. BULACAN (FOURTH DISTRICT) 7.101 83,905,000.001. Bocaue-Sn Jose Rd - 1.691 16,911,000.00
K0030+000-K0030+201, K0031+000-K0031+081, K0032+701-K0034+000, 0.201
2. Meycauayan-Camalig-Bahay Pari Rd - 1.003 18,209,000.00K0024+028-K0024+600, K0025+300-K0025+572, K0027+347-K0028+000, 0.572
3. Sta Maria By-Pass Rd - 1.974 15,756,000.00K0030+-204-K0030+307, K0030+475-K0031+000, K0032+000-K0032+538, K0033+000-K0033+414, 0.511
4. Sta Maria-Norzagaray Rd - 2.433 33,029,000.00K0032+-761-K0032+-617, K0032+-504-K0032+-141, K0034+296-K0034+496, K0034+761-K0035+000, K0036+000-K0036+137, K0036+168-K0036+483, K0038+168-K0038+473, K0039+000-K0039+631, K0039+631-K0039+721, 0.144
c. SAN JOSE CITY (LONE DISTRICT) 5.404 60,314,000.002. Muzon-Tungkong Manga Rd - 3.441 30,611,000.00
K0041+423-K0042+828, K0043+000-K0043+256, K0043+256-K0045+036, 1.405
3. NCR/Bulacan Bdry-Bigte-Ipo Dam Rd - 1.963 29,703,000.00K0032+000-K0032+193, K0032+306-K0032+867, K0034+970-K0035+000, K0035+683-K0036+402, K0036+469-K0037+025, 0.193
3. Nueva Ecija 1st DEO 2.277 25,034,000.00a. NUEVA ECIJA (SECOND DISTRICT) 2.277 25,034,000.00
1. Muñoz-Lupao Rd - 2.277 25,034,000.00K0152+374-K0153+000, K0153+476-K0154+360, K0162+000-K0162+737, 0.618
4. Pampanga 1st DEO 5.709 75,827,000.00a. PAMPANGA (THIRD DISTRICT) 4.619 63,514,000.00
1. Arayat-Magalang Rd - 0.595 6,307,000.00K0099+000-K0099+595 0.595
2. Mt Arayat National Park Rd - 0.970 10,282,000.00K0090+426-K0090+935, K0090+935-K0091+410, 0.509
3. Sn Fernando-Lubao Rd - 2.979 45,695,000.00K0067+246-K0067+791, K0068+360-K0069+000, K0071+206-K0072+000, K0072+000-K0073+000, 0.545
4. Tulauc-Sto Domingo Rd - 0.075 1,230,000.00K0068+475-K0068+550 0.075
b. PAMPANGA (FOURTH DISTRICT) 1.090 12,313,000.001. Tulauc-Sto Domingo Rd - 0.183 3,001,000.00
Chainage 0 - Chainage 183 0.183 3,001,000.002. Baliwag-Candaba-Sta Ana Rd - 0.907 9,312,000.00
K0058+926-K0059+759, K0063+858-K0064+958, 0.8075. Tarlac 2nd DEO 0.725 11,893,000.00
a. TARLAC (THIRD DISTRICT) 0.725 11,893,000.001. Tarlac-Zambales Rd - 0.725 11,893,000.00
K0111+844-K0112+570 0.7256. Zambales 1st DEO 1.385 14,679,000.00
a. ZAMBALES (SECOND DISTRICT) 1.385 14,679,000.001. Sn Marcelino-Sn Antonio-Sn Narciso Rd - 1.385 14,679,000.00
K0157+000-K0158+000, K0164+385-K0164+768, 1.0027. Zambales 2nd DEO 3.334 32,721,000.00
a. ZAMBALES (FIRST DISTRICT) 3.334 32,721,000.001. Sn Marcelino-Sn Antonio-Sn Narciso Rd - 0.839 13,759,000.00
K0153+-138-K0153+701 0.8392. Subic-PHILSECO Rd - 2.495 18,962,000.00
K0141+-407-K0142+655, K0142+793-K0143+222, 2.064
f. Region IV-A 10.623 135,794,000.001. Batangas 4th DEO 0.648 7,000,000.00
a. BATANGAS (SECOND DISTRICT) 0.648 7,000,000.001. Rosario-Sn Juan Rd - 0.648 7,000,000.00
K0135+299-K0135+947 0.6482. Cavite DEO 1.986 23,607,000.00
a. CAVITE (FIRST DISTRICT) 0.955 10,000,000.001. Kawit Loop Rd - 0.513 5,372,000.00
Chainage 0 - Chainage 513 0.513 5,372,000.002. Manila-Cavite Rd - 0.442 4,628,000.00
Chainage 0 - Chainage 442 0.442 4,628,000.00
716 eXpeNditUre program fY 2016 VolUme ii
PROGRAMS / ACTIVITIES / PROJECTS TARGET AMOUNT (Php)
b. CAVITE (SECOND DISTRICT) 0.749 7,939,000.001. Zapote-Salawag-Salitran Rd - 0.749 7,939,000.00
K0023+293-K0024+040 0.749c. CAVITE (FOURTH DISTRICT) 0.282 5,668,000.00
1. Zapote-Salawag-Salitran Rd - 0.282 5,668,000.00K0031+851-K0032+150 0.282
3. Laguna 1st DEO 1.662 27,885,000.00a. LAGUNA (FOURTH DISTRICT) 1.662 27,885,000.00
Paete-Famy Pob Rd - 1.662 27,885,000.00
K0103+-1472-K0103+-977, K0106+772-K0106+959,K0110+000-K0111+000
0.495
8,327,000.004. Laguna 2nd DEO 1.656 20,046,000.00
a. LAGUNA (SECOND DISTRICT) 1.656 20,046,000.001. Mt Makiling Eco Garden Rd - 1.225 12,985,000.00
K0061+-352-K0061+148, K0061+148-K0062+000, 0.7252. Mayapa-Canlubang Cadre Rd - 0.431 7,061,000.00
K0050+540-K0051+00026 0.4315. Quezon 4th DEO 1.178 12,484,000.00
a. QUEZON (FOURTH DISTRICT) 1.178 12,484,000.001. Tagkawayan Poblacion Rd - 0.100 1,060,000.00
Chainage 166 - Chainage 266 0.100 1,060,000.002. MSR Jct-Lopez-Catanauan Rd - 0.412 4,367,000.00
K0217+-510-K0217+-98 0.4123. Jct MSR-Old Zigzag Rd - 0.666 7,057,000.00
K0156+236-K0157+000 0.6666. Rizal 1st DEO 1.874 27,612,000.00
a. ANTIPOLO CITY (FIRST DISTRICT) 1.205 16,640,000.001. Antipolo Circumferential Rd B - 0.472 7,741,000.00
Chainage 0 - Chainage 472 0.472 7,741,000.002. Marikina-Infanta Rd - 0.539 5,713,000.00
K0023+658-K0023+1197 0.5393. Marikina-Victoria Valley-Antipolo Rd - 0.194 3,186,000.00
K0017+-625-K0017+-431 0.194b. ANTIPOLO CITY (SECOND DISTRICT) 0.669 10,972,000.00
1. Marikina-Infanta Rd - 0.669 10,972,000.00K0033+143-K0033+812 0.669
7. Rizal 2nd DEO 1.619 17,160,000.00a. RIZAL (SECOND DISTRICT) 1.619 17,160,000.00
1. Cainta-Kayticling-Antipolo-Teresa-Morong Rd - 1.053 11,162,000.00K0037+305-K0038+390 1.053
g. Region IV-B 0.996 9,321,000.001. Mindoro Oriental DEO 0.412 3,131,000.00
a. MINDORO ORIENTAL (FIRST DISTRICT) 0.412 3,131,000.001. CSR Jct-Minas Rd - 0.412 3,131,000.00
K0037+531-K0038+204 0.4122. Palawan 3rd DEO 0.584 6,190,000.00
a. PALAWAN (THIRD DISTRICT) 0.584 6,190,000.001. Malvar Rd - 0.584 6,190,000.00
K0002+1200-K0002+1784 0.584
h. Region V 8.203 66,755,000.001. Albay 3rd DEO 0.522 5,533,000.00
a. ALBAY (THIRD DISTRICT) 0.522 5,533,000.001. Guinobatan Poblacion Rd - 0.522 5,533,000.00
K0511+261-K0511+783 0.5222. Camarines Norte DEO 0.642 6,805,000.00
a. CAMARINES NORTE (FIRST DISTRICT) 0.642 6,805,000.001. Bagong Silang-Capalonga Rd - 0.642 6,805,000.00
K0304+000-K0304+642 0.6423. Camarines Sur 4th DEO 1.192 9,059,000.00
a. CAMARINES SUR (FIFTH DISTRICT) 1.192 9,059,000.001. Nabua-Balatan Rd - 1.192 9,059,000.00
K0488+499-K0489+000, K0490+000-K0490+678, 0.5144. Sorsogon 1st DEO 5.847 45,358,000.00
a. SORSOGON (FIRST DISTRICT) 5.847 45,358,000.001. Ariman-Casiguran Rd - 3.033 23,409,000.00
details of dpwh’s programs/projects 717
PROGRAMS / ACTIVITIES / PROJECTS TARGET AMOUNT (Php)
K0612+-328-K0612+000, K0615+000-K0616+000, K0617+000-K0618+000, K0620+000-K0620+300, K0622+188-K0622+751, 0.328
2. Bacon-Sawanga-Prieto Diaz Rd - 1.297 10,116,000.00K0595+460-K0596+000, K0596+240-K0597+000, 0.539
3. Juban-Magallanes Rd - 1.517 11,833,000.00K0623+000-K0623+546, K0625+000-K0626+000, 0.546
i. Region VI 7.577 63,252,000.001. Bacolod City DEO 1.972 14,985,000.00
a. BACOLOD CITY (LONE DISTRICT) 1.972 14,985,000.001. Bacolod-City Bdry Rd - 1.285 9,766,000.00
K0003+765-K0004+335, K0015+830-K0016+549, 0.5572. Plaza-Capitol Rd - 0.687 5,219,000.00
K0001+-650-K0001+037 0.6872. Iloilo 1st DEO 0.387 2,941,000.00
a. ILOILO (FIRST DISTRICT) 0.387 2,941,000.001. Oton-Pakiad-Mandurriao Rd - 0.387 2,941,000.00
K0010+402-K0010+789 0.3873. Iloilo 4th DEO 0.601 4,568,000.00
a. ILOILO (SECOND DISTRICT) 0.601 4,568,000.00
1.Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd -
0.601 4,568,000.00K0011+600-K0012+200 0.601
4. Iloilo City DEO 0.915 12,623,000.00a. ILOILO CITY (LONE DISTRICT) 0.915 12,623,000.00
1. Molo-Mandurriao Rd - 0.505 8,282,000.00K0004+-1018-K0004+-513 0.505
2. Iloilo-Jaro Diversion Rd - 0.410 4,341,000.00K0002+-17-K0002+749 0.410
5. Negros Occidental 1st DEO 0.963 7,319,000.00a. NEGROS OCCIDENTAL (SECOND DISTRICT) 0.963 7,319,000.00
1. Bulanon Rd - 0.963 7,319,000.00K0090+000-K0091+000 0.963
6. Negros Occidental 4th DEO 2.739 20,816,000.00a. NEGROS OCCIDENTAL (FOURTH DISTRICT) 2.739 20,816,000.00
1.Jct Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd -
0.330 2,508,000.00K0027+506-K0027+836 0.330
2. Jct Palencia-Boy Scout Camp - 1.834 13,938,000.00K0058+000-K0059+820 1.834
3. Jct Sn Enrique-Pontevedra By-Pass Rd - 0.575 4,370,000.00K0040+000-K0040+575 0.575
718 eXpeNditUre program fY 2016 VolUme ii
PROGRAMS / ACTIVITIES / PROJECTS TARGET AMOUNT (Php)
j. Region VII 8.871 98,070,000.001. Bohol 1st DEO 2.262 17,101,000.00
a. BOHOL (FIRST DISTRICT) 2.262 17,101,000.001. Jct (TNR) Cortes-Balilihan-Catigbian-Macaas Rd - 1.262 9,532,000.00
K0011+000-K0011+556, K0012+300-K0013+000, 0.5562. Jct (TNR) Maribojoc-Antequera-Catagbacan (Loon) - 1.000 7,569,000.00
K0015+000-K0016+000 1.0002. Cebu 4th DEO 1.481 12,901,000.00
a. CEBU (SECOND DISTRICT) 1.481 12,901,000.001. Dalaguete-Mantalongon Badian Rd - 1.481 12,901,000.00
K0093+000-K0093+500, K0097+000-K0097+608, K0097+608-K0097+810, K0086+661-K0087+832, 0.500
3. Cebu 5th DEO 0.505 10,151,000.00a. CEBU (FIFTH DISTRICT) 0.505 10,151,000.00
1. Sogod-Tabuelan Rd - 0.505 10,151,000.00K0119+-45-K0119+460 0.505
4. Cebu 6th DEO 0.742 14,906,000.00a. CEBU (SIXTH DISTRICT) 0.742 14,906,000.00
1. ML Quezon St - 0.742 14,906,000.00Chainage 2052 - Chainage 2794 0.742 14,906,000.00
5. Cebu City DEO 2.885 35,441,000.00a. CEBU CITY (FIRST DISTRICT) 1.001 19,078,000.00
1. Civic Ctr Rd II - 0.222 4,462,000.00Chainage 0 - Chainage 222 0.222 4,462,000.00
2. Imus Rd - 0.272 4,457,000.00Chainage 1076 - Chainage 1348 0.272 4,457,000.00
3. Legaspi Ext - 0.166 3,333,000.00Chainage 0 - Chainage 166 0.166 3,333,000.00
4. D Jakosalem St - 0.175 3,493,000.00Chainage 423 - Chainage 598 0.175 3,493,000.00
5. Legaspi Ext - 0.166 3,333,000.00Chainage 0 - Chainage 166 0.166 3,333,000.00
b. CEBU CITY (SECOND DISTRICT) 1.884 16,363,000.001. Cebu Circumferencial Rd (Salvador St) - 1.720 13,072,000.00
Chainage 57 - Chainage 281, Chainage 281 - Chainage 1276, Chainage 1276 - Chainage 1777, 0.501 3,808,000.00
2. V Rama-Tres de Abril St - 0.164 3,291,000.00Chainage 10 - Chainage 174 0.164 3,291,000.00
6. Negros Oriental 3rd DEO 0.996 7,570,000.00a. NEGROS ORIENTAL (THIRD DISTRICT) 0.996 7,570,000.00
1. Bayawan-Kabankalan Rd - 0.996 7,570,000.00K0115+000-K0116+000 0.996
k. Region VIII 2.685 20,403,000.001. Leyte 2nd DEO 0.526 3,998,000.00
a. LEYTE (SECOND DISTRICT) 0.526 3,998,000.001. Sta Fe-Pastrana-Dagami Rd - 0.230 1,748,000.00
K0932+300-K0932+530 0.2302. Mayorga-Lapaz Rd - 0.126 958,000.00
K0946+-38-K0946+88 0.1263. Dulag-Julita-Burauen Rd - 0.170 1,292,000.00
K0949+48-K0949+218 0.1702. Samar 2nd DEO 0.413 3,139,000.00
a. SAMAR (SECOND DISTRICT) 0.413 3,139,000.001. Wright Old Route - 0.413 3,139,000.00
K0826+-147-K0826+266 0.4133. Tacloban City DEO 1.746 13,266,000.00
a. LEYTE (FIRST DISTRICT) 1.746 13,266,000.001. Justice Romualdez St - 0.382 2,903,000.00
Chainage 0 - Chainage 382 0.382 2,903,000.002. Sn Jose-Manlurip-MacArthur Park Rd - 0.993 7,547,000.00
K0913+000-K0914+000 0.9933. Calanipawan Rd - 0.371 2,816,000.00
Chainage 0 - Chainage 371 0.371 2,816,000.00
details of dpwh’s programs/projects 719
PROGRAMS / ACTIVITIES / PROJECTS TARGET AMOUNT (Php)
l. Region IX 2.697 22,855,000.001. Zamboanga City DEO 0.369 2,804,000.00
a. ZAMBOANGA CITY (FIRST DISTRICT) 0.369 2,804,000.001. Gen V Alvarez St - 0.369 2,804,000.00
Chainage 0 - Chainage 369 0.369 2,804,000.00
2. Zamboanga del Sur 1st DEO 1.543 11,730,000.00a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 1.543 11,730,000.00
1. Jct Aurora-Monte Alegre-Jct Labangan Rd - 1.543 11,730,000.00K1649+247-K1650+000, K1650+585-K1651+370, 0.763 5,799,000.00
3. Zamboanga del Sur 2nd DEO 0.785 8,321,000.00a. ZAMBOANGA DEL SUR (SECOND DISTRICT) 0.785 8,321,000.00
1. Jct Dumalinao-Margosatubig Rd - 0.785 8,321,000.00K1679+-883-K1679+-225, K1718+-127-K1718+000,
0.658
m. Region X 10.928 86,730,000.001. Bukidnon 1st DEO 0.446 3,390,000.00
a. BUKIDNON (SECOND DISTRICT) 0.446 3,390,000.001. Jct SH-Casisang-Malaybalay Airport Rd - 0.446 3,390,000.00
Chainage 0 - Chainage 446 0.446 3,390,000.002. Bukidnon 2nd DEO 1.621 15,979,000.00
a. BUKIDNON (THIRD DISTRICT) 1.621 15,979,000.001. Don Carlos-Kadingilan Rd - 1.621 15,979,000.00
K1575+00058-K1575+461, K1575+461-K1576+000, K1576+000-K1576+655, 0.563
3. Bukidnon 3rd DEO 1.896 14,411,000.00a. BUKIDNON (FIRST DISTRICT) 1.896 14,411,000.00
1. Jct SH-Manolo Fortich-Libona-Indahag Rd - 1.896 14,411,000.00K1462+422-K1463+000, K1463+000-K1463+819, K1469+000-K1469+514, 0.563
4. Cagayan de Oro City 1st DEO 1.046 7,950,000.00a. CAGAYAN DE ORO CITY (FIRST DISTRICT) 1.046 7,950,000.00
1. Liceo de Cagayan By-Pass Rd - 0.490 3,724,000.00K1439+-150-K1439+340 0.490
2. CDO-Cadre Circumferential Ext Rd - 0.556 4,226,000.00Chainage 0 - Chainage 556 0.556 4,226,000.00
5. Lanao del Norte 1st DEO 5.919 45,000,000.00a. LANAO DEL NORTE (FIRST DISTRICT) 5.919 45,000,000.00
Lanao del Norte Interior Circum. Rd (LDNICR) - 5.919 45,000,000.00K1541+900-K1542+900, K1542+900-K1543+716, K1543+797-K1543+900, K1543+900-K1544+900, K1544+900-K1545+900, K1545+900-K1546+900, K1546+900-K1547+900, 1.000
n. Region XI 0.501 3,808,000.001. Davao City 2nd DEO 0.501 3,808,000.00
a. DAVAO CITY (THIRD DISTRICT) 0.501 3,808,000.001. Calinan-Baguio-Cadalian Rd - 0.501 3,808,000.00
K1695+638-K1696+122 0.501
720 eXpeNditUre program fY 2016 VolUme ii
PROGRAMS / ACTIVITIES / PROJECTS TARGET AMOUNT (Php)
o. Region XIII 2.070 16,410,000.001. Surigao del Norte 1st DEO 2.070 16,410,000.00
a. SURIGAO DEL NORTE (SECOND DISTRICT) 2.070 16,410,000.001. Jct Capalayan-Cabongbongan Rd - 1.845 14,022,000.00
K1136+-182-K1136+102, K1136+102-K1136+704, K1138+981-K1139+742, K1141+350-K1141+472, K1141+621-K1142+9, 0.602
2. Surigao City-Sn Juan Coastal Rd - 0.225 2,388,000.00K1115+-439-K1115+-214 0.225
107.647
details of dpwh’s programs/projects 721
B. Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainaged based on Pavement Management System/ Highway - 4
1. Primary Roads #REF! 4,843,333,000.00
I. Central Office 10.466 824,500,000.00a. Region II 5.171 156,696,000.00
1. Isabela 2nd DEO 5.171 156,696,000.00a. ISABELA (SECOND DISTRICT) 5.171 156,696,000.00
1. Santiago-Tuguegarao Rd - 5.171 156,696,000.00K0395+886-K0396+358, K0399+0-K0399+794, K0400+0-K0400+791, K0401+0-K0401+791, K0402+0-K0402+792, K0403+0-K0403+497, K0404+713-K0405+318, K0407+456-K0407+889
b. Region X 5.294 157,804,000.00 1. Bukidnon 3rd DEO 5.294 157,804,000.00
a. BUKIDNON (FIRST DISTRICT) 5.294 157,804,000.001. Sayre Highway - 5.294 157,804,000.00
K1438+-226-K1438+-118, K1438+65-K1438+210, K1441+523-K1441+906, K1444+689-K1444+932, K1449+770-K1449+870, K1452+470-K1452+705, K1452+705-K1453+180, K1453+475-K1453+796, K1456+0-K1456+889, K1457+538-K1457+910, K1459+650-K1459+895, K1460+0-K1460+648, K1461+0-K1461+600, K1463+2-K1463+400, K1464+997-K1465+237, K1470+88-K1470+128
c. Nationwide - 510,000,000.001. Central Office - 510,000,000.00
a. NATIONWIDE - 510,000,000.001. EDSA Rehabilitation and Other National Roads - 500,000,000.002. Rehabilitation/Reconstruction - Primary Roads - 10,000,000.00
II. Regional Office Proper #REF! 4,018,833,000.00a. Region I 3.459 79,903,000.00
1. La Union 2nd DEO 3.459 79,903,000.00a. LA UNION (SECOND DISTRICT) 3.459 79,903,000.00
1. Bauang-Baguio Rd - 3.459 79,903,000.00K0268+646-K0269+887, K0271+170-K0272+202, K0272+202-K0272+804, K0273+227-K0274+134
b. Region II 2.661 411,496,000.001. Isabela 1st DEO 0.260 68,750,000.00
a. ISABELA (FIRST DISTRICT) 0.260 68,750,000.001. Santiago-Tuguegarao Rd - 0.260 9,000,000.00
K0433+000-K0433+2602. Daang Maharlika (LZ) - 1.620 59,750,000.00
K0396+1050-K0396+1200, K0396+1200-K0396+1385, K0410+600-K0411+000, K0411+000-K0411+138, K0423+1848-K0425+000, K0457+529-K0457+575, K0457+575-K0457+853, K0457+853-K0458+048,K0458+048-K0458+130
2. Isabela 3rd DEO 1.011 29,218,000.00a. ISABELA (THIRD DISTRICT) 1.011 29,218,000.00
1. Daang Maharlika (LZ) - 1.011 29,218,000.00K0349+667-K0350+703
3. Nueva Vizcaya 2nd DEO 1.390 43,647,000.00a. NUEVA VIZCAYA LONE 1.390 43,647,000.00
1. Daang Maharlika (LZ) - 1.390 43,647,000.00K0209+510-K0210+-181, K0216+700-K0216+845, K0218+0-K0218+185, K0220+0-K0220+490, K0222+204-K0222+459
4. Isabela 4th DEO 4.461 138,546,000.00a. ISABELA (FOURTH DISTRICT) 4.461 138,546,000.00
1. Daang Maharlika (LZ) - 4.461 138,546,000.00K0313+0-K0313+100, K0315+0-K0315+464, K0318+131-K0318+796, K0319+0-K0319+766, K0320+0-K0320+798, K0321+0-K0321+758, K0322+0-K0322+164, K0341+766-K0342+022, K0342+42-K0342+509
AMOUNT (Php) PROGRAMS / ACTIVITIES / PROJECTS
722 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAMS / ACTIVITIES / PROJECTS
5. Nueva Vizcaya 1st DEO 4.226 131,335,000.00a. NUEVA VIZCAYA LONE 4.226 131,335,000.00
1. Daang Maharlika (LZ) - 4.226 131,335,000.00K0246+0-K0246+279, K0246+389-K0246+612, K0247+0-K0247+204, K0249+817-K0250+036, K0250+408-K0250+626, K0251+0-K0251+365, K0254+0-K0254+189, K0254+641-K0254+774, K0257+481-K0257+670, K0260+711-K0260+905, K0260+74-K0260+307, K0261+269-K0261+418, K0261+705-K0262+000, K0288+0-K0288+130, K0294+408-K0294+676, K0299+0-K0299+258, K0302+0-K0302+339 K0304+0-K0304+350
c. Cordillera Administrative Region 0.588 16,993,000.001. Benguet 1st DEO 0.588 16,993,000.00
a. BENGUET LONE 0.588 16,993,000.001. Kennon Rd - 0.588 16,993,000.00
K0239+5-K0239+593
d. Region III 10.486 374,725,000.001. Bataan 1st DEO 1.912 60,411,000.00
a. BATAAN (FIRST DISTRICT) 1.912 60,411,000.001. Gapan-Sn Fernando-Olongapo Rd - 1.912 60,411,000.00
K0114+529-K0115+38, K0115+630-K0115+700, K0117+0-K0117+1330
2. Bulacan 1st DEO 0.978 31,785,000.00a. BULACAN (SECOND DISTRICT) 0.978 31,785,000.00
1. Daang Maharlika (LZ) - 0.978 31,785,000.00K0037+-978-K0037+0
3. Nueva Ecija 2nd DEO 1.182 50,585,000.00
a. NUEVA ECIJA (FOURTH DISTRICT) 1.182 50,585,000.00
1. Gapan-Sn Fernando-Olongapo Rd - 1.182 50,585,000.00 K0115+000-K0115+643, K0115+643-K0116+000, K0114+139-K0114+318
4. Pampanga 1st DEO 4.783 147,160,000.00
a. PAMPANGA (THIRD DISTRICT) 4.783 147,160,000.00
1. Gapan-Sn Fernando-Olongapo Rd - 4.783 147,160,000.00 Chainage 0-Chainage 117, K0069+168-K0069+307, K0069+307-K0069+385, K0069+385-K0069+535, K0069+-554-K0069+-437, K0071+-074-K0071+000, K0072+110-K0072+391, K0072+411-K0073+000, K0073+000-K0073+906, K0073+926-K0074+000, K0074+000-K0074+060, K0077+000-K0077+552, K0077+552-K0077+635, K0077+635-K0078+002, K0078+002-K0078+141, K0079+506-K0079+660, K0093+556-K0093+866, K0095+424-K0096+000
5. Zambales 2nd DEO 2.609 84,784,000.00a. ZAMBALES (FIRST DISTRICT) 2.609 84,784,000.00
1. Gapan-Sn Fernando-Olongapo Rd - 2.609 84,784,000.00K0119+159-K0120+000, K0120+000-K0121+769
e. Region IV-A 3.092 75,874,000.001. Batangas 3rd DEO 2.592 64,324,000.00
a. BATANGAS (THIRD DISTRICT) 2.592 64,324,000.001. Daang Maharlika (LZ) - 1.186 27,397,000.00
K0057+297-K0058+92, K0057+-342-K0057+2972. Manila-Batangas Rd - 1.406 36,927,000.00
K0068+400-K0069+33, K0061+-51-K0062+-194
2. Quezon 4th DEO 0.500 11,550,000.00a. QUEZON (FOURTH DISTRICT) 0.500 11,550,000.00
1. Quirino H-way - 0.500 11,550,000.00K0261+777-K0262+319
f. Region V 2.451 364,019,000.001. Camarines Norte DEO 0.831 193,341,000.00
a. CAMARINES NORTE (FIRST DISTRICT) 0.831 193,341,000.001. Quirino H-way - 0.831 19,204,000.00
K0249+-262-K0249+060, K0249+239-K0249+626, K0249+841-K0250+0, K0250+450-K0250+461
details of dpwh’s programs/projects 723
AMOUNT (Php) PROGRAMS / ACTIVITIES / PROJECTS
2. Daang Maharlika (LZ) - 4.462 100,000,000.00K0250+640-K0250+1040, K0252+0-K0252+451, K0254+0-K0254+649, K0256+418-K0256+805, K0259+660-K0259+914, K0265+0-K0265+283, K0268+0-K0268+646, K0276+65-K0276+672, K0282+389-K0282+785, K0285+0-K0285+259
3. Daang Maharlika (LZ) - 2.945 74,137,000.00K0285+259-K0285+651, K0287+0-K0287+647, K0288+0-K0288+026, K0292+481-K0292+797, K0293+0-K0293+642, K0294+349-K0294+771, K0300+0-K0300+277, K0300+449-K0300+807
2. Camarines Sur 5th DEO 4.589 131,376,000.00a. CAMARINES SUR (FIRST DISTRICT) 4.589 131,376,000.00
1. Rolando A Andaya Highway - 2.523 71,669,000.00K0284+782-K0285+000, K0316+0-K0316+590, K0323+0-
2. Rolando A Andaya Highway - 2.066 59,707,000.00K0335+64-K0335+678, K0336+0-K0336+213, K0336+496-K0336+656, K0336+656-K0337+000, K0337+0-K0337+729
3. Sorsogon 1st DEO 1.620 39,302,000.00
a. SORSOGON (FIRST DISTRICT) 1.620 39,302,000.001. Daang Maharlika (LZ) - 1.620 39,302,000.00
K0562+500-K0562+700, K0564+0-K0564+750, K0569+750-K0570+400
g. Region VI 3.153 325,982,000.001. Iloilo 2nd DEO 0.884 28,730,000.00
a. ILOILO (THIRD DISTRICT) 0.884 28,730,000.001. Iloilo-Capiz (New Route) - 0.884 28,730,000.00
K0029+927-K0030+809
2. Iloilo City DEO 0.800 96,677,000.00a. ILOILO CITY LONE 0.800 96,677,000.00
1. Iloilo-Jaro Diversion Rd - 0.800 40,000,000.00K0004+129-K0004+929
1. Iloilo-Capiz Rd (Old Route) - 1.927 56,677,000.00K0001+327-K0002+0K0001+-494-K0001+-14K0001+-962-K0001+-288K0003+174-K0003+344
3. Negros Occidental 1st DEO 1.469 147,868,000.00a. NEGROS OCCIDENTAL (FIRST DISTRICT) 3.166 101,925,000.00
1. Bacolod North Rd - 3.166 101,925,000.00K0091+0-K0091+686, K0094+0-K0094+349, K0098+689-K0099+000, K0099+0-K0099+296, K0103+991-K0104+114, K0118+474-K0118+531, K0123+0-K0123+144, K0125+0-K0125+305, K0127+454-K0127+579, K0128+0-K0128+126, K0151+482-K0151+600, K0152+0-K0152+131, K0154+458-K0154+616, K0157+500-K0157+613, K0158+91-K0158+225
b. NEGROS OCCIDENTAL (SECOND DISTRICT) 0.969 31,493,000.001. Bacolod North Rd - 0.969 31,493,000.00
K0081+508-K0081+558, K0083+0-K0083+379, K0087+0-K0087+540K0024+0-K0024+500K0061+378-K0061+763K0050+0-K0051+0K0083+0-K0083+4460-296
c. NEGROS OCCIDENTAL (THIRD DISTRICT) 0.500 14,450,000.001. Bacolod North Rd - 0.500 14,450,000.00
K0024+0-K0024+500
4. Negros Occidental 2nd DEO 1.831 52,707,000.00
a. NEGROS OCCIDENTAL (FIFTH DISTRICT) 1.831 52,707,000.001. Bacolod South Rd - 1.831 52,707,000.00
K0050+0-K0051+0, K0061+378-K0061+763, K0083+0-K0083+4460-2960-695K0116+675-K0117+133K0117+133-K0117+560K0125+688-K0125+819K0127+738-K0128+000K0128+0-K0128+150
724 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAMS / ACTIVITIES / PROJECTS
h. Region VII 2.884 380,279,000.001. Cebu City DEO 0.991 32,208,000.00
a. CEBU CITY (FIRST DISTRICT) 0.991 32,208,000.001. Cebu North Rd - 0.991 32,208,000.00
Chainage 0-Chainage 296, Chainage 0-Chainage 695
2. Negros Oriental 1st DEO 7.323 211,622,000.00a. NEGROS ORIENTAL (FIRST DISTRICT) 7.323 211,622,000.00
1. Dumaguete North Rd (Jct Bais-Kabankalan- - 4.172 120,559,000.00K0116+675-K0117+133, K0117+133-K0117+560,
2. Dumaguete North Rd (Jct Bais-Kabankalan- - 3.151 91,063,000.00K0136+990-K0138+000, K0142+0-K0143+353, K0146+704-K0147+000, K0148+515-K0149+000
3. Negros Oriental 2nd DEO 1.893 56,536,000.00a. NEGROS ORIENTAL (SECOND DISTRICT) 1.893 56,536,000.00
1. Bais-Kabankalan Rd - 1.099 32,478,000.00K0051+725-K0052+125, K0063+93-K0063+202, K0069+0-K0069+538, K0073+0-K0073+49
2. Dumaguete North Rd (Dumaguete-Jct Bais-K - 0.794 24,058,000.00K0049+938-K0050+710
4. Negros Oriental 3rd DEO 2.637 79,913,000.00a. NEGROS ORIENTAL (THIRD DISTRICT) 2.637 79,913,000.00
1. Dumaguete South Rd - 2.637 79,913,000.00K0034+0-K0034+943, K0046+194-K0047+887
i. Region VIII 2.307 276,702,000.001. Leyte 1st DEO 1.788 41,303,000.00
a. LEYTE (FIRST DISTRICT) 1.788 41,303,000.001. Palo-Carigara-Ormoc Rd - 1.788 41,303,000.00
K0931+320-K0931+921, K0931+921-K0932+518, K0932+518-K0933+150
2. Leyte 2nd DEO 2.640 79,391,000.00a. LEYTE (SECOND DISTRICT) 2.640 79,391,000.00
1. Palo-Carigara-Ormoc Rd - 2.640 79,391,000.00K0957+648-K0957+761, K0972+220-K0974+722
3. Leyte 4th DEO 0.178 5,393,000.00
a. LEYTE (FOURTH DISTRICT) 0.178 5,393,000.001. Palo-Carigara-Ormoc Rd - 0.178 5,393,000.00
K0993+0-K0993+178
4. Samar 1st DEO 0.195 5,909,000.00a. SAMAR (FIRST DISTRICT) 0.195 5,909,000.00
1. Daang Maharlika (SM) (Sn Isidro-Sn Juani - 0.195 5,909,000.00K0771+521-K0772+-291
5. Samar 2nd DEO 0.146 4,220,000.00a. SAMAR (SECOND DISTRICT) 0.146 4,220,000.00
1. Daang Maharlika (SM) (Sn Isidro-Sn Juani - 0.146 4,220,000.00 K0790+746-K0790+861, K0794+200-K0794+231
6. Northern Samar 1st DEO 2.370 77,035,000.00a. NORTHERN SAMAR (FIRST DISTRICT) 2.370 77,035,000.00
1. Daang Maharlika (SM) (Sn Isidro-Sn Juani - 2.370 77,035,000.00K0679+-56-K0680+142, K0683+0-K0684+490
7. Southern Leyte DEO 3.612 63,451,000.00
a. SOUTHERN LEYTE LONE 3.612 63,451,000.001. Daang Maharlika (LT) - 3.612 63,451,000.00
K1020+0-K1021+0, K1021+0-K1022+0, K1022+0-K1023+0, K1023+0-K1023+149, K1026+561-K1027+0
j. Region IX 10.601 297,394,000.00
1. Zamboanga City DEO 2.329 70,569,000.00a. ZAMBOANGA CITY (SECOND DISTRICT) 2.329 70,569,000.00
1. Pagadian City-Zamboanga City Rd - 2.329 70,569,000.00K1906+328-K1907+170, K1912+363-K1913+0, K1914+0-K1914+942
details of dpwh’s programs/projects 725
AMOUNT (Php) PROGRAMS / ACTIVITIES / PROJECTS
2. Zamboanga del Norte 2nd DEO 2.793 80,710,000.00a. ZAMBOANGA DEL NORTE (THIRD DISTRICT) 2.793 80,710,000.00
1. Sindangan-Liloy Rd - 2.793 80,710,000.00K1951+804-K1952+000, K1952+205-K1952+777, K1952+827-K1953+000, K1953+0-K1953+928, K1954+0-K1954+110, K1954+134-K1954+936
3. Zamboanga del Sur 1st DEO 2.395 74,875,000.00
a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 2.395 74,875,000.001. Pagadian City-Zamboanga City Rd - 2.395 59,875,000.00
K1662+-205-K1662+500, K1663+564-K1665+3201. Jct Aurora-Ozamis City Rd - 0.598 15,000,000.00
K1657+907-K1658+0, K1658+0-K1658+400
4. Zamboanga del Sur 2nd DEO 3.084 71,240,000.00
a. ZAMBOANGA DEL SUR (SECOND DISTRICT) 3.084 71,240,000.001. Pagadian City-Zamboanga City Rd - 3.084 71,240,000.00
K1675+-31-K1675+468, K1675+-32-K1675+-31, K1675+468-K1676+0, K1676+0-K1676+726, K1676+726-K1677+-142, K1690+000-K1690+550, K1716+226-K1717+000
k. Region X 32.965 997,829,000.00
1. Bukidnon 1st DEO 3.444 105,136,000.00
a. BUKIDNON (SECOND DISTRICT) 3.444 105,136,000.00
1. Sayre Highway - 3.444 105,136,000.00 K1491+56-K1492+520, K1508+506-K1509+724, K1522+568-K1522+750, K1524+480-K1525+040
2. Bukidnon 2nd DEO 8.727 241,619,000.00a. BUKIDNON (THIRD DISTRICT) 8.727 241,619,000.00
1. Bukidnon-Davao City Rd - 5.571 150,000,000.00K1588+596-K1588+722, K1595+509-K1596+280, K1618+298-K1619+0, K1619+0-K1619+485, K1579+592-K1579+776, K1579+817-K1581+0, K1584+753-K1585+0, K1586+560-K1586+812, K1586+812-K1586+815, K1592+202-K1593+0, K1593+0-K1593+722
2. Bukidnon-Davao City Rd - 3.156 91,619,000.00K1593+722-K1594+0, K1594+0-K1595+0, K1595+0-K1595+100, K1595+453-K1595+779, K1595+779-K1596+0, K1596+0-K1596+280, K1596+575-K1596+863, K1597+50-K1597+721
3. Lanao del Norte 1st DEO 1.522 46,116,000.00a. LANAO DEL NORTE (FIRST DISTRICT) 0.524 15,877,000.00
1. Iligan City-Marawi City Rd - 0.524 15,877,000.00K1547+603-K1548+124
b. LANAO DEL NORTE (SECOND DISTRICT) 0.998 30,239,000.001. Linamon-Zamboanga Rd - 0.998 30,239,000.00
K1616+0-K1617+0
4. Lanao del Norte 2nd DEO 7.359 175,650,000.00a. LANAO DEL NORTE (FIRST DISTRICT) 7.359 126,853,000.00
1. Linamon-Zamboanga Rd - 7.359 126,853,000.00K1536+000-K1536+811,K1539+910-K1540+472,K1542+874-K1543+417, K1569+0-K1569+603, K1569+603-K1569+800, K1570+265-K1571+0, K1570+99-K1570+265, K1575+379-K1576+57, K1588+137-K1589+0, K1589+525-K1590+0, K1590+0-K1590+69, K1590+69-K1590+872, K1592+0-K1593+0
a. ILIGAN CITY LONE 1.564 48,797,000.001. Misamis Oriental-Ma Cristina Bdry Rd - 1.564 48,797,000.00
K1529+362-K1530+0, K1530+0-K1530+897
5. Misamis Occidental 1st DEO 3.273 99,191,000.00a. MISAMIS OCCIDENTAL (FIRST DISTRICT) 3.273 99,191,000.00
1. Oroquieta City-Plaridel-Calamba-Sapang D - 3.273 99,191,000.00K1745+32-K1746+365, K1765+800-K1767+352, K1785+500-K1785+888
726 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAMS / ACTIVITIES / PROJECTS
6. Misamis Occidental 2nd DEO 2.400 86,353,000.00a. MISAMIS OCCIDENTAL (SECOND DISTRICT) 2.400 86,353,000.00
1. Ozamis-Pagadian Rd - 2.400 69,357,000.00K1677+694-K1678+0, k1680+770-k1681+0, K1683+305-K1683+809, K1686+996-K1687+502, K1688+382-K1689+129, K1691+888-K1692+0
1. Ozamis-Oroquieta Rd - 0.575 16,996,000.00K1701+-271-K1701+0, K1707+895-K1708+0, K1708+0-K1708+200
7. Misamis Oriental 1st DEO 3.136 97,951,000.00a. MISAMIS ORIENTAL (FIRST DISTRICT) 3.136 97,951,000.00
1. Butuan City-Cagayan de Oro City-Iligan C - 3.136 97,951,000.00K1302+770-K1303+70, K1303+333-K1303+378, K1303+478-K1303+550, K1304+182-K1304+231, K1304+261-K1304+285, K1304+556-K1305+0, K1306+206-K1307+359, K1307+539-K1307+909, K1308+175-K1308+207, K1308+216-K1308+789, K1361+-13-K1361+54
8. Misamis Oriental 2nd DEO 4.626 145,813,000.00a. MISAMIS ORIENTAL (SECOND DISTRICT) 4.626 145,813,000.00
1. Butuan City-Cagayan de Oro City-Iligan C - 4.626 145,813,000.00K1462+737-K1463+0, K1487+547-K1489+0,K1495+0-K1495+243, K1498+627-K1498+1218, K1502+500-K1502+759, K1502+759-K1502+968, K1503+0-K1503+900, K1504+0-K1504+423, K1505+0-K1505+159, K1505+864-K1506+0K1626+0-K1626+200K1626+200-K1627+0K1626+0-K1627+0
l. Region XI 0.900 263,857,000.001. Davao City 2nd DEO 0.900 83,015,000.00
a. DAVAO CITY (THIRD DISTRICT) 0.900 83,015,000.001. Davao-Cotabato Rd (Davao City-Jct Digos - 0.900 29,250,000.00
K1532+0-K1532+384, K1532+384-K1532+630, K1532+630-K1532+900
1. Davao-Bukidnon Rd - 1.934 53,765,000.00K1626+000-K1626+200, K1626+200-K1627+000, K1628+000-K1629+000
2. Davao del Sur 1st DEO 3.523 109,924,000.00a. DAVAO DEL SUR LONE 3.523 109,924,000.00
1. Davao-Cotabato Rd (Davao City-Jct Digos - 3.523 109,924,000.00K1542+49-K1542+320, K1542+907-K1543+019, K1543+19-K1543+62, K1543+62-K1543+145, K1544+0-K1544+224, K1544+504-K1544+526, K1545+0-K1545+444, K1546+0-K1546+443, K1547+0-K1547+230, K1547+672-K1547+911, K1548+187-K1548+566, K1551+0-K1551+450, K1552+0-K1552+457
3. Davao del Sur 2nd DEO 2.273 70,918,000.00
a. DAVAO OCCIDENTAL LONE 2.273 70,918,000.001. Digos-Makar Rd - 2.273 70,918,000.00
K1589+0-K1590+0, K1590+0-K1590+1044
m. Region XII 0.600 89,972,000.001. Cotabato 1st DEO 2.372 70,472,000.00
a. COTABATO (SECOND DISTRICT) 2.372 70,472,000.001. Makilala-Allah Valley Rd - 2.372 70,472,000.00
K1611+-393-K1611+62, K1611+62-K1611+979, K1620+0-K1621+0
1. Sarangani DEO 0.600 19,500,000.00a. SARANGANI LONE 0.600 19,500,000.00
1. Digos-Makar Rd - 0.600 19,500,000.00K1600+223-K1600+823
n. Region XIII 2.117 63,808,000.001. Agusan del Sur 1st DEO 0.763 22,871,000.00
a. AGUSAN DEL SUR (FIRST DISTRICT) 0.763 22,871,000.001. Daang Maharlika (Agusan-Davao Sect) - 0.763 22,871,000.00
K1241+704-K1241+849, K1247+121-K1247+227, K1247+383-K1247+420, K1247+420-K1247+545, K1248+200-K1248+550
details of dpwh’s programs/projects 727
AMOUNT (Php) PROGRAMS / ACTIVITIES / PROJECTS
2. Agusan del Sur 2nd DEO 1.354 40,937,000.00a. AGUSAN DEL SUR (SECOND DISTRICT) 1.354 40,937,000.00
1. Daang Maharlika (Agusan-Davao Sect) - 1.354 40,937,000.00K1319+27-K1319+960, K1322+137-K1322+450, K1330+795-K1330+858, K1375+530-K1375+554, K1375+554-K1375+575
728 eXpeNditUre program fY 2016 VolUme ii
2. Secondary Roads 183.058 4,990,493,000
I. Central Office 20.377 603,000,000 a. Region IV-B 20.377 593,000,000
1. Southern Mindoro DEO 20.377 593,000,000a. MINDORO ORIENTAL (SECOND DISTRICT) 20.377 593,000,000
1. Calapan South Rd - 12.714 360,811,000 K0102+550-K0103+594, K0107+1016-K0109+8, K0110+181-K0111+456, K0121+668-K0122+20, K0122+560-K0124+107, K0124+153-K0124+960, K0130+000-K0131+000, K0158+0-K0159+0, K0161+713-K0162+522, K0175+141-K0177+14, K0177+176-K0178+0, K0178+554-K0179+0, K0181+191-K0182+10
2. Mindoro Oriental/Occidental East Coastal - 7.663 232,189,000 K0186+466-K0187+537, K0188+398-K0188+928, K0190+0-K0190+428, K0193+229-K0193+602, K0196+0-K0198+0, K0198+118-K0198+242, K0198+257-K0199+316, K0200+0-K0200+244, K0200+352-K0200+551, K0200+731-K0201+0, K0202+905-K0203+951
b. Nationwide - 10,000,0001. Central Office - 10,000,000
a. NATIONWIDE - 10,000,0001. Rehabilitation/Reconstruction - Secondary Roads - 10,000,000
II. Regional Office Proper 96.607 2,641,155,000 a. National Capital Region 3.461 107,979,000
1. Quezon City 1st DEO 3.461 107,979,000a. QUEZON CITY (FIRST DISTRICT) 3.461 107,979,000
1. A Bonifacio Ave - 3.461 107,979,000 K0006+-348-K0006+-086, K0007+0-K0007+363, K0007+0-K0007+440, K0007+693-K0008+074, K0007+840-K0006+087, K0008+309-K0008+670, K0008+353-K0008+615, K0008+853-K0009+142, K0009+111-K0009+425, K0009+-390-K0009+-128, K0009+711-K0008+036
b. Region I 19.035 388,137,0001. Ilocos Sur 2nd DEO 3.887 117,776,000
a. ILOCOS SUR (SECOND DISTRICT) 3.887 117,776,0001. Ilocos Sur-Abra Rd - 3.887 117,776,000
K0378+-155-K0379+0, K0379+0-K0380+0, K0381+0-K0382+0, K0382+0-K0382+728
2. La Union 2nd DEO 2.555 61,958,000a. LA UNION (SECOND DISTRICT) 2.555 61,958,000
1. Rosario-Pugo Rd - 2.555 61,958,000 K0216+-1004-K0216+-893, K0216+-408-K0216+0, K0216+-663-K0216+-408, K0220+-22-K0220+775, K0223+247-K0224+235
3. Pangasinan 1st DEO 9.696 120,619,000a. PANGASINAN (FIRST DISTRICT) 9.696 120,619,000
1. Pangasinan-Zambales Rd - 9.696 120,619,000 K0271+733-K0272+000, K0274+000-K0274+140, K0280+000-K0281+000, K0289+000-K0289+892, K0299+000-K0300+000, K0302+000-K0302+520, K0307+000-K0307+187, K0311+044-K0314+000, K0313+424-K0313+837, K0313+837-K0314+000, K0320+765-K0321+000, K0329+000-K0330+000,K0333+000-K0334+000
4. Pangasinan 4th DEO 2.897 87,784,000a. PANGASINAN (THIRD DISTRICT) 2.897 87,784,000
1. Villasis-Malasiqui-Sn Carlos Rd - 2.897 87,784,000 K0183+412-K0184+0, K0184+0-K0185+0, K0186+0-K0186+574, K0186+574-K0187+50, K0188+538-K0188+698, K0192+640-K0192+750
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
details of dpwh’s programs/projects 729
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
c. Cordillera Administrative Region 1.812 56,534,000 1. Benguet 1st DEO 1.812 56,534,000
a. BENGUET LONE 1.812 56,534,0001. Baguio-Bontoc Rd - 1.812 56,534,000
K0258+178-K0259+0, K0261+0-K0262+0
d. Region III 5.215 161,171,0001. Nueva Ecija 1st DEO 5.215 161,171,000
a. NUEVA ECIJA (FIRST DISTRICT) 3.351 103,014,0001. Nueva Ecija-Pangasinan Rd - 3.351 103,014,000
K0166+0-K0166+799, K0169+48-K0169+871, K0171+267-K0173+0
b. NUEVA ECIJA (SECOND DISTRICT) 1.864 58,157,0001. San Jose City-Rizal Rd via Pinili-Porais - 1.864 58,157,000
K0167+710-K0168+282, K0168+282-K0169+0, K0173+815-K0174+389
e. Region IV-A 2.671 79,685,0001. Batangas 2nd DEO 2.671 79,685,000
a. BATANGAS (SECOND DISTRICT) 2.671 79,685,0001. Batangas-Lobo Rd - 2.671 79,685,000
K0116+464-K0117+0, K0128+0-K0129+0, K0131+0-K0131+890
f. Region IV-B 6.341 136,542,0001. Marinduque DEO 1.785 54,086,000
a. MARINDUQUE LONE 1.785 54,086,0001. Marinduque Circumferential Rd - 1.785 54,086,000
K0004+0-K0004+600, K0005+300-K0005+486, K0005+670-K0005+832, K0057+000-K0057+837
2. Mindoro Occidental DEO 4.556 82,456,000a. MINDORO OCCIDENTAL LONE 4.556 82,456,000
1. Mindoro West Coastal Rd - 4.556 82,456,000 K0231+358-K0231+456, K0322+600-K0322+861, K0341+0-K0341+67, K0341+67-K0341+509, K0343+246-K0343+909, K0346+280-K0346+330, K0377+300-K0377+820, K0440+237-K0440+521, K0440+521-K0441+238, K0441+238-K0441+306, K0442+505-K0443+0, K0443+0-K0443+171, K0443+171-K0444+0
g. Region V 9.569 281,258,0001. Camarines Sur 3rd DEO 1.942 58,840,000
a. CAMARINES SUR (FOURTH DISTRICT) 1.942 58,840,0001. Lagonoy-Presentacion Rd - 1.942 58,840,000
K0518+403-K0518+523, K0521+181-K0521+832, K0522+982-K0523+149, K0523+762-K0523+848, K0525+684-K0526+000, K0526+0-K0526+564
2. Catanduanes DEO 3.418 103,562,000a. CATANDUANES LONE 3.418 103,562,000
1. Catanduanes Cir Rd - 3.418 103,562,000 K0007+0-K0007+292, K0011+0-K0011+259, K0013+0-K0013+368, K0014+0-K0014+186, K0016+0-K0016+140, K0020+726-K0020+878, K0028+687-K0028+803, K0034+0-K0034+275, K0034+745-K0035+000, K0035+0-K0035+368, K0046+376-K0046+656, K0049+276-K0049+544, K0050+952-K0051+063, K0051+364-K0052+305
3. Masbate 1st DEO 4.209 118,856,000a. MASBATE (SECOND DISTRICT) 4.209 118,856,000
1. Masbate-Cataingan-Placer Rd - 2.076 57,212,000 K0000+0-K0000+480, K0003+966-K0003+986, K0012+40-K0013+616Masbate-Milagros Rd - 2.133 61,644,000 K0010+877-K0012+0, K0013+0-K0014+0
h. Region VI 11.748 319,156,0001. Capiz 1st DEO 4.510 87,751,000
a. CAPIZ (FIRST DISTRICT) 4.510 87,751,0001. Iloilo East Coast-Capiz Rd - 4.510 87,751,000
K0124+481-K0126+077, K0130+000-K0132+500, K0136+924-K0137+484
730 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
2. Iloilo 2nd DEO 1.855 60,288,000a. ILOILO (FOURTH DISTRICT) 1.855 60,288,000
1. Iloilo East Coast-Capiz Rd - 1.855 60,288,000K0280+147-K0281+50, K0281+50-K0282+0
3. Iloilo City DEO 1.744 52,843,000a. ILOILO CITY LONE 1.744 52,843,000
1. Iloilo Airport Direct Rd - 1.744 52,843,000 Chainage 0-Chainage 710, Chainage 710-Chainage 1744
4. Negros Occidental 3rd DEO 3.639 118,274,000a. NEGROS OCCIDENTAL (SIXTH DISTRICT) 3.639 118,274,000
1. Bacolod South Rd (Kabankalan-Hinobaan Se - 3.639 118,274,000 K0116+10-K0116+122, K0120+0-K0120+893, K0121+0-K0121+892, K0155+1048-K0156+700, K0162+350-K0163+198
i. Region VII 16.868 517,502,0001. Bohol 2nd DEO 2.844 86,185,000
a. BOHOL (SECOND DISTRICT) 2.844 86,185,0001. Loay Interior Rd - 2.844 86,185,000
K0139+765-K0141+887, K0147+282-K0148+0
2. Cebu 3rd DEO 3.089 91,568,000a. CEBU (THIRD DISTRICT) 3.089 91,568,000
1. Toledo-Pinamungahan-Aloguinsan-Mantalong - 3.089 91,568,000 K0068+110-K0069+0, K0069+227-K0069+565, K0069+770-K0070+345, K0086+472-K0087+637, K0087+665-K0087+715
3. Cebu 4th DEO 2.167 70,394,000a. CEBU (SECOND DISTRICT) 2.167 70,394,000
1. Santander-Barili-Toledo Rd - 2.167 70,394,000 K0150+560-K0151+290, K0188+0-K0188+367, K0195+320-K0195+855, K0202+82-K0202+567
4. Cebu 5th DEO 3.398 102,960,000a. CEBU (FIFTH DISTRICT) 3.398 102,960,000
1. Consolacion-Tayud-Liloan Rd - 3.398 102,960,000 Chainage 0-Chainage 3082, Chainage 3375-Chainage 3692
5. Cebu 6th DEO 1.759 56,980,000a. CEBU (SIXTH DISTRICT) 1.759 56,980,000
1. Mandaue Causeway (Ouano Ave) - 1.759 56,980,000 Chainage 0-Chainage 20, Chainage 0-Chainage 620, Chainage 0-Chainage 903, Chainage 43-Chainage 259
6. Negros Oriental 3rd DEO 3.611 109,415,000a. NEGROS ORIENTAL (THIRD DISTRICT) 3.611 109,415,000
1. Dumaguete South Rd - 3.611 109,415,000 K0113+60-K0114+60, K0115+0-K0116+0, K0117+635-K0118+635, K0120+646-K0121+0, K0121+573-K0121+846
j. Region VIII 4.103 124,104,0001. Leyte 3rd DEO 2.101 63,660,000
a. LEYTE (THIRD DISTRICT) 2.101 63,660,0001. Calubian Jct-Sn Isidro-Tabango-Villaba-P - 2.101 63,660,000
K1014+930-K1015+0, K1015+515-K1015+670, K1018+890-K1019+150, K1019+500-K1019+550, K1020+575-K1020+625, K1022+883-K1023+81, K1024+780-K1024+830, K1025+480-K1025+533, K1025+690-K1025+790, K1025+91-K1025+151, K1032+884-K1033+180, K1033+980-K1034+165, K1047+300-K1047+770
2. Northern Samar 1st DEO 2.002 60,444,000a. NORTHERN SAMAR (FIRST DISTRICT) 2.002 60,444,000
1. Allen-Catarman Rd - 2.002 60,444,000 K0720+0-K0722+0
details of dpwh’s programs/projects 731
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
k. Region IX 2.338 70,841,0001. Zamboanga City DEO 2.338 70,841,000
a. ZAMBOANGA CITY (FIRST DISTRICT) 2.338 70,841,0001. Zamboanga City-Labuan-Limpapa Rd - 2.338 70,841,000
K1960+725-K1961+257, K1961+257-K1962+86, K1966+0-K1967+0
l. Region X 9.818 293,422,0001. Bukidnon 2nd DEO 2.905 83,967,000
a. BUKIDNON (THIRD DISTRICT) 2.905 83,967,0001. Sayre Highway (Bukidnon-Davao Jct to Cot - 2.905 83,967,000
K1587+0-K1589+781, K1595+94-K1595+152, K1603+936-K1604+0
2. Camiguin DEO 3.940 119,373,000a. CAMIGUIN LONE 3.940 119,373,000
1. Camiguin Circumferential Rd - 3.940 119,373,000 K0024+240-K0024+446, K0037+547-K0038+422, K0039+0-K0040+400, K0061+616-K0063+044
3. Regional Office X - Proper 2.973 90,082,000a. BUKIDNON (FOURTH DISTRICT) 2.973 90,082,000
1. Maramag-Maradugao Rd - 2.973 90,082,000 K1583+0-K1583+896, K1583+896-K1584+0, K1584+359-K1584+422, K1584+422-K1585+0, K1585+0-K1585+1004, K1587+500-K1587+890
m. Region XI 3.627 104,824,0001. Davao del Sur 2nd DEO 3.627 104,824,000
a. DAVAO OCCIDENTAL LONE 3.627 104,824,0001. Davao-Sarangani Coastal Rd (Malalag-Mali - 3.627 104,824,000
K1584+846-K1585+656, K1587+994-K1589+040, K1592+159-K1592+768, K1594+892-K1596+052
III. District Engineering Office 66.075 1,746,338,000 a. National Capital Region 2.179 64,700,000
1. Metro Manila 1st DEO 0.274 6,170,000a. PASIG CITY LONE 0.274 6,170,000
1. C-5 Road - 0.274 6,170,000 Chainage 87-Chainage 361
2. Metro Manila 2nd DEO 0.448 12,947,000a. PARANAQUE CITY (FIRST DISTRICT) 0.448 12,947,000
1. Ninoy Aquino Ave - 0.448 12,947,000 K0011+502-K0011+950
3. North Manila DEO 0.096 3,120,000a. MANILA CITY (FIRST DISTRICT) 0.096 3,120,000
1. R-10 - 0.096 3,120,000 K0003+630-K0003+726
4. Quezon City 1st DEO 1.361 42,463,000a. QUEZON CITY (SECOND DISTRICT) 1.361 42,463,000
1. Commonwealth Ave - 1.361 42,463,000 K0020+144-K0019+0, K0020+-357-K0020+144
b. Region I 6.221 147,160,0001. La Union 1st DEO 0.393 11,908,000
a. LA UNION (FIRST DISTRICT) 0.393 11,908,0001. Access Rd to Airport - 0.393 11,908,000
K0000+-98-K0000+295
2. Pangasinan 1st DEO 2.823 45,336,000a. PANGASINAN (FIRST DISTRICT) 2.823 45,336,000
1. Alaminos-Bolinao Rd - 2.321 37,561,000 K0322+328-K0322+735, K0333+931-K0334+000, K0335+773-K0336+080, K0336+125-K0336+473, K0338+326-K0338+500, K0341+000-K0341+400, K0343+675-K0344+093, K0361+130-K0361+327
2. Alaminos-Lucap Rd - 0.502 7,775,000 K0323+440-K0323+620, K0323+735-K0324+000, K0325+240-K0325+290
732 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
3. Pangasinan 3rd DEO 2.007 60,812,000a. PANGASINAN (FIFTH DISTRICT) 2.007 60,812,000
1. Carmen Jct-Manat Rd - 1.000 30,300,000 K0182+0-K0183+0
2. Villasis-Malasiqui-Sn Carlos Rd - 1.007 30,512,000 K0178+0-K0179+0
4. Pangasinan 4th DEO 0.998 29,104,000a. PANGASINAN (THIRD DISTRICT) 0.998 29,104,000
1. Camiling-Wawa-Bayambang-Malasiqui-Sta Ba - 0.596 17,224,000 K0177+350-K0178+0
2. Sta Barbara-Mangaldan Rd - 0.402 11,880,000 K0201+-160-K0201+026, K0201+370-K0201+587
c. Region II 1.423 41,123,0001. Quirino DEO 1.423 41,123,000
a. QUIRINO LONE 1.423 41,123,0001. Cordon-Aurora Bdry Rd (Isabela Bdry-Jct - 0.966 27,915,000
K0329+657-K0329+668, K0329+761-K0329+796, K0342+70-K0342+516, K0342+934-K0343+112, K0343+480-K0343+542, K0348+802-K0349+011
1. Cordon-Aurora Bdry Rd (Jct Dumabato-Auro - 0.457 13,208,000 K0372+150-K0372+607
d. Cordillera Administrative Region 0.532 16,120,0001. Abra DEO 0.532 16,120,000
a. ABRA LONE 0.532 16,120,0001. Abra-Kalinga Rd - 0.532 16,120,000
K0419+747-K0420+278
e. Region III 0.533 17,323,0001. Zambales 2nd DEO 0.533 17,323,000
a. ZAMBALES (FIRST DISTRICT) 0.533 17,323,0001. Olongapo-Bugallon Rd - 0.533 17,323,000
K0154+352-K0154+885
f. Region IV-A 2.316 60,340,0001. Batangas 2nd DEO 0.555 12,821,000
a. BATANGAS (SECOND DISTRICT) 0.555 12,821,0001. Palico-Balayan-Batangas Rd - 0.555 12,821,000
K0149+855-K0150+141
2. Batangas 3rd DEO 0.553 12,774,000a. BATANGAS (THIRD DISTRICT) 0.553 12,774,000
1. Banay-Banay-Mojon-Cuenca Rd - 0.553 12,774,000 K0098+439-K0099+0
3. Laguna 1st DEO 0.258 5,960,000a. LAGUNA (FOURTH DISTRICT) 0.258 5,960,000
1. Rizal Bdry-Famy-Quezon Rd - 0.258 5,960,000 K0089+199-K0089+457
4. Quezon 1st DEO 0.950 28,785,000a. QUEZON (FIRST DISTRICT) 0.950 28,785,000
1. Famy-Real-Infanta-Dinahican Port Rd - 0.950 28,785,000 K0108+0-K0109+0
g. Region IV-B 6.056 159,713,0001. Mindoro Occidental DEO 0.893 27,058,000
a. MINDORO OCCIDENTAL LONE 0.893 27,058,0001. Jct MWCR-Sn Jose Airport-Jct Bubog Rd - 0.121 3,666,000
K0239+869-K0240+02. Mindoro Oriental/Occidental East Coastal - 0.270 8,181,000
K0209+500-K0209+7703. Sn Jose-Caminawit Port Rd - 0.502 15,211,000
K0239+709-K0240+209
2. Mindoro Oriental DEO 0.048 1,387,000a. MINDORO ORIENTAL (FIRST DISTRICT) 0.048 1,387,000
1. Calapan North Rd - 0.048 1,387,000 K0052+217-K0052+265
3. Palawan 2nd DEO 0.517 15,665,000a. PALAWAN (SECOND DISTRICT) 0.517 15,665,000
1. Puerto Princesa South Rd - 0.517 15,665,000 K0144+0-K0144+517
details of dpwh’s programs/projects 733
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
4. Palawan 3rd DEO 3.210 91,458,000a. PALAWAN (THIRD DISTRICT) 3.210 91,458,000
1. Capitol-Canigaran Rd - 1.734 44,458,000 K0001+0-K0001+459K0001+-460-K0001+0K0001+-460-K0001+459K0001+000-K0001+393, K0036+000-K0036+529, K0065+1099-K0066+275, K0065+670-K0065+944
2. Puerto Princesa South Rd - 1.476 47,000,000 K0001+000-K0001+393, K0036+000-K0036+529, K0065+1099-K0066+275, K0065+670-K0065+944
5. Romblon DEO 1.388 24,145,000a. ROMBLON LONE 1.388 24,145,000
1. Tablas Circumferential Rd - 1.388 24,145,000 K0000+000-K0001+000, K0001+000-K0001+228, K0001+243-K0001+397
h. Region V 6.901 214,078,000 1. Albay 3rd DEO 0.082 2,485,000
a. ALBAY (THIRD DISTRICT) 0.082 2,485,0001. Ligao-Pio Duran Rd - 0.082 2,485,000
K0502+0-K0502+82
2. Camarines Norte DEO 1.584 48,021,000a. CAMARINES NORTE (FIRST DISTRICT) 1.584 48,021,000
1. Talobatib-Jose Panganiban Pob-Port Rd - 1.584 48,021,000 K0322+0-K0322+259, K0336+0-K0337+6
3. Camarines Sur 3rd DEO 2.334 70,735,000a. CAMARINES SUR (FOURTH DISTRICT) 2.334 70,735,000
1. Presentacion-Maligaya Rd - 1.274 38,607,000 K0532+0-K0533+293
2. Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via S - 1.060 32,128,000 K0575+0-K0575+803, K0576+0-K0576+258
4. Masbate 1st DEO 0.960 48,000,000a. MASBATE (SECOND DISTRICT) 0.960 48,000,000
1. Jct Tawad-Balud Rd - 0.960 48,000,000 K0028+944-K0029+910
5. Masbate 2nd DEO 1.941 44,837,000a. MASBATE (THIRD DISTRICT) 1.941 44,837,000
1. Masbate-Cataingan-Placer Rd - 1.941 44,837,000 K0060+920-K0062+22, K0062+22-K0062+280, K0062+280-K0062+380, K0062+380-K0062+547, K0062+580-K0062+661, K0068+805-K0069+0
i. Region VI 15.511 398,118,0001. Aklan DEO 1.002 30,361,000
a. AKLAN LONE 1.002 30,361,0001. Aklan East Rd - 1.002 30,361,000
K0312+0-K0313+0
2. Bacolod City DEO 0.536 16,241,000a. BACOLOD CITY LONE 0.536 16,241,000
1. Bacolod Circumferential Rd - 0.536 16,241,000 K0010+400-K0010+424, K0010+962-K0011+476
3. Capiz 1st DEO 3.539 73,000,000a. CAPIZ (FIRST DISTRICT) 3.539 73,000,000
1. Iloilo-Capiz Rd (New Route) - 1.545 25,000,000 K0120+-372-K0121+200
2. Maayon-Jct Bailan Rd - 1.994 48,000,000 K0122+000-K0124+000
4. Guimaras DEO 0.793 18,318,000a. GUIMARAS LONE 0.793 18,318,000
1. Guimaras Circumferential Rd - 0.793 18,318,000 K0000+211-K0000+451, K0034+235-K0034+788
5. Iloilo 1st DEO 1.811 41,799,000a. ILOILO (FIRST DISTRICT) 1.811 41,799,000
1. Iloilo-Antique Rd - 1.811 41,799,000 K0014+920-K0015+0, K0025+544-K0025+708, K0028+412-K0029+23, K0033+37-K0033+340, K0042+330-K0043+0
734 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
6. Iloilo 2nd DEO 0.561 17,503,000a. ILOILO (FOURTH DISTRICT) 0.561 17,503,000
1. Barotac Nuevo-Dumangas-Dacutan Wharf Rd - 0.561 17,503,000 K0275+88-K0275+649
7. Iloilo 3rd DEO 0.307 9,578,000a. ILOILO (FIFTH DISTRICT) 0.307 9,578,000
1. Iloilo East Coast-Capiz Rd - 0.097 3,026,000 K0218+114-K0218+165, K0218+50-K0218+96
2. Iloilo East Coast-Estancia Wharf Rd - 0.210 6,552,000 K0181+750-K0181+960
8. Iloilo 4th DEO 0.889 27,737,000a. ILOILO (SECOND DISTRICT) 0.889 27,737,000
1. New Lucena-Sta. Barbara Rd - 0.889 27,737,000 K0016+-467-K0016+422
9. Iloilo City DEO 2.745 62,197,000a. ILOILO CITY LONE 2.745 62,197,000
1. Arevalo By-Pass Rd - 0.785 16,000,000 K0005+215-K0006+000
2. Iloilo-Antique Rd - 0.098 3,185,000 Chainage 0-Chainage 98
3. Iloilo-Capiz Rd (Old Route) - 0.557 12,867,000 K0004+0-K0004+557
4. Iznart-Ledesma-Molo Rd - 0.238 5,498,000 Chainage 46-Chainage 284
5. JM Basa-Gen Hughes Port-Sn Pedro Rd - 1.067 24,647,000 Chainage 0-Chainage 532, K0001+-450-K0001+85
10. Negros Occidental 1st DEO 1.763 53,139,000a. NEGROS OCCIDENTAL (FIRST DISTRICT) 0.521 15,506,000
1. Jct Balintawak-Old Escalante Rd - 0.521 15,506,000 K0096+-1051-K0096+-987, K0096+-614-K0096+-414, K0096+-987-K0096+-730
b. NEGROS OCCIDENTAL (SECOND DISTRICT) 1.242 37,633,0001. Jct Natl Rd Sagay-Bato-Dian-Marcelo-Bale - 0.251 7,606,000
K0094+615-K0094+8662. Vito Port Rd - 0.991 30,027,000
K0093+0-K0094+0
11. Negros Occidental 2nd DEO 0.072 1,663,000a. NEGROS OCCIDENTAL (FIFTH DISTRICT) 0.072 1,663,000
1. Binalbagan-Isabela Rd - 0.072 1,663,000 Chainage 0-Chainage 72
12. Negros Occidental 4th DEO 1.493 46,582,000a. NEGROS OCCIDENTAL (FOURTH DISTRICT) 1.493 46,582,000
1. Jct Pulupandan-Pulupandan Pier Rd - 1.246 38,875,000 K0026+0-K0027+0, K0028+0-K0028+243
2. Jct Sn Enrique-Pontevedra By-Pass Rd - 0.247 7,707,000 K0036+-329-K0036+-82
j. Region VII 13.310 335,203,0001. Bohol 1st DEO 2.170 94,544,000
a. BOHOL (FIRST DISTRICT) 2.170 94,544,0001. Tagbilaran North Rd (Tagbilaran-Jetafe S - 1.461 44,544,000
K0034+194-K0034+631, K0035+798-K0036+0, K0038+0-K0038+818
2. Tagbilaran North Rd (Tagbilaran-Jetafe Sect) - 0.709 50,000,000 K0030+620-K0031+330
2. Bohol 2nd DEO 0.979 29,664,000a. BOHOL (SECOND DISTRICT) 0.979 29,664,000
1. Jct (LIR) Carmen-Sagbayan-Bacani Rd - 0.979 29,664,000 K0082+0-K0083+0
3. Bohol 3rd DEO 0.560 16,968,000a. BOHOL (THIRD DISTRICT) 0.560 16,968,000
1. Tagbilaran East Rd (Tagbilaran-Jagna) - 0.560 16,968,000 K0216+127-K0216+687
4. Cebu 1st DEO 7.605 138,000,000a. CEBU (FOURTH DISTRICT) 7.605 138,000,000
1. Antonio y De Pio H-way - 2.685 49,000,000 K0113+532-K01114+000, K0114+000-K0114+548, K0115+320-K0116+000, K0116+000-K0117+000
details of dpwh’s programs/projects 735
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
2. Cebu North Hagnaya Wharf Rd - 3.273 49,000,000 K0104+000-K0105+000, K0106+000-K0107+000, K0108+051-K0108+1331
3. Toledo-Tabuelan-Sn Remigio Rd - 1.647 40,000,000 K0105+507-K0105+703, K0106+017-K0106+205, K0106+214-K0106+1000, K0107+000-K0107+509
5. Cebu 2nd DEO 0.553 12,774,000a. CEBU (FIRST DISTRICT) 0.553 12,774,000
1. Carcar-Barili-Mantayupan Rd - 0.088 2,033,000 K0046+0-K0046+88
2. Cebu-Toledo Wharf Rd (Jct Naga-Uling) - 0.465 10,741,000 K0022+212-K0022+729
6. Negros Oriental 2nd DEO 1.443 43,253,000a. NEGROS ORIENTAL (SECOND DISTRICT) 1.443 43,253,000
1. Sta Catalina-Pamplona-Tanjay City - 1.443 43,253,000 K0032+887-K0034+0, K0037+836-K0038+172
k. Region VIII 4.104 94,975,0001. Eastern Samar DEO 1.646 21,851,000
a. EASTERN SAMAR LONE 1.646 21,851,0001. Jct Buenavista-Lawaan-Marabut Rd - 0.136 5,284,000
K0991+154-K0991+2902. Jct Taft-Oras-Sn Policarpo-Arteche Rd - 1.510 16,567,000
K0941+209-K0942+576, K0963+906-K0964+0
2. Leyte 3rd DEO 1.079 31,340,000a. LEYTE (THIRD DISTRICT) 1.079 31,340,000
1. Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - 1.079 31,340,000
K1030+000-K1030+1079
3. Northern Samar 2nd DEO 0.483 14,635,000a. NORTHERN SAMAR (SECOND DISTRICT) 0.483 14,635,000
1. Catarman-Laoang Rd - 0.483 14,635,000 K0774+1109-K0774+1186, K0776+600-K0776+730, K0777+20-K0777+80, K0787+850-K0788+50
4. Southern Leyte DEO 0.896 27,149,000a. SOUTHERN LEYTE LONE 0.896 27,149,000
1. Liloan-S Ricardo Rd - 0.896 27,149,000 K1056+-896-K1056+0
l. Region IX 0.600 15,000,0001. Zamboanga del Sur 1st DEO 0.600 15,000,000
a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 0.600 15,000,0001. Sindangan-Siayan-Dumingag-Mahayag Rd(Mahayag-
Dumin - 0.600 15,000,000
K1666+000-K1666+600
m. Region X 3.579 109,692,0001. Bukidnon 2nd DEO 1.016 30,785,000
a. BUKIDNON (THIRD DISTRICT) 1.016 30,785,0001. Maramag-Maradugao Rd - 1.016 30,785,000
K1575+0-K1576+0
2. Lanao del Norte 1st DEO 0.238 7,500,000a. LANAO DEL NORTE (FIRST DISTRICT) 0.238 7,500,000
1. Iligan City-Marawi City Rd via Balo-i Airport - 0.238 7,500,000 Chainage 0-Chainage 238
3. Lanao del Norte 2nd DEO 0.915 27,725,000a. LANAO DEL NORTE (FIRST DISTRICT) 0.915 27,725,000
1. Jct Natl H-way Tubod-Wharf Rd - 0.915 27,725,000 K1589+-915-K1589+0
4. Misamis Occidental 1st DEO 0.344 10,423,000a. MISAMIS OCCIDENTAL (FIRST DISTRICT) 0.344 10,423,000
1. Calamba-Baliangao Rd - 0.344 10,423,000 K1792+184-K1792+528
736 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
5. Misamis Occidental 2nd DEO 1.066 33,259,000a. MISAMIS OCCIDENTAL (SECOND DISTRICT) 1.066 33,259,000
1. Ozamis Port Rd - 0.527 16,442,000 Chainage 117-Chainage 556, Chainage 17-Chainage 105
2. Ozamis Port Rd (Dual) - 0.539 16,817,000 Chainage 0-Chainage 539
n. Region XIII 2.809 72,793,0001. Agusan del Norte DEO 1.249 36,929,000
a. AGUSAN DEL NORTE (SECOND DISTRICT) 1.249 36,929,0001. Nasipit Port Rd - 1.249 36,929,000
K1264+334-K1265+0, K1266+-842-K1266+-247
2. Agusan del Sur 1st DEO 1.515 34,500,000a. AGUSAN DEL SUR (FIRST DISTRICT) 1.515 34,500,000
1. NJR Bah-Bah-Talacogon Rd - 1.004 19,500,000 K1306+000-K1307+000
2. NRJ Awa-Lianga Rd - 0.511 15,000,000 K1297+371-K1297+882
3. Agusan del Sur 2nd DEO 0.045 1,364,000a. AGUSAN DEL SUR (SECOND DISTRICT) 0.045 1,364,000
1. NRJ Sn Francisco-Bahi-Barobo Rd - 0.045 1,364,000 K1315+600-K1315+645
details of dpwh’s programs/projects 737
3. Tertiary Roads 4,324,660,000
I. Central Office - 10,000,000 a. Nationwide - 10,000,000
1. Central Office - 10,000,000a. NATIONWIDE - 10,000,000
1. Rehabilitation/Reconstruction - Tertiary Roads - 10,000,000
II. Regional Office Proper 48.697 1,570,608,000a. Region I 8.672 262,475,000
1. Ilocos Norte 2nd DEO 2.821 85,476,000a. ILOCOS NORTE (SECOND DISTRICT) 2.821 85,476,000
1. Ilocos Norte-Abra Rd - 2.821 85,476,000 K0526+0-K0529+0
2. Ilocos Sur 2nd DEO 1.958 59,321,000a. ILOCOS SUR (SECOND DISTRICT) 1.958 59,321,000
1. Jct Sta Lucia-Salcedo Rd - 1.958 59,321,000 K0339+-880-K0339+-715, K0339+-371-K0339+083, K0340+0-K0340+317, K0341+0-K0341+338, K0342+000-K0343+000, K0345+2-K0345+267, K0350+0-K0350+170
3. La Union 1st DEO 2.231 67,319,000a. LA UNION (FIRST DISTRICT) 2.231 67,319,000
1. Bacnotan-Luna-Balaoan Rd - 2.231 67,319,000 K0285+-283-K0285+0, K0289+60-K0290+0, K0290+0-K0291+0
4. La Union 2nd DEO 1.662 50,359,000a. LA UNION (SECOND DISTRICT) 1.662 50,359,000
1. Agoo Beach Rd - 1.662 50,359,000 K0240+740-K0241+520, K0241+-332-K0240+740, K0241+520-K0242+-368, K0242+155-K0242+853
b. Region II 2.808 85,084,0001. Cagayan 1st DEO 2.808 85,084,000
a. CAGAYAN (FIRST DISTRICT) 2.808 85,084,0001. Baybayog-Baggao-Dalin-Sta. Margarita Rd - 2.808 85,084,000
K0513+-223-K0513+29, K0513+75-K0514+0, K0514+0-K0515+0, K0515+0-K0515+315, K0519+0-K0519+316
c. Region III 5.118 155,873,0001. Nueva Ecija 2nd DEO 2.669 80,873,000
a. NUEVA ECIJA (THIRD DISTRICT) 2.669 80,873,0001. Valdefuente-Fortaleza Rd - 2.669 80,873,000
K0121+387-K0122+319, K0123+0-K0124+765
2. Tarlac 1st DEO 2.449 75,000,000a. TARLAC (FIRST DISTRICT) 2.449 75,000,000
1. Capas-San Jose-Mayantoc-Malacampa Rd - 2.449 75,000,000 K0147+551-K0148+0, K0156+0-K0157+0, K0164+0-K0165+0
d. Region IV-B 3.872 117,687,0001. Mindoro Occidental DEO 2.060 62,808,000
a. MINDORO OCCIDENTAL LONE 2.060 62,808,0001. Jct MWCR (Labangan)-Murtha-Jct Iriron Rd - 2.060 62,808,000
K0234+-931-K0234+0, K0234+0-K0234+841, K0248+0-K0248+288
2. Mindoro Occidental Sub DEO 1.812 54,879,000a. MINDORO OCCIDENTAL LONE 1.812 54,879,000
1. Jct TLLR-Kusang Loob Rd - 1.812 54,879,000 K0001+-764-K0001+-591, K0001+-306-K0002+95, K0002+95-K0002+325
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
738 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
e. Region V 7.506 221,730,0001. Camarines Norte DEO 2.655 74,741,000
a. CAMARINES NORTE (FIRST DISTRICT) 2.655 74,741,0001. Bagong Silang-Capalonga Rd - 2.655 74,741,000
K0300+-207-K0300+000, K0300+0-K0300+160, K0300+160-K0300+357, K0302+509-K0302+644, K0303+0-K0303+100, K0303+740-K0304+000, K0308+0-K0308+260, K0314+862-K0314+917, K0319+869-K0320+090, K0324+586-K0325+000, K0325+0-K0325+207, K0328+0-K0328+282, K0330+0-K0330+116, K0330+421-K0330+608, K0331+0-K0331+181
2. Catanduanes DEO 2.676 81,090,000a. CATANDUANES LONE 2.676 81,090,000
1. Baras-Gigmoto-Viga Rd - 2.676 81,090,000 K0025+-698-K0025+-413, K0025+0-K0025+409, K0026+0-K0026+409, K0027+0-K0027+408, K0041+0-K0041+209, K0046+84-K0046+232, K0050+1000-K0051+399, K0090+0-K0090+409
3. Sorsogon 1st DEO 2.175 65,899,000a. SORSOGON (FIRST DISTRICT) 2.175 65,899,000
1. Jct Donsol-Banuang Gurang Rd - 2.175 65,899,000 K0580+203-K0580+286, K0580+351-K0581+691, K0585+854-K0586+776
f. Region VI 4.455 136,913,0001. Capiz 1st DEO 2.009 60,600,000
a. CAPIZ (FIRST DISTRICT) 2.009 60,600,0001. Roxas City Bdry-Panitan-Bailan Rd - 2.009 60,600,000
K0116+000-K0118+000
2. Iloilo 2nd DEO 2.446 76,313,000a. ILOILO (THIRD DISTRICT) 2.446 76,313,000
1. Cabatuan-New Lucena-Banga-Bante Rd - 2.446 76,313,000 K0026+625-K0027+311, K0027+439-K0028+462, K0028+654-K0029+422
g. Region VII 0.971 131,082,0001. Cebu City DEO 0.971 131,082,000
a. CEBU CITY (FIRST DISTRICT) 0.971 131,082,0001. Colon St - 0.971 131,082,000
Chainage 0-Chainage 226, Chainage 226-Chainage 341, Chainage 535-Chainage 1165
h. Region VIII 10.729 322,361,0001. Biliran DEO 4.574 138,000,000
a. BILIRAN LONE 4.574 138,000,0001. Maripipi Circumferential Rd - 4.574 138,000,000
K0000+400-K0002+500, K0019+200-K0021+674
2. Leyte 1st DEO 1.883 57,055,000a. LEYTE (FIRST DISTRICT) 1.883 57,055,000
1. Govt Ctr Rd Network - 1.883 57,055,000 Chainage 0-Chainage 217Chainage 0-Chainage 924Chainage 217-Chainage 432Chainage 924-Chainage 1000Chainage 924-Chainage 1375
3. Northern Samar 1st DEO 2.520 74,220,000a. NORTHERN SAMAR (FIRST DISTRICT) 2.520 74,220,000
1. Bugko-Nenita-Mirador-Cagpanit-an-De Mari - 2.520 74,220,000 Chainage 0-Chainage 994, Chainage 994-Chainage 2520
4. Tacloban City DEO 1.752 53,086,000a. LEYTE (FIRST DISTRICT) 1.752 53,086,000
1. Sn Jose-Manlurip-MacArthur Park Rd - 1.752 53,086,000 K0912+191-K0913+0, K0914+0-K0914+934
i. Region X 4.566 137,403,0001. Bukidnon 1st DEO 2.549 76,288,000
a. BUKIDNON (SECOND DISTRICT) 2.549 76,288,0001. Jct Sayre H-way-Impasugong-Patulangan By - 2.549 76,288,000
K1478+-911-K1478+775, K1482+786-K1482+965, K1484+502-K1484+802, K1485+941-K1486+015,
2. Regional Office X - Proper 2.017 61,115,000a. BUKIDNON (FOURTH DISTRICT) 2.017 61,115,000
Maramag-Maradugao Rd - 2.017 61,115,000 K1594+0-K1595+0, K1596+0-K1597+0
details of dpwh’s programs/projects 739
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
III. District Engineering Office 100.961 2,744,052,000a. National Capital Region 6.545 203,091,000
1. Malabon-Navotas DEO 0.736 22,301,000a. MALABON CITY LONE 0.736 22,301,000
1. MH Del Pilar St (Malabon) - 0.736 22,301,000 K0012+580-K0013+443
2. Metro Manila 1st DEO 0.196 5,664,000a. PASIG CITY LONE 0.196 5,664,000
1. Lopez-Jaena - 0.196 5,664,000 Chainage 231-Chainage 427
3. Metro Manila 3rd DEO 2.480 77,376,000a. KALOOKAN CITY (FIRST DISTRICT) 1.176 36,691,000
1. Deparo-Camarin Rd - 1.176 36,691,000 K0023+0-K0024+205
b. VALENZUELA CITY (FIRST DISTRICT) 1.304 40,685,0001. Canumay-Bignay Rd - 1.304 40,685,000
K0027+791-K0028+0, K0028+0-K0028+515, K0028+515-K0029+95
4. North Manila DEO 3.133 97,750,000a. MANILA CITY (FIRST DISTRICT) 0.369 11,513,000
1. Zaragosa St - 0.369 11,513,000 Chainage 0-Chainage 190Chainage 129-Chainage 308
b. MANILA CITY (SECOND DISTRICT) 1.359 42,401,0001. A Rivera St - 0.864 26,957,000
Chainage 14-Chainage 8782. North Antipolo St - 0.495 15,444,000
Chainage 0-Chainage 495c. MANILA CITY (THIRD DISTRICT) 0.052 1,622,000
1. Quiricada St - 0.052 1,622,000 Chainage 1076-Chainage 1128
d. MANILA CITY (FOURTH DISTRICT) 1.353 42,214,0001. J Fajardo St - 0.289 9,017,000
Chainage 118-Chainaage 4072. P Florentino - 0.242 7,551,000
Chainage 0-Chainage 2423. SH Loyola - 0.822 25,646,000
Chainage 179-Chainage 1001
b. Region I 4.744 109,490,0001. Ilocos Norte 2nd DEO 1.299 35,445,000
a. ILOCOS NORTE (SECOND DISTRICT) 1.299 35,445,0001. MNR Jct-Baay-Suba Rd - 1.299 35,445,000
K0481+200-K0482+500
2. Ilocos Sur 2nd DEO 1.074 32,557,000a. ILOCOS SUR (SECOND DISTRICT) 1.074 32,557,000
1. Jct Candon-Salcedo-Del Pilar Rd - 0.615 18,635,000 K0347+104-K0347+396, K0348+0-K0348+323
2. Sta Maria-Burgos Rd - 0.459 13,922,000 K0371+0-K0371+328, K0372+0-K0372+132
3. La Union 1st DEO 0.399 11,763,000a. LA UNION (FIRST DISTRICT) 0.399 11,763,000
1. Sn Fernando-Bagulin Rd - 0.399 11,763,000 K0273+0-K0273+226, K0273+226-K0273+399
4. Pangasinan 1st DEO 1.972 29,725,000a. PANGASINAN (FIRST DISTRICT) 1.972 29,725,000
1. Bani-Agno Rd - 1.972 29,725,000 K0336+231-K0337+374, K0339+000-K0339+868
c. Region II 3.752 105,416,0001. Batanes DEO 0.315 9,545,000
a. BATANES LONE 0.315 9,545,0001. Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd - 0.315 9,545,000
K0022+805-K0023+122
2. Isabela 1st DEO 0.500 15,000,000a. ISABELA (FIRST DISTRICT) 0.500 15,000,000
1. Jct Delfin Albano Rd - 0.500 15,000,000 K0425+000-K0425+500
3. Isabela 2nd DEO 1.057 24,417,000a. ISABELA (SECOND DISTRICT) 1.057 24,417,000
1. Naguilian-Sn Mariano Rd - 1.057 24,417,000 K0385+0-K0386+0
740 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
4. Nueva Vizcaya 1st DEO 0.367 10,606,000a. NUEVA VIZCAYA LONE 0.367 10,606,000
1. Bagabag Div Rd - 0.367 10,606,000 K0286+75-K0286+442
5. Quirino DEO 1.513 45,848,000a. QUIRINO LONE 1.513 45,848,000
1. Echague-Jones-Madella Rd (Villa Norte-Pa - 0.044 1,333,000 K0386+242-K0386+261, K0386+441-K0386+466
2. Jct Mangandingay-Saguday-Isabela Bdry Rd - 1.469 44,515,000 K0340+463-K0340+708, K0341+0-K0341+491, K0342+0-K0342+218, K0344+0-K0344+517
d. Region III 13.253 374,004,0001. Bataan 1st DEO 0.675 15,593,000
a. BATAAN (FIRST DISTRICT) 0.675 15,593,0001. Jct Layac-Balanga-Mariveles Port Rd - 0.675 15,593,000
K0110+325-K0111+0
2. Bataan 2nd DEO 1.305 37,459,000a. BATAAN (SECOND DISTRICT) 1.305 37,459,000
1. Jct Layac-Balanga-Mariveles Port Rd - 1.305 37,459,000 K0123+1682-K0125+0, K0127+0-K0128+0
3. Bulacan 1st DEO 0.648 17,950,000a. BULACAN (SECOND DISTRICT) 0.648 17,950,000
1. Plaridel-Pulilan Div Rd - 0.234 5,406,000 K0042+-1015-K0042+-781
2. Sn Simon-Baliwag Rd - 0.414 12,544,000 K0074+125-K0074+539
4. Bulacan 2nd DEO 2.602 70,050,000a. BULACAN (THIRD DISTRICT) 0.502 11,596,000
1. Old Cagayan Valley Rd - 0.502 11,596,000 K0054+-502-K0054+0
b. BULACAN (FOURTH DISTRICT) 2.100 58,454,0001. Meycauayan-Camalig-Bahay Pari Rd - 0.230 6,969,000
K0021+840-K0022+000, K0028+110-K0028+2002. Sta Maria By-Pass Rd - 0.626 18,968,000
K0031+000-K0031+237, K0033+414-K0033+8033. Sta Maria-Norzagaray Rd - 1.244 32,517,000
K0032+-824-K0032+-761, K0034+496-K0034+761, K0039+938-K0040+007, K0041+435-K0041+610, K0042+000-K0042+669
5. Nueva Ecija 1st DEO 3.886 121,243,000a. NUEVA ECIJA (FIRST DISTRICT) 1.599 49,889,000
1. Cabanatuan City-Carmen Rd - 1.599 49,889,000 K0133+999-K0135+0, K0135+0-K0135+542
b. NUEVA ECIJA (SECOND DISTRICT) 2.287 71,354,0001. Muñoz-Lupao Rd - 0.861 26,863,000
K0154+384-K0155+0, K0164+641-K0164+8862. Pantabangan-Canili-Basal-Baler Rd - 1.426 44,491,000
K0181+958-K0183+393
6. Pampanga 1st DEO 1.754 51,919,000a. PAMPANGA (THIRD DISTRICT) 0.876 25,316,000
1. Sn Fernando-Lubao Rd - 0.876 25,316,000 K0070+330-K0071+206
b. PAMPANGA (FOURTH DISTRICT) 0.878 26,603,0001. Baliwag-Candaba-Sta Ana Rd - 0.878 26,603,000
K0062+924-K0063+858
7. Tarlac 1st DEO 2.328 58,200,000a. TARLAC (SECOND DISTRICT) 2.328 58,200,000
1. Victoria - Pura Rd - 0.741 18,500,000 K0150+342-K0151+083
2. Victoria-La Paz Rd - 1.587 39,700,000 K0145+519-K0147+106
8. Zambales 2nd DEO 0.055 1,590,000a. ZAMBALES (FIRST DISTRICT) 0.055 1,590,000
1. Subic-PHILSECO Rd - 0.055 1,590,000 K0141+-462-K0141+-407
e. Region IV-A 4.119 121,000,0001. Laguna 1st DEO 0.471 13,550,000
a. LAGUNA (FOURTH DISTRICT) 0.471 13,550,0001. Paete-Famy Pob Rd - 0.471 13,550,000
K0112+510-K0113+000
details of dpwh’s programs/projects 741
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
2. Quezon 4th DEO 2.458 73,059,000a. QUEZON (FOURTH DISTRICT) 2.458 73,059,000
1. Daang Maharlika Jct-Atimonan Pob Rd - 1.445 43,783,000 Chainage 0-Chainage 1445
2. Jct MSR-Old Zigzag Rd - 1.013 29,276,000 K0156+874-K0157+0, K0157+0-K0158+0
3. Rizal 1st DEO 1.190 34,391,000a. ANTIPOLO CITY (FIRST DISTRICT) 1.190 34,391,000
1. Marikina-Victoria Valley-Antipolo Rd - 1.190 34,391,000 K0017+-625-K0017+-313, K0017+854-K0018+742
f. Region IV-B 12.136 236,552,0001. Mindoro Occidental DEO 0.890 26,967,000
a. MINDORO OCCIDENTAL LONE 0.890 26,967,0001. Bulalacao-Sn Jose-Jct Mapaya Rd - 0.458 13,877,000
K0221+176-K0221+6342. Jct MWCR (Sn Isidro)-Penal Colony-Jct Ya - 0.432 13,090,000
K0306+0-K0306+432
2. Mindoro Occidental Sub DEO 3.281 99,414,000a. MINDORO OCCIDENTAL LONE 3.281 99,414,000
1. Jct Lubang-Binakas-Barac Rd - 0.209 6,333,000 K0006+-464-K0006+-372, K0006+-372-K0006+-337, K0006+-337-K0006+-255
2. Jct TLLR-Agcawayan Rd - 0.974 29,512,000 K0031+-166-K0031+808
3. Jct TLLR-Tanggal Rd - 0.541 16,392,000 K0003+-526-K0003+-12, K0003+319-K0003+346
4. Tagbac-Lubang-Looc Rd - 1.557 47,177,000 K0015+837-K0015+907, K0020+0-K0020+164, K0021+0-K0021+317, K0022+697-K0023+19, K0026+943-K0027+43, K0028+100-K0028+201, K0028+330-K0028+835
3. Mindoro Oriental DEO 1.410 42,723,000a. MINDORO ORIENTAL (FIRST DISTRICT) 1.410 42,723,000
1. CSR Jct-Minas Rd - 1.410 42,723,000 K0046+802-K0048+135
4. Palawan 1st DEO 4.589 27,500,000a. PALAWAN (FIRST DISTRICT) 4.589 27,500,000
1. Coron-Busuanga Rd - 2.086 25,000,000 K0001+000-K0003+000
2. PPNR Jct-Taytay Poblacion Rd - 2.503 2,500,000 K0211+1548-K0213+000
5. Palawan 3rd DEO 0.715 16,517,000a. PALAWAN (THIRD DISTRICT) 0.715 16,517,000
1. Malvar Rd - 0.715 16,517,000 K0002+485-K0002+1200
6. Romblon DEO 1.166 20,855,000a. ROMBLON LONE 1.166 20,855,000
1. Batiano-Poctoy Port Rd - 0.190 3,305,000 Chainage 0-Chainage 190
2. Cajidiocan Port Rd - 0.231 4,405,000 Chainage 0-Chainage 231
3. Carmen Port Rd - 0.150 2,805,000 Chainage 373-Chainage 523
4. San Agustin Port Rd - 0.395 6,995,000 Chainage 0-Chainage 395
5. Tugdan Airport Rd - 0.200 3,345,000 Chainage 0-Chainage 200
7. Southern Mindoro DEO 0.085 2,576,000a. MINDORO ORIENTAL (SECOND DISTRICT) 0.085 2,576,000
1. Calapan South Rd - 0.085 2,576,000 K0183+42-K0183+127
g. Region V 9.056 268,085,0001. Camarines Norte DEO 0.370 11,212,000
a. CAMARINES NORTE (FIRST DISTRICT) 0.370 11,212,0001. Batobalani-Tawig-Tugos-Paracale Rd - 0.370 11,212,000
K0329+-625-K0329+-443, K0335+0-K0335+188
2. Camarines Sur 2nd DEO 2.458 76,299,000a. CAMARINES SUR (THIRD DISTRICT) 2.458 76,299,000
1. Manguiring-Tomagodtod-Sibobo Rd - 1.636 49,584,000 K0458+232-K0459+869
2. Panganiban Rd - 0.822 26,715,000 Chainage 0-Chainage 822
742 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
3. Camarines Sur 3rd DEO 1.243 37,663,000a. CAMARINES SUR (FOURTH DISTRICT) 1.243 37,663,000
1. Tinambac-Siruma Rd - 1.243 37,663,000 K0513+-637-K0513+-513, K0513+-513-K0513+-313, K0513+-71-K0513+23, K0513+23-K0513+848
4. Camarines Sur 5th DEO 0.366 11,090,000a. CAMARINES SUR (FIRST DISTRICT) 0.366 11,090,000
1. Sipocot-Cabusao Rd - 0.366 11,090,000 K0397+140-K0397+506
5. Catanduanes DEO 0.293 8,878,000a. CATANDUANES LONE 0.293 8,878,000
1. Jct Bato-Baras Rd - 0.293 8,878,000 K0024+0-K0024+293
6. Masbate 1st DEO 0.555 12,821,000a. MASBATE (SECOND DISTRICT) 0.555 12,821,000
1. Masbate Port Rd - 0.555 12,821,000 K0001+-799-K0001+-244
7. Masbate 2nd DEO 2.432 67,054,000a. MASBATE (THIRD DISTRICT) 2.432 67,054,000
1. Cataingan Poblacion Rd - 1.150 33,235,000 K0075+-268-K0075+882
2. Placer-Daraga Rd - 1.282 33,819,000 K0096+-38-K0096+178, K0097+408-K0097+890, K0101+0-K0101+584
8. Masbate 3rd DEO 0.577 20,000,000a. MASBATE (FIRST DISTRICT) 0.577 20,000,000
1. Sn Pascual-Claveria Rd - 0.577 20,000,000 K0000+318-K0000+895
9. Sorsogon 1st DEO 0.761 23,068,000a. SORSOGON (FIRST DISTRICT) 0.761 23,068,000
1. Ariman-Casiguran Rd - 0.496 15,039,000 K0620+300-K0620+797
2. Bacon-Sawanga-Prieto Diaz Rd - 0.064 1,939,000 K0604+935-K0605+000
3. Jct Putiao-Pilar-Donsol Rd - 0.201 6,090,000 K0562+622-K0562+823
h. Region VI 17.335 475,058,0001. Bacolod City DEO 0.166 5,030,000
a. BACOLOD CITY LONE 0.166 5,030,0001. Plaza-Capitol Rd - 0.166 5,030,000
K0001+-650-K0001+-484
2. Capiz 1st DEO 3.547 57,000,000a. CAPIZ (FIRST DISTRICT) 3.547 57,000,000
1. Lanot-Loctugan-Panitan Bdry Rd - 3.309 43,000,000 Chainage 0-Chainage 3309
2. Sn Roque-Baybay-Culasi Rd - 0.238 14,000,000 K0119+28-K0119+266
3. Iloilo 1st DEO 1.000 30,300,000a. ILOILO (FIRST DISTRICT) 1.000 30,300,000
1. Oton-Pakiad-Mandurriao Rd - 1.000 30,300,000 K0009+-326-K0009+0, K0009+278-K0010+0
4. Iloilo 3rd DEO 3.898 112,136,000a. ILOILO (FIFTH DISTRICT) 3.898 112,136,000
1. Balasan-Carles Rd - 0.971 32,136,000 K0184+000-K0184+971
2. Sara-Concepcion Rd - 1.935 49,000,000 K0208+-879-K0208+000
3. Sara-Sn Dionisio Rd - 0.992 31,000,000 K0206+000-K0207+000
5. Iloilo City DEO 4.902 151,944,000a. ILOILO CITY LONE 4.902 151,944,000
1. Arroyo St - 0.201 5,171,000 Chainage 0-Chainage 201
2. Cubay-Balabago Rd - 0.388 12,071,000 Chainage 0-Chainage 388
3. Duran St - 0.097 3,471,000 Chainage 420-Chainage 517
4. Iznart-Ledesma-Molo Rd - 0.582 13,516,000 K0001+-469-K0001+113
5. Molo Blvd - 2.000 49,071,000 Chainage 180-Chainage 2180
details of dpwh’s programs/projects 743
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
6. Molo-Mandurriao Rd - 0.800 39,572,000 K0004+-158-K0004+002, K0005+000-K0005+316, K0005+-209-K0005+000, K0005+316-K0005+431
7. Rizal St (City Proper) - 0.834 29,072,000 K0001+333-K0001+725, K0002+-232-K0002+210
6. Negros Occidental 1st DEO 1.175 35,453,000a. NEGROS OCCIDENTAL (SECOND DISTRICT) 1.175 35,453,000
1. Jct New Sagay-Old Sagay Rd - 1.068 32,360,000 K0085+0-K0085+337, K0088+471-K0089+164
2. Manapla By-Pass Rd - 0.107 3,093,000 K0042+-126-K0042+-19
7. Negros Occidental 4th DEO 2.647 83,195,000a. NEGROS OCCIDENTAL (FOURTH DISTRICT) 2.647 83,195,000
1. Bacolod South Road (Old Road) - 0.459 14,902,000 K0019+634-K0019+805, K0023+348-K0023+636
2. Bago-Mambucal Rd - 0.613 19,128,000 K0037+188-K0037+566, K0042+670-K0042+906
3. Sum-ag-Abuanan Rd - 1.576 49,165,000 K0014+477-K0014+655, K0017+343-K0017+609, K0018+426-K0018+692, K0019+0-K0019+119, K0019+399-K0019+959, K0021+-405-K0021+-216
i. Region VII 13.779 404,554,0001. Bohol 1st DEO 1.067 32,170,000
a. BOHOL (FIRST DISTRICT) 1.067 32,170,0001. Antequera-San Isidro-Libertad (Tubigon) Rd - 0.691 20,900,000
K0018+964-K0019+6502. Jct (TNR) Maribojoc-Antequera-Catagbacan - 0.060 1,734,000
K0017+624-K0017+6843. Jct (TNR) Maribojoc-Antequera-Catagbacan (Loon) - 0.294 8,900,000
K0016+985-K0017+181, K0018+890-K0018+9774. Panglao Island Circumferential Rd - 0.022 636,000
K0019+256-K0019+278
2. Bohol 3rd DEO 1.287 40,000,000a. BOHOL (THIRD DISTRICT) 1.287 40,000,000
1. Tagbilaran City-Corella-Sikatuna-Loboc Rd - 1.287 40,000,000 K0025+801-K0027+091
3. Cebu 1st DEO 3.292 84,455,000a. CEBU (FOURTH DISTRICT) 3.292 84,455,000
1. Bogo-Curva-Medellin-Daanbantayan-Maya Rd - 1.803 44,252,000 K0125+000-K0125+974, K0127+440-K0127+729, K0133+000-K0133+387, K0139+847-K0140+000
2. Sogod-Tabuelan Rd - 1.489 40,203,000 K0112+051-K0112+798, K0112+885-K0113+627
4. Cebu 4th DEO 2.038 55,131,000a. CEBU (SECOND DISTRICT) 2.038 55,131,000
1. Argao-Ronda Rd - 0.935 22,527,000 K0081+0-K0081+268, K0081+268-K0081+397, K0081+397-K0081+517, K0081+517-K0081+935
2. Dalaguete-Mantalongon Badian Rd - 1.103 32,604,000 K0085+-850-K0085+-739, K0088+75-K0089+0, K0097+517-K0097+608
5. Cebu 5th DEO 1.393 45,273,000a. CEBU (FIFTH DISTRICT) 1.393 45,273,000
1. Sogod-Tabuelan Rd - 1.393 45,273,000 K0119+-845-K0119+-45, K0125+656-K0126+247
6. Cebu 6th DEO 0.593 18,502,000a. CEBU (SIXTH DISTRICT) 0.593 18,502,000
1. Hernan Cortes St - 0.593 18,502,000 Chainage 1620-Chainage 2213
7. Cebu City DEO 2.594 83,118,000a. CEBU CITY (FIRST DISTRICT) 2.594 83,118,000
1. Archbishop Reyes Flyover 2 - 0.356 3,250,000 Chainage 0-Chainage 356
2. Arellano Blvd - 0.185 5,606,000 Chainage 0-Chainage 185
3. B Rodriguez Ext - 0.112 2,250,000 Chainage 63-Chainage 175
4. Civic Ctr Rd II - 0.222 4,500,000 Chainage 0-Chainage 222
5. Escario St - 1.077 34,796,000 Chainage 0-276, Chainage 0-Chainage 57, Chainage 276-Chainage 335, K0001+-135-K0001+9, K0001+-159-K0001+-135, K0001+-676-K0001+-159
6. Legaspi Ext - 0.548 30,000,000 Chainage 0-Chainage 274
7. P Burgos St - 0.094 2,716,000 Chainage 182-Chainage 218, Chainage 259-Chainage 317
744 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
8. Negros Oriental 2nd DEO 1.515 45,905,000a. NEGROS ORIENTAL (SECOND DISTRICT) 1.515 45,905,000
1. Bayawan-Mabinay Rd. - 0.802 24,301,000 K0140+-198-K0140+335, K0140+-325-K0140+-266, K0149+128-K0149+338
2. Dumaguete City-Valencia-Bacong Rd - 0.713 21,604,000 K0003+-697-K0003+16
j. Region VIII 6.141 195,267,0001. Leyte 2nd DEO 2.540 76,965,000
a. LEYTE (SECOND DISTRICT) 2.540 76,965,0001. Bagahupi-Babatngon-Sta Cruz-Barugo-Carig - 0.500 15,150,000
K0939+0-K0939+5002. Jaro-Dagami-Burauen-Lapaz Rd - 0.290 8,787,000
K0986+576-K0986+8663. Mayorga-Lapaz Rd - 0.835 25,291,000
K0950+0-K0950+165, K0951+0-K0951+6704. Sta Fe-Pastrana-Dagami Rd - 0.915 27,737,000
K0930+-252-K0930+664
2. Leyte 3rd DEO 1.453 44,178,000a. LEYTE (THIRD DISTRICT) 1.453 44,178,000
1. Cabunga-an-Tabunok-Consuegra Rd - 0.170 5,151,000 K1015+300-K1015+420, K1015+600-K1015+650
2. Sto Rosario-Villaba Rd - 1.057 32,027,000 K1008+700-K1008+920, K1010+900-K1011+230, K1011+805-K1012+50, K1014+120-K1014+380
3. Sn Isidro-Daja Rd - 0.226 7,000,000 K1019+530-K1019+756
3. Northern Samar 2nd DEO 1.616 58,241,000a. NORTHERN SAMAR (SECOND DISTRICT) 1.616 58,241,000
1. Arteche-Jipapad-Las Navas-Rawis Road - 0.150 4,545,000 Chainage 941.8-Chainage 1092
2. Rawis-Catubig Rd - 1.188 45,272,000 K0791+000-K0792+000, K0801+784-K0801+858, K0802+600-K0802+700
3. Sn Roque-Cababtoan Old Rd - 0.278 8,424,000 K0775+720-K0776+0K0908+477-K0908+840K0837+-075-K0837+094K0912+191-K0913+0, K0914+0-K0914+934
4. Samar 2nd DEO 0.532 15,883,000a. SAMAR (SECOND DISTRICT) 0.532 15,883,000
1. Basey Old Route - 0.363 10,999,000 K0908+477-K0908+840
2. Hinabangan Diversion Rd - 0.169 4,884,000 K0837+-075-K0837+094
k. Region X 5.727 154,925,0001. Bukidnon 3rd DEO 1.153 16,332,000
a. BUKIDNON (FIRST DISTRICT) 1.153 16,332,0001. Jct SH-Manolo Fortich-Libona-Indahag Rd - 1.153 16,332,000
K1463+0-K1463+819, K1464+455-K1464+789
2. Lanao del Norte 1st DEO 0.492 14,908,000a. LANAO DEL NORTE (SECOND DISTRICT) 0.492 14,908,000
1. Bacolod-Madalum Highway - 0.492 14,908,000 K1576+480-K1576+632, K1579+441-K1579+781
3. Lanao del Norte 2nd DEO 1.369 41,481,000a. ILIGAN CITY LONE 1.369 23,301,000
1. Luna Extension on Poblacion side - 0.131 3,970,000 Chainage 0-Chainage 131
2. Tambacan Rd-Tubod Natl H-way Jct - 0.350 10,605,000 K1526+360-K1526+710
3. Wye Length - 0.288 8,726,000 Chainage 0-Chainage 288
b. LANAO DEL NORTE (FIRST DISTRICT) 0.600 18,180,0001. Balo-i-Matungao-Linamon Rd - 0.600 18,180,000
K1560+900-K1561+500
4. Misamis Occidental 1st DEO 0.277 8,393,000a. MISAMIS OCCIDENTAL (FIRST DISTRICT) 0.277 8,393,000
1. Jimenez Old Route - 0.277 8,393,000 K1724+-455-K1724+-178
5. Misamis Occidental 2nd DEO 2.436 73,811,000a. MISAMIS OCCIDENTAL (SECOND DISTRICT) 2.436 73,811,000
1. Tan Avenue - 0.702 24,811,000 K1686+17-K1686+400, K1686+691-K1687+0
2. Tangub-Polao Rd - 1.734 49,000,000 K1684+-723-K1684+0, K1685+0-K1686+0
details of dpwh’s programs/projects 745
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
l. Region XI 1.224 37,000,0001. Davao del Sur 2nd DEO 1.224 37,000,000
a. DAVAO OCCIDENTAL LONE 1.224 37,000,0001. H-way Jct Mana-Ticulon-Lagumit-Little Baguio Rd - 1.224 37,000,000
K1673+000-K1673+958, K1975+451-K1675+717
m. Region XIII 3.150 59,610,0001. Agusan del Sur 1st DEO 2.690 48,000,000
a. AGUSAN DEL SUR (FIRST DISTRICT) 2.690 48,000,0001. NRJ Bayugan-Esperanza Rd - 2.690 48,000,000
K1270+-850-K1270+-440, K1270+-440-K1270+-298, K1270+-298-K1270+000, K1270+118-K1271+000, K1271+000-K1271+929
2. Butuan City DEO 0.323 7,459,000a. AGUSAN DEL NORTE (FIRST DISTRICT) 0.323 7,459,000
1. Butuan City-Malaybalay Rd - 0.323 7,459,000 Chainage 2116-Chainage 2439
3. Surigao del Norte 1st DEO 0.137 4,151,000a. SURIGAO DEL NORTE (SECOND DISTRICT) 0.137 4,151,000
1. Jct Capalayan-Cabongbongan Rd - 0.137 4,151,000 K1137+363-K1137+500
746 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)
C. 8,265,774,000
1. Primary Roads 1,483,172,000
I. Central Office 510,000,000
a. Region III 300,000,000
1. Nueva Ecija 1st DEO 300,000,000a. NUEVA ECIJA (SECOND DISTRICT) 300,000,000
1. Daang Maharlika (LZ) - K0193+500 - K0193+600
300,000,000
b. Region VII 200,000,000
2. Negros Oriental 1st DEO 200,000,000a. NEGROS ORIENTAL (FIRST DISTRICT) 200,000,000
1. Dumaguete North Rd (Jct Bais-Kabankalan-NOccBdry) - K0062+030 - K0062+696 L/S
200,000,000
c. Nationwide 10,000,0001. Central Office 10,000,000
a. NATIONWIDE 10,000,0001. Slope Protection Works Maintenance (Primary) 10,000,000
II. Regional Office Proper 973,172,000
a. Region I 50,500,0001. Ilocos Norte 1st DEO 48,000,000
a. ILOCOS NORTE (FIRST DISTRICT) 48,000,0001. Manila North Rd -
K0557+600 - K0557+630, K0579+100 - K0579+120, K0587+520 - K0587+538
48,000,000
2. Ilocos Norte 2nd DEO 2,500,000a. ILOCOS NORTE (SECOND DISTRICT) 2,500,000
1. Manila North Rd - K0460+821 - K0460+836, K0461+144 - K0461+154
2,500,000
b. Region II 36,000,0001. Isabela 1st DEO 18,000,000
a. ISABELA (FIRST DISTRICT) 18,000,0001. Daang Maharlika (LZ) -
K0409+560 - K0409+660, K0410+000 - K0410+500, K0448+160 - K0448+750, K0458+800 - K0460+140
18,000,000
2. Isabela 2nd DEO 2,500,000a. ISABELA (SECOND DISTRICT) 2,500,000
1. Daang Maharlika (LZ) - K0392+080 - K0392+200
2,500,000
3. Nueva Vizcaya 1st DEO 15,500,000a. NUEVA VIZCAYA (LONE DISTRICT) 15,500,000
1. Daang Maharlika (LZ) - K0255+400 - K0255+470, K0255+800 - K0255+900, K0286+150 - K0286+160, K0295+900 - K0295+950
15,500,000
c. CAR 109,000,0001. Baguio City DEO 55,000,000
a. BAGUIO CITY (LONE DISTRICT) 55,000,0001. Kennon Rd -
K0241+000 - K0241+008, K0241+-040 - K0241+-010, K0241+160 - K0241+270, K0241+925 - K0241+950, K0241+990 - K0242+000, K0242+240 - K0242+560, K0244+100 - K0244+140, K0244+-160 - K0244+-100, K0244+350 - K0244+430, K0244+970 - K0244+985
50,000,000
2. Quirino H-Way (Baguio-Bauang) - K0301+690 - K0301+730
5,000,000
2. Benguet 1st DEO 54,000,000a. BENGUET (LONE DISTRICT) 54,000,000
1. Baguio-Bauang Rd - K0288+710 - K0288+730, K0292+750 - K0292+765
4,000,000
PROGRAM / ACTIVITIES / PROJECTS
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide
details of dpwh’s programs/projects 747
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
2. Kennon Rd - K0235+445 - K0235+470, K0236+270 - K0236+295, K0238+845 - K0238+885, K0239+550 - K0239+585
50,000,000
d. Region III 7,000,0001. Bataan 1st DEO 7,000,000
a. BATAAN (FIRST DISTRICT) 7,000,0001. Gapan-Sn Fernando-Olongapo Rd -
K0113+135 - K0113+3357,000,000
e. Region V 2,000,0001. Sorsogon 1st DEO 2,000,000
a. SORSOGON (FIRST DISTRICT) 2,000,0001. Daang Maharlika (LZ) -
K0564+760 - K0564+798, K0568+337 - K0568+4172,000,000
f. Region VI 5,000,0001. Negros Occidental 1st DEO 5,000,000
a. NEGROS OCCIDENTAL (FIRST DISTRICT) 5,000,0001. Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd -
K0052+640 - K0052+6585,000,000
g. Region VII 2,500,0001. Cebu 3rd DEO 2,500,000
a. CEBU (THIRD DISTRICT) 2,500,0001. Cebu-Toledo Wharf Rd (Uling-Toledo Wharf) -
K0044+560 - K0045+2502,500,000
h. Region VIII 231,500,0001. Leyte 2nd DEO 50,000,000
a. LEYTE (SECOND DISTRICT) 50,000,0001. Palo-Carigara-Ormoc Rd -
K0969+900 - K0969+915, K0970+670 - K0970+685, K0971+100 - K0971+120, K0971+700 - K0971+708, K0972+300 - K0972+352, K0972+380 - K0972+415, K0972+500 - K0972+538, K0972+900 - K0972+918, K0977+480 - K0977+495, K0977+505 - K0977+520
50,000,000
2. Leyte 4th DEO 3,500,000a. LEYTE (FOURTH DISTRICT) 3,500,000
1. Palo-Carigara-Ormoc Rd - K0995+371 - K0995+441, K1000+324 - K1000+374
3,500,000
3. Leyte 5th DEO 89,500,000a. LEYTE (FIFTH DISTRICT) 89,500,000
1. Daang Maharlika (LT) - K0977+190 - K0977+280, K0979+370 - K0980+000, K0995+000 - K0995+105, K0995+800 - K0995+920, K0998+200 - K0998+400, K0998+800 - K0999+000, K0999+100 - K0999+180, K1000+850 - K1000+940, K1003+460 - K1003+600
50,000,000
2. Tacloban-Baybay South Rd - K0985+600 - K0985+900, K0987+600 - K0987+800, K0988+750 - K0988+900, K0990+500 - K0990+600, K0991+500 - K0991+600, K1000+000 - K1000+500
39,500,000
4. Samar 1st DEO 78,500,000a. SAMAR (FIRST DISTRICT) 78,500,000
1. Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0698+030 - K0698+110, K0700+030 - K0700+110, K0700+200 - K0700+240, K0700+500 - K0700+650, K0702+000 - K0702+080, K0704+950 - K0704+982, K0705+000 - K0705+050, K0705+300 - K0705+380
78,500,000
5. Southern Leyte DEO 10,000,000a. SOUTHERN LEYTE (LONE DISTRICT) 10,000,000
1. Daang Maharlika (LT) - K1005+042.5 - K1005+209, K1017+000 - K1017+120
10,000,000
748 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
i. Region IX 34,200,0001. Zamboanga del Norte 1st DEO 5,000,000
a. ZAMBOANGA DEL NORTE (SECOND DISTRICT) 5,000,0001. Dipolog-Sindangan-Liloy Rd -
K1898+900 - K1899+0105,000,000
2. Zamboanga del Sur 2nd DEO 10,000,000a. ZAMBOANGA DEL SUR (SECOND DISTRICT) 10,000,000
1. Pagadian City-Zamboanga City Rd - K1704+310 - K1704+480
10,000,000
3. Zamboanga Sibugay 2nd DEO 19,200,000a. ZAMBOANGA SIBUGAY (SECOND DISTRICT) 19,200,000
1. Lanao-Pagadian-Zamboanga City Rd - K1763+500 - K1763+527, K1795+450 - K1795+635, K1839+850 - K1840+000, K1845+500 - K1845+560
19,200,000
j. Region X 354,887,0001. Bukidnon 2nd DEO 174,950,000
a. BUKIDNON (THIRD DISTRICT) 174,950,0001. Bukidnon-Davao City Rd -
K1598+044 - K1598+261 R/S, K1603+300 - K1603+400 R/S
70,000,000
2. Bukidnon-Davao City Rd - K1611+329 - K1611+379 R/S, K1612+-018.7 - K1612+049.3 R/S
104,950,000
2. Bukidnon 3rd DEO 68,487,000a. BUKIDNON (FIRST DISTRICT) 68,487,000
1. Sayre Highway - K1466+700 - K1466+780 L/S
68,487,000
3. Lanao del Norte 1st DEO 34,450,000a. LANAO DEL NORTE (FIRST DISTRICT) 8,850,000
1. Iligan City-Marawi City Rd - K1545+260 - K1545+340 R/S, K1547+295 - K1547+450 R/S
8,850,000
b. LANAO DEL NORTE (SECOND DISTRICT) 25,600,0001. Malabang-Dobleston-Tukuran Rd -
K1981+630 - K1981+720 R/S, K1982+820 - K1982+860 R/S, K1984+360 - K1984+480 R/S, K1986+060 - K1986+110 L/S, K1986+220 - K1986+260 L/S, K1987+615 - K1988+130 L/S, K1998+000 - K1998+050 L/S
25,600,000
4. Lanao del Norte 2nd DEO 11,000,000a. ILIGAN CITY (LONE DISTRICT) 11,000,000
1. Misamis Oriental-Ma Cristina Bdry Rd - K1532+800 - K1532+850 L/S
11,000,000
5. Misamis Occidental 1st DEO 31,000,000a. MISAMIS OCCIDENTAL (FIRST DISTRICT) 31,000,000
1. Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd - K1750+1050 - K1750+1120 R/S, K1784+376 - K1784+412 L/S, K1788+890 - K1789+000 L/S, K1789+415 - K1789+474 L/S
31,000,000
6. Misamis Occidental 2nd DEO 35,000,000a. MISAMIS OCCIDENTAL (SECOND DISTRICT) 35,000,000
1. Ozamis-Pagadian Rd - K1667+085 - K1667+117 L/S, K1668+018 - K1668+137 R/S, K1686+803 - K1686+833 R/S
35,000,000
k. Region XI 14,000,0001. Davao Oriental 2nd DEO 14,000,000
a. DAVAO ORIENTAL (SECOND DISTRICT) 14,000,0001. Pres. Diosdado P.Macapagal Natl Hi-way -
K1724+000 - K1732+000 R/S, K1735+000 - K1737+000, K1771+146.10 - K1771+445.90, K1775+670 - K1776+000
14,000,000
l. Region XII 22,000,0001. Cotabato 2nd DEO 2,000,000
a. COTABATO (FIRST DISTRICT) 2,000,0001. Davao-Cotabato Rd (Jct Digos-Cotabato Sect) -
K1680+490 - K1680+5102,000,000
2. Sarangani DEO 20,000,000a. SARANGANI (LONE DISTRICT) 20,000,000
1. Digos-Makar Rd - K1603+545 - K1603+575
20,000,000
details of dpwh’s programs/projects 749
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
m. Region XIII 104,585,0001. Agusan del Norte DEO 13,585,000
a. AGUSAN DEL NORTE (SECOND DISTRICT) 13,585,0001. Butuan-Cagayan de Oro-Iligan (Agusan-Misamis Or) -
K1263+000 - K1263+032 R/S, K1265+448 - K1265+625 R/S
13,585,000
2. Surigao del Sur 2nd DEO 91,000,000a. SURIGAO DEL SUR (SECOND DISTRICT) 91,000,000
1. Jct Lingig-Trento Rd - K1475+159.75 - K1475+192.60, K1476+215 - K1476+265, K1479+940.60 - K1479+963.30, K1480+406- K1480+479.40, K1480+723.80 - K1480+747, K1482+689 - K1482+734.30, K1482+879.90 - K1482+911.60, K1483+507 - K1483+541.40, K1483+712.70 - K1483+735.20
91,000,000
2. Secondary Roads 4,072,845,000
I. Central Office 315,800,000
a. Region VII 305,800,0001. Cebu 2nd DEO 305,800,000
a. CEBU (FIRST DISTRICT) 305,800,0001. Cebu-Toledo Wharf Rd (Jct Naga-Uling) -
K0020+500 - K0021+945, K0026+000 - K0027+600, K0026+987 - K0028+667
305,800,000
b. Nationwide 10,000,0001. Central Office 10,000,000
a. NATIONWIDE 10,000,0001. Slope Protection Works Maintenance (Secondary) 10,000,000
II. Regional Office Proper 1,681,300,000
a. Region II 107,000,0001. Quirino DEO 107,000,000
a. QUIRINO (LONE DISTRICT) 107,000,0001. Cordon-Aurora Bdry Rd (Jct Dumabato-Aurora Bdry) -
K0399+1107 - K0399+1131, K0399+1175 - K0399+1209, K0399+711 - K0399+745, K0399+797 - K0399+814, K0399+911 - K0399+945, K0400+094 - K0400+223, K0400+337 - K0400+350, K0400+374 - K0400+390, K0400+460 - K0400+481, K0400+514 - K0400+553, K0400+653 - K0400+710, K0400+731 - K0400+778, K0400+908 - K0400+967, K0401+259 - K0401+292, K0401+392 - K0401+408, K0401+610 - K0401+636, K0402+166 - K0402+212, K0402+540 - K0402+560, K0402+582 - K0402+624, K0402+710 - K0402+725, K0403+607 - K0403+632, K0403+730 - K0403+786, K0403+835 - K0403+923
107,000,000
b. CAR 100,000,0001. Benguet 1st DEO 100,000,000
a. BENGUET (LONE DISTRICT) 100,000,0001. Benguet-Nueva Vizcaya Rd -
K0257+810 - K0257+825, K0257+920 - K0257+926, K0258+820 - K0258+940, K0271+800 - K0271+900, K0290+900 - K0290+920, K0293+400 - K0293+420, K0296+950 - K0296+955, K0309+000 - K0309+010, K0314+510 - K0314+525, K0315+400 - K0315+425
100,000,000
c. Region IV-B 109,700,0001. Romblon DEO 109,700,000
a. ROMBLON (LONE DISTRICT) 109,700,0001. Tablas Circumferential Rd -
K0028+000 - K0029+000, K0039+400 - K0039+600, K0039+900 - K0040+000, K0041+000 - K0041+127, K0042+360 - K0045+000
109,700,000
750 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
d. Region V 447,150,0001. Albay 3rd DEO 350,900,000
a. ALBAY (THIRD DISTRICT) 350,900,0001. Albay West Coast Rd -
K0495+560 - K0495+586, K0500+335 - K0500+358, K0501+337 - K0501+414, K0504+041 - K0504+087, K0506+734 - K0506+755, K0512+471 - K0512+615, K0515+394 - K0515+477, K0516+1023 - K0516+1063, K0516+861 - K0516+911
76,000,000
2. Albay West Coast Rd - K0518+542 - K0518+574, K0520+622 - K0520+671, K0550+160 - K0550+280, K0551+458 - K0551+504, K0552+815 - K0553+070 L/S
87,300,000
3. Albay West Coast Rd - K0552+815 - K0553+070 R/S
50,000,000
4. Ligao-Pio Duran Rd - K0516+904 - K0516+916, K0516+935 - K0516+980, K0517+031 - K0517+077, K0517+773 - K0517+817, K0519+994 - K0520+027, K0524+931 - K0524+955, K0525+719 - K0525+763, K0527+253 - K0527+285, K0528+973 - K0529+005
67,600,000
5. Ligao-Pio Duran Rd - K0529+374 - K0529+428, K0530+900 - K0530+950, K0531+892 - K0531+937, K0532+689 - K0532+739, K0535+676 - K0535+745, K0535+819 - K0535+859, K0535+904 - K0535+922
70,000,000
2. Camarines Sur 3rd DEO 96,250,000a. CAMARINES SUR (FOURTH DISTRICT) 96,250,000
1. Lagonoy-Presentacion Rd - K0506+600 - K0507+120, K0508+500 - K0509+235, K0510+600 - K0510+720, K0512+900 - K0513+400, K0514+100 - K0514+830, K0517+107.1 - K0517+627.1, K0520+500 - K0520+650
96,250,000
e. Region VII 308,700,0001. Cebu 3rd DEO 228,700,000
a. CEBU (THIRD DISTRICT) 228,700,0001. Cebu-Balamban Transcentral Highway -
K0031+190 - K0031+225, K0031+910 - K0031+985, K0033+900 - K0033+980, K0036+000 - K0036+600, K0038+595 - K0038+640, K0038+755 - K0038+795, K0038+770 - K0039+340
143,200,000
2. Cebu-Balamban Transcentral Highway - K0039+340 - K0039+420, K0039+700 - K0039+840, K0040+650 - K0040+730, K0046+000 - K0046+270
85,500,000
2. Cebu City DEO 80,000,000a. CEBU CITY (SECOND DISTRICT) 80,000,000
1. Cebu-Balamban Transcentral Highway - K0025+400 - K0025+595, K0028+145 - K0028+220
80,000,000
f. Region VIII 165,000,0001. Eastern Samar DEO 90,000,000
a. EASTERN SAMAR (LONE DISTRICT) 90,000,0001. Jct Buenavista-Lawaan-Marabut Rd -
K0962+268 - K0962+865, K0962+384 - K0962+406, K0962+750 - K0962+780, K0978+218 - K0978+310, K0984+636 - K0984+736, K0988+357 - K0988+547, K0989+000 - K0989+055
90,000,000
2. Tacloban City DEO 75,000,000a. LEYTE (FIRST DISTRICT) 75,000,000
1. Rizal Avenida Ext Rd - K0905+-600 - K0905+-594 R/S, K0905+-634 - K0905+-623 R/S, K0905+-653 - K0905+-646 L/S, K0905+-669 - K0905+-658 R/S
75,000,000
details of dpwh’s programs/projects 751
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
g. Region XI 140,500,0001. Davao Oriental 2nd DEO 140,500,000
a. DAVAO ORIENTAL (SECOND DISTRICT) 140,500,0001. Mati-Maragusan Rd -
K1499+367.5 - K1500+000, K1500+765.9 - K1500+788.3 L/S, K1500+765.9 - K1500+788.3 R/S, K1501+555.5 - K1501+602.8 L/S, K1501+555.5 - K1501+602.8 R/S, K1501+908.4 - K1502+000 L/S, K1501+908.4 - K1502+000 R/S, K1502+054.7 - K1502+069.2, K1503+000 - K1503+016.3, K1503+290 - K1503+324, K1503+509.9 - K1503+556.4, K1503+787.6 K1503+924.2 L/S, K1504+068.3 - K1504+187.10, K1504+312.6 - K1504+486.8 L/S, K1504+901.6 - K1505+122.5, K1505+433.7 - K1505+584.6, K1505+684 K1505+780 L/S, K1505+684 - K1505+780 R/S, K1518+906 - K1519+193.5, K1519+000 - K1520+000, K1524+318.2 - K1525+000, K1527+571 - K1527+641
140,500,000
h. Region XIII 303,250,0001. Agusan del Sur 2nd DEO 99,500,000
a. AGUSAN DEL SUR (SECOND DISTRICT) 99,500,0001. Asuncion-San Isidro-Laak-Veruela Rd -
K1551+166 - K1551+191 R/S, K1551+337 - K1551+377 R/S, K1551+345 - K1551+395 L/S, K1551+400 - K1551+465 R/S, K1551+440 - K1551+530 L/S, K1551+570 - K1551+600 R/S, K1551+857 - K1551+903 L/S, K1551+865 - K1551+920 L/S, K1551+920 - K1551+960 R/S, K1551+965 - K1552+080 L/S
99,500,000
2. Surigao del Sur 1st DEO 97,750,000a. SURIGAO DEL SUR (FIRST DISTRICT) 97,750,000
1. Surigao-Davao Coastal Rd - K1246+146.5 - K1246+169, K1246+227 - K1246+254, K1269+925 - K1269+967, K1285+932.5 - K1285+986.5, K1286+925 - K1286+961, K1311+000 - K1313+000, K1324+120 - K1324+220, K1328+010 - K1328+060
97,750,000
3. Surigao del Sur 2nd DEO 106,000,000a. SURIGAO DEL SUR (SECOND DISTRICT) 106,000,000
1. Surigao-Davao Coastal Rd - K1422+759 - K1422+809, K1446+497 - K1446+570, K1472+098.8 - K1472+149.3, K1473+690.2 - K1473+732.3, K1478+120.7 - K1478+130, K1478+480 - K1478+501, K1478+660 - K1478+690, K1480+548.10 - K1480+600, K1489+951 - K1490+028, K1496+580 - K1496+647, K1504+752.50 - K1504+842.50
106,000,000
III. District Engineering Office 2,075,745,000
a. Region I 4,000,0001. Ilocos Sur 2nd DEO 4,000,000
a. ILOCOS SUR (SECOND DISTRICT) 4,000,0001. Tagudin-Cervantes Rd -
K0348+500 - K0348+515, K0364+000 - K0364+0304,000,000
b. Region II 20,792,0001. Isabela 4th DEO 12,450,000
a. ISABELA (FOURTH DISTRICT) 12,450,0001. Jct Natl-Potia Rd -
K0342+292 - K0342+334 R/S, K0342+349 - K0342+474 L/S, K0343+-011 - K0343+071 L/S
12,450,000
2. Nueva Vizcaya 2nd DEO 8,342,000a. NUEVA VIZCAYA (LONE DISTRICT) 8,342,000
1. Nueva Vizcaya-Benguet Rd - K0258+415 - K0258+469
8,342,000
c. CAR 214,100,0001. Apayao 1st DEO 53,500,000
a. APAYAO (LONE DISTRICT) 53,500,0001. Abbut-Conner Rd -
K0565+241 - K0565+2914,000,000
752 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
2. Conner-Kabugao Rd - K0598+247 - K0598+347, K0601+566 - K0601+606, K0603+723 - K0603+786
49,500,000
2. Baguio City DEO 27,000,000a. BAGUIO CITY (LONE DISTRICT) 27,000,000
1. Magsaysay Ave. (Trinidad Rd) - K0252+300 - K0252+323, K0252+350 - K0252+444
21,000,000
2. Marcos Hi-way - K0280+-725 - K0280+-640
6,000,000
3. Benguet 1st DEO 45,500,000a. BENGUET (LONE DISTRICT) 45,500,000
1. Baguio-Bontoc Rd - K0253+-150 - K0253+-100
3,000,000
2. Gurel-Bokod-Kabayan-Buguias-Abatan Rd - K0319+730 - K0319+750, K0320+100 - K0320+120, K0320+150 - K0320+175, K0325+105 - K0325+120, K0312+558 - K0312+580, K0316+607 - K0316+620
12,500,000
3. Marcos Hi-way - K0261+740 - K0261+755, K0271+062 - K0271+094, K0272+620 - K0272+800
30,000,000
4. Benguet 2nd DEO 3,100,000a. BENGUET (LONE DISTRICT) 3,100,000
1. Gurel-Bokod-Kabayan-Buguias-Abatan Rd - K0356+860 - K0356+980
3,100,000
5. Ifugao 2nd DEO 39,000,000a. IFUGAO (LONE DISTRICT) 39,000,000
1. Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0354+600 - K0354+625, K0361+800 - K0361+850, K0363+750 - K0363+850, K0364+350 - K0364+630, K0400+220 - K0400+246, K0401+410 - K0401+460, K0407+500 - K0407+550, K0407+900 - K0407+921, K0409+700 - K0409+740, K0410+350 - K0410+380, K0411+613 - K0411+653, K0414+202 - K0414+232, K0414+600 - K0414+625, K0410+400 - K0410+430
30,000,000
2. Nueva Vizcaya-Ifugao-Mt Province Rd - K0355+840 - K0355+890, K0360+840 - K0360+910
9,000,000
6. Kalinga DEO 39,900,000a. KALINGA (LONE DISTRICT) 39,900,000
1. Kalinga-Abra Rd - K0467+921 - K0467+978, K0469+120 - K0469+201, K0469+600 - K0469+646, K0470+072 - K0470+108, K0471+630 - K0471+673, K0476+635 - K0476+685, K0476+706 - K0476+792, K0478+242 - K0478+259, K0479+090 - K0479+126, K0480+1900 - K0480+2008
20,600,000
2. Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0421+280 - K0421+311, K0460+500 - K0460+517, K0460+575 - K0460+589, K0460+680 - K0460+766
8,100,000
3. Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagalu - K0464+200 - K0464+293, K0466+-057 - K0466+027, K0467+157 - K0467+222, K0473+006 - K0473+040, K0473+400 - K0473+431, K0478+300 - K0478+334
11,200,000
7. Mt.Province DEO 6,100,000a. MOUNTAIN PROVINCE (LONE DISTRICT) 6,100,000
1. Baguio-Bontoc Rd - K0390+300 - K0390+320
1,100,000
2. Mt Province-N Vizcaya Rd - K0364+550 - K0364+630
5,000,000
d. Region III 29,000,0001. Bataan 1st DEO 19,000,000
a. BATAAN (FIRST DISTRICT) 19,000,0001. Roman Expressway -
K0114+517 - K0114+85719,000,000
2. Bataan 2nd DEO 10,000,000a. BATAAN (SECOND DISTRICT) 10,000,000
1. Mariveles-Talaga Bay Rd - K0166+380 - K0166+505
10,000,000
details of dpwh’s programs/projects 753
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
e. Region IV-A 43,237,0001. Batangas 3rd DEO 1,000,000
a. BATANGAS (THIRD DISTRICT) 1,000,0001. Tanauan-Talisay-Tagaytay Rd -
K0071+927 - K0071+9521,000,000
2. Cavite 2nd DEO 1,707,000a. CAVITE (SEVENTH DISTRICT) 1,707,000
1. Maragondon-Magallanes-Amuyong Rd - K0067+719 - K0068+094
1,707,000
3. Laguna 1st DEO 30,000,000a. LAGUNA (FOURTH DISTRICT) 30,000,000
1. Pagsanjan-Lucban Rd - K0104+000 - K0105+000
30,000,000
4. Quezon 3rd DEO 10,530,000a. QUEZON (THIRD DISTRICT) 10,530,000
1. Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0285+700 - K0285+760
5,300,000
2. MSR Jct-Lopez-Buenavista Rd - K0238+-700 - K0238+-682, K0248+750 - K0248+768
3,410,000
3. P Burgos-Pototanin Jct - K0192+700 - K0192+724
1,820,000
f. Region IV-B 357,000,0001. Marinduque DEO 49,500,000
a. MARINDUQUE (LONE DISTRICT) 49,500,0001. Marinduque Circumferential Rd -
K0005+425 - K0005+446, K0005+647 - K0005+687, K0013+200 - K0013+280, K0013+630 - K0013+690, K0013+919 - K0013+930, K0014+148 - K0014+180, K0014+361 - K0014+420, K0023+200 - K0023+244, K0023+305 - K0023+385, K0023+577 - K0023+638, K0024+134 - K0024+171, K0024+200 - K0024+233, K0024+254 - K0024+270, K0051+276 - K0051+331, K0051+613 - K0051+634, K0051+699 - K0051+713, K0051+876 - K0052+000, K0052+341 - K0052+396, K0052+418 - K0052+450, K0054+252 - K0054+294, K0054+324 - K0054+356, K0054+938 - K0054+968, K0055+376 - K0055+405, K0058+060 - K0058+121, K0058+183 - K0058+265, K0061+168 - K0061+194, K0061+207 - K0061+232, K0070+100 - K0070+107, K0070+120 - K0070+130, K0070+400 - K0070+465, K0073+400 - K0073+469, K0075+600 - K0075+625, K0086+100 - K0086+112, K0086+120 - K0086+129, K0086+400 - K0086+466
49,500,000
2. Mindoro Occidental DEO 49,500,000a. MINDORO OCCIDENTAL (LONE DISTRICT) 49,500,000
1. Mindoro West Coastal Rd - K0339+-175 - K0339+000, K0346+100 - K0346+150, K0346+250 - K0346+350, K0346+400 - K0346+450, K0346+700 - K0347+000, K0446+1207 - K0446+1215, K0446+1262 - K0446+1276, K0446+1658 - K0446+1712, K0446+-525 - K0446+-504
49,500,000
3. Palawan 1st DEO 51,000,000a. PALAWAN (FIRST DISTRICT) 51,000,000
1. El Nido-Jct New Ibahay Rd - K0280+200 - K0280+250
2,000,000
2. Puerto Princesa North Rd - K0083+900 - K0083+960, K0106+100 - K0106+150, K0142+500 - K0142+560, K0143+900 - K0143+950, K0144+986.5 - K0145+000, K0175+150 - K0175+200, K0178+300 - K0178+350, K0224+800 - K0224+860, K0225+150 - K0225+200, K0227+350 - K0227+400, K0266+500 - K0266+550, K0161+420 - K0161+470.5, K0166+978 - K0166+1034, K0171+415 - K0171+470, K0171+693 - K0171+750.15, K0173+600 - K0173+654, K0173+675 - K0173+751, K0173+800 - K0173+939, K0175+000 - K0175+100
49,000,000
754 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
4. Palawan 2nd DEO 49,000,000a. PALAWAN (SECOND DISTRICT) 49,000,000
1. Puerto Princesa South Rd - K0138+108 - K0138+142, K0138+335 - K0138+450, K0139+292 - K0139+397, K0141+807 - K0141+860, K0147+340 - K0147+370
49,000,000
5. Palawan 3rd DEO 15,000,000a. PALAWAN (THIRD DISTRICT) 15,000,000
1. PPSR Jct-Napsan-Apurawan Rd - K0040+000 - K0040+050, K0040+250 - K0040+300
2,000,000
2. Puerto Princesa North Rd - K0070+025 - K0070+070, K0070+097 - K0070+167, K0070+135 - K0070+175, K0070+373 - K0070+423, K0071+434 - K0071+499, K0072+325 - K0072+425, K0074+700 - K0074+750, K0075+275 - K0075+325, K0077+800 - K0077+900, K0078+550 - K0078+590, K0079+320 - K0079+360, K0079+590 - K0079+630, K0080+540 - K0080+560
13,000,000
6. Romblon DEO 115,000,000a. ROMBLON (LONE DISTRICT) 115,000,000
1. Romblon-Cogon-Sablayan Rd - K0002+000 - K0005+000
35,000,000
2. Sibuyan Circumferential Rd - K0037+000 - K0042+000
38,000,000
3. Tablas Circumferential Rd - K0078+000 - K0080+480
42,000,000
7. Southern Mindoro DEO 28,000,000a. MINDORO ORIENTAL (SECOND DISTRICT) 28,000,000
1. Calapan South Rd - K0181+060 - K0181+150
10,000,000
2. Mindoro Oriental/Occidental East Coastal Rd - K0189+780 - K0189+880, K0199+050 - K0199+130
18,000,000
g. Region V 239,405,0001. Albay 1st DEO 48,425,000
a. ALBAY (FIRST DISTRICT) 48,425,0001. DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry -
K0579+250 - K0579+450, K0579+650 - K0579+750, K0583+480 - K0583+550
48,425,000
2. Albay 2nd DEO 10,000,000a. ALBAY (SECOND DISTRICT) 10,000,000
1. Legazpi City-Punta de Jesus Rd - K0580+-068 - K0580+042
10,000,000
3. Camarines Norte DEO 11,100,000a. CAMARINES NORTE (FIRST DISTRICT) 11,100,000
1. Talobatib-Jose Panganiban Pob-Port Rd - K0338+189 - K0338+400
11,100,000
4. Camarines Sur 3rd DEO 26,750,000a. CAMARINES SUR (FOURTH DISTRICT) 26,750,000
1. Pili-Tigaon-Albay Bdry Rd - K0490+500 - K0490+600, K0503+600 - K0503+700, K0507+680 - K0508+365
26,750,000
5. Catanduanes DEO 53,130,000a. CATANDUANES (LONE DISTRICT) 53,130,000
1. Catanduanes Cir Rd - K0014+900 - K0015+150, K0034+609 - K0036+750, K0122+630 - K0122+900, K0123+100 - K0123+300, K0123+450 - K0123+700, K0124+050 - K0124+170, K0124+210 - K0124+260, K0126+840 - K0127+320, K0133+300 - K0133+410, K0146+600 - K0146+700, K0147+000 - K0147+100
46,630,000
2. Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0060+300 - K0060+330, K0060+900 - K0060+940, K0061+200 - K0061+260, K0074+890 - K0074+950, K0075+900 - K0075+950
6,500,000
6. Masbate 1st DEO 11,500,000a. MASBATE (SECOND DISTRICT) 11,500,000
1. Jct Milagros-Baleno-Lagta Rd - K0077+220 - K0077+320, K0079+840 - K0079+920
11,500,000
details of dpwh’s programs/projects 755
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
7. Masbate 2nd DEO 48,000,000a. MASBATE (THIRD DISTRICT) 48,000,000
1. Masbate-Cataingan-Placer Rd - K0019+-258 - K0019+100, K0023+500 - K0023+650, K0035+040 - K0035+240, K0043+500 - K0043+600, K0054+430 - K0054+500, K0056+750 - K0056+850, K0075+500 - K0075+700, K0075+620 - K0075+670, K0078+631 - K0078+681
48,000,000
8. Masbate 3rd DEO 28,000,000a. MASBATE (FIRST DISTRICT) 28,000,000
1. Sn Fernando North Rd - K0001+700 - K0007+200 , K0007+700 - K0008+600 , K0023+450 - K0025+357
28,000,000
9. Sorsogon 1st DEO 2,500,000a. SORSOGON (FIRST DISTRICT) 2,500,000
1. Sorsogon Diversion Rd - k0577+435 - K0577+485
2,500,000
h. Region VI 230,209,0001. Aklan DEO 38,909,000
a. AKLAN (LONE DISTRICT) 38,909,0001. Aklan West Rd (Kalibo-Nabas) -
K0244+600 - K0244+624.538,909,000
2. Antique DEO 18,000,000a. ANTIQUE (LONE DISTRICT) 18,000,000
1. Iloilo-Antique Rd - K0072+1069 - K0072+1097 R/S, K0073+481 - K0073+548 R/S, K0073+961 - K0074+000 R/S, K0074+000 - K0074+027 R/S, K0074+101 - K0074+202 R/S, K0074+811 - K0074+858 R/S, K0074+913 - K0074+940 L/S, K0076+230 - K0076+268 R/S, K0076+823 - K0076+856 R/S, K0077+000 - K0077+161 R/S, K0077+627 - K0077+742 R/S, K0078+781 - K0079+000 L/S, K0079+585 - K0079+684 L/S, K0080+340 - K0080+359 R/S
18,000,000
3. Capiz 1st DEO 20,800,000a. CAPIZ (FIRST DISTRICT) 20,800,000
1. Iloilo East Coast-Capiz Rd - K0148+161 - K0148+175 R/S, K0157+920 - K0157+950 R/S, K0165+067 - K0165+091 R/S, K0167+042 - K0167+162 R/S, K0169+825 - K0169+955 L/S, K0169+825 - K0170+000 R/S, K0171+612 - K0171+773
14,600,000
2. Maayon-Jct Bailan Rd - K0124+059 - K0124+074 L/S, K0127+068 - K0127+239 R/S, K0127+500 - K0127+559 L/S, K0128+000 - K0128+104 R/S
6,200,000
4. Guimaras DEO 12,000,000a. GUIMARAS (LONE DISTRICT) 12,000,000
1. Guimaras Circumferential Rd - K0007+450 - K0008+200, K0020+700 - K0021+200, K0072+100 - K0073+000, K0077+800 - K0078+200
12,000,000
5. Iloilo 1st DEO 55,000,000a. ILOILO (FIRST DISTRICT) 55,000,000
1. Iloilo-Antique Rd - K0042+330 - K0042+430, K0061+700 - K0061+900
25,000,000
2. Tiolas-Sinugbuhan Rd - K0065+300 - K0065+500
30,000,000
6. Negros Occidental 1st DEO 25,000,000a. NEGROS OCCIDENTAL (FIRST DISTRICT) 25,000,000
1. Jct DS Benedicto-Spur 16-Calatrava Rd - K0075+895 - K0075+910, K0076+050 - K0076+058, K0079+800 - K0079+950
17,000,000
2. Jct Natl Rd Sagay-Bato-Dian-Marcelo-Balea Jct Rd - K0117+200 - K0117+275
8,000,000
7. Negros Occidental 2nd DEO 11,100,000a. NEGROS OCCIDENTAL (FIFTH DISTRICT) 11,100,000
1. Vallehermoso-Canlaon City-La Castellana Rd - K0073+000 - K0073+100, K0073+200 - K0073+350, K0073+600 - K0073+700, K0074+00 - K0074+100
11,100,000
756 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
8. Negros Occidental 3rd DEO 49,400,000a. NEGROS OCCIDENTAL (SIXTH DISTRICT) 49,400,000
1. Bacolod South Rd (Kabankalan-Hinobaan Section) - K0131+000 - K0131+200, K0131+400 - K0131+500, K0136+000 - K0136+250, K0144+200 - K0144+500, K0146+100 - K0146+300, K0167+600 - K0167+750, K0170+873 - K0170+893, K0171+000 - K0171+100, K0171+050 - K0171+060, K0171+300 - K0171+360, K0171+402 - K0171+412, K0171+800 - K0172+000, K0172+600 - K0172+800
49,400,000
i. Region VII 125,900,0001. Cebu 3rd DEO 71,800,000
a. CEBU (THIRD DISTRICT) 71,800,0001. Cebu-Toledo Wharf Rd (Jct Naga-Uling) -
K0034+718 - K0034+7621,000,000
2. Toledo-Pinamungahan-Aloguinsan-Mantalongon Rd - K0077+419 - K0077+449, K0080+329 - K0080+589, K0080+629 - K0080+699
21,300,000
3. Toledo-Tabuelan-Sn Remigio Rd - K0071+362 - K0071+482, K0080+464 - K0080+654, K0101+100 - K0101+170
49,500,000
2. Cebu 5th DEO 20,000,000a. CEBU (FIFTH DISTRICT) 20,000,000
1. Cebu North Hagnaya Wharf Rd - K0074+800 - K0075+000
20,000,000
3. Cebu City DEO 30,000,000a. CEBU CITY (FIRST DISTRICT) 30,000,000
1. Cebu-Balamban Transcentral Highway - K0010+330 - K0010+350, K0010+-744 - K0010+-694, K0012+856 - K0012+885
30,000,000
4. Negros Oriental 1st DEO 4,100,000a. NEGROS ORIENTAL (FIRST DISTRICT) 4,100,000
1. Vallehermoso-Canlaon City-La Castellana Rd - K0152+393 - K0152+426, K0156+305 - K0156+350, K0159+-131 - K0159+-110
4,100,000
j. Region VIII 268,340,0001. Biliran DEO 90,000,000
a. BILIRAN (LONE DISTRICT) 90,000,0001. Biliran Circumferential Rd -
K1029+800 - K1030+300, K1036+100 - K1036+39045,000,000
2. Naval-Caibiran Cross Country Rd - K1040+800 - K1041+950
45,000,000
2. Leyte 3rd DEO 29,060,000a. LEYTE (THIRD DISTRICT) 29,060,000
1. Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1009+000 - K1009+050, K1012+191 - K1012+276, K1013+389 - K1013+412, K1014+752 - K1014+769, K1015+511 - K1015+527, K1019+503 - K1019+553, K1024+953 - K1024+975, K1025+102 - K1025+145, K1025+710 - K1025+735, K1025+868 - K1025+905, K1047+420 - K1047+461, K1047+549 - K1047+576, K1048+617 - K1048+687
27,860,000
2. Lemon-Leyte-Biliran Rd - K0977+100 - K0977+125
1,200,000
3. Leyte 4th DEO 11,280,000a. LEYTE (FOURTH DISTRICT) 11,280,000
1. Palompon-Isabel-Merida-Ormoc Rd - K1079+747 - K1079+797, K1081+000 - K1081+070
3,000,000
2. Villaba-Palompon Rd - K1059+1099 - K1059+1119, K1059+1135 - K1059+1157, K1060+090 - K1060+126
8,280,000
4. Leyte 5th DEO 48,000,000a. LEYTE (FIFTH DISTRICT) 48,000,000
1. Bato-Bontoc Rd - K1110+250 - K1110+300, K1111+200 - K1111+300, K1111+900 - K1112+050, K1113+600 - K1113+700, K1114+178 - K1114+203, K1115+900 - K1116+000, K1116+100 - K1116+400, K1118+800 - K1118+900
48,000,000
details of dpwh’s programs/projects 757
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
5. Northern Samar 2nd DEO 50,000,000a. NORTHERN SAMAR (SECOND DISTRICT) 50,000,000
1. Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0809+450 - K0809+470, K0810+500 - K0810+580, K0828+900 - K0829+000, K0831+000 - K0831+100, K0835+300 - K0835+400
47,000,000
2. Sn Policarpo-Arteche-Lapinig Rd - K0853+5500 - K0853+5600
3,000,000
6. Southern Leyte DEO 40,000,000a. SOUTHERN LEYTE (LONE DISTRICT) 40,000,000
1. Bato-Bontoc Rd - K1122+800 - K1123+200
10,000,000
2. Tomas Oppus St - K1135+300 - K1136+000
30,000,000
k. Region IX 104,762,0001. Isabela City DEO 49,500,000
a. ISABELA CITY (LONE DISTRICT) 49,500,0001. Basilan Circumferential Rd -
K0008+267 - K0009+062 R/S, K0008+592 - K0009+198 L/S
49,500,000
2. Zamboanga del Norte 1st DEO 5,000,000a. ZAMBOANGA DEL NORTE (SECOND DISTRICT) 5,000,000
1. Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Si -K1938+600 - K1938+645, K1941+260 - K1941+300
5,000,000
3. Zamboanga del Norte 2nd DEO 19,762,000a. ZAMBOANGA DEL NORTE (THIRD DISTRICT) 19,762,000
1. Liloy-Siocon Rd - K2012+500 - K2012+525, K2013+750 - K2013+770, K2017+030 - K2017+042, K2017+300 - K2017+315, K2018+100 - K2018+122, K2019+600 - K2019+630, K2020+300 - K2020+365
19,762,000
4. Zamboanga del Norte 3rd DEO 20,000,000a. ZAMBOANGA DEL NORTE (FIRST DISTRICT) 20,000,000
1. Rizal-Dakak-Dapitan Coastal Loop Rd - K1836+280 - K1836+440
20,000,000
5. Zamboanga del Sur 1st DEO 10,500,000a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 10,500,000
1. Sindangan-Siayan-Dumingag-Mahayag Rd(Mahayag-Dumin - K1677+500 - K1677+600, K1684+200 - K1684+300, K1685+100 - K1685+500
10,500,000
l. Region X 139,000,0001. Bukidnon 1st DEO 42,000,000
a. BUKIDNON (SECOND DISTRICT) 22,000,0001. Kapalong-Talaingod-Valencia (Bukidnon) Rd -
CH 43487 - CH 43587, CH 45687 - CH 45707, CH 46787 - CH 46807
22,000,000
b. BUKIDNON (FOURTH DISTRICT) 20,000,0001. Kapalong-Talaingod-Valencia (Bukidnon) Rd -
CH 69387 - CH 6949720,000,000
2. Cagayan de Oro City 1st DEO 45,000,000a. CAGAYAN DE ORO CITY (FIRST DISTRICT) 45,000,000
1. CDO-Airport-Bukidnon Rd - K1451+320 - K1451+420, K1452+850 - K1452+900
45,000,000
3. Camiguin DEO 12,000,000a. CAMIGUIN (LONE DISTRICT) 12,000,000
1. Camiguin Circumferential Rd - K0023+220 - K0023+500 R/S
12,000,000
4. Misamis Oriental 2nd DEO 40,000,000a. MISAMIS ORIENTAL (SECOND DISTRICT) 40,000,000
1. Gingoog-Claveria-Villanueva Rd - K1364+970 - K1365+020, K1368+800 - K1368+865
40,000,000
758 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
m. Region XI 175,000,0001. Compostela Valley DEO 98,000,000
a. COMPOSTELA VALLEY (FIRST DISTRICT) 88,000,0001. Compostela-Cateel Rd (Compostela Side) -
K1585+700 - K1585+730, K1586+600 - K1586+625, K1587+050 - K1587+070, K1587+100 - K1587+145, K1587+200 - K1587+230, K1587+500 - K1587+540, K1587+900 - K1587+930, K1588+300 - K1588+340, K1589+200 - K1589+235, K1601+650 - K1601+680, K1605+100 - K1605+130
39,000,000
2. Nabunturan-Maragusan Road - K1450+300 - K1450+350, K1452+200 - K1452+500, K1459+700 - K1459+730, K1460+800 - K1460+840, K1465+800 - K1465+850, K1467+200 - K1467+220
49,000,000
b. COMPOSTELA VALLEY (SECOND DISTRICT) 10,000,0001. Nabunturan-Maragusan Road -
K1439+500 - K1439+53010,000,000
2. Davao City DEO 48,000,000a. DAVAO CITY (FIRST DISTRICT) 48,000,000
1. Davao City Div Rd - K1512+480 - K1512+700
48,000,000
3. Davao Oriental 1st DEO 29,000,000a. DAVAO ORIENTAL (FIRST DISTRICT) 29,000,000
1. Surigao del Sur Bdry-Davao Or Coastal Rd - K1529+900 - K1529+910, K1530+900 - K1530+918, K1635+475 - K1635+488
29,000,000
n. Region XII 50,000,0001. Cotabato 2nd DEO 50,000,000
a. COTABATO (THIRD DISTRICT) 50,000,0001. Banisilan-Guiling-Alamada-Libungan Rd -
K1641+100 - K1641+3205,000,000
2. Bukidnon-Cotabato Rd - K1608+510 - K1608+540, K1628+300 - K1628+500, K1629+000 - K1629+820, K1629+240 - K1629+300, K1629+350 - K1629+420, K1630+000 - K1630+200
45,000,000
o. Region XIII 75,000,0001. Dinagat Islands DEO 40,000,000
a. DINAGAT ISLAND (LONE DISTRICT) 40,000,0001. Dinagat-Loreto Rd -
K0014+058 - K0014+100, K0015+065 - K0015+140, K0021+600 - K0021+800
40,000,000
2. Surigao del Norte 1st DEO 20,000,000a. SURIGAO DEL NORTE (SECOND DISTRICT) 20,000,000
1. Surigao-Davao Coastal Rd - K1149+000 - K1149+337 L/S
20,000,000
3. Surigao del Sur 1st DEO 15,000,000a. SURIGAO DEL SUR (FIRST DISTRICT) 15,000,000
1. Payasan-Los Arcos Rd - K1389+250 - K1389+300
15,000,000
3. Tertiary Roads 2,709,757,000
I. Central Office 10,000,000
a. Nationwide 10,000,0001. Central Office 10,000,000
a. NATIONWIDE 10,000,0001. Slope Protection Works Maintenance (Tertiary) 10,000,000
II. Regional Office Proper 640,050,000
a. CAR 100,000,0001. Apayao 2nd DEO 100,000,000
a. APAYAO (LONE DISTRICT) 100,000,0001. Claveria-Calanasan-Kabugao Rd -
K0672+567 - K0672+632, K0673+177 - K0673+222, K0700+515 - K0700+590
100,000,000
details of dpwh’s programs/projects 759
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
b. Region IV-B 80,000,0001. Mindoro Occidental DEO 80,000,000
a. MINDORO OCCIDENTAL (LONE DISTRICT) 80,000,0001. Jct MWCR (Sn Isidro)-Penal Colony-Jct Yapang Rd -
K0302+000 - K0303+00080,000,000
c. Region V 60,000,0001. Sorsogon 1st DEO 60,000,000
a. SORSOGON (FIRST DISTRICT) 60,000,0001. Jct Donsol-Banuang Gurang Rd -
K0582+000 - K0584+000 , K0586+050 - K0587+000 60,000,000
d. Region VI 81,300,0001. Iloilo 4th DEO 81,300,000
a. ILOILO (SECOND DISTRICT) 81,300,0001. Jct Bancal-Leon-Antique Bdry Rd -
K0044+400 - K0044+580, K0044+680 - K0044+780, K0045+265 - K0045+380, K0045+600 - K0045+650
81,300,000
e. Region X 155,750,0001. Bukidnon 2nd DEO 65,750,000
a. BUKIDNON (THIRD DISTRICT) 65,750,0001. Kibawe-Kadingilan-Kalilangan Rd -
K1584+780 - K1584+800, K1585+768 - K1585+851 R/S, K1590+000 - K1591+000 R/S
65,750,000
2. Cagayan de Oro City 1st DEO 90,000,000a. CAGAYAN DE ORO CITY (FIRST DISTRICT) 90,000,000
1. Lumbia-Uguiaban By-Pass Rd - K1462+100 - K1463+900, K1462+400 - K1462+800
90,000,000
f. Region XIII 163,000,0001. Agusan del Sur 1st DEO 70,000,000
a. AGUSAN DEL SUR (FIRST DISTRICT) 70,000,0001. NRJ Bayugan-Calaitan-Tandag Rd -
K1271+500 - K1271+970, K1273+451 - K1273+90070,000,000
2. Butuan City DEO 93,000,000a. AGUSAN DEL NORTE (FIRST DISTRICT) 93,000,000
1. Butuan City-Pianing-Tandag Rd - K1247+500 - K1247+530, K1248+350 - K1248+385
93,000,000
III. District Engineering Office 2,059,707,000
a. Region I 119,300,0001. Ilocos Norte 2nd DEO 45,300,000
a. ILOCOS NORTE (SECOND DISTRICT) 45,300,0001. Ilocos Norte-Abra Rd -
K0530+819 - K0530+839, K0530+841 - K0530+847, K0532+124 - K0532+154
6,500,000
2. Ilocos Norte-Apayao Rd - K0517+704 - K0517+734, K0520+213 - K0520+333, K0522+794 - K0522+809, K0523+041 - K0523+051, K0523+284 - K0523+294, K0523+411 - K0523+421, K0523+536 - K0523+546, K0523+682 - K0523+702, K0523+825 - K0523+835, K0524+445 - K0524+465, K0526+296 - K0526+326, K0526+388 - K0526+408, K0526+612 - K0526+642, K0527+197 - K0527+227, K0527+544 - K0527+574, K0528+217 - K0528+267, K0528+331 - K0528+381, K0528+587 - K0528+637, K0528+773 - K0528+793, K0529+470 - K0529+500, K0530+165 - K0530+185, K0530+833 - K0530+863, K0531+225 - K0531+255, K0531+325 - K0531+345, K0531+932 - K0531+947, K0532+047 - K0532+062, K0532+105 - K0532+125
38,800,000
2. Ilocos Sur 2nd DEO 44,000,000a. ILOCOS SUR (SECOND DISTRICT) 44,000,000
1. Cervantes-Quirino Rd - K0403+650 - K0403+670, K0403+680 - K0403+710, K0403+700 - K0403+718
21,000,000
2. Jct Santiago-Banayoyo-Lidlidda-Sn Emilio-Quirino - K0359+100 - K0359+140, K0372+150 - K0372+170, K0372+400 - K0372+420, K0372+950 - K0372+965
20,000,000
760 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
3. Mt Prov-Ilocos Sur via Kayan Rd - K0384+300 - K0384+310, K0384+350 - K0384+357
3,000,000
3. La Union 1st DEO 30,000,000a. LA UNION (FIRST DISTRICT) 30,000,000
1. Sn Fernando-Bagulin Rd - K0275+000 - K0277+000, K0284+000 - K0285+368
30,000,000
b. Region II 379,707,0001. Batanes DEO 30,185,000
a. BATANES (LONE DISTRICT) 30,185,0001. Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd -
K0004+030 - K0004+085, K0023+800 - K0023+85030,185,000
2. Cagayan 1st DEO 25,000,000a. CAGAYAN (FIRST DISTRICT) 25,000,000
1. Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0527+800 - K0527+920
5,000,000
2. Jct Magapit-Capissayan Rd - K0566+330 - K0566+370 B/S, K0566+373 - K0566+470 L/S, K0566+373 - K0566+550 R/S, K0566+590 - K0566+680 L/S, K0566+650 - K0566+680 R/S, K0567+650 - K0567+710 R/S, K0568+130 - K0568+150 R/S, K0568+190 - K0568+230 R/S, K0568+190 - K0568+290 L/S, K0568+310 - K0568+330 L/S
20,000,000
3. Cagayan 2nd DEO 149,000,000a. CAGAYAN (SECOND DISTRICT) 149,000,000
1. Cadcadir-Kabugao Rd - K0602+262 - K0602+410
49,500,000
2. Cagayan-Apayao Rd (Tuao-Rizal Sect) - K0532+-480 - K0532+-360 L/S, K0535+030 - K0535+050 L/S, K0535+110 - K0535+297 L/S, K0535+397 - K0535+645 L/S, K0536+605 - K0536+792 R/S, K0537+180 - K0538+172 R/S, K0538+222 - K0538+464 R/S, K0538+704 - K0538+773 R/S, K0538+883 - K0538+930 R/S, K0539+050 - K0539+224 R/S, K0539+254 - K0539+331 R/S, K0540+040 - K0540+130 R/S
49,500,000
3. Claveria-Diaballo-Luzon-Cagayan Bdry Rd - K0615+220 - K0615+350
20,000,000
4. Jct Logac-Lasam-Gagabutan Rd - K0716+-685 - K0716+-375 L/S, K0716+090 - K0716+310 R/S, K0717+420 - K0717+540 L/S, K0717+670 - K0717+970 L/S, K0718+100 - K0718+290 L/S, K0718+350 - K0719+000 L/S, K0718+670 - K0719+000 R/S
30,000,000
4. Cagayan 3rd DEO 49,900,000a. CAGAYAN (THIRD DISTRICT) 49,900,000
1. Peñablanca-Callao Cave Rd - K0480+415 - K0480+440, K0482+196 - K0482+351, K0482+880 - K0482+960, K0483+480 - K0483+710
49,900,000
5. Isabela 1st DEO 5,000,000a. ISABELA (FIRST DISTRICT) 5,000,000
1. Ilagan-Bigao-Palanan Rd - K0414+600 - K0414+700, K0418+100 - K0418+300, K0420+600 - K0420+700
4,000,000
2. Jct Natl-Sta Victoria Rd - K0411+450 - K0411+500
1,000,000
6. Isabela 2nd DEO 8,000,000a. ISABELA (SECOND DISTRICT) 8,000,000
1. Abbut-Agbannawag Rd - K0411+521 - K0411+621
3,000,000
2. Gamu-Roxas Rd - K0408+450 - K0408+950
5,000,000
7. Isabela 4th DEO 3,122,000a. ISABELA (FOURTH DISTRICT) 3,122,000
1. Jct Ipil-Quirino Bdry Rd - K0371+865 - K0372+033 B/S, K0372+720 - K0372+824 L/S
3,122,000
8. Nueva Vizcaya 1st DEO 44,500,000a. NUEVA VIZCAYA (LONE DISTRICT) 44,500,000
details of dpwh’s programs/projects 761
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
1. Bambang-Kasibu-Solano Rd - K0320+280 - K0320+360, K0320+400 - K0320+500, K0321+400 - K0321+450, K0325+600 - K0325+630
18,500,000
2. Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno Rd - K0312+000 - K0312+050, K0312+330 - K0312+340, K0312+350 - K0312+377, K0313+060 - K0313+430
26,000,000
9. Nueva Vizcaya 2nd DEO 49,500,000a. NUEVA VIZCAYA (LONE DISTRICT) 49,500,000
1. Aritao-Quirino Rd - K0238+535 - K0238+550, K0258+447 - K0258+471, K0258+542 - K0258+557, K0258+589 - K0258+604, K0259+171 - K0259+185, K0260+071 - K0260+108, K0260+171 - K0260+189, K0260+206 - K0260+246, K0260+796 - K0260+817, K0261+025 - K0261+055
49,500,000
10. Quirino DEO 15,500,000a. QUIRINO (LONE DISTRICT) 15,500,000
1. Jct Abbag-Guingin Bdry Rd - K0392+802 - K0392+856
15,500,000
c. CAR 126,000,0001. Abra DEO 29,500,000
a. ABRA (LONE DISTRICT) 29,500,0001. Abra-Ilocos Norte Rd -
K0437+940 - K0437+990, K0426+100 - K0426+117, K0427+515 - K0427+548, K0429+700 - K0429+727, K0430+620 - K0430+635, K0430+750 - K0430+768, K0431+900 - K0431+920, K0433+200 - K0433+215, K0433+480 - K0433+494, K0434+200 - K0434+207, K0434+436 - K0434+481, K0434+700 - K0434+730, K0435+150 - K0435+159, K0435+600 - K0435+619
29,500,000
2. Baguio City DEO 41,000,000a. BAGUIO CITY (LONE DISTRICT) 41,000,000
1. A Bonifacio Rd - K0251+136 - K0251+296
7,000,000
2. Eastern Link Circumferential Rd - CH 1030 - CH 1080, CH 1120 - CH 1170, CH 1620 - CH 1640, CH 1700 - CH 1740, CH 2400 - CH 2470
24,000,000
3. Quezon Hill Rd #1 - K0308+550 - K0308+570
10,000,000
3. Benguet 1st DEO 53,500,000a. BENGUET (LONE DISTRICT) 53,500,000
1. Asin(KM 8)-Nangalisan-Sn Pascual,Tuba,Benguet-LU - K0261+280 - K0261+300
1,500,000
2. Baguio-Itogon Rd - K0256+250 - K0256+260, K0257+004 - K0257+020, K0260+040 - K0260+130 L/S, K0260+040 - K0260+142 R/S, K0260+160 - K0260+250, K0261+330 - K0261+420
49,000,000
3. Tawang-Ambiong Rd - CH 1640 - CH 1670
3,000,000
4. Ifugao 1st DEO 2,000,000a. IFUGAO (LONE DISTRICT) 2,000,000
1. Banaue-Hungduan-Benguet Bdry Rd - K0354+330 - K0354+400, K0357+500 - K0357+600
2,000,000
d. Region III 143,962,0001. Bataan 1st DEO 5,000,000
a. BATAAN (FIRST DISTRICT) 5,000,0001. Calaguiman Vicinal Rd -
K0124+860 - K0125+0005,000,000
2. Pampanga 1st DEO 138,962,000a. PAMPANGA (FOURTH DISTRICT) 138,962,000
1. Apalit-Macabebe-Masantol Rd - K0059+700 - K0063+700
14,918,000
2. Bahay Pare-Sn Luis-Sto Domingo Rd - K0068+000 - K0069+000
35,000,000
762 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
3. Baliwag-Candaba-Sta Ana Rd - K0062+756 - K0064+000
39,544,000
4. Candaba-Sn Miguel Rd - K0080+000 - K0081+000, K0071+200 - K0072+250
49,500,000
e. Region IV-A 264,780,0001. Batangas 2nd DEO 49,500,000
a. BATANGAS (SECOND DISTRICT) 49,500,0001. Bauan-Mabini Rd -
K0170+000 - K0171+500, K0173+000 - K0174+500, K0175+211 - K0175+648
49,500,000
2. Batangas 3rd DEO 10,000,000a. BATANGAS (THIRD DISTRICT) 10,000,000
1. Talisay-Laurel-Agoncillo Rd - K0081+640 - K0081+670, K0096+331 - K0096+356
10,000,000
3. Cavite 2nd DEO 41,200,000a. CAVITE (SEVENTH DISTRICT) 41,200,000
1. Tagaytay-Taal Lake Rd - K0057+133 - K0057+174, K0057+581 - K0062+172
41,200,000
4. Laguna 1st DEO 42,600,000a. LAGUNA (FOURTH DISTRICT) 42,600,000
1. Cavinti-Caliraya Rd - K0100+510 - K0100+560, K0101+-200 - K0101+-150
2,600,000
2. Majayjay-Lucban Rd - K0118+060 - K0118+360
10,000,000
3. Marikina-Infanta Rd - K0082+000 - K0089+000
30,000,000
5. Laguna 2nd DEO 5,000,000a. LAGUNA (SECOND DISTRICT) 5,000,000
1. Mt Makiling Eco Garden Rd - K0062+800 - K0062+830
5,000,000
6. Laguna 3rd DEO 25,000,000a. LAGUNA (THIRD DISTRICT) 25,000,000
1. Lipa City - Alaminos Rd - K0079+040 - K0079+350, K0080+166 - K0080+259
25,000,000
7. Quezon 3rd DEO 26,480,000a. QUEZON (THIRD DISTRICT) 26,480,000
1. Catanauan-Buenavista Rd - K0261+350 - K0261+380
2,060,000
2. MSR Jct-Lopez-Catanauan Rd - K0241+050 - K0241+073
2,420,000
3. Talaba-Summit-Panaon Rd - K0188+797 - K0188+855.5, K0189+067 - K0189+130, K0189+584 - K0189+680, K0189+719 - K0189+743.5, K0195+382 - K0195+388 L/S, K0195+402 - K0195+410 L/S
22,000,000
8. Quezon 4th DEO 65,000,000a. QUEZON (FIRST DISTRICT) 20,000,000
1. Jct MSR-Old Zigzag Rd - K0153+-632 - K0153+-592
20,000,000
b. QUEZON (FOURTH DISTRICT) 45,000,0001. Jct MSR-Old Zigzag Rd -
K0156+689 - K0156+729, K0157+005 - K0157+05545,000,000
f. Region IV-B 81,700,0001. Mindoro Occidental DEO 31,500,000
a. MINDORO OCCIDENTAL (LONE DISTRICT) 31,500,0001. Jct MWCR (Bagong Silang)-Cabacao Div Rd -
K0426+000 - K0426+30031,500,000
2. Palawan 1st DEO 2,000,000a. PALAWAN (FIRST DISTRICT) 2,000,000
1. Coron-Busuanga Rd - K0058+400 - K0058+450
2,000,000
3. Palawan 2nd DEO 13,200,000a. PALAWAN (SECOND DISTRICT) 13,200,000
1. Palawan Circum. Rd (Panalingaan-Tagbita-Latud) - K0248+920 - K0248+967, K0248+980 - K0249+247, K0249+557 - K0249+640
13,200,000
details of dpwh’s programs/projects 763
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
4. Southern Mindoro DEO 35,000,000a. MINDORO ORIENTAL (SECOND DISTRICT) 35,000,000
1. Calapan South Rd - K0192+260 - K0192+300, K0192+500 - K0192+580, K0192+700 - K0192+800
35,000,000
g. Region V 179,770,0001. Albay 1st DEO 36,000,000
a. ALBAY (FIRST DISTRICT) 36,000,0001. Mt Mayon Park Rd -
K0521+200 - K0521+450 L/S, K0523+300 - K0523+400, K0524+100 - K0524+200
36,000,000
2. Camarines Norte DEO 49,000,000a. CAMARINES NORTE (FIRST DISTRICT) 49,000,000
1. Bagong Silang-Capalonga Rd - K0302+488 - K0302+506, K0311+096 - K0311+126, k0313+000 - k0313+080, K0313+1106 - K0313+1202, K0313+926 - K0313+1067, K0314+1130 - K0314+1214, K0314+698 - K0314+784, K0328+271 - K0328+333, K0328+390 - K0328+456, K0328+610 - K0328+688, K0329+094 - K0329+130
49,000,000
3. Camarines Sur 2nd DEO 3,000,000a. CAMARINES SUR (THIRD DISTRICT) 3,000,000
1. Hanawan-Consocep Rd - K0475+240 - K0475+270, K0475+335 - K0475+415, K0477+445 - K0477+475
3,000,000
4. Camarines Sur 4th DEO 45,000,000a. CAMARINES SUR (FIFTH DISTRICT) 45,000,000
1. Nabua-Balatan Rd - K0474+100 - K0475+101 B/S, K0488+943 - K0489+254, K0490+949.5 - K0490+1029.5
45,000,000
5. Catanduanes DEO 4,030,000a. CATANDUANES (LONE DISTRICT) 4,030,000
1. Jct Bato-Baras Rd - K0015+100 - K0015+200, K0015+850 - K0015+900, K0016+350 - K0016+410
4,030,000
6. Masbate 3rd DEO 10,500,000a. MASBATE (FIRST DISTRICT) 10,500,000
1. Sn Fernando-Talisay Rd - K0006+831 - K0006+918, K0006+945 - K0007+088
4,000,000
2. Sn Pascual-Claveria Rd - K0049+063 - K0049+096, K0050+182 - K0050+354
6,500,000
7. Sorsogon 1st DEO 30,000,000a. SORSOGON (FIRST DISTRICT) 30,000,000
1. Juban-Magallanes Rd - K0613+000 - K0616+000
30,000,000
8. Sorsogon 2nd DEO 2,240,000a. SORSOGON (SECOND DISTRICT) 2,240,000
1. Ariman-Jct Bulusan Lake Rd - K0621+250 - K0621+290
2,240,000
h. Region VI 123,240,0001. Capiz 1st DEO 9,500,000
a. CAPIZ (FIRST DISTRICT) 9,500,0001. Jct Natl Rd-Mi-anay-Duyoc-Calaan-Panitan Rd -
K0105+883 - K0106+080, K0107+924 - K0108+027 L/S7,600,000
2. Roxas City Bdry-Panitan-Bailan Rd - K0119+778 - K0119+900 R/S
1,900,000
2. Capiz 2nd DEO 49,000,000a. CAPIZ (SECOND DISTRICT) 49,000,000
1. Tapaz-Jamindan-Altavaz Rd - K0086+925 - K0086+942, K0087+350 - K0087+381, K0087+800 - K0087+846, K0092+155 - K0092+191, K0097+731 - K0097+777, K0097+876 - K0097+931, K0098+007 - K0098+022, K0098+058 - K0098+117, K0098+705 - K0098+725, K0100+497 - K0100+522, K0100+612 - K0100+654
49,000,000
764 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
3. Iloilo 1st DEO 49,500,000a. ILOILO (FIRST DISTRICT) 49,500,000
1. Guimbal-Igbaras-Tubungan-Leon Rd - K0043+380 - K0043+450, K0044+420 - K0044+470, K0044+480 - K0044+540, K0044+705 - K0044+725, K0047+800 - K0047+950, K0049+750 - K0049+900, K0052+200 - K0052+300, K0053+160 - K0053+240, K0053+600 - K0053+650, K0057+750 - K0057+790, K0057+900 - K0057+950, K0058+100 - K0058+150, K0059+850 - K0059+880, K0059+900 - K0059+950
49,500,000
4. Negros Occidental 3rd DEO 10,240,000a. NEGROS OCCIDENTAL (SIXTH DISTRICT) 10,240,000
1. Dancalan-Candoni-Damutan Valley Rd - K0101+010 - K0101+150
10,240,000
5. Negros Occidental 4th DEO 5,000,000a. NEGROS OCCIDENTAL (FOURTH DISTRICT) 5,000,000
1. Jct Palencia-Boy Scout Camp - K0061+782 - K0061+888
5,000,000
i. Region VII 43,548,0001. Bohol 2nd DEO 2,500,000
a. BOHOL (SECOND DISTRICT) 2,500,0001. Jct (LIR) Buenavista-Carmen-Danao-Jetafe Rd -
K0100+300 - K0100+400, K0100+500 - K0100+7002,500,000
2. Bohol 3rd DEO 4,000,000a. BOHOL (THIRD DISTRICT) 4,000,000
1. Jct (LIR) Buenavista-Carmen-Danao-Jetafe Rd - K0067+400 - K0067+420, K0069+010 - K0069+020
4,000,000
3. Negros Oriental 1st DEO 27,048,000a. NEGROS ORIENTAL (FIRST DISTRICT) 27,048,000
1. Guihulngan-Baloc-Isabela Rd - K0121+119 - K0121+188
9,500,000
2. Mabinay-Ayungon Rd - K0130+541 - K0130+620
17,548,000
4. Negros Oriental 2nd DEO 10,000,000a. NEGROS ORIENTAL (SECOND DISTRICT) 10,000,000
1. Bayawan-Mabinay Rd. - K0148+724 - K0149+010, K0149+128 - K0149+338
10,000,000
j. Region VIII 212,240,0001. Leyte 2nd DEO 3,000,000
a. LEYTE (SECOND DISTRICT) 3,000,0001. Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd -
K0943+000 - K0943+0253,000,000
2. Leyte 3rd DEO 81,840,000a. LEYTE (THIRD DISTRICT) 81,840,000
1. Cabunga-an-Tabunok-Consuegra Rd - K1015+300 - K1015+414, K1015+600 - K1015+664
47,910,000
2. Sn Isidro-Daja Rd - K1021+200 - K1021+405
21,780,000
3. Sto Rosario-Villaba Rd - K1008+709 - K1008+734, K1008+800 - K1008+828, K1010+946 - K1011+052, K1011+493 - K1011+539, K1012+007 - K1012+042
12,150,000
3. Leyte 4th DEO 52,400,000a. LEYTE (FOURTH DISTRICT) 52,400,000
1. Libungao-Matag-ob-Palompon Rd - K1006+895 - K1006+945, K1010+1013 - K1010+1043, K1010+365 - K1010+380, K1010+900 - K1010+915, K1011+485 - K1011+545, K1011+505 - K1011+575, K1011+530 - K1011+620, K1012+405 - K1012+435, K1015+050 - K1015+070, K1015+454 - K1015+474, K1015+495 - K1015+510, K1015+585 - K1015+635 L/S, K1015+585 - K1015+635 R/S, K1016+364 - K1016+394, K1017+950 - K1017+1050
47,000,000
2. Merida-Lundag-Puting Bato-Consolacion-Isabel Rd - K1115+725 - K1115+775
5,400,000
details of dpwh’s programs/projects 765
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
4. Northern Samar 2nd DEO 45,000,000a. NORTHERN SAMAR (SECOND DISTRICT) 45,000,000
1. Rawis-Catubig Rd - K0802+950 - K0803+150
45,000,000
5. Tacloban City DEO 30,000,000a. LEYTE (FIRST DISTRICT) 30,000,000
1. Tigbao-Sta Fe-Sn Miguel Rd - K0903+667 - K0903+684, K0905+586 - K0905+622
30,000,000
k. Region IX 25,000,0001. Zamboanga del Sur 2nd DEO 25,000,000
a. ZAMBOANGA DEL SUR (SECOND DISTRICT) 25,000,0001. Jct Dumalinao-Margosatubig Rd -
K1689+408 - K1689+43810,000,000
2. Jct Tubod-Lakewood Rd - K1701+-420 - K1701+-400, K1710+390 - K1710+540
15,000,000
l. Region X 146,250,0001. Bukidnon 1st DEO 8,000,000
a. BUKIDNON (SECOND DISTRICT) 8,000,0001. Jct Sayre H-way-Impasugong-Patulangan By-Pass Rd -
K1482+000 - K1482+070, K1486+000 - K1486+0504,000,000
2. Jct SH Aglayan-Zamboanguita Rd - K1554+300 - K1554+350, K1560+000 - K1560+020
4,000,000
2. Bukidnon 3rd DEO 44,000,000a. BUKIDNON (FIRST DISTRICT) 44,000,000
1. Jct SH-Manolo Fortich-Libona-Indahag Rd - K1477+900 - K1478+800 B/S
13,000,000
2. Misamis Or-Bukidnon-Agusan Rd - K1445+750 - K1445+782 L/S
31,000,000
3. Lanao del Norte 1st DEO 30,250,000a. LANAO DEL NORTE (FIRST DISTRICT) 21,000,000
1. Lanao del Norte Interior Circum. Rd (LDNICR) - K1535+900 - K1536+200 L/S, K1544+725 - K1544+775
21,000,000
b. LANAO DEL NORTE (SECOND DISTRICT) 9,250,0001. Dobleston-Butadon Rd -
K1996+340 - K1996+380 L/S1,350,000
2. Lala-Salvador-Tubod Rd - K1617+800 - K1618+160 R/S
6,400,000
3. Lanao del Norte Interior Circum. Rd (LDNICR) - K1581+200 - K1581+350 L/S
1,500,000
4. Lanao del Norte 2nd DEO 64,000,000a. ILIGAN CITY (LONE DISTRICT) 49,000,000
1. Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd - K1519+850 - K1519+950, K1520+470 - K1520+570 L/S, K1522+500 - K1522+650 L/S
49,000,000
b. LANAO DEL NORTE (FIRST DISTRICT) 15,000,0001. Balo-i-Matungao-Linamon Rd -
K1561+300 - K1561+380 L/S15,000,000
m. Region XI 151,210,0001. Compostela Valley DEO 42,300,000
a. COMPOSTELA VALLEY (FIRST DISTRICT) 41,300,0001. Montevista-Compostela-Mati Bdry Rd -
K1454+650 - K1454+850, K1456+200 - K1456+240, K1456+400 - K1456+450, K1456+500 - K1456+560, K1456+600 - K1456+700, K1456+900 - K1456+922, K1460+800 - K1460+840, K1464+100 - K1464+130, K1467+500 - K1467+510, K1468+400 - K1468+430, K1470+900 - K1470+980
35,000,000
2. Montevista-DNAS Rd - K1423+010 - K1423+060, K1423+400 - K1423+420, K1424+110 - K1424+118, K1430+500 - K1430+530, K1432+700 - K1432+708
6,300,000
b. COMPOSTELA VALLEY (SECOND DISTRICT) 1,000,0001. Nabunturan-Mainit Park Rd -
K1440+640 - K1440+6591,000,000
766 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAM / ACTIVITIES / PROJECTS
2. Davao City DEO 29,410,000a. DAVAO CITY (SECOND DISTRICT) 29,410,000
1. Fatima-Malabog Rd - K1503+320 - K1503+340, K1503+400 - K1503+460, K1505+300 - K1505+360, K1508+100 - K1508+270, K1510+850 - K1510+900
29,410,000
3. Davao Oriental 2nd DEO 79,500,000a. DAVAO ORIENTAL (SECOND DISTRICT) 79,500,000
1. Jct Manikling-Gov Generoso Rd - K1763+000 - K1763+991 R/S
30,000,000
2. Tibanban-Lavigan Rd - K1781+091.4 - K1781+211.10, K1782+392.90 - K1783+000, K1785+797.5 - K1786+000, K1786+178 - K1786+878, K1788+574.4 - K1788+840.2, K1804+000 - K1804+092.4, K1804+185.3 - K1804+315.9, K1822+198.10 - K1822+539.5, K1823+111.70 - K1823+164.9, K1823+512 - K1823+745, K1824+218.7 - K1824+321.5
49,500,000
n. Region XII 18,500,0001. Cotabato 2nd DEO 18,500,000
a. COTABATO (FIRST DISTRICT) 18,500,0001. Dualing-New Panay-Midsayap Rd -
K1708+621 - K1708+701, K1708+910 - K1708+980, K1709+170 - K1709+240
18,500,000
o. Region XIII 44,500,0001. Agusan del Norte DEO 18,000,000
a. AGUSAN DEL NORTE (SECOND DISTRICT) 18,000,0001. Agusan-Bukidnon Rd -
K1260+060 - K1260+50018,000,000
2. Agusan del Sur 1st DEO 19,000,000a. AGUSAN DEL SUR (FIRST DISTRICT) 19,000,000
1. Butuan City-Pianing-Tandag Rd - K1250+-627 - K1250+784
19,000,000
3. Surigao del Norte 1st DEO 7,500,000a. SURIGAO DEL NORTE (SECOND DISTRICT) 7,500,000
1. Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1143+368 - K1143+401 R/S
7,500,000
details of dpwh’s programs/projects 767
D. Construction/ Upgrading / Rehabilitation of Drainage Along National Roads 5,382,567,000
1. Primary Roads 1,177,390,000
I. Central Office 3,500,000
Nationwide 3,500,000Central Office 3,500,000
NATIONWIDE 3,500,000Construction/ Upgrading / Rehabilitation of DrainageAlong National Roads
3,500,000
II. Regional Office 1,173,890,000
a. NCR 65,000,0001. Metro Manila 2nd DEO 65,000,000
a. PARANAQUE CITY (FIRST DISTRICT) 65,000,0001. Paranaque-Sucat Rd -
K0013+-702 - K0013+403, K0014+040 - K0014+59215,000,000
2. Roxas Blvd - K0006+-357 - K0007+433
50,000,000
b. Region I 24,000,0001. La Union 1st DEO 24,000,000
a. LA UNION (FIRST DISTRICT) 24,000,0001. Manila North Rd -
K0270+500 - K0271+378, K0272+000 - K0273+76724,000,000
c. Region II 90,386,0001. Cagayan 2nd DEO 19,336,000
a. CAGAYAN (SECOND DISTRICT) 19,336,0001. Manila North Rd -
K0598+280 - K0598+419, K0605+850 - K0606+043, K0673+100 - K0673+293, K0681+622 - K0681+709, K0631+800 - K0632+068
19,336,000
2. Isabela 1st DEO 38,400,000a. ISABELA (FIRST DISTRICT) 38,400,000
1. Daang Maharlika (LZ) - K0396+400 - K0396+700, K0400+000 - K0400+300, K0421+600 - K0422+300, K0444+000 - K0444+818
38,400,000
3. Isabela 2nd DEO 25,642,000a. ISABELA (SECOND DISTRICT) 25,642,000
1. Santiago-Tuguegarao Rd - K0384+000 - K0384+503, K0385+00 - K0385+447, K0385+623 - K0386+080
25,642,000
4. Isabela 3rd DEO 7,008,000a. ISABELA (THIRD DISTRICT) 7,008,000
1. Daang Maharlika (LZ) - K0368+484 - K0369+227
7,008,000
d. CAR 39,000,0001. Baguio City DEO 39,000,000
a. BAGUIO CITY (LONE DISTRICT) 39,000,0001. Abanao Rd -
Chainage 0 - Chainage 3526,000,000
2. Harrison Rd No 1 - Chainage 0 - Chainage 352
16,000,000
3. Kayang St - Chainage 0 - Chainage 166
3,000,000
4. Kennon Rd - K0244+865 - K0245+608
14,000,000
e. Region III 77,823,0001 Nueva Ecija 2nd DEO 50,000,000
a. NUEVA ECIJA (THIRD DISTRICT) 10,000,0001. Daang Maharlika (LZ) -
K0116+242 - K0117+10210,000,000
b. NUEVA ECIJA (FOURTH DISTRICT) 40,000,0001. Daang Maharlika (LZ) -
K0090+000 - K0092+00030,000,000
2. Daang Maharlika (LZ) - K0092+925 - K0093+785
10,000,000
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
768 eXpeNditUre program fY 2016 VolUme ii
2 Pampanga 1st DEO 27,823,000a. PAMPANGA (THIRD DISTRICT) 17,823,000
1. Gapan-Sn Fernando-Olongapo Rd - K0086+300 - K0087+200
17,823,000
b. PAMPANGA (FOURTH DISTRICT) 10,000,0001. Manila North Rd -
K0062+756 - K0063+81110,000,000
f. Region IV-A 146,720,0001. Laguna 3rd DEO 6,720,000
a. LAGUNA (THIRD DISTRICT) 6,720,0001. Calamba-Sta Cruz-Famy Jct Rd -
K0069+200 - K0069+5713,360,000
2. Maspang H-way - K0070+-768 - K0070+-397
3,360,000
2. Quezon 4th DEO 140,000,000a. QUEZON (FOURTH DISTRICT) 140,000,000
1. Daang Maharlika (LZ) - K0196+800 - K0197+762, K0215+400 - K0216+475, K0222+100 - K0223+456
80,000,000
2. Quirino H-way - K0253+000 - K0255+153, K0266+900 - K0267+1076
60,000,000
g. Region V 51,840,0001. Albay 2nd DEO 21,840,000
a. ALBAY (SECOND DISTRICT) 21,840,0001. Daang Maharlika (LZ) -
K0515+651 - K0518+04821,840,000
2. Sorsogon 2nd DEO 30,000,000a. SORSOGON (SECOND DISTRICT) 30,000,000
1. Daang Maharlika (LZ) - K0601+623 - K0605+382
30,000,000
h. Region VI 86,334,0001. Negros Occidental 4th DEO 86,334,000
a. NEGROS OCCIDENTAL (FOURTH DISTRICT) 86,334,0001. Bacolod South Rd -
K0011+-469 - K0012+138, K0015+971 - K0016+836, K0033+947 - K0036+200
86,334,000
i. Region VII 134,280,0001. Cebu 2nd DEO 48,000,000
a. CEBU (FIRST DISTRICT) 48,000,0001. N Bacalso Ave (Cebu South Rd) -
K0011+700 - K0003+93948,000,000
2. Cebu 3rd DEO 23,680,000a. CEBU (THIRD DISTRICT) 23,680,000
1. Cebu-Toledo Wharf Rd (Uling-Toledo Wharf) - K0047+650 - K0048+716, K0054+651 - K0054+894
23,680,000
3. Cebu 4th DEO 40,000,000a. CEBU (SECOND DISTRICT) 40,000,000
1. N Bacalso Ave (Cebu South Rd) - K0082+000 - K0082+572, K0093+000 - K0093+572, K0107+000 - K0107+572, K0125+000 - K0125+572
40,000,000
4. Negros Oriental 2nd DEO 22,600,000a. NEGROS ORIENTAL (SECOND DISTRICT) 22,600,000
1. Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) -K0049+020 - K0050+710
17,600,000
2. Dumaguete South Rd - K0004+657 - K0005+205
5,000,000
j. Region VIII 67,352,0001. Leyte 2nd DEO 29,520,000
a. LEYTE (SECOND DISTRICT) 29,520,0001. Palo-Carigara-Ormoc Rd -
K0964+215 - K0963+1862, K0969+298 - K0970+015, K0970+308 - K0972+115
29,520,000
2. Leyte 4th DEO 37,832,000a. LEYTE (FOURTH DISTRICT) 37,832,000
2. Palo-Carigara-Ormoc Rd - K1004+717 - K1007+534, K1007+500 - K1008+176
37,832,000
k. Region IX 19,000,0001. Zamboanga City DEO 10,000,000
a. ZAMBOANGA CITY (SECOND DISTRICT) 10,000,000
details of dpwh’s programs/projects 769
1. Pagadian City-Zamboanga City Rd - K1929+700 - K1930+300
10,000,000
2. Zamboanga del Norte 1st DEO 9,000,000a. ZAMBOANGA DEL NORTE (SECOND DISTRICT) 9,000,000
1. Dipolog-Sindangan-Liloy Rd - K1855+117 - K1855+615
9,000,000
l. Region X 287,137,0001. Bukidnon 2nd DEO 111,485,000
a. BUKIDNON (THIRD DISTRICT) 111,485,0001. Bukidnon-Davao City Rd -
K1575+500 - K1576+617, K1616+000 - K1618+25460,000,000
2. Sayre Highway - K1540+000 - K1541+000, K1548+000 - K1549+000, K1551+400 - K1551+422, K1555+583 - K1556+450
51,485,000
2. Cagayan de Oro City 2nd DEO 40,000,000a. CAGAYAN DE ORO CITY (SECOND DISTRICT) 40,000,000
1. Butuan City-Cagayan de Oro City-Iligan City Rd - K1435+000 - K1436+098, K1435+600 - K1436+098
40,000,000
3. Lanao del Norte 1st DEO 71,900,000a. LANAO DEL NORTE (SECOND DISTRICT) 71,900,000
1. Linamon-Zamboanga Rd - K1602+300 - K1602+840, K1605+245 - K1605+945, K1611+1050 - K1613+920, K1617+751 - K1617+911
58,225,000
2. Malabang-Dobleston-Tukuran Rd - K1969+836 - K1970+195, K1970+340 - K1970+918
13,675,000
4. Lanao del Norte 2nd DEO 20,000,000a. LANAO DEL NORTE (FIRST DISTRICT) 20,000,000
1. Linamon-Zamboanga Rd - K1539+000 - K1540+098, K1543+200 - K1544+316
20,000,000
5. Misamis Occidental 1st DEO 3,752,000a. MISAMIS OCCIDENTAL (FIRST DISTRICT) 3,752,000
1. Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd - K1761+500 - K1761+753
2,292,000
2. Ozamis City-Oroquieta City Rd - K1734+780 - K1734+941
1,460,000
6. Misamis Oriental 1st DEO 40,000,000a. MISAMIS ORIENTAL (FIRST DISTRICT) 40,000,000
1. Butuan City-Cagayan de Oro City-Iligan City Rd - K1281+-168 - K1282+489, Chainage - K1281+670
40,000,000
m. Region XI 65,018,0001. Davao del Norte DEO 65,018,000
a. DAVAO DEL NORTE (FIRST DISTRICT) 29,978,0001. Daang Maharlika (MN) -
K1453+256 - K1454+657, K1462+749 - K1462+49129,978,000
b. DAVAO DEL NORTE (SECOND DISTRICT) 35,040,0001. Daang Maharlika (MN) -
K1473+072 - K1474+504, K1476+250 - K1476+78635,040,000
n. Region XIII 20,000,0001. Surigao del Norte 1st DEO 20,000,000
a. SURIGAO DEL NORTE (SECOND DISTRICT) 20,000,0001. Daang Maharlika (Surigao-Agusan Sect) -
K1126+555 - K1127+65520,000,000
2. Secondary Roads 2,216,547,000
I. Central Office 3,500,000-
a. Nationwide 3,500,0001. Central Office 3,500,000
a. NATIONWIDE 3,500,0001. Construction/ Upgrading / Rehabilitation of Drainage
Along National Roads3,500,000
770 eXpeNditUre program fY 2016 VolUme ii
II. Regional Office 220,011,000
a. NCR 70,000,0001. North Manila DEO 70,000,000
a. MANILA CITY (FOURTH DISTRICT) 70,000,0001. Legarda St 70,000,000
d. Region VII 68,000,0001. Cebu 3rd DEO 68,000,000
a. CEBU (THIRD DISTRICT) 68,000,0001. Toledo-Tabuelan-Sn Remigio Rd -
K0087+223 - K0088+323, K0095+000 - K0095+884, K0089+466 - K0094+999
68,000,000
e. Region XI 82,011,0001. Davao Oriental 1st DEO 82,011,000
a. DAVAO ORIENTAL (FIRST DISTRICT) 82,011,0001. Surigao del Sur Bdry-Davao Or Coastal Rd -
K1514+-267 - K1514+-004, K1536+200 - K1536+947, K1555+000 - K1555+922, K1587+000 - K1587+800, K1591+100 - K1591+329, K1633+000 - K1633+800, K1673+000 - K1673+669, K1683+500 - K1683+600
82,011,000
III. District Engineering Office 1,993,036,000
a. Region I 132,906,0001. La Union 1st DEO 28,000,000
a. LA UNION (FIRST DISTRICT) 28,000,0001. Sn Fernando Airport Rd -
K0265+000 - K0266+47016,000,000
2. Sn Fernando Port Rd - K0266+500 - K0267+933
12,000,000
2. Pangasinan 2nd DEO 30,752,000a. PANGASINAN (FOURTH DISTRICT) 30,752,000
1. Dagupan-Bonuan-San Fabian Rd - K0384+000 - K0385+699
30,752,000
3. Pangasinan 3rd DEO 24,000,000a. PANGASINAN (FIFTH DISTRICT) 24,000,000
1. Mangaldan-Manaoag-Binalonan Rd - K0189+-486 - K0192+158
24,000,000
4. Pangasinan 4th DEO 50,154,000a. PANGASINAN (THIRD DISTRICT) 50,154,000
1. Carmen Jct-Bayambang-Manat Rd - K0206+345 - K0207+185
15,431,000
2. Sn Carlos-Calasiao Rd - K0209+426 - K0210+126
12,649,000
3. Villasis-Malasiqui-Sn Carlos Rd - K0198+462 - K0199+661
22,074,000
b. Region II 5,250,0001. Nueva Vizcaya 1st DEO 5,250,000
a. NUEVA VIZCAYA (LONE DISTRICT) 5,250,0001. Nueva Vizcaya-Ifugao Rd -
K0283+500 - K0283+7905,250,000
c. CAR 129,700,0001. Abra DEO 49,000,000
a. ABRA (LONE DISTRICT) 49,000,0001. Abra-Kalinga Rd -
K0409+-200 - K0411+54149,000,000
1. Baguio City DEO 65,000,000a. BAGUIO CITY (LONE DISTRICT) 65,000,000
1. Loakan Rd - K0245+-158 - K0245+947
20,000,000
2. Magsaysay Ave. (Trinidad Rd) - K0251+-463 - K0251+365
15,000,000
3. Marcos Hi-way - K0281+900 - K0282+470
10,000,000
4. Pacdal Rd - K0252+-180 - K0252+925
20,000,000
2. Benguet 2nd DEO 10,000,000a. BENGUET (LONE DISTRICT) 10,000,000
1. Baguio-Bontoc Rd - K0334+000 - K0335+109
10,000,000
details of dpwh’s programs/projects 771
3. Mt.Province DEO 5,700,000a. MOUNTAIN PROVINCE (LONE DISTRICT) 5,700,000
1. Baguio-Bontoc Rd - K0366+811 - K0366+966
1,400,000
2. Mt Prov-Ilocos Sur via Tue Rd - K0399+900 - K0400+167, K0405+200 - K0405+399
4,300,000
d. Region III 231,408,0001. Pampanga 2nd DEO 10,000,000
a. PAMPANGA (SECOND DISTRICT) 10,000,0001. Angeles-Porac-Floridablanca-Dinalupihan Rd 10,000,000
2. Bataan 2nd DEO 18,300,000a. BATAAN (SECOND DISTRICT) 18,300,000
1. Gov JJ Linao Rd - K0148+806 - K0149+359
5,000,000
2. Jct Layac-Balanga-Mariveles Port Rd - K0141+119 - K0142+034
8,300,000
3. Roman Expressway - K0151+000 - K0151+553
5,000,000
3. Nueva Ecija 2nd DEO 79,608,000a. NUEVA ECIJA (THIRD DISTRICT) 79,608,000
1. Bongabon-Rizal-Aurora Rd - K0144+040 - K0147+540
34,608,000
2. Nueva Ecija-Aurora Rd - K0147+540 - K0150+540
45,000,000
4. Tarlac 1st DEO 70,200,000a. TARLAC (FIRST DISTRICT) 70,200,000
1. Paniqui Poblacion Rd - K0144+100 - K0145+485
20,700,000
2. Paniqui-Camiling-Wawa Rd - K0164+093 - K0166+890
49,500,000
5. Zambales 2nd DEO 53,300,000a. ZAMBALES (FIRST DISTRICT) 53,300,000
1. Olongapo-Bugallon Rd - K0126+000 - K0126+939
17,000,000
2. Rizal Ave - Chainage 0 - Chainage 2010
36,300,000
e. Region IV-A 341,021,0001. Batangas 1st DEO 45,000,000
a. BATANGAS (FIRST DISTRICT) 45,000,0001. Palico-Balayan-Batangas Rd -
K0131+668 - K0134+14945,000,000
2. Batangas 3rd DEO 85,104,000a. BATANGAS (THIRD DISTRICT) 85,104,000
1. Banay-Banay-Mojon-Cuenca Rd - K0094+200 - K0096+898
49,000,000
2. Tanauan-Talisay-Tagaytay Rd - K0080+728 - K0082+709
36,104,000
3. Cavite 2nd DEO 8,144,000a. CAVITE (FIFTH DISTRICT) 8,144,000
1. Cavite-Batangas Rd - K0052+740 - K0053+195
8,144,000
4. Quezon 1st DEO 100,000,000a. QUEZON (FIRST DISTRICT) 100,000,000
1. Famy-Real-Infanta-Dinahican Port Rd - K0136+000 - K0137+300, K0139+800 - K0148+153
40,000,000
2. Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Rd - K0145+000 - K0155+140
40,000,000
3. Tayabas-Mainit-Mauban Rd - K0151+000 - K0156+038
20,000,000
5. Quezon 3rd DEO 24,453,000a. QUEZON (THIRD DISTRICT) 24,453,000
1. Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0207+-316 - K0207+-254
1,120,000
2. MSR Jct-Lopez-Buenavista Rd - K0238+-500 - K0238+-358, K0243+927 - K0244+040, K0244+080 - K0244+119, K0244+540 - K0244+680, K0244+800 - K0244+880, K0244+960 - K0244+990
9,866,000
3. Mulanay-Sn Francisco Rd - K0293+1458 - K0293+1557
1,787,000
4. Sn Francisco-Sn Andres-Sn Narciso Rd - K0368+540 - K0369+185
11,680,000
772 eXpeNditUre program fY 2016 VolUme ii
6. Quezon 4th DEO 70,000,000a. QUEZON (FOURTH DISTRICT) 70,000,000
1. Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0198+-200 - K0198+516
20,000,000
2. MSR Jct Lopez-Hondagua Port Rd - K0225+100 - K0226+556
20,000,000
3. MSR Jct-Lopez-Buenavista Rd - K0218+-300 - K0219+848
30,000,000
7. Rizal 2nd DEO 8,320,000a. RIZAL (SECOND DISTRICT) 8,320,000
1. Manila East Rd - K0039+700 - K0040+004
8,320,000
f. Region IV-B 141,030,0001. Mindoro Occidental DEO 20,000,000
a. MINDORO OCCIDENTAL (LONE DISTRICT) 20,000,0001. Mindoro West Coastal Rd -
K0229+-871 - K0229+01820,000,000
2. Palawan 1st DEO 62,120,000a. PALAWAN (FIRST DISTRICT) 62,120,000
1. Puerto Princesa North Rd - K0110+000 - K0110+071, K0115+270 - K0115+611, K0161+160 - K0161+658, K0161+370 - K0161+462, K0162+828 - K0163+243, K0166+1130 - K0166+1244, K0171+120 - K0171+238, K0211+1455 - K0212+490
49,000,000
2. Roxas Diversion Rd - K0137+-709 - K0137+-279
13,120,000
3. Southern Mindoro DEO 58,910,000a. MINDORO ORIENTAL (SECOND DISTRICT) 58,910,000
1. Calapan South Rd - K0142+726 - K0143+196, K0144+350 - K0144+764, K0149+785 - K0150+018, K0164+138 - K0164+978, K0166+733 - K0166+914, K0169+683 - K0170+534, K0173+200 - K0173+398, K0181+872 - K0182+1000
44,400,000
2. Mindoro Oriental/Occidental East Coastal Rd - K0187+938 - K0187+1000, K0193+250 - K0193+803, K0201+833 - K0202+697
14,510,000
g. Region V 224,460,0001. Albay 1st DEO 29,600,000
a. ALBAY (FIRST DISTRICT) 29,600,0001. DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry -
K0565+300 - K0565+433, K0583+000 - K0583+61913,600,000
2. Ligao-Tabaco Rd - K0518+000 - K0518+884, K0520+000 - K0520+884
16,000,000
2. Albay 2nd DEO 30,160,000a. ALBAY (SECOND DISTRICT) 30,160,000
1. DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry - K0537+983 - K0538+930
13,585,000
2. Legazpi Airport Rd - K0530+-867 - K0530+965
16,575,000
3. Camarines Sur 3rd DEO 125,700,000a. CAMARINES SUR (FOURTH DISTRICT) 125,700,000
1. Lagonoy-Presentacion Rd - K0526+000 - K0527+680, K0499+000 - K0500+441
38,000,000
2. Presentacion-Maligaya Rd - K0538+200 - K0539+966, K0535+000 - K0536+419
38,000,000
3. Pili-Tigaon-Albay Bdry Rd - K0503+000 - K0507+169, K0504+787 - K0506+171
49,700,000
4. Masbate 3rd DEO 39,000,000a. MASBATE (FIRST DISTRICT) 39,000,000
1. Sn Fernando North Rd - K0016+733 - K0018+758, K0026+611 - K0028+875
39,000,000
h. Region VI 209,668,0001. Antique DEO 7,500,000
a. ANTIQUE (LONE DISTRICT) 7,500,0001. Iloilo-Antique Rd -
K0130+800 - K0131+2087,500,000
2. Capiz 1st DEO 47,056,000a. CAPIZ (FIRST DISTRICT) 47,056,000
1. Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan - Chainage 0 - Chainage 2600
47,056,000
details of dpwh’s programs/projects 773
3. Guimaras DEO 95,000,000a. GUIMARAS (LONE DISTRICT) 95,000,000
1. Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0051+-1127 - K0052+384
47,000,000
2. Guimaras Circumferential Rd - K0001+445 - K0004+090
48,000,000
4. Iloilo 1st DEO 20,112,000a. ILOILO (FIRST DISTRICT) 20,112,000
1. Iloilo-Antique Rd - K0020+000 - K0020+604, K0022+904 - K0023+027, K0043+800 - K0044+262, K0047+000 - K0047+164
20,112,000
5. Iloilo 3rd DEO 30,000,000a. ILOILO (FIFTH DISTRICT) 30,000,000
1. Iloilo East Coast-Estancia Wharf Rd - K0180+340 - K0181+994
30,000,000
6. Iloilo City DEO 10,000,000a. ILOILO CITY (LONE DISTRICT) 10,000,000
1. Iloilo-Antique Rd - K0003+-959 - K0003+141
10,000,000
i. Region VII 70,418,0001. Cebu 1st DEO 22,518,000
a. CEBU (FOURTH DISTRICT) 22,518,0001. Cebu North Hagnaya Wharf Rd -
K0099+017 - K0100+26622,518,000
2. Cebu 3rd DEO 30,300,000a. CEBU (THIRD DISTRICT) 30,300,000
1. Cebu-Balamban Transcentral Highway - K0036+000 - K0036+920
8,300,000
2. Toledo-Pinamungahan-Aloguinsan-Mantalongon Rd - K0060+700 - K0062+356, K0079+000 - K0079+774
22,000,000
3. Negros Oriental 2nd DEO 17,600,000a. NEGROS ORIENTAL (SECOND DISTRICT) 17,600,000
1. Sta Catalina-Pamplona-Tanjay City - K0034+000 - K0035+945
17,600,000
j. Region VIII 268,910,0001. Eastern Samar DEO 96,000,000
a. EASTERN SAMAR (LONE DISTRICT) 96,000,0001. Jct Buenavista-Lawaan-Marabut Rd -
K0954+450 - K0954+950, K0957+390 - K0958+202, K0959+142 - K0959+208, K0959+212 - K0959+384, K0959+388 - K0959+613, K0959+615 - K0959+861, K0959+820 - K0960+134, K0959+851 - K0960+162
48,000,000
2. Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0928+321 - K0928+538, K0932+012 - K0932+124, K0932+208 - K0932+311, K0950+129 - K0950+961, K0951+180 - K0952+060, K0951+220 - K0951+301, K0951+776 - K0951+980, K0952+064 - K0952+098, K0959+650 - K0959+811
48,000,000
2. Leyte 4th DEO 16,160,000a. LEYTE (FOURTH DISTRICT) 16,160,000
1. Palompon-Isabel-Merida-Ormoc Rd - K1086+000 - K1087+482
16,160,000
3. Leyte 5th DEO 46,750,000a. LEYTE (FIFTH DISTRICT) 46,750,000
1. Bato-Bontoc Rd - K1108+500 - K1109+601
10,000,000
2. Ormoc-Baybay-Southern Leyte Bdry Rd - K1061+800 - K1063+100, K1074+900 - K1076+200, K1107+900 - K1108+005, K1111+000 - K1112+300
36,750,000
4. Northern Samar 2nd DEO 90,000,000a. NORTHERN SAMAR (SECOND DISTRICT) 90,000,000
1. Laoang-Calomotan Rd - K0794+500 - K0795+599
20,000,000
2. Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0799+000 - K0799+700, K0813+000 - K0813+958
30,000,000
3. Sn Policarpo-Arteche-Lapinig Rd - K0851+-376 - K0852+908
40,000,000
5. Southern Leyte DEO 20,000,000a. SOUTHERN LEYTE (LONE DISTRICT) 20,000,000
1. Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika - K1122+-925 - K1122+180
20,000,000
k. Region IX 43,400,000
774 eXpeNditUre program fY 2016 VolUme ii
1. Zamboanga City DEO 34,400,000a. ZAMBOANGA CITY (FIRST DISTRICT) 34,400,000
1. Zamboanga City-Labuan-Limpapa Rd - K1942+700 - K1944+604
34,400,000
2. Zamboanga del Norte 2nd DEO 9,000,000a. ZAMBOANGA DEL NORTE (THIRD DISTRICT) 9,000,000
1. Siocon-Sirawai Rd - K2075+-299 - K2075+198
9,000,000
l. Region X 103,977,0001. Bukidnon 2nd DEO 49,000,000
a. BUKIDNON (THIRD DISTRICT) 49,000,0001. Sayre Highway (Bukidnon-Davao Jct to Cotabato Bdry -
K1566+000 - K1568+000, K1572+000 - K1572+252, K1576+000 - K1576+497
49,000,000
2. Camiguin DEO 32,617,000a. CAMIGUIN (LONE DISTRICT) 32,617,000
1. Camiguin Circumferential Rd - K0024+240 - K0024+446, K0037+547 - K0038+422, K0039+000 - K0039+708
32,617,000
3. Misamis Occidental 1st DEO 6,360,000a. MISAMIS OCCIDENTAL (FIRST DISTRICT) 6,360,000
1. Oroquieta City-Calamba Mt Rd - K1771+047 - K1771+224, K1771+497 - K1772+022
6,360,000
4. Misamis Oriental 1st DEO 16,000,000a. MISAMIS ORIENTAL (FIRST DISTRICT) 16,000,000
1. Gingoog-Claveria-Villanueva Rd - K1316+-328 - K1316+556
16,000,000
m. Region XI 68,032,0001. Davao del Norte DEO 23,032,000
a. DAVAO DEL NORTE (FIRST DISTRICT) 23,032,0001. Tagum City Diversion Rd -
K1461+-20 - K1462+09319,032,000
2. Tagum-Panabo Circum Rd - K1458+280 - K1458+501
4,000,000
2. Davao del Sur 2nd DEO 45,000,000a. DAVAO OCCIDENTAL (LONE DISTRICT) 45,000,000
1. Davao-Sarangani Coastal Rd (Malalag-Mali - K1786+000 - K1787+000, K1778+000 - K1779+000, K1786+500 - K1787+500
45,000,000
n. Region XII 17,856,0001. South Cotabato 2nd DEO 17,856,000
a. SOUTH COTABATO (FIRST DISTRICT) 17,856,0001. Makar-Kiamba Rd -
K1660+505 - K1661+60817,856,000
o. Region XIII 5,000,0001. Agusan del Norte DEO 5,000,000
a. AGUSAN DEL NORTE (SECOND DISTRICT) 5,000,0001. Nasipit Port Rd -
K1264+300 - K1264+5765,000,000
3. Tertiary Roads 1,988,630,000
I. Central Office 3,000,000
a. Nationwide 3,000,0001. Central Office 3,000,000
a. NATIONWIDE 3,000,0001. Construction/ Upgrading / Rehabilitation of Drainage
Along National Roads3,000,000
II. Regional Office 212,000,000
a. NCR 70,000,0001. North Manila DEO 70,000,000
a. MANILA CITY (FOURTH DISTRICT) 70,000,0001. Dapitan St 70,000,000
details of dpwh’s programs/projects 775
a. Region IV-A 60,000,0001. Quezon 4th DEO 60,000,000
a. QUEZON (FOURTH DISTRICT) 60,000,0001. Quezon-Alabat-Perez Rd -
K0005+969 - K0006+855, K0009+163 - K0009+465, K0013+163 - K0013+426, K0015+421 - K0015+675, K0018+547 - K0018+695, K0020+805 - K0020+905, K0021+800 - K0021+945, K0023+150 - K0023+294, K0023+620 - K0024+035, K0026+234 - K0026+493, K0039+146 - K0039+332, K0039+742 - K0040+014, K0041+188 - K0041+443, K0042+093 - K0042+354, K0042+515 - K0043+408
60,000,000
b. Region VII 82,000,0001. Bohol 1st DEO 82,000,000
a. BOHOL (FIRST DISTRICT) 82,000,0001. Balilihan-Hanopol-Batuan Rd -
K0023+-263 - K0030+74082,000,000
III. District Engineering Office 1,773,630,000
a. NCR 198,300,0001. Metro Manila 3rd DEO 63,300,000
a. KALOOKAN CITY (FIRST DISTRICT) 63,300,0001. Central Luzon Leprosarium Rd -
K0031+-200 - K0031+35210,000,000
2. Deparo-Camarin Rd - K0020+-150 - K0020+678
15,000,000
3. Novaliches-Sn Jose Rd - K0025+-145 - K0025+866, K0026+000 - K0027+095
38,300,000
2. Quezon City 2nd DEO 25,000,000a. QUEZON CITY (FOURTH DISTRICT) 25,000,000
1. Kamuning Rd - K0011+-244 - K0011+861
20,000,000
2. Scout Ybardaloza - K0011+-061 - K0011+491
5,000,000
3. North Manila DEO 110,000,000a. MANILA CITY (FOURTH DISTRICT) 110,000,000
1. Algeciras 49,000,0002. J Fajardo St 49,000,0003. North Antipolo St 12,000,000
b. Region I 20,000,0001. La Union 1st DEO 20,000,000
a. LA UNION (FIRST DISTRICT) 20,000,0001. Sn Fernando-Bagulin Rd -
K0270+-1016 - K0271+19620,000,000
c. Region II 120,608,0001. Batanes DEO 28,040,000
a. BATANES (LONE DISTRICT) 28,040,0001. Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd -
K0005+000 - K0005+456, K0005+608 - K0005+848, K0007+735 - K0007+975, K0009+776 - K0010+062, K0011+402 - K0011+950, K0019+500 - K0020+163
28,040,000
2. Cagayan 2nd DEO 65,609,000a. CAGAYAN (SECOND DISTRICT) 65,609,000
1. Cagayan-Apayao Rd (Tuao-Rizal Sect) - K0534+173 - K0534+556, K0540+596 - K0540+741, K0540+757 - K0541+039, K0541+070 - K0541+295, K0541+650 - K0541+731, K0542+019 - K0542+105, K0542+130 - K0542+283, K0543+200 - K0543+250, K0548+834 - K0550+000
45,609,000
2. Jct Logac-Lasam-Gagabutan Rd - K0732+013 - K0733+107
20,000,000
3. Cagayan 3rd DEO 6,359,000a. CAGAYAN (THIRD DISTRICT) 6,359,000
1. CVR Regional Govt Center Rd Network - Chainage 591 - Chainage 881, Chainage 967 - Chainage 1380
6,359,000
4. Isabela 1st DEO 16,000,000a. ISABELA (FIRST DISTRICT) 16,000,000
1. Ilagan-Delfin Albano-Mallig Rd - K0418+000 - K0418+442, K0419+700 - K0419+965, K0430+800 - K0431+013
16,000,000
5. Nueva Vizcaya 1st DEO 4,600,000a. NUEVA VIZCAYA (LONE DISTRICT) 4,600,000
1. DM Jct-Malasin Rd - K0248+-456 - K0248+-202
4,600,000
776 eXpeNditUre program fY 2016 VolUme ii
d. CAR 155,600,0001. Abra DEO 59,600,000
a. ABRA (LONE DISTRICT) 59,600,0001. Abra-Cervantes Rd -
K0441+000 - K0442+94131,000,000
2. Abra-Ilocos Norte Rd - K0436+000 - K0438+100
28,600,000
2. Baguio City DEO 96,000,000a. BAGUIO CITY (LONE DISTRICT) 96,000,000
1. Balatoc Rd - K0248+000 - K0248+550
10,000,000
2. Bokawkan Rd - K0307+-802 - K0307+-360
8,000,000
3. F Calderon St - Chainage 0 - Chainage 180
2,000,000
4. Gibraltar Rd - K0252+-760 - K0252+070
15,000,000
5. Legarda Rd - K0251+-360 - K0251+-080
5,000,000
6. Military Cut-off Rd - K0249+-830 - K0249+-277
10,000,000
7. Outlook Drive - K0253+-430 - K0253+012
8,000,000
8. PMA Cut Off Rd 1 - K0252+-823 - K0252+-160
12,000,000
9. Quezon Hill Drive - Chainage 0 - Chainage 773
8,000,000
10. South Drive - K0251+-295 - K0251+700
18,000,000
e. Region III 449,722,0001. Bataan 2nd DEO 22,500,000
a. BATAAN (SECOND DISTRICT) 22,500,0001. Bagac-Mariveles Rd -
K0192+500 - K0195+54622,500,000
2. Nueva Ecija 2nd DEO 47,040,000a. NUEVA ECIJA (FOURTH DISTRICT) 47,040,000
1. Gapan-Fort Magsaysay Rd - K0110+000 - K0110+884, K0101+000 - K0101+600, K0104+350 - K0104+980, K0105+000 - K0106+045, K0106+800 - K0107+160, K0107+500 - K0108+200, K0119+000 - K0119+750
47,040,000
3. Pampanga 1st DEO 25,952,000a. PAMPANGA (FOURTH DISTRICT) 25,952,000
1. Bahay Pare-Sn Luis-Sto Domingo Rd - K0068+000 - K0069+000
8,000,000
2. Baliwag-Candaba-Sta Ana Rd - K0062+756 - K0064+000
9,952,000
3. Candaba-Sn Miguel Rd - K0070+-487 - K0070+397
8,000,000
4. Tarlac 1st DEO 309,230,000a. TARLAC (FIRST DISTRICT) 109,800,000
1. Anao-Ramos Rd - K0164+100 - K0165+343, K0165+974 - K0166+803
37,500,000
2. Moncada-Anao Rd - K0167+-197 - K0168+046
22,500,000
3. Paniqui-Ramos Rd - K0148+700 - K0149+300, K0149+681 - K0151+604
49,800,000
b. TARLAC (SECOND DISTRICT) 199,430,0001. Tarlac City-Sn Jose via Tibag-Burgos Rd -
K0136+983 - K0140+21649,500,000
2. Tarlac-Guimba Rd via Victoria - K0129+000 - K0130+500, K0137+898 - K0140+331
49,800,000
3. Tarlac-Maliwalo Rd - K0147+-865 - K0148+522
40,400,000
4. Tarlac-Sn Miguel via Macabulos Rd - K0123+344 - K0124+756
23,130,000
5. Victoria-La Paz Rd - K0144+666 - K0147+106
36,600,000
5. Zambales 2nd DEO 45,000,000a. ZAMBALES (FIRST DISTRICT) 45,000,000
1. Subic-PHILSECO Rd - K0142+500 - K0143+222
45,000,000
f. Region IV-A 142,632,0001. Batangas 2nd DEO 2,400,000
a. BATANGAS (SECOND DISTRICT) 2,400,0001. Bauan-Mabini Rd -
K0153+678 - K0153+8102,400,000
details of dpwh’s programs/projects 777
2. Batangas 3rd DEO 49,000,000a. BATANGAS (THIRD DISTRICT) 49,000,000
1. Talisay-Laurel-Agoncillo Rd - K0100+000 - K0102+553
49,000,000
3. Laguna 3rd DEO 10,080,000a. LAGUNA (THIRD DISTRICT) 10,080,000
1. Calauan-Nagcarlan Bdry Rd - K0088+920 - K0088+1291
3,360,000
2. Sn Pablo-Dolores Rd - K0087+-248 - K0087+122
3,360,000
3. Sn Pablo-Rizal-Nagcarlan-Liliw Rd - K0095+280 - K0095+465
3,360,000
4. Quezon 1st DEO 20,000,000a. QUEZON (FIRST DISTRICT) 20,000,000
1. Marikina-Infanta Rd - K0100+000 - K0105+003
20,000,000
5. Quezon 4th DEO 30,000,000a. QUEZON (FOURTH DISTRICT) 30,000,000
1. MSR Jct-Lopez-Catanauan Rd - K0222+800 - K0224+857
30,000,000
6. Rizal 2nd DEO 31,152,000a. RIZAL (SECOND DISTRICT) 31,152,000
1. Rodriguez-Sn Jose Rd - K0029+-158 - K0029+907
31,152,000
g. Region IV-B 19,970,0001. Marinduque DEO 2,650,000
a. MARINDUQUE (LONE DISTRICT) 2,650,0001. Tigwi-Dampulan-Lipata-Yook-Buenavista Rd -
K0094+359 - K0094+6522,650,000
2. Mindoro Occidental Sub DEO 7,000,000a. MINDORO OCCIDENTAL (LONE DISTRICT) 7,000,000
1. Tagbac-Lubang-Looc Rd - K0037+662 - K0037+973
7,000,000
3. Palawan 1st DEO 10,320,000a. PALAWAN (FIRST DISTRICT) 10,320,000
1. Coron-Busuanga Rd - K0002+900 - K0003+291
10,320,000
h. Region V 217,880,0001. Albay 1st DEO 67,200,000
a. ALBAY (FIRST DISTRICT) 67,200,0001. Mt Mayon Park Rd -
K0520+000 - K0521+127, K0523+000 - K0524+13530,000,000
2. Sto Domingo Poblacion Rd - K0541+150 - K0545+675
37,200,000
2. Albay 2nd DEO 20,000,000a. ALBAY (SECOND DISTRICT) 20,000,000
1. Comun-Inarado-Peñafrancia Rd - K0517+000 - K0519+224
20,000,000
3. Camarines Sur 1st DEO 40,080,000a. CAMARINES SUR (SECOND DISTRICT) 40,080,000
1. Milaor-Minalabac-Pili Rd - K0437+816 - K0438+929, K0439+315 - K0442+631
40,080,000
4. Camarines Sur 3rd DEO 70,500,000a. CAMARINES SUR (FOURTH DISTRICT) 70,500,000
1. Jct Binalay (Tinambac)-Tamban Rd - K0513+025 - K0512+3783
35,000,000
2. Jct Digdigon (Goa)-Tinambac Rd - K0509+436 - K0512+150
35,500,000
5. Masbate 3rd DEO 20,100,000a. MASBATE (FIRST DISTRICT) 20,100,000
1. Sn Pascual-Claveria Rd - K0011+650 - K0011+900, K0016+300 - K0016+564, K0019+560 - K0019+700, K0021+500 - K0022+1002
20,100,000
i. Region VI 135,000,0001. Capiz 1st DEO 20,000,000
a. CAPIZ (FIRST DISTRICT) 20,000,0001. Roxas City Bdry-Panitan-Bailan Rd -
K0120+739 - K0121+84120,000,000
2. Iloilo City DEO 115,000,000a. ILOILO CITY (LONE DISTRICT) 115,000,000
1. Delgado St - Chainage 0 - Chainage 1582
49,000,000
2. Jereos St - Chainage 0 - Chainage 1220
20,000,000
3. La Paz-Jaro Rd - K0002+-800 - K0002+602
21,000,000
4. Mandurriao-Jaro Rd - K0006+-093 - K0006+457
5,000,000
5. Rizal St (City Proper) - Chainage 0 - Chainage 1725
20,000,000
778 eXpeNditUre program fY 2016 VolUme ii
j. Region VII 102,300,0001. Cebu 1st DEO 48,800,000
a. CEBU (FOURTH DISTRICT) 48,800,0001. Bogo-Curva-Medellin-Daanbantayan-Maya Rd -
K0111+000 - K0113+400, K0136+500 - K0136+81048,800,000
2. Cebu 2nd DEO 53,500,000a. CEBU (FIRST DISTRICT) 53,500,000
1. Sibonga-Dumanjug Rd - K0051+000 - K0052+000, K0059+000 - K0059+557
28,000,000
2. Tapal (Carcar) Zaragosa-Olango-Aloguinsan Rd - K0088+000 - K0089+432
25,500,000
k. Region VIII 30,000,0001. Northern Samar 2nd DEO 30,000,000
a. NORTHERN SAMAR (SECOND DISTRICT) 30,000,0001. Rawis-Catubig Rd -
K0794+500 - K0796+29030,000,000
l. Region X 133,618,0001. Bukidnon 1st DEO 20,000,000
a. BUKIDNON (SECOND DISTRICT) 20,000,0001. Jct SH Aglayan-Zamboanguita Rd -
K1527+000 - K1528+09920,000,000
2. Bukidnon 3rd DEO 29,000,000a. BUKIDNON (FIRST DISTRICT) 29,000,000
1. Jct SH-Manolo Fortich-Libona-Indahag Rd - K1448+-405 - K1448+976, K1460+170 - K1460+300, Chainage - K1460+261
29,000,000
3. Lanao del Norte 1st DEO 82,618,000a. LANAO DEL NORTE (FIRST DISTRICT) 82,618,000
1. Iligan City-Marawi City Rd via Bito Abaga Rd - K1539+-825 - K1540+796
47,500,000
2. Lanao del Norte Interior Circum. Rd (LDNICR) - K1536+500 - K1537+800, K1538+500 - K1539+140
35,118,000
3. Misamis Occidental 2nd DEO 2,000,000a. MISAMIS OCCIDENTAL (SECOND DISTRICT) 2,000,000
1. Tan Avenue - K1686+017 - K1686+238
2,000,000
m. Region XIII 48,000,0001. Agusan del Sur 1st DEO 48,000,000
a. AGUSAN DEL SUR (FIRST DISTRICT) 48,000,0001. NRJ Bayugan-Esperanza Rd -
K1270+-900 - K1271+76148,000,000
details of dpwh’s programs/projects 779
2. Network Development 71,518,390,000.00
A. Improvement/Widening of National Roads 919.822 27,665,717,000.00
1. Primary Roads 587.040 17,708,941,000.00
a. along N1 307.682 8,839,160,000.00
I. Central Office 44.334 1,508,143,000.00
a. Region IV-A 8.732 425,000,000.001. Quezon 2nd DEO 8.732 425,000,000.00
a. QUEZON (SECOND DISTRICT) 8.732 425,000,000.001. Daang Maharlika (LZ) -
K0093+929 - K0094+410, K0095+635 - K0098+000, K0104+459 - K0106+711
5.106 205,000,000.00
2. MSR Diversion Rd - K0127+887.1 - K0128+219, K0128+251 - K0129+008, K0129+101 - K0129+800, K0132+090 - K0134+021
3.626 220,000,000.00
b. Region XI 23.024 690,729,000.001. Compostela Valley DEO 11.222 336,660,000.00
a. COMPOSTELA VALLEY (FIRST DISTRICT) 5.534 166,020,000.001. Daang Maharlika (MN) -
K1377+-203 - K1381+12625.534 166,020,000.00
b. COMPOSTELA VALLEY (SECOND DISTRICT) 5.688 170,640,000.001. Daang Maharlika (MN) -
K1417+906 - K1417+992, K1437+233 - K1438+444, K1440+355 - K1442+000, K1443+000 - K1445+252, K1445+560 - K1445+1256
5.688 170,640,000.00
2. Davao City DEO 5.937 178,095,000.00a. DAVAO CITY (FIRST DISTRICT) 5.937 178,095,000.00
1. Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1513+168 - K1513+467, K1514+202 - K1516+357, K1518+500 - K1518+647, K1519+2280 - K1524+478
5.937 178,095,000.00
3. Davao del Norte DEO 5.866 175,974,000.00a. DAVAO DEL NORTE (FIRST DISTRICT) 5.866 175,974,000.00
1. Daang Maharlika (MN) - K1448+000 - K1450+388, K1453+214.20 - K1453+264, K1462+900 - K1466+180
5.866 175,974,000.00
c. Region XIII 12.578 382,414,000.001. Agusan del Sur 2nd DEO 6.591 202,805,000.00
a. AGUSAN DEL SUR (SECOND DISTRICT) 6.591 202,805,000.00 1. Daang Maharlika (Agusan-Davao Sect) -
K1313+027 - K1318+056, K1319+960 - K1321+5226.591 202,805,000.00
2. Surigao del Norte 1st DEO 5.987 179,609,000.00a. SURIGAO DEL NORTE (SECOND DISTRICT) 5.987 179,609,000.00
1. Daang Maharlika (Surigao-Agusan Sect) - K1125+008 - K1128+000, K1145+000 - K1148+000
5.987 179,609,000.00
d. Nationwide - 10,000,000.001. Central Office - 10,000,000.00
a. NATIONWIDE - 10,000,000.00N1 - Road Widening - 10,000,000.00
II. Regional Office 263.348 7,331,017,000.00
a. Region I 9.293 280,911,000.001. Ilocos Norte 1st DEO 9.293 280,911,000.00
a. ILOCOS NORTE (FIRST DISTRICT) 9.293 280,911,000.001. Manila North Rd -
K0493+520.11 - K0494+385, K0495+890 - K0495+958, K0496+171 - K0498+000, K0499+200 - K0500+700, K0503+845 - K0504+000
4.363 130,911,000.00
2. Manila North Rd - K0540+-547 - K0540+-046, K0541+202 - K0542+000, K0542+079 - K0550+000, K0487+426.81 - K0491+278, K0492+474 - K0493+520.11
4.930 150,000,000.00
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
780 eXpeNditUre program fY 2016 VolUme ii
b. Region II 35.586 1,056,610,000.001. Cagayan 2nd DEO 9.052 271,560,000.00
a. CAGAYAN (SECOND DISTRICT) 9.052 271,560,000.001. Bangag-Magapit Rd -
K0686+-512 - K0688+0002.560 76,800,000.00
2. Manila North Rd - K0590+-955 - K0590+(-837), K0615+000 - K0617+000
2.136 64,080,000.00
3. Manila North Rd - K0626+000 - K0630+364
4.356 130,680,000.00
2. Cagayan 3rd DEO 4.043 121,290,000.00a. CAGAYAN (THIRD DISTRICT) 4.043 121,290,000.00
1. Cagayan Valley Rd - K0461+-465 - K0461+-417, K0474+313 - K0478+300
4.043 121,290,000.00
3. Isabela 1st DEO 7.029 210,860,000.00a. ISABELA (FIRST DISTRICT) 7.029 210,860,000.00
1. Daang Maharlika (LZ) - K0415+500 - K0418+851.33
3.333 100,000,000.00
2. Daang Maharlika (LZ) - K0418+851.33 - K0420+1130.66667, K0444+070 - K0445+500
3.695 110,860,000.00
4. Isabela 2nd DEO 2.917 87,510,000.00a. ISABELA (SECOND DISTRICT) 2.917 87,510,000.00
1. Daang Maharlika (LZ) - K0383+1288 - K0387+215
2.917 87,510,000.00
5. Isabela 3rd DEO 5.602 168,300,000.00a. ISABELA (THIRD DISTRICT) 5.602 168,300,000.00
1. Daang Maharlika (LZ) - K0344+-039 - K0344+563, K0347+400 - K0349+763
2.992 90,000,000.00
2. Daang Maharlika (LZ) - K0349+763 - K0352+400
2.610 78,300,000.00
6. Isabela 4th DEO 4.878 135,140,000.00a. ISABELA (FOURTH DISTRICT) 4.878 135,140,000.00
1. Daang Maharlika (LZ) - K0315+007 - K0317+321, K0340+300 - K0342+540, K0343+589 - K0343+961
4.878 135,140,000.00
7. Nueva Vizcaya 1st DEO 1.169 35,070,000.00a. NUEVA VIZCAYA LONE 1.169 35,070,000.00
1. Daang Maharlika (LZ) - K0246+389 - K0247+559
1.169 35,070,000.00
8. Nueva Vizcaya 2nd DEO 0.896 26,880,000.00a. NUEVA VIZCAYA LONE 0.896 26,880,000.00
1. Daang Maharlika (LZ) - K0209+-896 - K0209+000
0.896 26,880,000.00
c. Region III 5.936 178,080,000.001. Bulacan 1st DEO 0.435 13,050,000.00
a. BULACAN (SECOND DISTRICT) 0.435 13,050,000.001. Daang Maharlika (LZ) -
K0039+-435 - K0039+0000.435 13,050,000.00
2. Bulacan 2nd DEO 5.000 150,000,000.00a. BULACAN (THIRD DISTRICT) 5.000 150,000,000.00
1. Daang Maharlika (LZ) - K0054+260 - K0054+765, K0055+1110 - K0059+000, K0060+400 - K0060+838, K0060+864 - K0061+417, K0063+700 - K0064+200
5.000 150,000,000.00
3. Nueva Ecija 2nd DEO 0.501 15,030,000.00a. NUEVA ECIJA (FOURTH DISTRICT) 0.501 15,030,000.00
1. Daang Maharlika (LZ) - K0085+-911 - K0085+-410
0.501 15,030,000.00
d. Region IV-A 13.666 461,730,000.001. Batangas 3rd DEO 0.398 11,940,000.00
a. BATANGAS (THIRD DISTRICT) 0.398 11,940,000.001. Daang Maharlika (LZ) -
K0063+731 - K0064+000, K0069+380 - K0069+3980.398 11,940,000.00
2. Quezon 1st DEO 0.285 8,550,000.00a. QUEZON (FIRST DISTRICT) 0.285 8,550,000.00
1. Daang Maharlika (LZ) - K0124+367 - K0124+652
0.285 8,550,000.00
3. Quezon 2nd DEO 2.775 135,000,000.00a. QUEZON (SECOND DISTRICT) 2.775 135,000,000.00
1. Daang Maharlika (LZ) - K0113+180 - K0114+080, K0116+182 - K0116+1553, K0117+665 - K0116+1874, K0116+1894 - K0118+071
2.775 135,000,000.00
details of dpwh’s programs/projects 781
4. Quezon 4th DEO 10.208 306,240,000.00a. QUEZON (FIRST DISTRICT) 7.905 237,150,000.00
1. Daang Maharlika (LZ) - K0152+000 - K0157+584
5.000 150,000,000.00
2. Daang Maharlika (LZ) - K0157+584 - K0160+000
2.905 87,150,000.00
b. QUEZON (FOURTH DISTRICT) 2.303 69,090,000.001. Daang Maharlika (LZ) -
K0160+000 - K0162+4002.303 69,090,000.00
e. Region V 45.875 1,412,327,000.001. Camarines Norte DEO 2.045 61,530,000.00
a. CAMARINES NORTE (FIRST DISTRICT) 2.045 61,530,000.001. Daang Maharlika (LZ) -
K0300+000 - K0302+071.672.045 61,530,000.00
2. Camarines Sur 1st DEO 3.590 143,600,000.00a. CAMARINES SUR (SECOND DISTRICT) 3.590 143,600,000.00
1. Daang Maharlika (LZ) - K0401+500 - K0403+000, K0407+432 - K0409+000, K0415+500 - K0415+1042
3.590 143,600,000.00
3. Regional Office V - Proper DEO 40.240 1,207,197,000.00a. REGIONWIDE 40.240 1,207,197,000.00
1. Daang Maharlika (LZ) - K0540+-547 - K0540+-046, K0541+202 - K0542+000, K0542+079 - K0545+786
5.000 150,000,000.00
2. Daang Maharlika (LZ) - K0545+786 - K0550+000, K0551+472 - K0552+234
5.000 150,000,000.00
3. Daang Maharlika (LZ) - K0552+234 - K0552+460, K0556+600 - K0556+903, K0557+601 - K0558+000, K0560+318 - K0562+000, K0564+703 - K0564+750, K0566+000 - K0567+760, K0568+974 - K0569+572
5.000 150,000,000.00
4. Daang Maharlika (LZ) - K0569+572 - K0574+000, K0582+500 - K0583+000, K0585+100 - K0585+153
5.000 150,000,000.00
5. Daang Maharlika (LZ) - K0585+153 - K0588+221, K0588+294 - K0589+423, K0590+000 - K0590+243, K0591+667 - K0592+220
5.000 150,000,000.00
6. Daang Maharlika (LZ) - K0592+220 - K0595+380
3.160 94,800,000.00
7. Daang Maharlika (LZ) - K0595+380 - K0598+396
3.016 90,480,000.00
8. Daang Maharlika (LZ) - K0620+000 - K0620+800, K0621+000 - K0621+841.40, K0622+308 - K0622+407, K0623+445 - K0623+466.5, K0625 + 000 - K0626 + 572.43
3.333 100,000,000.00
9. Daang Maharlika (LZ) - K0626 + 572.43 - K0629 + 912.77
3.333 100,000,000.00
10. Daang Maharlika (LZ) - K0629 + 912.77 - K0631 + 500, K0636+164 - K0636+979
2.397 71,917,000.00
f. Region VIII 49.662 1,433,103,000.001. Leyte 5th DEO 2.456 84,000,000.00
a. LEYTE (FIFTH DISTRICT) 2.456 84,000,000.001. Daang Maharlika (LT) -
K0983+500 - K0986+0002.456 84,000,000.00
2. Northern Samar 1st DEO 1.453 43,590,000.00a. NORTHERN SAMAR (FIRST DISTRICT) 1.453 43,590,000.00
1. Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0695+325 - K0696+010, K0696+090 - K0696+836
1.453 43,590,000.00
3. Samar 2nd DEO 7.854 246,175,000.00a. SAMAR (SECOND DISTRICT) 7.854 246,175,000.00
1. Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0790+000 - K0791+000, K0793+000 - K0794+300, K0795+000 - K0796+300, K0800+000 - K0800+500, K0809+000 - K0809+551
4.649 150,000,000.00
2. Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0809+550.33 - K0811+000, K0814+000 - K0814+700, K0859 + 000 - K0860 + 046.17
3.205 96,175,000.00
4. Southern Leyte DEO 2.012 60,360,000.00a. SOUTHERN LEYTE LONE 2.012 60,360,000.00
1. Daang Maharlika (LT) - K1022+000 - K1024+000
2.012 60,360,000.00
5. Tacloban City DEO 3.185 95,635,000.00
782 eXpeNditUre program fY 2016 VolUme ii
a. LEYTE (FIRST DISTRICT) 3.185 95,635,000.001. Daang Maharlika (LT) -
K0904+000 - K0904+342, K0905+200 - K0907+1732.355 70,650,000.00
2. Daang Maharlika (LT) - K0908+-830 - K0908+000
0.830 24,985,000.00
6. Regional Office VIII - Proper DEO 32.702 903,343,000.00a. REGIONWIDE 32.702 903,343,000.00
1. Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0691+-646 - K0691+-300, K0694+000 - K0695+030, K0702+000 - K0704+000, K0709+000 - K0710+947.13
5.202 150,000,000.00
2. Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0710+947.13 - K0711+000, K0714+000 - K0716+000, K0721+500 - K0723+000, K0727+000 - K0728+554.13
5.000 150,000,000.00
3. Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0728+554.13 - K0733+537.13
5.000 150,000,000.00
4. Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0733+537.13 - K0733+750.67, K0747+000 - K0749+585, K0756+000 - K0758+000, K0760+000 - K0761+923.97
6.740 150,000,000.00
5. Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0761+923.97 - K0764+000, K0766+000 - K0766+1858.50
3.983 100,000,000.00
6. Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0766+1858.50 - K0769+000, K0776+000 - K0777+000, K0778+400.40 - K0779+566.23
3.333 100,000,000.00
7. Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0779+566.23 - K0781+000, K0784+000 - K0786+000
3.445 103,343,000.00
g. Region IX 10.726 328,530,000.001. Zamboanga del Sur 1st DEO 4.333 130,830,000.00
a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 4.333 130,830,000.001. Pagadian City-Zamboanga City Rd -
K1662+-205 - K1663+3001.508 45,240,000.00
2. Tucuran Jct-Karomatan Jct Rd - K1648+-262 - K1648+-200, K1651+-536 - K1651+000, K1654+000 - K1656+227
2.825 85,590,000.00
2. Zamboanga del Sur 2nd DEO 2.384 71,520,000.00a. ZAMBOANGA DEL SUR (SECOND DISTRICT) 2.384 71,520,000.00
1. Pagadian City-Zamboanga City Rd - K1675+468 - K1677+932
2.384 71,520,000.00
3. Zamboanga Sibugay 1st DEO 0.591 23,640,000.00a. ZAMBOANGA SIBUGAY (FIRST DISTRICT) 0.591 23,640,000.00
1. Lanao-Pagadian-Zamboanga City Rd - K1724+-591 - K1724+000
0.591 23,640,000.00
4. Zamboanga Sibugay 2nd DEO 3.418 102,540,000.00a. ZAMBOANGA SIBUGAY (SECOND DISTRICT) 3.418 102,540,000.00
1. Lanao-Pagadian-Zamboanga City Rd - K1790+240 - K1791+480, K1804+760 - K1806+918
3.418 102,540,000.00
h. Region XI 25.421 766,990,000.001. Compostela Valley DEO 6.897 211,280,000.00
a. COMPOSTELA VALLEY (FIRST DISTRICT) 6.897 211,280,000.001. Daang Maharlika (MN) -
K1399+000 - K1401+770, K1402+160 - K1402+320, K1403+140 - K1404+500
4.340 130,375,000.00
2. Daang Maharlika (MN) - K1404+500 - K1405+560, K1407+615 - K1407+960, K1409+660 - K1410+000, K1412+409 - K1413+102, K1417+810 - K1417+906
2.557 80,905,000.00
2. Davao City 2nd DEO 0.227 6,810,000.00
details of dpwh’s programs/projects 783
a. DAVAO CITY (THIRD DISTRICT) 0.227 6,810,000.001. Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1525+-200 - K1525+000, K1528+273 - K1528+3000.227 6,810,000.00
3. Davao City DEO 2.427 72,810,000.00a. DAVAO CITY (SECOND DISTRICT) 2.427 72,810,000.00
1. Daang Maharlika (MN) - K1484+-095 - K1484+000, K1484+634 - K1485+157, K1490+200 - K1491+153, K1491+560 - K1492+136, K1492+200 - K1492+290, K1492+458 - K1492+717
2.427 72,810,000.00
4. Davao del Sur 1st DEO 7.582 227,450,000.00a. DAVAO DEL SUR LONE 7.582 227,450,000.00
1. Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1534+-223 - K1534+837, K1534+862 - K1535+336, K1536+500 - K1536+753, K1538+298 - K1538+326, K1541+767 - K1542+657, K1542+705 - K1543+019, K1543+062 - K1543+145, K1547 + 521 - K1547 + 1020.65
3.674 110,210,000.00
2. Digos-Makar Rd - K1564+-495 - K1567 + 546
3.908 117,240,000.00
5. Davao del Sur 2nd DEO 8.288 248,640,000.00a. DAVAO OCCIDENTAL LONE 8.288 248,640,000.00
1. Digos-Makar Rd - K1579+-244 - K1583+732
5.000 150,000,000.00
2. Digos-Makar Rd - K1583+732 - K1587+000
3.288 98,640,000.00
i. Region XII 19.192 577,370,000.001. Sarangani DEO 0.462 15,470,000.00
a. SARANGANI LONE 0.462 15,470,000.001. Digos-Makar Rd -
K1592+-322 - K1592+000, K1601+566 - K1601+7060.462 15,470,000.00
2. South Cotabato 2nd DEO 14.000 420,000,000.00a. SOUTH COTABATO (FIRST DISTRICT) 14.000 420,000,000.00
1. Digos-Makar Rd - K1647+341 - K1651+374
4.000 120,000,000.00
2. Marbel-Makar Rd - K1661+925 - K1663+790, K1663+825 - K1665+806, K1665+847 - K1666+982
5.000 150,000,000.00
3. Marbel-Makar Rd - K1666+982 - K1667+698, K1667+744 - K1668+000, K1689+589 - K1693+588
5.000 150,000,000.00
3. Sultan Kudarat 1st DEO 1.082 32,460,000.00a. SULTAN KUDARAT (FIRST DISTRICT) 1.082 32,460,000.00
1. Marbel-Allah Valley-Cotabato Rd - K1773+188 - K1774+267
1.082 32,460,000.00
4. Sultan Kudarat 2nd DEO 3.648 109,440,000.00a. SULTAN KUDARAT (SECOND DISTRICT) 3.648 109,440,000.00
1. Marbel-Allah Valley-Cotabato Rd - K1775+-036 - K1778+605
3.648 109,440,000.00
j. Region XIII 47.991 835,366,000.001. Agusan del Norte DEO 8.262 200,000,000.00
a. AGUSAN DEL NORTE (SECOND DISTRICT) 8.262 200,000,000.001. Daang Maharlika (Surigao-Agusan Sect) -
K1168+-823 - K1170+200, K1179+600 - K1181+500.304.936 100,000,000.00
2. Daang Maharlika (Surigao-Agusan Sect) - K1181+500.30 - K1184+824.13
3.326 100,000,000.00
2. Agusan del Sur 1st DEO 21.210 336,290,000.00a. AGUSAN DEL SUR (FIRST DISTRICT) 21.210 336,290,000.00
1. Daang Maharlika (Agusan-Davao Sect) - K1286+978 - K1291+973
5.000 150,000,000.00
2. Daang Maharlika (Agusan-Davao Sect) - K1291+973 - K1295+274.33
3.333 100,000,000.00
3. Daang Maharlika (Agusan-Davao Sect) - K1295+274.33 - K1298+149.67
2.876 86,290,000.00
3. Butuan City DEO 17.500 266,776,000.00a. AGUSAN DEL NORTE (FIRST DISTRICT) 17.500 266,776,000.00
1. Daang Maharlika (Surigao-Agusan Sect) - K1230+757.39 - K1231+428.70, K1232+976 - K1236+951.47
4.882 150,000,000.00
2. Daang Maharlika (Surigao-Agusan Sect) - K1236+951.47 - K1240+696
3.893 116,776,000.00
4. Surigao del Norte 1st DEO 1.020 32,300,000.00a. SURIGAO DEL NORTE (SECOND DISTRICT) 1.020 32,300,000.00
1. Daang Maharlika (Lipata-Surigao Sect) - K1116+000 - K1117+000
1.020 32,300,000.00
784 eXpeNditUre program fY 2016 VolUme ii
b. Outside N1 279.358 8,869,781,000.00
I. Central Office 70.984 2,141,330,000.00
a. Region I 17.744 532,322,000.001. Ilocos Sur 1st DEO 5.514 165,420,000.00
a. ILOCOS SUR (FIRST DISTRICT) 5.514 165,420,000.001. Manila North Rd -
K0410+516 - K0411+000, K0412+800 - K0414+220, K0416+000 - K0417+859, K0422+654 - K0424+418
5.514 165,420,000.00
2. La Union 1st DEO 6.282 188,462,000.00a. LA UNION (FIRST DISTRICT) 6.282 188,462,000.00
1. Manila North Rd - K0277+300 - K0283+568.67
6.282 188,462,000.00
3. Pangasinan 2nd DEO 5.948 178,440,000.00a. PANGASINAN (SECOND DISTRICT) 5.948 178,440,000.00
1. Pangasinan-Tarlac Rd - K0183+040 - K0189+000
5.948 178,440,000.00
b. Region II 7.040 176,000,000.001. Isabela 4th DEO 7.040 176,000,000.00
a. ISABELA (FOURTH DISTRICT) 7.040 176,000,000.001. Santiago-Tuguegarao Rd -
K0331+662 - K0334+500, K0334+876 - K0336+873, K0338+385 - K0340+589.8
7.040 176,000,000.00
c. Region IV-A 6.395 191,850,000.001. Batangas 3rd DEO 6.395 191,850,000.00
a. BATANGAS (THIRD DISTRICT) 6.395 191,850,000.001. Manila-Batangas Rd -
K0062+920 - K0064+375, K0064+742 - K0064+855, K0064+991 - K0065+301, K0065+649 - K0065+856, K0066+576 - K0069+670, K0070+773 - K0072+000
6.395 191,850,000.00
d. Region VI 11.944 358,310,000.001. Capiz 2nd DEO 11.944 358,310,000.00
a. CAPIZ (SECOND DISTRICT) 11.944 358,310,000.001. Iloilo-Capiz Rd (New Route) -
K0064+-865 - K0068+000, K0070+212 - K0070+9225.586 167,580,000.00
2. Iloilo-Capiz Rd (New Route) - K0070+922 - K0073+667, K0076+114 - K0079+373, K0079 + 572 - K0079 + 889.67
6.358 190,730,000.00
e. Region X 5.920 177,758,000.001. Bukidnon 1st DEO 5.920 177,758,000.00
a. BUKIDNON (FOURTH DISTRICT) 5.920 177,758,000.001. Sayre Highway -
K1527+242.72 - K1533+1005.920 177,758,000.00
f. Region XI 10.503 315,090,000.001. Davao City 2nd DEO 5.225 156,750,000.00
a. DAVAO CITY (THIRD DISTRICT) 5.225 156,750,000.001. Davao-Bukidnon Rd -
K1674+448 - K1678+884, K1690+315 - K1690+579, K1690+596 - K1691+113
5.225 156,750,000.00
2. Davao del Sur 1st DEO 5.278 158,340,000.00a. DAVAO DEL SUR LONE 5.278 158,340,000.00
1. Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1564+-278 - K1567+448, K1568+301 - K1569+122, K1569+277 - K1569+978
5.278 158,340,000.00
g. Region XII 6.000 180,000,000.001. Cotabato 2nd DEO 6.000 180,000,000.00
a. COTABATO (FIRST DISTRICT) 6.000 180,000,000.001. Davao-Cotabato Rd (Jct Digos-Cotabato Sect) -
K1670+000 - K1672+000, K1705+961 - K1709+9056.000 180,000,000.00
h. Region XIII 5.438 200,000,000.001. Agusan del Norte DEO 5.438 200,000,000.00
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
details of dpwh’s programs/projects 785
a. AGUSAN DEL NORTE (SECOND DISTRICT) 5.438 200,000,000.001. Butuan-Cagayan de Oro-Iligan (Agusan-Misamis Or) -
K1255+672 - K1259+860, K1261+100 - K1261+980, K1262+800 - K1263+000, K1263 + 000 - K1263 + 149.06
5.438 200,000,000.00
i. Nationwide - 10,000,000.001. Central Office - 10,000,000.00
a. NATIONWIDE - 10,000,000.001. Outside N1 - Road Widening - 10,000,000.00
II. Regional Office 208.374 6,728,451,000.00a. Region I 34.137 1,024,110,000.00
1. Ilocos Sur 1st DEO 1.767 53,010,000.00a. ILOCOS SUR (FIRST DISTRICT) 1.767 53,010,000.00
1. Manila North Rd - K0440+526 - K0441+000, K0441+382 - K0442+677
1.767 53,010,000.00
2. Ilocos Sur 2nd DEO 7.334 220,020,000.00a. ILOCOS SUR (SECOND DISTRICT) 7.334 220,020,000.00
1. Manila North Rd - K0313+-103 - K0319 + 860
7.334 220,020,000.00
3. La Union 1st DEO 10.000 300,000,000.00a. LA UNION (FIRST DISTRICT) 10.000 300,000,000.00
1. Manila North Rd - K0265+-658 - K0269+388
5.000 150,000,000.00
2. Manila North Rd - K0269+388 - K0274+000, K0276+952 - K0277+300
5.000 150,000,000.00
4. Pangasinan 2nd DEO 8.712 261,360,000.00a. PANGASINAN (FOURTH DISTRICT) 3.905 117,150,000.00
1. Pangasinan-La Union Inter-Provl Rd - K0387+912 - K0391+812
3.905 117,150,000.00
b. PANGASINAN (SECOND DISTRICT) 4.807 144,210,000.001. Pangasinan-Tarlac Rd -
K0195+000 - K0197+6202.617 78,510,000.00
2. Pangasinan-Tarlac Rd - K0191+000 - K0193+200
2.190 65,700,000.00
5. Pangasinan 3rd DEO 1.240 37,200,000.00a. PANGASINAN (FIFTH DISTRICT) 1.240 37,200,000.00
1. Urdaneta Jct-Dagupan-Lingayen Rd - K0182+-240 - K0183+000
1.240 37,200,000.00
6. Pangasinan 4th DEO 5.084 152,520,000.00a. PANGASINAN (THIRD DISTRICT) 5.084 152,520,000.00
1. Judge Jose de Venecia Sr Ave - K0207+-711 - K0207+-711, K0207+744 - K0207+996
1.036 31,080,000.00
2. Urdaneta Jct-Dagupan Rd - K0194+680 - K0196+680, K0201+000 - K0203+000
4.048 121,440,000.00
b. Region II 1.898 56,940,000.001. Cagayan 3rd DEO 1.898 56,940,000.00
a. CAGAYAN (THIRD DISTRICT) 1.898 56,940,000.001. Santiago-Tuguegarao Rd -
K0434+-754 - K0435+0001.754 52,620,000.00
2. Santiago-Tuguegarao Rd (Jct Kalinga-Tuguegarao Sec - K0437+-031 - K0437+-031
0.144 4,320,000.00
c. CAR 0.400 25,000,000.001. Baguio City DEO 0.400 25,000,000.00
a. BAGUIO CITY LONE 0.400 25,000,000.001. Kennon Rd -
K0241+340 - K0241+640, K0248+047 - K0248+1470.400 25,000,000.00
d. Region III 6.840 186,190,000.001. Pampanga 1st DEO 0.950 28,500,000.00
a. PAMPANGA (THIRD DISTRICT) 0.950 28,500,000.001. Gapan-Sn Fernando-Olongapo Rd -
K0071+000 - K0071+9500.950 28,500,000.00
2. Pampanga 3rd DEO 1.059 31,770,000.00a. PAMPANGA (FIRST DISTRICT) 1.059 31,770,000.00
1. Manila North Rd - K0095+285 - K0096+365
1.059 31,770,000.00
786 eXpeNditUre program fY 2016 VolUme ii
3. Tarlac 1st DEO 4.831 125,920,000.00a. TARLAC (FIRST DISTRICT) 1.897 37,900,000.00
1. Romulo H-way - K0152+815 - K0154+717
1.897 37,900,000.00
b. TARLAC (SECOND DISTRICT) 2.934 88,020,000.001. Romulo H-way -
K0125+600 - K0126+000, K0126+296 - K0126+691, K0127+186 - K0127+321, K0127+487 - K0129+510
2.934 88,020,000.00
e. Region IV-A 16.136 542,720,000.001. Batangas 2nd DEO 1.100 40,000,000.00
a. BATANGAS (SECOND DISTRICT) 1.100 40,000,000.001. Manila-Batangas Rd -
K0100+340 - K0101+4351.100 40,000,000.00
2. Batangas 4th DEO 2.443 107,500,000.00a. BATANGAS (FOURTH DISTRICT) 2.443 107,500,000.00
1. Manila-Batangas Rd - K0088+330 - K0090+141, K0092+281 - K0092+900
2.443 107,500,000.00
3. Cavite DEO 4.924 147,720,000.00a. CAVITE (FIFTH DISTRICT) 3.531 105,930,000.00
1. Dasmariñas-Carmona Rd - K0040+763 - K0042+401, K0043+000 - K0043+667, K0044+271 - K0045+500
3.531 105,930,000.00
b. CAVITE (FIRST DISTRICT) 1.393 41,790,000.001. Manila-Cavite (NCR Bdry-Jct Cavite City Sect) -
K0022+600 - K0024+0001.393 41,790,000.00
4. Laguna 2nd DEO 0.445 21,350,000.00a. LAGUNA (SECOND DISTRICT) 0.445 21,350,000.00
1. Calamba-Sta Cruz-Famy Jct Rd - K0057+156 - K0057+201, K0067+000 - K0067+400
0.445 21,350,000.00
5. Quezon 4th DEO 5.338 160,140,000.00a. QUEZON (FOURTH DISTRICT) 5.338 160,140,000.00
1. Quirino H-way - K0254+000 - K0256+207
2.485 74,550,000.00
2. Quirino H-way - K0277+000 - K0279+900
2.853 85,590,000.00
6. Rizal 1st DEO 1.886 66,010,000.00a. ANTIPOLO CITY (FIRST DISTRICT) 1.886 66,010,000.00
1. Sumulong Highway - K0024+320 - K0025+640, K0027+180 - K0027+780
1.886 66,010,000.00
f. Region VI 35.212 1,056,360,000.001. Iloilo 2nd DEO 12.856 385,680,000.00
a. ILOILO (FOURTH DISTRICT) 7.098 212,940,000.001. Iloilo-Capiz (New Route) -
K0037+000 - K0040+246.333.333 100,000,000.00
2. Iloilo-Capiz (New Route) - K0040+246.33 - K0044+000
3.765 112,940,000.00
b. ILOILO (THIRD DISTRICT) 5.758 172,740,000.001. Iloilo-Capiz (New Route) -
K0022 + -381 - K0024 + 941.333.333 100,000,000.00
2. Iloilo-Capiz (New Route) - K0024 + 941.33 - K0026+000, K0027+000 - K0028+342
2.425 72,740,000.00
2. Negros Occidental 1st DEO 10.000 300,000,000.00a. NEGROS OCCIDENTAL (FIRST DISTRICT) 10.000 300,000,000.00
1. Bacolod North Rd - K0091 + 537 - K0094 + 633.33
3.333 100,000,000.00
2. Bacolod North Rd - K0094 + 633.33 - K0098 + 001.67
3.333 100,000,000.00
3. Bacolod North Rd - K0098 + 001.67 - K0101 + 334
3.333 100,000,000.00
3. Negros Occidental 2nd DEO 5.000 150,000,000.00a. NEGROS OCCIDENTAL (FIFTH DISTRICT) 5.000 150,000,000.00
1. Bacolod South Rd - K0065+360 - K0068+781.33
3.333 100,000,000.00
2. Bacolod South Rd - K0068+781.33 - K0071+-568
1.667 50,000,000.00
4. Negros Occidental 3rd DEO 6.131 183,930,000.00a. NEGROS OCCIDENTAL (SIXTH DISTRICT) 6.131 183,930,000.00
1. Bacolod South Rd - K0085+340 - K0087+850
2.514 75,420,000.00
2. Kabankalan-Bais Rd - K0089+000 - K0092+613
3.617 108,510,000.00
details of dpwh’s programs/projects 787
5. Negros Occidental 4th DEO 1.225 36,750,000.00a. NEGROS OCCIDENTAL (FOURTH DISTRICT) 1.225 36,750,000.00
1. Bacolod South Rd - K0038+711 - K0040+004
1.225 36,750,000.00
g. Region VII 8.873 516,990,000.001. Cebu 3rd DEO 1.733 51,990,000.00
a. CEBU (THIRD DISTRICT) 1.733 51,990,000.001. Cebu-Toledo Wharf Rd (Uling-Toledo Wharf) -
K0052+652 - K0054+-30, K0055+561 - K0055+9811.733 51,990,000.00
2. Cebu 5th DEO 4.000 120,000,000.00a. CEBU (FIFTH DISTRICT) 4.000 120,000,000.00
1. Cebu North Hagnaya Wharf Rd - K0023+-170 - K0023+865, K0024+000 - K0024+395, K0024+890 - K0027+000, K0027+939 - K0027+1403
4.000 120,000,000.00
3. Cebu City DEO 1.640 300,000,000.00a. CEBU CITY (SECOND DISTRICT) 1.640 300,000,000.00
1. N Bacalso Ave (Cebu South Rd) - K0007+-251 - K0007+569
0.820 150,000,000.00
2. N Bacalso Ave (Cebu South Rd) - K0007+569 - K0008+390
0.820 150,000,000.00
4. Negros Oriental 3rd DEO 1.500 45,000,000.00a. NEGROS ORIENTAL (THIRD DISTRICT) 1.500 45,000,000.00
1. Dumaguete South Rd - K0008+000 - K0009+500
1.500 45,000,000.00
h. Region VIII 10.776 323,270,000.001. Leyte 2nd DEO 4.109 123,270,000.00
a. LEYTE (SECOND DISTRICT) 4.109 123,270,000.001. Palo-Carigara-Ormoc Rd -
K0957+-699 - K0960+3724.109 123,270,000.00
2. Leyte 4th DEO 3.333 100,000,000.00a. LEYTE (FOURTH DISTRICT) 3.333 100,000,000.00
1. Ormoc-Baybay-Southern Leyte Bdry Rd - K1012+-209 - K1013 + 511.67
1.667 50,000,000.00
2. Palo-Carigara-Ormoc Rd - K1006+000 - K1007 + 861.67
1.667 50,000,000.00
3. Leyte 5th DEO 3.333 100,000,000.00a. LEYTE (FIFTH DISTRICT) 3.333 100,000,000.00
1. Tacloban-Baybay South Rd - K1002+497 - K1005+796.33
3.333 100,000,000.00
i. Region IX 6.925 220,705,000.001. Zamboanga del Norte 1st DEO 3.413 104,835,000.00
a. ZAMBOANGA DEL NORTE (SECOND DISTRICT) 3.413 104,835,000.001. Dipolog-Oroquieta National Rd -
K1830+-458 - K1832+9533.413 104,835,000.00
2. Zamboanga del Norte 2nd DEO 0.931 27,930,000.00a. ZAMBOANGA DEL NORTE (THIRD DISTRICT) 0.931 27,930,000.00
1. Liloy-Ipil Rd - K1966+-931 - K1966+000
0.931 27,930,000.00
3. Zamboanga del Norte 3rd DEO 2.581 87,940,000.00a. ZAMBOANGA DEL NORTE (FIRST DISTRICT) 2.581 87,940,000.00
1. Dipolog-Oroquieta National Rd - K1795+-437 - K1796 + 215.67
1.682 56,475,000.00
2. Dipolog-Punta-Dansullan-S Osmeña-Zambo N/Sur Bdry - K1857+-1123 - K1857+-224
0.899 31,465,000.00
j. Region X 74.712 2,396,135,000.001. Bukidnon 1st DEO 4.965 148,950,000.00
a. BUKIDNON (FOURTH DISTRICT) 1.633 48,990,000.001. Sayre Highway -
K1537+188 - K1537+360, K1537+858 - K1538+360, K1538+854 - K1539+695
1.633 48,990,000.00
b. BUKIDNON (SECOND DISTRICT) 3.332 99,960,000.001. Sayre Highway -
K1511+400 - K1514+225, K1515+550 - K1515+659, K1524+804 - K1525+211
3.332 99,960,000.00
2. Bukidnon 2nd DEO 9.101 273,040,000.00a. BUKIDNON (THIRD DISTRICT) 9.101 273,040,000.00
1. Bukidnon-Davao City Rd - K1563+-768 - K1567+278
5.000 150,000,000.00
2. Bukidnon-Davao City Rd - K1567+278 - K1571+409.33
4.101 123,040,000.00
788 eXpeNditUre program fY 2016 VolUme ii
3. Bukidnon 3rd DEO 9.454 289,431,000.00a. BUKIDNON (FIRST DISTRICT) 9.454 289,431,000.00
1. Sayre Highway - K1438+-226 - K1442+630.83
4.880 150,000,000.00
2. Sayre Highway - K1442+630.83 - K1447+162
4.574 139,431,000.00
4. Lanao del Norte 1st DEO 1.633 49,000,000.00a. LANAO DEL NORTE (SECOND DISTRICT) 1.633 49,000,000.00
1. Linamon-Zamboanga Rd - K1606+305 - K1607+933.33333
1.633 49,000,000.00
5. Misamis Occidental 1st DEO 8.922 267,668,000.00a. MISAMIS OCCIDENTAL (FIRST DISTRICT) 8.922 267,668,000.00
1. Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd - K1744+199 - K1744+574, K1746+180 - K1747+248, K1747+285 - K1747+400, K1749+875 - K1750+421, K1768+160 - K1769+000, K1770+300 - K1771+000, K1779+400 - K1779+850, K1789+500 - K1790+394.28
4.976 149,288,000.00
2. Ozamis City-Oroquieta City Rd - K1722+-817 - K1722+300, K1723+130 - K1724+200, K1726+800 - K1727+700, K1737+270 - K1738+390
3.946 118,380,000.00
6. Misamis Oriental 1st DEO 15.468 464,950,000.00a. MISAMIS ORIENTAL (FIRST DISTRICT) 15.468 464,950,000.00
1. Butuan City-Cagayan de Oro City-Iligan City Rd - K1281+-168 - K1286+074
5.000 150,000,000.00
2. Butuan City-Cagayan de Oro City-Iligan City Rd - K1286+074 - K1288+1404.33
3.333 100,000,000.00
3. Butuan City-Cagayan de Oro City-Iligan City Rd - K1329+-1589 - K1329+-1153, K1351+500 - K1353+903
2.844 86,220,000.00
4. Butuan City-Cagayan de Oro City-Iligan City Rd - K1355 + 3 - K1358+687, K1302+-600 - K1302+000
4.291 128,730,000.00
7. Misamis Oriental 2nd DEO 8.000 240,000,000.00a. MISAMIS ORIENTAL (SECOND DISTRICT) 8.000 240,000,000.00
1. Butuan City-Cagayan de Oro City-Iligan City Rd - K1400+-625 - K1403+367
4.000 120,000,000.00
2. Butuan City-Cagayan de Oro City-Iligan City Rd - K1403+367 - K1407+085
4.000 120,000,000.00
8. Regional Office X - Proper DEO 17.168 663,096,000.00a. REGIONWIDE 17.168 663,096,000.00
1. Butuan City-Cagayan de Oro City-Iligan City Rd - K1472 + 082.80 - K1477 + 114.80
5.000 150,000,000.00
2. Butuan City-Cagayan de Oro City-Iligan City Rd - K1477 + 114.80 - K1482 + 106.80
5.000 150,000,000.00
3. Butuan City-Cagayan de Oro City-Iligan City Rd - K1482 + 106.80 - K1486 + 000
3.903 117,096,000.00
4. Sayre Highway - K1465+200 - K1467+124
1.916 146,000,000.00
5. Sayre Highway - K1467+124 - K1468+441
1.349 100,000,000.00
k. Region XI 4.433 132,990,000.001. Compostela Valley DEO 0.971 29,130,000.00
a. COMPOSTELA VALLEY (SECOND DISTRICT) 0.971 29,130,000.001. Surigao-Davao Coastal Rd -
K1781+-586 - K1781+3850.971 29,130,000.00
2. Davao City 2nd DEO 3.462 103,860,000.00a. DAVAO CITY (THIRD DISTRICT) 3.462 103,860,000.00
1. Davao-Bukidnon Rd - K1623+373 - K1625+420, K1639+000 - K1640+000, K1642+574 - K1643+000, K1665+523 - K1666+000
3.462 103,860,000.00
l. Region XII 4.782 144,365,000.001. Cotabato 1st DEO 2.782 84,365,000.00
a. COTABATO (SECOND DISTRICT) 2.601 78,030,000.001. Davao-Cotabato Rd (Jct Digos-Cotabato Sect) -
K1611+600 - K1612+015, K1612+046 - K1614+2072.601 78,030,000.00
b. COTABATO (THIRD DISTRICT) 0.181 6,335,000.001. Davao-Cotabato Rd (Jct Digos-Cotabato Sect) -
Chainage 0 - Chainage 1810.181 6,335,000.00
details of dpwh’s programs/projects 789
2. Cotabato 2nd DEO 2.000 60,000,000.00a. COTABATO (FIRST DISTRICT) 2.000 60,000,000.00
1. Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1713+832 - K1715+788
2.000 60,000,000.00
m. Region XIII 3.251 102,676,000.001. Agusan del Sur 2nd DEO 0.604 18,120,000.00
a. AGUSAN DEL SUR (SECOND DISTRICT) 0.604 18,120,000.001. NRJ Cuevas-Bislig Rd -
K1371+-732 - K1371+-1280.604 18,120,000.00
2. Surigao del Sur 2nd DEO 2.647 84,556,000.00b. SURIGAO DEL SUR (SECOND DISTRICT) 2.647 84,556,000.00
1. Jct Lingig-Trento Rd - K1472+-647 - K1474+000
2.647 84,556,000.00
790 eXpeNditUre program fY 2016 VolUme ii
2. Secondary Roads 201.005 6,018,919,000.00
I. Central Office 17.557 525,920,000.00
a. Region IV-A 12.167 365,000,000.001. Batangas 1st DEO 5.500 165,000,000.00
a. BATANGAS (FIRST DISTRICT) 5.500 165,000,000.001. Palico-Balayan-Batangas Rd -
K0094+-880 - K0098+6215.500 165,000,000.00
2. Rizal 1st DEO 6.667 200,000,000.00a. RIZAL (FIRST DISTRICT) 6.667 200,000,000.00
1. Manila East Rd - K0028+000 - K0028+176, K0028+198 - K0030+788, K0031+600 - K0031+613, K0031+647 - K0033+264, K0033+298 - K0034+008, K0034+014 - K0035+523
6.667 200,000,000.00
b. Region VI 5.390 150,920,000.001. Iloilo 2nd DEO 5.390 150,920,000.00
a. ILOILO (THIRD DISTRICT) 5.390 150,920,000.001. Iloilo-Capiz Rd (Old Route) -
K0021+294 - K0023+059, K0034+951 - K0035+693, K0048+855 - K0049+828
5.390 150,920,000.00
c. Nationwide - 10,000,000.001. Central Office - 10,000,000.00
a. NATIONWIDE - 10,000,000.001. Secondary - Road Widening - 10,000,000.00
II. Regional Office 80.439 2,430,800,000.00
a. Region I 4.139 124,170,000.001. Pangasinan 1st DEO 4.139 124,170,000.00
a. PANGASINAN (FIRST DISTRICT) 4.139 124,170,000.001. Pangasinan-Zambales Rd -
K0316+818 - K0317+924, K0321+000 - K0324+0354.139 124,170,000.00
b. Region II 3.474 100,000,000.001. Isabela 1st DEO 3.474 100,000,000.00
a. ISABELA (FIRST DISTRICT) 3.474 100,000,000.001. Cabagan-Sta Maria Rd -
K0455+062 - K0459+0163.474 100,000,000.00
c. Region III 4.094 131,600,000.001. Bataan 2nd DEO 1.760 61,600,000.00
a. BATAAN (SECOND DISTRICT) 1.760 61,600,000.001. Gov JJ Linao Rd -
K0150 + 096 - K0151+8401.760 61,600,000.00
2. Zambales 1st DEO 2.334 70,000,000.00a. ZAMBALES (SECOND DISTRICT) 2.334 70,000,000.00
1. Olongapo-Bugallon Rd - K0175+532 - K0176+198, K0180+000 - K0180+667, K0224+190 - K0225+191
2.334 70,000,000.00
d. Region IV-A 5.787 212,810,000.001. Batangas 2nd DEO 0.956 51,000,000.00
a. BATANGAS (SECOND DISTRICT) 0.956 51,000,000.001. Batangas-Lobo Rd -
K0105+663 - K0106+6200.956 51,000,000.00
2. Batangas 4th DEO 2.388 92,520,000.00a. BATANGAS (FOURTH DISTRICT) 2.388 92,520,000.00
1. Batangas-Quezon Rd - K0108+-377 - K0108+923, K0113+085 - K0114+205
2.388 92,520,000.00
3. Laguna 2nd DEO 0.300 5,000,000.00a. LAGUNA (FIRST DISTRICT) 0.300 5,000,000.00
1. Access to SLEX Mamplasan Exit 0.300 5,000,000.004. Rizal 1st DEO 2.143 64,290,000.00
a. ANTIPOLO CITY (FIRST DISTRICT) 2.143 64,290,000.001. Marikina-Victoria Valley-Antipolo Rd -
K0027+588 - K0028+118, K0028+132 - K0030+2492.143 64,290,000.00
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
details of dpwh’s programs/projects 791
e. Region IV-B 12.270 368,140,000.001. Mindoro Occidental DEO 3.333 100,000,000.00
a. MINDORO OCCIDENTAL (LONE DISTRICT) 3.333 100,000,000.001. Mindoro West Coastal Rd -
K0236+000 - K0236+790, K0320+550 - K0322+600, K0381+700 - K0382+126
3.333 100,000,000.00
2. Mindoro Oriental DEO 6.666 200,000,000.00a. MINDORO ORIENTAL (FIRST DISTRICT) 6.666 200,000,000.00
1. Calapan North Rd - K0013+790 - K0014+590, K0015+523 - K0016+200, K0020+050 - K0020+850, K0023+000 - K0023+800, K0028+000 - K0028+241
3.333 100,000,000.00
2. Calapan North Rd - K0028+241 - K0029+900, K0045+000 - K0047+026
3.333 100,000,000.00
3. Palawan 3rd DEO 2.271 68,140,000.00a. PALAWAN (THIRD DISTRICT) 2.271 68,140,000.00
1. Puerto Princesa South Rd - K0004+-392 - K0004+375, K0005+000 - K0006+500
2.271 68,140,000.00
f. Region VI 33.011 992,080,000.001. Aklan DEO 3.333 100,000,000.00
a. AKLAN (LONE DISTRICT) 3.333 100,000,000.001. Aklan East Rd -
K0290+179 - K0293+4893.333 100,000,000.00
2. Guimaras DEO 5.151 177,820,000.00a. GUIMARAS (LONE DISTRICT) 5.151 177,820,000.00
1. Guimaras Circumferential Rd - K0027+210 - K0029+-113, K0094+363 - K0095+174
2.578 95,000,000.00
2. Guimaras Circumferential Rd - K0095+274 - K0096+145, K0096+630 - K0098+195
2.573 82,820,000.00
3. Iloilo 3rd DEO 10.255 286,260,000.00a. ILOILO (FIFTH DISTRICT) 10.255 286,260,000.00
1. Iloilo East Coast-Capiz Rd - K0172+-251 - K0173+390, K0189+750 - K0191+450, K0211+449 - K0211+553
3.469 100,000,000.00
2. Iloilo East Coast-Capiz Rd - K0211+553 - K0213+159, K0215+389 - K0216+933, K0217+467 - K0217+898
3.785 100,000,000.00
3. Iloilo East Coast-Capiz Rd - K0217+898 - K0219+167, K0244+280 - K0246+000
3.001 86,260,000.00
4. Iloilo 4th DEO 7.272 218,000,000.00a. ILOILO (SECOND DISTRICT) 7.272 218,000,000.00
1. Iloilo City-Leganes-Dumangas Coastal Rd - K0011+000 - K0013+583, K0013+693 - K0015+737
4.627 138,708,000.00
2. Iloilo-Capiz Rd (Old Route) - K0014+631.03 - K0014+700, K0015+041 - K0017+689
2.645 79,292,000.00
5. Negros Occidental 1st DEO 7.000 210,000,000.00a. NEGROS OCCIDENTAL (THIRD DISTRICT) 7.000 210,000,000.00
1. Bacolod Silay Airport Access Rd - K0008+-460 - K0008+477, K0008+537 - K0010+394, K0008+-560 - K0008+-526, K0010+454 - K0012+626
5.000 150,000,000.00
2. Silay-Lantawan Rd - K0015+-052 - K0016+948
2.000 60,000,000.00
g. Region VII 2.332 70,000,000.001. Bohol 3rd DEO 2.332 70,000,000.00
a. BOHOL (THIRD DISTRICT) 2.332 70,000,000.001. Tagbilaran East Rd (Tagbilaran-Jagna) -
K0187+500 - K0188+165, K0195+000 - K0195+666, K0239+219 - K0240+219
2.332 70,000,000.00
h. Region VIII 2.333 70,000,000.001. Tacloban City DEO 2.333 70,000,000.00
a. LEYTE (FIRST DISTRICT) 2.333 70,000,000.001. Picas-Sn Jose DZR Airport Rd -
K0910+-1575 - K0910+7582.333 70,000,000.00
792 eXpeNditUre program fY 2016 VolUme ii
i. Region IX 3.333 100,000,000.001. Zamboanga City DEO 3.333 100,000,000.00
a. ZAMBOANGA CITY (FIRST DISTRICT) 3.333 100,000,000.001. Zamboanga City-Labuan-Limpapa Rd -
K1961+750 - K1965+1063.333 100,000,000.00
j. Region XII 6.333 162,000,000.001. Cotabato 2nd DEO 2.333 63,000,000.00
a. COTABATO (FIRST DISTRICT) 2.333 63,000,000.001. Banisilan-Guiling-Alamada-Libungan Rd -
K1679+1000 - K1681+328, K1699+000 - K1700+0002.333 63,000,000.00
2. South Cotabato 2nd DEO 4.000 99,000,000.00a. SOUTH COTABATO (FIRST DISTRICT) 4.000 99,000,000.00
1. Makar-Kiamba Rd - K1661+925 - K1662+946, K1664+271 - K1667+270
4.000 99,000,000.00
k. Region XIII 3.333 100,000,000.001. Surigao del Sur 2nd DEO 3.333 100,000,000.00
a. SURIGAO DEL SUR (SECOND DISTRICT) 3.333 100,000,000.001. Surigao-Davao Coastal Rd -
K1399+700 - K1400+333, K1410+492 - K1412+132, K1431+000 - K1432+060
3.333 100,000,000.00
III District Engineering Office 103.009 3,062,199,000.00
a. NCR 0.666 20,000,000.001. Quezon City 1st DEO 0.666 20,000,000.00
a. QUEZON CITY (FIFTH DISTRICT) 0.666 20,000,000.001. Gen Luis St -
K0019+-1002 - K0019+-3360.666 20,000,000.00
b. Region I 10.815 324,720,000.001. Ilocos Norte 1st DEO 0.463 13,890,000.00
a. ILOCOS NORTE (FIRST DISTRICT) 0.463 13,890,000.001. Laoag-Airport Rd -
K0490+245 - K0490+619, K0490+665 - K0490+7540.463 13,890,000.00
2. Pangasinan 1st DEO 0.694 20,830,000.00a. PANGASINAN (FIRST DISTRICT) 0.694 20,830,000.00
1. Alaminos-Lucap Rd - K0321+-107 - K0321+587
0.694 20,830,000.00
3. Pangasinan 2nd DEO 0.667 20,000,000.00a. PANGASINAN (FOURTH DISTRICT) 0.667 20,000,000.00
1. Sta Barbara-Mangaldan Rd - K0204+-038 - K0204+629
0.667 20,000,000.00
4. Pangasinan 3rd DEO 3.991 120,000,000.00a. PANGASINAN (FIFTH DISTRICT) 3.001 90,000,000.00
1. Carmen Jct-Bayambang-Manat Rd - K0194+-003 - K0195+000
1.000 30,000,000.00
2. Carmen Jct-Manat Rd - K0176+200 - K0176+867
0.667 20,000,000.00
3. Mangaldan-Manaoag-Binalonan Rd - K0194+000 - K0194+667
0.667 20,000,000.00
4. Villasis-Malasiqui-Sn Carlos Rd - K0177+000 - K0177+667
0.667 20,000,000.00
b. PANGASINAN (SIXTH DISTRICT) 0.990 30,000,000.001. Carmen Jct-Manat Rd -
K0172+-859 - K0172+-6970.160 5,000,000.00
2. Pangasinan-Nueva Ecija Rd - K0179+548 - K0180+376
0.830 25,000,000.00
5. Pangasinan 4th DEO 5.000 150,000,000.00a. PANGASINAN (THIRD DISTRICT) 5.000 150,000,000.00
1. Camiling-Wawa-Bayambang-Malasiqui-Sta Ba - K0183+032.7 - K0183+1032.70
1.000 30,000,000.00
2. Carmen Jct-Bayambang-Manat Rd - K0203+-645 - K0203+355
1.000 30,000,000.00
3. Sn Carlos-Calasiao Rd - K0207+500 - K0208+496
1.000 30,000,000.00
4. Sta Barbara Old Rd - K0199+-096 - K0199+904
1.000 30,000,000.00
5. Sta Barbara-Mangaldan Rd - K0201+965 - K0202+970
1.000 30,000,000.00
c. Region II 1.250 36,420,000.001. Cagayan 1st DEO 0.980 29,420,000.00
a. CAGAYAN (FIRST DISTRICT) 0.980 29,420,000.00
details of dpwh’s programs/projects 793
1. Dugo-Sn Vicente Rd (Dugo-Mission Sect) - K0576+446 - K0576+757, K0577+643 - K0577+646, K0579+754 - K0580+444
0.980 29,420,000.00
2. Isabela 1st DEO 0.270 7,000,000.00a. ISABELA (FIRST DISTRICT) 0.270 7,000,000.00
1. Cabagan-Sta Maria Rd - Chainage 0 - Chainage 270
0.270 7,000,000.00
d. CAR 1.923 57,690,000.001. Abra DEO 1.468 44,040,000.00
a. ABRA (LONE DISTRICT) 1.468 44,040,000.001. Abra-Kalinga Rd -
K0415+102 - K0416+5801.468 44,040,000.00
2. Baguio City DEO 0.050 1,500,000.00a. BAGUIO CITY (LONE DISTRICT) 0.050 1,500,000.00
1. Loakan Rd - K0250+635 - K0250+685
0.050 1,500,000.00
3. Mt.Province DEO 0.405 12,150,000.00a. MOUNTAIN PROVINCE (LONE DISTRICT) 0.405 12,150,000.00
1. Dantay-Sagada Rd - K0395+430 - K0395+835
0.405 12,150,000.00
e. Region III 8.554 200,320,000.001. Bataan 1st DEO 0.833 25,000,000.00
a. BATAAN (FIRST DISTRICT) 0.833 25,000,000.001. Roman Expressway -
K0116+000 - K0116+075, K0116+135 - K0116+8930.833 25,000,000.00
2. Nueva Ecija 2nd DEO 1.000 30,000,000.00a. NUEVA ECIJA (THIRD DISTRICT) 1.000 30,000,000.00
1. Nueva Ecija-Aurora Rd - K0142+306 - K0143+325
1.000 30,000,000.00
3. Pampanga 2nd DEO 1.000 30,000,000.00a. PAMPANGA (SECOND DISTRICT) 1.000 30,000,000.00
1. Angeles-Porac-Floridablanca-Dinalupihan - K0100+634 - K0101+596
1.000 30,000,000.00
4. Tarlac 1st DEO 3.031 49,000,000.00a. TARLAC (FIRST DISTRICT) 3.031 49,000,000.00
1. Paniqui-Camiling-Wawa Rd - K0147+622 - K0150+663
3.031 49,000,000.00
5. Tarlac 2nd DEO 1.187 21,320,000.00a. TARLAC (THIRD DISTRICT) 1.187 21,320,000.00
1. Concepcion-Capas Rd - K0117+584 - K0118+018, K0118+549.15 - K0119+122.15, K0119+613 - K0119+793
1.187 21,320,000.00
6. Zambales 2nd DEO 1.503 45,000,000.00a. ZAMBALES (FIRST DISTRICT) 1.503 45,000,000.00
1. Olongapo-Bugallon Rd - K0140+000 - K0141+500
1.503 45,000,000.00
f. Region IV-A 21.118 613,580,000.001. Batangas 1st DEO 1.166 35,000,000.00
a. BATANGAS (FIRST DISTRICT) 1.166 35,000,000.001. Tagaytay-Nasugbu Rd -
K0073+091 - K0073+591, K0081+066 - K0081+7321.166 35,000,000.00
2. Batangas 2nd DEO 1.555 56,200,000.00a. BATANGAS (SECOND DISTRICT) 1.555 56,200,000.00
1. Batangas-Lobo Rd - K0135+500 - K0135+680
0.180 7,200,000.00
2. Palico-Balayan-Batangas Rd - K0150+000 - K0151+373
1.375 49,000,000.00
3. Batangas 3rd DEO 3.919 120,000,000.00a. BATANGAS (THIRD DISTRICT) 3.919 120,000,000.00
1. Banay-Banay-Mojon-Cuenca Rd - K0091+800 - K0092+800
0.997 45,000,000.00
2. Palico-Balayan-Batangas Rd (Right Side Only) - K0138+545.71 - K0140+260
1.760 30,000,000.00
3. Tanauan-Talisay-Tagaytay Rd - K0072+340 - K0073+500
1.162 45,000,000.00
4. Batangas 4th DEO 0.507 6,480,000.00a. BATANGAS (FOURTH DISTRICT) 0.507 6,480,000.00
1. Batangas-Quezon Rd (Left Side Only) - K0114+205 - K0114+712
0.507 6,480,000.00
5. Cavite 2nd DEO 2.800 84,000,000.00a. CAVITE (FIFTH DISTRICT) 1.600 48,000,000.00
1. Cavite-Batangas Rd - K0039+-186 - K0040+414
1.600 48,000,000.00
794 eXpeNditUre program fY 2016 VolUme ii
b. CAVITE (SEVENTH DISTRICT) 1.200 36,000,000.001. Mahogany Ave -
K0060+001 - K0060+1340.133 4,000,000.00
2. Tagaytay-Batangas via Tuy Rd - K0066+866 - K0067+935
1.067 32,000,000.00
6. Laguna 1st DEO 3.889 87,000,000.00a. LAGUNA (FOURTH DISTRICT) 3.889 87,000,000.00
1. Calamba-Sta Cruz-Famy Jct Rd - K0102+180 - K0104+000
1.823 38,000,000.00
2. Rizal Bdry-Famy-Quezon Rd - K0074+000 - K0076+097
2.066 49,000,000.00
7. Quezon 1st DEO 4.500 135,000,000.00a. QUEZON (FIRST DISTRICT) 4.500 135,000,000.00
1. Jct Lucban-Luisiana Rd - K0130+692 - K0132+199
1.500 45,000,000.00
2. Lucena-Tayabas-Lucban-Sampaloc-Mauban Po - K0130+099 - K0131+609
1.500 45,000,000.00
3. Tayabas-Mainit-Mauban Rd - K0145+166 - K0146+666
1.500 45,000,000.00
8. Quezon 2nd DEO 0.552 23,000,000.00a. QUEZON (SECOND DISTRICT) 0.552 23,000,000.00
1. Quezon-Batangas Rd - K0105+720 - K0106+289
0.552 23,000,000.00
9. Rizal 1st DEO 2.230 66,900,000.00a. ANTIPOLO CITY (SECOND DISTRICT) 2.230 66,900,000.00
1. Antipolo Circumferential Rd A - K0025+-398 - K0025+542, K0026+155 - K0026+510
1.295 38,850,000.00
2. Marikina-Victoria Valley-Antipolo Rd - K0030+249 - K0031+271
0.935 28,050,000.00
g. Region IV-B 3.659 107,860,000.001. Marinduque DEO 1.833 55,000,000.00
a. MARINDUQUE (LONE DISTRICT) 1.833 55,000,000.001. Marinduque Circumferential Rd -
K0015+000 - K0016+0101.000 30,000,000.00
2. Mogpog-Balanacan Port Rd - K0013+000 - K0013+833
0.833 25,000,000.00
2. Palawan 3rd DEO 1.826 52,860,000.00a. PALAWAN (THIRD DISTRICT) 1.826 52,860,000.00
1. Puerto Princesa North Rd - K0011+580 - K0012+498
0.900 25,080,000.00
2. Puerto Princesa South Rd - K0000+420 - K0001+322
0.926 27,780,000.00
h. Region V 12.182 341,394,000.001. Albay 1st DEO 3.233 97,000,000.00
a. ALBAY (FIRST DISTRICT) 3.233 97,000,000.001. DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. S -
K0540+-936 - K0540+6971.633 49,000,000.00
2. Ligao-Tabaco Rd - K0519+081 - K0519+443, K0519+458 - K0519+560, K0519+569 - K0519+595, K0520+000 - K0520+374, K0520+380 - K0520+724, K0520+735 - K0521 +129
1.600 48,000,000.00
2. Albay 2nd DEO 3.160 95,100,000.00a. ALBAY (SECOND DISTRICT) 3.160 95,100,000.00
1. DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. S - K0533+000 - K0533+500
0.500 15,000,000.00
2. Lakandula Drive - K0531+-58 - K0532+-298.28
0.770 23,100,000.00
3. Legazpi Airport Rd - K0530+-661 - K0530+-161, K0530+-990 - K0530+000
1.490 45,000,000.00
4. Quezon Ave- Wharf Rd - Chainage 11 - Chainage 408
0.400 12,000,000.00
3. Camarines Norte DEO 0.667 20,000,000.00a. CAMARINES NORTE (FIRST DISTRICT) 0.667 20,000,000.00
1. Talobatib-Jose Panganiban Pob-Port Rd - K0321+036 - K0321+703
0.667 20,000,000.00
4. Camarines Sur 2nd DEO 0.510 15,000,000.00a. CAMARINES SUR (THIRD DISTRICT) 0.510 15,000,000.00
1. Pili-Airport Rd - Chainage 0 - Chainage 510
0.510 15,000,000.00
5. Catanduanes DEO 2.800 49,000,000.00a. CATANDUANES (LONE DISTRICT) 2.800 49,000,000.00
1. Jct Catanduanes Cir Rd-Panganiban-Sabloy - K0068+000 - K0070+743
2.800 49,000,000.00
6. Masbate 1st DEO 1.812 65,294,000.00
details of dpwh’s programs/projects 795
a. MASBATE (SECOND DISTRICT) 1.812 65,294,000.001. Jct Milagros-Baleno-Lagta Rd -
K0027+-094 - K0027+310, K0052+110 - K0052+9601.254 49,200,000.00
2. Masbate-Cataingan-Placer Rd - K0000+480 - K0001+027
0.558 16,094,000.00
i. Region VI 11.561 336,880,000.001. Bacolod City DEO 0.666 20,000,000.00
a. BACOLOD CITY (LONE DISTRICT) 0.666 20,000,000.001. Bacolod Silay Airport Access Rd -
K0007+-602 - K0007+0640.666 20,000,000.00
2. Capiz 2nd DEO 2.335 70,000,000.00a. CAPIZ (SECOND DISTRICT) 2.335 70,000,000.00
1. Capiz-Aklan Rd - K0324+-742 - K0324+591
1.333 40,000,000.00
2. Jct Natl Rd Cuartero-Tapulang-Maayon Rd - K0101+770 - K0102+760
1.002 30,000,000.00
3. Guimaras DEO 1.507 49,000,000.00a. GUIMARAS (LONE DISTRICT) 1.507 49,000,000.00
1. Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0055+611 - K0057+134
1.507 49,000,000.00
4. Iloilo 3rd DEO 1.720 49,880,000.00a. ILOILO (FIFTH DISTRICT) 1.720 49,880,000.00
1. Passi-Sn Rafael-Lemery-Sara Rd - K0087+500 - K0089+207
1.720 49,880,000.00
5. Iloilo City DEO 5.333 148,000,000.00a. ILOILO CITY (LONE DISTRICT) 5.333 148,000,000.00
1. Arevalo By-Pass Rd - K0005+-061 - K0006+080
1.141 34,230,000.00
2. Iloilo-Antique Rd - K0006+266 - K0007+203, Chainage 0 - Chainage 98
1.220 36,600,000.00
3. Iloilo-Capiz Rd (Old Route) - K0003+567 - K0003+994
0.427 12,820,000.00
4. Iznart-Ledesma-Molo Rd - K0000+000 - K0000+545
0.545 16,350,000.00
5. La Paz Deep Sea Water Port Rd - Chainage 0 - Chainage 2000
2.000 48,000,000.00
j. Region VII 1.752 116,675,000.001. Cebu 2nd DEO 1.236 91,675,000.00
a. CEBU (FIRST DISTRICT) 1.236 91,675,000.001. Cebu South Coastal Rd -
K0011+766 - K0012+5900.838 41,875,000.00
2. Cebu-Toledo Wharf Rd (Jct Naga-Uling) - K0022+706 - K0023+260
0.398 49,800,000.00
2. Cebu 6th DEO 0.516 25,000,000.00a. LAPU LAPU CITY (LONE DISTRICT) 0.516 25,000,000.00
1. Mactan Circumferential Rd - K0034+500 - K0035+000
0.516 25,000,000.00
k. Region VIII 4.059 122,850,000.001. Biliran DEO 0.631 20,000,000.00
a. BILIRAN (LONE DISTRICT) 0.631 20,000,000.001. Biliran Circumferential Rd -
K1029+550 - K1030+000, K1033+200 - K1033+3690.631 20,000,000.00
2. Leyte 1st DEO 1.000 30,000,000.00a. LEYTE (FIRST DISTRICT) 1.000 30,000,000.00
1. Govt Ctr Rd Network - K0913+000 - K0913+569, K0913+585 - K0913+683
0.667 20,000,000.00
2. Tacloban-Baybay South Rd - K0917+050 - K0917+383
0.333 10,000,000.00
3. Leyte 5th DEO 1.000 30,000,000.00a. LEYTE (FIFTH DISTRICT) 1.000 30,000,000.00
1. Ormoc-Baybay-Southern Leyte Bdry Rd - K1103+335 - K1103+874, K1103+890 - K1104+180, K1104+228 - K1104+392
1.000 30,000,000.00
4. Southern Leyte DEO 0.095 2,850,000.00a. SOUTHERN LEYTE (LONE DISTRICT) 0.095 2,850,000.00
1. Tomas Oppus St - K1135+-642 - K1135+-547
0.095 2,850,000.00
5. Tacloban City DEO 1.333 40,000,000.00a. LEYTE (FIRST DISTRICT) 1.333 40,000,000.00
796 eXpeNditUre program fY 2016 VolUme ii
1. Rizal Avenida Ext Rd - K0905+000 - K0905+333
0.333 10,000,000.00
2. Tacloban-Baybay South Rd - K0915+-118.20 - K0915+882
1.000 30,000,000.00
l. Region IX 1.167 35,000,000.001. Zamboanga del Norte 3rd DEO 1.167 35,000,000.00
a. ZAMBOANGA DEL NORTE (FIRST DISTRICT) 1.167 35,000,000.001. Jct Pulauan Port Rd -
K1827+-320 - K1827+3470.667 20,000,000.00
2. Rizal-Dakak-Dapitan Coastal Loop Rd - K1827+-320 - K1827+180
0.500 15,000,000.00
m. Region X 4.000 120,010,000.001. Bukidnon 2nd DEO 0.833 25,000,000.00
a. BUKIDNON (THIRD DISTRICT) 0.833 25,000,000.001. Maramag-Maradugao Rd -
K1558+000 - K1558+8330.833 25,000,000.00
2. Cagayan de Oro City 1st DEO 0.167 5,010,000.00a. CAGAYAN DE ORO CITY (FIRST DISTRICT) 0.167 5,010,000.00
1. CDO-Airport-Bukidnon Rd - K1455+109 - K1455+154, K1455+504 - K1455+626
0.167 5,010,000.00
3. Cagayan de Oro City 2nd DEO 1.000 30,000,000.00a. CAGAYAN DE ORO CITY (SECOND DISTRICT) 1.000 30,000,000.00
1. Corrales Extension St. - Port Road - K1438+-271 - K1438+729
1.000 30,000,000.00
4. Misamis Occidental 1st DEO 2.000 60,000,000.00a. MISAMIS OCCIDENTAL (FIRST DISTRICT) 2.000 60,000,000.00
1. Calamba-Baliangao Rd - K1780+-874 - K1780+126
1.000 30,000,000.00
2. Oroquieta City-Calamba Mt Rd - K1745+541 - K1746+250, K1746+390 - K1746+682
1.000 30,000,000.00
n. Region XI 9.816 295,000,000.001. Compostela Valley DEO 2.333 70,000,000.00
a. COMPOSTELA VALLEY (FIRST DISTRICT) 1.000 30,000,000.001. Montevista-Compostela-Mati Bdry Rd -
K1414+-149 - K1414+309, K1414+355 - K1414+8971.000 30,000,000.00
b. COMPOSTELA VALLEY (SECOND DISTRICT) 1.333 40,000,000.001. Nabunturan-Mainit Park Rd -
K1430+162 - K1430+300, K1430+332 - K1431+4841.333 40,000,000.00
2. Davao City DEO 1.485 45,000,000.00a. DAVAO CITY (FIRST DISTRICT) 0.833 25,000,000.00
1. Davao City Div Rd - K1506+882 - K1507+792
0.833 25,000,000.00
b. DAVAO CITY (SECOND DISTRICT) 0.652 20,000,000.001. Davao City Div Rd -
K1498+-349 - K1498+289, K1515+928 - K1515+9420.652 20,000,000.00
3. Davao del Norte DEO 4.665 140,000,000.00a. DAVAO DEL NORTE (FIRST DISTRICT) 2.666 80,000,000.00
1. Tagum City Diversion Rd - K1456+1002 - K1458+280
1.333 40,000,000.00
1. Tagum-Panabo Circum Rd - K1470+946 - K1471+903, K1471+923 - K1472+227
1.333 40,000,000.00
b. DAVAO DEL NORTE (SECOND DISTRICT) 1.999 60,000,000.001. Babak-Samal-Kaputian Rd -
K1501+-513 - K1501+8201.333 40,000,000.00
2. Tagum-Panabo Circum Rd - K1518+000 - K1518+666
0.666 20,000,000.00
4. Davao Oriental 1st DEO 1.333 40,000,000.00a. DAVAO ORIENTAL (FIRST DISTRICT) 1.333 40,000,000.00
1. Surigao del Sur Bdry-Davao Or Coastal Rd - K1545+389 - K1546+688
1.333 40,000,000.00
o. Region XII 5.820 178,800,000.001. Cotabato 2nd DEO 1.383 46,000,000.00
a. COTABATO (FIRST DISTRICT) 1.383 46,000,000.001. Midsayap-Makar Rd -
K1695+811.7 - K1697+188.31.383 46,000,000.00
details of dpwh’s programs/projects 797
2. Sarangani DEO 0.666 20,000,000.00a. SARANGANI (LONE DISTRICT) 0.666 20,000,000.00
1. Sarangani-Davao Del Sur Coastal Rd - K1672+004 - K1672+670
0.666 20,000,000.00
3. South Cotabato 2nd DEO 1.000 30,000,000.00a. SOUTH COTABATO (FIRST DISTRICT) 1.000 30,000,000.00
1. Filipino-American Friendship Ave. - K1662+-652 - K1662+348
1.000 30,000,000.00
4. Sultan Kudarat 2nd DEO 2.771 82,800,000.00a. SULTAN KUDARAT (SECOND DISTRICT) 2.771 82,800,000.00
1. Isulan Jct-Ninoy Aquino Rd - K1795+000 - K1796+000
1.011 30,000,000.00
2. Makar-Kiamba Rd - K1949+1000 - K1949+2000
1.000 30,000,000.00
3. SNA-Lebak-Kalamansig Rd - K1855+000 - K1855+760
0.760 22,800,000.00
p. Region XIII 4.668 155,000,000.001. Agusan del Sur 2nd DEO 1.333 40,000,000.00
a. AGUSAN DEL SUR (SECOND DISTRICT) 1.333 40,000,000.001. NRJ Sn Francisco-Bahi-Barobo Rd -
K1309+667 - K1311+0421.333 40,000,000.00
2. Surigao del Norte 1st DEO 2.002 75,000,000.00a. SURIGAO DEL NORTE (SECOND DISTRICT) 2.002 75,000,000.00
1. Surigao Wharf Rd - K1123+-810 - K1123+-141
0.669 35,000,000.00
2. Surigao-Davao Coastal Rd - K1178+000 - K1179+334
1.333 40,000,000.00
3. Surigao del Sur 1st DEO 1.333 40,000,000.00a. SURIGAO DEL SUR (FIRST DISTRICT) 1.333 40,000,000.00
1. Surigao-Davao Coastal Rd - K1293+000 - K1294+131, K1294+153 - K1294+355
1.333 40,000,000.00
798 eXpeNditUre program fY 2016 VolUme ii
3. Tertiary Roads 133.444 3,937,857,000.00
I. Central Office 12.334 380,000,000.00a. Region IV-A 5.167 155,000,000.00
1. Laguna 3rd DEO 5.167 155,000,000.00a. LAGUNA (THIRD DISTRICT) 5.167 155,000,000.00
1. Calauan-Nagcarlan Bdry Rd - K0077+-930 - K0077+-522, K0078+700 - K0083+443
5.167 155,000,000.00
b. Region XII 7.167 215,000,000.001. South Cotabato 2nd DEO 7.167 215,000,000.00
a. SOUTH COTABATO (FIRST DISTRICT) 7.167 215,000,000.001. General Santos City Circumferential Rd -
Chainage 0 - Chainage 71677.167 215,000,000.00
c. Nationwide - 10,000,000.001. Central Office - 10,000,000.00
a. NATIONWIDE - 10,000,000.001. Tertiary - Road Widening - 10,000,000.00
II. Regional Office 31.818 1,071,793,000.00a. Region II 2.500 75,000,000.00
1. Isabela 1st DEO 2.500 75,000,000.00a. ISABELA (FIRST DISTRICT) 2.500 75,000,000.00
1. Ilagan-Delfin Albano-Mallig Rd - K0402+000 - K0404+000, K0410+000 - K0410+457
2.500 75,000,000.00
b. Region III 2.500 75,000,000.001. Bataan 2nd DEO 2.500 75,000,000.00
a. BATAAN (SECOND DISTRICT) 2.500 75,000,000.001. Alas-Asin Port Rd -
K0156+500 - K0159+0602.500 75,000,000.00
c. Region IV-A 4.843 173,000,000.001. Batangas 4th DEO 1.667 50,000,000.00
a. BATANGAS (FOURTH DISTRICT) 1.667 50,000,000.001. Lipa City - Alaminos Rd -
K0083+-662 - K0084+0051.667 50,000,000.00
2. Rizal 1st DEO 3.176 123,000,000.00a. ANTIPOLO CITY (FIRST DISTRICT) 3.176 123,000,000.00
1. Marikina-Infanta Rd - K0019+000 - K0020+457, K0021+121 - K0021+284, K0021+169 - K0021+445, K0021+805 - K0023+043
3.176 123,000,000.00
d. Region V 6.842 205,270,000.001. Camarines Sur 2nd DEO 6.842 205,270,000.00
a. CAMARINES SUR (THIRD DISTRICT) 6.842 205,270,000.001. Fraternidad-Biak-na-Bato-E Angeles-Bagumbayan Rd -
Chainage 681 - Chainage 29172.236 67,080,000.00
2. Naga-Carolina-Panicuason Rd - K0438+-910 - K0439+-402.79, K0453+-279 - K0454+021
2.884 86,530,000.00
3. Panganiban Rd - Chainage 0 - Chainage 1722
1.722 51,660,000.00
e. Region VI 12.397 345,523,000.001. Capiz 1st DEO 3.526 85,500,000.00
a. CAPIZ (FIRST DISTRICT) 3.526 85,500,000.001. Jct Natl Rd-Mi-anay-Duyoc-Calaan-Panitan -
K0103+-128 - K0105+000, K0108+083 - K0109+5833.526 85,500,000.00
2. Iloilo 3rd DEO 5.869 169,963,000.00a. ILOILO (FIFTH DISTRICT) 5.869 169,963,000.00
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
details of dpwh’s programs/projects 799
1. Balasan-Carles Rd - K0174+-099 - K0175+621, K0185+286 - K0185+992
2.428 70,412,000.00
2. Barotac Viejo-Sn Rafael Rd - K0076+000 - K0077+720, K0088+400 - K0090+100
3.441 99,551,000.00
3. Iloilo City DEO 3.002 90,060,000.00a. ILOILO CITY (LONE DISTRICT) 3.002 90,060,000.00
1. Iznart-Ledesma-Molo Rd - K0001+-469 - K0003+519
3.002 90,060,000.00
f. Region VII 0.403 128,000,000.001. Cebu City DEO 0.403 128,000,000.00
a. CEBU CITY (FIRST DISTRICT) 0.403 128,000,000.001. Archbishop Reyes Ave -
K0003+631 - K0004+0820.403 128,000,000.00
g. Region IX 2.333 70,000,000.001. Zamboanga del Norte 1st DEO 2.333 70,000,000.00
a. ZAMBOANGA DEL NORTE (SECOND DISTRICT) 2.333 70,000,000.001. Dipolog-Polanco-Piñan-Jct Oroquieta Rd -
K1831+-338 - K1833+0492.333 70,000,000.00
III District Engineering Office 89.292 2,486,064,000.00a. NCR 7.332 220,000,000.00
1. Metro Manila 1st DEO 3.999 120,000,000.00a. MANDALUYONG CITY (LONE DISTRICT) 1.333 40,000,000.00
1. Pioneer St - K0012+-328 - K0012+1005
1.333 40,000,000.00
b. PASIG CITY (LONE DISTRICT) 1.333 40,000,000.001. Amang Rodriguez Rd -
K0017+-001 - K0018+0080.903 27,100,000.00
2. Pioneer St - K0012+-758 - K0012+-328
0.430 12,900,000.00
c. SAN JUAN CITY (LONE DISTRICT) 1.333 40,000,000.001. San Juan-Santolan Rd -
K0009+-869 - K0009+4641.333 40,000,000.00
2. North Manila DEO 2.666 80,000,000.00a. MANILA CITY (FIRST DISTRICT) 1.333 40,000,000.00
1. Juan Luna St - K0003+632 - K0004+960
1.333 40,000,000.00
b. MANILA CITY (SECOND DISTRICT) 1.333 40,000,000.001. Juan Luna St -
K0005+184 - K0006+5031.333 40,000,000.00
3. Quezon City 1st DEO 0.667 20,000,000.00a. QUEZON CITY (SIXTH DISTRICT) 0.667 20,000,000.00
1. Tandang Sora Ave - Chainage 2754 - Chainage 3421
0.667 20,000,000.00
b. Region I 2.333 70,000,000.001. Ilocos Norte 1st DEO 1.000 30,000,000.00
a. ILOCOS NORTE (FIRST DISTRICT) 1.000 30,000,000.001. Laoag-Sarrat-Piddig-Solsona Rd -
K0497+058 - K0498+0531.000 30,000,000.00
2. Ilocos Sur 1st DEO 0.500 15,000,000.00a. ILOCOS SUR (FIRST DISTRICT) 0.500 15,000,000.00
1. Vigan-Sta Catalina Rd - K0408+400 - K0408+900
0.500 15,000,000.00
3. Pangasinan 3rd DEO 0.833 25,000,000.00a. PANGASINAN (SIXTH DISTRICT) 0.833 25,000,000.00
1. Pangasinan-Nueva Vizcaya Rd - K0178+830 - K0179+495
0.833 25,000,000.00
c. Region II 1.583 47,500,000.001. Isabela 1st DEO 0.916 27,500,000.00
a. ISABELA (FIRST DISTRICT) 0.916 27,500,000.001. Ilagan-Bigao-Palanan Rd -
K0408+-700 - K0408+2160.916 27,500,000.00
2. Isabela 3rd DEO 0.667 20,000,000.00a. ISABELA (THIRD DISTRICT) 0.667 20,000,000.00
1. Alicia-San Mateo Rd - K0350+602 - K0351+274
0.667 20,000,000.00
800 eXpeNditUre program fY 2016 VolUme ii
d. CAR 3.483 104,500,000.001. Abra DEO 3.266 98,000,000.00
a. ABRA (LONE DISTRICT) 3.266 98,000,000.001. Abra-Cervantes Rd -
K0431+-527 - K0432+0921.633 49,000,000.00
2. Abra-Ilocos Norte Rd - K0421+725 - K0423+333
1.633 49,000,000.00
2. Baguio City DEO 0.217 6,500,000.00a. BAGUIO CITY (LONE DISTRICT) 0.217 6,500,000.00
1. Military Cut-off Rd - K0249+-830 - K0249+-663, K0249+132 - K0249+182
0.217 6,500,000.00
e. Region III 19.731 368,112,000.001. Nueva Ecija 2nd DEO 0.833 25,000,000.00
a. NUEVA ECIJA (FOURTH DISTRICT) 0.833 25,000,000.001. Gapan-Fort Magsaysay Rd -
K0099+700 - K0100+5400.833 25,000,000.00
2. Pampanga 1st DEO 1.334 40,000,000.00a. PAMPANGA (THIRD DISTRICT) 0.667 20,000,000.00
1. Sn Fernando-Lubao Rd - K0069+000 - K0069+667
0.667 20,000,000.00
b. PAMPANGA (FOURTH DISTRICT) 0.667 20,000,000.001. Baliwag-Candaba-Sta Ana Rd -
K0070+010 - K0070+6770.667 20,000,000.00
3. Pampanga 2nd DEO 1.000 30,000,000.00a. PAMPANGA (SECOND DISTRICT) 1.000 30,000,000.00
1. Sn Antonio-Floridablanca Rd - K0082+000 - K0083+038
1.000 30,000,000.00
4. Tarlac 2nd DEO 15.093 228,972,000.00a. TARLAC (THIRD DISTRICT) 15.093 228,972,000.00
1. Bamban Poblacion Rd - K0099+-1224 - K0099+-938
0.286 8,600,000.00
2. Capas-Botolan Rd - K0123+-425 - K0124+947
2.370 27,900,000.00
3. Capas-San Jose-Mayantoc-Malacampa Rd - K0115+878 - K0116+701, K0117+065 - K0119+267
3.026 49,920,000.00
4. Concepcion - La Paz Rd - K0129+268 - K0131+337
2.069 49,000,000.00
5. Tarlac-Zambales Rd - K0111+000 - K0112+949, K0114+429 - K0117+418
4.937 49,410,000.00
6. Victoria-La Paz Rd - K0137+050 - K0137+489, K0137+608 - K0137+879, K0137+885 - K0139+580
2.405 44,142,000.00
5. Zambales 1st DEO 0.833 25,000,000.00a. ZAMBALES (SECOND DISTRICT) 0.833 25,000,000.00
1. Amungan-Palauig-Banlog Rd - K0219+000 - K0219+833
0.833 25,000,000.00
6. Zambales 2nd DEO 0.638 19,140,000.00a. ZAMBALES (FIRST DISTRICT) 0.638 19,140,000.00
1. Sn Marcelino-Sn Antonio-Sn Narciso Rd - K0153+-138 - K0153+500
0.638 19,140,000.00
f. Region IV-A 16.476 548,500,000.001. Batangas 1st DEO 1.333 40,000,000.00
a. BATANGAS (FIRST DISTRICT) 1.333 40,000,000.001. Palico-Balayan-Lemery-Taal Div Rd -
K0128+050 - K0129+3891.333 40,000,000.00
2. Batangas 3rd DEO 3.333 100,000,000.00a. BATANGAS (THIRD DISTRICT) 3.333 100,000,000.00
1. Lipa-Balete Rd - K0086+008 - K0087+113
1.000 30,000,000.00
2. Manila South Rd via Sto Tomas Pob - K0060+-030 - K0061+282
1.333 40,000,000.00
3. Talisay-Laurel-Agoncillo Rd - K0114+141 - K0115+145
1.000 30,000,000.00
3. Cavite 2nd DEO 1.833 55,000,000.00a. CAVITE (SIXTH DISTRICT) 0.333 10,000,000.00
1. Crisanto M de los Reyes Ave - K0054+-410 - K0054+-077
0.333 10,000,000.00
details of dpwh’s programs/projects 801
b. CAVITE (SEVENTH DISTRICT) 1.500 45,000,000.001. Indang-Alfonso via Luksuhin Rd -
K0071+640 - K0072+316, K0072+900 - K0073+7051.500 45,000,000.00
4. Laguna 2nd DEO 1.110 39,500,000.00a. LAGUNA (SECOND DISTRICT) 1.110 39,500,000.00
1. Makiling Park Rd - K0063+228 - K0064+000
0.800 24,000,000.00
2. Mayapa-Canlubang Cadre Rd - K0051+365 - K0051+675
0.310 15,500,000.00
5. Quezon 1st DEO 1.500 45,000,000.00a. QUEZON (FIRST DISTRICT) 1.500 45,000,000.00
1. Lucban-Majayjay Rd - K0123+-590 - K0123+910
1.500 45,000,000.00
6. Quezon 2nd DEO 4.130 124,000,000.00a. QUEZON (SECOND DISTRICT) 4.130 124,000,000.00
1. Lutucan-Guisguis Port Rd - K0118+715 - K0120+315
1.600 49,000,000.00
2. MSR Jct Tiaong-Dolores Rd - K0094+-880 - K0094+20
0.720 40,000,000.00
3. Sn Juan-Candelaria Jct-Candelaria-Bolboc - K0155+823 - K0156+313
1.100 35,000,000.00
7. Rizal 1st DEO 1.237 85,000,000.00a. ANTIPOLO CITY (SECOND DISTRICT) 1.237 85,000,000.00
1. Cainta-Kayticling-Antipolo-Teresa-Morong Rd - K0027+428 - K0027+565, K0030+760 - K0030+960
0.337 40,000,000.00
2. Marikina-Infanta Rd - K0027+815 - K0028+760
0.900 45,000,000.00
8. Rizal 2nd DEO 2.000 60,000,000.00a. RIZAL (SECOND DISTRICT) 2.000 60,000,000.00
1. Cainta-Kayticling-Antipolo-Teresa-Morong - K0032+850 - K0033+914
1.000 30,000,000.00
2. Sagbat-Pililla Div Rd - K0047+280 - K0048+430
1.000 30,000,000.00
g. Region IV-B 1.472 44,130,000.001. Palawan 3rd DEO 1.472 44,130,000.00
a. PALAWAN (THIRD DISTRICT) 1.472 44,130,000.001. Malvar Rd -
K0002+-665 - K0002+8071.472 44,130,000.00
h. Region V 4.380 134,280,000.001. Albay 1st DEO 1.333 40,000,000.00
a. ALBAY (FIRST DISTRICT) 1.333 40,000,000.001. Sto Domingo Poblacion Rd -
K0541+540 - K0542+700, K0545+000 - K0545+2491.333 40,000,000.00
2. Albay 2nd DEO 0.759 25,650,000.00a. ALBAY (SECOND DISTRICT) 0.759 25,650,000.00
1. Lakandula Drive Portion - K0532+-089 - K0532+670
0.759 25,650,000.00
3. Camarines Sur 2nd DEO 1.621 48,630,000.00a. CAMARINES SUR (THIRD DISTRICT) 1.621 48,630,000.00
1. Liboton-Magsaysay Rd - K0439+-055 - K0440+570
1.621 48,630,000.00
4. Camarines Sur 4th DEO 0.667 20,000,000.00a. CAMARINES SUR 5TH 0.667 20,000,000.00
1. Bato-Poblacion Rd - K0476+-115 - K0476+552
0.667 20,000,000.00
i. Region VI 20.173 591,272,000.001. Capiz 2nd DEO 2.167 65,000,000.00
a. CAPIZ (SECOND DISTRICT) 2.167 65,000,000.001. Mambusao-Imbug Rd -
K0096+-206 - K0096+4610.667 20,000,000.00
2. Sigma-Mambusao-Jamindan Rd - K0088+-397 - K0088+436
0.833 25,000,000.00
3. Tapaz-Jamindan-Altavaz Rd - K0104+-968 - K0104+-301
0.667 20,000,000.00
2. Iloilo 2nd DEO 3.334 100,000,000.00a. ILOILO (THIRD DISTRICT) 3.334 100,000,000.00
802 eXpeNditUre program fY 2016 VolUme ii
1. Baje-Ngi-ngi-an-Bingawan Rd - K0071+293 - K0071+713
0.420 12,600,000.00
2. Banga-Polot-an-Pototan Pob Rd - K0281+427 - K0281+932
0.505 15,140,000.00
3. Iloilo-Capiz Rd (Old Route) - K0058+440 - K0059+466
1.000 30,000,000.00
4. Pototan-Mina-Janiuay Rd - K0030+284 - K0031+156
0.904 27,120,000.00
5. Pototan-Tina-Lambunao Rd - K0031+300 - K0031+805
0.505 15,140,000.00
3. Iloilo 3rd DEO 10.187 295,147,000.00a. ILOILO (FIFTH DISTRICT) 10.187 295,147,000.00
1. Ajuy-Jamul-awon-Concepcion Rd - K0219+290 - K0220+1093
1.710 49,590,000.00
2. Concepcion-Sn Dionisio Rd - K0219+601 - K0221+625
1.700 49,300,000.00
3. Sara-Concepcion Rd - K0208+-999 - K0208+724
1.723 49,967,000.00
4. Sara-Sn Dionisio Rd - K0203+243 - K0204+943
1.704 49,140,000.00
5. Sn Dionisio-Capinang Rd - K0200+205 - K0201+1075
1.720 49,880,000.00
6. Sn Rafael-Dumarao Rd - K0074+-580 - K0075+060
1.630 47,270,000.00
4. Iloilo City DEO 4.485 131,125,000.00a. ILOILO CITY (LONE DISTRICT) 4.485 131,125,000.00
1. Iloilo-Jaro Diversion Rd - K0002+-017 - K0002+657
0.674 20,205,000.00
2. La Paz-Jaro Rd - K0001+-269 - K0001+891
1.160 34,800,000.00
3. Mandurriao-Pakiad Road - K0006+-099 - K0007+528
1.623 35,000,000.00
4. Rizal St (La Paz) - Chainage 0 - Chainage 1028
1.028 41,120,000.00
j. Region VII 5.144 142,190,000.001. Bohol 1st DEO 2.603 78,690,000.00
a. BOHOL (FIRST DISTRICT) 2.603 78,690,000.001. Antequera-San Isidro-Libertad (Tubigon) -
K0023+730 - K0025+2861.556 46,690,000.00
2. Jct (TNR) Maribojoc-Antequera-Catagbacan - K0017+445 - K0018+495
1.047 32,000,000.00
2. Cebu 1st DEO 1.874 43,500,000.00a. CEBU (FOURTH DISTRICT) 1.874 43,500,000.00
1. Sogod-Tabuelan Rd - K0110+400 - K0111+400, K0112+815 - K0113+700
1.874 43,500,000.00
3. Negros Oriental 3rd DEO 0.667 20,000,000.00a. NEGROS ORIENTAL (THIRD DISTRICT) 0.667 20,000,000.00
1. Dumaguete City-Valencia-Bacong Rd - K0008+000 - K0008+667
0.667 20,000,000.00
k. Region VIII 0.999 30,000,000.001. Tacloban City DEO 0.999 30,000,000.00
a. LEYTE (FIRST DISTRICT) 0.999 30,000,000.001. Apitong-Paterno Rd -
K0908+094 - K0908+400, K0909+000 - K0909+0270.333 10,000,000.00
2. Naga-Naga Anibong Rd - K0909+-405 - K0906+-038, K0906+218 - K0906+439, K0906+1039 - K0906+1117
0.666 20,000,000.00
l. Region IX 1.333 40,000,000.001. Zamboanga del Sur 2nd DEO 0.833 25,000,000.00
a. ZAMBOANGA DEL SUR (SECOND DISTRICT) 0.833 25,000,000.001. Jct Dumalinao-Margosatubig Rd -
K1700+850 - K1701+6780.833 25,000,000.00
2. Zamboanga Sibugay 1st DEO 0.500 15,000,000.00a. ZAMBOANGA SIBUGAY (FIRST DISTRICT) 0.500 15,000,000.00
1. Diplahan Jct-Malangas Port Rd - K1749+928 - K1750+421
0.500 15,000,000.00
details of dpwh’s programs/projects 803
m. Region X 0.500 15,000,000.001. Misamis Occidental 1st DEO 0.500 15,000,000.00
a. MISAMIS OCCIDENTAL (FIRST DISTRICT) 0.500 15,000,000.001. Plaridel Old Route -
Chainage 155 - Chainage 6550.500 15,000,000.00
n. Region XI 3.186 95,580,000.001. Compostela Valley DEO 0.667 20,000,000.00
a. COMPOSTELA VALLEY (SECOND DISTRICT) 0.667 20,000,000.001. Nabunturan-Mainit Park Rd -
K1434+1008 - K1435+6490.667 20,000,000.00
2. Davao City 2nd DEO 0.186 5,580,000.00a. DAVAO CITY (THIRD DISTRICT) 0.186 5,580,000.00
1. Davao-Cotabato Old Rd - K1526+301 - K1526+487
0.186 5,580,000.00
3. Davao City DEO 1.333 40,000,000.00a. DAVAO CITY (FIRST DISTRICT) 1.333 40,000,000.00
1. Davao-Cotabato Old Rd - K1520+ -404 - K1520+ -382, K1521+648 - K1521+658, K1521+783 - K1521+1812, K1521+1830 - K1523+098
1.333 40,000,000.00
4. Davao Oriental 2nd DEO 1.000 30,000,000.00a. DAVAO ORIENTAL (SECOND DISTRICT) 1.000 30,000,000.00
1. Mati-Diversion Rd - K1714+410 - K1714+800, K1715+390 - K1715+760, K1716+420 - K1716+660
1.000 30,000,000.00
o. Region XII 0.667 20,000,000.001. Cotabato 1st DEO 0.667 20,000,000.00
a. COTABATO (SECOND DISTRICT) 0.667 20,000,000.001. Kidapawan-Calunusan-Mlang Rd -
K1617+-246 - K1617+4210.667 20,000,000.00
p. Region XIII 0.500 15,000,000.001. Butuan City DEO 0.500 15,000,000.00
a. AGUSAN DEL NORTE (FIRST DISTRICT) 0.500 15,000,000.001. Butuan City-Malaybalay Rd -
Chainage 0 - Chainage 5000.500 15,000,000.00
804 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)
B. Construction of By-Passes/ Diversion Roads, incl. ROW 12,116,335,000
I. Central Office 8,572,457,000
a. Region I 881,000,0001. Laoag City Bypass Road, incl. Bridge, Laoag City, 391,000,000
Ilocos Norte 1st LD2. Candon City Bypass Road, incl. Bridge, Candon City, 200,000,000
Ilocos Sur 2nd LD3. Urdaneta City Bypass Road, incl. Bridge, Urdaneta City, 290,000,000
Pangasinan 5th LD
b. Region III 310,000,0001. Pulilan-Baliuag Diversion Road, incl. ROW, Pulilan,
Bulacan 2nd LD 310,000,000
c. Region IV-A 692,035,0001. Tayabas Bypass Road, incl. Bridge and ROW, Tayabas City, 200,000,000
Quezon Province, Quezon 1st LD2. Sariaya By-pass, incl. Bridge and ROW, Sariaya, 300,000,000
Quezon 2nd LD3. Jct. Batasan-San Mateo-Rodriguez By-pass Link Road, 192,035,000
incl. Bridge, Slope Protection and ROW, Phase II, III & IV, Rizal 2nd LD
d. Region V 480,000,0001. Camarines Sur/Albay Diversion Road, Albay 3rd LD 200,000,000 2. Sorsogon City Coastal Bypass Road, Sorsogon 1st LD 280,000,000
e. Region VI 250,000,0001. Kalibo Circumferential Road from Calangcang to Mina, 250,000,000
incl. Bridge, Aklan LD
f. Region VIII 192,488,0001. Tacloban City Bypass Road, incl. ROW, Tacloban City, 192,488,000
Leyte 1st LD
g. Region IX 712,800,0001. Zamboanga By-pass Road, Zamboanga City (Culianan- 300,000,000
Patalon Section), Patalon Section, Zamboanga City 1st LD2. Vitali-Sibulao Bypass Road (Alternate Road of N1), 250,000,000
Zamboanga City 1st LD3. Diversion Road Phase - I : Juncntion Nat'l Highway @ Brgy. 162,800,000
Pangi - Guitoan - Taway - Sucleme - JCT. Nat'l Highway @ Brgy. Tiayon, Zamboanga Sibugay 2nd LD
h. Region X 1,364,626,0001. Malaybalay By-pass Road, incl. Bridge and ROW, 374,626,000
Bukidnon 2nd LD2. Kadingilan-Bukidnon/North Cotabato By-Pass Road, 200,000,000
incl. Bridge and ROW, Kadingilan and Damulog, Bukidnon 3rd LD
3. Opol Diversion Road (Opol-Canitoan), incl. Bridge and ROW, 200,000,000 Cagayan De Oro City 1st LD
4. Cagayan de Oro Coastal Road, Cagayan de Oro City 2nd LD 200,000,000 5. Valencia By-pass Road, Bukidnon 4th 190,000,000 6. Valencia City Pangantucan Diversion Road, incl. Bridge 200,000,000
and ROW, Bukidnon 4th LD
i. Region XI 183,085,0001. Davao City Bypass, Davao City 1st LD 183,085,000
j. Region XIII 612,000,0001. NRJ Daang Maharlika (Taguibo-Section)-Masao Port, incl.
Bridge, Agusan del Norte 1st LD 612,000,000
k. Regionwide 2,601,923,0001. Misamis Oriental-Bukidnon- By-pass Road, incl. ROW, 302,350,000
PHIVIDEC-ALAE Section, Region X2. CDO-New Western Diversion Road (Canitoan CDO Coastal 200,000,000
Road), Region X
PROGRAMS / ACTIVITIES / PROJECTS
details of dpwh’s programs/projects 805
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
3. Cagayan de Oro Diversion Road 360,000,000 (Jct. Balubal Sayre Highway-Pueblo de Oro, CDO-Old Airport Road Diversion Road (Pueblo de Oro/Jct. CDO-Old Airport Road) Phase II, incl. Bridge and ROW.Region X
4. Sayre Highway By Pass Road, incl. ROW, 250,000,000 Carmen Puerto Section (Climbing Lanes), Region X
5. Eastern Interior Road Section (Jct. BCIR /Sayre Highway 250,000,000 Brgy Gusa) incl. Bridge, Region X
6. Davao City Diversion Road Extension to Toril, Bangkal- 264,573,000 Talomo-Puan Section, Davao City, (Jct. Dvo. City Diversion Road - Jct. Dvo. Bukidnon Road and Jct. Dvo. BukidnonRoad-Jct. - Dvo. Cotabato Old Rd Sections), incl. Bridge and ROW, Region XI
7. Daang Maharlika (Alternate Route) (NRJ - Mayor Democrito 975,000,000 D. Plaza II Avenue - Las Nieves - Sibagat), Region XIII
l. Nationwide 292,500,0001. Construction of By-Passes/ Diversion Roads, incl. ROW, 292,500,000
Nationwide
II. Regional Office 3,222,878,000
a. Region I 85,000,0001. Alaminos-Bani By-pass Road, Pangasinan 1st LD 85,000,000
b. Region II 259,368,0001. Santiago Bypass Road, Isabela 4th LD 59,368,000 2. Bambang Bypass Road, Nueva Vizcaya LD 100,000,000 3. Bayombong-Solano Bypass Road, Nueva Vizcaya LD 100,000,000
c. Region IV-A 750,000,0001. Lucban Diversion Road, incl. ROW, Quezon 1st LD 150,000,000 2. Lopez By-pass Road, incl. ROW, Lopez, Quezon 4th LD 150,000,000 3. Gumaca Bypass Road, incl. ROW, Gumaca, Quezon 4th LD 150,000,000 4. Malagasang-Bucandala-Alapan Road, Cavite 3rd LD 150,000,000 5. Alaminos-San Pablo City Bypass, Laguna 3rd LD 150,000,000
d. Region VI 250,000,0001. Dumalag-Pinamalatican-Mambusao, Capiz 2nd LD 100,000,000 2. New Bacolod Economic Highway, Bacolod City LD 150,000,000
e. Region VII 81,000,0001. Metro Dumaguete Diversion Road, incl. ROW, 81,000,000
Dumaguete - Sibulan Road, Negros Oriental 2nd LD
f. Region VIII 178,200,0001. Palo West Bypass Road, incl. Bridge, Pawing-Campetic- 88,200,000
Guindapunan-San Jose-Arado, Palo, Leyte 1st LD2. Basey-Maydolong Road, Samar 2nd LD 90,000,000
g. Region IX 291,000,0001. Airport-Turno-Sinaman By-pass Road, Zamboanga 141,000,000
del Norte 2nd LD2. Jct. Nat'l Highway R.T. Lim - Jct. Nat'l Highway Siocon Road 150,000,000
(Surabay-San Fernandino), Zamboanga Sibugay 2nd LD
h. Region X 789,410,0001. Sayre Highway By-Pass Road (Climbing Lanes), Maluko 100,000,000
Section, Manolo Fortich, Bukidnon 1st LD2. Mangima Agusan Canyon Bypass, incl. ROW, 90,000,000
Bukidnon 1st LD3. Cagayan de Oro Coastal Road, (Bypass Road) incl. Slope 149,410,000
Protection and ROW, Cagayan de Oro City LD4. Iligan City Circumferential Road, Phase II incl. ROW, 60,000,000
Iligan City LD5. Ozamis City-Clarin Interior By-pass Airport Link (OCCIBAL) 110,000,000
Ozamis city, Misamis Occidental 2nd LD6. Ozamis City Coastal By-pass Road, Misamis 120,000,000
Occidental 2nd LD7. Tudela Bypass Road, incl. ROW, Tudela, Misamis 90,000,000
Occidental 2nd LD8. Claveria-Balingoan By-Pass Road, incl. Bridge and ROW, 70,000,000
Misamis Oriental 2nd LD
i. Region XI 255,000,000
806 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
1. Mati-tarragona Bypass (Tagabakid-Lucatan Rd), 150,000,000 Davao Oriental 1st LD
2. Mati-Tarragano Bypass Road (Lucatan-Tagabakid), 105,000,000 incl. ROW, Davao Oriental 2nd LD
j. Region XIII 283,900,0001. Butuan City By-Pass Road, (Bonbon-Bancasi Airport Section 133,900,000
and Lemon-NRJ-Antongalon Section), Agusan Del Norte 1st LD
2. NRJ SDCR- San Isidro- Quezon Tandag Airport Bypass Road, 150,000,000 incl. Bridge, Surigao del Sur 1st LD
III. District Engineering Office 321,000,000
a. Region I 45,000,000a. Pangasinan 3rd DEO 45,000,000
1. Villasis By-pass Road, Pangasinan 5th LD 45,000,000
b. Region III 49,000,000a. Zambales 2nd DEO 49,000,000
1. Subic Bypass, incl. Bridge, Zambales 1st LD 49,000,000
c. Region VII 94,000,000a. Negros Oriental 3rd DEO 45,000,000
1. Metro Dumaguete Diversion Road, Dumaguete - 45,000,000 Sibulan Road, Negros Oriental 3rd LD
b. Cebu 2nd DEO 49,000,0001. Carcar Bypass Road, incl. ROW, Cebu 1st LD 49,000,000
4. Region VIII 88,000,000a. Leyte 5th DEO 45,000,000
1. Baybay City Diversion Road, incl. Slope Protection, 45,000,000 Baybay City, Leyte 5th LD
b. Biliran DEO 43,000,0001. Biliran Diversion Road, incl. Slope Protection and ROW, 43,000,000
Biliran LD
5. Region XI 45,000,000a. Davao Oriental 2nd DEO 45,000,000
1. Mati Diversion Road, Davao Oriental 2nd LD 45,000,000
details of dpwh’s programs/projects 807
AMOUNT (Php)
C. Construction of Missing Gaps connecting National Roads, incl. ROW 13,326,065,000
I. Central Office 10,923,065,000
a. Region I 280,000,0001. 280,000,000
b. Region III 200,000,0001. Capas-Botolan Rd (Zambales Section), Zambales 2nd LD 200,000,000
c. Region IV-A 316,118,0001. 154,118,000
2. 162,000,000
d. Region IV-B 250,000,0001. 250,000,000
e. Region VIII 200,000,0001. 200,000,000
f. Region IX 324,000,0001. 324,000,000
g. Region X 200,000,0001. Puntian-Arakan Road, incl. Bridge, Bukidnon 3rd LD 200,000,000
h. Region XIII 200,000,0001. 200,000,000
i. Regionwide 8,660,447,0001. 360,000,000
2. 400,000,000
3. 420,000,000
4. 560,956,000
5. 429,444,000
6. Completion of the East-West lateral road connecting 402,051,000 Agusan Del Sur to Bukidnon Jct CDO City Camp Kibaritan Dominorog Road to Jct Manolo Fortich Libona Indahag Road (Talakag-Baungon Section ) incl. Bridge and ROW,Region X
7. Completion of the East-West lateral road connecting 324,862,000 Agusan Del Sur to Bukidnon Jct CDO City Camp Kibaritan Dominorog Road to Jct Manolo Fortich Libona Indahag Road (Baungon-Libona Section ), incl. Bridge and ROW,Region X
8. 739,879,000
9. Mawab-Maragusan-Caraga Road, incl. Bridge, 946,997,000 Compostella Valley, Region XI
10. Mawab-Maragusan-Caraga Road, incl. Bridge, Region XI 421,878,000 Davao Oriental, Region XI
11. Matanao-Kiblawan-Padada Road incl. Bridge, Region XI 323,433,000 12. 583,734,000
13. Datu Paglas-Columbio-Matanao Road, Region XII 274,358,000 14. Surallah-Lake Sebu-Maitum Road, Region XII 216,628,000 15. 578,687,000
Butuan City-Pianing-Tandag Rd (Brgy Kolambogan, Sibagat-Brgy Sn Juan, Bayugan), Agusan del Sur 1st LD
Bacon-Manito Road, incl. Bridge, Albay and Sorsogon Section, Region VMalaybalay-Gingoog Road (Gingoog City - Kalhaan, Claveria - Bulunay - Malaybalay City), Region XBukidnon-Davao (Jct. Sinuda-Kalaganhan, San Fernando), incl. Bridge, Region XCompletion of the East-West lateral road connecting Agusan Del Sur to Bukidnon, Damay-Calabugao-Adtolawon Road, incl. Bridge and ROW, Region X
PROGRAMS / ACTIVITIES / PROJECTS
Pangasinan-Nueva Vizcaya Rd, incl. Bridge and ROW, Pangasinan 6th LD
San Francisco-San Narciso Rd (San Francisco-San Andres-San Narciso Road), incl. Bridge, Quezon 3rd LDGeneral Aguinaldo-Magallanes-Nasugbu Road (East-West Road), incl. Bridge, Nasugbo Section, Batangas 1st LD
Mindoro Island Circumferential Road, Abra de Ilog-Puerto Galera, Mindoro Occidental LD
Arteche, Brgy. Catumsan-Jipapad-Las Navas-Catubig-Rawis Road, Northern Samar 2nd LD
Zamboanga Del Sur Coastal Road, Zamboanga Del Sur 2nd
Completion of the East-West lateral road connecting Agusan Del Sur to Bukidnon, Cabanglasan-Bukidnon Bdry (Brgy. Makilos) incl. Bridge, Region X
Impasug-ong Brdy. Bukidnon (Siloo)-Misamis Oriental (Urika) incl. Bridge and ROW, Region X
Surallah-T'boli-San Jose Road (Gen.Santos City), incl. Bridge, Region XII
Completion of the East-West lateral road connecting Agusan Del Sur to Bukidnon San Miguel Proper (Surigao del Sur) - Calaitan (Bayugan), incl. Bridge, Region XIII
808 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAMS / ACTIVITIES / PROJECTS
16. 164,443,000
17. 378,108,000
18. 494,000,000
Region XIII19. 100,000,000
20. 170,775,000 Region XIII
21. 370,214,000
j. Nationwide 292,500,0001. 292,500,000
II. Regional Office 2,150,000,000
a. National Capital Region 75,000,0001. Marcos-Alvares Rd, Las Piñas side, Las Piñas City LD 75,000,000
b. Region I 50,000,0001. San Fernando-Bagulin Rd, La Union 2nd LD 50,000,000
c. Region III 250,000,0001. Sta Cruz-Mangatarem Road, Zambales 2nd LD 150,000,000 2. Capas-Botolan Rd (Tarlac Section), Tarlac 2nd LD 100,000,000
d. Region IV-A 300,000,0001. 100,000,000
2. 100,000,000
3. 100,000,000
e. Region VII 100,000,0001. 100,000,000
f. Region VIII 100,000,0001. 100,000,000
g. Region IX 150,000,0001. 150,000,000
h. Region X 825,000,0001. 100,000,000
2. 125,000,000
3. 150,000,000
4. 150,000,000
5. 150,000,000
6. 150,000,000
i. Region XII 150,000,0001. Puntian-Arakan Road, incl. Bridge, North Cotabato 2nd LD 150,000,000
Completion of the East-West lateral road connecting Agusan Del Sur to Bukidnon, Bilay - Dulag Section, incl. Bridge, Region XIIIEsperanza (Crossing Luna) - San Luis Section, incl. Bridge,
Bukidnon-Misamis Oriental Road, incl. Bridge and ROW, Agusan del Norte, Misamis Oriental 2nd LDBonifacio-Don Victoriano Road, incl. Bridge, Misamis Occidental 2nd
Bdry.Bukidnon/Agusan Del Norte, Buenavista (Brgy. Sangay-Lawan-Lawan), incl. Bridge, Region XIII
Completion of the East-West lateral road connecting Agusan Del Sur to Bukidnon Sampaguita-Makilos(Agusan del Sur/Bukidnon Boundary), incl. Bridge, Region XIIICompletion of the East-West lateral road connecting Agusan Del Sur to Bukidnon Agusan - Malaybalay Road, Hawilian-Salug-Sinakungan-ADS/Bukidnon Bdry, incl. Bridge, Region XIII
Completion of the East-West lateral road connecting Agusan Del Sur to Bukidnon, Simbalan - Dulag Section, incl. Bridge,
Jct. Maramag-Marandugao Road-Jct. Lampanusan Road, incl. Bridge and ROW, Maramag, Bukidnon 4th LD
Construction of Missing Gaps connecting National Roads, incl. ROW, Nationwide
General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Gen Indang-Silang Section, Cavite 5th LDGeneral Aguinaldo-Magallanes-Nasugbu Road (East-West Road), incl. Bridge and ROW, Gen Amadeo Section, Cavite 6th LDGeneral Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Magallanes-Gen Aguinaldo-Maragondon-Indan Section, Cavite 7th LD
Dalaguete-Mantalongon-Badian Rd, Brgy. Ablayan to Brgy. Dobdob Section, incl. Slope Protection, Cebu 4th LD
Arteche, Brgy. Catumsan-Jipapad-Las Navas-Catubig-Rawis Road, Eastern Samar LD
Sindangan-Bayog-Lakewood Road (Talinga-Dagohoy-Tinaplan-Titik) Zamboanga Del Norte 2nd LD
Lanao del Norte Interior Circumferential Road (LDNICR), incl. ROW, Salvador-Sapad-Nunungan-SND Section, Lanao del Norte 2nd LDSta Felomina-Bonbonon-Digkilaan-Rogongon Road, incl. ROW, Iligan City LD
Tagoloan-Misamis Oriental Boundary, incl. Bridge, Misamis Oriental 2nd LD
details of dpwh’s programs/projects 809
AMOUNT (Php) PROGRAMS / ACTIVITIES / PROJECTS
j. Regionwide 150,000,0001. 150,000,000
III. District Engineering Office 253,000,000
a. Cordillera Administrative Region 98,000,0001. Apayao 1st DEO 49,000,000
1. 49,000,000
2. Apayao 2nd DEO 49,000,0001. 49,000,000
b. Region IV-B 59,000,0001. Mindoro Oriental DEO 30,000,000
1. 30,000,000
2. Romblon DEO 29,000,0001. 29,000,000
c. Region VIII 96,000,0001. Leyte 2nd DEO 48,000,000
1. Burauen-Albuera Road, Leyte 2nd LD 48,000,000 2. Southern Leyte DEO 48,000,000
1. 48,000,000 Liloan-San Ricardo Road, Brgy. San-Ok - Brgy. Manglit Road Section (Saddle Area), incl. Slope Protection, Pintuyan, Southern Leyte LD
Cotabato City Circumferential Rd (Western Sect), incl. Bridge, Manakulil-Miwaray Section
Apayao-Ilocos Norte Rd (Kabugao, Apayao-Solsona, Ilocos Norte Road), Apayao 1st DEO, LD
Apayao-Ilocos Norte Rd (Kabugao, Apayao-Solsona, Ilocos Norte Road), Apayao 2nd DEO, LD
Mindoro Island Circumferential Road, Abra de Ilog-Puerto Galera, Mindoro Oriental 1st LD
Sibuyan Circumferential Road Azagra Section, Romblon LD
810 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)
D. Construction of Flyovers/ Interchanges/ Underpasses 2,365,000,000
I. Central Office 2,365,000,000
a. National Capital Region 100,000,0001. 100,000,000
b. Region IV-A 560,000,0001. 240,000,000
2. Flyover at Aguinaldo-Daang Hari Intersection, 320,000,000 Cavite 3rd LD
c. Region VI 35,000,0001. Araneta-Magsaysay Flyover, Bacolod City 35,000,000
d. Region VII 1,000,000,0001. 500,000,000
2. 500,000,000
e. Regionwide 660,000,0001. 200,000,000
2. 100,000,000
3. 360,000,000
f. Nationwide 10,000,0001. Construction of Flyovers/ Interchanges/ Underpasses, 10,000,000
C-5 Kalayaan and C-5 Bagong Ilog Fly-over, Pasig City Lone District
Bonifacio Global City to Ortigas Center Link Road Project, Phase IIA (Lawton Ave-Bonifacio Global City Viaduct), Makati CityC-2 (Gov. Forbes) St./ R-7 (España St.) Interchange Project, Manila City
PROGRAMS / ACTIVITIES / PROJECTS
C-5 Katipunan Avenue- C.P. Garcia Aveneue Intersection Flyover
Flyover at Molino-Daang Hari Road Intersection, Cavite 2nd LD
Depressed Structures and Intersection of N. Bacalso and F. Llamas and Intersection Mambaling Road and Cebu Coastal Road, Cebu CityDepressed Structures at Intersection of UN Avenue and Plaridel Road, Mandaue City
details of dpwh’s programs/projects 811
E. Off-Carriageway Improvement including drainage 642.955 8,735,273,000
1. Primary Roads 148.746 1,905,557,000
I. Central Office 3,500,000
a. Nationwide 3,500,0001. Central Office 3,500,000
a. NATIONWIDE 3,500,0001. Off-Carriageway 3,500,000
II. Regional Office 148.746 1,902,057,000
a. Region I 16.225 159,422,0001. Ilocos Norte 2nd District Engineering Office 6.149 60,424,000
a. ILOCOS NORTE 2ND 6.149 60,424,0001. Manila North Rd -
K0452+409 - K0456+464, K0458+820 - K0459+481, K0466+000 - K0467+387
6.149 60,424,000
2. Pangasinan 2nd District Engineering Office 5.389 52,948,000a. PANGASINAN 2ND 3.100 30,464,000
1. Pangasinan-Zambales Rd - K0368+700 - K0371+328, K0372+820 - K0373+329
3.100 30,464,000
b. PANGASINAN 4TH 2.289 22,484,0001. Pangasinan-La Union Inter-Provl Rd -
K0391+912 - K0393+342, K0393+912 - K0394+276, K0398+700 - K0399+199
2.289 22,484,000
3. Pangasinan 3rd District Engineering Office 4.687 46,050,000a. PANGASINAN 5TH 4.687 46,050,000
1. Manila North Rd - K0181+000 - K0181+560, K0182+416 - K0183+490, K0199+950 - K0201+477, K0204+050 - K0205+548
4.687 46,050,000
b. Region II 2.522 24,780,0001. Isabela 2nd District Engineering Office 2.522 24,780,000
a. ISABELA 2ND 2.522 24,780,0001. Santiago-Tuguegarao Rd -
K0387+092 - K0388+356, K0390+445 - K0391+7112.522 24,780,000
c. Region III 26.527 271,562,0001. Nueva Ecija 1st District Engineering Office 23.057 226,562,000
a. NUEVA ECIJA 2ND 23.057 226,562,0001. Daang Maharlika (LZ) -
K0174+726 - K0180+262, K0183+700 - K0191+36213.077 128,500,000
2. Daang Maharlika (LZ) - K0194+000 - K0201+344
7.333 72,057,000
3. Sn Jose-Lupao Rd - K0173+100 - K0175+764
2.647 26,005,000
2. Nueva Ecija 2nd District Engineering Office 3.470 45,000,000a. NUEVA ECIJA 4TH 3.470 45,000,000
1. Gapan-Sn Fernando-Olongapo Rd - K0099+700 - K0103+200
3.470 45,000,000
d. Region IV-A 27.653 707,675,0001. Laguna 2nd District Engineering Office 11.401 306,000,000
a. LAGUNA 1ST 3.761 105,000,0001. Manila South Rd -
K0029+833 - K0031+718, K0032+000 - K0033+8183.761 105,000,000
b. LAGUNA 2ND 7.640 201,000,0001. Calamba-Sta Cruz-Famy Jct Rd -
K0054+450 - K0056+217, K0061+593 - K0065+5305.849 150,000,000
2. Manila South Rd - K0049+300 - K0050+1025
1.791 51,000,000
2. Laguna 3rd District Engineering Office 8.756 200,000,000a. LAGUNA 3RD 8.756 200,000,000
1. Calamba-Sta Cruz-Famy Jct Rd - K0069+-422 - K0070+654
2.000 50,000,000
2. Daang Maharlika (LZ) - K0083+380 - K0085+648
2.000 50,000,000
3. Maspang H-way - K0070+-910 - K0071+840
2.756 50,000,000
4. Sn Pablo-Calauan Rd - K0073+-498 - K0074+752
2.000 50,000,000
3. Quezon 2nd District Engineering Office 3.125 78,125,000a. QUEZON 2ND 3.125 78,125,000
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
812 eXpeNditUre program fY 2016 VolUme ii
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
1. Daang Maharlika (LZ) - K0092+-524 - K0093+929, K0105+3101 - K0105+3725
3.125 78,125,000
4. Rizal 1st District Engineering Office 4.371 123,550,000a. ANTIPOLO CITY 1ST 3.913 110,750,000
1. Sumulong Highway - K0022+-334 - K0022+429, K0022+-105 - K0022+279, K0022+500 - K0023+151, K0024+300 - K0024+694, K0025+100 - K0025+440, K0026+000 - K0026+347, K0027+180 - K0027+780, K0027+800 - K0028+414
3.913 110,750,000
b. RIZAL 1ST 0.458 12,800,0001. Cainta-Kayticling-Antipolo-Teresa-Morong Rd -
K0021+940 - K0022+3860.458 12,800,000
e. Region V 26.480 259,512,000
1. Regional Office V - Proper 20.423 200,000,000a. REGIONWIDE V 20.423 200,000,000
1. Daang Maharlika (LZ) - K0542+000 - K0543+14, K0544+800 - K0545+832, K0546+500 - K0548+518, K0550+200 - K0551+218, K0556+000 - K0557+150, K0560+100 - K0561+118, K0562+500 - K0563+518, K0567+800 - K0569+432
9.883 100,000,000
2. Daang Maharlika (LZ) - K0570+000 - K0571+180, K0571+400 - K0572+414, K0572+500 - K0573+519, K0574+500 - K0575+517, K0576+900 - K0578+819, K0583+250 - K0584+262, K0584+900 - K0585+923, K0588+000 - K0589+190, K0590+000 - K0591+160
10.540 100,000,000
2. Sorsogon 2nd District Engineering Office 6.057 59,512,000a. SORSOGON 2ND 6.057 59,512,000
1. Daang Maharlika (LZ) - K0624+979 - K0627+440, K0628+000 - K0630+850, K0636+047 - K0636+806
6.057 59,512,000
f. Region VII 10.889 107,000,0001. Cebu City District Engineering Office 10.177 100,000,000
a. CEBU CITY IST 10.177 100,000,0001. Cebu North Rd -
K0002+129 - K0002+12910.177 100,000,000
2. Negros Oriental 2nd District Engineering Office 0.712 7,000,000a. NEGROS ORIENTAL 2ND 0.712 7,000,000
1. Bais-Kabankalan Rd - K0085+600 - K0086+318
0.712 7,000,000
g. Region VIII 28.442 275,506,0001. Leyte 1st District Engineering Office 2.206 19,912,000
a. LEYTE 1ST 2.206 19,912,0001. Daang Maharlika (LT) -
K0916+1011 - K0919+2002.206 19,912,000
2. Leyte 2nd District Engineering Office 12.243 119,069,000a. LEYTE 2ND 12.243 119,069,000
1. Palo-Carigara-Ormoc Rd - K0975+000 - K0976+140, K0979+000 - K0980+372, K0940+065 - K0945+188, K0949+855 - K0952+896, K0953+416 - K0955+569
12.243 119,069,000
3. Leyte 4th District Engineering Office 3.445 33,845,000a. LEYTE 4TH 3.445 33,845,000
1. Ormoc-Baybay-Southern Leyte Bdry Rd - K1012+510 - K1012+888, K1023+000 - K1024+197
1.531 15,043,000
2. Palo-Carigara-Ormoc Rd - K0984+-423 - K0984+401, K1001+000 - K1001+784, K1002+000 - K1002+208, K1005+002 - K1005+100
1.914 18,802,000
4. Leyte 5th District Engineering Office 5.561 53,680,000a. LEYTE 5TH 5.561 53,680,000
1. Daang Maharlika (LT) - K0967+700 - K0968+616, K0977+000 - K0977+997, K0984+000 - K0984+234, K0992+000 - K0993+110, K1002+700 - K1003+502
4.136 39,680,000
2. Ormoc-Baybay-Southern Leyte Bdry Rd - K1045+700 - K1046+674
0.926 9,100,000
3. Tacloban-Baybay South Rd - K0985+900 - K0986+461
0.499 4,900,000
5. Samar 2nd District Engineering Office 4.987 49,000,000a. SAMAR 2ND 4.987 49,000,000
details of dpwh’s programs/projects 813
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
1. Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0821+229 - K0826+140
4.987 49,000,000
h. Region XI 0.333 1,000,0001. Compostela Valley District Engineering Office 0.333 1,000,000
a. COMPOSTELLA VALLEY IST 0.333 1,000,0001. Daang Maharlika (MN) -
K1404+500 - K1404+8330.333 1,000,000
i. Region XIII 9.675 95,600,0001. Agusan del Sur 2nd District Engineering Office 9.575 93,100,000
a. AGUSAN DEL SUR 2ND 9.575 93,100,0001. Daang Maharlika (Agusan-Davao Sect) -
K1323+000 - K1323+603, K1324+348 - K1326+96, K1336+000 - K1342+554, K1354+500 - K1355+170
9.575 93,100,000
2. Surigao del Norte 1st District Engineering Office 0.100 2,500,000a. SURIGAO DEL NORTE 2ND 0.100 2,500,000
1. Daang Maharlika (Surigao-Agusan Sect) - K1146+144 - K1146+244
0.100 2,500,000
2. Secondary Roads 285.027 4,024,149,000
1. Central Office - 3,500,000
a. Nationwide 3,500,0001. Central Office - 3,500,000
a. NATIONWIDE 3,500,0001. Off-Carriageway 3,500,000
2. Regional Office 87.625 1,295,698,000
a. Region III 12.636 256,085,0001. Tarlac 1st District Engineering Office 12.636 256,085,000
a. TARLAC 1ST 12.636 256,085,0001. Paniqui-Camiling-Wawa Rd -
K0147+622 - K0148+938, K0148+957 - K0150+663, K0150+849 - K0151+533, K0152+866 - K0153+601, K0154+471 - K0155+259, K0156+241 - K0157+650, K0158+002 - K0158+625
7.234 127,957,000
2. Paniqui-Camiling-Wawa Rd - K0159+855 - K0161+354, K0163+021 - K0163+915, K0167+000 - K0167+745, K0168+602 - K0170+195, K0170+232 - K0170+1014
5.402 128,128,000
b. Region IV-A 12.564 320,720,0001. Batangas 4th District Engineering Office 4.842 138,600,000
a. BATANGAS 4TH 4.842 138,600,0001. Banay-Banay-Mojon-Cuenca Rd -
K0086+-452 - K0087+4181.871 64,710,000
2. Batangas-Quezon Rd - K0115+200 - K0116+815, K0119+770 - K0121+134
2.971 73,890,000
2. Quezon 2nd District Engineering Office 4.566 94,000,000a. QUEZON 2ND 4.566 94,000,000
1. MSR Old Route - K0132+862 - K0135+560, K0127+1560.47 - K0130+445
4.566 94,000,000
3. Rizal 1st District Engineering Office 3.156 88,120,000a. RIZAL 1ST 3.156 88,120,000
1. Manila East Rd - K0018+-244 - K0018+401, K0024+700 - K0025+155, K0029+400 - K0030+185, K0031+642 - K0032+326, K0036+300 - K0036+1007
3.156 88,120,000
c. Region IV-B 10.286 139,668,0001. Marinduque District Engineering Office 4.020 72,870,000
a. MARINDUQUE LONE 4.020 72,870,0001. Marinduque Circumferential Rd -
K0000+000 - K0000+516, K0014+100 - K0014+436, K0030+000 - K0030+430, K0030+500 - K0030+627, K0035+020 - K0035+356, K0046+200 - K0046+536, K0049+300 - K0049+453, K0058+773 - K0059+438, K0094+100 - K0094+436, K0106+800 - K0107+145, K0109+000 - K0109+336, K0113+150 - K0113+268
4.020 72,870,000
814 eXpeNditUre program fY 2016 VolUme ii
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
2. Southern Mindoro District Engineering Office 6.266 66,798,000a. MINDORO ORIENTAL 2ND 6.266 66,798,000
1. Calapan South Rd - K0125+650 - K0126+190, K0129+890 - K0130+110, K0140+000 - K0140+400, K0140+650 - K0140+816, K0143+200 - K0143+658, K0145+450 - K0145+683, K0147+367 - K0147+977, K0148+415 - K0149+401, K0157+970 - K0158+464, K0163+672 - K0164+479, K0171+240 - K0171+456, K0180+240 - K0181+339
6.266 66,798,000
d. Region V 7.522 73,912,0001. Sorsogon 2nd District Engineering Office 7.522 73,912,000
a. SORSOGON 2ND 7.522 73,912,0001. Gate-Bulan Airport Rd -
K0629+-487 - K0630+171, K0633+000 - K0637+874, K0642+679 - K0643+727
7.522 73,912,000
e. Region VII 22.871 295,493,0001. Bohol 1st District Engineering Office 2.203 62,000,000
a. BOHOL 1ST 2.203 62,000,0001. Tagbilaran East Rd (Tagbilaran-Jagna) -
K0248+000 - K0248+412, K0248+950 - K0249+696, K0253+000 - K0253+215, K0253+880 - K0254+701
2.203 62,000,000
2. Bohol 2nd District Engineering Office 7.934 73,493,000a. BOHOL 2ND 7.934 73,493,000
2. Tagbilaran North Rd (Tagbilaran-Jetafe Sect) - K0063+000 - K0064+800, k0072+000 - K0073+314, K0074+000 - K0075+374, K0103+800 - K0104+722, K0111+000 - K0112+736, K0116+360 - K0117+214
7.934 73,493,000
3. Bohol 3rd District Engineering Office 12.734 160,000,000a. BOHOL 3RD 12.734 160,000,000
1. Loay Interior Rd - K0164+000 - K0167+000, K0176+879 - K0178+000, K0193+800 - K0195+000
5.404 70,000,000
2. Tagbilaran East Rd (Tagbilaran-Jagna) - K0157+500 - K0158+000, K0164+000 - K0164+1018, K0177+000 - K0178+000, K0184+000 - K0185+000, K0198+378 - K0199+000, K0208+700 - K0209+000, K0215+000 - K0216+000, K0220+000 - K0221+000, K0232+000 - K0233+000
7.330 90,000,000
f. Region VIII 13.820 132,370,0001. Leyte 3rd District Engineering Office 13.820 132,370,000
a. LEYTE 3RD 13.820 132,370,0001. Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd -
K1040+806 - K1047+480, K1048+730 - K1058+35513.820 132,370,000
g. Region X 7.926 77,450,0001. Camiguin District Engineering Office 7.926 77,450,000
a. CAMIGUIN LONE 7.926 77,450,0001. Camiguin Circumferential Rd -
K0001+583 - K0002+351, K0014+356 - K0015+600, K0024+240 - K0024+446, K0037+547 - K0038+422, K0039+000 - K0040+400, K0059+281 - K0062+668
7.926 77,450,000
3. District Engineering Office 197.402 2,724,951,000
a. Region I 0.204 2,000,0001. Ilocos Norte 2nd District Engineering Office 0.204 2,000,000
a. ILOCOS NORTE 2ND 0.204 2,000,0001. Gaang Wharf Rd -
Chainage 0 - Chainage 2040.204 2,000,000
b. Region II 1.602 40,420,0001. Cagayan 2nd District Engineering Office 1.602 40,420,000
a. CAGAYAN 2ND 1.602 40,420,0001. Calog-Pudtol Rd -
K0666+-270 - K0667+3871.602 40,420,000
c. CAR 15.409 149,400,0001. Apayao 1st District Engineering Office 5.577 54,800,000
a. APAYAO LONE 5.577 54,800,0001. Abbut-Conner Rd -
K0549+183 - K0550+5321.425 14,000,000
2. Conner-Kabugao Rd - K0571+576 - K0575+775
4.152 40,800,000
2. Benguet 1st District Engineering Office 4.580 45,000,000
details of dpwh’s programs/projects 815
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
a. BENGUET LONE 4.580 45,000,0001. Benguet-Nueva Vizcaya Rd -
K0298+000 - K0302+4984.580 45,000,000
3. Benguet 2nd District Engineering Office 5.252 49,600,000a. BENGUET LONE 5.252 49,600,000
1. Baguio-Bontoc Rd - K0266+000 - K0270+541, K0319+000 - K0319+672
5.252 49,600,000
d. Region III 14.704 175,810,0001. Nueva Ecija 1st District Engineering Office 5.239 43,165,000
a. NUEVA ECIJA 1ST 5.239 43,165,0001. Nueva Ecija-Pangasinan Rd -
K0142+138 - K0142+637, K0148+567 - K0148+850, K0149+460 - K0150+000, K0155+262 - K0156+610, K0163+952 - K0165+66, K0167+694 - K0168+687, K0169+871 - K0170+330
5.239 43,165,000
2. Nueva Ecija 2nd District Engineering Office 5.295 62,500,000a. NUEVA ECIJA 3RD 5.295 62,500,000
1. Bongabon-Rizal-Aurora Rd - K0145+-975 - K0147+300
3.282 32,250,000
2. Nueva Ecija-Aurora Rd - K0121+600 - K0123+615
2.013 30,250,000
3. Tarlac 1st District Engineering Office 0.284 2,795,000a. TARLAC 1ST 0.284 2,795,000
1. Paniqui Poblacion Rd - K0146+170 - K0146+454
0.284 2,795,000
4. Tarlac 2nd District Engineering Office 0.346 3,400,000a. TARLAC 3RD 0.346 3,400,000
1. Concepcion-Capas Rd - K0109+-321 - K0109+-225, K0112+135 - K0112+385
0.346 3,400,000
5. Zambales 1st District Engineering Office 1.928 18,950,000a. ZAMBALES 2ND 1.928 18,950,000
1. Olongapo-Bugallon Rd - K0170+345 - K0171+186, K0207+365 - K0207+688, K0221+000 - K0221+763
1.928 18,950,000
6. Zambales 2nd District Engineering Office 1.612 45,000,000a. ZAMBALES 1ST 1.612 45,000,000
1. Olongapo-Bugallon Rd - K0146+000 - K0147+610
1.612 45,000,000
e. Region IV-A 30.477 613,019,0001. Batangas 1st District Engineering Office 3.926 100,000,000
a. BATANGAS 1ST 3.926 100,000,0001. Nasugbu-Lian-Calatagan Rd -
K0099+-600 - K0099+4081.008 27,000,000
2. Tagaytay-Nasugbu Rd - K0100+068 - K0101+241
1.168 29,325,000
3. Ternate-Nasugbu Rd - Chainage 4149 - Chainage 5899
1.750 43,675,000
2. Batangas 2nd District Engineering Office 2.445 39,765,000a. BATANGAS 2ND 2.445 39,765,000
1. Batangas-Lobo Rd - K0106+924 - K0108+220
1.176 27,300,000
2. Batangas-Quezon Rd - K0134+-664 - K0134+-275
0.389 3,820,000
3. Batangas-Tabangao-Lobo Rd - K0112+860 - K0113+600
0.755 7,420,000
4. Lobo-Malabrigo-Sn Juan Rd - K0166+474 - K0166+599
0.125 1,225,000
3. Batangas 4th District Engineering Office 0.873 30,204,000a. BATANGAS 4TH 0.873 30,204,000
1. Lipa-Rosario Rd - K0083+574 - K0084+435
0.873 30,204,000
4. Cavite 2nd District Engineering Office 13.995 318,250,000a. CAVITE 5TH 5.248 85,000,000
1. Cavite-Batangas Rd - K0045+-180 - K0045+219, K0045+-219 - K0048+162
3.328 37,000,000
2. Sta Rosa-Ulat-Tagaytay Rd - K0061+-020 - K0062+921
1.920 48,000,000
b. CAVITE 7TH 8.747 233,250,0001. Maragondon-Magallanes-Amuyong Rd -
K0059+000 - K0059+8700.870 28,658,000
2. Naic Jct-Caylabne Rd - K0049+-786 - K0049+-746, K0049+-721 - K0049+374
1.135 31,680,000
3. Noveleta-Naic-Tagaytay Rd - K0069+769 - K0071+760
1.960 48,000,000
816 eXpeNditUre program fY 2016 VolUme ii
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
4. Sta Rosa-Ulat-Tagaytay Rd - K0059+-373 - K0060+207, k0060+207 - K0060+455
1.800 45,000,000
5. Tagaytay-Cavite via Mendez Rd - K0062+-310 - K0062+966
1.276 42,000,000
6. Tanza-Trece Martires City-Indang Rd - K0053+168 - K0054+130
0.966 26,964,000
7. Ternate-Nasugbu Rd - Chainage 2155 - Chainage 2895
0.740 10,948,000
5. Quezon 2nd District Engineering Office 2.920 73,600,000a. QUEZON 2ND 2.920 73,600,000
1. Lucena-Dalahican Port Rd - K0133+806 - K0135+245
1.320 33,000,000
2. Lucena-Tayabas-Mauban Port Rd - K0128+295 - K0129+999
1.600 40,600,000
6. Quezon 4th District Engineering Office 6.318 51,200,000a. QUEZON 4TH 6.318 51,200,000
1. Gumaca-Pitogo-Mulanay-Sn Narciso Rd - K0203+000 - K0204+460
1.432 10,000,000
2. MSR Jct Lopez-Hondagua Port Rd - K0224+714 - K0226+33
1.165 11,450,000
3. MSR Jct-Lopez-Buenavista Rd - K0223+010 - K0226+770
3.721 29,750,000
f. Region IV-B 16.692 293,621,0001. Marinduque District Engineering Office 0.667 18,615,000
a. MARINDUQUE LONE 0.667 18,615,0001. Mogpog-Balanacan Port Rd -
K0008+-1060 - K0008+-3930.667 18,615,000
2. Mindoro Occidental District Engineering Office 3.880 108,324,000a. MINDORO OCCIDENTAL LONE 3.880 108,324,000
1. Mamburao-Airport Rd - K0407+-364 - K0407+259
0.623 17,396,000
2. Mindoro West Coastal Rd - K0233+500 - K0235+284
1.755 49,000,000
3. Sn Jose-Caminawit Port Rd - K0238+000 - K0239+502
1.502 41,928,000
3. Mindoro Oriental District Engineering Office 1.086 30,108,000a. MINDORO ORIENTAL 1ST 1.086 30,108,000
1. Calapan South Rd - K0037+500 - K0038+300, K0040+500 - K0040+769
1.086 30,108,000
4. Palawan 1st District Engineering Office 2.145 49,000,000a. PALAWAN 1ST 2.145 49,000,000
1. Puerto Princesa North Rd - K0090+000 - K0090+600, K0091+100 - K0091+350, K0095+200 - K0096+246, K0103+600 - K0103+961, K0107+600 - K0107+720
2.145 49,000,000
5. Palawan 2nd District Engineering Office 4.072 40,000,000a. PALAWAN 2ND 4.072 40,000,000
1. Puerto Princesa South Rd - K0086+956 - K0087+960, K0090+000 - K0090+1018, K0111+000 - K0112+16, K0161+100 - K0162+107
4.072 40,000,000
6. Romblon District Engineering Office 4.580 45,000,000a. ROMBLON LONE 4.580 45,000,000
1. Tablas Circumferential Rd - K0000+000 - K0004+582
4.580 45,000,000
7. Southern Mindoro District Engineering Office 0.262 2,574,000a. MINDORO ORIENTAL 2ND 0.262 2,574,000
1. Mindoro Oriental/Occidental East Coastal Rd - K0183+450 - K0183+712
0.262 2,574,000
g. Region V 42.004 611,890,0001. Albay 2nd District Engineering Office 6.502 94,740,000
a. ALBAY 2ND 6.502 94,740,0001. DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry -
K0536+282 - K0539+5403.245 49,668,000
2. Legazpi City-Punta de Jesus Rd - K0534+530 - K0537+790
3.257 45,072,000
2. Camarines Sur 3rd District Engineering Office 8.892 147,000,000a. CAMARINES SUR 4TH 8.892 147,000,000
1. Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente - K0483+858 - K0486+760
2.964 49,000,000
2. Pili-Tigaon-Albay Bdry Rd - K0475+040 - K0478+000
2.964 49,000,000
3. Pili-Tigaon-Albay Bdry Rd - K0488+655 - K0491+539
2.964 49,000,000
3. Camarines Sur 4th District Engineering Office 8.613 82,500,000
details of dpwh’s programs/projects 817
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
a. CAMARINES SUR 5TH 8.613 82,500,0001. Baao-Iriga City-Nabua Rd -
K0467+000 - K0468+240, K0468+397 - K0469+120, K0469+200 - K0469+886
2.124 18,750,000
2. Iriga City-Masoli Rd - K0475+400 - K0475+940, K0476+700 - K0477+300, K0477+400 - K0477+800, K0477+890 - K0478+200, K0478+300 - K0479+582
3.079 30,250,000
3. Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0470+-367 - K0471+349, K0476+200 - K0477+615, K0482+481 - K0482+756
3.410 33,500,000
4. Masbate 1st District Engineering Office 6.558 189,650,000a. MASBATE 2ND 6.558 189,650,000
1. Jct Crossing-Mandaon Rd - K0046+-375 - K0046+818
1.193 34,500,000
2. Jct Milagros-Baleno-Lagta Rd - K0025+-119 - K0025+367, K0045+604 - K0046+282
1.141 33,000,000
3. Jct Tawad-Balud Rd - K0028+-708 - K0028+476
1.184 34,250,000
4. Lagta-Crossing Malinta Rd - K0110+978 - K0111+872
0.893 25,825,000
5. Masbate-Cataingan-Placer Rd - K0003+715 - K0003+889, K0003+1316 - K0004+666, K0007+141 - K0007+283
1.258 36,375,000
6. Masbate-Milagros Rd - K0024+000 - K0024+889
0.889 25,700,000
5. Masbate 3rd District Engineering Office 11.439 98,000,000a. MASBATE 1ST 11.439 98,000,000
1. Sn Fernando South Rd - K0002+000 - K0007+359
5.371 49,000,000
2. Sn Fernando North Rd - K0006+200 - K0007+410, K0007+430 - K0008+420, K0008+500 - K0011+917, K0015+000 - K0015+399
6.068 49,000,000
h. Region VII 22.946 253,193,0001. Bohol 1st District Engineering Office 2.276 49,500,000
a. BOHOL 1ST 2.276 49,500,0002. Tagbilaran North Rd (Tagbilaran-Jetafe Sect) -
K0026+000 - K0027+540, K0027+850 - K0028+5602.276 49,500,000
2. Bohol 2nd District Engineering Office 9.975 95,429,000a. BOHOL 2ND 9.975 95,429,000
1. Jct (LIR) Carmen-Sagbayan-Bacani Rd - K0079+000 - K0080+481, K0081+400 - K0082+194
2.274 22,347,000
2. Loay Interior Rd - K0122+079 - K0122+874, K0133+000 - K0133+926, K0140+800 - K0141+491
2.400 23,582,000
3. Tagbilaran East Rd (Tagbilaran-Jagna) - K0128+000 - K0129+324, K0132+320 - K0133+471, K0137+178 - K0137+761, K0147+500 - K0148+162, K0148+900 - K0150+484
5.301 49,500,000
3. Bohol 3rd District Engineering Office 3.519 30,000,000a. BOHOL 3RD 3.519 30,000,000
1. Jct Dat-an-Carmen-Sierra Bullones-Pilar-Alicia Rd - K0069+500 - K0070+000, K0072+000 - K0074+000, K0091+800 - K0091+1818
3.519 30,000,000
4. Cebu 1st District Engineering Office 1.048 29,264,000a. CEBU 4TH 1.048 29,264,000
1. Antonio y De Pio H-way - K0122+639 - K0123+660
1.048 29,264,000
5. Siquijor District Engineering Office 6.128 49,000,000a. SIQUIJOR LONE 6.128 49,000,000
1. Siquijor Circumferential Rd - K0000+000 - K0001+122, K0007+000 - K0008+000, K0020+000 - K0021+001, K0031+000 - K0032+000, K0042+676 - K0043+677, K0063+000 - K0064+036
6.128 49,000,000
i. Region VIII 41.794 451,773,0001. Eastern Samar District Engineering Office 9.872 97,000,000
a. EASTER SAMAR LONE 9.872 97,000,0001. Jct Buenavista-Lawaan-Marabut Rd -
K0979+000 - K0983+9764.987 49,000,000
2. Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0926+000 - K0930+750
4.885 48,000,000
818 eXpeNditUre program fY 2016 VolUme ii
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
2. Leyte 2nd District Engineering Office 2.118 21,020,000a. LEYTE 2ND 2.118 21,020,000
1. Lemon-Leyte-Biliran Rd - K0975+-099 - K0977+000
2.118 21,020,000
3. Leyte 3rd District Engineering Office 8.216 81,230,000a. LEYTE 3RD 8.216 81,230,000
1. Lemon-Leyte-Biliran Rd - K0978+300 - K0983+084
4.808 47,150,000
2. Sambulawan Jct-Calaguise-Calubian Rd - K1003+000 - K1004+703, K1005+-699 - K1006+000
3.408 34,080,000
4. Leyte 4th District Engineering Office 3.205 31,490,000a. LEYTE 4TH 3.205 31,490,000
1. Dayhagan-Salvacion-Coob-Libertad Rd - K1006+000 - K1006+521, K1007+000 - K1007+519, K1008+000 - K1008+520, K1009+000 - K1009+515
2.075 20,390,000
2. Palompon-Isabel-Merida-Ormoc Rd - K1082+374 - K1082+883, K1127+000 - K1127+621
1.130 11,100,000
5. Leyte 5th District Engineering Office 1.242 12,200,000a. LEYTE 5TH 1.242 12,200,000
1. Bato-Bontoc Rd - K1107+400 - K1108+633
1.242 12,200,000
6. Northern Samar 2nd District Engineering Office 3.914 73,833,000a. NORTHERN SAMAR 2ND 3.914 73,833,000
1. Catarman-Laoang Rd - K0778+500 - K0779+444, K0781+990 - K0783+000, K0784+000 - K0785+000
2.967 47,400,000
2. Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0810+500 - K0811+447
0.947 26,433,000
7. Samar 2nd District Engineering Office 3.766 37,000,000a. SAMAR 2ND 3.766 37,000,000
1. Sn Juanico-Basey-Sohoton Rd - K0896+-934 - K0898+874
3.766 37,000,000
8. Southern Leyte District Engineering Office 9.461 98,000,000a. SOUTHERN LEYTE LONE 9.461 98,000,000
1. Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika -K1122+169 - K1122+750, K1148+000 - K1149+1008, K1199+374 - K1201+223
4.474 49,000,000
2. Liloan-S Ricardo Rd - K1056+-896 - K1056+882, K1086+000 - K1089+000, K1095+490 - K1096+195
4.987 49,000,000
j. Region X 4.953 40,000,0001. Misamis Oriental 1st District Engineering Office 1.018 10,000,000
a. MISAMIS ORIENTAL 1ST 1.018 10,000,0001. Gingoog-Claveria-Villanueva Rd -
K1316+020 - K1317+501.018 10,000,000
2. Misamis Oriental 2nd District Engineering Office 3.935 30,000,000a. MISAMIS ORIENTAL 2ND 3.935 30,000,000
1. Gingoog-Claveria-Villanueva Rd - K1367+000 - K1370+980
3.935 30,000,000
k. Region XI 4.083 38,695,0001. Davao City District Engineering Office 1.379 13,550,000
a. DAVAO CITY 2ND 1.379 13,550,0001. Davao City Div Rd -
K1503+280 - K1503+827, K1504+923 - K1505+7451.379 13,550,000
2. Davao del Sur 2nd District Engineering Office 2.704 25,145,000a. DAVAO OCCIDENTAL LONE 2.704 25,145,000
1. Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1604+000 - K1605+160, K1618+200 - K1618+709, K1638+480 - K1638+989, K1666+1046 - K1667+404
2.704 25,145,000
l. Region XIII 2.534 55,130,0001. Dinagat Islands District Engineering Office 0.624 6,130,000
a. DINAGAT ISLANDS LONE 0.624 6,130,0001. Dinagat-Loreto Rd -
K0015+580 - K0016+1980.624 6,130,000
2. Surigao del Norte 1st District Engineering Office 1.910 49,000,000a. SURIGAO DEL NORTE 2ND 1.910 49,000,000
1. Surigao-Davao Coastal Rd - K1147+-910 - K1148+000
1.910 49,000,000
details of dpwh’s programs/projects 819
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
3. Tertiary Roads 209.182 2,805,567,000
I. Central Office 3,000,000
820 eXpeNditUre program fY 2016 VolUme ii
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
a. Nationwide 3,000,0001. Central Office - 3,000,000
a. NATIONWIDE - 3,000,0001. Off-Carriageway 3,000,000
II. Regional Office 59.417 703,072,000a. CAR 9.206 84,500,000
1. Benguet 2nd District Engineering Office 9.206 84,500,000a. BENGUET LONE 9.206 84,500,000
1. Abatan-Mankayan-Cervantes Rd - K0334+000 - K0337+814, K0341+500 - K0346+900
9.206 84,500,000
b. Region IV-A 2.194 69,000,0001. Rizal 2nd District Engineering Office 2.194 69,000,000
a. RIZAL 2ND 2.194 69,000,0001. Marikina-Infanta Rd -
K0039+485 - K0040+222, K0050+000 - K0050+699, K0065+500 - K0066+353
2.194 69,000,000
c. Region V 44.758 458,572,0001. Camarines Sur 2nd District Engineering Office 15.051 163,780,000
a. CAMARINES SUR 3RD 15.051 163,780,0001. Hanawan-Consocep Rd -
K0470+-594 - K0473+326, K0475+576 - K0477+392, K0477+592 - K0478+382
6.745 68,680,000
2. Naga City Bdry-Calabanga-Balongay Rd - K0440+790 - K0443+670, K0448+000 - K0450+810, K0450+087 - K0454+668
8.306 95,100,000
2. Sorsogon 2nd District Engineering Office 29.707 294,792,000a. SORSOGON 2ND 29.707 294,792,000
1. Ariman-Casiguran Rd - K0602+-864 - K0608+532, K0611+093 - K0611+569
7.418 75,784,000
2. Ariman-Jct Bulusan Lake Rd - K0602+-793 - K0602+-691, K0603+700 - K0603+755, K0605+877 - K0606+957, K0608+974 - K0609+479, K0613+350 - K0614+128, K0614+307 - K0616+503, K0617+000 - K0621+500
8.885 87,304,000
3. Bacon-Sawanga-Prieto Diaz Rd - K0612+-249 - K0614+153, K0615+090 - K0617+853, K0618+614 - K0619+578
6.115 60,088,000
4. Juban-Magallanes Rd - K0604+-097 - K0607+334, K0608+000 - K0611+995
7.289 71,616,000
d. Region VII 3.259 91,000,0001. Bohol 1st District Engineering Office 3.259 91,000,000
a. BOHOL 1ST 3.259 91,000,0001. Jct (TNR) Cortes-Balilihan-Catigbian-Macaas Rd -
K0009+-130 - K0010+382, K0020+000 - K0021+7453.259 91,000,000
III. District Engineering Office 149.765 2,099,495,000
a. Region I 1.600 40,000,0001. Pangasinan 3rd District Engineering Office 1.600 40,000,000
a. PANGASINAN 6TH 1.600 40,000,0001. Sn Nicolas-Natividad-Sn Quintin-Umingan-Guimba Rd -
K0220+-382 - K0221+2181.600 40,000,000
b. Region II 11.797 114,001,0001. Batanes District Engineering Office 1.570 11,165,000
a. BATANES LONE 1.570 11,165,0001. Basco-Contracosta Rd -
K0002+516 - K0002+7680.252 2,475,000
2. Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd - K0000+433 - K0001+-262, K0010+260 - K0010+853
1.318 8,690,000
2. Cagayan 2nd District Engineering Office 8.804 86,515,000a. CAGAYAN 2ND 8.804 86,515,000
1. Cagayan-Apayao Rd (Tuao-Rizal Sect) - K0532+100 - K0535+795
3.704 36,400,000
2. Claveria-Diaballo-Luzon-Cagayan Bdry Rd - K0613+-795 - K0615+318
3.248 31,915,000
3. Jct Logac-Lasam-Gagabutan Rd - K0721+650 - K0723+563
1.852 18,200,000
details of dpwh’s programs/projects 821
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
3. Isabela 1st District Engineering Office 0.280 2,750,000a. ISABELA 1ST 0.280 2,750,000
1. Ilagan-Delfin Albano-Mallig Rd - K0400+-998 - K0400+-718
0.280 2,750,000
4. Isabela 2nd District Engineering Office 0.690 6,776,000a. ISABELA 2ND 0.690 6,776,000
1. Gamu-Roxas Rd - K0391+281 - K0391+971
0.690 6,776,000
5. Isabela 3rd District Engineering Office 0.453 6,795,000a. ISABELA 3RD 0.453 6,795,000
1. Alicia-San Mateo Rd - K0351+307 - K0351+760
0.453 6,795,000
c. CAR 8.282 81,380,0001. Benguet 1st District Engineering Office 3.442 33,825,000
a. BENGUET LONE 3.442 33,825,0001. Pico-Lamtang Rd -
K0256+200 - K0259+6733.442 33,825,000
2. Ifugao 2nd District Engineering Office 4.840 47,555,000a. IFUGAO LONE 4.840 47,555,000
1. Banaue-Hungduan-Benguet Bdry Rd - K0343+499 - K0343+683
0.184 1,805,000
2. Jct Potia-Mt Province Bdry Rd - K0432+-765 - K0435+968
4.656 45,750,000
d. Region III 24.249 380,955,0001. Bulacan 2nd District Engineering Office 2.040 20,000,000
a. BULACAN 3RD 2.040 20,000,0001. Eastern Bulacan Rd -
K0073+307 - K0075+3462.040 20,000,000
2. Nueva Ecija 1st District Engineering Office 2.690 26,435,000a. NUEVA ECIJA 2ND 2.690 26,435,000
1. Muñoz-Lupao Rd - K0159+758 - K0162+521
2.690 26,435,000
3. Nueva Ecija 2nd District Engineering Office 6.261 94,000,000a. NUEVA ECIJA 3RD 6.261 94,000,000
1. Bangad-Fort Magsaysay Rd - K0124+000 - K0127+000
2.994 45,000,000
2. Sta Rosa-Fort Magsaysay Rd - K0108+-881 - K0108+-631, K0109+300 - K0112+326
3.267 49,000,000
4. Tarlac 1st District Engineering Office 9.486 193,740,000a. TARLAC 1ST 0.318 3,120,000
1. Paniqui-Ramos Rd - K0148+356 - K0148+674
0.318 3,120,000
b. TARLAC 2ND 9.168 190,620,0001. Capas-San Jose-Mayantoc-Malacampa Rd -
K0121+935 - K0124+9913.057 45,850,000
2. Gerona Poblacion Rd - K0138+-957 - K0138+468
1.425 39,770,000
3. Ramos-Pura Rd - K0156+858 - K0158+111
1.253 35,000,000
4. Tarlac-Maliwalo Rd - K0147+-866 - K0148+110
2.000 30,000,000
5. Victoria - Pura Rd - K0148+-758 - K0148+675
1.433 40,000,000
5. Tarlac 2nd District Engineering Office 3.772 46,780,000a. TARLAC 3RD 3.772 46,780,000
1. Concepcion - La Paz Rd - K0132+400 - K0133+977
1.577 15,500,000
2. Victoria-La Paz Rd - K0132+762 - K0133+106, K0133+124 - K0133+309, K0133+226 - K0134+120, K0135+619 - K0136+474
2.195 31,280,000
e. Region IV-A 19.317 382,335,0001. Batangas 2nd District Engineering Office 1.527 15,000,000
a. BATANGAS 2ND 1.527 15,000,0001. Bauan-Mabini Rd -
K0147+284 - K0148+8111.527 15,000,000
2. Batangas 4th District Engineering Office 2.776 96,000,000a. BATANGAS 4TH 2.776 96,000,000
1. Sn Juan-Laiya Rd - K0142+-292 - K0143+124
1.388 48,000,000
2. Sn Juan-Laiya Rd - K0161+775 - K0163+106
1.388 48,000,000
822 eXpeNditUre program fY 2016 VolUme ii
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
3. Cavite 2nd District Engineering Office 1.830 17,985,000a. CAVITE 6TH 1.156 11,360,000
1. Crisanto M de los Reyes Ave - K0063+220 - K0064+376
1.156 11,360,000
b. CAVITE 7TH 0.674 6,625,0001. Crisanto M de los Reyes Ave -
K0066+723 - K0067+3930.674 6,625,000
4. Laguna 2nd District Engineering Office 1.791 49,000,000a. LAGUNA 2ND 1.791 49,000,000
1. Bay Poblacion Rd - K0067+-1139 - K0067+652
1.791 49,000,000
5. Laguna 3rd District Engineering Office 2.400 60,000,000a. LAGUNA 3RD 2.400 60,000,000
1. Calauan-Nagcarlan Bdry Rd - K0077+-356 - K0077+444
0.800 20,000,000
2. Lipa City - Alaminos Rd - K0078+000 - K0078+800
0.800 20,000,000
3. Sn Pablo-Rizal-Nagcarlan-Liliw Rd - K0083+000 - K0083+800
0.800 20,000,000
6. Quezon 4th District Engineering Office 4.259 41,850,000a. QUEZON 4TH 4.259 41,850,000
1. MSR Jct-Lopez-Catanauan Rd - K0217+-880 - K0220+366
4.259 41,850,000
7. Rizal 1st District Engineering Office 1.558 43,500,000a. RIZAL 1ST 1.558 43,500,000
1. Binangonan Div Rd - K0035+-678 - K0035+293
0.971 27,120,000
2. Imelda Ave - K0020+800 - K0021+387
0.587 16,380,000
8. Rizal 2nd District Engineering Office 3.176 59,000,000a. RIZAL 2ND 3.176 59,000,000
1. Pillila Jct-Jala Jala Rd - K0062+-575 - K0062+124, K0074+000 - K0075+920
2.531 41,000,000
2. Tanay-Sampaloc Rd - K0070+100 - K0070+745
0.645 18,000,000
f. Region IV-B 7.297 171,630,0001. Mindoro Occidental Sub District Engineering Office 3.044 65,156,000
a. MINDORO OCCIDENTAL LONE 3.044 65,156,0001. Jct TLLR-Binacas Rd -
K0014+540 - K0015+4100.856 13,610,000
2. Jct TLLR-Burol Rd - K0008+271 - K0008+797
0.526 14,677,000
3. Jct TLLR-Tumibo-Lubang-Binacas Rd - K0001+625 - K0002+380, K0005+309 - K0005+330
0.689 9,699,000
4. Tagbac-Lubang-Looc Rd - K0000+774 - K0001+417, K0009+055 - K0009+391
0.973 27,170,000
2. Mindoro Oriental District Engineering Office 1.913 53,404,000a. MINDORO ORIENTAL 1ST 1.913 53,404,000
1. CSR Jct-Minas Rd - K0043+050 - K0043+844
0.794 22,165,000
2. CSR Jct-Pola Rd - K0062+-500 - K0062+300, K0068+100 - K0068+419
1.119 31,239,000
3. Palawan 1st District Engineering Office 1.322 43,070,000a. PALAWAN 1ST 1.322 43,070,000
1. Coron-Busuanga Rd - K0054+927 - K0056+241
1.322 43,070,000
4. Romblon District Engineering Office 1.018 10,000,000a. ROMBLON LONE 1.018 10,000,000
1. Looc (Cogon Tulay)-Odiongan Rd - K0103+000 - K0104+118
1.018 10,000,000
g. Region V 19.121 246,537,0001. Camarines Sur 2nd District Engineering Office 6.901 78,540,000
a. CAMARINES SUR 3RD 6.901 78,540,0001. Liboton-Magsaysay Rd -
K0439+-869 - K0440+5702.435 23,900,000
2. Manguiring-Tomagodtod-Sibobo Rd - K0458+-533 - K0458+232, K0461+829 - K0462+290
1.246 23,000,000
3. Naga-Carolina-Panicuason Rd - K0438+650 - K0441+841
3.220 31,640,000
2. Camarines Sur 3rd District Engineering Office 1.158 19,150,000a. CAMARINES SUR 4TH 1.158 19,150,000
1. Goa-Digdigon-Sn Isidro Rd - K0488+-147 - K0489+008
1.158 19,150,000
details of dpwh’s programs/projects 823
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
3. Camarines Sur 4th District Engineering Office 0.738 7,250,000a. CAMARINES SUR 5TH 0.738 7,250,000
1. Nabua-Balatan Rd - K0476+546 - K0477+110, K0483+591 - K0483+769
0.738 7,250,000
824 eXpeNditUre program fY 2016 VolUme ii
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
4. Masbate 2nd District Engineering Office 1.367 45,000,000a. MASBATE 3RD 1.367 45,000,000
1. Placer-Daraga Rd - K0096+-617 - K0096+750
1.367 45,000,000
5. Masbate 3rd District Engineering Office 4.783 55,577,000a. MASBATE 1ST 4.783 55,577,000
1. Sn Fernando-Talisay Rd - K0004+800 - K0007+700
1.832 28,800,000
2. Sn Pascual-Claveria Rd - K0045+652 - K0048+574
2.951 26,777,000
6. Sorsogon 2nd District Engineering Office 4.174 41,020,000a. SORSOGON 2ND 4.174 41,020,000
1. Irosin-Sn Roque-Bulusan Lake Rd - K0630+141 - K0632+911
2.770 27,220,000
2. Jct Abuyog-Gubat-Ariman Rd - K0598+007 - K0599+597
0.590 5,800,000
3. Jct Gubat-Prieto Diaz Rd - K0605+525 - K0606+384
0.814 8,000,000
h. Region VII 0.737 9,735,0001. Bohol 2nd District Engineering Office 0.737 9,735,000
a. BOHOL 2ND 0.737 9,735,0001. Antequera-San Isidro-Libertad (Tubigon) Rd -
K0031+000 - K0031+5090.509 5,000,000
2. Ubay By-Pass Rd - K0137+-128 - K0137+100
0.228 4,735,000
i. Region VIII 40.683 418,754,0001. Leyte 2nd District Engineering Office 13.002 127,764,000
a. LEYTE 2ND 13.002 127,764,0001. Dulag-Julita-Burauen Rd -
K0948+000 - K0948+273, K0949+-589 - K0950+1682.035 20,000,000
2. Jaro-Dagami-Burauen-Lapaz Rd - K0969+500 - K0971+620, K0973+400 - K0975+433
4.172 41,000,000
3. Kiling-Tanauan-Tabontabon-Julita Rd - K0932+-638 - K0933+602
2.239 22,000,000
4. Tanauan-Dagami Rd - K0930+-143 - K0934+378
4.556 44,764,000
2. Leyte 3rd District Engineering Office 18.582 183,500,000a. LEYTE 3RD 18.582 183,500,000
1. Belen-Consuegra Rd - K0980+-638 - K0981+783, K0982+000 - K0984+619
4.986 49,000,000
2. Cabunga-an-Tabunok-Consuegra Rd - K1014+-449 - K1018+000
4.500 45,000,000
3. Sto Rosario-Villaba Rd - K1005+000 - K1009+281, K1012+000 - K1012+726
5.026 49,500,000
4. Tabing-Kawayan-Sta Rosa-Lawis-Tabango Rd - K1032+102 - K1034+132, K1034+200 - K1036+207
4.070 40,000,000
3. Northern Samar 2nd District Engineering Office 6.609 82,990,000a. NORTHERN SAMAR 2ND 6.609 82,990,000
1. Arteche-Jipapad-Las Navas-Rawis Road - Chainage 2768 - Chainage 4803, Chainage 6768 - Chainage 8803
4.070 40,000,000
2. Rawis-Catubig Rd - K0787+167 - K0788+000, K0799+446 - K0800+000, K0801+872 - K0803+000
2.539 42,990,000
4. Samar 1st District Engineering Office 2.490 24,500,000a. SAMAR 1ST 2.490 24,500,000
1. Calbayog Diversion Road - Chainage 6784 - Chainage 9274
2.490 24,500,000
j. Region IX 1.596 44,568,0001. Zamboanga del Sur 1st District Engineering Office 1.596 44,568,000
a. ZAMBOANGA DEL SUR 1ST 1.596 44,568,0001. Jct Aurora-Monte Alegre-Jct Labangan Rd -
K1648+000 - K1649+5961.596 44,568,000
k. Region X 8.919 87,600,0001. Lanao del Norte 1st District Engineering Office 8.919 87,600,000
a. LANAO DEL NORTE 1ST 8.919 87,600,0001. Balo-i-Matungao-Linamon -
K1545+-683 - K1545+-69, K1545+035 - K1546+000, K1546+970 - K1549+730
4.339 42,600,000
2. Lanao del Norte Interior Circum. Rd (LDNICR) - K1545+344 - K1549+924
4.580 45,000,000
l. Region XI 4.620 82,000,0001. Compostela Valley District Engineering Office 0.667 2,000,000
details of dpwh’s programs/projects 825
PROGRAMS / ACTIVITIES / PROJECTS AMOUNT (Php)
a. COMPOSTELLA VALLEY IST 0.667 2,000,0001. Montevista-Compostela-Mati Bdry Rd -
K1428+-342 - K1428+3250.667 2,000,000
2. Davao del Sur 2nd District Engineering Office 3.953 80,000,000a. DAVAO OCCIDENTAL LONE 3.953 80,000,000
1. Demoloc-Little Baguio-Alabel Rd - K1637+-962 - K1637+380
1.342 20,000,000
2. H-way Jct Mana-Ticulon-Lagumit-Little Baguio Rd - K1646+635 - K1647+388, K1656+214 - K1657+214
1.611 40,000,000
3. Pangian-Pinalpalan-Demolok Rd - K1619+-232 - K1619+768
1.000 20,000,000
m. Region XIII 1.547 40,000,0001. Surigao del Norte 1st District Engineering Office 1.547 40,000,000
a. SURIGAO DEL NORTE 2ND 1.547 40,000,0001. Quezon-Mapawa-Capalayan-Espina-Navarro Rd -
K1146 + 649 - K1148+0001.547 40,000,000
826 eXpeNditUre program fY 2016 VolUme ii
3. 1,211.695 39,840,908,000
a. Secondary Roads 460.368 15,279,641,000
I. Central Office - 98,894,000
a. Nationwide - 98,894,0001. Central Office - 98,894,000
a. NATIONWIDE - 98,894,0001. Secondary - Road Upgrading - 98,894,000
II. Regional Office 441.169 14,546,826,000
a. CAR 13.549 423,995,0001. Ifugao 2nd DEO 11.750 352,500,000
a. IFUGAO (LONE DISTRICT) 11.750 352,500,0001. Banaue-Mayoyao-A Lista-Isabela Bdry Rd -
K0361+273 - K0361+351, K0364+753 - K0364+960, K0377+494 - K0378+500, K0378+863 - K0379+127, K0379+434 - K0380+264, K0380+483 - K0380+615, K0383+026 - K0383+175, K0383+450 - K0383+593, K0383+853 - K0387+029
5.001 150,000,000
2. Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0387+029 - K0389+663, K0389+757 - K0391+066, K0391+197 - K0392+565
4.959 150,000,000
3. Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0393+760 - K0394+484, K0395+643 - K0395+814, K0396+078 - K0397+004, K0398+570 - K0398+629, K0400+799 - K0401+097, K0403+200 - K0403+335
1.790 52,500,000
2. Kalinga DEO 1.799 71,495,000a. KALINGA (LONE DISTRICT) 1.799 71,495,000
1. Kalinga-Abra Rd - K0483+495 - K0485+181, K0485+255 - K0485+364, K0498+213 - K0498+300, K0511+800 - K0511+1460
1.799 71,495,000
b. Region III 5.941 220,970,0001. Aurora DEO 5.941 220,970,000
a. AURORA (LONE DISTRICT) 5.941 220,970,0001. Dinadiawan-Madella Rd -
K0307+036 - K0309+20664.167 150,000,000
2. Nueva Ecija-Aurora Rd - K0173+500 - K0174+500, K0191+039 - K0191+326, K0194+000 - K0194+167, K0195+1178 - K0195+1443, K0211+757 - K0211+786, K0211+949.75 - K0211+989
1.774 70,970,000
c. Region IV-A 38.094 1,264,160,0001. Quezon 3rd DEO 33.271 1,071,240,000
a. QUEZON (THIRD DISTRICT) 33.271 1,071,240,0001. Abuyon-Buenavista Rd -
K0255+720 - K0260+9815.311 132,775,000
2. Abuyon-Buenavista Rd - K0260+981 - K0264+971
4.000 100,000,000
3. Mulanay-Sn Francisco Rd - K0293+1717 - K0293+1953, K0293+2491 - K0296+431, K0299+822 - K0301+578
2.905 100,000,000
4. Mulanay-Sn Francisco Rd - K0301+578 - K0303+648, K0305+419 - K0305+660, K0306+310 - K0306+449
2.442 95,605,000
5. Sn Francisco-Sn Andres-Sn Narciso Rd - K0314+466 - K0318+216
3.750 150,000,000
6. Sn Francisco-Sn Andres-Sn Narciso Rd - K0318+216 - K0322+621
4.405 150,000,000
7. Sn Francisco-Sn Andres-Sn Narciso Rd - K0322+621 - K0328+259
5.639 150,000,000
8. Sn Francisco-Sn Andres-Sn Narciso Rd - K0355+319 - K0357+819
2.500 100,000,000
9. Sn Francisco-Sn Andres-Sn Narciso Rd - K0357+819 - K0359+954, K0363+896 - K0363+980, K0368+131 - K0368+231
2.319 92,860,000
2. Quezon 4th DEO 4.823 192,920,000a. QUEZON (FOURTH DISTRICT) 4.823 192,920,000
AMOUNT (Php)
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) (Intermittent Section)
PROGRAMS / ACTIVITIES / PROJECTS
details of dpwh’s programs/projects 827
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
1. MSR Jct-Lopez-Buenavista Rd - K0224+000 - K0224+244, K0226+960 - K0227+145, K0227+203 - K0227+814, K0228+826 - K0229+295, K0229+498 - K0229+748, K0230+249 - K0230+331, K0230+429 - K0230+719, K0231+799 - K0232+338
2.500 100,000,000
2. MSR Jct-Lopez-Buenavista Rd - K0232+338 - K0232+739, K0234+029 - K0234+276, K0234+419 - K0235+000, K0235+676 - K0236+786
2.323 92,920,000
d. Region IV-B 95.071 2,682,315,0001. Palawan 1st DEO 5.000 142,000,000
a. PALAWAN (FIRST DISTRICT) 5.000 142,000,0001. El Nido-Jct New Ibahay Rd -
K0303+562 - K0308+7485.000 142,000,000
2. Palawan 2nd DEO 66.112 1,918,990,000a. PALAWAN (SECOND DISTRICT) 66.112 1,918,990,000
1. Aramaywan-Berong-Pto Princesa Rd - K0176+1061 - K0176+1185, K0187+503 - K0193+313
5.974 150,000,000
2. Aramaywan-Berong-Pto Princesa Rd - K0193+313 - K0197+960
4.647 115,000,000
3. Culandanum-Panalingaan Cross Country Rd - Chainage 2380 - Chainage 8285
5.905 150,000,000
828 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
4. Culandanum-Panalingaan Cross Country Rd - Chainage 8285 - Chainage 11694
3.409 105,000,000
5. Palawan Circum. Rd - K0208+220 - K0212+1026
5.000 150,000,000
6. Palawan Circum. Rd - K0212+1026 - K0216+237
3.337 100,000,000
7. Palawan Circum. Rd - K0216+237 - K0216+596, K0216+774 - K0217+938, K0217+1119 - K0221+466
5.000 150,000,000
8. Palawan Circum. Rd - K0221+466 - K0225+295
3.830 115,000,000
9. Quezon-Aramaywan Rd - K0147+363 - K0147+423, K0158+849 - K0162+812
4.220 140,200,000
10. Quezon-Aramaywan Rd - K0162+812 - K0166+000
3.390 100,000,000
11. Quezon-Punta Baja Rd - K0150+680 - K0155+448
5.000 150,000,000
12. Quezon-Punta Baja Rd - K0155+448 - K0156+1008, K0157+-040 - K0157+000, K0160+060 - K0162+505, K0167+591 - K0168+285
4.938 150,000,000
13. Quezon-Punta Baja Rd - K0168+285 - K0171+460
3.334 100,000,000
14. Quezon-Punta Baja Rd - K0171+460 - K0174+637
3.335 100,000,000
15. Quezon-Punta Baja Rd - K0174+637 - K0175+177, K0175+297 - K0176+044, K0176+096 - K0179+325
4.793 143,790,000
3. Palawan 3rd DEO 5.399 134,975,000a. PALAWAN (THIRD DISTRICT) 5.399 134,975,000
1. Aramaywan-Berong-Pto Princesa Rd - K0227+187 - K0227+901, K0228+140 - K0232+825
5.399 134,975,000
4. Romblon DEO 18.560 486,350,000a. ROMBLON (LONE DISTRICT) 18.560 486,350,000
1. Sibuyan Circumferential Rd - K0013+194 - K0013+876, K0026+132 - K0031+364, K0031+431 - K0031+638
6.131 150,000,000
2. Sibuyan Circumferential Rd - K0032+555 - K0033+615, K0034+094 - K0035+690, K0035+908 - K0036+910, K0037+016 - K0037+286, K0037+880 - K0038+220, K0038+242 - K0039+300
5.297 150,000,000
3. Sibuyan Circumferential Rd - K0039+300 - K0040+657, K0040+679 - K0042+391, K0042+579 - K0043+184
3.678 100,000,000
4. Sibuyan Circumferential Rd - K0043+184 - K0046+636
3.454 86,350,000
e. Region V 9.058 274,685,0001. Albay 3rd DEO 5.408 165,185,000
a. ALBAY (THIRD DISTRICT) 5.408 165,185,0001. Albay West Coast Rd -
K0533+488 - K0533+589, K0544+000 - K0545+578, K0546+776 - K0547+041, K0552+727 - K0553+465, K0553+974 - K0554+405, K0554+496 - K0554+700
3.136 100,000,000
2. Albay West Coast Rd - K0554+700 - K0556+253, K0556+508 - K0557+300
2.272 65,185,000
2. Catanduanes DEO 3.650 109,500,000a. CATANDUANES (LONE DISTRICT) 3.650 109,500,000
1. Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0068+352 - K0069+560, K0069+609 - K0071+191, K0071+245 - K0072+037
3.650 109,500,000
f. Region VI 21.777 867,160,0001. Negros Occidental 1st DEO 21.777 867,160,000
a. NEGROS OCCIDENTAL (FIRST DISTRICT) 21.777 867,160,0001. Jct DS Benedicto-Spur 16-Calatrava Rd -
K0056+661 - K0057+155, K0057+167 - K0057+620, K0062+588 - K0063+636, K0069+069 - K0069+674, K0076+747 - K0078+218
3.847 150,000,000
2. Jct DS Benedicto-Spur 16-Calatrava Rd - K0078+218 - K0082+352
3.750 150,000,000
3. Jct DS Benedicto-Spur 16-Calatrava Rd - K0082+352 - K0085+684, K0085+714 - K0086+539
3.751 150,000,000
details of dpwh’s programs/projects 829
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
4. Jct DS Benedicto-Spur 16-Calatrava Rd - K0086+539 - K0091+089
3.750 150,000,000
5. Jct DS Benedicto-Spur 16-Calatrava Rd - K0091+089 - K0093+806, K0094+081 - K0095+448
3.750 150,000,000
6. Jct DS Benedicto-Spur 16-Calatrava Rd - K0095+448 - K0099+229
2.929 117,160,000
g. Region IX 60.035 2,213,680,0001. Zamboanga del Norte 2nd DEO 33.770 1,350,800,000
a. ZAMBOANGA DEL NORTE (THIRD DISTRICT) 33.770 1,350,800,0001. Liloy-Siocon Rd -
K2027+000 - K2030+6893.750 150,000,000
2. Liloy-Siocon Rd - K2030+689 - K2034+299
3.750 150,000,000
3. Liloy-Siocon Rd - K2034+299 - K2037+1006
3.750 150,000,000
4. Liloy-Siocon Rd - K2037+1006 - K2041+441
3.750 150,000,000
5. Liloy-Siocon Rd - K2041+441 - K2045+101
3.750 150,000,000
6. Liloy-Siocon Rd - K2045+101 - K2048+609
3.750 150,000,000
7. Liloy-Siocon Rd - K2048+609 - K2051+090
2.500 100,000,000
8. Liloy-Siocon Rd - K2051+090 - K2054+614
3.750 150,000,000
9. Liloy-Siocon Rd - K2054+614 - K2058+000
3.526 141,040,000
10. Siocon-Sirawai Rd - K2094+000 - K2095+286
1.494 59,760,000
2. Zamboanga del Norte 3rd DEO 24.229 781,440,000a. ZAMBOANGA DEL NORTE (FIRST DISTRICT) 24.229 781,440,000
1. Rizal-Dakak-Dapitan Coastal Loop Rd - K1812+254 - K1812+365, K1814+780 - K1815+570, K1817+485 - K1817+815, K1817+825 - K1818+755, K1818+801 - K1819+821, K1823+460 - K1823+646, K1823+658 - K1824+300, K1827+236 - K1827+911
4.684 150,000,000
2. Rizal-Dakak-Dapitan Coastal Loop Rd - K1827+911 - K1829+437, K1829+641 - K1830+541, K1830+553 - K1832+796
4.669 150,000,000
3. Rizal-Dakak-Dapitan Coastal Loop Rd - K1833+027 - K1834+789, K1834+915 - K1835+245, K1835+340 - K1835+406, K1835+469 - K1836+283, K1836+822 - K1837+955, K1838+000 - K1838+224
4.329 150,000,000
4. Rizal-Dakak-Dapitan Coastal Loop Rd - K1838+224 - K1838+423, K1838+574 - K1839+081, K1840+410 - K1840+557, K1840+905 - K1841+984, K1843+000 - K1843+235, K1844+000 - K1844+828, K1844+903 - K1845+419, K1845+518 - K1846+107, K1846+390 - K1846+715, K1847+043 - K1847+239
4.621 150,000,000
5. Rizal-Dakak-Dapitan Coastal Loop Rd - K1847+239 - K1848+245, K1848+286 - K1848+968, K1849+069 - K1849+540, K1849+601 - K1849+792, K1850+083 - K1850+232, K1850+263 - K1850+500, K1850+601 - K1850+969
3.104 100,000,000
6. Rizal-Dakak-Dapitan Coastal Loop Rd - K1851+079 - K1852+000, K1854+000 - K1854+150, K1854+249 - K1856+000
2.822 81,440,000
3. Zamboanga del Sur 1st DEO 2.036 81,440,000a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 2.036 81,440,000
1. Sindangan-Siayan-Dumingag-Mahayag Rd(Mahayag-Dumin - K1688+332 - K1689+000, K1689+105 - K1690+473
2.036 81,440,000
h. Region X 35.933 1,071,351,0001. Bukidnon 3rd DEO 9.892 345,971,000
a. BUKIDNON (FIRST DISTRICT) 9.892 345,971,0001. Barandias-Dominorog Rd -
K1609+785 - K1612+1792.421 60,525,000
830 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
2. CDO City-Dominorog-Camp Kibaritan Rd - K1479+133 - K1479+190, K1480+000 - K1480+213, K1482+879 - K1483+000, K1494+056.40 - K1495+060, K1499+515.04 - K1501+066, K1508+757 - K1509+815
4.084 150,000,000
3. CDO City-Dominorog-Camp Kibaritan Rd - K1509+815 - K1510+661, K1514+791 - K1517+297
3.386 135,446,000
2. Regional Office X - Proper 26.041 725,380,000a. BUKIDNON (FOURTH DISTRICT) 18.054 482,375,000
1. Barandias-Dominorog Rd - K1590+-329 - K1590+-068, K1591+582 - K1592+220, K1593+270 - K1596+081, K1596+575 - K1596+753, K1596+767 - K1598+275
6.000 150,000,000
2. Barandias-Dominorog Rd - K1598+275 - K1599+028, K1599+241 - K1600+309, K1602+392 - K1607+291
6.039 150,000,000
3. Barandias-Dominorog Rd - K1607+291 - K1609+785, K1616+135 - K1617+497
2.505 94,625,000
4. Jct Maradugao-Camp Kibaritan-Dominorog Rd - K1626+-579 - K1629+683
3.510 87,750,000
b. REGIONWIDE X 7.987 243,005,0001. Kapalong-Talaingod-Valencia (Bukidnon) Rd -
Chainage 25187 - Chainage 29101, Chainage 39875 - Chainage 40527, Chainage 43279 - Chainage 43480, Chainage 43770 - Chainage 43965, Chainage 44124 - Chainage 44445
5.283 150,000,000
2. Kapalong-Talaingod-Valencia (Bukidnon) Rd - Chainage 44845 - Chainage 44991, Chainage 45196 - Chainage 45483, Chainage 45773 - Chainage 45813, Chainage 48607 - Chainage 50282, Chainage 51338 - Chainage 51687, Chainage 53989 - Chainage 54108, Chainage 54167 - Chainage 54255
2.704 93,005,000
i. Region XI 57.984 2,316,410,0001. Compostela Valley DEO 22.137 742,630,000
a. COMPOSTELA VALLEY (FIRST DISTRICT) 22.137 742,630,0001. Compostela-Cateel Rd (Compostela Side) -
K1595+068 - K1598+002, K1599+714 - K1600+5303.750 150,000,000
2. Compostela-Cateel Rd (Compostela Side) - K1600+530 - K1600+870, K1605+220 - K1609+725, K1613+382 - K1613+421
4.884 149,725,000
3. Montevista-Compostela-Mati Bdry Rd - K1489+877 - K1490+853, K1491+092 - K1493+480
3.383 84,575,000
4. Nabunturan-Maragusan Road - K1460+398 - K1462+082, K1463+186 - K1465+252
3.750 150,000,000
5. Nabunturan-Maragusan Road - K1465+252 - K1466+527, K1466+552 - K1469+703
4.426 150,000,000
6. Nabunturan-Maragusan Road - K1469+703 - K1471+647
1.944 58,330,000
2. Davao del Norte DEO 9.079 363,160,000a. DAVAO DEL NORTE (FIRST DISTRICT) 9.079 363,160,000
1. Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1522+003 - K1524+050, K1530+281 - K1531+984
3.750 150,000,000
2. Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1531+984 - K1534+481
2.497 100,000,000
3. Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1534+481 - K1537+313
2.832 113,160,000
3. Davao del Sur 2nd DEO 19.653 926,020,000a. DAVAO OCCIDENTAL (LONE DISTRICT) 19.653 926,020,000
1. Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1683+1009 - K1685+458, K1699+507 - K1699+602, K1700+356 - K1700+460, K1716+886 - K1717+000, K1717+000 - K1717+240
1.944 90,000,000
2. Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1732+220 - K1733+267, K1733+624 - K1735+730
3.153 150,000,000
details of dpwh’s programs/projects 831
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
3. Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1735+730 - K1736+759, K1737+161 - K1738+395, K1738+970 - K1739+518, K1739+621 - K1739+956
3.146 150,000,000
4. Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1739+956 - K1742+039, K1742+424 - K1743+465
3.124 150,000,000
5. Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1743+465 - K1745+740, K1747+640 - K1748+394, K1748+662 - K1748+906
3.273 150,000,000
6. Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1748+906 - K1750+466, K1753+400 - K1755+026
3.186 150,000,000
7. Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1755+026 - K1756+160, K1757+329 - K1758+027
1.827 86,020,000
4. Davao Oriental 2nd DEO 7.115 284,600,000a. DAVAO ORIENTAL (SECOND DISTRICT) 7.115 284,600,000
1. Mati-Maragusan Rd - K1499+-774 - K1501+984
3.750 150,000,000
2. Mati-Maragusan Rd - K1501+984 - K1502+241, K1502+337 - K1504+400, K1505+593 - K1506+656
3.365 134,600,000
j. Region XII 49.522 1,686,670,0001. Cotabato 1st DEO 6.409 195,710,000
a. COTABATO (SECOND DISTRICT) 6.409 195,710,0001. Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd -
K1667+586 - K1667+643, K1677+620 - K1679+8443.333 100,000,000
2. Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1679+844 - K1682+473, K1684+627 - K1684+821, K1688+727 - K1688+877
3.076 95,710,000
2. Cotabato 2nd DEO 9.311 291,745,000a. COTABATO (FIRST DISTRICT) 9.311 291,745,000
1. Banisilan-Guiling-Alamada-Libungan Rd - K1645+253 - K1646+100, K1646+160 - K1648+100, K1648+140 - K1649+670
4.317 150,000,000
2. Banisilan-Guiling-Alamada-Libungan Rd - K1649+670 - K1651+000, K1657+000 - K1659+000, K1659+630 - K1660+500, K1661+300 - K1661+867.49, K1674+220 - K1674+447
4.994 141,745,000
3. Sultan Kudarat 2nd DEO 33.802 1,199,215,000a. SULTAN KUDARAT (SECOND DISTRICT) 33.802 1,199,215,000
1. Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd -K1958+327 - K1958+478, K1959+120 - K1959+302, K1960+986 - K1961+303, K1961+514 - K1963+531, K1970+400 - K1972+276
4.542 150,000,000
2. Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd -K1972+286 - K1976+733, K1978+-879 - K1978+-464
4.862 150,000,000
3. Awang-Upi-Lebak-Kalamansig-Palimbang-Sarangani Rd -K1978+-464 - K1979+220
2.684 93,215,000
4. Isulan Jct-Ninoy Aquino Rd - K1803+339 - K1805+474, K1806+279 - K1807+733
3.648 150,000,000
5. Isulan Jct-Ninoy Aquino Rd - K1808+523 - K1810+359
1.856 67,240,000
6. SNA-Lebak-Kalamansig Rd - K1857+892 - K1859+000, K1859+900 - K1863+005
4.216 150,000,000
7. SNA-Lebak-Kalamansig Rd - K1863+005 - K1867+251
4.244 150,000,000
8. SNA-Lebak-Kalamansig Rd - K1867+251 - K1871+183
3.932 150,000,000
9. SNA-Lebak-Kalamansig Rd - K1871+183 - K1875+000
3.818 138,760,000
k. Region XIII 54.205 1,525,430,0001. Agusan del Sur 1st DEO 10.885 272,125,000
a. AGUSAN DEL SUR (FIRST DISTRICT) 10.885 272,125,000
832 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
1. Butuan City-Talacogon-Loreto-Veruela-Sta Josefa R - K1336+304 - K1340+000, K1341+013 - K1342+770, K1343+009 - K1397+940
5.913 150,000,000
2. Butuan City-Talacogon-Loreto-Veruela-Sta Josefa R - K1397+940 - K1344+793, K1349+338 - K1350+480, K1350+640 - K1353+114
4.972 122,125,000
2. Agusan del Sur 2nd DEO 18.621 587,180,000a. AGUSAN DEL SUR (SECOND DISTRICT) 18.621 587,180,000
1. Asuncion-San Isidro-Laak-Veruela Rd - K1527+178 - K1528+000, K1530+100 - K1532+000, K1533+200 - K1534+228
3.750 150,000,000
2. Asuncion-San Isidro-Laak-Veruela Rd - K1534+228 - K1537+978
3.750 150,000,000
3. Butuan City-Talacogon-Loreto-Veruela-Sta Josefa R - Chainage 114 - Chainage 2204, Chainage 2548 - Chainage 4450, Chainage 4550 - Chainage 4828, K1399+648 - K1400+153
4.776 119,440,000
4. Butuan City-Talacogon-Loreto-Veruela-Sta Josefa R - K1370+236 - K1375+648, K1377+-170 - K1377+170
5.674 150,000,000
5. Butuan City-Talacogon-Loreto-Veruela-Sta Josefa R - K1385+1000 - K1386+660
0.671 17,740,000
3. Dinagat Island DEO 24.699 666,125,000a. DINAGAT ISLAND (LONE DISTRICT) 24.699 666,125,000
1. Dinagat-Loreto Rd - K0010+091 - K0011+095, K0011+217 - K0013+050, K0014+779 - K0015+171, K0028+203 - K0028+690, K0029+430 - K0030+785, K0030+816 - K0031+281
5.647 150,000,000
2. Dinagat-Loreto Rd - K0031+281 - K0032+000, K0037+580 - K0041+000, K0047+756 - K0048+700
5.010 145,000,000
3. Dinagat-Loreto Rd - K0052+500 - K0055+000, K0068+341 - K0069+000, K0069+895 - K0072+763
5.702 150,000,000
4. Dinagat-Loreto Rd - K0072+763 - K0076+700
3.775 100,000,000
5. Dinagat-Loreto Rd - K0076+700 - K0080+420, K0080+460 - K0081+500
4.565 121,125,000
III. District Engineering Office 19.199 633,921,000
a. Region II 1.068 32,505,0001. Isabela 1st DEO 0.681 17,025,000
a. ISABELA (FIRST DISTRICT) 0.681 17,025,0001. Cabagan-Sta Maria Rd -
K0450+966 - K0451+462, K0451+942 - K0451+10600.681 17,025,000
2. Quirino DEO 0.387 15,480,000a. QUIRINO (LONE DISTRICT) 0.387 15,480,000
1. Cordon-Aurora Bdry Rd (Jct Dumabato-Aurora Bdry) - K0407+360 - K0407+476, K0407+578 - K0407+849
0.387 15,480,000
b. CAR 2.619 104,760,0001. Apayao 1st DEO 0.432 17,280,000
a. APAYAO (LONE DISTRICT) 0.432 17,280,0001. Conner-Kabugao Rd -
K2041+441 - K2046+263, K0584+783 - K0585+1770.432 17,280,000
2. Benguet 1st DEO 0.357 14,280,000a. BENGUET (LONE DISTRICT) 0.357 14,280,000
1. Gurel-Bokod-Kabayan-Buguias-Abatan Rd - K0334+540 - K0335+040
0.357 14,280,000
3. Benguet 2nd DEO 0.503 20,120,000a. BENGUET (LONE DISTRICT) 0.503 20,120,000
1. Gurel-Bokod-Kabayan-Buguias-Abatan Rd - K0352+791 - K0353+174, K0363+540 - K0363+603
0.503 20,120,000
4. Mt.Province DEO 1.327 53,080,000a. MOUNTAIN PROVINCE (LONE DISTRICT) 1.327 53,080,000
1. Dantay-Sagada Rd - K0395+2276 - K0395+3170
0.894 35,760,000
details of dpwh’s programs/projects 833
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
2. Mt Prov-Cagayan via Tabuk-Enrile Rd - K0392+301 - K0392+335, K0393+112 - K0393+177, K0393+779 - K0394+042, K0403+501 - K0403+512, K0403+523 - K0403+539, K0419+828 - K0419+833
0.396 15,840,000
3. Mt Province-N Vizcaya Rd - K0373+290 - K0373+327
0.037 1,480,000
c. Region III 3.319 103,075,0001. Aurora DEO 1.632 60,900,000
a. AURORA (LONE DISTRICT) 1.632 60,900,0001. Baler-Casiguran Rd (Dinadiawan-Casiguran Sect) -
K0316+160 - K0316+6860.526 13,150,000
2. Dinadiawan-Madella Rd - K0303+384.50 - K0303+800, K0306+405 - K0306+1095
1.106 47,750,000
2. Nueva Ecija 2nd DEO 1.687 42,175,000a. NUEVA ECIJA (THIRD DISTRICT) 1.687 42,175,000
1. Nueva Ecija-Aurora Rd - K0162+756 - K0164+420
1.687 42,175,000
d. Region IV-B 3.827 127,661,0001. Palawan 2nd DEO 0.660 19,155,000
a. PALAWAN (SECOND DISTRICT) 0.660 19,155,0001. Palawan Circum. Rd (Panalingaan-Tagbita-Latud) -
K0245+-395 - K0245+-2660.129 3,225,000
2. PPSR Jct (Abo-abo)-Quezon Rd - K0132+084 - K0132+557, K0138+550 - K0138+608
0.531 15,930,000
2. Palawan 3rd DEO 0.801 19,081,000a. PALAWAN (THIRD DISTRICT) 0.801 19,081,000
1. PPSR Jct-Napsan-Apurawan Rd - K0059+355 - K0060+124
0.801 19,081,000
3. Romblon DEO 2.366 89,425,000a. ROMBLON (LONE DISTRICT) 2.366 89,425,000
1. Romblon-Cogon-Sablayan Rd - K0018+345 - K0018+696, K0019+069 - K0019+768
1.050 42,000,000
2. Tablas Circumferential Rd - K0034+414 - K0034+808, K0042+855 - K0042+964, K0043+229 - K0043+942, K0079+275 - K0079+320, K0091+065 - K0091+120
1.316 47,425,000
e. Region V 0.129 3,755,0001. Camarines Sur 3rd DEO 0.129 3,755,000
a. CAMARINES SUR (FOURTH DISTRICT) 0.129 3,755,0001. Lagonoy-Presentacion Rd -
K0505+852 - K0505+875, K0507+843 - K0508+0010.129 3,755,000
f. Region VI 0.430 15,950,0001. Guimaras DEO 0.125 3,750,000
a. GUIMARAS (LONE DISTRICT) 0.125 3,750,0001. Guimaras Circumferential Rd -
K0062+521 - K0062+562, K0062+578 - K0062+6620.125 3,750,000
2. Negros Occidental 1st DEO 0.305 12,200,000a. NEGROS OCCIDENTAL (FIRST DISTRICT) 0.305 12,200,000
1. Jct Natl Rd Sagay-Bato-Dian-Marcelo-Balea Jct Rd - K0120+072 - K0120+377
0.305 12,200,000
g. Region VII 0.417 12,510,0001. Bohol 3rd DEO 0.417 12,510,000
a. BOHOL (THIRD DISTRICT) 0.417 12,510,0001. Jct (TER)-Jagna-Sierra Bullones Rd -
K0064+239 - K0064+6560.417 12,510,000
h. Region VIII 1.469 38,885,0001. Northern Samar 2nd DEO 0.384 11,520,000
a. NORTHERN SAMAR (SECOND DISTRICT) 0.384 11,520,0001. Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd -
K0816+500 - K0816+8840.384 11,520,000
2. Samar 2nd DEO 1.085 27,365,000a. SAMAR (SECOND DISTRICT) 1.085 27,365,000
1. Dolongan-Basey Rd - K0893+641 - K0894+724
1.085 27,365,000
i. Region IX 0.447 11,175,000
834 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
1. Zamboanga City DEO 0.447 11,175,000a. ZAMBOANGA CITY (FIRST DISTRICT) 0.447 11,175,000
1. Zamboanga City-Labuan-Limpapa Rd - K1977+1462 - K1977+1909
0.447 11,175,000
j. Region X 1.934 66,740,0001. Misamis Occidental 1st DEO 1.062 31,860,000
a. MISAMIS OCCIDENTAL (FIRST DISTRICT) 1.062 31,860,0001. Oroquieta City-Calamba Mt Rd -
K1769+300 - K1770+3621.062 31,860,000
2. Misamis Oriental 1st DEO 0.553 22,120,000a. MISAMIS ORIENTAL (FIRST DISTRICT) 0.553 22,120,000
1. Gingoog-Claveria-Villanueva Rd - Chainage 23932 - Chainage 24485
0.553 22,120,000
3. Misamis Oriental 2nd DEO 0.319 12,760,000a. MISAMIS ORIENTAL (SECOND DISTRICT) 0.319 12,760,000
1. Gingoog-Claveria-Villanueva Rd - K1348+500 - K1348+819
0.319 12,760,000
k. Region XI 2.047 73,730,0001. Compostela Valley DEO 1.291 38,730,000
a. COMPOSTELA VALLEY (SECOND DISTRICT) 1.291 38,730,0001. Asuncion-San Isidro-Laak-Veruela Rd -
K1518+731 - K1519+740, K1525+519 - K1525+8011.291 38,730,000
2. Davao del Sur 2nd DEO 0.756 35,000,000a. DAVAO OCCIDENTAL (LONE DISTRICT) 0.756 35,000,000
1. Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1663+225 - K1663+530, K1665+388 - K1666+016
0.756 35,000,000
l. Region XII 1.493 43,175,0001. Sarangani DEO 0.390 15,600,000
a. SARANGANI (LONE DISTRICT) 0.390 15,600,0001. Sarangani-Davao Del Sur Coastal Rd -
K1748+-753 - K1748+-383, K1751+933 - K1752+0000.390 15,600,000
2. Sultan Kudarat 1st DEO 1.103 27,575,000a. SULTAN KUDARAT (FIRST DISTRICT) 1.103 27,575,000
1. Dulawan-Marbel Rd - K1742+-599 - K1742+-300, K1744+400 - K1745+211
1.103 27,575,000
b. Tertiary Roads 751.327 24,561,267,000
I. Central Office - 98,894,000
a. Nationwide - 98,894,0001. Central Office - 98,894,000
a. NATIONWIDE - 98,894,0001. Tertiary - Road Upgrading - 98,894,000
II. Regional Office 689.696 22,631,655,000
a. Region I 19.072 687,395,0001. Ilocos Norte 2nd DEO 9.070 298,795,000
a. ILOCOS NORTE (SECOND DISTRICT) 9.070 298,795,0001. Batac-Pinili via Maipalig Rd -
K0481+643 - K0482+046, K0482+186 - K0485+6243.750 150,000,000
2. Batac-Pinili via Maipalig Rd - K0485+624 - K0485+978, K0486+023 - K0486+304, K0486+369 - K0488+039, K0488+308 - K0488+1134, K0488+1150 - K0489+061
3.223 85,885,000
3. Pinili-Banna (Espiritu) Rd - K0496+-712 - K0496+081, K0494+720 - K0492+076
2.097 62,910,000
2. Ilocos Sur 2nd DEO 10.002 388,600,000a. ILOCOS SUR (SECOND DISTRICT) 10.002 388,600,000
1. Cervantes-Quirino Rd - K0403+198 - K0403+520, K0404+249 - K0406+169, K0406+679 - K0407+193
2.603 100,000,000
2. Cervantes-Quirino Rd - K0407+193 - K0409+374
2.266 90,630,000
details of dpwh’s programs/projects 835
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
3. Jct Santiago-Banayoyo-Lidlidda-Sn Emilio-Quirino - K0375+804 - K0375+871, K0387+678 - K0390+082
2.500 100,000,000
4. Jct Santiago-Banayoyo-Lidlidda-Sn Emilio-Quirino - K0390+082 - K0392+000, K0396+000 - K0396+297, K0396+394 - K0396+755
2.633 97,970,000
b. Region II 60.598 1,791,573,0001. Batanes DEO 2.292 78,320,000
a. BATANES (LONE DISTRICT) 2.292 78,320,0001. Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan
Rd - Chainage 0 - Chainage 260, K0015+514 - K0016+861, K0023+003 - K0023+319, K0023+836 - K0024+033, K0007+427 - K0007+485, K0008+032 - K0008+171
2.292 78,320,000
2. Cagayan 1st DEO 15.856 459,540,000a. CAGAYAN (FIRST DISTRICT) 15.856 459,540,000
1. Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0519+376 - K0519+591, K0527+950 - K0528+428, K0529+338 - K0532+463, K0534+307 - K0535+833
5.344 150,000,000
2. Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0535+853 - K0536+699, K0536+710 - K0538+231, K0543+109 - K0543+382, K0548+402 - K0550+000, K0551+172 - K0551+632
4.698 135,120,000
3. Jct Gattaran-Cumao-Capissayan-Sta Margarita-Bolos - K0577+600 - K0578+154, K0579+274 - K0579+423, K0579+447 - K0579+938, K0580+308 - K0580+385, K0580+650 - K0580+710, K0580+770 - K0580+840, K0587+371 - K0587+500, K0589+761 - K0591+614
3.333 100,000,000
4. Jct Gattaran-Cumao-Capissayan-Sta Margarita-Bolos - K0591+614 - K0593+410, K0594+532 - K0595+000
2.481 74,420,000
3. Cagayan 2nd DEO 9.895 215,753,000a. CAGAYAN (SECOND DISTRICT) 9.895 215,753,000
1. Jct Logac-Lasam-Gagabutan Rd - K0736+600 - K0736+611, K0736+623 - K0736+629, K0737+357 - K0737+391, K0737+403 - K0737+449, K0741+-453.50 - K0741+-054, K0741+931 - K0742+008, K0742+022 - K0742+904, K0743+063 - K0744+000, Chainage 19187 - Chainage 21187
4.383 100,000,000
2. Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd - Chainage 2278 - Chainage 4060, Chainage 4085 - Chainage 7815
5.512 115,753,000
4. Cagayan 3rd DEO 5.356 160,508,000a. CAGAYAN (THIRD DISTRICT) 5.356 160,508,000
1. Gadu-Carilucud-Nabbotuan-Palao-Macutay Rd - Chainage 2641.26 - Chainage 3632, Chainage 4743 - Chainage 6490, Chainage 7318 - Chainage 7914
3.333 100,000,000
2. Gadu-Carilucud-Nabbotuan-Palao-Macutay Rd - Chainage 7914 - Chainage 9900, Chainage 0 - Chainage 37
2.023 60,508,000
5. Nueva Vizcaya 1st DEO 3.444 86,090,000a. NUEVA VIZCAYA (LONE DISTRICT) 3.444 86,090,000
1. Bambang-Kasibu-Solano Rd - K0323+636.40 - K0324+287.40, K0326+225 - K0328+497, K0330+696 - K0331+019
3.444 86,090,000
6. Nueva Vizcaya 2nd DEO 10.664 392,913,000a. NUEVA VIZCAYA (LONE DISTRICT) 10.664 392,913,000
1. Bambang-Kasibu-Solano Rd - K0279+180 - K0280+070, K0288+101 - K0288+140, K0288+1016 - K0290+964
3.115 100,000,000
2. Bambang-Kasibu-Solano Rd - K0290+964 - K0292+634, K0293+955 - K0294+000
1.837 65,000,000
3. Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno RdK0294+849 - K0294+916, K0294+936 - K0294+993, K0299+024 - K0301+196
2.397 100,000,000
4. Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno RdK0302+154 - K0305+232
3.315 127,913,000
7. Quirino DEO 13.091 398,449,000
836 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
a. QUIRINO (LONE DISTRICT) 13.091 398,449,0001. Jct Abbag-Gingin Bdry Rd -
K0453+099 - K0454+1021, K0455+237 - K0455+8872.616 100,000,000
2. Jct Abbag-Gingin Bdry Rd - K0455+887 - K0457+000, K0457+159 - K0457+747
1.750 70,000,000
3. Jct Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct Vi - K0360+320 - K0360+701, K0360+835 - K0362+673, K0362+812 - K0366+876
5.770 144,250,000
4. NRJ Villa Sur-San Pedro-Cabua-an-Ysmael-Disimungal - K0367+-123 - K0367+739, K0367+1312 - K0368+158, K0368+508 - K0369+015, K0369+066 - K0370+246
2.955 84,199,000
c. CAR 161.762 6,050,085,0001. Abra DEO 2.030 81,200,000
a. ABRA (LONE DISTRICT) 2.030 81,200,0001. Abra-Ilocos Norte Rd -
Chainage 7058 - Chainage 90882.030 81,200,000
2. Apayao 1st DEO 3.291 131,640,000a. APAYAO (LONE DISTRICT) 3.291 131,640,000
1. Apayao-Ilocos Norte Rd - K0611+186 - K0614+476
3.291 131,640,000
3. Apayao 2nd DEO 24.006 951,880,000a. APAYAO (LONE DISTRICT) 24.006 951,880,000
1. Apayao (Calanasan)-Ilocos Norte Rd - K0619+021 - K0621+000, K0631+113 - K0631+676
2.361 85,995,000
2. Claveria-Calanasan-Kabugao Rd - K0638+275 - K0642+034
3.750 150,000,000
3. Claveria-Calanasan-Kabugao Rd - K0642+034 - K0646+173
3.750 150,000,000
4. Claveria-Calanasan-Kabugao Rd - K0646+173 - K0649+600, K0652+700 - K0653+541
3.750 150,000,000
5. Claveria-Calanasan-Kabugao Rd - K0653+541 - K0655+420, K0656+935 - K0658+343
3.750 150,000,000
6. Claveria-Calanasan-Kabugao Rd - K0658+343 - K0661+929
3.750 150,000,000
7. Claveria-Calanasan-Kabugao Rd - K0661+929 - K0664+824
2.895 115,885,000
4. Benguet 1st DEO 5.753 230,090,000a. BENGUET (LONE DISTRICT) 5.753 230,090,000
1. Asin(KM 8)-Nangalisan-Sn Pascual,Tuba,Benguet-LU - K0266+072 - K0267+055, K0267+523 - K0267+583, K0268+412 - K0268+504, K0268+537 - K0268+962, K0268+972 - K0269+458, K0269+681 - K0269+979, K0272+473 - K0272+576, K0272+706 - K0272+768, K0272+794 - K0272+1049, K0273+437 - K0273+487, K0273+520 - K0273+728, K0273+790 - K0274+127, K0275+422 - K0275+494
3.296 130,000,000
2. Asin(KM 8)-Nangalisan-Sn Pascual,Tuba,Benguet-LU - K0275+531 - K0275+613, K0275+629 - K0275+1014, K0275+1050 - K0275+3040
2.457 100,090,000
5. Benguet 2nd DEO 28.183 1,128,330,000a. BENGUET (LONE DISTRICT) 28.183 1,128,330,000
1. Acop- Kapangan-Kibungan-Bakun Rd - K0266+963 - K0267+000, K0283+971 - K0284+020, K0284+273 - K0284+349, K0285+555 - K0285+582, K0307+591 - K0310+773, K0312+670 - K0312+939
3.750 150,000,000
2. Acop- Kapangan-Kibungan-Bakun Rd - K0312+939 - K0315+896, K0316+042 - K0316+112, K0316+202 - K0316+908
3.686 150,000,000
3. Acop- Kapangan-Kibungan-Bakun Rd - K0316+908 - K0318+167, K0319+-840 - K0320+771
3.859 150,000,000
4. Acop- Kapangan-Kibungan-Bakun Rd - K0320+771 - K0322+115, K0328+000 - K0330+238
3.750 150,000,000
5. Acop- Kapangan-Kibungan-Bakun Rd - K0330+238 - K0331+345, K0331+405 - K0333+965
3.679 150,000,000
details of dpwh’s programs/projects 837
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
6. Acop- Kapangan-Kibungan-Bakun Rd - K0333+965 - K0334+690, K0336+000 - K0336+198, K0336+288 - K0336+465, K0328+653 - K0330+057
2.450 98,010,000
7. Kiangan-Tinoc-Buguias Rd - Chainage 1047 - Chainage 1997, Chainage 5850 - Chainage 8074
3.174 130,320,000
8. Kiangan-Tinoc-Buguias Rd - Chainage 8074 - Chainage 11908
3.834 150,000,000
6. Ifugao 1st DEO 19.403 776,070,000a. IFUGAO (LONE DISTRICT) 19.403 776,070,000
1. Banaue-Hungduan-Benguet Bdry Rd - Chainage 1075 - Chainage 4825
3.750 150,000,000
2. Banaue-Hungduan-Benguet Bdry Rd - Chainage 4825 - Chainage 8477
3.652 146,080,000
3. Kiangan-Tinoc-Buguias Rd - Chainage 25277 - Chainage 25398, Chainage 35707 - Chainage 39337
3.751 150,000,000
4. Kiangan-Tinoc-Buguias Rd - Chainage 39337 - Chainage 43087
3.750 150,000,000
5. Kiangan-Tinoc-Buguias Rd - Chainage 43087 - Chainage 44907, Chainage 45668 - Chainage 46347
2.499 100,000,000
6. Kiangan-Tinoc-Buguias Rd - Chainage 46347 - Chainage 48348
2.001 79,990,000
7. Ifugao 2nd DEO 14.474 549,137,000a. IFUGAO (LONE DISTRICT) 14.474 549,137,000
1. Alfonso Lista - Aurora Bdry. Rd - K0447+130 - K0447+640, K0449+640 - K0452+110
2.980 89,377,000
2. Ubao-Taang Road - K0399+280 - K0399+390, K0400+837 - K0401+083, K0402+499 - K0402+635, K0404+940 - K0408+198
3.750 150,000,000
3. Ubao-Taang Road - K0408+198 - K0411+940
3.742 150,000,000
4. Ubao-Taang Road - K0411+940 - K0413+440
1.500 59,760,000
5. Ubao-Taang Road - K0413+440 - K0415+942
2.502 100,000,000
8. Kalinga DEO 38.507 1,224,834,000a. KALINGA (LONE DISTRICT) 38.507 1,224,834,000
1. Bulo Natl Road (Agbannawag-Bulo-Callagdao Sect) - K0503+400 - K0507+921, K0508+434 - K0508+454, K0508+478.55 - K0508+499, K0510+123 - K0510+143, K0510+168.75 - K0510+189
4.601 137,617,500
2. Lubuagan-Batong Buhay-Abra Bdry Rd - K0462+032 - K0464+536
2.500 100,000,000
3. Lubuagan-Batong Buhay-Abra Bdry Rd - K0464+536 - K0466+360, K0466+423 - K0466+546, K0466+744 - K0467+051, K0467+136 - K0467+401
2.504 100,000,000
4. Malalao Natl Rd (Agbannawag-Malalao-Bulo Sect) - K0514+690 - K0516+440, K0516+553 - K0518+356
3.553 95,000,000
5. Malalao Natl Rd (Agbannawag-Malalao-Bulo Sect) - K0519+144 - K0523+631
4.487 137,185,000
6. Rizal Natl Rd (Babalag-Kinama-Sn Francisco Sect) - K0529+520 - K0534+475
5.000 150,000,000
7. Rizal Natl Rd (Babalag-Kinama-Sn Francisco Sect) - K0534+475 - K0535+258, K0535+274 - K0535+580, K0535+980 - K0536+978, K0537+160 - K0539+422
4.410 132,300,000
8. Rizal Natl Rd (Romualdez-Santor-Calaocan-Sn Pascua - K0425+243 - K0425+393, K0426+228.20 - K0426+435, K0426+465 - K0428+074, K0428+683 - K0432+080
5.289 132,970,000
9. Tabuk-Banawe via Tanudan-Barlig Rd - K0522+831 - K0524+566, K0525+563 - K0527+291
3.514 139,761,500
10. Tabuk-Banawe via Tanudan-Barlig Rd - K0527+291 - K0529+953
2.649 100,000,000
9. Mt.Province DEO 26.116 976,904,000a. MOUNTAIN PROVINCE (LONE DISTRICT) 26.116 976,904,000
1. Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0408+567 - K0412+290
3.750 150,000,000
2. Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0412+290 - K0415+984
3.750 150,000,000
838 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
3. Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0415+984 - K0416+500, K0416+865 - K0416+948, K0417+119 - K0417+687, K0418+474 - K0421+058
3.750 150,000,000
4. Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0421+058 - K0424+817
3.750 150,000,000
5. Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0424+817 - K0427+391
2.500 100,000,000
6. Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0427+391 - K0429+417
1.923 76,904,000
7. Mt. Province-Isabela Rd - Chainage 12167 - Chainage 15499
3.332 100,000,000
8. Mt. Province-Isabela Rd - Chainage 7720 - Chainage 7886, Chainage 8972 - Chainage 12167
3.361 100,000,000
d. Region III 5.767 230,680,0001. Bataan 2nd DEO 5.767 230,680,000
a. BATAAN (SECOND DISTRICT) 5.767 230,680,0001. Bagac-Mariveles Rd -
K0166+061 - K0166+230, K0169+067 - K0171+0602.161 90,000,000
2. Bagac-Mariveles Rd - K0178+724 - K0182+324
3.606 140,680,000
e. Region IV-A 15.459 426,308,0001. Quezon 1st DEO 3.624 144,940,000
a. QUEZON (FIRST DISTRICT) 3.624 144,940,0001. Mauban-Tignoan Rd -
K0116+612 - K0116+717, K0123+116.50 - K0126+6153.624 144,940,000
2. Quezon 3rd DEO 4.486 125,935,000a. QUEZON (THIRD DISTRICT) 4.486 125,935,000
1. MSR Jct-Lopez-Catanauan Rd - K0243+700 - K0245+300, K0246+050 - K0248+912
4.486 125,935,000
3. Quezon 4th DEO 7.349 155,433,000a. QUEZON (FOURTH DISTRICT) 7.349 155,433,000
1. Quezon-Alabat-Perez Rd - K0018+539 - K0018+979, K0027+384 - K0027+460, K0031+431 - K0031+631, K0031+898 - K0031+925, K0032+764 - K0032+955, K0033+188 - K0033+353, K0033+472 - K0033+594, K0033+822 - K0033+894, K0034+166 - K0034+260, K0034+390 - K0034+604, K0034+702 - K0035+273, K0035+385 - K0036+094, K0037+630 - K0037+888, K0039+164 - K0040+767
4.709 100,000,000
2. Quezon-Alabat-Perez Rd - K0040+767 - K0042+010, K0042+083 - K0043+408
2.640 55,433,000
f. Region IV-B 55.019 1,556,164,0001. Marinduque DEO 4.163 129,235,000
a. MARINDUQUE (LONE DISTRICT) 4.163 129,235,0001. Dr Damian Reyes Rd (Boac Side) -
K0022+258 - K0024+0131.876 56,280,000
2. Dr Damian Reyes Rd (Torrijos Side) - K0045+141 - K0047+403
2.287 72,955,000
2. Mindoro Occidental DEO 21.577 546,695,000a. MINDORO OCCIDENTAL (LONE DISTRICT) 21.577 546,695,000
1. Crossing MWCR (Pola)-Casague-Jct Alacaak Rd - K0385+518.24 - K0388+255, K0391+634 - K0391+960, K0392+446 - K0393+285
3.912 100,000,000
2. Crossing MWCR (Pola)-Casague-Jct Alacaak Rd - K0393+285 - K0393+650, Chainage 0 - Chainage 3417
3.782 94,550,000
3. Jct MWCR (Labangan)-Murtha-Jct Iriron Rd - K0251+744 - K0252+951, K0253+589 - K0254+241, K0254+541 - K0256+004
3.269 83,250,000
4. Jct MWCR (Labangan)-Murtha-Jct Iriron Rd - K0256+343 - K0262+404
6.061 150,000,000
5. Sablayan Penal Colony Rd - K0325+820 - K0326+706, K0333+512 - K0335+212, K0335+284 - K0335+622, K0335+945 - K0337+555
4.553 118,895,000
3. Mindoro Occidental Sub DEO 9.446 309,249,000a. MINDORO OCCIDENTAL (LONE DISTRICT) 9.446 309,249,000
details of dpwh’s programs/projects 839
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
1. Jct TLLR-Binacas Rd - K0009+625 - K0012+265, K0012+664 - K0012+880, K0013+051 - K0014+265, K0014+349 - K0014+540
4.291 128,055,000
2. Tagbac-Lubang-Looc Rd - K0021+403 - K0021+538, K0021+632 - K0022+697, K0023+019 - K0024+404
2.642 100,000,000
3. Tagbac-Lubang-Looc Rd - K0024+404 - K0024+986, K0024+999 - K0026+943
2.513 81,194,000
4. Palawan 1st DEO 15.202 455,210,000a. PALAWAN (FIRST DISTRICT) 15.202 455,210,000
1. Coron-Busuanga Rd - K0013+809 - K0014+021, K0025+226 - K0025+376, K0028+451 - K0028+592, K0028+611 - K0028+745, K0029+243 - K0029+254, K0032+522 - K0032+689, K0032+727 - K0033+483, K0039+201 - K0039+620, K0041+241 - K0041+457, K0044+158 - K0045+000
3.344 100,000,000
2. Coron-Busuanga Rd - K0049+092 - K0050+000, K0058+226 - K0058+332, K0058+434 - K0058+537, K0059+778 - K0059+823, K0059+866 - K0059+870, K0064+987 - K0066+605, K0066+617 - K0067+830
4.056 136,810,000
3. Jct Paglaum-Bato Rd - K0190+655 - K0192+630, K0192+651 - K0194+699
4.032 118,400,000
4. Jct Paglaum-Bato Rd - K0194+749 - K0198+416
3.770 100,000,000
5. Palawan 2nd DEO 4.631 115,775,000a. PALAWAN (SECOND DISTRICT) 4.631 115,775,000
1. Palawan Circum. Rd (Panalingaan-Tagbita-Latud) - K0250+220 - K0253+800, K0255+470 - K0256+630
4.631 115,775,000
g. Region V 43.360 1,170,243,0001. Camarines Norte DEO 19.110 446,738,000
a. CAMARINES NORTE (FIRST DISTRICT) 19.110 446,738,0001. Sta. Elena-Capalonga By Pass Coastal Rd -
Chainage 11480 - Chainage 12090, Chainage 0 - Chainage 1530, Chainage 1545 - Chainage 2500, Chainage 2586 - Chainage 2700, Chainage 2730 - Chainage 2890, Chainage 2940 - Chainage 5700, Chainage 0 - Chainage 204, Chainage 800 - Chainage 1359
6.892 150,000,000
2. Sta. Elena-Capalonga By Pass Coastal Rd - Chainage 1359 - Chainage 4410, Chainage 6940 - Chainage 8120, Chainage 8453 - Chainage 10440
6.218 146,738,000
3. Sta. Elena-Capalonga By Pass Coastal Rd - Chainage 5480 - Chainage 11480
6.000 150,000,000
2. Camarines Sur 3rd DEO 5.022 169,883,000a. CAMARINES SUR (FOURTH DISTRICT) 5.022 169,883,000
1. Jct Balaynan-Tabgon-Lamon-Pinamihagan Rd - K0510+150 - K0510+563, K0510+650 - K0513+483
3.150 95,000,000
2. Tinambac-Siruma Rd - K0520+784 - K0520+811, K0534+960 - K0535+000, K0535+080 - K0535+098, K0535+240 - K0535+246, K0535+420 - K0535+444, K0535+900 - K0536+000, K0536+900 - K0537+000, K0541+300 - K0541+451, K0545+017 - K0545+803.10, K0545+839.20 - K0545+885.45, K0545+909.65 - K0546+492.65
1.872 74,883,000
3. Catanduanes DEO 8.213 260,987,000a. CATANDUANES (LONE DISTRICT) 8.213 260,987,000
1. Baras-Gigmoto-Viga Rd - K0061+474 - K0062+000, K0063+993 - K0065+483
2.033 60,987,000
2. Baras-Gigmoto-Viga Rd - K0065+483 - K0066+085.60, K0067+122 - K0069+008, K0071+457 - K0071+700
2.742 100,000,000
3. Baras-Gigmoto-Viga Rd - K0071+700 - K0073+444, K0073+585 - K0075+258
3.438 100,000,000
4. Masbate 3rd DEO 11.015 292,635,000a. MASBATE (FIRST DISTRICT) 11.015 292,635,000
1. Sn Pascual-Claveria Rd - K0026+402 - K0028+1142, K0029+803 - K0029+985, K0031+807 - K0033+926
5.082 142,635,000
840 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
2. Sn Pascual-Claveria Rd - K0034+757 - K0035+011, K0039+204 - K0042+178, K0017+035 - K0018+776, K0018+816 - K0018+934, K0025+615 - K0026+402
5.933 150,000,000
h. Region VI 32.433 1,035,531,0001. Antique DEO 2.065 80,066,000
a. ANTIQUE (LONE DISTRICT) 2.065 80,066,0001. Odiong-Sibalom-Sn Remigio-Leon Rd -
K0131+200 - K0132+752, K0134+-645 - K0134+-1842.065 80,066,000
2. Iloilo 2nd DEO 6.799 173,840,000a. ILOILO (FOURTH DISTRICT) 6.799 173,840,000
1. Balabag-Maquina-Cayos-Patlad Rd - K0287+612 - K0288+020, K0288+091 - K0289+058, K0289+239 - K0289+886
2.814 73,840,000
2. Passi-San Enrique-Garrita Rd - K0056+940 - K0057+735, K0062+402 - K0065+767
3.985 100,000,000
3. Iloilo 4th DEO 2.200 88,000,000a. ILOILO (SECOND DISTRICT) 2.200 88,000,000
1. Jct Bancal-Leon-Antique Bdry Rd - K0047+867 - K0050+000
2.200 88,000,000
4. Negros Occidental 1st DEO 4.388 146,490,000a. NEGROS OCCIDENTAL (FIRST DISTRICT) 2.869 85,730,000
1. Stop Aguinaldo-Bug-ang Rd - K0116+004 - K0116+581, K0116+642 - K0117+428, K0120+650 - K0121+309, K0121+627 - K0122+792
2.869 85,730,000
b. NEGROS OCCIDENTAL (THIRD DISTRICT) 1.519 60,760,0001. Silay-Lantawan Rd -
Chainage 5080 - Chainage 65991.519 60,760,000
5. Negros Occidental 2nd DEO 3.948 157,920,000a. NEGROS OCCIDENTAL (FIFTH DISTRICT) 3.948 157,920,000
1. Isabela-Libas Negros Occ. Bdry Rd - K0090+286 - K0092+791
2.500 100,000,000
2. Isabela-Libas Negros Occ. Bdry Rd - K0092+791 - K0094+304
1.448 57,920,000
6. Negros Occidental 3rd DEO 13.033 389,215,000a. NEGROS OCCIDENTAL (SIXTH DISTRICT) 13.033 389,215,000
1. Candoni-Sipalay Rd - K0152+843 - K0157+224
3.849 115,455,000
2. Candoni-Sipalay Rd - K0157+224 - K0161+048
3.392 100,000,000
3. Dancalan-Candoni-Damutan Valley Rd - K0138+780 - K0139+000, K0142+300 - K0145+416
3.333 100,000,000
4. Dancalan-Candoni-Damutan Valley Rd - K0145+416 - K0147+902
2.459 73,760,000
i. Region VII 32.140 943,930,0001. Bohol 3rd DEO 2.653 66,325,000
a. BOHOL (THIRD DISTRICT) 2.653 66,325,0001. Balilihan-Hanopol-Batuan Rd -
K0042+223 - K0044+8772.653 66,325,000
2. Cebu 4th DEO 11.605 344,355,000a. CEBU (SECOND DISTRICT) 11.605 344,355,000
1. Argao-Moalboal Rd - K0073+554 - K0073+564, K0074+007 - K0074+435, K0074+724 - K0077+360
3.134 94,020,000
2. Dalaguete-Mantalongon Badian Rd - K0100+612 - K0101+612, K0109+632 - K0110+742
2.177 65,310,000
3. Dalaguete-Mantalongon Badian Rd - K0110+-751 - K0112+607
3.397 100,000,000
4. Dalaguete-Mantalongon Badian Rd - K0112+917 - K0112+997, K0113+000 - K0115+759
2.897 85,025,000
3. Negros Oriental 1st DEO 8.411 252,330,000a. NEGROS ORIENTAL (FIRST DISTRICT) 8.411 252,330,000
1. Mabinay-Ayungon Rd - K0107+050 - K0108+184, K0108+236 - K0109+000, K0120+319 - K0120+348, K0121+692 - K0122+644, K0122+666 - K0122+886, K0123+084 - K0124+018, K0124+044 - K0125+000
4.989 150,000,000
details of dpwh’s programs/projects 841
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
2. Mabinay-Ayungon Rd - K0125+000 - K0126+462, K0126+689 - K0126+764, K0127+817 - K0128+385, K0128+648 - K0129+650, K0131+800 - K0131+862, K0134+358 - K0134+611
3.422 102,330,000
4. Negros Oriental 2nd DEO 1.884 56,170,000a. NEGROS ORIENTAL (SECOND DISTRICT) 1.884 56,170,000
1. Bayawan-Mabinay Rd. - K0143+430 - K0144+969, K0145+036 - K0145+095, K0148+724 - K0149+010
1.884 56,170,000
5. Negros Oriental 3rd DEO 7.587 224,750,000a. NEGROS ORIENTAL (THIRD DISTRICT) 7.587 224,750,000
1. Bayawan-Mabinay Rd. - K0131+500 - K0134+878
3.380 124,750,000
2. Bayawan-Mabinay Rd. - K0134+878 - K0139+086
4.207 100,000,000
j. Region VIII 9.422 294,050,0001. Leyte 2nd DEO 4.742 138,680,000
a. LEYTE (SECOND DISTRICT) 4.742 138,680,0001. Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd -
Chainage 0 - Chainage 34003.400 85,000,000
2. Burauen-Mahagnao Rd - K0987+704 - K0987+758, K0991+893 - K0992+687, K0992+856 - K0993+425
1.342 53,680,000
2. Leyte 3rd DEO 2.558 102,320,000a. LEYTE (THIRD DISTRICT) 2.558 102,320,000
1. Cabunga-an-Tabunok-Consuegra Rd - Chainage 302 - Chainage 2860
2.558 102,320,000
3. Southern Leyte DEO 2.122 53,050,000a. SOUTHERN LEYTE (LONE DISTRICT) 2.122 53,050,000
1. Jct Himay-angan-Silago-Abuyog Bdry Rd - K1128+878 - K1131+000
2.122 53,050,000
k. Region IX 49.055 1,411,651,0001. Zamboanga del Norte 1st DEO 8.734 257,700,000
a. ZAMBOANGA DEL NORTE (SECOND DISTRICT) 8.734 257,700,0001. Sindangan-Bayog-Lakewood Rd -
K1938+235 - K1941+969, K1942+000 - K1943+3305.064 150,000,000
2. Sindangan-Bayog-Lakewood Rd - K1943+330 - K1947+000
3.670 107,700,000
2. Zamboanga del Norte 3rd DEO 5.634 168,890,000a. ZAMBOANGA DEL NORTE (FIRST DISTRICT) 5.634 168,890,000
1. Ilaya-Isis-Polanco Rd - K1819+420 - K1821+389, K1821+408 - K1821+889
2.422 72,660,000
2. Polanco-Macleodes Rd - K1838+020 - K1839+180, K1839+787 - K1841+347, K1841+643 - K1842+334
3.212 96,230,000
3. Zamboanga del Sur 1st DEO 9.429 329,645,000a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 9.429 329,645,000
1. Eastern Bobongan-Sominot-Midsalip-Dumingag Rd - Chainage 11008 - Chainage 13000
1.992 79,645,000
2. Eastern Bobongan-Sominot-Midsalip-Dumingag Rd - Chainage 1478 - Chainage 1688, Chainage 1908 - Chainage 2461, Chainage 4334 - Chainage 8508
4.937 150,000,000
3. Eastern Bobongan-Sominot-Midsalip-Dumingag Rd - Chainage 8508 - Chainage 11008
2.500 100,000,000
4. Zamboanga del Sur 2nd DEO 17.511 445,521,000a. ZAMBOANGA DEL SUR (SECOND DISTRICT) 17.511 445,521,000
1. Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd - K1717+084 - K1717+369, K1720+953 - K1723+820
3.153 78,825,000
2. Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd - K1737+-880 - K1737+-040, K1744+888 - K1747+667
3.620 90,363,500
3. Sindangan-Bayog-Lakewood Rd - K1721+578.90 - K1721+650, K1723+760 - K1723+820, K1730+190 - K1730+480, K1731+000 - K1732+718, K1736+691 - K1736+883, K1744+110 - K1747+551
5.774 150,000,000
4. Sindangan-Bayog-Lakewood Rd - K1747+551 - K1751+606, K1751+710 - K1751+774, K1751+796 - K1751+821, K1751+910 - K1752+302, K1752+318 - K1752+747
4.964 126,332,500
5. Zamboanga Sibugay 1st DEO 7.747 209,895,000
842 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
a. ZAMBOANGA SIBUGAY (FIRST DISTRICT) 7.747 209,895,0001. Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd -
K1752+500 - K1755+075, K1756+000 - K1756+6663.242 97,260,000
2. Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd - K1766+160 - K1768+579.80, K1770+646.40 - K1770+955, K1770+990 - K1771+700, K1772+900 - K1773+968
4.505 112,635,000
l. Region X 87.640 2,998,847,0001. Bukidnon 1st DEO 7.576 289,530,000
a. BUKIDNON (SECOND DISTRICT) 7.576 289,530,0001. Jct SH Aglayan-Zamboanguita Rd -
K1565+000 - K1567+5722.500 100,000,000
2. Jct SH Aglayan-Zamboanguita Rd - K1567+572 - K1570+094
2.081 83,240,000
3. Jct SH-Aglayan-Alanib-Ticalaan Rd (Aglayan-Basak) - K1544+347 - K1544+906, K1547+860 - K1548+000, K1551+145 - K1551+242, K1554+729 - K1555+920, K1565+030 - K1566+306
2.995 106,290,000
2. Bukidnon 2nd DEO 13.026 407,470,000a. BUKIDNON (THIRD DISTRICT) 13.026 407,470,000
1. Dologon-Kisanday-Ginoyuran Rd - K1550+000 - K1552+065, K1552+490 - K1553+677
3.259 91,510,000
2. Kibawe-Kadingilan-Kalilangan Rd - K1586+716 - K1588+055, K1588+743 - K1588+819, K1588+910 - K1591+571
4.064 150,000,000
3. Kibawe-Kadingilan-Kalilangan Rd - K1591+571 - K1591+1026, K1594+360 - K1597+392
3.334 100,000,000
4. Kibawe-Kadingilan-Kalilangan Rd - K1597+392 - K1599+570
2.369 65,960,000
3. Bukidnon 3rd DEO 15.085 552,577,000a. BUKIDNON (FIRST DISTRICT) 15.085 552,577,000
1. Jct SH-Aglayan-Alanib-Ticalaan Rd (Aglayan-Basak) - K1567+-965 - K1567+775, Jct SH-Aglayan-Alanib-Ticalaan Rd (Aglayan-Basak) - K1582+145.83 - K1583+372
2.989 118,007,000
2. Jct SH-Manolo Fortich-Libona-Indahag Rd - K1450+378 - K1454+062, K1471+228 - K1472+191
4.120 136,080,000
3. Misamis Or-Bukidnon-Agusan Rd - K1438+354 - K1438+520, K1444+023 - K1447+558
3.750 150,000,000
4. Misamis Or-Bukidnon-Agusan Rd - K1447+558 - K1449+684
2.174 86,960,000
5. Ticalaan-Iligan Rd (Mamaon-Ragongon Sect) - K1496+-493.38 - K1497+157, K1498+186 - K1498+624
2.051 61,530,000
4. Lanao del Norte 1st DEO 13.757 458,510,000a. LANAO DEL NORTE (SECOND DISTRICT) 13.757 458,510,000
1. Lala-Salvador-Tubod Rd - K1614+251 - K1617+327, K1617+494 - K1618+853
4.436 128,000,000
2. Lanao del Norte Interior Circum. Rd (LDNICR) - K1553+729 - K1554+933, K1555+707 - K1556+390, K1556+465 - K1556+966, K1557+484 - K1557+974
2.878 100,000,000
3. Lanao del Norte Interior Circum. Rd (LDNICR) - K1576+-121 - K1578+065, K1580+164 - K1580+978, K1581+158 - K1582+451
4.293 150,000,000
4. Lanao del Norte Interior Circum. Rd (LDNICR) - K1582+451 - K1584+601
2.150 80,510,000
5. Lanao del Norte 2nd DEO 12.894 477,470,000a. ILIGAN CITY (LONE DISTRICT) 12.894 477,470,000
1. Overton-Abaga Bdry Rd - K1534+931 - K1538+192
3.307 132,280,000
2. Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd - K1534+729 - K1534+956, K1535+240 - K1537+000, K1552+989 - K1553+000, K1556+508 - K1557+000
2.569 100,000,000
3. Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd - K1561+024 - K1563+320
2.352 100,000,000
details of dpwh’s programs/projects 843
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
4. Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd - K1569+351 - K1570+214, K1573+272 - K1575+100, K1578+500 - K1580+500
4.666 145,190,000
6. Misamis Occidental 2nd DEO 6.569 262,680,000a. MISAMIS OCCIDENTAL (SECOND DISTRICT) 6.569 262,680,000
1. Bonifacio-Don Victoriano Rd - K0000+399 - K0000+514, K0000+685 - K0001+006, K0001+036 - K0001+425, K0001+741 - K0002+857, K0003+285 - K0003+844
2.500 100,000,000
2. Bonifacio-Don Victoriano Rd - K0003+844 - K0004+294, K0004+635 - K0005+570
1.385 55,320,000
3. Bonifacio-Don Victoriano Rd - K1678+824 - K1680+971, K1681+101 - K1681+638
2.684 107,360,000
7. Regional Office X - Proper 18.733 550,610,000a. BUKIDNON (FOURTH DISTRICT) 18.733 550,610,000
1. Jct Maradugao-Camp Kibaritan-Dominorog Rd - K1606+276 - K1609+544, K1611+694 - K1613+286
4.000 100,000,000
2. Jct Maradugao-Camp Kibaritan-Dominorog Rd - K1613+286 - K1617+177
4.000 100,000,000
3. Kalilangan-Lampanusan Rd - K1606+052 - K1611+335
4.495 134,840,000
4. Kalilangan-Lampanusan Rd - K1611+335 - K1616+187
3.333 100,000,000
5. Kibawe-Kadingilan-Kalilangan Rd - K1608+460 - K1609+469, K1610+376 - K1612+332
2.905 115,770,000
m. Region XI 21.025 699,070,0001. Compostela Valley DEO 7.260 200,000,000
a. COMPOSTELA VALLEY (FIRST DISTRICT) 7.260 200,000,0001. Montevista-Compostela-Mati Bdry Rd -
K1465+500 - K1470+270, K1470+300 - K1470+7006.020 150,000,000
2. Montevista-DNAS Rd - K1421+069 - K1422+332
1.240 50,000,000
2. Davao City DEO 2.830 84,900,000a. DAVAO CITY (SECOND DISTRICT) 2.830 84,900,000
1. Fatima-Malabog Rd - K1507+174 - K1507+466, K1508+300 - K1508+395, K1514+093 - K1515+000, K1516+973 - K1518+502
2.830 84,900,000
3. Davao del Sur 1st DEO 6.289 251,560,000a. DAVAO DEL SUR (LONE DISTRICT) 6.289 251,560,000
1. Bansalan-Mt Apo Natl Park Rd - K1597+034 - K1599+525
2.504 101,560,000
2. Bansalan-Mt Apo Natl Park Rd - K1601+-1518 - K1601+-333, K1601+-317 - K1603+415
3.785 150,000,000
4. Davao del Sur 2nd DEO 2.529 80,000,000a. DAVAO OCCIDENTAL (LONE DISTRICT) 2.529 80,000,000
1. Demoloc-Little Baguio-Alabel Rd - K1640+840 - K1642+082
1.242 40,000,000
2. H-way Jct Mana-Ticulon-Lagumit-Little Baguio Rd - K1648+438 - K1649+773
1.287 40,000,000
5. Davao Oriental 2nd DEO 2.117 82,610,000a. DAVAO ORIENTAL (SECOND DISTRICT) 2.117 82,610,000
1. Tibanban-Lavigan Rd - K1796+171 - K1796+349, K1804+312 - K1804+450, K1819+124 - K1820+973
2.117 82,610,000
n. Region XII 71.333 2,514,687,0001. Cotabato 1st DEO 27.487 838,062,000
a. COTABATO (SECOND DISTRICT) 9.917 396,667,0001. Magpet-Nowa-Doroluman-Greenfield Rd -
K1647+187 - K1650+9393.750 150,000,000
2. Magpet-Nowa-Doroluman-Greenfield Rd - K1650+939 - K1654+689
3.750 150,000,000
3. Magpet-Nowa-Doroluman-Greenfield Rd - K1654+689 - K1657+106
2.417 96,667,000
b. COTABATO (THIRD DISTRICT) 17.570 441,395,0001. Matalam-Lampayan-Antipas Rd -
K1652+007 - K1653+275, K1653+548 - K1656+304, K1659+430 - K1659+534, K1661+280 - K1662+940
5.914 150,000,000
844 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
2. Matalam-Lampayan-Antipas Rd - K1662+940 - K1663+548, K1663+569 - K1668+888
6.000 150,000,000
3. Matalam-Lampayan-Antipas Rd - K1668+888 - K1674+485
5.656 141,395,000
2. Sarangani DEO 23.937 905,785,000a. SARANGANI (LONE DISTRICT) 23.937 905,785,000
1. Demoloc-Little Baguio-Alabel Rd - K1667+740 - K1667+800, K1676+900 - K1679+342
2.500 100,080,000
2. Demoloc-Little Baguio-Alabel Rd - K1679+342 - K1681+842
2.500 100,000,000
3. Demoloc-Little Baguio-Alabel Rd - K1681+842 - K1685+593
3.750 150,000,000
4. Demoloc-Little Baguio-Alabel Rd - K1685+593 - K1689+343
3.750 150,000,000
5. Demoloc-Little Baguio-Alabel Rd - K1689+343 - K1693+093
3.750 150,000,000
6. Maitum-Lake Sebu Rd - K1778+950 - K1783+569
4.619 150,000,000
7. Maitum-Lake Sebu Rd - K1783+569 - K1786+425, K1765+354 - K1765+400, K1768+162 - K1768+328
3.068 105,705,000
3. South Cotabato DEO 19.909 770,840,000a. SOUTH COTABATO (SECOND DISTRICT) 19.909 770,840,000
1. Surallah-Lake Sebu-Maitum Rd - Chainage 2982 - Chainage 4856, Chainage 0 - Chainage 1701
3.575 143,000,000
2. Surallah-Lake Sebu-Maitum Rd - K1767+180 - K1768+000, Chainage 0 - Chainage 2480, Chainage 2510 - Chainage 2982
3.750 150,000,000
3. Surallah-Lake Sebu-Maitum Rd (S00295MN) - Chainage 0 - Chainage 3950
3.950 150,000,000
4. Surallah-Lake Sebu-Maitum Rd (S00295MN) - Chainage 11850 - Chainage 15800
3.950 150,000,000
5. Surallah-Lake Sebu-Maitum Rd (S00295MN) - Chainage 3950 - Chainage 7900
3.950 150,000,000
6. Surallah-Lake Sebu-Maitum Rd (S00295MN) - Chainage 7900 - Chainage 8634
0.734 27,840,000
o. Region XIII 25.611 821,441,0001. Agusan del Norte DEO 6.414 207,940,000
a. AGUSAN DEL NORTE (SECOND DISTRICT) 6.414 207,940,0001. Buenavista-Bunaguit Rd (S00390MN) -
Chainage 2538 - Chainage 53542.816 100,000,000
2. Buenavista-Bunaguit Rd (S00390MN) - Chainage 5354 - Chainage 8952
3.598 107,940,000
2. Agusan del Sur 1st DEO 12.445 382,950,000a. AGUSAN DEL SUR (FIRST DISTRICT) 12.445 382,950,000
1. Agusan-Malaybalay Rd - K1290+217 - K1292+717
2.500 100,000,000
2. Butuan City-Talacogon-Loreto-Veruela-Sta Josefa R (S00448MN) - Chainage 0 - Chainage 3764
3.764 94,100,000
3. Butuan City-Talacogon-Loreto-Veruela-Sta Josefa R (S00828MN) - K1325+256 - K1325+388, K1327+501 - K1330+731, K1330+944 - K1331+300
3.681 88,850,000
4. NRJ Bayugan-Calaitan-Tandag Rd - K1284+279 - K1286+722
2.500 100,000,000
3. Agusan del Sur 2nd DEO 2.071 61,740,000a. AGUSAN DEL SUR (SECOND DISTRICT) 2.071 61,740,000
1. NRJ Pulanglupa-Sta Josefa Rd - K1373+920 - K1376+000
2.071 61,740,000
4. Butuan City DEO 3.092 115,080,000a. AGUSAN DEL NORTE (FIRST DISTRICT) 3.092 115,080,000
1. Butuan City-Pianing-Tandag Rd - K1246+621 - K1249+860
3.092 115,080,000
5. Surigao del Norte 2nd DEO 1.589 53,731,000a. SURIGAO DEL NORTE (FIRST DISTRICT) 1.589 53,731,000
1. Jct Del Carmen-Sta Monica-Sn Isidro Rd - K0057+311 - K0057+756, K0058+099 - K0058+255, K0059+700 - K0059+1688
1.589 53,731,000
III. District Engineering Office 61.632 1,830,718,000
a. Region II 9.776 265,812,0001. Cagayan 1st DEO 0.136 3,400,000
a. CAGAYAN (FIRST DISTRICT) 0.136 3,400,000
details of dpwh’s programs/projects 845
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
1. Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd - Chainage 1200 - Chainage 1336
0.136 3,400,000
2. Cagayan 2nd DEO 0.972 24,300,000a. CAGAYAN (SECOND DISTRICT) 0.972 24,300,000
1. Cadcadir-Kabugao Rd - K0605+722 - K0606+699
0.972 24,300,000
3. Cagayan 3rd DEO 1.960 49,000,000a. CAGAYAN (THIRD DISTRICT) 1.960 49,000,000
1. Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd - Chainage 3000 - Chainage 4960
1.960 49,000,000
4. Isabela 2nd DEO 1.101 33,030,000a. ISABELA (SECOND DISTRICT) 1.101 33,030,000
1. Ilagan-Delfin Albano-Mallig Rd - K0439+882 - K0440+983
1.101 33,030,000
5. Nueva Vizcaya 1st DEO 0.234 6,822,000a. NUEVA VIZCAYA (LONE DISTRICT) 0.234 6,822,000
1. Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno RdK0315+536 - K0315+748, K0318+050 - K0318+072
0.234 6,822,000
6. Nueva Vizcaya 2nd DEO 1.697 50,760,000a. NUEVA VIZCAYA (LONE DISTRICT) 1.697 50,760,000
1. Aritao-Quirino Rd - K0292+584 - K0293+000, K0276+406 - K0276+858, K0279+895 - K0280+276, K0283+241 - K0283+332
1.371 41,000,000
2. Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd - K0278+684 - K0278+926
0.242 7,260,000
3. Jct Victoria-Maddela-Nagtipunan Rd via Alicia - K0282+185 - K0282+269
0.084 2,500,000
7. Quirino DEO 3.676 98,500,000a. QUIRINO (LONE DISTRICT) 3.676 98,500,000
1. Jct Abbag-Gingin Bdry Rd - K0402+541 - K0404+541
2.041 49,500,000
2. Jct Victoria-Maddela-Alicia-Kasibu Bdry Rd (Jct Ba - K0380+171 - K0381+122, K0384+330.60 - K0384+368, K0385+000 - K0385+640
1.635 49,000,000
b. CAR 4.102 161,480,0001. Apayao 2nd DEO 1.203 48,120,000
a. APAYAO (LONE DISTRICT) 1.203 48,120,0001. Apayao-Ilocos Norte Rd -
K0727+373 - K0728+5761.203 48,120,000
2. Benguet 1st DEO 0.976 39,040,000a. BENGUET (LONE DISTRICT) 0.976 39,040,000
1. Baguio-Itogon Rd - K0265+879 - K0265+919
0.040 1,600,000
2. City Limit-Sto Tomas Rd - K0263+600 - K0264+163
0.598 23,920,000
3. Itogon-Dalupirip-Sn Manuel Bdry Rd - K0269+257 - K0269+552, K0277+742 - K0277+785
0.338 13,520,000
3. Kalinga DEO 0.837 33,480,000a. KALINGA (LONE DISTRICT) 0.837 33,480,000
1. Balbalan-Pinukpuk Rd - K0499+103 - K0499+940
0.837 33,480,000
4. Mt.Province DEO 1.086 40,840,000a. MOUNTAIN PROVINCE (LONE DISTRICT) 1.086 40,840,000
1. Bananao Access Rd - Chainage 900 - Chainage 1160
0.260 7,800,000
2. Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0377+-917 - K0377+-091
0.826 33,040,000
c. Region III 1.065 26,625,0001. Pampanga 1st DEO 1.065 26,625,000
a. PAMPANGA (FOURTH DISTRICT) 1.065 26,625,0001. Baliwag-Candaba-Sta Ana Rd -
K0067+517 - K0068+1420.539 13,475,000
2. Sto. Tomas-Minalin Road (Minalin-Macabebe Sect) - K0068+240 - K0068+766
0.526 13,150,000
d. Region IV-A 2.696 58,525,0001. Quezon 3rd DEO 2.377 49,500,000
a. QUEZON (THIRD DISTRICT) 2.377 49,500,0001. Catanauan-Buenavista Rd -
K0250+-482 - K0250+141, K0260+012 - K0261+7512.377 49,500,000
846 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
2. Quezon 4th DEO 0.319 9,025,000a. QUEZON (FOURTH DISTRICT) 0.319 9,025,000
1. MSR Jct-Lopez-Catanauan Rd - K0230+060 - K0230+270, K0234+463 - K0234+572
0.319 9,025,000
e. Region IV-B 6.537 219,855,0001. Mindoro Occidental DEO 1.414 41,060,000
a. MINDORO OCCIDENTAL (LONE DISTRICT) 1.414 41,060,0001. Bulalacao-Sn Jose-Jct Mapaya Rd -
K0219+-559 - K0219+052, K0227+076 - K0227+6071.142 34,260,000
2. Jct MWCR (Labangan)-Murtha-Jct Iriron Rd - K0283+334 - K0283+606
0.272 6,800,000
2. Mindoro Occidental Sub DEO 0.551 16,360,000a. MINDORO OCCIDENTAL (LONE DISTRICT) 0.551 16,360,000
1. Jct Lubang-Binakas-Barac Rd - K0009+052 - K0009+458
0.406 12,180,000
2. Jct TLLR-Tanggal Rd - K0003+-539 - K0003+-500
0.039 1,000,000
3. Jct TLLR-Tumibo-Lubang-Binacas Rd - K0003+860 - K0003+900, K0005+280 - K0005+346
0.106 3,180,000
3. Palawan 2nd DEO 0.801 24,000,000a. PALAWAN (SECOND DISTRICT) 0.801 24,000,000
1. Palawan Circum. Rd (Panalingaan-Tagbita-Latud) - K0059+355 - K0060+124
0.801 24,000,000
4. Romblon DEO 3.771 138,435,000a. ROMBLON (LONE DISTRICT) 3.771 138,435,000
1. Concepcion East-West Rd - K0078+-1739 - K0078+-1254, K0078+106 - K0078+189
0.568 17,215,000
2. Jct Linawan-Mablaran Falls Rd - K0024+466 - K0024+581, K0024+714 - K0025+014
0.415 12,450,000
3. Jct. TCR-Batiano Complex Rd - Chainage 27 - Chainage 206
0.179 5,370,000
4. Lubi-Binoog Rd - K0060+460 - K0060+1329, K0062+301 - K0062+661
1.229 49,000,000
5. Odiongan-East-West Rd - K0007+660 - K0007+740, K0008+237 - K0008+295
0.138 5,400,000
6. Parpagoha (Marigondon)-Binoog Rd - K0017+-272 - K0017+-200, K0021+956 - K0023+087
1.242 49,000,000
f. Region V 2.664 78,405,0001. Camarines Sur 3rd DEO 2.461 73,330,000
a. CAMARINES SUR (FOURTH DISTRICT) 2.461 73,330,0001. Goa-Digdigon-Sn Isidro Rd -
K0501+130 - K0501+510, K0502+250 - K0502+819, K0502+919 - K0503+005
1.068 32,040,000
2. Jct Balaynan-Tabgon-Lamon-Pinamihagan Rd - K0508+158 - K0508+424, K0508+633 - K0509+091, K0509+295 - K0509+953
1.393 41,290,000
2. Masbate 3rd DEO 0.203 5,075,000a. MASBATE (FIRST DISTRICT) 0.203 5,075,000
1. Sn Fernando-Talisay Rd - K0009+505 - K0009+708
0.203 5,075,000
g. Region VI 9.644 276,525,0001. Antique DEO 0.767 22,995,000
a. ANTIQUE (LONE DISTRICT) 0.767 22,995,0001. Bugo-Gen Fullon Rd -
K0129+202.50 - K0129+287, K0130+-701 - K0130+-377, K0130+-158 - K0130+000
0.567 16,995,000
2. Sn Remigio-Bugo Rd - K0126+020 - K0126+220
0.200 6,000,000
2. Capiz 2nd DEO 1.276 38,905,000a. CAPIZ (SECOND DISTRICT) 1.276 38,905,000
1. Jct Natl Rd-Mi-anay-Duyoc-Calaan-Panitan Rd - K0102+021 - K0102+830
0.809 20,225,000
2. Tapaz-Jamindan-Altavaz Rd - K0116+400 - K0116+867
0.467 18,680,000
3. Iloilo 2nd DEO 2.101 52,525,000a. ILOILO (FOURTH DISTRICT) 1.980 49,500,000
details of dpwh’s programs/projects 847
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
1. Balabag-Maquina-Cayos-Patlad Rd - K0284+865 - K0286+000, K0286+500 - K0287+163, K0287+181 - K0287+612
1.980 49,500,000
b. ILOILO (THIRD DISTRICT) 0.121 3,025,0001. Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd -
K0032+889 - K0033+0000.121 3,025,000
4. Iloilo 4th DEO 1.005 30,150,000a. ILOILO (SECOND DISTRICT) 1.005 30,150,000
1. Guimbal-Igbaras-Tubungan-Leon Rd - K0065+1405 - K0066+452, K0066+727 - K0066+773
0.561 16,830,000
2. Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd - K0028+167 - K0028+611
0.444 13,320,000
5. Negros Occidental 1st DEO 3.157 98,500,000a. NEGROS OCCIDENTAL (FIRST DISTRICT) 3.157 98,500,000
1. Prosperidad-Quezon-Cabaron Rd - K0069+697 - K0071+035
1.650 49,500,000
2. Stop Aguinaldo-Bug-ang Rd - K0113+595 - K0115+200
1.507 49,000,000
6. Negros Occidental 3rd DEO 1.338 33,450,000a. NEGROS OCCIDENTAL (SIXTH DISTRICT) 1.338 33,450,000
1. Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd -K0133+458 - K0134+807
1.338 33,450,000
h. Region VII 3.105 97,669,0001. Bohol 1st DEO 1.055 34,800,000
a. BOHOL (FIRST DISTRICT) 1.055 34,800,0001. Antequera-San Isidro-Libertad (Tubigon) Rd -
K0025+065 - K0025+286, K0038+-260 - K0038+-2380.243 9,720,000
2. Antequera-San Isidro-Libertad (Tubigon) Rd - K0043+720 - K0044+080
0.416 9,240,000
3. Balilihan-Hanopol-Batuan Rd - K0039+200 - K0039+422
0.222 8,880,000
4. Panglao Island Circumferential Rd - Chainage 1830 - Chainage 2004
0.174 6,960,000
2. Cebu 3rd DEO 0.360 14,400,000a. CEBU (THIRD DISTRICT) 0.360 14,400,000
Tapal (Carcar) Zaragosa-Olango-Aloguinsan Rd - K0085+449 - K0085+809
0.360 14,400,000
3. Cebu 4th DEO 0.718 17,589,000a. CEBU (SECOND DISTRICT) 0.718 17,589,000
1. Argao-Ronda Rd - K0086+081 - K0086+126, K0086+500 - K0087+081, K0088+221 - K0088+311
0.718 17,589,000
4. Negros Oriental 2nd DEO 0.972 30,880,000a. NEGROS ORIENTAL (SECOND DISTRICT) 0.972 30,880,000
1. Mabinay-Ayungon Rd - K0095+-350 - K0095+-014, K0096+320 - K0096+684, K0096+871 - K0096+943, K0099+600 - K0099+800
0.972 30,880,000
i. Region VIII 12.234 328,423,0001. Leyte 1st DEO 1.848 59,940,000
a. LEYTE (FIRST DISTRICT) 1.848 59,940,0001. Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd -
Chainage 1937 - Chainage 21670.230 9,200,000
2. Leyte-Samar Inter-Provl Rd - K0911+400 - K0912+060, K0912+095 - K0912+343
0.941 30,430,000
3. Mainit-Sn Miguel-Santol Rd - K0951+090 - K0951+767
0.677 20,310,000
2. Leyte 3rd DEO 0.671 24,930,000a. LEYTE (THIRD DISTRICT) 0.671 24,930,000
1. Sn Isidro-Daja Rd - K1021+759 - K1022+020, K1026+145 - K1026+169, K1026+280 - K1026+286
0.333 12,990,000
2. Tabing-Kawayan-Sta Rosa-Lawis-Tabango Rd - K1031+737 - K1031+839, K1031+960 - K1032+102
0.338 11,940,000
3. Northern Samar 1st DEO 8.549 196,913,000a. NORTHERN SAMAR (FIRST DISTRICT) 8.549 196,913,000
1. Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose - Chainage 10460 - Chainage 10912, Chainage 13830 - Chainage 14953
1.575 45,000,000
848 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
2. Mondragon-Bantayan Old Rd - Chainage 3047 - Chainage 5128
2.081 44,000,000
3. Pob-Gengarog-Tubigdanao-Sn Lorenzo-Bonglas-Manduga - K0731+348 - K0733+104, K0733+159 - K0733+201
1.813 45,000,000
4. Poblacion-Barangay Trujillo Rd - K0737+839 - K0738+620, K0741+1419 - K0741+3001
2.372 45,000,000
5. Sn Antonio Circumferential Rd - K0005+037 - K0005+745
0.708 17,913,000
4. Tacloban City DEO 1.166 46,640,000a. LEYTE (FIRST DISTRICT) 1.166 46,640,000
1. Tigbao-Sta Fe-Sn Miguel Rd - K0913+876 - K0914+764, K0907+455 - K0907+638
1.166 46,640,000
j. Region IX 2.816 100,370,0001. Zamboanga del Norte 2nd DEO 0.807 24,210,000
a. ZAMBOANGA DEL NORTE (THIRD DISTRICT) 0.807 24,210,0001. ZNAC Access Rd -
K1989+-825 - K1989+-778, K1989+161 - K1989+9210.807 24,210,000
2. Zamboanga del Norte 3rd DEO 1.195 47,800,000a. ZAMBOANGA DEL NORTE (FIRST DISTRICT) 1.195 47,800,000
1. Piñan-Mutia Rd - K1828+571 - K1829+766
1.195 47,800,000
3. Zamboanga del Sur 2nd DEO 0.394 15,760,000a. ZAMBOANGA DEL SUR (SECOND DISTRICT) 0.394 15,760,000
1. Jct Tubod-Lakewood Rd - K1711+735 - K1712+128
0.394 15,760,000
4. Zamboanga Sibugay 2nd DEO 0.420 12,600,000a. ZAMBOANGA SIBUGAY (SECOND DISTRICT) 0.420 12,600,000
1. Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd - K1758+000 - K1758+420
0.420 12,600,000
k. Region X 4.400 135,680,0001. Bukidnon 1st DEO 0.082 2,050,000
a. BUKIDNON (SECOND DISTRICT) 0.082 2,050,0001. Jct SH-Bangcud-Mailag Rd (By-Pass Rd) -
K1525+595 - K1525+6770.082 2,050,000
2. Bukidnon 2nd DEO 2.182 63,010,000a. BUKIDNON (THIRD DISTRICT) 2.182 63,010,000
1. Jct Dologon-Busco-Quezon Rd - K1558+619 - K1559+109
0.490 12,250,000
2. Jct Dologon-Panadtalan - K1546+514 - K1546+973, K1550+-280 - K1550+897
1.636 49,080,000
3. Jct Sayre Highway-Damulog Poblacion Rd - K1595+709 - K1595+765
0.056 1,680,000
3. Bukidnon 3rd DEO 0.200 8,000,000a. BUKIDNON (FIRST DISTRICT) 0.200 8,000,000
1. Jct SH-Aglayan-Alanib-Ticalaan (Ticalaan-Paganan) - K1508+196 - K1508+396
0.200 8,000,000
4. Lanao del Norte 1st DEO 1.209 36,225,000a. LANAO DEL NORTE (SECOND DISTRICT) 1.209 36,225,000
1. Bacolod-Madalum Highway - K1573+323 - K1574+367, K1574+815 - K1574+980
1.209 36,225,000
5. Lanao del Norte 2nd DEO 0.727 26,395,000a. LANAO DEL NORTE (FIRST DISTRICT) 0.727 26,395,000
1. Bacolod-Madalum Highway - K1564+405 - K1564+584
0.179 4,475,000
2. Tubod-Ganassi Road - K1611+874 - K1612+421
0.548 21,920,000
l. Region XI 1.161 38,050,0001. Davao del Sur 2nd DEO 1.003 34,100,000
a. DAVAO OCCIDENTAL (LONE DISTRICT) 1.003 34,100,0001. H-way Jct Mana-Ticulon-Lagumit-Little Baguio Rd -
K1653+494 - K1654+1750.658 20,300,000
2. Pangian-Pinalpalan-Demolok Rd - Chainage 44 - Chainage 389
0.345 13,800,000
2. Davao Oriental 2nd DEO 0.158 3,950,000a. DAVAO ORIENTAL (SECOND DISTRICT) 0.158 3,950,000
1. Dahican-Lawigan Road - K1716+523 - K1716+681
0.158 3,950,000
details of dpwh’s programs/projects 849
AMOUNT (Php)PROGRAMS / ACTIVITIES / PROJECTS
m. Region XII 0.437 14,475,0001. Cotabato 1st DEO 0.437 14,475,000
a. COTABATO (SECOND DISTRICT) 0.437 14,475,0001. Kidapawan-Ilomavis Tourist Rd -
K1629+407 - K1629+508, K1629+568 - K1629+670, K1635+060 - K1635+229
0.372 12,850,000
2. Matalam-Lampayan-Antipas Rd - K1674+485 - K1674+550
0.065 1,625,000
n. Region XIII 0.994 28,824,0001. Agusan del Norte DEO 0.085 3,400,000
a. AGUSAN DEL NORTE (SECOND DISTRICT) 0.085 3,400,0001. Buenavista-Bunaguit Rd (S00396MN) -
K1271+919 - K1272+0000.085 3,400,000
2. Dinagat Islands DEO 0.909 25,424,000a. DINAGAT ISLAND (LONE DISTRICT) 0.909 25,424,000
1. Dinagat-Loreto Rd - K0087+463 - K0088+000
0.465 13,950,000
2. Jct Bolodbolod-Albor Rd - K0061+294 - K0061+415
0.121 3,025,000
3. Jct Mabini-Tubajon Rd - K0085+-2362 - K0085+-2198, K0085+-1397 - K0085+-1362, K0086+435 - K0086+486
0.250 6,250,000
4. Jct Magsaysay-Cagdianao Rd - Chainage 468.7 - Chainage 542
0.073 2,199,000
850 eXpeNditUre program fY 2016 VolUme ii
4. Construction and Maintenance of Bridges along National Roads 24,053,454,000
a. Replacement of Bridges from Temporary to Permanent 1,036,710,000
I. Central Office 317,660,000
a. CAR 155,660,0001. Apayao 1st DEO 155,660,000
a. APAYAO (LONE DISTRICT) 155,660,0001. Matalag Br. (B02242LZ) along Conner-Kabugao Rd 155,660,000
b. Region IV-B 152,000,0001. Mindoro Occidental DEO 152,000,000
a. MINDORO OCCIDENTAL (LONE DISTRICT) 152,000,0001. Manoot Br. (B00145MR) along Jct MWCR (Labangan)-
Murtha-Jct Iriron Rd152,000,000
c. Nationwide 10,000,0001. Central Office 10,000,000
a. NATIONWIDE 10,000,0001. Replacement of Bridges (Temporary to Permanent) 10,000,000
II. Regional Office Proper 141,870,000
a. Region IV-B 141,870,0001. Palawan 2nd DEO 66,000,000
a. PALAWAN (SECOND DISTRICT) 66,000,0001. Ransang Br. (B00014PW) along Palawan Circum. Rd 66,000,000
2. Romblon DEO 75,870,000a. ROMBLON (LONE DISTRICT) 75,870,000
1. Punong Br. (B00012SY) along Sibuyan Circumferential Rd
75,870,000
III. District Engineering Office 577,180,000
a. Region II 31,500,0001. Cagayan 2nd DEO 31,500,000
a. CAGAYAN (SECOND DISTRICT) 31,500,0001. Banga Br. 1 (B04518LZ) along Jct Logac-Lasam-
Gagabutan Rd10,500,000
2. Minugyan Br. (B04286LZ) along Jct Logac-Lasam-Gagabutan Rd
10,500,000
3. Talat Br. (B04519LZ) along Jct Logac-Lasam-Gagabutan Rd
10,500,000
b. CAR 248,350,0001. Apayao 1st DEO 86,000,000
a. APAYAO (LONE DISTRICT) 86,000,0001. Buyukan Br. (B02232LZ) along Kabugao-Pudtol-Luna-
Cagayan Bdry Rd12,000,000
2. Manguli Br. 1 (B04238LZ) along Kabugao-Pudtol-Luna-Cagayan Bdry Rd
22,000,000
3. Nagyadan Br. 1 (B04240LZ) along Kabugao-Pudtol-Luna-Cagayan Bdry Rd
12,000,000
4. Nagyadan Br. 2 (B04241LZ) along Kabugao-Pudtol-Luna-Cagayan Bdry Rd
12,000,000
5. Sibayan Br. (B04243LZ) along Kabugao-Pudtol-Luna-Cagayan Bdry Rd
28,000,000
2. Benguet 1st DEO 25,000,000a. BENGUET (LONE DISTRICT) 25,000,000
1. Anapol Br. (B04278LZ) along Asin(KM 8)-Nangalisan-Sn Pascual,Tuba,Benguet-LU
25,000,000
3. Benguet 2nd DEO 67,000,000a. BENGUET (LONE DISTRICT) 67,000,000
1. Malikliko Br. (B02077LZ) along Acop- Kapangan-Kibungan-Bakun Rd
22,000,000
2. Namalitok Br. (B02076LZ) along Acop- Kapangan-Kibungan-Bakun Rd
45,000,000
4. Kalinga DEO 29,050,000a. KALINGA (LONE DISTRICT) 29,050,000
1. Basao Br. (B00952LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd
13,800,000
2. Makilo Br. (B00951LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd
15,250,000
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
details of dpwh’s programs/projects 851
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
5. Mt.Province DEO 41,300,000a. MOUNTAIN PROVINCE (LONE DISTRICT) 41,300,000
1. Gawa Br. (B00928LZ) along Mt Prov-Cagayan via Tabuk-Enrile Rd (Completion)
2,000,000
2. Sinigpit Br. (B04310LZ) along Mt. Province-Isabela Rd 19,500,000
3. Sinmakbot Br. (B04311LZ) along Mt. Province-Isabela Rd
19,800,000
c. Region IV-B 170,230,0001. Mindoro Occidental DEO 18,700,000
a. MINDORO OCCIDENTAL (LONE DISTRICT) 18,700,0001. Mimacor Br. (B00192MR) along Crossing MWCR (Pola)-
Casague-Jct Alacaak Rd18,700,000
2. Palawan 2nd DEO 151,530,000a. PALAWAN (SECOND DISTRICT) 151,530,000
1. Colby Br. (B00292PW) along Palawan Circum. Rd (Panalingaan-Tagbita-Latud)
41,530,000
2. Ibat-ong Br. (B00291PW) along Aramaywan-Berong-Pto Princesa Rd
25,000,000
3. Isugod Br. (B00078PW) along Quezon-Aramaywan Rd 25,000,000
4. Lubgob Br. (B00079PW) along Quezon-Aramaywan Rd 25,000,000
5. Tagusao Br. (B00002PW) along Quezon-Punta Baja Rd 35,000,000
d. Region V 44,100,0001. Masbate 3rd DEO 44,100,000
a. MASBATE (FIRST DISTRICT) 44,100,0001. Clemente Br. (B00002TC) along Sn Fernando South Rd 44,100,000
e. Region IX 20,000,0001. Zamboanga del Sur 2nd DEO 20,000,000
a. ZAMBOANGA DEL SUR (SECOND DISTRICT) 20,000,0001. Buburay Br. (B01712MN) along Zamboanga del Sur
Coastal Rd (Completion)20,000,000
f. Region XII 63,000,0001. Sultan Kudarat 2nd DEO 63,000,000
a. SULTAN KUDARAT (SECOND DISTRICT) 63,000,0001. Sebayor Br. 3 (B01146MN) along Awang-Upi-Lebak-
Kalamansig-Palimbang-Sarangani Rd (Completion)45,000,000
2. Tran II Br. (B01760MN) along SNA-Lebak-Kalamansig Rd
18,000,000
852 eXpeNditUre program fY 2016 VolUme ii
b. Replacement of Permanent Weak Bridges 4,396,635,000
1. Central Office 1,406,500,000a. Region II 350,000,000
1. Isabela 1st DEO 350,000,000a. ISABELA (FIRST DISTRICT) 350,000,000
1. Cabagan-Sta.Maria Br. (B03236LZ) along Cabagan-StaMaria Rd (Completion)
350,000,000
b. Region III 696,000,0001. Aurora DEO 166,000,000
a. AURORA (LONE DISTRICT) 166,000,0001.
Diteki "A" Br. (B02828LZ) along Nueva Ecija-Aurora Rd166,000,000
2. Bulacan 1st DEO 300,000,000a. BULACAN (SECOND DISTRICT) 300,000,000
1. Gen. Alejo Santos Br. (B00013LZ) along Baliwag-BustosRd
300,000,000
3. Bulacan 2nd DEO 230,000,000a. BULACAN (THIRD DISTRICT) 230,000,000
1. Sta. Lucia Br. (B04456LZ) along Eastern Bulacan Rd 230,000,000
c. Region IV-B 150,500,0001. Mindoro Occidental DEO 150,500,000
a. MINDORO OCCIDENTAL (LONE DISTRICT) 150,500,0001. Pandurucan Br. (B00078MR) along Mindoro West
Coastal Rd150,500,000
d. Region VI 200,000,0001. Iloilo 1st DEO 200,000,000
a. ILOILO (FIRST DISTRICT) 200,000,0001. Tumagbok Br. (B00131PN) along Iloilo-Antique Rd 200,000,000
e. Nationwide 10,000,0001. Central Office 10,000,000
a. NATIONWIDE 10,000,0001. Replacement of Permanent Weak Bridges 10,000,000
2. Regional Office Proper 2,008,553,000a. Region I 201,033,000
1. Ilocos Norte 2nd DEO 65,000,000a. ILOCOS NORTE (SECOND DISTRICT) 65,000,000
1. Malamin Br. (B02410LZ) along Ilocos Norte-Abra Rd 65,000,000
2. Pangasinan 1st DEO 53,050,000a. PANGASINAN (FIRST DISTRICT) 53,050,000
1. Garita Br. (B00864LZ) along Alaminos-Bolinao Rd 53,050,000
3. Pangasinan 2nd DEO 36,980,000a. PANGASINAN (SECOND DISTRICT) 20,920,000
1. San Jose Br. (B02145LZ) along Pangasinan-ZambalesRd (Completion)
2,000,000
2. Sobol Br. (B00681LZ) along Pangasinan-Tarlac Rd 18,920,000b. PANGASINAN (FOURTH DISTRICT) 16,060,000
1. Tambac Br. (B02156LZ) along Pangasinan-La Union Inter-Provl Rd
16,060,000
4. Pangasinan 3rd DEO 46,003,000a. PANGASINAN (FIFTH DISTRICT) 46,003,000
1. Tabuyog Br. (B00727LZ) along Manila North Rd (Completion)
46,003,000
b. Region II 165,500,0001. Isabela 3rd DEO 28,500,000
a. ISABELA (THIRD DISTRICT) 28,500,0001. Luzon Br. (B03238LZ) along Cauayan-Cabatuan Rd 28,500,000
2. Isabela 4th DEO 137,000,000a. ISABELA (FOURTH DISTRICT) 137,000,000
1. Garit Br. (B01202LZ) along Jct Ipil-Quirino Bdry Rd 75,000,0002. Sisim Br. (B01206LZ) along Jct Ipil-Quirino Bdry Rd 62,000,000
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
details of dpwh’s programs/projects 853
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
c. CAR 50,000,0001. Benguet 1st DEO 50,000,000
a. BENGUET (LONE DISTRICT) 50,000,0001. Camp 5 Br. 2 (B02182LZ) along Kennon Rd 50,000,000
d. Region III 269,000,0001. Aurora DEO 55,000,000
a. AURORA (LONE DISTRICT) 55,000,0001. Duongan Br. (B02833LZ) along Nueva Ecija-Aurora Rd
(Baler-Cemento Sect)55,000,000
2. Bataan 2nd DEO 90,000,000a. BATAAN (SECOND DISTRICT) 90,000,000
1. Mariveles Br. (B01591LZ) along Mariveles-Talaga BayRd
90,000,000
3. Nueva Ecija 1st DEO 100,000,000a. NUEVA ECIJA (SECOND DISTRICT) 100,000,000
1. Ganduz Br. (B03208LZ) along Jct Pinagpanaan-Rizal-Pantabangan Rd
100,000,000
4. Tarlac 2nd DEO 24,000,000a. TARLAC (THIRD DISTRICT) 24,000,000
1. Anupul Br. (B02687LZ) along Manila North Rd 24,000,000
e. Region IV-A 99,000,0001. Batangas 2nd DEO 54,000,000
a. BATANGAS (SECOND DISTRICT) 54,000,0001. Biga Br. 2 (Steel Type) (B03034LZ) along Batangas-
Lobo Rd54,000,000
2. Quezon 4th DEO 45,000,000a. QUEZON (FOURTH DISTRICT) 45,000,000
1.Pandanan Br. (B02591LZ) along Daang Maharlika (LZ)
45,000,000
f. Region IV-B 277,750,0001. Marinduque DEO 63,750,000
a. MARINDUQUE (LONE DISTRICT) 63,750,0001. Bantay Br. (B00037MQ) along Dr Damian Reyes Rd
(Boac Side)63,750,000
2. Mindoro Occidental DEO 106,000,000a. MINDORO OCCIDENTAL (LONE DISTRICT) 106,000,000
1. Caguray Br. (B00168MR) along Mindoro Oriental/Occidental East Coastal Rd
106,000,000
3. Palawan 3rd DEO 108,000,000a. PALAWAN (THIRD DISTRICT) 108,000,000
1.Iraan Br. (B00021PW) along Puerto Princesa South Rd
108,000,000
g. Region V 82,220,0001. Sorsogon 2nd DEO 82,220,000
a. REGIONWIDE 82,220,0001. Barcelona Br. (B00173LZ) along Ariman-Jct Bulusan
Lake Rd82,220,000
h. Region VI 265,530,0001. Aklan DEO 64,000,000
a. AKLAN (LONE DISTRICT) 64,000,0001. Balete Br. (B00283PN) along Aklan East Rd 64,000,000
2. Capiz 2nd DEO 113,130,000a. CAPIZ (SECOND DISTRICT) 113,130,000
1. Ilo Br. (B00022PN) along Mambusao-Imbug Rd 63,540,0002. Ivisan Br. (B00239PN) along Iloilo-Capiz Rd (New
Route)49,590,000
3. Iloilo 1st DEO 88,400,000a. ILOILO (FIRST DISTRICT) 88,400,000
1. Quianan Br. 1 (B00146PN) along Iloilo-Antique Rd 88,400,000
i. Region VII 121,600,0001. Bohol 3rd DEO 50,000,000
a. BOHOL (THIRD DISTRICT) 50,000,0001. Makapiko Br. (B00117BH) along Balilihan-Hanopol-
Batuan Rd (Completion)50,000,000
2. Cebu 3rd DEO 57,600,000
854 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
a. CEBU (THIRD DISTRICT) 57,600,0001. Talavera Br. (B00546CB) along Toledo-Tabuelan-Sn
Remigio Rd57,600,000
3. Cebu 4th DEO 7,000,000a. CEBU (SECOND DISTRICT) 7,000,000
1. Luka Br. 2 (B00026CB) along N Bacalso Ave (CebuSouth Rd)
7,000,000
4. Cebu 5th DEO 7,000,000a. CEBU (FIFTH DISTRICT) 7,000,000
1. Guimbal Br. (B00582CB) along Cebu North HagnayaWharf Rd
7,000,000
j. Region VIII 114,320,0001. Leyte 2nd DEO 38,000,000
a. LEYTE (SECOND DISTRICT) 38,000,0001.
Hiagsam Br. (B00524LT) along Palo-Carigara-Ormoc Rd38,000,000
2. Leyte 4th DEO 36,320,000a. LEYTE (FOURTH DISTRICT) 36,320,000
1.Libungao Br. (B00183LT) along Palo-Carigara-Ormoc Rd
28,320,000
2. Sacaotan Br. (B00564LT) along Ormoc-Baybay-SouthernLeyte Bdry Rd
8,000,000
3. Northern Samar 1st DEO 40,000,000a. NORTHERN SAMAR (FIRST DISTRICT) 40,000,000
1. Veriato Br. (B00239SM) along Daang Maharlika (SM)(Sn Isidro-Sn Juanico Br)
40,000,000
k. Region IX 84,600,0001. Zamboanga del Norte 1st DEO 24,600,000
a. ZAMBOANGA DEL NORTE (SECOND DISTRICT) 24,600,0001. Bogatong Br. (B00443MN) along Dipolog-Sindangan-
Liloy Rd12,000,000
2. Lipras Br. (B00435MN) along Dipolog-Sindangan-LiloyRd
12,600,000
2. Zamboanga del Sur 1st DEO 60,000,000a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 60,000,000
1. Bayao Br. (B01201MN) along Lanao-Pagadian-Zamboanga City Rd
60,000,000
l. Region X 130,000,0001. Lanao del Norte 2nd DEO 130,000,000
a. ILIGAN CITY (LONE DISTRICT) 70,000,0001. Mandulog Br. 1 (B00606MN) along H-way Secondary
Div Rd (Completion)70,000,000
b. LANAO DEL NORTE (FIRST DISTRICT) 60,000,0001. Larapan Br. (B00942MN) along Linamon-Zamboanga Rd
(Completion)60,000,000
m. Region XII 25,000,0001. Sultan Kudarat 1st DEO 25,000,000
a. SULTAN KUDARAT (FIRST DISTRICT) 25,000,0001. Allah Br. (B00615MN) along Marbel-Allah Valley-
Cotabato Rd (Completion)25,000,000
n. Region XIII 123,000,0001. Surigao del Sur 1st DEO 123,000,000
a. SURIGAO DEL SUR (FIRST DISTRICT) 123,000,0001. Tago-gamut Br. (B00701MN) along Surigao-Davao
Coastal Rd123,000,000
3. District Engineering Office 981,582,000a. NCR 52,353,000
1. Malabon-Navotas DEO 6,853,000a. MALABON CITY (LONE DISTRICT) 6,853,000
1. Malabon Br. (B01740LZ) along P Aquino Rd (Letre)(Completion)
6,853,000
2. North Manila DEO 30,000,000a. MANILA CITY (THIRD DISTRICT) 30,000,000
1. Quiricada Br. (B02269LZ) along Quiricada St 30,000,000
details of dpwh’s programs/projects 855
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
3. South Manila DEO 15,500,000a. MANILA CITY (SIXTH DISTRICT) 15,500,000
1. Otis Br. (B02299LZ) along Paz Mendoza Guazon (OtisSt) (Completion)
15,500,000
b. Region I 167,520,0001. La Union 1st DEO 41,120,000
a. LA UNION (FIRST DISTRICT) 41,120,0001. Alimungao East Br. (B04181LZ) along Alilem-Sugpon-
Sudipen Rd13,200,000
2. Alimungao West Br. (B04180LZ) along Alilem-Sugpon-Sudipen Rd
17,920,000
3. Ilocano Br. (B04182LZ) along Alilem-Sugpon-SudipenRd
10,000,000
2. Pangasinan 1st DEO 46,800,000a. PANGASINAN (FIRST DISTRICT) 46,800,000
1. Embarcadero Br. 1 (B00863LZ) along Alaminos-Bolinao Rd
46,800,000
3. Pangasinan 2nd DEO 79,600,000a. PANGASINAN (FOURTH DISTRICT) 79,600,000
1. Guibel Br. (B01325LZ) along Mangaldan-Manaoag-Binalonan Rd
30,600,000
2. Mangueragday Br. (B00755LZ) along Dagupan-Bonuan-San Fabian Rd (Completion)
49,000,000
c. Region II 85,000,0001. Cagayan 1st DEO 37,000,000
a. CAGAYAN (FIRST DISTRICT) 37,000,0001. Zinarag Br. (B01035LZ) along Manila North Rd (Jct
Bangag-Paruddun Sect)37,000,000
2. Isabela 1st DEO 30,000,000a. ISABELA (FIRST DISTRICT) 30,000,000
1. Aga Br. 1 (B01142LZ) along Ilagan-Delfin Albano-MalligRd
30,000,000
3. Nueva Vizcaya 1st DEO 18,000,000a. NUEVA VIZCAYA (LONE DISTRICT) 18,000,000
1. Batungbaket Br. (B02819LZ) along Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno Rd
18,000,000
d. CAR 83,900,0001. Benguet 2nd DEO 38,000,000
a. BENGUET (LONE DISTRICT) 38,000,0001. Palew Br. (B02680LZ) along Acop- Kapangan-Kibungan-
Bakun Rd38,000,000
2. Kalinga DEO 45,900,000a. KALINGA (LONE DISTRICT) 45,900,000
1. Cudal Br. (B00986LZ) along Bulanao-Paracelis Rd 45,900,000
e. Region III 212,980,0001. Aurora DEO 30,800,000
a. AURORA (LONE DISTRICT) 30,800,0001. Diduan Br. (B04213LZ) along Baler-Casiguran Rd
(Dinadiawan-Casiguran Sect)30,800,000
2. Bataan 1st DEO 13,000,000a. BATAAN (FIRST DISTRICT) 13,000,000
1. Malimatac Br. (B01550LZ) along Jct Layac-Balanga-Mariveles Port Rd
7,000,000
2. Orani Br. 1 (B01554LZ) along Jct Layac-Balanga-Mariveles Port Rd
6,000,000
3. Bulacan 1st DEO 21,000,000a. BULACAN (FIRST DISTRICT) 21,000,000
1. Cut-Cut Br. (B02101LZ) along Pulilan-Calumpit Rd 21,000,000
4. Bulacan 2nd DEO 7,580,000a. BULACAN (THIRD DISTRICT) 7,580,000
1. Niugan Br. 2 (B01661LZ) along Gen Alejo Santos Highway
7,580,000
5. Pampanga 1st DEO 84,000,000a. PAMPANGA (FOURTH DISTRICT) 84,000,000
1. Bahay Pare Br. (B01497LZ) along Baliwag-Candaba-StaAna Rd
35,000,000
856 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
2. Caduang Tete Br. (B01462LZ) along Apalit-Macabebe-Masantol Rd
49,000,000
6. Pampanga 3rd DEO 18,000,000a. PAMPANGA (FIRST DISTRICT) 18,000,000
1. Paranum Br. (B01956LZ) along Arayat-Magalang-Mabalacat Rd
18,000,000
7. Tarlac 1st DEO 38,600,000a. TARLAC (FIRST DISTRICT) 38,600,000
1. Matubog Br. (B00087LZ) along Paniqui-Camiling-WawaRd
38,600,000
f. Region IV-B 75,730,0001. Mindoro Occidental Sub-DEO 32,000,000
a. MINDORO OCCIDENTAL (LONE DISTRICT) 32,000,0001. Libis Br. (B00001CA) along Libis Lighthouse-Buli
Lighthouse Rd32,000,000
2. Palawan 3rd DEO 21,000,000a. PALAWAN (THIRD DISTRICT) 21,000,000
1. Sicsican Br. (B00170PW) along Puerto Princesa South Rd
21,000,000
3. Romblon DEO 22,730,000a. ROMBLON (LONE DISTRICT) 22,730,000
1. Fuente - De La Paz Br. (B00002RB) along Romblon Port Rd
5,750,000
2. Fuerte Progreso Br. (B00004RB) along Romblon-Cogon-Sablayan Rd
4,560,000
3. Tinimbawan Br. (B00016SY) along SibuyanCircumferential Rd
12,420,000
g. Region V 92,400,0001. Albay 1st DEO 49,850,000
a. ALBAY (FIRST DISTRICT) 49,850,0001. Malinao Br. (B00244LZ) along DM Jct-Legazpi-Sto
Domingo-Tabaco-Cam. Sur Bdry49,850,000
2. Camarines Sur 3rd DEO 6,000,000a. CAMARINES SUR (FOURTH DISTRICT) 6,000,000
1. Mabca Br. (B00475LZ) along Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente
6,000,000
3. Sorsogon 2nd DEO 36,550,000a. REGIONWIDE 36,550,000
1. Taisan Br. (B00180LZ) along Ariman-Jct Bulusan Lake Rd
36,550,000
h. Region VI 52,650,0001. Antique DEO 6,600,000
a. ANTIQUE (LONE DISTRICT) 6,600,0001.
Lisub Br. (B00416PN) along Anini-y-Tobias Fornier Rd6,600,000
2. Capiz 2nd DEO 4,450,000a. CAPIZ (SECOND DISTRICT) 4,450,000
1. Quisan Br. (B00054PN) along Jct Natl Rd-Dumarao-Sn Rafael (Iloilo) Rd (Completion)
4,450,000
3. Negros Occidental 2nd DEO 5,000,000a. NEGROS OCCIDENTAL (FIFTH DISTRICT) 5,000,000
1. Si-ag Br. (B00383NR) along Isabela-Libas Negros Occ. Bdry Rd
5,000,000
4. Negros Occidental 3rd DEO 36,600,000a. NEGROS OCCIDENTAL SIXTH (5TH) 36,600,000
1. Gilis Br. (B00237NR) along Bacolod South Rd (Kabankalan-Hinobaan Section)
9,600,000
2. Pasalan Br. (B00234NR) along Bacolod South Rd (Kabankalan-Hinobaan Section)
12,000,000
3.Pinag-ulingan Br. (B00278NR) along Candoni-Sipalay Rd
15,000,000
i. Region VII 25,100,0001. Bohol 3rd DEO 15,900,000
a. BOHOL (THIRD DISTRICT) 15,900,0001. Candangas Br. (B00091BH) along Jct Dat-an-Carmen-
Sierra Bullones-Pilar-Alicia Rd15,900,000
details of dpwh’s programs/projects 857
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
2. Cebu City DEO 9,200,000a. CEBU CITY (FIRST DISTRICT) 9,200,000
1. F. Sotto Br. (B00425CB) along F Sotto Drive 9,200,000
j. Region VIII 5,700,0001. Biliran DEO 5,700,000
a. BILIRAN (LONE DISTRICT) 5,700,0001.
Banlas Br. (B00061BR) along Maripipi Circumferential Rd5,700,000
k. Region IX 103,249,0001. Zamboanga del Sur 1st DEO 57,500,000
a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 57,500,0001. Bucayan Br. (B01677MN) along Eastern Bobongan-
Sominot-Midsalip-Dumingag Rd (Completion)33,000,000
2. Ramon Magsaysay Br. (B00469MN) along Jct Switch-Jct Monte Alegre Rd (Completion)
24,500,000
2. Zamboanga del Sur 2nd DEO 45,749,000a. ZAMBOANGA DEL SUR (SECOND DISTRICT) 45,749,000
1. Dinas Br. (B00538MN) along Jct Dumalinao-Margosatubig Rd
45,749,000
l. Region XIII 25,000,0001. Surigao del Norte 1st DEO 25,000,000
a. SURIGAO DEL NORTE (SECOND DISTRICT) 25,000,0001. Daywan Br. (B00987MN) along Surigao-Davao Coastal
Rd (Completion)25,000,000
858 eXpeNditUre program fY 2016 VolUme ii
c. Retrofitting/ Strengthening of Permanent Bridges 1,758,994,000
I. Central Office 10,000,000a. Nationwide 10,000,000
1. Central Office 10,000,000a. NATIONWIDE 10,000,000
1. Retrofitting/ Strengthening of Bridges 10,000,000
II. Regional Office Proper 737,797,000a. Region I 55,150,000
1. Ilocos Sur 2nd DEO 3,150,000a. ILOCOS SUR (SECOND DISTRICT) 3,150,000
1. Alambique Br. (B00619LZ) along Manila North Rd 3,150,000
2. Pangasinan 2nd DEO 52,000,000a. PANGASINAN (SECOND DISTRICT) 52,000,000
1.Guesang-Magsaysay Br. (B02773LZ) along Lingayen-Labrador Div Rd 52,000,000
b. Region II 6,000,0001. Isabela 1st DEO 2,000,000
a. ISABELA (FIRST DISTRICT) 2,000,000
1.Magassi Br. (B01133LZ) along Daang Maharlika (LZ)
2,000,000
2. Isabela 2nd DEO 4,000,000a. ISABELA (SECOND DISTRICT) 4,000,000
1.Laguinday Br. (B01164LZ) along Santiago-Tuguegarao Rd 4,000,000
c. Region III 6,908,0001. Nueva Ecija 1st DEO 6,908,000
a. NUEVA ECIJA (FIRST DISTRICT) 1,175,000
1.Lomboy Br. 1 (B01964LZ) along Daang Maharlika (LZ)
1,175,000 b. NUEVA ECIJA (SECOND DISTRICT) 5,733,000
1. Digdig Br. (B00121LZ) along Daang Maharlika (LZ) 5,733,000
d. Region IV-A 80,256,0001. Quezon 4th DEO 80,256,000
a. QUEZON (FOURTH DISTRICT) 80,256,0001. Canda Br. (B02589LZ) along Daang Maharlika (LZ) 8,525,000
2.Inaclagan Br. (B02573LZ) along Daang Maharlika (LZ)
10,000,000
3.Inagbuhan Br. (B02574LZ) along Daang Maharlika (LZ)
13,145,000
4.Lumutan Br. (B02571LZ) along Daang Maharlika (LZ)
6,341,000
5.Manguisian Br. (B02587LZ) along Daang Maharlika (LZ)
15,675,000
6.Sipay-Sipay Br. (B02593LZ) along Daang Maharlika (LZ)
15,290,000 7. Sugod Br. (B02585LZ) along Daang Maharlika (LZ) 2,700,000
8.Villa Padua Br. (B02578LZ) along Daang Maharlika (LZ)
8,580,000
e. Region VII 63,594,0001. Cebu 2nd DEO 49,000,000
a. CEBU (FIRST DISTRICT) 49,000,000
1.Mananga Br. 2 (B00072CB) along N Bacalso Ave (Cebu South Rd) 49,000,000
2. Negros Oriental 1st DEO 7,000,000a. NEGROS ORIENTAL (FIRST DISTRICT) 7,000,000
1.Hiba-iyo Br. (B00138NR) along Dumaguete North Rd (Jct Bais-Kabankalan-NOccBdry) 4,500,000
2.Malapay Br. (B00140NR) along Dumaguete North Rd (Jct Bais-Kabankalan-NOccBdry) 2,500,000
3. Negros Oriental 2nd DEO 7,594,000a. NEGROS ORIENTAL (SECOND DISTRICT) 7,594,000
1.Ocoy Br. (B00074NR) along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) 7,594,000
f. Region VIII 429,597,0001. Leyte 1st DEO 19,767,000
a. LEYTE (FIRST DISTRICT) 19,767,000
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
details of dpwh’s programs/projects 859
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
1.Malaihao Br. (B00048LT) along Palo-Carigara-Ormoc Rd
5,000,000
2.Malirong Br. (B00044LT) along Palo-Carigara-Ormoc Rd
10,167,000
3.San Roque Br. (B00042LT) along Daang Maharlika (LT)
4,600,000
2. Leyte 2nd DEO 49,500,000a. LEYTE (SECOND DISTRICT) 49,500,000
1.Cabungaan Br. (B00525LT) along Palo-Carigara-Ormoc Rd 6,000,000
2.Cotcot Br. (B00494LT) along Palo-Carigara-Ormoc Rd
3,000,000
3.Hibucawan Br. (B00523LT) along Palo-Carigara-Ormoc Rd 4,500,000
4.Jugaban Br. (B00532LT) along Palo-Carigara-Ormoc Rd
5,000,000
5.Lemon Br. (B00008LT) along Palo-Carigara-Ormoc Rd
15,000,000
6.Masalago Br. (B00007LT) along Palo-Carigara-Ormoc Rd
10,000,000
7.Ponong Br. (B00492LT) along Palo-Carigara-Ormoc Rd
3,500,000
8.Sagkahan Br. (B00528LT) along Palo-Carigara-Ormoc Rd 2,500,000
3. Leyte 4th DEO 307,830,000a. LEYTE (FOURTH DISTRICT) 307,830,000
1.Bacan Br. (B00582LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 33,885,000
2.Bagongbong Br. (B00569LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 56,273,000
3.Binolho Br. (B00572LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 22,739,000
4.Calingatnan Br. (B00578LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 13,275,000
5.Dayhagan Br. (B00189LT) along Palo-Carigara-Ormoc Rd 6,855,000
6.Ipil Br. (B00567LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 5,625,000
7.Juaton Br. (B00187LT) along Palo-Carigara-Ormoc Rd
2,010,000
8.Macabug Br. (B00570LT) along Ormoc-Baybay-SouthernLeyte Bdry Rd 3,285,000
9.Matilog Br. (B00581LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 6,060,000
10.Naliwatan Br. (B00573LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 8,676,000
11.Palanas Br. (B00580LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 18,500,000
12.Panalian Br. 1 (B00565LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 21,000,000
13.Panalian Br. 2 (B00566LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 12,772,000
14.Seguinon Br. (B00574LT) along Ormoc-Baybay-SouthernLeyte Bdry Rd 13,251,000
15.Sibugay Br. (B00577LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 36,194,000
16.Tabgas Br. (B00579LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 12,900,000
17.Talisayan Br. (B00575LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 14,688,000
18.Tinag-an Br. (B00568LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 9,027,000
19.Valencia Br. (B00185LT) along Palo-Carigara-Ormoc Rd
10,815,000
4. Leyte 5th DEO 7,000,000a. LEYTE (FIFTH DISTRICT) 7,000,000
1.Calbiga-a Br. (B00248LT) along Ormoc-Baybay-SouthernLeyte Bdry Rd 7,000,000
5. Northern Samar 1st DEO 25,500,000a. NORTHERN SAMAR (FIRST DISTRICT) 25,500,000
1.Caaguit-itan Br. 1 (B00242SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) 13,600,000
2.Tangolon Br. (B00244SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) 11,900,000
6. Southern Leyte DEO 20,000,000a. SOUTHERN LEYTE (LONE DISTRICT) 20,000,000
860 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
1.Subang Daku Br. (B00587LT) along Daang Maharlika (LT) 20,000,000
g. Region IX 25,836,0001. Zamboanga del Norte 1st DEO 10,836,000
a. ZAMBOANGA DEL NORTE (SECOND DISTRICT) 10,836,000
1.Pasanan Br. (B00450MN) along Dipolog-Sindangan-Liloy Rd 10,836,000
2. Zamboanga del Norte 3rd DEO 15,000,000a. ZAMBOANGA DEL NORTE (FIRST DISTRICT) 15,000,000
1.
Sicot Br. (Cantilever) (B00421MN) along Dipolog-Punta-Dansullan-S Osmeña-Zambo N/Sur Bdry (Completion)
15,000,000
h. Region XI 3,000,0001. Davao del Sur 1st DEO 3,000,000
a. DAVAO DEL SUR (LONE DISTRICT) 3,000,000
1.Balutakay Br. (B00136MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect) 3,000,000
i. Region XII 67,456,0001. Cotabato 1st DEO 8,656,000
a. COTABATO (SECOND DISTRICT) 8,656,000
1.San Vicente Br. (B00237MN) along Makilala-Allah Valley Rd 8,656,000
2. Cotabato 2nd DEO 58,800,000a. COTABATO (FIRST DISTRICT) 50,000,000
1.Pagalungan Br. (B00305MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect) 50,000,000
b. COTABATO (THIRD DISTRICT) 8,800,000
1.Malabuaya Br. (B00299MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect) 8,800,000
III. District Engineering Office 1,011,197,000a. NCR 60,800,000
1. Malabon-Navotas DEO 20,000,000a. MALABON CITY (LONE DISTRICT) 20,000,000
1. C-4 Br. 1 (B01751LZ) along C-4 Road 10,000,0002. C-4 Br. 2 (B01750LZ) along C-4 Road 10,000,000
2. Metro Manila 3rd DEO 13,500,000a. VALENZUELA CITY (SECOND DISTRICT) 13,500,000
1.Malinta Interchange Br. (Left) (B01784LZ) along Polo-Novaliches Rd 13,500,000
3. North Manila DEO 11,500,000a. MANILA CITY (THIRD DISTRICT) 10,000,000
1. Dimasalang Br. (B01820LZ) along Dimasalang St 10,000,000b. MANILA CITY (FOURTH DISTRICT) 1,500,000
1. Legarda Br. (B01778LZ) along Legarda St 1,500,000
4. Quezon City 1st DEO 1,500,000a. QUEZON CITY (SIXTH DISTRICT) 1,500,000
1.Tullahan Br. 3 (SB) (B01322LZ) along Mindanao Ave
1,500,000
5. South Manila DEO 14,300,000a. MANILA CITY (FIFTH DISTRICT) 14,300,000
1. Lagusnilad Br. (B01321LZ) along P Burgos Street 6,800,0002. San Andres Br. (B02307LZ) along Sn Andres St 7,500,000
b. Region I 25,380,0001. La Union 2nd DEO 7,380,000
a. LA UNION (SECOND DISTRICT) 7,380,0001. Maoasoas Br. (B00832LZ) along Rosario-Pugo Rd 7,380,000
details of dpwh’s programs/projects 861
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
2. Pangasinan 3rd DEO 18,000,000a. PANGASINAN (SIXTH DISTRICT) 18,000,000
1.Aragaag Br. (B01625LZ) along Binalonan-Asingan-Santa Maria Rd 18,000,000
c. Region II 6,900,0001. Batanes DEO 4,900,000
a. BATANES (LONE DISTRICT) 4,900,000
1.Disvayangan Br. (B00010BN) along Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd 4,900,000
2. Isabela 2nd DEO 2,000,000a. ISABELA (SECOND DISTRICT) 2,000,000
1.Alibadabad Br. (B01177LZ) along Naguilian-Sn Mariano Rd 2,000,000
d. Region III 120,605,0001. Aurora DEO 85,000,000
a. AURORA (LONE DISTRICT) 85,000,000
1.Aguang Br. (B03015LZ) along Baler-Casiguran Rd (Baler-Dinadiawan) 35,000,000
2.Baul Br. (B03423LZ) along Baler-Casiguran Rd (Baler-Dinadiawan) 30,000,000
3.Disogon Br. (B03280LZ) along Baler-Casiguran Rd (Dinadiawan-Casiguran Sect) 6,000,000
4.Kinalapan Br. (B02834LZ) along Baler-Cemento via Dicaloyungan 7,000,000
5.Pudoc Br. (B03014LZ) along Baler-Casiguran Rd (Baler-Dinadiawan) 7,000,000
2. Nueva Ecija 1st DEO 5,405,000a. NUEVA ECIJA (FIRST DISTRICT) 5,405,000
1.Curva Br. (B00113LZ) along Nueva Ecija-Pangasinan Rd
5,405,000
3. Nueva Ecija 2nd DEO 8,000,000a. NUEVA ECIJA (THIRD DISTRICT) 8,000,000
1.Dupinga Br. (B01353LZ) along Jct Tablang-Gabaldon Rd
8,000,000
4. Tarlac 1st DEO 22,200,000a. TARLAC (SECOND DISTRICT) 22,200,000
1.Maluid Br. (B04331LZ) along Tarlac-Guimba Rd via Victoria 5,300,000
2.San Vicente Br. 1 (B04332LZ) along Tarlac-Guimba Rd via Victoria 6,900,000
3.San Vicente Br. 2 (B04333LZ) along Tarlac-Guimba Rd via Victoria 4,700,000
4.San Vicente Br. 3 (B04334LZ) along Tarlac-Guimba Rd via Victoria 5,300,000
e. Region IV-A 99,565,0001. Batangas 2nd DEO 22,000,000
a. BATANGAS (SECOND DISTRICT) 22,000,0001. Pallocan Br. (B03027LZ) along Batangas-Lobo Rd 10,000,000
2.Talahib Pandayan Br. (B03045LZ) along Batangas-Tabangao-Lobo Rd 12,000,000
2. Batangas 4th DEO 20,000,000a. BATANGAS (FOURTH DISTRICT) 20,000,000
1. Sabang Br. (B00025LZ) along Batangas-Quezon Rd 20,000,000
3. Cavite 2nd DEO 15,400,000a. CAVITE (SEVENTH DISTRICT) 15,400,000
1.Palanas Br. (B02517LZ) along Noveleta-Naic-Tagaytay Rd 15,400,000
4. Cavite DEO 5,000,000a. CAVITE (THIRD DISTRICT) 5,000,000
1. Imus Br. (B02903LZ) along Cavite-Batangas Rd 5,000,000
5. Laguna 1st DEO 9,450,000a. LAGUNA (FOURTH DISTRICT) 9,450,000
1.Maapon Br. (B02494LZ) along Pagsanjan-Lucban Rd
4,571,000
2.Paete Br. (B02472LZ) along Calamba-Sta Cruz-Famy Jct Rd 3,251,000
3. Paete Br. (B02478LZ) along Paete-Famy Pob Rd 1,628,000
862 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
6. Quezon 1st DEO 2,000,000a. QUEZON (FIRST DISTRICT) 2,000,000
1.Maasin Br. (B02448LZ) along Tayabas-Mainit-Mauban Rd 2,000,000
7. Quezon 3rd DEO 8,500,000a. QUEZON (THIRD DISTRICT) 8,500,000
1.Aurora Br. (B01857LZ) along Sn Francisco-Sn Andres-Sn Narciso Rd 1,500,000
2.Catanauan Br (B02540LZ) along Gumaca-Pitogo-Mulanay-Sn Narciso Rd (Completion) 2,000,000
3.Doongan Br. (B01693LZ) along Talaba-Summit-Panaon Rd (Completion) 1,000,000
4.Mayubok Br. (B02530LZ) along Gumaca-Pitogo-Mulanay-Sn Narciso Rd (Completion) 3,000,000
5.Mulanay Br. (B02965LZ) along Mulanay-Sn Francisco Rd (Completion) 1,000,000
8. Quezon 4th DEO 17,215,000a. QUEZON (FOURTH DISTRICT) 17,215,000
1.Bayod Br. (B03109LZ) along Talaba-Summit-Panaon Rd
5,885,000
2.Lakit Br. (B03103LZ) along Talaba-Summit-Panaon Rd
11,330,000
f. Region IV-B 52,434,0001. Palawan 2nd DEO 5,000,000
a. PALAWAN (SECOND DISTRICT) 5,000,000
1.Malatgao Br. (B00029PW) along Puerto Princesa South Rd 5,000,000
2. Palawan 3rd DEO 25,000,000a. PALAWAN (THIRD DISTRICT) 25,000,000
1.Iwahig Br. (B00176PW) along Puerto Princesa South Rd
20,000,000
2.Tacduan Br. (B00181PW) along Puerto Princesa South Rd 5,000,000
3. Romblon DEO 22,434,000a. ROMBLON (LONE DISTRICT) 22,434,000
1.Cantingas Br. 3 (B00009SY) along Sibuyan Circumferential Rd 18,135,000
2.Lopog Br. (B00046TL) along Tablas Circumferential Rd
4,299,000
g. Region V 91,793,0001. Catanduanes DEO 88,793,000
a. CATANDUANES (LONE DISTRICT) 88,793,0001. Marcos Br. (B00042CN) along Catanduanes Cir Rd 41,932,0002. Pilot Br. (B00018CN) along Catanduanes Cir Rd 5,558,000
3.Quiambag Br. (B00019CN) along Catanduanes Cir Rd
31,600,000
4.San Miguel Br. (B00008CN) along Catanduanes Cir Rd
9,703,000
2. Masbate 3rd DEO 3,000,000a. MASBATE (FIRST DISTRICT) 3,000,000
1.Mapanique Br. (B00003BU) along Sn Pascual-Claveria Rd 3,000,000
h. Region VI 163,320,0001. Antique DEO 6,700,000
a. ANTIQUE (LONE DISTRICT) 6,700,0001. Apgahan Br. (B00321PN) along Iloilo-Antique Rd 3,200,000
2.Ceo Br. (B00431PN) along Bugasong-Valderrama Rd
1,500,000
3.Irrigation Br. (B00390PN) along Odiong-Sibalom-Sn Remigio-Leon Rd 2,000,000
2. Capiz 1st DEO 23,900,000a. CAPIZ (FIRST DISTRICT) 23,900,000
1.Adlawan Br. (B00494PN) along Lanot-Loctugan-Panitan Bdry Rd 10,400,000
2.Panitan Br. 1 (B00280PN) along Roxas City Bdry-Panitan-Bailan Rd 13,500,000
3. Capiz 2nd DEO 12,900,000
details of dpwh’s programs/projects 863
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
a. CAPIZ (SECOND DISTRICT) 12,900,000
1.Balat-an Br. (B00272PN) along Sigma-Mambusao-Jamindan Rd 12,900,000
4. Iloilo 1st DEO 7,000,000a. ILOILO (FIRST DISTRICT) 7,000,000
1.Iyasan Br. (B00037PN) along Guimbal-Igbaras-Tubungan-Leon Rd 4,000,000
2.Nito-an Br. (B00038PN) along Guimbal-Igbaras-Tubungan-Leon Rd 3,000,000
5. Iloilo 4th DEO 38,320,000a. ILOILO (SECOND DISTRICT) 38,320,000
1.Aganan Br. (new) (B00500PN) along Iloilo-Capiz Rd (OldRoute) 4,730,000
2.Aganan Br. (old) (B00046PN) along Iloilo-Capiz Rd (Pavia Diversion) 8,555,000
3.Bolo Br. (B00170PN) along Guimbal-Igbaras-Tubungan-Leon Rd 2,250,000
4.Ilog-Ilog Br. (B00172PN) along Guimbal-Igbaras-Tubungan-Leon Rd 4,100,000
5.Inguan Br. (B00004PN) along Jct Bancal-Leon-Antique Bdry Rd 7,730,000
6.Peñaflorida Deza Br. (B00468PN) along Iloilo East Coast-Capiz Rd 4,405,000
7.Tacuyung Br. (B00169PN) along Guimbal-Igbaras-Tubungan-Leon Rd 6,550,000
6. Iloilo City DEO 48,300,000a. ILOILO CITY (LONE DISTRICT) 48,300,000
1. Batiano Br. (B00488PN) along Molo Blvd 4,000,000
2.Quirino-Lopez Br. (B00117PN) along Iloilo Airport Direct Rd 44,300,000
7. Negros Occidental 3rd DEO 26,200,000a. NEGROS OCCIDENTAL (SIXTH DISTRICT) 26,200,000
1.Caliling Br. (B00233NR) along Bacolod South Rd (Kabankalan-Hinobaan Section) 5,000,000
2.Cambugsok Br. (B00271NR) along Dancalan-Candoni-Damutan Valley Rd 5,000,000
3.Caningay Br. (B00272NR) along Dancalan-Candoni-Damutan Valley Rd 5,000,000
4.Cauayan Br. (B00227NR) along Bacolod South Rd (Kabankalan-Hinobaan Section) 11,200,000
i. Region VII 27,310,0001. Bohol 1st DEO 8,000,000
a. BOHOL (FIRST DISTRICT) 8,000,000
1.Camayaan Br. (B00022BH) along Jct (TNR) Cortes-Balilihan-Catigbian-Macaas Rd 8,000,000
2. Bohol 3rd DEO 14,000,000a. BOHOL (THIRD DISTRICT) 14,000,000
1.Balbalan Br. (B00064BH) along Tagbilaran East Rd (Tagbilaran-Jagna) 5,000,000
2.Canmanico Br. (B00062BH) along Tagbilaran East Rd (Tagbilaran-Jagna) 3,000,000
3.Tangohay Br. (B00063BH) along Tagbilaran East Rd (Tagbilaran-Jagna) 6,000,000
3. Siquijor DEO 5,310,000a. SIQUIJOR (LONE DISTRICT) 5,310,000
1.Maria Br. (B00006SJ) along Siquijor Circumferential Rd
5,310,000
j. Region VIII 222,411,0001. Leyte 1st DEO 62,097,000
a. LEYTE (FIRST DISTRICT) 62,097,000
1.Bairan Br. (B00054LT) along Mainit-Sn Miguel-Santol Rd
2,100,000
2.Embarkadero Br. (B00518LT) along Tacloban-Baybay South Rd (Tanauan Sect) 15,000,000
3.Magsaigad Br. (B00061LT) along Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd 7,212,000
4.Nabungcagan Br. (B00063LT) along Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd 7,785,000
5.Pitogo Br. (B00062LT) along Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd 10,000,000
864 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
6.San Isidro Br. (B00485LT) along Tigbao-Pulak-Sta Fe Rd
10,000,000
7.Tab-ang Br. (B00060LT) along Bagahupi-Babatngon-StaCruz-Barugo-Carigara Rd 10,000,000
2. Leyte 2nd DEO 31,000,000a. LEYTE (SECOND DISTRICT) 31,000,000
1.Balugohay Br. (B00489LT) along Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd 3,000,000
2.Cabadiangan Br. (B00498LT) along Mayorga-Lapaz Rd
6,000,000
3.Daguitan Br. (B00082LT) along Jaro-Dagami-Burauen-Lapaz Rd 12,000,000
4.Hibuga Br. (B00084LT) along Jaro-Dagami-Burauen-Lapaz Rd 10,000,000
3. Leyte 4th DEO 93,014,000a. LEYTE (FOURTH DISTRICT) 93,014,000
1.Ata Br. (B00219LT) along Palompon-Isabel-Merida-Ormoc Rd 3,784,000
2.Bagacay Br. (B00218LT) along Palompon-Isabel-Merida-Ormoc Rd 5,635,000
3.Can-unzo Br. (B00216LT) along Palompon-Isabel-Merida-Ormoc Rd 3,938,000
4.Kinawa Br. (B00195LT) along Libungao-Matag-ob-Palompon Rd 12,531,000
5.Kinayaban Br. 1 (B00215LT) along Palompon-Isabel-Merida-Ormoc Rd 4,710,000
6.Kinayaban Br. 2 (B00214LT) along Palompon-Isabel-Merida-Ormoc Rd 1,954,000
7. Sabang Br. (B00228LT) along Villaba-Palompon Rd 18,264,000
8.San Miguel Br. (B00203LT) along Libungao-Matag-ob-Palompon Rd 18,078,000
9.Seguinon Br. (B00224LT) along Palompon-Isabel-Merida-Ormoc Rd 7,200,000
10.Tugbong Br. (B00190LT) along Libungao-Matag-ob-Palompon Rd 16,920,000
4. Leyte 5th DEO 27,700,000a. LEYTE (FIFTH DISTRICT) 27,700,000
1.Bangkerohan Br. (B00283LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 7,600,000
2.Hibagnan Br. (B00288LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 8,000,000
3.Hipusngo Br. (B00257LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 3,500,000
4.Inopacan Br. 2 (B00274LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 8,600,000
5. Northern Samar 2nd DEO 8,600,000a. NORTHERN SAMAR (SECOND DISTRICT) 8,600,000
1. Dango Br. (B00320SM) along Rawis-Catubig Rd 4,000,0002. Simora Br. (B00318SM) along Rawis-Catubig Rd 4,600,000
k. Region IX 42,300,0001. Zamboanga City DEO 17,200,000
a. ZAMBOANGA CITY (FIRST DISTRICT) 17,200,000
1.Busugan Br. (B01164MN) along Zamboanga City-Labuan-Limpapa Rd 12,000,000
2.Miluao Br. (B01166MN) along Zamboanga City-Labuan-Limpapa Rd 5,200,000
2. Zamboanga del Norte 3rd DEO 25,100,000a. ZAMBOANGA DEL NORTE (FIRST DISTRICT) 25,100,000
1.Polo Br. (B00411MN) along Jct Polo-Dapitan Park Natl Rd 25,100,000
l. Region X 15,000,0001. Misamis Oriental 2nd DEO 15,000,000
a. MISAMIS ORIENTAL (SECOND DISTRICT) 15,000,000
1.Guinbaloran Br. (B01223MN) along Gingoog-Claveria-Villanueva Rd 15,000,000
details of dpwh’s programs/projects 865
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
m. Region XI 1,000,0001. Davao del Norte DEO 1,000,000
a. DAVAO DEL NORTE (SECOND DISTRICT) 1,000,000
1.Tadeco Br. (B00026MN) along Carmen-DAPECOL Cmpd Rd 1,000,000
n. Region XII 82,379,0001. Cotabato 1st DEO 8,188,000
a. COTABATO (THIRD DISTRICT) 8,188,000
1.Labo Br. (B00277MN) along Matalam-Mlang-Bagontapay Jct Rd 5,175,000
2.Taculen Br. (B00274MN) along Matalam-Mlang-Bagontapay Jct Rd 3,013,000
2. Sarangani DEO 74,191,000a. SARANGANI (LONE DISTRICT) 74,191,000
1.Kalaong Br. 2 (B01240MN) along Sarangani-Sultan Kudarat Coastal Rd 5,000,000
2.Kamanga Br. (B01061MN) along Sarangani-Sultan Kudarat Coastal Rd 10,095,000
3.Kanantong Br. (B01071MN) along Sarangani-Sultan Kudarat Coastal Rd 8,000,000
4.Kiblis Br. (B01609MN) along Sarangani-Sultan Kudarat Coastal Rd 5,000,000
5.Kitagas Br. (B01608MN) along Sarangani-Sultan Kudarat Coastal Rd 5,000,000
6.Lomuyon Br. (B01070MN) along Sarangani-Sultan Kudarat Coastal Rd 5,000,000
7.Lumasal Br. (B01067MN) along Sarangani-Sultan Kudarat Coastal Rd 9,018,000
8.Maglangit Br. (B01069MN) along Sarangani-Sultan Kudarat Coastal Rd 9,078,000
9.Nalus Br. (B01079MN) along Sarangani-Sultan Kudarat Coastal Rd 5,000,000
10.Pananag Br. (B01066MN) along Sarangani-Sultan Kudarat Coastal Rd 5,000,000
11.Saub Br. (B01082MN) along Sarangani-Sultan Kudarat Coastal Rd 8,000,000
866 eXpeNditUre program fY 2016 VolUme ii
d. Rehabilitation/ Major Repair of Permanent Bridges 4,914,874,000
I. Central Office 10,000,000a. Nationwide 10,000,000
1. Central Office 10,000,000a. NATIONWIDE 10,000,000
1. Rehabilitation/ Major Repair of Bridges 10,000,000
II. Regional Office Proper 1,636,474,000a. National Capital Region 101,500,000
1. Malabon-Navotas DEO 1,500,000a. MALABON CITY (LONE DISTRICT) 1,500,000
1. Tullahan Br. (B01736LZ) along MacArthur H-way 1,500,000
2. Metro Manila 1st DEO 100,000,000a. MARIKINA CITY (FIRST DISTRICT) 100,000,000
1. Barangca Viaduct(Flyover) (B01720LZ) along A Bonifacio Ave 50,000,000
2. Marcos Br. (B01752LZ) along Marcos Highway 50,000,000
b. Region I 369,129,0001. Ilocos Norte 1st DEO 236,447,000
a. ILOCOS NORTE (FIRST DISTRICT) 236,447,0001. Ayoyo Br. (B00544LZ) along Manila North Rd 4,524,0002. Balaoi Br. (B00546LZ) along Manila North Rd 13,722,0003. Bocal Br. (B00532LZ) along Manila North Rd 1,500,0004. Gilbert Br. 2 (B00842LZ) along Manila North Rd 100,000,0005. Gilbert Br.I (B00897LZ) along Manila North Rd 100,000,0006. Pancian Br. (B00549LZ) along Manila North Rd 13,671,0007. Tabbug Br. (B00545LZ) along Manila North Rd 3,030,000
2. Ilocos Norte 2nd DEO 9,000,000a. ILOCOS NORTE (SECOND DISTRICT) 9,000,000
1. Banas Br. (B00563LZ) along Manila North Rd 9,000,000
3. Ilocos Sur 1st DEO 4,320,000a. ILOCOS SUR (FIRST DISTRICT) 4,320,000
1. Barecbec Br. (B00581LZ) along Manila North Rd 4,320,000
4. Ilocos Sur 2nd DEO 21,000,000a. ILOCOS SUR (SECOND DISTRICT) 21,000,000
1. Dili Br. (B00608LZ) along Manila North Rd 4,500,0002. San Antonio Br. 2 (B00630LZ) along Manila North Rd
5,820,000 3. Sawat Br. 1 (B00610LZ) along Manila North Rd 10,680,000
5. La Union 2nd DEO 86,820,000a. LA UNION (SECOND DISTRICT) 86,820,000
1. Aringay Br. (B02638LZ) along Manila North Rd 82,980,0002. Maning Br. (B02643LZ) along Manila North Rd 3,840,000
6. Pangasinan 2nd DEO 11,542,000a. PANGASINAN (SECOND DISTRICT) 11,542,000
1. Bayaoas Br. (B00678LZ) along Pangasinan-Tarlac Rd1,242,000
2. Curambeng Br. (B02147LZ) along Pangasinan-Zambales Rd 10,300,000
c. Region II 159,220,0001. Cagayan 1st DEO 89,220,000
a. CAGAYAN (FIRST DISTRICT) 89,220,0001. Gattaran Br. (B01096LZ) along Cagayan Valley Rd 7,500,0002. Pateng Br. 2 (B02040LZ) along Dugo-Sn Vicente Rd
(Mission-Sta Ana Sect) 51,840,000 3. Piggatan Br. (B01086LZ) along Cagayan Valley Rd 29,880,000
2. Cagayan 3rd DEO 25,000,000a. CAGAYAN (THIRD DISTRICT) 25,000,000
1. Balzain Br. 1 (B01924LZ) along Cagayan-Apayao Rd (Tuguegarao Sect) 4,000,000
2. Baret Br. (B01923LZ) along Cagayan-Apayao Rd (Tuguegarao Sect) 5,000,000
3. Dapang Br. (B01119LZ) along Santiago-Tuguegarao Rd (Jct Kalinga-Tuguegarao Sec 6,000,000
4. Liwan Br. (B01118LZ) along Kalinga-Cagayan Rd (Calanan-Enrile Section) 5,000,000
5. Pinacanauan Br. (B01910LZ) along Cagayan Valley Rd5,000,000
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
details of dpwh’s programs/projects 867
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
3. Isabela 3rd DEO 45,000,000a. ISABELA (THIRD DISTRICT) 45,000,000
1. Ganano Br. (B01179LZ) along Daang Maharlika (LZ) 15,000,0002. Paddad Br. (B01181LZ) along Daang Maharlika (LZ) 10,000,0003. Puzzer Br. (B01189LZ) along Daang Maharlika (LZ) 10,000,0004. Tagaran Br. (B01188LZ) along Daang Maharlika (LZ)
10,000,000
d. Cordillera Administrative Region 90,041,0001. Benguet 1st DEO 4,121,000
a. BENGUET (LONE DISTRICT) 4,121,0001. Camp 6 Br. (B02183LZ) along Kennon Rd 1,229,0002. Colorado Br. (B02170LZ) along Kennon Rd 1,059,0003. Irisan Br. (B02186LZ) along Baguio-Bauang Rd 1,833,000
2. Ifugao 1st DEO 55,240,000a. IFUGAO (LONE DISTRICT) 55,240,000
1. Ibulao Br. (B02203LZ) along Nueva Vizcaya-Ifugao-Mt Province Rd 55,240,000
3. Kalinga DEO 30,680,000a. KALINGA (LONE DISTRICT) 30,680,000
1. Aliog Br. (B00977LZ) along Kalinga-Cagayan Rd (Calanan-Enrile Section) 23,680,000
2. Liwan Br. (B00980LZ) along Kalinga-Cagayan Rd (Calanan-Enrile Section) 7,000,000
e. Region III 64,400,0001. Bulacan 2nd DEO 5,000,000
a. BULACAN (THIRD DISTRICT) 5,000,0001. Labnoan Br. (B01684LZ) along Daang Maharlika (LZ)
5,000,000
2. Nueva Ecija 1st DEO 57,900,000a. NUEVA ECIJA (SECOND DISTRICT) 57,900,000
1. Cabitbitnugan Br. (B01967LZ) along Daang Maharlika (LZ) 18,000,000
2. Capintalan Br. 2 (B01983LZ) along Daang Maharlika (LZ) 10,000,000
3. Ese-ese Br. (B01972LZ) along Daang Maharlika (LZ)6,000,000
4. Lomboy Br. 2 (B01970LZ) along Daang Maharlika (LZ)6,000,000
5. Malasin Br. (B01966LZ) along Daang Maharlika (LZ) 8,000,0006. Minuli Br. 1 (B00123LZ) along Daang Maharlika (LZ) 6,400,0007. Puncan Br. 1 (B01973LZ) along Daang Maharlika (LZ)
3,500,000
3. Tarlac 2nd DEO 1,500,000a. TARLAC (THIRD DISTRICT) 1,500,000
1. Rio Chico Br (B02691LZ) along Tarlac-Sta Rosa Rd 1,500,000
f. Region IV-A 42,975,0001. Cavite DEO 15,000,000
a. CAVITE (FIRST DISTRICT) 5,000,0001. Batong Dalig Br. (B03409LZ) along Kawit-Noveleta-
Diversion Rd 5,000,000 b. CAVITE (FOURTH DISTRICT) 10,000,000
1. Aguinaldo Br. (B02908LZ) along Dasmariñas-Carmona Rd 10,000,000
2. Laguna 2nd DEO 12,300,000a. LAGUNA (FIRST DISTRICT) 10,200,000
1. Sta. Rosa Br. (B03124LZ) along Manila South Rd 10,200,000b. LAGUNA (SECOND DISTRICT) 2,100,000
1. Tabon Br. (B02509LZ) along Calamba-Sta Cruz-Famy Jct Rd 2,100,000
3. Quezon 4th DEO 15,675,000a. QUEZON (FOURTH DISTRICT) 15,675,000
1. Camohaguin Br. (B02580LZ) along Daang Maharlika (LZ) 15,675,000
g. Region V 38,290,0001. Camarines Norte DEO 28,290,000
a. CAMARINES NORTE (FIRST DISTRICT) 28,290,000
868 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
1. Dagook Br. 1 (B02702LZ) along Daang Maharlika (LZ)18,930,000
2. Macahadoc Br. (B02557LZ) along Daang Maharlika (LZ)9,360,000
2. Camarines Sur 1st DEO 10,000,000a. CAMARINES SUR (SECOND DISTRICT) 10,000,000
1. San Fernando Br. (B00396LZ) along Daang Maharlika (LZ) 10,000,000
h. Region VI 257,777,0001. Capiz 2nd DEO 10,690,000
a. CAPIZ (SECOND DISTRICT) 10,690,0001. Amaga Br. (B00234PN) along Iloilo-Capiz Rd (New
Route) 2,000,000 2. Mianay Br. (B00236PN) along Iloilo-Capiz Rd (New
Route) (Completion) 5,490,000 3. Pamantawan Br. (B00237PN) along Iloilo-Capiz Rd (New
Route) 1,400,000 4. Sayuyan Br. (B00238PN) along Iloilo-Capiz Rd (New
Route) 1,800,000
2. Iloilo 4th DEO 2,050,000a. ILOILO (SECOND DISTRICT) 2,050,000
1. Janipaan Br. (B00178PN) along Iloilo-Capiz Rd (New Route) 2,050,000
3. Negros Occidental 1st DEO 210,037,000a. NEGROS OCCIDENTAL (FIRST DISTRICT) 52,597,000
1. Cawa Br. (B00417NR) along Bacolod North Rd 6,012,0002. Hagnaya Br. (B00416NR) along Bacolod North Rd 28,000,0003. Higalaman Br. (B00186NR) along Bacolod North Rd 5,700,0004. Labi-Labi Br. (B00178NR) along Bacolod North Rd 9,285,0005. Vascoña Br. (B00183NR) along Bacolod North Rd 3,600,000
b. NEGROS OCCIDENTAL (SECOND DISTRICT) 61,525,0001. Lag-asan Br. (B00170NR) along Bacolod North Rd 17,500,0002. Sangay Br. (B00174NR) along Bacolod North Rd 13,800,0003. Tan-ao Br. (B00175NR) along Bacolod North Rd 14,970,0004. Trozo Br. (B00169NR) along Bacolod North Rd 15,255,000
c. NEGROS OCCIDENTAL (THIRD DISTRICT) 95,915,0001. Imbang Br. 1 (B00146NR) along Bacolod North Rd 19,020,0002. Malijao Br. (B00154NR) along Bacolod North Rd 15,060,0003. Matab-ang Br. 1 (B00314NR) along Bacolod North Rd
22,750,000 4. Matab-ang Br. 2 (B00315NR) along Bacolod North Rd
19,560,000 5. Matigay Br. (B00144NR) along Bacolod North Rd 4,935,0006. Minuluan Br. (B00316NR) along Bacolod North Rd 12,250,0007. Tinihaban Br. 1 (B00149NR) along Bacolod North Rd
2,340,000
4. Negros Occidental 4th DEO 35,000,000a. NEGROS OCCIDENTAL (FOURTH DISTRICT) 35,000,000
1. Bago Br. (B00195NR) along Bacolod South By-Pass Rd (Completion) 35,000,000
i. Region VII 102,097,0001. Cebu 6th DEO 15,000,000
a. CEBU (SIXTH DISTRICT) 15,000,0001. Butuanon Br. 1 (B00588CB) along Cebu North Hagnaya
Wharf Rd 15,000,000
2. Negros Oriental 1st DEO 2,500,000a. NEGROS ORIENTAL (FIRST DISTRICT) 2,500,000
1. Hilaitan Br. (B00137NR) along Dumaguete North Rd (JctBais-Kabankalan-NOccBdry) 2,500,000
3. Negros Oriental 2nd DEO 24,597,000a. NEGROS ORIENTAL (SECOND DISTRICT) 24,597,000
1. Langao Br. (Cantilevered) (B00053NR) along Bais-Kabankalan Rd 10,297,000
2. Mojon Br. (B00087NR) along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) 4,300,000
3. Polo Br. (B00085NR) along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) 10,000,000
4. Negros Oriental 3rd DEO 60,000,000a. NEGROS ORIENTAL (THIRD DISTRICT) 60,000,000
details of dpwh’s programs/projects 869
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
1. Canaway Br. (B00017NR) along Dumaguete South Rd30,000,000
2. Siaton Br. (B00018NR) along Dumaguete South Rd 30,000,000
j. Region VIII 230,094,0001. Leyte 1st DEO 6,468,000
a. LEYTE (FIRST DISTRICT) 6,468,0001. Mainit Br. (B00049LT) along Palo-Carigara-Ormoc Rd
3,000,000 2. Tibak Br. (B00045LT) along Palo-Carigara-Ormoc Rd
3,468,000
2. Leyte 4th DEO 5,734,000a. LEYTE (FOURTH DISTRICT) 5,734,000
1. Tinag-an Br. (B00584LT) along Ormoc-Baybay-Southern Leyte Bdry Rd 5,734,000
3. Leyte 5th DEO 36,000,000a. LEYTE (FIFTH DISTRICT) 36,000,000
1. Layog Br. (B00551LT) along Daang Maharlika (LT) 22,000,0002. Makinhas Br. (B00559LT) along Tacloban-Baybay South
Rd 14,000,000
4. Northern Samar 1st DEO 58,400,000a. NORTHERN SAMAR (FIRST DISTRICT) 58,400,000
1. Canawayon Br. (B00235SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) 18,400,000
2. Erenas Br. (B00245SM) along Daang Maharlika (SM) (SnIsidro-Sn Juanico Br) 16,000,000
3. Maludbalud Br. (B00238SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) 24,000,000
5. Samar 1st DEO 10,000,000a. SAMAR (FIRST DISTRICT) 10,000,000
1. Hinagbungan Br. (B00355SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) 10,000,000
6. Samar 2nd DEO 10,000,000a. SAMAR (SECOND DISTRICT) 10,000,000
1. Balugo Br. (B00384SM) along Daang Maharlika (SM) (SnIsidro-Sn Juanico Br) 5,000,000
2. Bucalan Br. (B00383SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) 5,000,000
7. Southern Leyte DEO 101,200,000a. SOUTHERN LEYTE (LONE DISTRICT) 101,200,000
1. Lilo-an Steel Br. (B00617LT) along Daang Maharlika (LT) 50,000,000
2. Magaupas Br. (B00609LT) along Daang Maharlika (LT)10,900,000
3. Magkasag Br. (B00608LT) along Daang Maharlika (LT)20,000,000
4. Mayuga Br. (B00607LT) along Daang Maharlika (LT)12,400,000
5. Nahaong Br. (B00594LT) along Daang Maharlika (LT)7,900,000
8. Tacloban City DEO 2,292,000a. LEYTE (FIRST DISTRICT) 2,292,000
1. Bagacay Br. (B00023LT) along Daang Maharlika (LT)2,292,000
k. Region IX 39,891,0001. Zamboanga City DEO 8,000,000
a. ZAMBOANGA CITY (SECOND DISTRICT) 8,000,0001. Manicahan Br. (B00574MN) along Pagadian City-
Zamboanga City Rd 8,000,000
2. Zamboanga del Norte 1st DEO 3,141,000a. ZAMBOANGA DEL NORTE (SECOND DISTRICT) 3,141,000
1. Langatian Br. (B00430MN) along Dipolog-Sindangan-Liloy Rd 3,141,000
3. Zamboanga del Norte 3rd DEO 19,550,000a. ZAMBOANGA DEL NORTE (FIRST DISTRICT) 19,550,000
1. De Venta Perla Br. (B01606MN) along Dipolog-Punta-Dansullan-S Osmeña-Zambo N/Sur Bdry 1,750,000
870 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
2. Layawan Br. (B00422MN) along Dipolog-Punta-Dansullan-S Osmeña-Zambo N/Sur Bdry 10,700,000
3. Leop Br. (B00584MN) along Dipolog-Oroquieta National Rd 4,800,000
4. Oyan Br. (B00585MN) along Dipolog-Oroquieta National Rd 2,300,000
4. Zamboanga del Sur 1st DEO 7,200,000a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 7,200,000
1. Baclay Br. (B01195MN) along Lanao-Pagadian-Zamboanga City Rd 7,200,000
5. Zamboanga Sibugay 2nd DEO 2,000,000a. ZAMBOANGA SIBUGAY (SECOND DISTRICT) 2,000,000
1. Sanito Br. (B01206MN) along Ipil-Liloy-Sindangan Rd 2,000,000
l. Region X 22,500,0001. Lanao del Norte 2nd DEO 6,500,000
a. LANAO DEL NORTE (FIRST DISTRICT) 6,500,0001. Barogohan Br. (B00948MN) along Linamon-Zamboanga
Rd 2,000,000 2. Kawit Br. (B00944MN) along Linamon-Zamboanga Rd
2,000,000 3. Segapod Br. (B00950MN) along Linamon-Zamboanga Rd
2,500,000
2. Misamis Occidental 1st DEO 4,000,000a. MISAMIS OCCIDENTAL (FIRST DISTRICT) 4,000,000
1. Dulapo Br. (B01100MN) along Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd 1,000,000
2. Pines Br. (B00367MN) along Ozamis City-Oroquieta City Rd 3,000,000
3. Misamis Occidental 2nd DEO 10,000,000a. MISAMIS OCCIDENTAL (SECOND DISTRICT) 10,000,000
1. H. Ramiro Br. (B01500MN) along Ozamis-Oroquieta Rd2,000,000
2. Hinagdong Br. (B00359MN) along Ozamis-Pagadian Rd5,000,000
3. Litapan Br. (B00357MN) along Ozamis-Pagadian Rd 1,000,0004. Pulot Br.II (B01640MN) along Ozamis-Pagadian Rd 2,000,000
4. Misamis Oriental 1st DEO 2,000,000a. MISAMIS ORIENTAL (FIRST DISTRICT) 2,000,000
1. Lunao Br. (B01350MN) along Butuan City-Cagayan de Oro City-Iligan City Rd 2,000,000
m. Region XI 5,000,0001. Davao del Norte DEO 1,000,000
a. DAVAO DEL NORTE (SECOND DISTRICT) 1,000,0001. Tuganay Br. (B00017MN) along Daang Maharlika (MN)
1,000,000
2. Davao del Sur 1st DEO 4,000,000a. DAVAO DEL SUR (LONE DISTRICT) 4,000,000
1. Ebreo Br. (B00134MN) along Davao-Cotabato Rd (Jct Digos-Cotabato Sect) 4,000,000
n. Region XII 18,560,0001. Cotabato 2nd DEO 3,000,000
a. COTABATO (FIRST DISTRICT) 3,000,0001. Buluan Br. 1 (B00315MN) along Davao-Cotabato Rd (Jct
Digos-Cotabato Sect) 3,000,000
2. South Cotabato 2nd DEO 15,560,000a. SOUTH COTABATO (FIRST DISTRICT) 15,560,000
1. South Polomolok Br. (B01030MN) along Marbel-Makar Rd 15,560,000
details of dpwh’s programs/projects 871
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
o. Region XIII 95,000,0001. Agusan del Sur 1st DEO 65,000,000
a. AGUSAN DEL SUR (FIRST DISTRICT) 65,000,0001. Talacogon Steel Br. (B00602MN) along NJR Bah-Bah-
Talacogon Rd 65,000,000
2. Agusan del Sur 2nd DEO 30,000,000a. AGUSAN DEL SUR (SECOND DISTRICT) 30,000,000
1. Simulao Br. (B00928MN) along Daang Maharlika (Agusan-Davao Sect) (Completion) 30,000,000
III. District Engineering Office 3,268,400,000a. National Capital Region 81,500,000
1. Malabon-Navotas DEO 5,500,000a. MALABON CITY (LONE DISTRICT) 5,500,000
1. Concepcion Br. (B01760LZ) along Gov W Pascual Ave1,000,000
2. Potrero Br. (B01758LZ) along Gov W Pascual Ave 4,500,000
2. Metro Manila 1st DEO 49,000,000a. MARIKINA CITY (FIRST DISTRICT) 49,000,000
1. Marikina Br. (B01866LZ) along A Bonifacio Ave 49,000,000
3. Quezon City 1st DEO 7,000,000a. QUEZON CITY (FIRST DISTRICT) 7,000,000
1. Culiat Br. 3 (SB) (B02356LZ) along Visayas Ave 7,000,000
4. Quezon City 2nd DEO 20,000,000a. QUEZON CITY (FOURTH DISTRICT) 20,000,000
1. Mariablo Br. (B02335LZ) along E Rodriguez Sr 20,000,000
b. Region I 163,025,0001. Ilocos Norte 2nd DEO 20,000,000
a. ILOCOS NORTE (SECOND DISTRICT) 20,000,0001. Sawang Br. (B00558LZ) along Pias-Currimao-Balaccad
Rd 20,000,000
2. La Union 1st DEO 68,150,000a. LA UNION (FIRST DISTRICT) 68,150,000
1. Bambanay Br. (B00872LZ) along Sn Juan-Sn Gabriel Rd9,150,000
2. Maragayap West Br. (B00660LZ) along Bacnotan-Luna-Balaoan Rd 49,000,000
3. Nagrebcan Br. (B00663LZ) along Bacnotan-Luna-Balaoan Rd 10,000,000
3. Pangasinan 2nd DEO 51,775,000a. PANGASINAN (SECOND DISTRICT) 26,085,000
1. Taroy Br. (B00578LZ) along Carmen Jct-Bayambang-Manat Rd 1,170,000
2. Tataypo Br. (B02139LZ) along Pangasinan-Zambales Rd9,000,000
3. Tobuan Br. (B02135LZ) along Pangasinan-Zambales Rd15,915,000
b. PANGASINAN (FOURTH DISTRICT) 25,690,0001. Dawel Br. (B00687LZ) along Dagupan-Bonuan-San
Fabian Rd 3,730,000 2. Tanap Br. (B00688LZ) along Dagupan-Bonuan-San
Fabian Rd 21,960,000
4. Pangasinan 3rd DEO 23,100,000a. PANGASINAN (SIXTH DISTRICT) 23,100,000
1. Cabalayangan Br. (B00851LZ) along Sn Nicolas-Natividad-Sn Quintin-Umingan-Guimba Rd 6,000,000
2. Carayungan Br. (B00852LZ) along Sn Nicolas-Natividad-Sn Quintin-Umingan-Guimba Rd 12,000,000
3. Gonzalo Br. (B00847LZ) along Sn Nicolas-Natividad-Sn Quintin-Umingan-Guimba Rd 5,100,000
c. Region II 201,552,0001. Batanes DEO 23,910,000
a. BATANES (LONE DISTRICT) 23,910,0001. Chajajas Br. (B00006BN) along Basco-Mahatao-Ivana-
Uyugan-Imnajbu Rd 3,800,000 2. Itbud Br. (B00017BN) along Basco-Mahatao-Ivana-
Uyugan-Imnajbu Rd 7,500,000 3. San Vicente Br. (B00012BN) along Basco-Mahatao-Ivana-
Uyugan-Imnajbu Rd 9,100,000
872 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
4. Vayayat Br. (B00005BN) along Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd 3,510,000
2. Cagayan 1st DEO 66,300,000a. CAGAYAN (FIRST DISTRICT) 66,300,000
1. Bitag Grande Br. 1 (B04256LZ) along Baybayog-Baggao-Dalin-Sta. Margarita Rd 25,980,000
2. Luec Br. (B02015LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect) 4,740,000
3. Maddalero Br. (B02028LZ) along Dugo-Sn Vicente Rd (Dugo-Mission Sect) 6,300,000
4. Magapit Br. (B01100LZ) along Cagayan Valley Rd 4,800,0005. Masical Br. 1 (B04249LZ) along Baybayog-Baggao-Dalin-
Sta. Margarita Rd 1,980,000 6. Masical Br. 2 (B04250LZ) along Baybayog-Baggao-Dalin-
Sta. Margarita Rd 1,980,000 7. Masisit Br. 2 (B04253LZ) along Baybayog-Baggao-Dalin-
Sta. Margarita Rd 10,980,000 8. Matuyem Br. 2 (B02049LZ) along Dugo-Sn Vicente Rd
(Mission-Sta Ana Sect) 3,180,000 9. Tapel Br. 3 (B02044LZ) along Dugo-Sn Vicente Rd
(Mission-Sta Ana Sect) 3,180,000 10. Tueg Br. 2 (B04255LZ) along Baybayog-Baggao-Dalin-
Sta. Margarita Rd 3,180,000
3. Cagayan 3rd DEO 4,000,000a. CAGAYAN (THIRD DISTRICT) 4,000,000
1. Bayabo Br. (B01930LZ) along Cagayan-Apayao Rd 2,000,0002. Pangul Br. (B01931LZ) along Cagayan-Apayao Rd 2,000,000
4. Isabela 1st DEO 4,362,000a. ISABELA (FIRST DISTRICT) 4,362,000
1. Aga Br. 2 (B01143LZ) along Ilagan-Delfin Albano-Mallig Rd 4,362,000
5. Isabela 3rd DEO 89,000,000a. ISABELA (THIRD DISTRICT) 89,000,000
1. Salinungan Br. (B03286LZ) along Alicia-San Mateo Rd49,000,000
2. Victoria Br. (B03284LZ) along Alicia-San Mateo Rd 40,000,000
6. Nueva Vizcaya 1st DEO 7,200,000a. NUEVA VIZCAYA (LONE DISTRICT) 7,200,000
1. Unaon Br. (B01261LZ) along Nueva Vizcaya-Ifugao Rd7,200,000
7. Quirino DEO 6,780,000a. QUIRINO (LONE DISTRICT) 6,780,000
1. Dumaditim Br. (B01933LZ) along Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) 6,780,000
d. Cordillera Administrative Region 112,000,0001. Abra DEO 15,000,000
a. ABRA (LONE DISTRICT) 15,000,0001. Don Mariano Marcos Br. (B02229LZ) along Abra-Kalinga
Rd 15,000,000
2. Baguio City DEO 2,000,000a. BAGUIO CITY (LONE DISTRICT) 2,000,000
1. Rimando Br. (B04283LZ) along Rimando-Ambiong Rd2,000,000
3. Ifugao 2nd DEO 16,000,000a. IFUGAO (LONE DISTRICT) 16,000,000
1. Busilac Br. (B02214LZ) along Jct Potia-Mt Province Bdry Rd 3,000,000
2. Mapacopaco Br. (B02211LZ) along Banaue-Mayoyao-A Lista-Isabela Bdry Rd 5,000,000
3. Sibalon Br. (B02213LZ) along Jct Potia-Mt Province BdryRd 4,000,000
4. Sumigar Br. (B02205LZ) along Nueva Vizcaya-Ifugao-Mt Province Rd 4,000,000
details of dpwh’s programs/projects 873
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
4. Kalinga DEO 78,000,000a. KALINGA (LONE DISTRICT) 78,000,000
1. Bagombong Br. (B02220LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagalu 3,000,000
2. Bogbog Br. (B02117LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calana 7,000,000
3. Cacaligan Br. (B02109LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagalu 5,000,000
4. Cobaet Br. (B02221LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagalu 5,000,000
5. Dao Br. (B02218LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagalu 7,000,000
6. Gapang Br. (B02223LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagalu 7,000,000
7. Gawidan Br. (B02222LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagalu 5,000,000
8. Magabbangon Br. (B00984LZ) along Bulanao-Paracelis Rd 7,000,000
9. Mananeg Br. (B02119LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calana 8,000,000
10. Mapaco Br. (B02116LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calana 7,000,000
11. Masablang Br. (B02115LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calana 7,000,000
12. Patiking Br. (B02219LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagalu 5,000,000
13. Pinagan Br. (B02127LZ) along Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagalu 5,000,000
5. Mt.Province DEO 1,000,000a. MOUNTAIN PROVINCE (LONE DISTRICT) 1,000,000
1. Magkang Br. (B00940LZ) along Jct Talubin-Barlig-Natonin-Paracelis-Callacad Rd 1,000,000
e. Region III 241,472,0001. Aurora DEO 33,500,000
a. AURORA (LONE DISTRICT) 33,500,0001. Borlongan Br. (B03421LZ) along Baler-Casiguran Rd
(Baler-Dinadiawan) 2,500,000 2. Cemento Br. (B02836LZ) along Baler-Cemento via
Dicaloyungan 5,000,000 3. Dibunong Br. (B03420LZ) along Baler-Casiguran Rd
(Baler-Dinadiawan) 5,000,000 4. Dicong Br. (B02826LZ) along Nueva Ecija-Aurora Rd 4,000,0005. Diteki Br. (B03288LZ) along A Castañeda--Ma Aurora-Sn
Luis Rd 5,000,000 6. Mijares Br. (B03017LZ) along Baler-Casiguran Rd (Baler-
Dinadiawan) 3,000,000 7. Sala Br. (B04212LZ) along Baler-Casiguran Rd
(Dinadiawan-Casiguran Sect) 5,000,000 8. Tanawan Br. (B03004LZ) along Dingalan-Gabaldon Rd
4,000,000
2. Bataan 1st DEO 5,072,000a. BATAAN (FIRST DISTRICT) 5,072,000
1. Pagsakian Br. 1 (B01575LZ) along Gov JJ Linao Rd 2,972,0002. Pagsakian Br. 2 (B01576LZ) along Gov JJ Linao Rd 2,100,000
3. Bataan 2nd DEO 50,000,000a. BATAAN (SECOND DISTRICT) 50,000,000
1. Ayam Br. (B01606LZ) along Roman Expressway 19,800,0002. Tenejero Br. 1 (B01594LZ) along Roman Expressway
14,400,000 3. Tenejero Br. 2 (B01595LZ) along Roman Expressway
15,800,000
4. Bulacan 1st DEO 13,000,000a. BULACAN (FIRST DISTRICT) 3,000,000
1. Malolos Br. (B01727LZ) along Bigaa-Plaridel via Bulacan & Malolos Rd 3,000,000
b. BULACAN (SECOND DISTRICT) 10,000,0001. Culianin Br. (B01717LZ) along Gen Alejo Santos
Highway 5,000,000 2. Irrigation Br. (B01731LZ) along Plaridel-Pulilan Div Rd
5,000,000
874 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
5. Bulacan 2nd DEO 23,000,000a. BULACAN (THIRD DISTRICT) 23,000,000
1. Bigte Br. (B00138LZ) along NCR/Bulacan Bdry-Bigte-Ipo Dam Rd 3,000,000
2. New Norzagaray Br. (Lawang Br.) (B00139LZ) along Norzagaray-Bigte Rd 5,000,000
3. Niugan Br. 1 (B00137LZ) along Gen Alejo Santos Highway 5,000,000
4. Niugan Br. 4 (B04229LZ) along Gen Alejo Santos Highway 5,000,000
5. Sulucan Br. 2 (B03205LZ) along Gen Alejo Santos Highway 5,000,000
6. Nueva Ecija 2nd DEO 31,900,000a. NUEVA ECIJA (THIRD DISTRICT) 30,900,000
1. Bankerohan Br. (B00135LZ) along Nueva Ecija-Aurora Rd 10,000,000
2. Bato Bato Br. (B00132LZ) along Cabanatuan City Circumferential Rd 2,200,000
3. San Juan Br. 2 (B00122LZ) along Jct Tablang-Gabaldon Rd 3,300,000
4. San Juan Br. 3 (B00151LZ) along Jct Tablang-Gabaldon Rd 4,000,000
5. Sapang-Buhay Br. 2 (B02792LZ) along Cabanatuan City Circumferential Rd 2,400,000
6. Saw Mill Br. (B01356LZ) along Jct Tablang-Gabaldon Rd5,000,000
7. Segum Br. 2 (B01351LZ) along Jct Tablang-Gabaldon Rd4,000,000
b. NUEVA ECIJA (FOURTH DISTRICT) 1,000,0001. Sto. Tomas Br. (B01343LZ) along Gapan-Fort
Magsaysay Rd 1,000,000
7. Pampanga 1st DEO 8,000,000a. PAMPANGA (THIRD DISTRICT) 8,000,000
1. Cacutud Br. (B01498LZ) along Arayat-Magalang Rd 3,000,0002. Sto. Domingo Br. (B01465LZ) along Tulauc-Sto
Domingo Rd 3,000,000 3. Sto. Domingo Br. (B01493LZ) along Bahay Pare-Sn Luis-
Sto Domingo Rd 2,000,000
8. Pampanga 2nd DEO 56,400,000a. PAMPANGA (SECOND DISTRICT) 56,400,000
1. Banqueruan Br. 1 (B01531LZ) along Sasmuan-Lubao Rd2,000,000
2. Banqueruan Br. 2 (B01532LZ) along Sasmuan-Lubao Rd2,000,000
3. Caulaman Br. (B01529LZ) along Angeles-Porac-Floridablanca-Dinalupihan Rd 5,000,000
4. Consuelo Br. (B01528LZ) along Angeles-Porac-Floridablanca-Dinalupihan Rd 5,000,000
5. Fortuna Br. (B01524LZ) along Sn Antonio-Floridablanca Rd 5,000,000
6. Lucsuan Br. 1 (B01525LZ) along Angeles-Porac-Floridablanca-Dinalupihan Rd 2,000,000
7. Santol Br. (B01527LZ) along Angeles-Porac-Floridablanca-Dinalupihan Rd 5,000,000
8. Valdez Br. (B01522LZ) along Sn Antonio-Floridablanca Rd 30,400,000
9. Pampanga 3rd DEO 4,500,000a. PAMPANGA (FIRST DISTRICT) 4,500,000
1. San Roque Br. 1 (B04235LZ) along Concepcion-Capas Rd 4,500,000
10. Tarlac 1st DEO 3,100,000a. TARLAC (FIRST DISTRICT) 3,100,000
1. Pance Br. (B01823LZ) along Anao-Ramos Rd 3,100,000
11. Tarlac 2nd DEO 3,000,000a. TARLAC (THIRD DISTRICT) 3,000,000
1. San Juan Br. (B03298LZ) along Concepcion-Capas Rd1,000,000
2. Santiago Br. (B03297LZ) along Concepcion-Capas Rd2,000,000
details of dpwh’s programs/projects 875
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
12. Zambales 1st DEO 10,000,000a. ZAMBALES (SECOND DISTRICT) 10,000,000
1. Kiling Br. (B01405LZ) along Olongapo-Bugallon Rd 2,500,0002. Lucapon Br. (B01430LZ) along Olongapo-Bugallon Rd
2,000,000 3. Salaza Br. (B00029LZ) along Olongapo-Bugallon Rd 2,500,0004. Sto Niño Br. (B00032LZ) along Olongapo-Bugallon Rd
3,000,000
f. Region IV-A 166,000,0001. Batangas 1st DEO 91,500,000
a. BATANGAS (FIRST DISTRICT) 91,500,0001. Balisong Br. (B01327LZ) along Palico-Balayan-Batangas
Rd 2,000,000 2. Duhatan Br. (B03051LZ) along Balayan-Balibago Rd 2,000,0003. Lian Br. (B03176LZ) along Nasugbu-Lian-Calatagan Rd
39,000,000 4. Mataywanak Br. (B00039LZ) along Palico-Balayan-
Batangas Rd 16,000,000 5. Munting Tubig Br. (B00103LZ) along Palico-Balayan-
Batangas Rd 11,500,000 6. Obispo Br. (B00036LZ) along Palico-Balayan-Batangas
Rd 15,000,000 7. Puting Bato Br. (B00004LZ) along Palico-Balayan-
Batangas Rd 6,000,000
2. Batangas 2nd DEO 25,000,000a. BATANGAS (SECOND DISTRICT) 25,000,000
1. Patay Br. (B03046LZ) along Batangas-Quezon Rd 10,000,0002. Sn. Pedro Br. (B02925LZ) along Bauan-Mabini Rd 10,000,0003. Takad Br. (B03037LZ) along Batangas-Tabangao-Lobo
Rd 5,000,000
3. Quezon 1st DEO 6,000,000a. QUEZON (FIRST DISTRICT) 6,000,000
1. Bataan Br. (B02750LZ) along Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Rd 3,000,000
2. Gunao Br. (B02751LZ) along Lucena-Tayabas-Lucban-Sampaloc-Mauban Port Rd 3,000,000
4. Quezon 2nd DEO 20,000,000a. QUEZON (SECOND DISTRICT) 20,000,000
1. Iyam Br. (B02976LZ) along MSR Old Route 20,000,000
5. Quezon 3rd DEO 1,500,000a. QUEZON (THIRD DISTRICT) 1,500,000
1. Yabaan Br. (B01780LZ) along Catanauan-Buenavista Rd1,500,000
6. Quezon 4th DEO 22,000,000a. QUEZON (FOURTH DISTRICT) 22,000,000
1. Caglate Br. (B00014AB) along Quezon-Alabat-Perez Rd15,000,000
2. Kabitanganan Br. (B03135LZ) along Talaba-Summit-Panaon Rd 7,000,000
g. Region IV-B 272,349,0001. Mindoro Occidental DEO 30,000,000
a. MINDORO OCCIDENTAL (LONE DISTRICT) 30,000,0001. Pinamanaan Br. (B00076MR) along Mindoro West
Coastal Rd 30,000,000
2. Palawan 2nd DEO 95,547,000a. PALAWAN (SECOND DISTRICT) 95,547,000
1. Aramaywan Br. (B00049PW) along Puerto Princesa South Rd 13,680,000
2. Batang Batang Br. (B00035PW) along Puerto Princesa South Rd 28,041,000
3. Bato - Bato Br. 1 (B00036PW) along Puerto Princesa South Rd 4,650,000
4. Cabulu-an Br. (B00044PW) along Puerto Princesa South Rd 6,690,000
5. Calatubog Br. (B00053PW) along Puerto Princesa South Rd 2,010,000
6. Carañogan Br. (B00032PW) along Puerto Princesa South Rd 5,571,000
7. Magtatabo Br. (B00055PW) along Puerto Princesa South Rd 3,810,000
876 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
8. Malanap Br. (B00061PW) along Puerto Princesa South Rd 7,335,000
9. Maranan Br. (B00047PW) along Puerto Princesa South Rd 7,680,000
10. Patilig Br. (B00048PW) along Puerto Princesa South Rd4,950,000
11. Punang Br. (B00060PW) along Puerto Princesa South Rd9,120,000
12. Tacras Br. (B00050PW) along Puerto Princesa South Rd2,010,000
3. Palawan 3rd DEO 25,500,000a. PALAWAN (THIRD DISTRICT) 25,500,000
1. Marupso Br. (B00180PW) along Puerto Princesa South Rd 10,500,000
2. Tandayag Br. (B00091PW) along Puerto Princesa North Rd 10,000,000
3. Tapul Br. (B00090PW) along Puerto Princesa North Rd5,000,000
4. Romblon DEO 118,902,000a. ROMBLON (LONE DISTRICT) 118,902,000
1. Agnocnoc Br. (B00048TL) along Tablas Circumferential Rd 9,180,000
2. Bangon Br. 1 (B00045TL) along Tablas Circumferential Rd 4,470,000
3. Cambajao Br. (B00001SY) along Sibuyan Circumferential Rd 36,000,000
4. Colis Br. (B00020TL) along Tablas Circumferential Rd3,165,000
5. Dumlog Br. (B00008TL) along Tablas Circumferential Rd7,350,000
6. Lusong Br. (B00030TL) along Tablas Circumferential Rd4,686,000
7. Madalag Br. (B00006TL) along Tablas Circumferential Rd 7,530,000
8. Malaoay Br. (B00027TL) along Tablas Circumferential Rd 10,380,000
9. Panique Br. 1 (B00013TL) along Tablas Circumferential Rd 11,232,000
10. Rizal Br. (B00042TL) along Looc (Cogon Tulay)-Odiongan Rd 16,350,000
11. Talaba Br. (B00023SY) along Sibuyan Circumferential Rd5,559,000
12. Tingaray Br. (B00047TL) along Tablas Circumferential Rd 3,000,000
5. Southern Mindoro DEO 2,400,000a. MINDORO ORIENTAL (SECOND DISTRICT) 2,400,000
1. Ipil Br. (B00201MR) along Bongabong-Sagana-Roxas-Sn Aquilino Rd 2,400,000
h. Region V 231,536,0001. Albay 1st DEO 2,500,000
a. ALBAY (FIRST DISTRICT) 2,500,0001. San Ramon Br. (B00238LZ) along DM Jct-Legazpi-Sto
Domingo-Tabaco-Cam. Sur Bdry 2,500,000
2. Albay 3rd DEO 69,240,000a. ALBAY (THIRD DISTRICT) 69,240,000
1. Agol Br. (B00300LZ) along Ligao-Pio Duran Rd 5,700,0002. Bayag Br. (B00301LZ) along Ligao-Pio Duran Rd 5,400,0003. Biak-na-Bato Br. (B00325LZ) along Albay West Coast Rd
6,060,000 4. Natirisan Br. (B00326LZ) along Albay West Coast Rd
4,560,000 5. Paclas Br. 1 (B00320LZ) along Albay West Coast Rd
8,700,000 6. Paclas Br. 2 (B00321LZ) along Albay West Coast Rd
8,700,000 7. Pantao Br. (B00327LZ) along Albay West Coast Rd 6,120,0008. San Francisco Br. (B00316LZ) along Guinobatan
Poblacion Rd 8,400,000 9. San Vicente Br. 1 (B00310LZ) along Libon-Bacolod-Sn
Vicente-Marocmoc-Buga Rd 9,600,000 10. Tula-tula Br. 2 (B00296LZ) along Ligao-Pio Duran Rd
6,000,000
details of dpwh’s programs/projects 877
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
3. Camarines Sur 2nd DEO 10,000,000a. CAMARINES SUR (THIRD DISTRICT) 10,000,000
1. Mabato-Bato Br. (B00412LZ) along Pili-Tigaon-Albay Bdry Rd 10,000,000
4. Camarines Sur 3rd DEO 6,201,000a. CAMARINES SUR (FOURTH DISTRICT) 6,201,000
1. Rangas Br. 3 (B04207LZ) along Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente 6,201,000
5. Catanduanes DEO 2,620,000a. CATANDUANES (LONE DISTRICT) 2,620,000
1. Panabananon Br. (B00033CN) along Catanduanes Cir Rd (Completion) 2,620,000
6. Masbate 1st DEO 7,075,000a. MASBATE (SECOND DISTRICT) 7,075,000
1. Bañadero Br. (B00002MT) along Masbate-Cataingan-Placer Rd (Completion) 7,075,000
7. Masbate 2nd DEO 119,500,000a. MASBATE (THIRD DISTRICT) 119,500,000
1. Alimango Br. (B00049MT) along Masbate-Cataingan-Placer Rd 8,000,000
2. Aliño Boundary Br. (B00043MT) along Masbate-Cataingan-Placer Rd 3,000,000
3. Aporong Br. (B00046MT) along Masbate-Cataingan-Placer Rd 3,500,000
4. Armenia Br. (B00062MT) along Masbate-Cataingan-Placer Rd 3,000,000
5. Badling Br. (B00069MT) along Masbate-Cataingan-Placer Rd 6,000,000
6. Balocaue Br. (B00040MT) along Masbate-Cataingan-Placer Rd 5,000,000
7. Banahao Br. (B00041MT) along Masbate-Cataingan-Placer Rd 3,500,000
8. Buenavista Br. (B00067MT) along Masbate-Cataingan-Placer Rd 5,000,000
9. Catmon Br. (B00054MT) along Masbate-Cataingan-Placer Rd 3,000,000
10. Domorog Br. (B00051MT) along Masbate-Cataingan-Placer Rd 15,000,000
11. G. Aliño Br. (B00042MT) along Masbate-Cataingan-Placer Rd 3,500,000
12. Gaid Br. (B00044MT) along Masbate-Cataingan-Placer Rd 10,000,000
13. Impapanan Br. (B00030MT) along Masbate-Cataingan-Placer Rd 10,000,000
14. Marcella Br. (B00033MT) along Masbate-Cataingan-Placer Rd 5,000,000
15. Minuswang Br. (B00032MT) along Masbate-Cataingan-Placer Rd 5,000,000
16. Nipa Br. (B00045MT) along Masbate-Cataingan-Placer Rd 6,000,000
17. Pinangapugan Br. (B00068MT) along Masbate-Cataingan-Placer Rd 15,000,000
18. Sawang Br. (B00034MT) along Masbate-Cataingan-Placer Rd 10,000,000
8. Sorsogon 1st DEO 14,400,000a. SORSOGON (FIRST DISTRICT) 14,400,000
1. Sorsogon Br. (B01162LZ) along Sorsogon Diversion Rd14,400,000
i. Region VI 274,547,0001. Antique DEO 15,860,000
a. ANTIQUE (LONE DISTRICT) 15,860,0001. Dao Br. (B00421PN) along Anini-y-Tobias Fornier Rd
8,000,000 2. Nipa Br. (B00389PN) along Pandan-Libertad-Aklan Bdry
Rd 6,360,000 3. Yapo Br. (B00338PN) along Iloilo-Antique Rd 1,500,000
2. Capiz 2nd DEO 10,074,000a. CAPIZ (SECOND DISTRICT) 10,074,000
1. Caidquid Br. (B00274PN) along Sigma-Mambusao-Jamindan Rd 1,490,000
2. Malinao Br. (B00076PN) along Tapaz-Jamindan-Altavaz Rd 1,846,000
878 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
3. Malitbug Br. 1 (B00259PN) along Iloilo-Capiz Rd (Old Route) 1,375,000
4. Matubang Br. (B00051PN) along Jct Natl Rd-Dumarao-Sn Rafael (Iloilo) Rd 2,100,000
5. Sibaguan Br. (B00075PN) along Tapaz-Jamindan-AltavazRd 1,683,000
6. Tumalalud Br. (B00273PN) along Sigma-Mambusao-Jamindan Rd 1,580,000
3. Guimaras DEO 20,000,000a. GUIMARAS (LONE DISTRICT) 20,000,000
1. Sibunag Br. (B00014GR) along Guimaras Circumferential Rd 20,000,000
4. Iloilo 1st DEO 3,900,000a. ILOILO (FIRST DISTRICT) 3,900,000
1. Alameda Br. (B00043PN) along Guimbal-Igbaras-Tubungan-Leon Rd 1,000,000
2. Jovellar Br. (B00039PN) along Guimbal-Igbaras-Tubungan-Leon Rd 1,000,000
3. Seguidan Br. (B00045PN) along Guimbal-Igbaras-Tubungan-Leon Rd 1,900,000
5. Iloilo 2nd DEO 41,120,000a. ILOILO (THIRD DISTRICT) 10,160,000
1. Abangay Br. (B00015PN) along Pototan-Tina-Lambunao Rd 10,160,000
b. ILOILO (FOURTH DISTRICT) 30,960,0001. Binaobao Br. (B00018PN) along Barotac Nuevo-
Dumangas-Dacutan Wharf Rd 6,060,000 2. Lamonan Br. (B00188PN) along Passi-Calinog Rd 12,300,0003. Tabucan Br. (B00017PN) along Barotac Nuevo-
Dumangas-Dacutan Wharf Rd 12,600,000
6. Iloilo 3rd DEO 70,000,000a. ILOILO (FIFTH DISTRICT) 70,000,000
1. Agcawayan Br. (B00216PN) along Iloilo East Coast-Capiz Rd 9,000,000
2. Bacjauan Br. (B00104PN) along Concepcion-Sn Dionisio Rd 10,500,000
3. Balogo Br. (B00211PN) along Iloilo East Coast-Capiz Rd6,000,000
4. Barotac Viejo Br. (B00218PN) along Iloilo East Coast-Capiz Rd 9,000,000
5. Gubaton Br. (B00222PN) along Ajuy-Jamul-awon-Concepcion Rd 2,000,000
6. Iyang Br. (B00103PN) along Concepcion-Sn Dionisio Rd5,000,000
7. Malayu-an Br. (B00213PN) along Iloilo East Coast-Capiz Rd 8,000,000
8. Zerruco Br. (B00207PN) along Iloilo East Coast-Capiz Rd20,500,000
7. Iloilo 4th DEO 10,971,000a. ILOILO (SECOND DISTRICT) 10,971,000
1. Baltazar Aquino Br. (B00003PN) along Jct Bancal-Leon-Antique Bdry Rd 3,410,000
2. Lanag Br. 1 (B00476PN) along New Lucena-Sta. Barbara Rd 5,811,000
3. Sigangao Br. (B00455PN) along Iloilo East Coast-Capiz Rd 1,750,000
8. Negros Occidental 1st DEO 37,582,000a. NEGROS OCCIDENTAL (FIRST DISTRICT) 10,567,000
1. Benejewan Br. (B00291NR) along Jct DS Benedicto-Spur16-Calatrava Rd 3,150,000
2. Maaswa Br. 1 (B00309NR) along Jct Curva Hagnaya-Poblacion-Maaswa Rd 5,317,000
3. Maaswa Br. 2 (B00310NR) along Jct Curva Hagnaya-Poblacion-Maaswa Rd 2,100,000
b. NEGROS OCCIDENTAL (SECOND DISTRICT) 12,285,0001. Tan-ao Br. (B00311NR) along Jct Natl Rd Sagay-Bato-
Dian-Marcelo-Balea Jct Rd 12,285,000
details of dpwh’s programs/projects 879
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
c. NEGROS OCCIDENTAL (THIRD DISTRICT) 14,730,0001. Damsite Br. (B00388NR) along Jct Murcia-Cansilayan-
Damsite-Abuanan-Bago City Rd 4,230,000 2. Sum-ag Br. (B00385NR) along Jct Murcia-Cansilayan-
Damsite-Abuanan-Bago City Rd 10,500,000
9. Negros Occidental 2nd DEO 6,000,000a. NEGROS OCCIDENTAL (FIFTH DISTRICT) 6,000,000
1. Pantao Br. (B00419NR) along Jct Pontevedra-La Castellana Rd 6,000,000
10. Negros Occidental 3rd DEO 44,040,000a. NEGROS OCCIDENTAL (SIXTH DISTRICT) 44,040,000
1. Balabago Br. (B00205NR) along Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd 2,940,000
2. Cabadiangan Br. (B00288NR) along Candoni-Sipalay Rd5,000,000
3. Guiljungan Br. (B00222NR) along Bacolod South Rd (Kabankalan-Hinobaan Section) 7,400,000
4. Ilog Br. (B00217NR) along Bacolod South Rd (Kabankalan-Hinobaan Section) 21,400,000
5. Tabla Br. (B00213NR) along Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd 7,300,000
11. Negros Occidental 4th DEO 15,000,000a. NEGROS OCCIDENTAL (FOURTH DISTRICT) 15,000,000
1. Bakyas Br. (B00348NR) along Jct Sn Enrique-Pontevedra By-Pass Rd 5,000,000
2. Kipot Br. (B00366NR) along Bago-Mambucal Rd 10,000,000
j. Region VII 86,067,0001. Bohol 2nd DEO 42,567,000
a. BOHOL (SECOND DISTRICT) 42,567,0001. Butong Br. (B00188BH) along Tagbilaran North Rd
(Tagbilaran-Jetafe Sect) 10,500,000 2. Isumod Br. (B00143BH) along Jct (LIR) Buenavista-
Carmen-Danao-Jetafe Rd 27,000,000 3. Malitbog Br. (B00140BH) along Loay Interior Rd 5,067,000
2. Bohol 3rd DEO 4,000,000a. BOHOL (THIRD DISTRICT) 4,000,000
1. Bayog Br. (B00118BH) along Jct (LIR) Carmen-Sagbayan-Bacani Rd 2,000,000
2. Loboc Br. 2 (B00080BH) along Loay Interior Rd 2,000,000
3. Cebu 1st DEO 12,000,000a. CEBU (FOURTH DISTRICT) 12,000,000
1. Lambusan Br. (B00017CB) along Antonio y De Pio H-way 12,000,000
4. Cebu 3rd DEO 15,000,000a. CEBU (THIRD DISTRICT) 15,000,000
1. Pondol Br. (B00534CB) along Toledo-Tabuelan-Sn Remigio Rd 15,000,000
5. Cebu 5th DEO 4,000,000a. CEBU (FIFTH DISTRICT) 4,000,000
1. Panalipan Br. (B00576CB) along Cebu North Hagnaya Wharf Rd 4,000,000
6. Cebu 6th DEO 4,000,000a. CEBU (SIXTH DISTRICT) 4,000,000
1. Suba Br. (B00625CB) along Consolacion-Tayud-Liloan Rd 4,000,000
7. Negros Oriental 1st DEO 2,500,000a. NEGROS ORIENTAL (FIRST DISTRICT) 2,500,000
1. Ulay Br. (B00061NR) along Vallehermoso-Canlaon City-La Castellana Rd 2,500,000
8. Siquijor DEO 2,000,000a. SIQUIJOR (LONE DISTRICT) 2,000,000
1. Sabang Br. (B00001SJ) along Siquijor Circumferential Rd 2,000,000
880 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
k. Region VIII 1,143,288,0001. Biliran DEO 12,000,000
a. BILIRAN (LONE DISTRICT) 12,000,0001. Biliran Br. (B00057BR) along Leyte-Biliran Rd 5,000,0002. Bilwang Br. (B00058BR) along Biliran Circumferential Rd
5,000,000 3. Cabibihan Br. (B00027BR) along Biliran Circumferential
Rd 2,000,000
2. Eastern Samar DEO 242,800,000a. EASTERN SAMAR (LONE DISTRICT) 242,800,000
1. Alugan Br. 1 (B00533SM) along Jct Taft-Oras-Sn Policarpo-Arteche Rd 15,000,000
2. Binacalan Br. (B00512SM) along Jct Buenavista-Lawaan-Marabut Rd 14,000,000
3. Biniyawan Br. (B00517SM) along Jct Taft-Oras-Sn Policarpo-Arteche Rd 11,000,000
4. Bolusao Br. (B00513SM) along Jct Buenavista-Lawaan-Marabut Rd 19,000,000
5. Can-avid Br. 1 (B00514SM) along Jct Taft-Oras-Sn Policarpo-Arteche Rd 20,000,000
6. Carapdapan Br. 2 (B00528SM) along Jct Taft-Oras-Sn Policarpo-Arteche Rd 7,500,000
7. Dao Br. (B00521SM) along Jct Taft-Oras-Sn Policarpo-Arteche Rd 6,300,000
8. Dolores Br. (B00516SM) along Jct Taft-Oras-Sn Policarpo-Arteche Rd 20,000,000
9. Giporlos Br. 2 (B00506SM) along Jct Buenavista-Lawaan-Marabut Rd 18,000,000
10. Malinao Br. (B00515SM) along Jct Taft-Oras-Sn Policarpo-Arteche Rd 7,200,000
11. Oras Br. (B00522SM) along Jct Taft-Oras-Sn Policarpo-Arteche Rd 20,000,000
12. Pangpang Br. (B00548SM) along Jct Taft-Oras-Sn Policarpo-Arteche Rd 10,000,000
13. Parena Br. (B00507SM) along Jct Buenavista-Lawaan-Marabut Rd 10,000,000
14. Quinapandan Br. (B00499SM) along Jct Buenavista-Lawaan-Marabut Rd 15,000,000
15. Sabang Br. (B00526SM) along Jct Taft-Oras-Sn Policarpo-Arteche Rd 10,000,000
16. San Eduardo Br. (B00525SM) along Jct Taft-Oras-Sn Policarpo-Arteche Rd 20,000,000
17. Sto. Niño Br. (B00501SM) along Jct Buenavista-Lawaan-Marabut Rd 6,300,000
18. Tabo Br. (B00524SM) along Jct Taft-Oras-Sn Policarpo-Arteche Rd 7,500,000
19. Talisay Br. (B00518SM) along Jct Taft-Oras-Sn Policarpo-Arteche Rd 6,000,000
3. Leyte 2nd DEO 16,500,000a. LEYTE (SECOND DISTRICT) 16,500,000
1. Cabayongan Br. (B00074LT) along Jaro-Dagami-Burauen-Lapaz Rd 2,000,000
2. Mainit Br. (B00076LT) along Jaro-Dagami-Burauen-Lapaz Rd 14,500,000
4. Leyte 3rd DEO 4,000,000a. LEYTE (THIRD DISTRICT) 4,000,000
1. Silad Br. (B00152LT) along Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd 4,000,000
5. Leyte 4th DEO 33,282,000a. LEYTE (FOURTH DISTRICT) 33,282,000
1. Dupong Br. (B00206LT) along Palompon-Isabel-Merida-Ormoc Rd 9,624,000
2. Libertad Br. (B00207LT) along Palompon-Isabel-Merida-Ormoc Rd 2,504,000
3. Matlang Br. (B00208LT) along Palompon-Isabel-Merida-Ormoc Rd 9,180,000
4. Merida Br. (B00212LT) along Palompon-Isabel-Merida-Ormoc Rd 9,470,000
5. Taberna Br. (B00204LT) along Palompon-Isabel-Merida-Ormoc Rd 2,504,000
details of dpwh’s programs/projects 881
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
6. Leyte 5th DEO 9,000,000a. LEYTE (FIFTH DISTRICT) 9,000,000
1. Cadac-an Br. (B00624LT) along Abuyog-Silago Rd 6,500,0002. Plaridel Br. (B00263LT) along Ormoc-Baybay-Southern
Leyte Bdry Rd 2,500,000
7. Northern Samar 1st DEO 330,919,000a. NORTHERN SAMAR (FIRST DISTRICT) 330,919,000
1. Bayho Br. (B00268SM) along Catarman-Calbayog Rd25,000,000
2. Baysag Br. (B00281SM) along Allen-Catarman Rd 4,375,0003. Bugko Br. (B00540SM) along Catarman-Laoang Rd 28,000,0004. Cabatuan Br. (B00270SM) along Catarman-Calbayog Rd
18,688,000 5. Cablangan Br. (B00001SM) along Bugko-Nenita-Mirador-
Cagpanit-an-De Maria-Sn Jose 5,400,000 6. Cag-anahao Br. (B00265SM) along Catarman-Calbayog
Rd 15,300,000 7. Caganibong Br. (B00273SM) along Catarman-Calbayog
Rd 7,200,000 8. Cagkinay Br. (B00256SM) along Catarman-Calbayog Rd
15,300,000 9. Cataogan Br. (B00277SM) along Allen-Catarman Rd 6,000,00010. Colgante Br. (B00291SM) along Allen-Catarman Rd 15,000,00011. Dancalan Br. (B00290SM) along Allen-Catarman Rd 8,400,00012. Dao Br. (B00287SM) along Allen-Catarman Rd 28,000,00013. De Maria Br. (B00560SM) along Bugko-Nenita-Mirador-
Cagpanit-an-De Maria-Sn Jose 18,280,000 14. Gibulwangan Br. (B00263SM) along Catarman-Calbayog
Rd 14,400,000 15. Hiodian Br. (B00272SM) along Catarman-Calbayog Rd
13,780,000 16. Lamod Br. (B00286SM) along Allen-Catarman Rd 7,000,00017. Ligued Br. (B00254SM) along Catarman-Calbayog Rd
9,600,000 18. Lobog Br. (B00257SM) along Catarman-Calbayog Rd
12,280,000 19. Londres Br. (B00275SM) along Allen-Catarman Rd 4,200,00020. Looc Br. (B00008SM) along Poblacion-Barangay
Cabacungan Rd 12,360,000 21. Makiwalo Br. (B00537SM) along Catarman-Laoang Rd
12,600,000 22. Nenita Br. (B00002SM) along Bugko-Nenita-Mirador-
Cagpanit-an-De Maria-Sn Jose 12,500,000 23. Rosario Br. (B00316SM) along Rosario Rd 8,240,00024. Sabang Br. 2 (B00250SM) along Allen Old Rd 12,528,00025. Salhag Br. (B00285SM) along Allen-Catarman Rd 7,000,00026. Taguibian Br. (B00536SM) along Catarman-Laoang Rd
9,488,000
8. Samar 2nd DEO 10,000,000a. SAMAR (SECOND DISTRICT) 10,000,000
1. Catbalogan Div. Br. (B00408SM) along Catbalogan Diversion Rd 10,000,000
9. Southern Leyte DEO 475,775,000a. SOUTHERN LEYTE (LONE DISTRICT) 475,775,000
1. Agogong Br. (B00342LT) along Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika 7,400,000
2. Awayon Br. 3 (B00468LT) along Jct Himay-angan-Silago-Abuyog Bdry Rd 4,590,000
3. Biliran Br. (B00321LT) along Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika 20,000,000
4. Bonbon Br. (B00337LT) along Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika 13,710,000
5. Caaga Br. (B00319LT) along Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika 7,700,000
6. Calayugan Br. (B00333LT) along Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika 9,200,000
7. Calian Br. (B00113LT) along Liloan-S Ricardo Rd 7,400,0008. Candatag Br. (B00316LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 7,700,000 9. Canlawis Br. (B00368LT) along Liloan-S Ricardo Rd 20,000,00010. Canlupao Br. (B00328LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 6,200,000 11. Cantamuac Br. (B00315LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 6,200,000 12. Canumay Br. (B00327LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 6,200,000 13. Casao Br. (B00340LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 7,600,000
882 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
14. Concepcion Br. (B00317LT) along Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika 6,200,000
15. Dinahugan Br. 2 (B00311LT) along Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika 20,000,000
16. Higusoan Br. (B00336LT) along Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika 11,500,000
17. Hilogtogan Br. (B00347LT) along Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika 20,115,000
18. Hipgasan Br. (B00343LT) along Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika 8,160,000
19. Iniguihan Br. (B00334LT) along Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika 7,200,000
20. Lo-oc Br. (B00330LT) along Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika 9,900,000
21. Mag-ata Br. (B00329LT) along Bdry S Leyte-Maasin-Macrohon-Sogod-Daang Maharlika 11,400,000
22. Mahalo Br. (B00399LT) along Jct Himay-angan-Silago-Abuyog Bdry Rd 12,700,000
23. Mapait Br. (B00455LT) along Bato-Bontoc Rd 10,600,00024. Maslog Br. (B00331LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 5,100,000 25. Maslog Br. 2 (B00332LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 6,100,000 26. Padre Burgos Br. (B00307LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 6,300,000 27. Pintuyan Br. 1 (B00365LT) along Liloan-S Ricardo Rd
15,000,000 28. Pintuyan Br. 2 (B00366LT) along Liloan-S Ricardo Rd
15,000,000 29. Sagbok Br. (B00403LT) along Jct Himay-angan-Silago-
Abuyog Bdry Rd 18,500,000 30. San Joaquin Br. (B00302LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 20,000,000 31. San Jose Br. (B00320LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 14,400,000 32. San Ricardo Br. (B00373LT) along Liloan-S Ricardo Rd
7,900,000 33. San Roque Br. (B00306LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 14,400,000 34. San Vicente Br. (B00324LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 20,000,000 35. Sangaahon Br. (B00323LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 10,500,000 36. Son-ok Br. 1 (B00363LT) along Liloan-S Ricardo Rd 20,000,00037. Sta. Cruz Br. 1 (B00322LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 10,300,000 38. Sta. Cruz Br. 1 (B00326LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 12,300,000 39. Sudmon Br. (B00472LT) along Jct Himay-angan-Silago-
Abuyog Bdry Rd 10,700,000 40. Timba Br. (B00325LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 9,100,000 41. Villa Jacinta Br. (B00303LT) along Bdry S Leyte-Maasin-
Macrohon-Sogod-Daang Maharlika 18,500,000
10. Tacloban City DEO 9,012,000a. LEYTE (FIRST DISTRICT) 9,012,000
1. Baruguan Br. (B00019LT) along Leyte-Samar Rd (via Guintigui-an) 3,984,000
2. Payapay Br. (B00484LT) along Sn Jose-Manlurip-MacArthur Park Rd 2,316,000
3. Suhi Br. (B00021LT) along Leyte-Samar Rd (via Guintigui-an) 2,712,000
l. Region IX 54,283,0001. Isabela City DEO 31,653,000
a. BASILAN (LONE DISTRICT) 31,653,0001. Aguada Br. (B00001BL) along Basilan Circumferential Rd
30,250,000 2. Balagtasan Br. (B00010BL) along Basilan Circumferential
Rd 1,403,000
2. Zamboanga del Norte 3rd DEO 12,630,000a. ZAMBOANGA DEL NORTE (FIRST DISTRICT) 12,630,000
1. Dionum Br. (B01588MN) along Piñan-Mutia Rd 9,000,0002. Napuyan Br. (Cantilever) (B01587MN) along Piñan-Mutia
Rd 2,100,000 3. Piñan Br. (Cantilever) (B01586MN) along Piñan-Mutia Rd
1,530,000
3. Zamboanga del Sur 2nd DEO 10,000,000
details of dpwh’s programs/projects 883
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
a. ZAMBOANGA DEL SUR (SECOND DISTRICT) 10,000,0001. Maclob Br. (B00540MN) along Jct Dumalinao-
Margosatubig Rd 10,000,000
m. Region X 80,600,0001. Bukidnon 2nd DEO 3,090,000
a. BUKIDNON (THIRD DISTRICT) 3,090,0001. Lalapoy Br. (B01417MN) along Don Carlos-Kadingilan
Rd 1,612,000 2. San Miguel Br. (B01432MN) along Maramag-Maradugao
Rd 1,478,000
2. Bukidnon 3rd DEO 8,010,000a. BUKIDNON (FOURTH DISTRICT) 8,010,000
1. Malatipay Br. (B01388MN) along Kalilangan-Lampanusan Rd 8,010,000
3. Lanao del Norte 1st DEO 11,500,000a. LANAO DEL NORTE (SECOND DISTRICT) 11,500,000
1. Calingawan Br. (FVR) (B01719MN) along Lanao del Norte Interior Circum. Rd (LDNICR) 1,800,000
2. Daligdigan Br. (FVR) (B01717MN) along Lanao del Norte Interior Circum. Rd (LDNICR) 4,600,000
3. Lyndon Br.(FVR) (B01718MN) along Lanao del Norte Interior Circum. Rd (LDNICR) 3,000,000
4. Ningal Br. (FVR) (B01720MN) along Lanao del Norte Interior Circum. Rd (LDNICR) 2,100,000
4. Lanao del Norte 2nd DEO 2,000,000a. ILIGAN CITY (LONE DISTRICT) 2,000,000
1. Baslayan Br. 1 (B00893MN) along Tibanga Rd-Pala-o Jct2,000,000
5. Misamis Occidental 1st DEO 3,500,000a. MISAMIS OCCIDENTAL (FIRST DISTRICT) 3,500,000
1. Daisug Br. 2 (B01636MN) along Oroquieta City-Calamba Mt Rd 2,500,000
2. Sulipat Diut Br. (B00390MN) along Oroquieta City-Calamba Mt Rd 1,000,000
6. Misamis Occidental 2nd DEO 2,500,000a. MISAMIS OCCIDENTAL (SECOND DISTRICT) 2,500,000
1. Lagbas Br. (B00374MN) along Ozamis Port Rd 2,500,000
7. Misamis Oriental 2nd DEO 50,000,000a. MISAMIS ORIENTAL (SECOND DISTRICT) 50,000,000
1. Dal-as Br. (B01222MN) along Gingoog-Claveria-Villanueva Rd 10,000,000
2. Dangayon Br. (B01216MN) along Gingoog-Claveria-Villanueva Rd 10,000,000
3. Guibone Br. (B01218MN) along Gingoog-Claveria-Villanueva Rd 10,000,000
4. Mat-i Br. (B01224MN) along Gingoog-Claveria-Villanueva Rd 20,000,000
n. Region XI 61,091,0001. Compostela Valley DEO 9,443,000
a. COMPOSTELA VALLEY (FIRST DISTRICT) 7,940,0001. Canidkid Br. (B01284MN) along Montevista-DNAS Rd
(Completion) 2,000,000 2. Languan Br. (B00084MN) along Montevista-Compostela-
Mati Bdry Rd 1,367,000 3. Mapawa Br. 2 (B01429MN) along Montevista-
Compostela-Mati Bdry Rd 1,728,000 4. Tadia Br. (formerly Ngan Br.) (B01418MN) along
Compostela-Cateel Rd (Compostela Side) 1,605,000 5. Tagbibinta Br. (B01425MN) along Montevista-
Compostela-Mati Bdry Rd 1,240,000 b. COMPOSTELA VALLEY (SECOND DISTRICT) 1,503,000
1. Kao Br. (B01529MN) along Nabunturan-Maragusan Road1,503,000
884 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
2. Davao del Norte DEO 11,000,000a. DAVAO DEL NORTE (FIRST DISTRICT) 8,000,000
1. Cambago Br. (B01570MN) along Asuncion-San Isidro-Laak-Veruela Rd 3,000,000
2. Gabuyan Br. (B00192MN) along Kapalong-Talaingod-Valencia (Bukidnon) Rd 2,000,000
3. Nanaga Br. 1 (B01121MN) along Kapalong-Talaingod-Valencia (Bukidnon) Rd 3,000,000
b. DAVAO DEL NORTE (SECOND DISTRICT) 3,000,0001. Benoling Br. (B00028MN) along Babak-Samal-Kaputian
Rd 1,000,000 2. Magsaysay Br. 2 (B00025MN) along Carmen-DAPECOL
Cmpd Rd 2,000,000
3. Davao Oriental 1st DEO 39,400,000a. DAVAO ORIENTAL (FIRST DISTRICT) 39,400,000
1. Baguan Br. (B00119MN) along Surigao del Sur Bdry-Davao Or Coastal Rd 2,700,000
2. Gov. Lopez Br. (B00111MN) along Surigao del Sur Bdry-Davao Or Coastal Rd 8,000,000
3. Kadungonan Br. (B00094MN) along Surigao del Sur Bdry-Davao Or Coastal Rd 1,000,000
4. San Victor Br. (B00097MN) along Surigao del Sur Bdry-Davao Or Coastal Rd 1,200,000
5. Udiongan Br. (B01150MN) along Compostela-Cateel Rd (Davao Or side) 26,500,000
4. Davao Oriental 2nd DEO 1,248,000a. DAVAO ORIENTAL (SECOND DISTRICT) 1,248,000
1. Kawayan Br. (B01126MN) along Jct Manikling-Gov Generoso Rd 1,248,000
o. Region XII 49,990,0001. Cotabato 2nd DEO 16,000,000
a. COTABATO (FIRST DISTRICT) 8,000,0001. Iruruos Br. (B00601MN) along Banisilan-Guiling-
Alamada-Libungan Rd 2,000,000 2. Malitubog Br. (B00600MN) along Banisilan-Guiling-
Alamada-Libungan Rd 5,000,000 3. Olandang Br. 1 (B00329MN) along Midsayap-Makar Rd
1,000,000 b. COTABATO (THIRD DISTRICT) 8,000,000
1. Magulay Br. (B01473MN) along Banisilan-Guiling-Alamada-Libungan Rd 1,000,000
2. Mutian Br. (B00319MN) along Bukidnon-Cotabato Rd2,000,000
3. Upian Br. (B00318MN) along Bukidnon-Cotabato Rd 5,000,000
2. Sarangani DEO 27,990,000a. SARANGANI (LONE DISTRICT) 27,990,000
1. Tambilil Br. (B01075MN) along Sarangani-Sultan Kudarat Coastal Rd 27,990,000
3. Sultan Kudarat 1st DEO 6,000,000a. SULTAN KUDARAT (FIRST DISTRICT) 6,000,000
1. Calean Br. (B00292MN) along Dulawan-Marbel Rd 6,000,000
p. Region XIII 49,100,0001. Agusan del Sur 1st DEO 15,000,000
a. AGUSAN DEL SUR (FIRST DISTRICT) 15,000,0001. San Juan Br. (B01463MN) along NRJ Bayugan-Calaitan-
Tandag Rd 15,000,000
2. Butuan City DEO 9,000,000a. AGUSAN DEL NORTE (FIRST DISTRICT) 9,000,000
1. Suatan Br. (B00892MN) along Butuan City-Masao Port Rd 9,000,000
3. Surigao del Norte 1st DEO 5,100,000a. SURIGAO DEL NORTE (SECOND DISTRICT) 5,100,000
1. Mapaso Br. (B00976MN) along Surigao-Davao Coastal Rd 3,600,000
2. Poniente Br. (B00984MN) along Surigao-Davao Coastal Rd 1,500,000
details of dpwh’s programs/projects 885
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
4. Surigao del Sur 1st DEO 20,000,000a. SURIGAO DEL SUR (FIRST DISTRICT) 20,000,000
1. Carmen Br. (B00662MN) along Surigao-Davao Coastal Rd 3,000,000
2. Magroyong Br. 2 (B01410MN) along Jct Gamut-Sn Miguel Bayugan Rd 5,000,000
3. Pamugsukan Br. (B00699MN) along Surigao-Davao Coastal Rd 3,000,000
4. Tagbinaba Br. (B00709MN) along Surigao-Davao Coastal Rd 4,000,000
5. Unidos Br. (B00703MN) along Surigao-Davao Coastal Rd5,000,000
886 eXpeNditUre program fY 2016 VolUme ii
e. Widening of Bridges 9,833,016,000
1. from 1 to 2 Lanes 713,000,000
I. Central Office 167,500,000a. Region III 157,500,000
1. Tarlac 1st DEO 157,500,000a. TARLAC (SECOND DISTRICT) 157,500,000
1. Lubigan Br. (B03428LZ) along Capas-San Jose-Mayantoc-Malacampa Rd
157,500,000
b. Nationwide 10,000,0001. Central Office 10,000,000
a. NATIONWIDE 10,000,0001. Widening of Bridges (1-2 Lanes) 10,000,000
II. Regional Office Proper 80,000,000a. Region I 80,000,000
1. Pangasinan 3rd DEO 80,000,000a. PANGASINAN (SIXTH DISTRICT) 80,000,000
1. Viray Br. (B00844LZ) along Sn Nicolas-Natividad-Sn Quintin-Umingan-Guimba Rd (Completion)
80,000,000
III. District Engineering Office 465,500,000a. Region II 46,000,000
1. Nueva Vizcaya 1st DEO 46,000,000a. NUEVA VIZCAYA (LONE DISTRICT) 46,000,000
1. Rosario Br. 2 (B01260LZ) along Bambang-Kasibu-SolanoRd
46,000,000
b. Cordillera Administrative Region 65,000,0001. Ifugao 2nd DEO 65,000,000
a. IFUGAO (LONE DISTRICT) 65,000,0001.
Monggayang Br. (B03435LZ) along Ubao-Taang Road41,000,000
2. Talite Br. (B02210LZ) along Banaue-Mayoyao-A Lista-Isabela Bdry Rd
24,000,000
c. Region IV-A 27,500,0001. Cavite 2nd DEO 27,500,000
a. CAVITE (FIFTH DISTRICT) 27,500,0001. Tartaria Br. (B02523LZ) along Sta Rosa-Ulat-Tagaytay
Rd27,500,000
d. Region IV-B 142,200,0001. Mindoro Occidental DEO 26,800,000
a. MINDORO OCCIDENTAL (LONE DISTRICT) 26,800,0001. Bubog Br. (B00148MR) along Jct MWCR-Sn Jose Airport-
Jct Bubog Rd26,800,000
2. Palawan 2nd DEO 111,400,000a. PALAWAN (SECOND DISTRICT) 111,400,000
1.Buligay Br. (B00115PW) along Puerto Princesa South Rd
9,400,000
2. Ipilan Br. 1 (B00158PW) along PPSR Jct (Abo-abo)-Quezon Rd
9,400,000
3. Ipilan Br. 2 (B00159PW) along PPSR Jct (Abo-abo)-Quezon Rd
15,400,000
4. Ipilan Br. 3 (B00160PW) along PPSR Jct (Abo-abo)-Quezon Rd
15,100,000
5.Malatgao Br. (B00168PW) along Quezon-Punta Baja Rd
19,000,000
6. Pinaglabanan Br. (B00163PW) along PPSR Jct (Abo-abo)-Quezon Rd
9,500,000
7. Taglumot Br. (B00162PW) along PPSR Jct (Abo-abo)-Quezon Rd
11,500,000
8. Tumarbong Br. (B00161PW) along PPSR Jct (Abo-abo)-Quezon Rd
15,100,000
9. Underground Br. (B00166PW) along Quezon-Punta BajaRd
7,000,000
3. Palawan 3rd DEO 4,000,000a. PALAWAN (THIRD DISTRICT) 4,000,000
1. Magsaysay Br. (B00023PW) along Puerto Princesa South Rd
4,000,000
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
details of dpwh’s programs/projects 887
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
e. Region V 137,800,0001. Camarines Sur 3rd DEO 99,000,000
a. CAMARINES SUR (FOURTH DISTRICT) 99,000,0001. Caguiscan Br. (B00488LZ) along Lagonoy-Presentacion
Rd49,500,000
2. Panicuan Br. (B00489LZ) along Lagonoy-PresentacionRd
49,500,000
2. Catanduanes DEO 38,800,000a. CATANDUANES (LONE DISTRICT) 38,800,000
1. Minaili Br. (B00074CN) along Catanduanes Cir Rd 38,800,000
f. Region XIII 47,000,0001. Agusan del Sur 2nd DEO 47,000,000
a. AGUSAN DEL SUR (SECOND DISTRICT) 47,000,0001. Adgawan Br. (B00598MN) along Butuan City-Talacogon-
Loreto-Veruela-Sta Josefa R47,000,000
888 eXpeNditUre program fY 2016 VolUme ii
2. More than 2 Lanes 9,120,016,000
1. Central Office 707,448,000a. Region IV-A 200,000,000
1. Laguna 2nd DEO 200,000,000a. LAGUNA (FIRST DISTRICT) 200,000,000
1. San Pedro Br. (B03121LZ) along Manila South Rd 200,000,000
b. Region V 190,000,0001. Sorsogon 1st DEO 190,000,000
a. SORSOGON (FIRST DISTRICT) 190,000,0001. Cawayan Br. (B00341LZ) along Daang Maharlika (LZ) 190,000,000
c. Region XI 307,448,0001. Davao del Norte DEO 307,448,000
a. DAVAO DEL NORTE (SECOND DISTRICT) 307,448,0001. Gov. Miranda Br. 2 (B01270MN) along Daang Maharlika
(MN) (Completion)307,448,000
d. Nationwide 10,000,0001. Central Office 10,000,000
a. NATIONWIDE 10,000,0001. Widening of Bridges to more than 2 Lanes 10,000,000
2. Regional Office Proper 6,914,064,000a. Region I 508,130,000
1. Ilocos Norte 1st DEO 63,580,000a. ILOCOS NORTE (FIRST DISTRICT) 63,580,000
1. Buraan Br. (B00535LZ) along Manila North Rd 63,580,000
2. Ilocos Sur 1st DEO 165,000,000a. ILOCOS SUR (FIRST DISTRICT) 165,000,000
1. Bical Br. (B00589LZ) along Manila North Rd 77,000,0002. Bimmeclat Br. (B00592LZ) along Manila North Rd 33,000,0003. Sinait Br. 2 (B00596LZ) along Manila North Rd 28,000,0004. Teppeng Br. (B00594LZ) along Manila North Rd 27,000,000
3. Ilocos Sur 2nd DEO 120,000,000a. ILOCOS SUR (SECOND DISTRICT) 120,000,000
1. Borono Br. (B00602LZ) along Manila North Rd 12,873,0002. Caparia-an Br. (B00607LZ) along Manila North Rd 6,437,0003. Casitagan Br. (B00606LZ) along Manila North Rd 6,069,0004. Cavite Br. 1 (B00616LZ) along Manila North Rd 8,920,0005. Libtong Br. (B00601LZ) along Manila North Rd 22,161,0006. Paratong Br. (B00604LZ) along Manila North Rd 7,356,0007. San Juan Br. 1 (B00613LZ) along Manila North Rd 5,885,0008. San Juan Br. 2 (B00614LZ) along Manila North Rd 5,517,0009. Sawat Br. 2 (B00611LZ) along Manila North Rd 6,253,00010. Taliawen Br. 1 (B00599LZ) along Manila North Rd 24,184,00011. Taliawen Br. 2 (B00600LZ) along Manila North Rd 14,345,000
4. La Union 1st DEO 122,550,000a. LA UNION (FIRST DISTRICT) 122,550,000
1. Bagui-ing Br. (B02655LZ) along Manila North Rd 19,750,0002. Carlatan Br. (B02649LZ) along Manila North Rd 60,000,0003. Pantar Br. (B02656LZ) along Manila North Rd 42,800,000
5. Pangasinan 2nd DEO 37,000,000a. PANGASINAN (SECOND DISTRICT) 37,000,000
1. Gumapos Br. (B02146LZ) along Pangasinan-Zambales Rd
37,000,000
b. Region II 375,900,0001. Cagayan 1st DEO 62,000,000
a. CAGAYAN (FIRST DISTRICT) 62,000,0001. Baculud Br. (B01083LZ) along Cagayan Valley Rd 62,000,000
2. Cagayan 2nd DEO 56,000,000a. CAGAYAN (SECOND DISTRICT) 56,000,000
1. Sanchez Mira Br. (B01010LZ) along Manila North Rd 56,000,000
AMOUNT (Php) PROGRAMS/ ACTIVITIES/ PROJECTS
details of dpwh’s programs/projects 889
AMOUNT (Php) PROGRAMS/ ACTIVITIES/ PROJECTS
3. Cagayan 3rd DEO 68,000,000a. CAGAYAN (THIRD DISTRICT) 68,000,000
1. Alimanao Br. (B01911LZ) along Cagayan Valley Rd 33,950,0002. Carig Br. 1 (B01912LZ) along Cagayan Valley Rd 9,550,0003. Carig Br. 2 (B01913LZ) along Cagayan Valley Rd 9,550,0004. Carig Br. 3 (B04447LZ) along Cagayan Valley Rd 14,950,000
4. Nueva Vizcaya 1st DEO 162,000,000a. NUEVA VIZCAYA (LONE DISTRICT) 162,000,000
1. Apad Br. (B01233LZ) along Daang Maharlika (LZ) 12,000,0002. Indiana Br. (B01225LZ) along Daang Maharlika (LZ) 150,000,000
5. Nueva Vizcaya 2nd DEO 27,900,000a. NUEVA VIZCAYA (LONE DISTRICT) 27,900,000
1. Mag-asawang Kahoy Br. (B01219LZ) along Daang Maharlika (LZ)
27,900,000
c. Region III 604,400,0001. Bulacan 1st DEO 38,500,000
a. BULACAN (SECOND DISTRICT) 38,500,0001. Cut-Cut Br. 2 (B02094LZ) along Daang Maharlika (LZ) 22,000,000
2. Irrigation Br. (B00018LZ) along Daang Maharlika (LZ) 16,500,000
2. Bulacan 2nd DEO 215,000,000a. BULACAN (FOURTH DISTRICT) 215,000,000
1. Marilao Br. (B01649LZ) along Manila North Rd 65,000,0002. Sta. Maria Br. (B01654LZ) along Sta Maria-Norzagaray
Rd150,000,000
3. Nueva Ecija 2nd DEO 44,400,000a. NUEVA ECIJA (FOURTH DISTRICT) 44,400,000
1. Baluarte Br. 3 (B01308LZ) along Daang Maharlika (LZ) 14,000,000
2. Malimba Br. (B01309LZ) along Daang Maharlika (LZ) 30,400,000
4. Pampanga 1st DEO 125,000,000a. PAMPANGA (THIRD DISTRICT) 125,000,000
1. Sto. Domingo Br. (B01480LZ) along Gapan-Sn Fernando-Olongapo Rd
125,000,000
5. Tarlac 1st DEO 181,500,000a. TARLAC (FIRST DISTRICT) 112,600,000
1. Bayating Br. (B01382LZ) along Romulo H-way 38,400,0002. Camiling Br. (B01384LZ) along Romulo H-way 22,000,0003. Malacampa Br. (B01383LZ) along Romulo H-way 19,800,0004. Nambalan Br. (B01381LZ) along Romulo H-way 14,400,0005. Salamaque Br. (B01380LZ) along Romulo H-way 18,000,000
b. TARLAC (SECOND DISTRICT) 68,900,0001. Barbon Br. 1 (B01377LZ) along Romulo H-way 17,000,0002. Barbon Br. 2 (B01959LZ) along Romulo H-way 9,800,0003. Barbon Br. 3 (B01378LZ) along Romulo H-way 17,000,0004. Binig Br. (B01379LZ) along Romulo H-way 25,100,000
d. Region IV-A 437,751,0001. Batangas 3rd DEO 80,751,000
a. BATANGAS (THIRD DISTRICT) 80,751,0001. Sambat Flyover (B03152LZ) along Tanauan-Talisay-
Tagaytay Rd80,751,000
2. Cavite DEO 80,000,000a. CAVITE (SIXTH DISTRICT) 80,000,000
1. Mag-asawang Layon Br. (B03065LZ) along Dasmariñas-Trece Martires City-Naic Rd
20,000,000
2. Malabon Br. (B03059LZ) along Dasmariñas-Trece Martires City-Naic Rd
20,000,000
3. Pagong Elo Br. (B03062LZ) along Dasmariñas-Trece Martires City-Naic Rd
15,000,000
4. Panaysayan Br. (B03061LZ) along Dasmariñas-Trece Martires City-Naic Rd
15,000,000
5. Punta Br. (B02915LZ) along Tanza-Trece Martires City-Indang Rd
10,000,000
890 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAMS/ ACTIVITIES/ PROJECTS
3. Laguna 1st DEO 140,000,000a. LAGUNA (FOURTH DISTRICT) 140,000,000
1. Lumban Br. (B02469LZ) along Calamba-Sta Cruz-Famy Jct Rd
140,000,000
4. Laguna 3rd DEO 9,000,000a. LAGUNA (THIRD DISTRICT) 9,000,000
1. Calauan Br. (B02880LZ) along Calamba-Sta Cruz-Famy Jct Rd
9,000,000
5. Quezon 2nd DEO 128,000,000a. QUEZON (SECOND DISTRICT) 128,000,000
1. Domoit Br. (B02934LZ) along MSR Diversion Rd 45,000,0002. Dumoklong Br. (B02938LZ) along MSR Diversion Rd 36,000,0003. Masin Br. (B03085LZ) along Daang Maharlika (LZ) 25,000,0004. Quiapo Br. (B03086LZ) along Daang Maharlika (LZ) 22,000,000
e. Region V 1,126,121,0001. Camarines Norte DEO 278,050,000
a. CAMARINES NORTE (SECOND DISTRICT) 278,050,0001. Alinao Br. (B02720LZ) along Daang Maharlika (LZ) 16,010,0002. Daet Br. 2 (B02725LZ) along Daang Maharlika (LZ) 121,330,0003. Mabulao Br. 2 (B02726LZ) along Daang Maharlika (LZ) 60,270,000
4. Mampaod Br. (B02721LZ) along Daang Maharlika (LZ) 6,540,000
5. Matnog Br. (B02728LZ) along Daang Maharlika (LZ) 31,900,0006. Talisay Br. (B02723LZ) along Daang Maharlika (LZ) 25,850,0007. Tulay na Bato Br. (B02727LZ) along Daang Maharlika
(LZ)16,150,000
2. Camarines Sur 1st DEO 57,660,000a. CAMARINES SUR (SECOND DISTRICT) 57,660,000
1. Pamukid Br. (B00395LZ) along Daang Maharlika (LZ) 25,740,000
2. Uguis Br. (B00384LZ) along Daang Maharlika (LZ) 31,920,000
3. Camarines Sur 2nd DEO 170,200,000a. CAMARINES SUR (THIRD DISTRICT) 170,200,000
1. Mabolo Br. (B02549LZ) along Daang Maharlika (LZ) 111,700,0002. Pili Airport Br. (B00418LZ) along Pili-Airport Rd 58,500,000
4. Camarines Sur 4th DEO 27,211,000a. CAMARINES SUR (FIFTH DISTRICT) 27,211,000
1. Unknown Br. 1 (B00458LZ) along Daang Maharlika (LZ) 15,599,000
2. Unknown Br. 2 (B00459LZ) along Daang Maharlika (LZ) 11,612,000
5. Regional Office V 593,000,000a. REGIONWIDE 593,000,000
1. Aroroy Br. (B00270LZ) along Daang Maharlika (LZ) 33,050,0002. Bacolod Br. (B00154LZ) along Daang Maharlika (LZ) 30,800,0003. Bamban Br. (B00161LZ) along Daang Maharlika (LZ) 17,990,000
4. Bolo Br. (B00163LZ) along Daang Maharlika (LZ) 15,670,0005. Buenavista Br. (B00158LZ) along Daang Maharlika (LZ) 12,120,000
6. Calibag Br. (B00164LZ) along Daang Maharlika (LZ) 38,950,0007. Caluscos Br. (B00157LZ) along Daang Maharlika (LZ) 99,320,000
8. Casini Br. (B00159LZ) along Daang Maharlika (LZ) 31,430,0009. Gulang-Gulang Br. (B00155LZ) along Daang Maharlika
(LZ)24,430,000
10. Hoyon-Hoyon Br. (B00153LZ) along Daang Maharlika (LZ)
17,850,000
11. Matnog Br. (B00165LZ) along Daang Maharlika (LZ) 18,540,00012. Monbon Br. (B00156LZ) along Daang Maharlika (LZ) 20,240,000
13. Pange Br. (B00162LZ) along Daang Maharlika (LZ) 16,000,00014. Rangas Br. (B00271LZ) along Daang Maharlika (LZ) 61,890,00015. Solinao Br. (B00160LZ) along Daang Maharlika (LZ) 31,500,00016. Talinga Br. (B00269LZ) along Daang Maharlika (LZ) 123,220,000
f. Region VI 516,939,0001. Capiz 1st DEO 45,000,000
a. CAPIZ (FIRST DISTRICT) 45,000,0001. Capiz Br. (B00240PN) along Iloilo-Capiz Rd (New Route) 45,000,000
details of dpwh’s programs/projects 891
AMOUNT (Php) PROGRAMS/ ACTIVITIES/ PROJECTS
2. Guimaras DEO 57,000,000a. GUIMARAS (LONE DISTRICT) 57,000,000
1. Mantangingi Br. (B00003GR) along Guimaras Circumferential Rd
57,000,000
3. Iloilo 2nd DEO 285,954,000a. ILOILO (THIRD DISTRICT) 30,000,000
1. Casalsagan Br. (B00190PN) along Iloilo-Capiz (New Route)
30,000,000
b. ILOILO (FOURTH DISTRICT) 255,954,0001. Abangay Br. (B00192PN) along Iloilo-Capiz (New Route) 73,000,000
2. Alacaygan Br. (B00180PN) along Iloilo East Coast-Capiz Rd
61,725,000
3. Anilao Br. (B00182PN) along Iloilo East Coast-Capiz Rd 58,763,000
4. Balandra Br. (B00179PN) along Iloilo East Coast-Capiz Rd
62,466,000
4. Negros Occidental 1st DEO 128,985,000a. NEGROS OCCIDENTAL (SECOND DISTRICT) 128,985,000
1. Dapdap Br. (B00160NR) along Bacolod North Rd 26,250,0002. Guindascan Br. (B00164NR) along Bacolod North Rd 11,160,000
3. Madalag Br. (B00158NR) along Bacolod North Rd 20,250,0004. Sicaba Br. (B00163NR) along Bacolod North Rd 53,325,0005. Talaban Br. (B00159NR) along Bacolod North Rd 18,000,000
g. Region VII 85,000,0001. Cebu 5th DEO 70,000,000
a. CEBU (FIFTH DISTRICT) 70,000,0001. Cotcot Br. (B00583CB) along Cebu North Hagnaya
Wharf Rd50,000,000
2. Maslog Br. (B00581CB) along Cebu North Hagnaya Wharf Rd
20,000,000
2. Negros Oriental 2nd DEO 15,000,000a. NEGROS ORIENTAL (SECOND DISTRICT) 15,000,000
1. Banica Br. 2 (B00070NR) along Mayor Ramon T. Pastor Sr. St.
12,000,000
2. Boloc-boloc Br. (B00072NR) along Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan)
3,000,000
h. Region VIII 575,410,0001. Leyte 1st DEO 166,410,000
a. LEYTE (FIRST DISTRICT) 166,410,0001. Calogcog Br. (B00034LT) along Daang Maharlika (LT) 68,120,000
2. San Joaquin Br. (B00033LT) along Daang Maharlika (LT) 98,290,000
2. Leyte 2nd DEO 130,800,000a. LEYTE (SECOND DISTRICT) 130,800,000
1. Hibuga Br. (B00069LT) along Daang Maharlika (LT) 46,200,0002. Labiranan Br. (B00064LT) along Daang Maharlika (LT) 45,400,000
3. Matadbatad Br. (B00066LT) along Daang Maharlika (LT) 15,800,000
4. Pinamitinan Br. (B00001LT) along Palo-Carigara-Ormoc Rd
23,400,000
3. Leyte 4th DEO 60,200,000a. LEYTE (FOURTH DISTRICT) 60,200,000
1. Anilao Br. (B00618LT) along Palo-Carigara-Ormoc Rd 60,200,000
4. Samar 1st DEO 218,000,000a. SAMAR (FIRST DISTRICT) 218,000,000
1. Arapison Br. (B00351SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br)
33,000,000
2. Lambigue Br. (B00354SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br)
38,000,000
3. Lawayon Br. (B00357SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br)
21,000,000
4. Sapinit Viaduct (B00360SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br)
100,000,000
5. Solsogon Br. (B00352SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br)
26,000,000
i. Region IX 197,860,000
892 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAMS/ ACTIVITIES/ PROJECTS
1. Zamboanga del Norte 1st DEO 55,200,000a. ZAMBOANGA DEL NORTE (SECOND DISTRICT) 55,200,000
1. Quezon Br. (B01191MN) along Dipolog-Oroquieta National Rd
55,200,000
2. Zamboanga del Norte 3rd DEO 27,900,000a. ZAMBOANGA DEL NORTE (FIRST DISTRICT) 27,900,000
1. Tolon Br. (B00581MN) along Dipolog-Oroquieta National Rd
27,900,000
3. Zamboanga del Sur 1st DEO 45,000,000a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 45,000,000
1. Tagulo Br. (B01508MN) along Tucuran Jct-Karomatan Jct Rd
25,000,000
2. Tawagan Sur Br. (B01501MN) along Pagadian City-Zamboanga City Rd
20,000,000
4. Zamboanga del Sur 2nd DEO 69,760,000a. ZAMBOANGA DEL SUR (SECOND DISTRICT) 69,760,000
1. Begong Br. (B00544MN) along Pagadian City-Zamboanga City Rd
9,200,000
2. Deorok Br. (B00545MN) along Pagadian City-Zamboanga City Rd
31,200,000
3. Dumalinao Br. (B00543MN) along Pagadian City-Zamboanga City Rd
29,360,000
j. Region X 1,533,680,0001. Bukidnon 1st DEO 146,600,000
a. BUKIDNON (SECOND DISTRICT) 104,400,0001. Kalasungay Br. (B01368MN) along Sayre Highway 28,800,0002. Manupali Br. (B01370MN) along Sayre Highway 75,600,000
b. BUKIDNON (FOURTH DISTRICT) 42,200,0001. Malingon Br. (B01371MN) along Sayre Highway 42,200,000
2. Bukidnon 2nd DEO 94,800,000a. BUKIDNON (THIRD DISTRICT) 94,800,000
1. Kulaman Br. (B01374MN) along Sayre Highway 75,600,0002. Musuan Br. (B01373MN) along Sayre Highway 19,200,000
3. Bukidnon 3rd DEO 56,000,000a. BUKIDNON (FIRST DISTRICT) 56,000,000
1. Kulaman Br. (B01497MN) along Sayre Highway (Completion)
56,000,000
4. Misamis Occidental 2nd DEO 45,000,000a. MISAMIS OCCIDENTAL (SECOND DISTRICT) 45,000,000
1. Tudela Br. (B01139MN) along Ozamis-Oroquieta Rd (Completion)
45,000,000
5. Misamis Oriental 1st DEO 284,000,000a. MISAMIS ORIENTAL (FIRST DISTRICT) 284,000,000
1. Binitinan Br. (B01318MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
94,000,000
2. Cabulawan Br. (B01311MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
47,000,000
3. Lagonglong Br. (B01312MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
13,000,000
4. Lapinig Br. (B01299MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
23,000,000
5. May-Ang Br. (B01310MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
26,000,000
6. Musimusi Br. (B01317MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
25,000,000
7. Napaliran Br. (B01313MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
30,000,000
8. Waterfall Br. 1 (B01316MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
26,000,000
6. Misamis Oriental 2nd DEO 414,280,000a. MISAMIS ORIENTAL (SECOND DISTRICT) 414,280,000
1. Alubijid Br. (B01325MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Completion)
88,000,000
2. Amoros Br. (B01323MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Completion)
45,000,000
3. Bolo-bolo Br. (B01324MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
60,000,000
4. Gitagum Br. (B01326MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
50,000,000
5. Igpit Br. (B01321MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Completion)
82,000,000
details of dpwh’s programs/projects 893
AMOUNT (Php) PROGRAMS/ ACTIVITIES/ PROJECTS
6. Mandangisiao Br. (B01319MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
58,780,000
7. Opol Br. (B01322MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Completion)
30,500,000
7. Regional Office X 493,000,000a. REGIONWIDE 493,000,000
1. Alae Br. 1 (B01287MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Completion)
45,000,000
2. Alae Br. 2 (B01288MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Completion)
45,000,000
3. Gimangpang Br. (B01332MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
32,000,000
4. Gimaylan Br. (B01330MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
20,000,000
5. Initao Br. (B01331MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
52,000,000
6. Lugait Br. (B01338MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
36,000,000
7. Lug-an Br. (B01337MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
21,000,000
8. Manticao Br. (B01336MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
61,000,000
9. Naawan Br. (B01334MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
63,000,000
10. Pamoni Br. (B01333MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
18,000,000
11. Pangayawan Br. (B01327MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
26,000,000
12. Simanoc Br. (B01335MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
22,000,000
13. Tabo-o Br. (B01329MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
26,000,000
14. Taytayan Br. (B01328MN) along Butuan City-Cagayan de Oro City-Iligan City Rd
26,000,000
k. Region XI 596,775,0001. Compostela Valley DEO 213,075,000
a. COMPOSTELA VALLEY (FIRST DISTRICT) 85,000,0001. Casangay Br. (B00074MN) along Daang Maharlika (MN) 27,618,000
2. Guyon Br. (B00072MN) along Daang Maharlika (MN) 22,859,000
3. Olaycon Br. (B00070MN) along Daang Maharlika (MN) 34,523,000
b. COMPOSTELA VALLEY (SECOND DISTRICT) 128,075,0001. Linda Br. (B00077MN) along Daang Maharlika (MN) 39,390,0002. Mawab Br. (B00078MN) along Daang Maharlika (MN) 38,550,000
3. Puntod Br. (B00076MN) along Daang Maharlika (MN) 23,135,000
4. Tagmanok Br. (B00079MN) along Daang Maharlika (MN) 27,000,000
2. Davao City 2nd DEO 248,000,000a. DAVAO CITY (THIRD DISTRICT) 248,000,000
1. Lipadas Br. (B00012MN) along Davao-Cotabato Rd (Davao City-Jct Digos Sect)
90,000,000
2. Simod Br. (B00211MN) along Davao-Bukidnon Rd 49,000,0003. Tamugan Br. (B00215MN) along Davao-Bukidnon Rd 109,000,000
3. Davao City DEO 95,700,000a. DAVAO CITY (FIRST DISTRICT) 95,700,000
1. Talomo Br. 1 (B00010MN) along Davao-Cotabato Rd (Davao City-Jct Digos Sect)
95,700,000
4. Davao del Sur 1st DEO 40,000,000a. DAVAO DEL SUR (LONE DISTRICT) 40,000,000
1. Pilan Br. (B00130MN) along Davao-Cotabato Rd (Davao City-Jct Digos Sect)
40,000,000
l. Region XII 64,000,0001. South Cotabato DEO 64,000,000
a. SOUTH COTABATO (SECOND DISTRICT) 64,000,0001. Banga Br. (B01039MN) along Cotabato-Marbel Rd 64,000,000
m. Region XIII 292,098,0001. Agusan del Norte DEO 209,000,000
a. AGUSAN DEL NORTE (SECOND DISTRICT) 209,000,000
894 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAMS/ ACTIVITIES/ PROJECTS
1. Aclan Br. (B00874MN) along Butuan-Cagayan de Oro-Iligan (Agusan-Misamis Or)
25,000,000
2. Guinoyoran Br. (B01725MN) along Daang Maharlika (Surigao-Agusan Sect)
19,000,000
3. Jagupit Br. (B00835MN) along Daang Maharlika (Surigao-Agusan Sect)
18,000,000
4. Jaliobong Br. (B00828MN) along Daang Maharlika (Surigao-Agusan Sect)
30,000,000
5. Lambog Br. (B00826MN) along Daang Maharlika (Surigao-Agusan Sect)
24,000,000
6. Mamkas Br. (B00825MN) along Daang Maharlika (Surigao-Agusan Sect)
50,000,000
7. New Camalig Br. (B00829MN) along Daang Maharlika (Surigao-Agusan Sect)
43,000,000
2. Agusan del Sur 2nd DEO 51,500,000a. AGUSAN DEL SUR (SECOND DISTRICT) 51,500,000
1. Bayugan Br. 2 (B00916MN) along Daang Maharlika (Agusan-Davao Sect)
22,000,000
2. Bayugan Br. 3 (B00924MN) along Daang Maharlika (Agusan-Davao Sect)
29,500,000
3. Surigao del Norte 1st DEO 31,598,000a. SURIGAO DEL NORTE (SECOND DISTRICT) 31,598,000
1. Lipata Br. (B01208MN) along Daang Maharlika (Lipata-Surigao Sect)
16,000,000
2. Pingaping Br. (B00856MN) along Daang Maharlika (Surigao-Agusan Sect)
15,598,000
3. District Engineering Office 1,498,504,000a. Cordillera Administrative Region 30,000,000
1. Baguio City DEO 30,000,000a. BAGUIO CITY (LONE DISTRICT) 30,000,000
1. Loakan Br. 1 (B02195LZ) along Loakan Rd 10,000,0002. Loakan Br. 2 (B02196LZ) along Loakan Rd 20,000,000
b. Region III 226,380,0001. Bulacan 2nd DEO 20,000,000
a. BULACAN (FOURTH DISTRICT) 20,000,0001. Sta. Maria Br. 3 (B04407LZ) along Sta Maria By-Pass Rd 20,000,000
2. Tarlac 1st DEO 18,100,000a. TARLAC (SECOND DISTRICT) 18,100,000
1. San Antonio Br. (B00089LZ) along Gerona Poblacion Rd 18,100,000
3. Tarlac 2nd DEO 30,780,000a. TARLAC (THIRD DISTRICT) 30,780,000
1. Casilang Br. (B03302LZ) along Victoria-La Paz Rd 9,000,0002. Macalong Br. (B03301LZ) along Victoria-La Paz Rd 21,780,000
4. Zambales 2nd DEO 157,500,000a. ZAMBALES (FIRST DISTRICT) 157,500,000
1. Aninguay Br. (B01640LZ) along Olongapo-Bugallon Rd 6,000,000
2. Bulala Br. (B01644LZ) along Olongapo-Bugallon Rd 9,000,0003. Cabaoangan Br. (B01449LZ) along Subic-PHILSECO Rd 11,000,000
4. Calapacuan Br. (B01638LZ) along Olongapo-Bugallon Rd 11,000,000
5. Calapandayan Br. (B01639LZ) along Olongapo-Bugallon Rd
33,500,000
6. Malinta Br. (B01448LZ) along Subic-PHILSECO Rd 13,000,0007. Mapanao Br. (B01447LZ) along Subic-PHILSECO Rd 11,000,0008. Maquinaya Br. (B01635LZ) along Olongapo-Bugallon Rd 14,000,000
9. Pamatawan Br. (B01643LZ) along Olongapo-Bugallon Rd 37,000,000
10. Sacatihan Br. (B01641LZ) along Olongapo-Bugallon Rd 6,000,000
11. Talos Br. (B01642LZ) along Olongapo-Bugallon Rd 6,000,000
details of dpwh’s programs/projects 895
AMOUNT (Php) PROGRAMS/ ACTIVITIES/ PROJECTS
c. Region IV-A 683,138,0001. Batangas 1st DEO 21,000,000
a. BATANGAS (FIRST DISTRICT) 21,000,0001. Matingain Br. (B00048LZ) along Palico-Balayan-
Batangas Rd21,000,000
2. Batangas 1st District Engineering Office 167,700,000a. BATANGAS (FIRST DISTRICT) 167,700,000
1. Bagong Tubig Br. (B00001LZ) along Palico-Balayan-Batangas Rd
48,800,000
2. Calawang Br. (B00009LZ) along Palico-Balayan-Batangas Rd
22,000,000
3. Colong Colong Br. (B00005LZ) along Palico-Balayan-Batangas Rd
49,500,000
4. Kayponce Br. (B00011LZ) along Palico-Balayan-Batangas Rd
10,500,000
5. Sinisian Br. (B00012LZ) along Palico-Balayan-Batangas Rd
36,900,000
3. Batangas 3rd DEO 107,438,000a. BATANGAS (THIRD DISTRICT) 107,438,000
1. Banga Br. 1 (B03160LZ) along Tanauan-Talisay-Tagaytay Rd
20,588,000
2. Bangin Br. (B01288LZ) along Talisay-Laurel-Agoncillo Rd 30,588,000
3. Bugaan Br. (B03174LZ) along Talisay-Laurel-Agoncillo Rd
36,422,000
4. Quiling Br. 1 (B00033LZ) along Tanauan-Talisay-Tagaytay Rd
19,840,000
4. Batangas 4th DEO 125,000,000a. BATANGAS (FOURTH DISTRICT) 125,000,000
1. Abung Br. (B03108LZ) along Sn Juan-Laiya Rd 15,000,0002. Bulacnin Br. (B03070LZ) along Lipa-Balete Rd 15,000,0003. Lawaye Br. (B03104LZ) along Sn Juan-Laiya Rd 20,000,0004. Mabalanoy Br. (B03105LZ) along Sn Juan-Laiya Rd 15,000,0005. Pinagsibaan Br. 1 (B02997LZ) along Rosario-Sn Juan Rd 25,000,000
6. Soloc Br. (B03387LZ) along Lipa City - Alaminos Rd 35,000,000
5. Cavite DEO 60,000,000a. CAVITE (SIXTH DISTRICT) 60,000,000
1. Pasong Balite Br. (B03067LZ) along Dasmariñas-Trece Martires City-Naic Rd
20,000,000
2. Putting Tubig Br. (B03066LZ) along Dasmariñas-Trece Martires City-Naic Rd
20,000,000
3. Vaquero Br. (B03068LZ) along Dasmariñas-Trece Martires City-Naic Rd
20,000,000
6. Laguna 1st DEO 44,000,000a. LAGUNA (FOURTH DISTRICT) 44,000,000
1. Llavak Br. (B02476LZ) along Calamba-Sta Cruz-Famy Jct Rd
22,000,000
2. Siniloan Br. (B02475LZ) along Calamba-Sta Cruz-Famy Jct Rd
22,000,000
7. Laguna 2nd DEO 45,000,000a. LAGUNA (SECOND DISTRICT) 45,000,000
1. Bay Br. (B02513LZ) along Bay Poblacion Rd 25,000,0002. Calo Br. (B02512LZ) along Bay Poblacion Rd 20,000,000
8. Quezon 2nd DEO 14,000,000a. QUEZON (SECOND DISTRICT) 14,000,000
1. Mayao Br. (B02941LZ) along MSR Old Route 14,000,000
9. Rizal 1st DEO 99,000,000a. ANTIPOLO CITY (SECOND DISTRICT) 99,000,000
1. Fourth Br. (B03120LZ) along Marikina-Infanta Rd 49,500,0002. Third Br. (B03119LZ) along Marikina-Infanta Rd 49,500,000
d. Region V 273,400,0001. Albay 1st DEO 273,400,000
a. ALBAY (FIRST DISTRICT) 273,400,0001. Bangkilingan Br. (B03363LZ) along Ligao-Tabaco Rd 6,600,0002. Gajo Br. 1 (B00249LZ) along DM Jct-Legazpi-Sto
Domingo-Tabaco-Cam. Sur Bdry11,000,000
3. Gajo Br. 2 (B00250LZ) along DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry
11,000,000
4. Matagbac Br. (B00211LZ) along Ligao-Tabaco Rd 21,000,000
896 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php) PROGRAMS/ ACTIVITIES/ PROJECTS
5. Mestizo Br. (B00248LZ) along DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry
39,600,000
6. Nagas Br. 1 (B03362LZ) along DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry
22,000,000
7. Nagas Br. 2 (B00247LZ) along DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry
49,950,000
8. San Isidro Br. 1 (B00232LZ) along DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry
7,750,000
9. San Isidro Br. 2 (B00233LZ) along DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry
22,000,000
10. San Isidro Br. 3 (B00234LZ) along DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry
8,800,000
11. San Lorenzo Br. 1 (B00235LZ) along DM Jct-Legazpi-StoDomingo-Tabaco-Cam. Sur Bdry
12,100,000
12. San Lorenzo Br. 2 (B00237LZ) along DM Jct-Legazpi-StoDomingo-Tabaco-Cam. Sur Bdry
7,700,000
13. San Vicente Br. (B00210LZ) along Ligao-Tabaco Rd 22,000,00014. Sn. Fernando Br. 1 (B00222LZ) along DM Jct-Legazpi-
Sto Domingo-Tabaco-Cam. Sur Bdry13,200,000
15. Sn. Fernando Br. 2 (B00223LZ) along DM Jct-Legazpi-Sto Domingo-Tabaco-Cam. Sur Bdry
18,700,000
e. Region VI 129,106,0001. Bacolod City DEO 35,000,000
a. BACOLOD CITY (LONE DISTRICT) 35,000,0001. PHHC Br. (B00333NR) along Bacolod Circumferential Rd 35,000,000
2. Guimaras DEO 42,500,000a. GUIMARAS (LONE DISTRICT) 42,500,000
1. Cabalagnan Br. (B00016GR) along Guimaras Circumferential Rd
23,000,000
2. Katiliran Br. (B00017GR) along Guimaras Circumferential Rd
19,500,000
3. Iloilo 2nd DEO 10,246,000a. ILOILO (FOURTH DISTRICT) 10,246,000
1. Dangula-an Br. (B00181PN) along Iloilo East Coast-Capiz Rd
10,246,000
4. Iloilo 3rd DEO 21,360,000a. ILOILO (FIFTH DISTRICT) 21,360,000
1. Bacabac Br. (B00221PN) along Sara-Concepcion Rd 4,500,0002. Gerongan Br. (B00225PN) along Passi-Sn Rafael-Lemery-
Sara Rd16,860,000
5. Iloilo City DEO 20,000,000a. ILOILO CITY (LONE DISTRICT) 20,000,000
1. Calajunan Br. (B00072PN) along Mandurriao-Pakiad Road
20,000,000
f. Region VII 123,480,0001. Cebu 1st DEO 63,480,000
a. CEBU (FOURTH DISTRICT) 63,480,0001. Bangon Br. (B00010CB) along Bogo-Curva-Medellin-
Daanbantayan-Maya Rd33,000,000
2. Dayhagon Br. (B00008CB) along Bogo-Curva-Medellin-Daanbantayan-Maya Rd
30,480,000
2. Cebu 5th DEO 60,000,000a. CEBU (FIFTH DISTRICT) 60,000,000
1. Bagatayam Br. (B00572CB) along Cebu North Hagnaya Wharf Rd
20,000,000
2. Catmon Daan Br. (B00575CB) along Cebu North Hagnaya Wharf Rd
40,000,000
g. Region IX 33,000,0001. Zamboanga City DEO 8,000,000
a. ZAMBOANGA CITY (FIRST DISTRICT) 8,000,0001. Cawit Br. (B01158MN) along Zamboanga City-Labuan-
Limpapa Rd (Completion)8,000,000
2. Zamboanga del Sur 1st DEO 25,000,000a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 25,000,000
1. Pulacan Br. (B00468MN) along Jct Aurora-Monte Alegre-Jct Labangan Rd
25,000,000
details of dpwh’s programs/projects 897
f. New Construction of Permanent Bridges 2,113,225,000
1. Central Office 710,000,000a. Region X 300,000,000
1. Misamis Oriental 1st DEO 300,000,000a. MISAMIS ORIENTAL (FIRST DISTRICT) 300,000,000
1. Mambayaan Parallel Br. along Butuan City-Cagayan de Oro City-Iligan City Rd (Completion)
300,000,000
b. Region XII 400,000,0001. Sultan Kudarat 1st DEO 400,000,000
a. SULTAN KUDARAT (FIRST DISTRICT) 400,000,0001. Pinguiaman Br. 2 along Dulawan-Marbel Rd 400,000,000
c. Nationwide 10,000,0001. Central Office 10,000,000
a. NATIONWIDE 10,000,0001. New Construction of Bridges 10,000,000
2. Regional Office Proper 686,000,000a. Region IX 180,000,000
1. Zamboanga del Sur 1st DEO 180,000,000a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 180,000,000
1. Ecuan Br. along Eastern Bobongan-Sominot-Midsalip-Dumingag Rd
120,000,000
2. Timbaboy Br. along Eastern Bobongan-Sominot-Midsalip-Dumingag Rd
60,000,000
b. Region X 166,000,0001. Bukidnon 3rd DEO 42,000,000
a. BUKIDNON (FIRST DISTRICT) 42,000,0001. New Dicklum Br. along Sayre Highway (Completion) 42,000,000
2. Cagayan de Oro City 1st DEO 20,000,000a. CAGAYAN DE ORO CITY (FIRST DISTRICT) 20,000,000
1. Sapang Br. along Butuan City-Cagayan de Oro City-Iligan City Rd (Completion)
20,000,000
3. Lanao del Norte 1st DEO 104,000,000a. LANAO DEL NORTE (FIRST DISTRICT) 60,000,000
1. Larapan Br. along Linamon-Zamboanga Rd (Completion) 60,000,000
b. LANAO DEL NORTE (SECOND DISTRICT) 44,000,0001. Balili Br. 2 along Linamon-Zamboanga Rd (Completion) 12,000,000
2. Maranding Br. 2 along Linamon-Zamboanga Rd (Completion)
32,000,000
c. Region XI 340,000,0001. Davao del Sur 2nd DEO 340,000,000
a. DAVAO OCCIDENTAL (LONE DISTRICT) 340,000,0001. Butuan Br. along Davao-Sarangani Coastal Rd (Malalag-
Malita-JAS-G)90,000,000
2. Butulan Br. along Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G)
100,000,000
3. Nuing Br. along Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G)
90,000,000
4. Tanuman Small Br. along Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G)
60,000,000
3. District Engineering Office 717,225,000a. National Capital Region 30,000,000
1. North Manila DEO 30,000,000a. MANILA CITY (SECOND DISTRICT) 30,000,000
1. Tayuman Br. along Tayuman Rd 30,000,000
b. Region V 250,825,0001. Camarines Norte DEO 14,715,000
a. CAMARINES NORTE (FIRST DISTRICT) 14,715,0001. Tinawid Br. along Sta. Elena-Capalonga By Pass Coastal
Rd14,715,000
2. Camarines Sur 3rd DEO 48,000,000a. CAMARINES SUR (FOURTH DISTRICT) 48,000,000
1. Sitio Siulo Br. along Tinambac-Siruma Rd 48,000,000
3. Catanduanes DEO 159,110,000a. CATANDUANES (LONE DISTRICT) 159,110,000
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
898 eXpeNditUre program fY 2016 VolUme ii
AMOUNT (Php)PROGRAMS/ ACTIVITIES/ PROJECTS
1. Barihay Br. along Catanduanes Cir Rd (Completion) 3,110,0002. Genitligan Spillway 2 along Baras-Gigmoto-Viga Rd 40,000,0003. Sioron Spillway (RCPC) along Baras-Gigmoto-Viga Rd 40,000,0004. Tabugoc Box Culvert along Catanduanes Cir Rd 36,000,0005. Tinago Spillway along Baras-Gigmoto-Viga Rd 40,000,000
4. Masbate 1st DEO 29,000,000a. MASBATE (SECOND DISTRICT) 29,000,000
1. Bat-ongan Br. along Jct Crossing-Mandaon Rd 29,000,000
c. Region IX 177,400,0001. Zamboanga City DEO 11,300,000
a. ZAMBOANGA CITY (FIRST DISTRICT) 11,300,0001. Construction of Bridge at Labuan Spillway along
Zamboanga City-Labuan-Limpapa Rd (Completion)11,300,000
2. Zamboanga del Norte 2nd DEO 51,600,000a. ZAMBOANGA DEL NORTE (THIRD DISTRICT) 51,600,000
1. Paniran Br. along Zamboanga West Coastal Rd (Limpapa-Sibuco Sect) (Completion)
5,600,000
2. Sibuco Br. along Zamboanga West Coastal Rd (Limpapa-Sibuco Sect) (Completion)
46,000,000
3. Zamboanga del Sur 1st DEO 65,000,000a. ZAMBOANGA DEL SUR (FIRST DISTRICT) 65,000,000
1. Guinabot Br. along Eastern Bobongan-Sominot-Midsalip-Dumingag Rd
25,000,000
2. Senote Br. along Eastern Bobongan-Sominot-Midsalip-Dumingag Rd
40,000,000
4. Zamboanga Sibugay 1st DEO 49,500,000a. ZAMBOANGA SIBUGAY (FIRST DISTRICT) 49,500,000
1. Subing-Subing Br. along Jct Imelda-Alicia Rd (Completion)
49,500,000
d. Region X 79,000,0001. Bukidnon 3rd DEO 25,000,000
a. BUKIDNON (FIRST DISTRICT) 25,000,0001. Libona PCPS Br. along Jct SH-Manolo Fortich-Libona-
Indahag Rd (Completion)25,000,000
2. Camiguin DEO 22,000,000a. CAMIGUIN (LONE DISTRICT) 22,000,000
1. Lumad Br. along Camiguin Circumferential Rd (Completion)
22,000,000
3. Lanao del Norte 2nd DEO 32,000,000a. ILIGAN CITY (LONE DISTRICT) 32,000,000
1. New Pigcotin Br. along Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd (Completion)
32,000,000
e. Region XI 180,000,0001. Davao del Sur 2nd DEO 180,000,000
a. DAVAO OCCIDENTAL (LONE DISTRICT) 180,000,0001. Capisolon Br. along Davao-Sarangani Coastal Rd
(Malalag-Malita-JAS-G)30,000,000
2. Kakikan Br. along Demoloc-Little Baguio-Alabel Rd 30,000,0003. Katingan Br. along Davao-Sarangani Coastal Rd (Malalag-
Malita-JAS-G)30,000,000
4. Kilalag Br. 1 along Demoloc-Little Baguio-Alabel Rd 30,000,0005. Kituling Br. along Davao-Sarangani Coastal Rd (Malalag-
Malita-JAS-G)30,000,000
6. Tubalan Br. along Demoloc-Little Baguio-Alabel Rd 30,000,000
details of dpwh’s programs/projects 899
7/21/2015
b. MFO 2 : FLOOD MANAGEMENT SERVICES 54,608,165,000
1. Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems 50,558,165,000
National Capital Region 27,370,707,000Central Office 22,025,512,000
Construction/Rehabilitation of Flood Control Structures - Las Piñas City Lone District 300,000,000
Construction/Rehabilitation of Flood Control Structures - Muntinlupa City Lone District
240,500,000
Construction/Rehabilitation of Flood Control Structures - Manila City 3rd LD 200,000,000
Construction/Rehabilitation of Flood Control Structures - Pasay City Lone District 345,000,000
Construction/Rehabilitation of Flood Control Structures - San Juan City Lone District 450,000,000
Construction/Rehabilitation of Flood Control Structures - Taguig City 2nd LD 350,000,000
Construction/Rehabilitation of Flood Control Structures - Pasig City Lone District 300,000,000
Construction/Rehabilitation of Flood Control Structures - Quezon City 2nd LD 250,000,000
Construction of Retarding Pond, Kaingin Bukid, Brgy. Apolonio Samson, Quezon City 6th LD
410,000,000
Construction/Rehabilitation of Flood Control Structures - Quezon City 3rd LD 563,737,000
Construction of Flood Control Works and River Bank Protection Works along Bued River at Brgy. Lekep Butao, San Fabian, Pangasinan
200,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries - Construction of Additional Flood Control Structure along Dongdong River, Brgy Acnam, Nueva Era, Ilocos Norte 2nd LD
20,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries - Construction of Flood Control Structure along Tibangran River, Brgy Barangobong, Nueva Era, Ilocos Norte 2nd LD
20,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries - Construction of Additional Flood Control Structure along Lading River, Brgy Cabittuauran-Caray, Nueva Era, Ilocos Norte 2nd LD
20,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries - Construction of Dike Extension along Papa River Left Bank, Brgy Sto Nino, Nueva Era, Ilocos Norte 2nd LD
20,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries - Construction of Dike Extension along Bongo River, Brgys. Medina and Mandaloque, Dingras, Ilocos Norte 2nd LD
30,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries - Construction of Flood Control Structure along Bongo River: Brgys. Tabtagan, Baliweg, Hilario, Municipality of Banna, and Brgy. Valdez, Sitio Suerte, Mariliyn, Cielom, and Filipinas, Municipality of Marcos, Ilocos Norte 2nd LD
54,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries - Construction of Flood Control Structure along Quiaoit River, Brgys. San Agustin, Callaguip, Laoa, San Roque, Municipality of Paoay, and Brgy. Palpalicong, City of Batac, Ilocos Norte 2nd LD
42,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries - Construction of Flood Control Structure, Brgy Lubigan, Sitio Las-ud, Badoc, Ilocos Norte 2nd LD
8,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries - Construction of Flood Control Structure, Brgy San Julian, Sitio Batu, Badoc, Ilocos Norte 2nd LD
8,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries - Construction of Flood Control Structure, Brgy Balbaldez, Badoc,Ilocos Norte 2nd LD
8,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Flood Control Structure, Brgy. Esperanza, Vintar
10,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Flood Control Structure, Brgy. Tamdagan, Sitio Lagalangan, Vintar
10,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Flood Control Structure Right Bank, Brgy. Cabayo, Vintar
20,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Rehabilitation of Flood Control Structure, Parparoroc, Sitio Bucana, Vintar
5,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Additional Flood Control Structure along Bongo River, Brgy. San Mateo-Rioeng, Laoag City
30,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Additional Sea Wall, Brgy. Caaoacan, Laoag City
20,000,000
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Page 1 of 162
900 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Flood Control Structure, Brgy. Casilian, Bacarra
15,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Sea Wall, Poblacion 1&2, Pagudpud
10,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Flood Control Structure, Brgy. Caunayan, Pagudpud
10,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Flood Control Structure, Brgy. Baduang, Pagudpud
10,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Additional Flood Control Structure along Bolo River, Brgy. San Isidro, Dumalneg
30,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Additional Flood Control Structure along Bolo River Upper Datag, Dumalneg
30,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Sea Wall along Bangui Bay, Brgy. San Lorenzo, Bangui
10,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Flood Control Structure along Sanjera Day-as, Brgy. Dadaor - Brgy. Banban, Bangui
10,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Flood Control Structure along Kabwayaan Creek, Burgos
15,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Additional Sea Wall, Brgy. Caruan, Pasuquin
15,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Flood Control Structure along Padsan River Brgy. San Leandro, Sarrat
10,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Additional Flood Control Structure along Bongo River, Brgy. San Joaquin, Sarrat
10,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Flood Control Structure, Brgy. Gayamat, Sitio Angdol Piddig
10,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Flood Control Structure, Brgy. Aruay, Piddig
10,000,000
Sabo/Flood Control Projects along Laoag River Basin & Principal Rivers/Tributaries-Construction of Flood Control Structure, Brgy. Libnaoan, Sitio Duyon, Piddig
10,000,000
Construction of Langiden Flood Control along Abra River, Langiden, Abra 172,674,000
Construction of Bucay Flood Control along Abra River, Bucay, Abra 177,326,000
Construction/ Rehabilitattion of Flood Control Structures - Apayao Lone District 38,750,000
Construction/Rehabilitation of Flood Control Structures - Cagayan 3rd LD 100,000,000
Construction/Rehabilitation of Flood Control Structures - Isabela 1st LD 50,000,000
Construction/Rehabilitation of Flood Control Structures - Isabela 4th LD 80,000,000
Construction of Layac Diversion Channel, Bataan 210,630,000
Flood Control Works in Angat/Calumpit River, Bulacan 150,000,000
Construction/Rehabilitation of Flood Control Structures - Pampanga 3rd LD 103,110,000
Flood / Lahar Control Works in Pasig-Potrero River and Pasac Delta Area, Pampanga including Diversion of flow of water to Pasig-Potrero River
450,000,000
Flood Control Works in Sta. Rita, Kalaklan River, Olongapo City 150,000,000
Flood Control Works - Rehabilitation/ Restoration of Deteriorated Dikes/ Eroded Pampanga River Bank including Candaba Cut-off Channel, Pampanga / Nueva Ecija
243,000,000
Flood Control Works - Sacobia - Bamban-Abacan River Training Works including Rio Chico River, Tarlac and Nueva Ecija
300,000,000
Flood Control Project - Western River Sto. Tomas / Bucao River, Zambales 500,000,000
Diking with Slope Protection Works at Camachilles River, Guagua River Basin, Bacolor and Minalin, Pampanga
103,110,000
Diking with Slope Protection Sacobia-Bamban River, Pampanga and Tarlac 200,000,000
Rehabilitation of Dike along Sapang Cauayan, Mabalacat, Pampanga and Bamban, Tarlac
24,700,000
Almacen River Improvement Project, Hermosa and Orani, Bataan 1st LD 300,000,000
Page 2 of 162
details of dpwh’s programs/projects 901
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Rehabilitation of Flood Control Structures - Cavite 1st LD 120,000,000
Flood Control and River Improvement Projects along Laguna Lake based on Metro Manila Master Plan - Slope Protection Works for Pooc-Caingin River, Sta. Rosa City, Laguna 1st LD
200,000,000
Flood Control and River Improvement Projects along Laguna Lake based on Metro Manila Master Plan - Construction of Slope Protection for Sta. Maria-Mabitac River, Laguna
150,000,000
Flood Control and River Improvement Projects along Laguna Lake based on Metro Manila Master Plan - Construction of Slope Protection for Tanay River, Tanay, Rizal
120,000,000
Construction/Rehabilitation of Flood Control Structures - Rizal 2nd LD 120,000,000
Construction/Rehabilitation of Flood Control Structures - Mindoro Oriental 2nd LD 200,000,000
Construction/Rehabilitation of Flood Control Structures - Camarines Sur 3rd LD 180,000,000
Construction/Rehabilitation of Flood Control Structures - Camarines Sur 1st LD 100,000,000
Bicol River Basin and Watershed Management Project (Flood Mitigation Component)-Albay Section
400,000,000
Bicol River Basin and Watershed Management Project (Flood Mitigation Component)-Camarines Sur Section
50,000,000
Legaspi City Urban Drainage Improvement Project 300,000,000
Construction/ Rehabilitation of Drainage System within the vicinity of City Proper Area ( Gen. Luna-Jalondoni-Rizal-J.M. Basa)
200,000,000
Aklan River Flood Control and Drainage Project 200,000,000
Construction/Rehabilitation of Flood Control Structures - Cebu 6th LD 200,000,000
Flood Control and Drainage Improvement Project- Bulacao, Kinalumsan, Guadalupe, Lahug and Subang Daku River Basins, Cebu City
731,060,000
Construction/Improvement of Catbalogan City Drainage System, Catbalogan City, including Antiao River Control, Samar
500,000,000
Construction of Tidal Protection Dike, Tacloban City, Leyte 2,606,280,000
Construction/Rehabilitation of Flood Control Structures - Zamboanga City 2nd LD 200,000,000
Dipolog River Basin Flood Control Project 100,000,000
Tumaga River Basin Flood Control and Drainage Project (including Right-of-Way Acquisition)
393,880,000
Cagayan de Oro City River Basin Flood Control Project - Sta. 5+737-6+120, Cagayan de Oro City 1st LD
200,000,000
Cagayan de Oro City River Basin Flood Control Project - Sta. 3+700 - Sta. 4+235.11, Cagayan de Oro City 2nd LD
315,000,000
Iponan Flood Control Project - Barra Side - Reconstruction of Revetment, Iponan Bridge I & II to Iponan Bridge III, along Iponan River, Sta. 1+369.70 - Sta. 1+689.80, Brgy. Iponan, Cagayan de Oro City
100,000,000
Iponan Flood Control Project - Bulua Side - Construction of Iponan Flood Control Project along Iponan Br. I and II, Cagayan de Oro City 1st LD
300,000,000
Channel Excavation along Tagoloan River (Downstream Side), Sta. 2+080.00 - Sta. 2+630.00, Misamis Oriental
200,000,000
Channel Excavation along Tagoloan River (Upstream Side), Sta. 1+700.00 - Sta. 2+080.00, Misamis Oriental
200,000,000
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas, Malabon-Tullahan River Improvement, including ROW, Quezon City 4th LD
400,000,000
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas, San Juan River Improvement, Quezon City 6th LD
400,000,000
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas, Upper Marikina River Improvement (Upstream of Marikina Bridge)
800,000,000
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas, Las Piñas River Improvement including ROW
400,000,000
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas, Zapote River Impv.t. Works, Las Piñas City
400,000,000
Valenzuela-Obando-Meycauayan Flood Control Project 784,475,000
Valenzuela-Obando-Meycauayan Flood Control Project - Navotas Coastal Dike, including ROW
226,000,000
Flood Control and River Improvement Projects along Laguna Lake based on Metro Manila Master Plan - Construction of Slope Protection for San Pedro, Biñan and Sta. Cruz Rivers, Laguna
150,000,000
Page 3 of 162
902 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Desiltation works of Rivers and Creeks at East and West of Mangahan Floodway - West of Mangahan Floodway (Along Antipolo River from Tapayan Pumping Station to Sta. 3+500, Taytay, Rizal, and Pasig City), Rizal 1st DEO, Rizal 1st LD
11,280,000
Mindanao River Basins Flood Control Projects 400,000,000
Cagayan River Flood Management Projects - Cataggaman, Tuguegarao City Spurdikes Extension, Cagayan 3rd LD
200,000,000
Cagayan River Flood Management Projects - Alibago, Enrile River Excavation 150,000,000
Cagayan River Flood Management Projects - Cabagan, Cabagan, Isabela 1st District, Isabela 1st LD
269,000,000
Cagayan River Flood Management Projects - Bagumbayan, Tuguegarao, Cagayan 3rd District,
49,000,000
Cagayan River Flood Management Projects - Baculud, Ilagan, Isabela 1st District 200,000,000
Cagayan River Flood Management Projects - Centro 1, Angadanan, Isabela 3rd District
174,000,000
Cagayan River Flood Management Projects - Natappian, Solana, Cagayan 3rd District 150,000,000
Cagayan River Flood Management Projects - San Vicente, Iguig, Cagayan 3rd District 180,000,000
Cagayan River Flood Management Projects - Agusi, Calamaniugan, Cagayan 1st District
214,000,000
Cagayan River Flood Management Projects - Namabbalan, Tuguegarao, Cagayan 3rd District
329,000,000
Rehabilitation of Sapang Labuan River Flood Control (PHUMP, Phase II) 50,000,000
Flood Control Works in Porac-Gumain River, San Fernando Rivers, Lubao, Sasmuan, Guagua and City of San Fernando, Pampanga
200,000,000
Construction/Rehabilitation of Flood Control Structures 10,000,000
Regional Office NCR 2,480,860,000Construction of Covered Line Canal Along PNR Site from Bayanan Creek going to Buli Creek, Brgy. Sucat, Muntinlupa City
50,000,000
Construction of Covered Line Canal Along PNR Site from Magdaong River going to Tunasan River, Brgy. Poblacion, Muntinlupa City
51,500,000
Construction of Riverwall along Tullahan River (Upstream Side), Brgy. Potrero, Malabon City Lone District
50,000,000
Bank Improvement Malabon - Tullahan River, Brgy. Tanong, Malabon City 50,000,000
Bank Improvement along Malabon - Tullahan River, Brgy. Catmon, Malabon City 50,000,000
Construction/Rehabilitation of Flood Control Structures - Makati City 1st LD 150,000,000
Improvement of Parañaque River North, Sheet Piling (East Side) from Sto. Niño Bridge towards MIA Road
90,000,000
Construction/Rehabilitation of Flood Control Structures - Parañaque City 2nd LD 130,000,000
Bank Improvement with Steel Sheet Pile, Estero de Vitas, Tondo, Manila (Pritil to Vitas Pumping Station), Manila City 1st LD
50,000,000
Bank Improvement (Sheet Pile), Estero de Sunog Apog, Tondo, Manila (Vitas Pumping Station - Estero de Maypajo), Manila City 1st LD
50,000,000
Installation of Additional Pump, Estero de Vitas Pumping Station, Vitas, Tondo, Manila City 1st LD
50,000,000
Bank Improvement with Steel Sheet Pile, Estero dela Reina, Tondo, Manila (C.M. Recto to Pritil), Manila City 1st LD
50,000,000
River Bank Improvement (Sheet Pile), Estero de Vitas (Rodriguez to Mouth Manila Bay), Manila City 1st LD
50,000,000
Construction of riverwall, Estero de Maypajo, Rizal Avenue Section, Tondo, Manila City 2nd LD
50,000,000
Construction of riverwall, Estero de Maypajo, Abucay Section, Tondo, Manila City 2nd LD
50,000,000
Construction of riverwall, Estero de Maypajo, Junction of Estero de Sunog Apog, Tondo, Manila City 2nd LD
50,000,000
River Bank Improvement (Sheet Pile), Estero dela Reina (River Wall) (C.M. Recto to Estero de Binondo), Manila City 3rd LD
50,000,000
Const. of Additional retarding basin & improvement of Pumping station, Estero de Binondo Pumping Station, Binondo, Manila City 3rd LD
50,000,000
Impv.t of pumping station & sump pit, Estero de Quiapo Pumping Station, Quiapo, Manila City 3rd LD
50,000,000
River Bank Improvement (Sheet Pile), Escolta Pumping Station, Sta. Cruz, Manila City 3rd LD
50,000,000
Page 4 of 162
details of dpwh’s programs/projects 903
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
River Bank Improvement (Sheet Pile), Estero de San Miguel, Sta. Mesa, Manila City 6th LD
50,000,000
Installation of Pump with riverwall, Estero de Sampaloc (Lacson - Estero de Aviles), Manila City 6th LD
50,000,000
Improvement of riverwall with Additionall. retarding basin, Estero de Aviles, Sta. Mesa, Manila City 6th LD
50,000,000
Installation of Pump with riverwall, Estero de Valencia, Manila City 6th LD 50,000,000
Improvement. of Pumping Station (Additional pump), Estero de Aviles Pumping Station, Manila City 6th LD
50,000,000
Improvement of Pumping Station, Valencia Pumping Station, Manila City 6th LD 50,000,000
Installation of Pump with Riverwall, Estero de Uli-Uli, Quiapo, Manila City 6th LD 50,000,000
Construction of pumping station at PUP Compound, Sta. Mesa, Manila City 6th LD 50,000,000
Sheet Pile installation at Taguig River, Brgy. Ususan, Taguig City 100,000,000
Sheet Pile installation at Taguig River, Brgy. Tuktukan, Taguig City 90,000,000
Construction/Rehabilitation of Flood Control Structures - Taguig City-Pateros 1st LD 70,000,000
Construction/Rehabilitation of Flood Control Structures - Marikina City 1st LD 149,360,000
Construction of Pumping Station and Flood gate at Malanday Creek, Brgy. Malanday, Marikina City 1st LD
50,000,000
Construction/Rehabilitation of Revetment Wall along Nangka River from Marikina River to J.P. Rizal, Brgy. Nangka, Marikina City 2nd LD
50,000,000
Construction/Rehabilitation of Revetment Wall along Nangka River, Mirasol, Brgy. Nangka, Marikina City 2nd LD
50,000,000
Construction/Rehabilitation of Revetment Wall along Nangka River, Mira Verda, Brgy. Nangka, Marikina City 2nd LD
50,000,000
Construction/Rehabilitation of Revetment Wall along Nangka River, Tiera Vista,Brgy. Nangka, Marikina City 2nd LD
50,000,000
Construction/Rehabilitation of Revetment Wall along Nangka River, Anastasia, Brgy. Nangka, Marikina City 2nd LD
50,000,000
Construction/Rehabilitation of Revetment Wall along Nangka River, Boys Town,Brgy. Fortune, Marikina City 2nd LD
50,000,000
Construction/Rehabilitation of Revetment Wall along Nangka River, Red Cross Compound, Brgy. Fortune, Marikina City 2nd LD
50,000,000
Construction/Rehabilitation of Revetment Wall along Balanti Creek, Brgy. Concepcion Dos, Marikina City 2nd LD
50,000,000
Las Piñas-Muntinlupa DEO 174,500,000Construction of Slope Protection and Other Improvement at Talon Creek, Las Piñas City
20,000,000
Construction of Slope Protection and Other Improvement at Zapote River, Brgy. Talon I and Talon V, Las Piñas City
20,000,000
Construction of Slope Protection and Other Improvement at Tuntong Creek, (Las Piñas - Paranaque Boundary), Las Piñas City
20,000,000
Construction of Box Culvert and Slope Protection along Alabang-Bayanan Creek, Muntinlupa City
20,000,000
Construction of Slope Protection along Tunasan Creek, Muntinlupa City 20,000,000
Construction of Flood Control Structures, Brgy. Putatan, Muntinlupa City 20,000,000
Construction of Flood Control Structures, Kabulusan Creek, Brgy. Cupang, Muntinlupa City
20,000,000
Construction of Covered Line Canal Along PNR Site from Cupang River going to Montillano Street, Brgy. Alabang, Muntinlupa City
5,500,000
Construction of Covered Line Canal Along PNR Site from Poblacion River going to Magdaong River, Brgy. Poblacion, Muntinlupa City
9,000,000
Construction/Repair/Rehab of Flood Control (Magdaong River, Greenheights Area), Brgy. Putatan, Muntinlupa City
20,000,000
Malabon-Navotas DEO 508,200,000Rehabilitation of Drainage Outlet/Construction of Pumping Station along Estrella St., Malabon City Lone District
5,000,000
Raising/Strengthening of Riverwall along Tullahan River, Malabon City 40,000,000
Construction of Riverwall along South Pinagkabalian River, Malabon City 40,000,000
Construction of Flood Gate along Tullahan River, Malabon City 40,000,000
Construction of Flood Gate along Dampalit River, Malabon City 45,000,000
Construction of Flood Gate along Catmon River, Malabon City 40,000,000
Page 5 of 162
904 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Sealing/Strengthening of Tanza Dike, Navotas City 8,200,000
Strengthening of Riverwall along Navotas River, from Vadeo 5 to Navigational Gate, Brgy. Tangos, Navotas City
49,000,000
Construction/Strengthening of Riverwall at Brgy. Tanza (Pabahay), Navotas City 35,526,000
Strengthening/Raising of Wall along Navotas River, from Navotas City Hall to Vadeo 5, Navotas City
49,000,000
Construction of Two Pumping Stations at Brgy. Tanza (Beside Ravago Shipyard and R< Shipyard), Navotas City
10,000,000
Construction of Riverwall at Brgy. Tanza (Kaliwa), Navotas City 49,026,000
Construction of Riverwall along Navotas River from MELITA Shipyard to Navigational Gate, Brgy. Tanza, Navotas City
49,448,000
Construction/Raising of Riverwall along Marala River, Brgy. San Rafael Village, Navotas City
48,000,000
Metro Manila 1st DEO 310,000,000Construction of slope protection, Pateros River at Brgy. Aguho, Pateros, Metro Manila
20,000,000
Construction of slope protection, Pateros River at Brgy. Martirez del, Pateros, Metro Manila
20,000,000
Construction of slope protection, Pateros River at Brgy. Sta. Ana and Brgy. San Roque, Pateros, Metro Manila
20,000,000
Construction of slope protection with gabions as foundation, Labasan River at Brgy. Napindan, Taguig City 1st LD
20,000,000
Construction of slope protection with gabions as foundation, Labasan River at Brgy. Palingon, Taguig City 1st LD
20,000,000
Construction of slope protection, Sta. Ana River at Brgy. Magtanggol, Pateros, Taguig City-Pateros 1st LD
10,000,000
Rehabilitation of Slope Protection along Concepcion Creek, Marikina 2nd LD 20,000,000
Construction of Box Culvert Culvert along Shoe Avenue, Marikina City 2nd LD 20,000,000
Construction of Box Culvert Culvert along Bonanza Creek, Brgy. Fortune, Marikina City 2nd LD
20,000,000
Construction of Box Culvert Culvert along Spain Street from Marikina-San Mateo Road to Bangkaang Usiw Creek, Marikina City 2nd LD
20,000,000
Construction of Box Culvert Culvert along Park Creek, Brgy. Marikina Heights, Marikina City 2nd LD
20,000,000
Rehabilitation of Slope Protection along Nangka River, Brgy. Fortune, Marikina City 2nd LD
20,000,000
Rehabilitation of Slope Protection along Park Creek, Marikina City 2nd LD 20,000,000
Rehabilitation of Slope Protection along Nangka River, Brgy. Nangka, Marikina City 2nd LD
20,000,000
Rehabilitation of Outfall including Laterals, Balanti Outfall, Brgy. Concepcion Dos, Marikina City 2nd LD
20,000,000
Rehabilitation of Outfall including Laterals, Park Creek Outfall, Brgy. Marikina Heights, Marikina City 2nd LD
20,000,000
Metro Manila 2nd DEO 310,000,000Slope Protection and Bank Improvement along Estero Tripa de Gallina Brgy. Bangkal, District I, Makati City
20,000,000
Rehabilitation/Upgrading & Drainage Improvement of Ponte Street & its vicinity, Brgy. Singkamas, District I, Makati City, Metro Manila
20,000,000
Rehabilitation/Upgrading & Drainage Improvement of Primo de Rivera Street & its vicinity, District I, Makati City, Metro Manila
20,000,000
Rehabilitation/Upgrading & Drainage Improvement of Sunrise Street & its vicinity, District I, Makati City, Metro Manila
20,000,000
Rehabilitation/Upgrading & Drainage Improvement of Mayapis Street & its vicinity, District I, Makati City, Metro Manila
20,000,000
Rehabilitation/Upgrading & Drainage Improvement of P. Medina Street & its vicinity, Brgy. Pio del Pilar, District I, Makati City, Metro Manila
20,000,000
Bank Improvement/Slope Protection along Makati - Pateros River , District II, Makati City 2nd LD
20,000,000
Drainage Improvement along C-5 Road Service Road & its Vicinity, from C-5 Road- 7th Street- Makati-Pateros River, District II, Makati City, Metro Manila
20,000,000
Rehabilitation/Upgrading & Drainage Improvement of J. Luna Street & its Vicinity, from C-5 Road-Blue Boz St.- Floraville St.- J. Luna St.- Makati-Pateros River, District II, Makati City, Metro Manila
20,000,000
Page 6 of 162
details of dpwh’s programs/projects 905
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Rehabilitation/Upgrading & Drainage Improvement of San Francisco Street & its Vicinity, from C-5 Road-Blue Boz St.- Floraville St.-San Francisco St.- J. Luna St.- Makati-Pateros River, District II, Makati City, Metro Manila
15,000,000
Rehabilitation/Upgrading & Drainage Improvement of Roma Amor Street & its Vicinity, from C-5 Road-Target Range St.- Xyris St.- Milflores St.- Roma Amor St.- Makati-Pateros River, District II, Makati City, Metro Manila
15,000,000
Improvement/ Slope Protection of Don Bosco Creek, Brgy. Don Bosco, Parañaque City, Metro Manila
18,500,000
Improvement/ Slope Protection of Don Bosco Creek, Brgy. Tributary, Brgy. Don Bosco, Parañaque City, Metro Manila
15,000,000
Construction of Box Culvert and Drainage Improvement along Doña Soledad Avenue, Brgy. Don Bosco, Parañaque City, Metro Manila
16,500,000
Improvement/ Slope Protection of Villanueva Creek Tributary along Concha Cruz St., Brgy. B.F. Parañaque City, Metro Manila
15,500,000
Drainage and Road Improvement of Orchid St., Cyplress St., and Willow St., Brgy. Marcelo Green, Parañaque City, Metro Manila
17,500,000
Improvement/ Slope Protection and Constructionof Box Culvert and Sunvalley Creek, Brgy. Sun Valley, Parañaque City, Metro Manila
17,000,000
Metro Manila 3rd DEO 960,000,000Construction of Flood Control Riverwall along Tullahan River, Brgy. 164, Sta. 4+140 -Sta.2+520
49,960,000
Construction of Flood Control Riverwall along Tullahan River, Libis Baesa, Sta. 140 - Sta. 4+605
49,980,000
Construction of Flood Control Wall/ Riprapping along the banks of Various Creeks in Brgy. 170, Caloocan City 1st LD
20,000,000
Construction of Flood Control Wall/ Riprapping along the banks of Various Creeks in Brgy. 178, Caloocan City 1st LD
20,000,000
Construction of Flood Control Wall/ Riprapping along the banks of Various Creeks in Brgy. 179, Caloocan City 1st LD
20,000,000
Construction of Flood Control Wall/ Riprapping along the banks of Various Creeks in Brgy. 180, Caloocan City 1st LD
20,000,000
Construction of Flood Control Wall/ Riprapping along the banks of Various Creeks in Brgy. 181, Caloocan City 1st LD
15,000,000
Construction of Flood Control Wall/ Riprapping along the banks of Various Creeks in Brgy. 182, Caloocan City 1st LD
15,000,000
Construction of Flood Control Wall/ Riprapping along the banks of Various Creeks in Brgy. 185, Caloocan City 1st LD
10,000,000
Construction of Flood Control Wall/ Riprapping along the banks of Various Creeks in Brgy. 186, Caloocan City 1st LD
10,060,000
Improvement of Peripheral Canal leading to Spine Pumping Station, Brgy. 8 and Brgy. 12, Caloocan City 2nd LD
20,000,000
Construction of Box Culvert along EDSA Southbound, Caloocan City 2nd LD 20,000,000
Construction/ Rehabilitation of Drainage System along A. Mabini St., Caloocan City 2nd LD
20,000,000
Improvement of Peripheral Canal in Brgy. 14, Caloocan City 2nd LD 20,150,000
Improvement of Peripheral Canal in Brgy. 16 & 18, Caloocan City 2nd LD 20,000,000
Construction of Road Dike along Maypajo River Phase I, Caloocan City 2nd LD 49,980,000
Construction of Road Dike along Maypajo River Phase II, Caloocan City 2nd LD 49,990,000
Construction of Road Dike along Maypajo River Phase III, Caloocan City 2nd LD 49,970,000
Construction of Road Dike along Maypajo River Phase IV, Caloocan City 2nd LD 49,960,000
Construction of Road Dike along Maypajo River Phase V, Caloocan City 2nd LD 49,950,000
Construction/Rehabilitation of Flood Control Structures/Riverwall along Tullahan River in Palagad, Valenzuela City 1st LD
20,070,000
Construction/Rehabilitation of Flood Control Structure/Earthdike along Right and Left Bank of Polo River
49,950,000
Construction of Flood Control Structures/ Relief Pumping Station along Calabingoo Creek, Valenzuela City 1st LD
30,000,000
Construction of Flood Control Structures/ Floodgate along Lingahan Creek, Valenzuela City 1st LD
40,000,000
Construction of Flood Control Structures/ Stone Masonry Wall along Polo River, Valenzuela City 1st LD
49,980,000
Construction of Flood Control Structures/ Relief Pumping Station along Tullahan River, Sitio Jacinto, Valenzuela City 2nd LD
15,000,000
Page 7 of 162
906 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Flood Control Structures/ Relief Pumping Station along Tullahan River, Sitio La Huerta, Valenzuela City 2nd LD
15,000,000
Construction of Flood Control Wall along Tullahan River, Brgy. Ugong, Valenzuela City 2nd LD
40,000,000
Construction of Flood Control Wall along Tullahan River (Sta. 0+000-Sta. 0+500), Valenzuela City 2nd LD
49,940,000
Construction of Flood Control Wall along Tullahan River (Sta. 0+500-Sta. 1+000), Valenzuela City 2nd LD
49,950,000
Construction of Flood Control Wall along Tullahan River (Sta. 1+000-Sta. 1+383), Valenzuela City 2nd LD
20,110,000
North Manila DEO 130,000,000Construction of Vitas Pumping Station, Tondo, Manila 2nd LD 40,000,000
Construction of flood control/drainage at Gastambide Street crossing SH Loyola, P. Noval and España Blvd.
35,000,000
Construction of flood control/drainage at Pureza Street crossing Lardizabal and Arevalo
15,000,000
Construction of flood control/drainage at Francisco Street crossing G. Tuazon and loreto Strees
20,000,000
Construction of PUP drainage system to drain water from Old Sta. Mesa and Anonas Street (a nat'l road) and PNR
20,000,000
Quezon City 1st DEO 209,375,000Completion of Drainage Improvement of EDSA SB (Brgy. Bago Bantay and Veterans Village) Quezon City 1st LD
9,988,000
Completion of Drainage Improvement at A. Bonifacio Avenue (Cemetery to Blumentrit Interceptor), Quezon City 1st LD
9,993,000
Completion of Upgrading of Drainage System at West Avenue (Times St. to Baler St.), Quezon City 1st LD
14,063,000
Rehabilitation/ Improvement of Flood Control Structures at Baler St. District I, Quezon City
20,000,000
Rehabilitation/ Improvement of Flood Control Structures at Jude Juan Luna St., District I, Quezon City
15,000,000
Rehabilitation/ Improvement of Flood Control Structures at Mayon Street,District I, Quezon City
15,000,000
Rehabilitation/ Improvement of Flood Control Structures at Biak na Bato.,District I, Quezon City
15,956,000
Rehabilitation/ Improvement of Flood Control Structures and Tributaries at Brgy. Batasan Hills, (Phase 2) District II, Quezon City
20,000,000
Rehabilitation/ Improvement of Flood Control Structures and Tributaries at Brgy. Holy Spirit, (Phase 2) District II, Quezon City
20,000,000
Rehabilitation/ Improvement of Flood Control Structures and Tributaries at Brgy. Payatas, (Phase 2) District II, Quezon City
20,000,000
Rehabilitation/ Improvement of Flood Control Structures and Tributaries at Brgy. Bagong Silangan, (Phase 2) District II, Quezon City
20,000,000
Rehabilitation/ Improvement of Flood Control Structures and Tributaries at Brgy.Commonwealth, Quezon City
20,000,000
Completion of Drainage Improvement of Quirino Highway (Zabarte-SM Kaligayahan LTO) Quezon City 5th LD
9,375,000
South Manila DEO 262,260,000Rehabilitation/ Improvement of Drainage System along Pres. Quirino Ave. from Taft Ave. to Leveriza
7,000,000
Rehabilitation/ Improvement of Drainage System along Taft Avenue (SB) from P. Faura to P. Gil
6,000,000
Rehabilitation/ Improvement of Drainage System along Pres. Quirino Ave. from Taft Ave. to Singalong
6,000,000
Rehabilitation/ Improvement of Drainage System along P. Ocampo from Adriatico to Taft Avenue
12,000,000
Rehabilitation/ Improvement of Drainage System along Pres. Quirino(NB) from P. Gil to Bridge No. 2
7,000,000
Rehabilitation/ Improvement of Drainage System along Baseco, Port Area, Manila 15,000,000
Rehabilitation/ Improvement of Drainage System along Victoria St. from Sta. Lucia to P. Burgos St.
20,000,000
Rehab/improvement of drainage system along UN Avenue from Ma. Orosa St. to Taft Avenue, Manila 5th LD
10,000,000
Rehab/improvement of drainage system along Pres. Quirino Avenue from Roxas Blvd. to Adriatico St
9,500,000
Rehab/improvement of drainage system along A. Mabini St. from P. Ocampo St. to Pres. Quirino Avenue
14,500,000
Page 8 of 162
details of dpwh’s programs/projects 907
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Rehab/Improvement of drainage system along Pres. Quirino Avenue from A. Mabini to Roxas Blvd.
4,500,000
Rehab/Improvement of drainage system along Singalong St. from Pres. Quirino Avenue to P. Ocampo
17,000,000
Rehab/Improvement of drainage system along San Andres St. from Roxas Blvd to Taft Avenue
22,500,000
Rehab/Improvement of drainage system along San Andres St. from Taft Avenue to Osmeña Highway
21,000,000
Rehab/Improvement of drainage system along P. Ocampo St. from Roxas Blvd. to Mabini St.
6,000,000
Rehab/Improvement of drainage system along TM Kalaw St. from Roxas Blvd. to Ma. Orosa St. (SB)
14,500,000
Rehab/Improvement of drainage system along Osmeña Highway from Estrada to Zobel Roxas St.
6,000,000
Rehab/Improvement of drainage system along Osmeña Highway from San Andres to P. Quirino Avenue
13,000,000
Rehab/Improvement of drainage system along Finance Road Taft Avenue to P. Burgos St.
6,500,000
Rehab/Improvement of drainage system along A. Linao St. from P. Quirino Avenue to P. Gil St.
4,760,000
Rehab/Improvement of drainage system along A. Linao St. from Perez St. from Belen to Gen. Luna St.
5,500,000
Rehab/Improvement of drainage system along Concepcion St. from P. Burgos St. Ayala Blvd.
12,500,000
Rehab/Improvement of drainage system along A. Mabini St. from P. Gil St. to T.M. Kalaw St.
21,500,000
Region I 2,638,326,000Regional Office I 463,000,000
Construction of Boulder Bank Protection along Aloragat Waterways (Downstream), Cabanbanan, Manaog, Pangasinan 4th LD
20,000,000
Construction of Boulder Bank Protection along Aloragat Waterways, Nalsian, Manaog, Pangasinan, 4th LD
20,000,000
Construction of Boulder Bank Protection along Angalacan Waterways, Licsi, Manaog, Pangasinan 4th LD
20,000,000
Construction of Boulder Bank Protection along Angalacan Waterways, Poblacion, Manaog, Pangasinan 4th LD
20,000,000
Construction of Boulder Bank Protection along Aloragat Waterways, Bucao, Manaog, Pangasinan 4th LD
20,000,000
Construction of Boulder Bank Protection along Aloragat Waterways, Bisal, Manaog, Pangasinan 4th LD
20,000,000
Construction of Boulder Bank Protection along Inamotan-Tulong Waterways, Inamotan, Manaog, Pangasinan 4th LD
20,000,000
Construction of Boulder Bank Protection along Aloragat Waterways (Upstream), Cabanbanan, Manaog, Pangasinan 4th LD
20,000,000
Construction of Flood Control Structure along Aringay River, Sta. Cecilia, Aringay, La Union 2nd LD
50,000,000
Construction of Flood Control Structure along Brgy. Bucayab, Bauang, La Union 2nd LD
50,000,000
Construction/Maintenance of Flood Mitigation Structures and Drainage System-Santa Seawall, Santa, Ilocos Sur 2nd LD
50,000,000
Construction of Flood Control Project (Phase II) along Bataoay River, San Sebastain, San Vicente, Ilocos Sur 1st LD
35,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Vintar Flood Control, Brgys. Baldi, Cabayo, Dipilat, Salsalamagui, Bucana, Alsem, Municipality of Vintar, Ilocos Norte
118,000,000
Ilocos Norte 1st DEO 249,000,000Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Sarrat Flood Control, Brgy. 8 San Antonio, Sarrat, Ilocos Norte
7,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Sarrat Flood Control, Brgy. 6 San Leandro, Sarrat, Ilocos Norte
12,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Pagudpud Flood Control, Cabacanan Flood Control, Brgy. Baduang, Pagudpud, Ilocos Norte
15,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Pagudpud Flood Control, Bolo River, Brgy. Dampig, Pagudpud, Ilocos Norte
15,000,000
Page 9 of 162
908 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Pagudpud Flood Control, Caunayan River, Brgy. Caunayan, Pagudpud, Ilocos Norte
10,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Pagudpud Flood Control, Baag River, Brgy. Pasaleng, Pagudpud, Ilocos Norte
10,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Bacarra Flood Control, Brgy. Cabaruan, Sitio 2 & 4, Bacarra, Ilocos Norte
15,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Bacarra Flood Control, Brgy. 16 Bacarra, Ilocos Norte
10,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Bangui Flood Control, Banban River U/S LB, Eroded Bank Revetment
15,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Bangui Flood Control, Banban River D/S LB, Eroded Bank Revetment
15,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Bangui Flood Control, Bolo River, Eroded Bank Revetment
15,000,000
Piddig Flood Control, Apagang River, Brgy. Libnaoan, Piddig, Ilocos Norte 11,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Piddig Flood Control, Dingris River, Brgy. Cabaraoan, Piddig, Ilocos Norte
11,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Dumalneg Flood Control, Bridge Approach along Cabaritan River
15,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Dumalneg Flood Control, Municipal Dumpsite Road along Cabaritan River
25,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Laoag City Flood Control, Brgy. Cavit, Laoag City, Eroded Dike
25,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Laoag City Flood Control, Brgy. Gabu, Laoag City, Eroded Bank Revetment
10,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP)-Pasuquin Flood Control, Brgy. Caraun, Pasuquin, Ilocos Norte
13,000,000
Ilocos Norte 2nd DEO 171,500,000Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) along Madongan River, Sta. 6+280 to Sta. 6+340 Left Bank
5,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) along Madongan River, Sta. 6+746 to Sta. 6+846 Left Bank
10,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) along Poblacion Dingras, Sta. 2+575 to Sta. 2+625 Left Bank
5,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) along Poblacion Dingras, Sta. 5+009 to Sta. 5+164 Left Bank
15,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) along Solsona River, eroded portion of dike slope at riverside Left Bank and Right Bank
20,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) Marcos Flood Control, Brgy. Valdez Sitio Suerte, Marcos, Ilocos Norte, Damaged Existing Spurdikes
20,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) Banna Flood Control, Brgy. Macayepyep Sitio Nagrebcan, Banna, Ilocos Norte
1,500,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) Banna Flood Control, Bongo River & Landing River, Brgy. Hilario, Banna, Ilocos Norte
10,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) Nueva Era Flood Control, Dong dong River, Brgy. Acnam, Nueva Era, Ilocos Norte
15,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) Nueva Era Flood Control, Gadgadaoan River, Brgy. Barikir, Nueva Era, Ilocos Norte
15,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) Badoc Flood Control, Badoc River U/S, Overspill of floodwater to landslide area
20,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) Batac City Flood Control, Quiaoit River, Eroded Bank Embankment
15,000,000
Page 10 of 162
details of dpwh’s programs/projects 909
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) Paoay Flood Control, Quiaoit River, Brgy. San Agustin, Paoay, Ilocos Norte
11,000,000
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) Paoay Flood Control, Quiaoit River, Brgy. Surgui, Paoay, Ilocos Norte
9,000,000
Ilocos Sur 1st DEO 115,000,000Construction of River Flood Control located at barangays Laoingen, Nambaran, Sto. Tomas, Quimmarayan and Nagbettedan, Sto. Domingo, Ilocos Sur 1st LD
25,000,000
Construction of Flood Control along Sinait River, Jordan, Ilocos Sur 15,000,000
Construction of Flood Control along Parsua River, Magsingal, Ilocos Sur 15,000,000
Construction of Flood Control along Cabugao River, Cabugao, Ilocos Sur 15,000,000
Construction of Flood Control along San Juan River, San Juan, Ilocos Sur 15,000,000
Construction of Flood Control along Bical River, San Juan, Ilocos Sur 15,000,000
Construction of Flood Control along Mestizo River, Brgy. Pandan, Caoayan, Ilocos Sur
15,000,000
Ilocos Sur 2nd DEO 108,141,000Construction of Upper Diversion Dam, Suyo, Ilocos Sur 40,000,000
Construction/Maintenance of Flood Mitigation Structures and Drainage System-Buaya River Flood Control, Sta. Cruz, Ilocos Sur 2nd LD
15,000,000
Construction/Maintenance of Flood Mitigation Structures and Drainage System-Bucong Flood Control, Candon City, Ilocos Sur 2nd LD
20,000,000
Construction/Maintenance of Flood Mitigation Structures and Drainage System-Oaig Daya-San Nicolas Flood Control (San Nicolas Bridge) Candon City, Ilocos Sur 2nd LD
15,000,000
Construction/Maintenance of Flood Mitigation Structures and Drainage System-Paras-Oaig Daya Flood Control (Nagbaudan Bridge) Candon City, Ilocos Sur 2nd LD
10,000,000
Repair/Restoration of Santa Seawall along Manila North Road, Km. 385+600, Santa, Ilocos Sur 2nd LD
8,141,000
La Union 2nd DEO 80,000,000Construction of Shore Protection (Groins) Brgy. Santiago Norte, Caba, La Union 20,000,000
Construction of Shore Protection (Rock Bulhead) Brgy. Santiago Norte, Caba, La Union
10,000,000
Construction of Shore Protection (Groins) Brgy. Santiago Sur, Caba, La Union 20,000,000
Construction/Rehabilitation of Flood Mitigation Facilities along Aringay River Basin, Brgy. San Antonio, Aringay, and along Bauang River Basin, Brgy. Boy-Utan, Bauang, La Union
30,000,000
Pangasinan 2nd DEO 384,000,000Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. San Vicente, San Jacinto, Pangasinan
8,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Sto. Tomas, San Jacinto, Pangasinan
10,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Leukep-Botao, San Fabian, Pangasinan
12,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Cayanga, San Fabian, Pangasinan
10,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection with 2 units Spurdikes, Brgy. Parac-Parac, San Fabian, Pangasinan
11,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Osiem-Landas, Mangaldan, Pangasinan
13,000,000
Construction of Bank Protection, Brgy. Bolo, San Jacinto, Pangasinan 8,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. Bacayao Sur, Dagupan City
15,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. Pantal, Dagupan City
20,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. Pugo-Lasip, Dagupan City
10,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. Maliued, Dagupan City
10,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. San Ramon, Manaoag, Pangasinan
8,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. Pantal, Manaoag, Pangasinan
12,000,000
Page 11 of 162
910 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. Nalsian, Manaoag, Pangasinan
12,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. Baritao, Manaoag, Pangasinan
10,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. Inamotan, Manaoag, Pangasinan
10,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. Cabanbanan, Manaoag, Pangasinan
11,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection and Improvement of river course, Brgy. Pasileng Norter & Sitio Tangke, Sumabnit, Manaoag, Pangasin
20,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. Pangapisan Norte, Lingayen, Pangasinan
32,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Bantay, Mangatarem, Pangasinan
30,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. Malibong, Urbiztondo, Pangasinan
30,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. Sawat, Urbiztondo, Pangasinan
30,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. Angarian, Bugallon, Pangasinan
22,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection, Brgy. Salavante, Mangatarem, Pangasinan
30,000,000
Pangasinan 3rd DEO 801,685,000Agno River Basin Flood Control Project-Rehabilitation/Extension of Bank Protection, Brgy. Carmay, Rosales, Pangasinan
5,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Tumana East, Rosales, Pangasinan
10,000,000
Agno River Basin Flood Control Project-Construction/Extension of Dike with Protection Works, Brgy. San Patricio-Sta Rosa, Sta Maria, Pangasinan
10,000,000
Agno River Basin Flood Control Project-Construction of Boulder Spur Dikes, Brgy. Samon, Sta Maria, Pangasinan
5,000,000
Agno River Basin Flood Control Project-Rehabilitation of Boulder Bank Protection, Brgy. Callitang, Sta Maria, Pangasinan
7,500,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Angayan, Balungao, Pangasinan
20,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Pugaro-San Aurelio, Balungao, Pangasinan
15,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Decreto, Umingan, Pangasinan
15,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Cabalitian, Umingan, Pangasinan
15,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Papallasen, Umingan, Pangasinan
10,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Zone V/Station Dist., Rosales, Pangasinan
15,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Don Antonio Village, Rosales, Pangasinan
15,000,000
Agno River Basin Flood Control Project-Rehabilitation/Extension of Dike with Protection Works, Sitio San Jose, Brgy. Cacandungan, Natividad, Pangasinan
20,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Burgos, Natividad, Pangasinan
15,000,000
Agno River Basin Flood Control Project-Construction of Dike's Protection Works, Brgy. Casantamariaan, San Quintin, Pangasinan
15,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Casaratan-Sobol, San Nicolas, Pangasinan
15,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Salpad, San Nicolas, Pangasinan
10,000,000
Agno River Basin Flood Control ProjectConstruction of Dike with Protection Works, Brgy. Bensican, San Nicolas, Pangasinan
10,000,000
Agno River Basin Flood Control Project-Construction of Dike with Protection Works, San Rafael West, San Nicolas, Pangasinan
10,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Nining, San Nicolas, Pangasinan
15,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Libertad, Tayug, Pangasinan
15,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection, Brgy. Sobol-Legaspi, Tayug, Pangasinan
20,000,000
Page 12 of 162
details of dpwh’s programs/projects 911
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Agno River Basin Flood Control Project-Construction of Dike with Protection Works, Brgy. Sto Domingo, San Manuel, Pangasinan
20,000,000
Agno River Basin Flood Control Project-Construction of Dike with Protection Works, Brgy. Lapalo, San Manuel, Pangasinan
30,000,000
Construction of Banila River Flood Control Dike, Don Justo - Barat Section, Umingan, Pangasinan 6th LD
40,000,000
Improvement of Bued River Course and Bank Protection Works, Bued River Control Project at Brgy. Dungon, Sison, Pangasinan 5th LD
44,433,000
Improvement of Bued River Course and Bank Protection Works of Sison Bridge Approach, Bued River Control Project at Brgy. Agat, Sison, Pangasinan 5th LD
44,477,000
Improvement of Bued River Course and Dike with Protection Works, Bued River Control Project at Brgy. Esperanza, Sison, Pangasinan 5th LD
42,885,000
River Improvement and Dike with Protection Works, Bued River Control Project at Brgy. Tara-Tara,Sison, Pangasinan 5th LD
22,749,000
Improvement of Angacalan River Course and Bank Protection Works, Angacalan River Control Project at Brgys. Malasin-Tulnac, Pozorrubio, Pangasinan 5th LD
28,900,000
Improvement of Tagamusing River Course, Tagamusing River Control Project at Brgys. Mangkasuy, Binalonan, Pangasian 5th LD
14,683,000
Bank Protection using Gabions and River Improvement, Tagamusing River Control Project at Brgy. Pasileng Norte, Binalonan, Pangasian 5th LD
13,279,000
River Improvement and Bank Protection Works, Tagamusing River Control Project at Sitio Riverview, Sumabnit, Binalonan, Pangasinan 5th LD
9,321,000
Improvement of Tagamusing River Course, Tagamusing River Control Project at Brgy. Casantiagoan, Laoac, Pangasinan 5th LD
23,502,000
River Improvement of Tagamusing River Course and Cut-Off Channel with Protection Works, Tagamusing River Control Project at Sitio Paitan "D" Alarcio, Laoac, Pangasinan 5th LD
14,243,000
River Improvement, Macalong River Control Project at Brgys. Mabanogbog, Nancamaliran and Bayaoas, Urdaneta City, Pangasinan 5th LD
11,264,000
Heightening of Villasis-Asingan Earthdike, Agno River Proejct at Brgys. Puelay-Lipay, Villasis, Pangasinan 5th LD
11,110,000
Heightening of Villasis-Asingan Earthdike, Agno River Proejct at Brgys. Piaz-Caramuran, Villasis, Pangasinan 5th LD
13,339,000
Agno River Basin Flood Control Project-Extension/Construction of Dike with Protection, Brgy. Artacho, Sison, Pangasinan
20,000,000
Agno River Basin Flood Control Project-Extension/Construction of Dike with Protection, Brgy. Amagbagan, Sison, Pangasinan
22,000,000
Agno River Basin Flood Control Project-Extension/Construction of Bank Protection of River Course, Brgy. Mabanogbog, Nancamaliran, Pinmaludpod, Urdaneta City
35,000,000
Agno River Basin Flood Control Project-Rehabilitation of Dike with Protection Works, Brgy. Cabaritan, Sison, Pangasinan
18,000,000
Agno River Basin Flood Control Project-Construction of Bank Protection and Improvement of River Course, Brgy. Malasin-Tulnac, Pozorrubio, Pangasinan
10,000,000
Agno River Basin Flood Control Project-Rehabilitation/Extension of Bank Protection, Brgy. Puelay, Villasis, Pangasinan
10,000,000
Agno River Basin Flood Control Project-Construction/Extension of Bank Protection, Brgy. San Jose & Poblacion, Sto Tomas, Pangasinan
15,000,000
Pangasinan 4th DEO 266,000,000Agno River Basin Flood Control Project Extension/Construction of Bank Protection, Brgy. Caturay, Bayambang, Pangasinan
28,000,000
Agno River Basin Flood Control Project Extension/Construction of Bank Protection, Brgy. Supo, San Carlos City, Pangasinan
30,000,000
Agno River Basin Flood Control Project Construction of Bank Protection, Brgy. Panacol, San Carlos City, Pangasinan
28,000,000
Slope Protection Works along Marusay River at Barangay Quesban, Calasiao, Pangasinan 3rd LD
20,000,000
Construction of Protection Works along Agno River, Bayambang, Pangasinan, Ambayat II Section, Pangasinan 3rd LD
40,000,000
Construction of Protection Works along Agno River, Bayambang, Pangasinan, San Gabriel II Section, Pangasinan 3rd LD
40,000,000
Construction of Protection Works along Agno River, Bayambang, Pangasinan, Pangdel Section, Pangasinan 3rd LD
40,000,000
Construction of Protection Works along Agno River, Bayambang, Pangasinan, Salinap Section, Pangasinan 3rd LD
40,000,000
Cordillera Administrative Region 502,881,000Regional Office CAR 300,000,000
Page 13 of 162
912 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Maintenance of Flood Mitigation Structures/ Drainage System along Crystal Cave to Asin Flood Control, Crystal Cave to Asin, Baguio City
50,000,000
Maintenance of Flood Mitigation Structures/ Drainage System along City Camp Lagoon Flood Control, City Camp Lagoon, Baguio City
50,000,000
Construction/ Rehabilitation of Flood Mitigation Facilitites along Bued River, Baguio City LD
50,000,000
Construction/ Rehabilitation of Flood Mitigation Facilitites along Balili River, Baguio City LD
50,000,000
Construction of Bayudan-Chico River Flood - Erosion Control Project, Mt. Province 100,000,000
Abra DEO 202,881,000Construction of Flood Control Structure, Pagala, Bucay, Abra 46,569,000
Construction of Flood Control Structure, Brgy. Aguet, Lagangilang, Abra 45,302,000
Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basin (Phase II), Sta. 1+062 - Sta. 1+840, Canan, La Paz, Abra
36,428,000
Construction/Rehabilitation of Flood Control, Sta. 0+550 - Sta. 2+100, Poblacion, La Paz, Abra
39,582,000
Flood Control Structure along Abra River Basin 35,000,000
Region II 732,699,000Regional Office II 130,000,000
Cagayan River Basin, Gattaran Section, Cagayan Valley 1st LD 80,000,000
Libtong Brgy. Disulap, San Mariano and Disabungan River FC, Isabela 2nd LD 50,000,000
Batanes DEO 68,000,000Improvement if Ivana Flood Control/Seawall, Ivana, Batanes 20,000,000
Improvement of Sabtang Seawall/Flood Control, Sinakan, Batanes 48,000,000
Cagayan 1st DEO 139,708,000Cagayan River Basin, Lal-lo Section, Cagayan Valley 1st LD 40,000,000
Construction of Tueg River Control, Baggao, Cagayan 49,860,000
Construction of Assao River Control, Baggao, Cagayan 49,848,000
Cagayan 2nd DEO 153,171,000Construction of Matalag River Flood Control, Rizal, Cagayan 26,175,000
Construction of Sanchez Mira Flood Control, Nangoluan, Sanchez Mira, Cagayan 16,996,000
Construction of Cabicungan Flood Control along Cabicungan River Gabion) Claveria, Cagayan
20,000,000
Construction/ Rehabilitation of Tabbuggan Flood Control along Cabicungan River(Gabion) Claveria, Cagayan
20,000,000
Construction of Dugayung Flood Control along Chico River, Piat, Cagayan 2nd LD 20,000,000
Construction of Abulug River, Sta. Rosa, Abulug, Cagayan, Cagayan 2nd LD 30,000,000
Construction of Abulug River Flood Control, Canayun, Abulug, Cagayan 2nd LD 20,000,000
Isabela 2nd DEO 76,320,000Construction of Pinacanauan River Flood Control Project (Daragutan East Section), San Mariano, Isabela, Sta.0+000-Sta.0+890, Isabela
18,440,000
Construction of Pinacanauan River Flood Control Project (Del Pilar Section), San Mariano, Isabela, Sta.0+000-Sta.0+400, Isabela
19,980,000
Construction of Siffu River Flood Control Project (Quirino Section), Quirino, Isabela, Sta.0+000-Sta.0+725, Isabela
18,960,000
Construction of Magat River Flood Control Project (Camarungayan Section), Aurora, Isabela, Sta.0+000-Sta.0+816, Isabela
18,940,000
Isabela 4th DEO 77,500,000Rehabilitation of Flood Control Structures along Cagayan River, Rang-ay, San Agustin, Isabela
38,750,000
Rehabilitation of Flood Control Structures along Cagayan River, Sinaoangan Norte, San Agustin, Isabela
38,750,000
Nueva Vizcaya 2nd DEO 88,000,000Construction of Calitlitan Flood Control along Daang Maharlika (Phase II), Calitlitan Section, Aritao, Nueva Vizcaya
20,000,000
Construction of Lamo Flood Control Project along Apian River, protecting DM Jct. Lamo-Malasim Road, Lamo Section, Dupax del Norte, Nueva Vizcaya
20,000,000
Construction of Revetment for Protection of Mangayang Bridge, Aritao-Quirino Road, Brgy. Banganan, Aritao, Nueva Vizcaya
48,000,000
Region III 4,579,805,000Regional Office III 988,105,000
Page 14 of 162
details of dpwh’s programs/projects 913
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Rehabilitation of Orani Channel (in front of Pantalan Bago to Tatlong Butas), Orani
70,000,000
Rehabilitation of Obando River Wall, Obando, Bulacan 50,000,000
Rehabilitation of Rio Chico at Barangay San Antonio, Nueva Ecija 4th LD 91,910,000
Diking with Slope Protection Rio Chico River, San Antonio/Cabiao, Nueva Ecija 100,000,000
Slope Protection works along Sapang Balen Creek, Angeles City, Pampanga 50,000,000
Slope Protection works along Sapang Balen Creek, Mabalacat, Pampanga 50,000,000
Slope Protection works along Quitangil Creek, Mabalacat, Pampanga 50,000,000
Construction of concrete slope protection with steel sheet piles foundation along Abacan River, Brgy. Pulung Maragul, Angeles City, Sta. 0+000 tos Sta. 0+690
50,000,000
Repair/Rehabilitation along Abacan River (lower Friendship Bridge) Angeles City, Pampanga 1st LD
50,000,000
Slope Protection at Gumain River (Right Dike) Upstream of San Pedro Bridge, Floridablanca, Pampanga
76,195,000
Flood Control Projects in Central Luzon - Diking with Slope Protection Gumain Porac River, Lubao, Pampanga
100,000,000
Diking with Slope Protection Malisik-Maasim River, Candaba 100,000,000
Flood Control Projects in Central Luzon - Rehabilitation of Slope Protection along Pampanga River, San Luis
50,000,000
Arayat-Apalit-Setback Levee (Asphalt) 100,000,000
Bataan 1st DEO 230,000,000Construction/Improvement of Dila-Dila River, Dinalupihan, Bataan 40,000,000
Rehabilitation of Slope Protection at San Juan River, East Daang Bago Section Samal, Bataan
12,000,000
Construction/Improvement of San Juan River Tabang Ilog SeCTION, Samal, Bataan 14,000,000
Construction/Improvement of Pentor-Balsik River (Torres Section), Dinalupihan, Bataan
15,000,000
Construction/Improvement of Pentor-Balsik River(Balsik Section), Hermosa 15,000,000
Construction/Improvement of Calaguiman River Samal 15,000,000
Construction/Improvement of Abucay River Samal 18,000,000
Construction/Improvement of Colo River (Happy Valley Section), Dinalupihan 20,000,000
Construction/Improvement of Colo River (Saguing Section), Dinalupihan 20,000,000
Construction/Improvement of Colo River (San Benito Section), Dinalupihan 15,000,000
Construction/Improvement of Colo River (Maguindong Section), Dinalupihan 20,000,000
Construction/Improvement of Colo River (Layac Section), Dinalupihan 10,000,000
Construction/Improvement of Colo River (Luakan Section), Dinalupihan 12,000,000
Construction/Improvement of Colo River (Magsaysay Section), Dinalupihan 4,000,000
Bataan 2nd DEO 31,673,000Construction of Flood Control Structures/Slope Protection, Talisay River, Sta 0+000 - Sta 0+805, Maluya-Cupang, Balanga City, Bataan
15,835,000
Construction of Flood Control Structures Slope Protection, Cataning River, Balanga City, Bataan
15,838,000
Bulacan 1st DEO 236,855,000Construction of Revetment at Sto. Rosario, Hagonoy, Bulacan 16,572,000
Construction of Revetment at San Pascual, Hagonoy, Bulacan 16,572,000
Construction of Revetment at Sta. Cruz, Hagonoy, Bulacan 16,573,000
Construction of Revetment at Sta. Elena, Hagonoy, Bulacan 16,572,000
Construction of Revetment at Sagrada Familia, Hagonoy, Bulacan 16,572,000
Construction of Slope Protection along Barangay at San Juan, Hagonoy, Bulacan 1st LD
20,000,000
Construction of Slope Protection along Barangay at Mercado, Hagonoy, Bulacan 1st LD
20,000,000
Construction of Slope Protection along Barangay at Iba O Este, Hagonoy, Bulacan 1st LD
20,000,000
Construction of Slope Protection along Barangay at San Isidro, Hagonoy, Bulacan 1st LD
20,000,000
Construction of Slope Protection at San Agustin, Hagonoy, Bulacan 1st LD 30,000,000
Construction of Flood Control along Bocaue River at Binang 1st Section, Bocaue, Bulacan
23,994,000
Page 15 of 162
914 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Flood Control Structure along Angat River, Bintog, Plaridel. Bulacan 20,000,000
Bulacan 2nd DEO 882,025,000Upgrading of Road Dike, Plaridel Street, Catanghalan - Pag-asa, Obando, Bulacan 14,397,000
Upgrading of Road Dike, Sn. Joaquin Street, Catanghalan - Pag-asa, Obando, Bulacan
14,754,000
Upgrading of Road Dike, along J.P. Rizal Street up to Pantay Bituin Subdivision, Paliwas, Obando, Bulacan, (Phase I)
16,528,000
Upgrading of Road Dike, along J.P. Rizal Street up to Pantay Bituin Subdivision, Paliwas, Obando, Bulacan, (Phase II)
5,929,000
Construction of Flood Control Structure along Sta Maria River (Phase I - Left Side), Sta. Maria, Bulacan
49,500,000
Construction of Flood Control Structures along Marilao River, Marilao, Bulacan 40,392,000
Construction of Flood Control Structures along Daang Maharlika Road, San Miguel River, San Miguel, Bulacan 3rd LD
49,970,000
Construction of Flood Control Structures/Retaining Wall/Slope Protection along Maasim River Phase I, San Rafael & San Ildefonso, Bulacan 3rd LD
49,000,000
Construction of Flood Control Structures along Daang Maharlika Road, Tigpalas Creek, San Miguel, Bulacan 3rd LD
48,500,000
Construction of Flood Control Structures along Eastern Bulacan Road, DRT - San Miguel, Bulacan 3rd LD
49,000,000
Construction of Flood Control Structures along Daang Maharlika Road, Buga Creek, San Miguel, Bulacan 3rd LD
48,000,000
Construction of Slope Protection Phase I, Matictic, Norzagaray, Bulacan 3rd LD 49,995,000
Construction of Flood Control Structures Bulo River Phase I, San Miguel, Bulacan 3rd LD
48,900,000
Construction of Slope Protection/Retaining Wall at San Juan and Sta. Rita Bata, San Miguel, Bulacan 3rd LD
48,500,000
Construction/Improvement of Flodo Control Structures, Masalipit, San Miguel, Bulacan
49,200,000
Construction of Flood Control Structures along NCR/Bulacan Bdry.-Bigte-Ipo Dam Road, Sto. Cristo River, San Jose del Monte City Lone District
49,950,000
Construction of Flood Control Structures along NCR/Bulacan Bdry.-Bigte-Ipo Dam Road, San Jose River, San Jose del Monte City Lone District
49,980,000
Construction of Flood Control Structures along NCR/Bulacan Bdry.-Bigte-Ipo Dam Road, Ilog Bayan River, San Jose del Monte City Lone District
49,900,000
Construction of Flood Control Structures, Ilog Bayan River, San Jose del Monte City Lone District, Bulacan, Sta. 1+425-Sta. 2+010
49,990,000
Construction of Flood Control Structures, San Jose River, San Jose del Monte City Lone District, Bulacan, Sta. 1+984-Sta. 2+569 (downstream)
49,700,000
Construction of Flood Control Structures, Sto. Cristo River, San Jose del Monte City Lone District, Bulacan, Sta. 0+497-Sta. 0+997
49,940,000
Nueva Ecija 1st DEO 194,024,000Repair/Rehabilitation of Flood Control Structures along Talavera River at Brgy. Sta. Monica, Aliaga, Nueva Ecija
16,957,000
Repair/Rehabilitation of Flood Control Structures along Talavera River at Brgy. San Eustacio, Aliaga, Nueva Ecija
17,032,000
Improvement/Rehabilitation of Dikes at Talavera River, Sta. Lucia Old, Zaragoza, Nueva Ecija
18,253,000
Improvement/Rehabilitation of Dikes at Talavera River, Sta. Monica, Aliaga, Nueva Ecija
27,300,000
Improvement/Rehabilitation of Revetment, Talavera River, Basang Hamog, Talavera, Nueva Ecija
27,241,000
Improvement/Rehabilitation of Revetment at Banco River, San Esteban, Rizal, Nueva Ecija
27,241,000
Rehabilitation/Improvement of Cabulinawan River Control, Brgy. Puncan, Carranglan, Nueva Ecija
20,000,000
Rehabilitation/Improvement of Protection Works along Maharlika Road, Carranglan, Nueva Ecija
20,000,000
Rehabilitation/Improvement of Flood Control Interceptor along Daang Maharlika Road, Sta. 175+900 - Sta. 176+529.6, Carranglan, Nueva Ecija
20,000,000
Nueva Ecija 2nd DEO 89,937,000Repair/Rehabilitation/Improvement of Digmala River Control, Sta. 0+869.47 - Sta. 1+602.47, Ariendo Section, Bongabon, Nueva Ecija
19,937,000
Flood Control Projects in Central Luzon - Rehabilitation of Slope Protection along Pampanga River, Jaen, Nueva Ecija
40,000,000
Page 16 of 162
details of dpwh’s programs/projects 915
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Restoration of Pampanga River Bank, Jaen Revetment, Poblacion and Navao Section, Jaen, Nueva Ecija
30,000,000
Pampanga 1st DEO 114,395,000Restoration of Collapsed River Bank, Pampanga River Control, Guagua River Basin, Candaba, Pampanga
34,420,000
Flood Control Projects in Central Luzon - Cut Off Channeling with Dike Embankment & Sheet Pile Foundation Works, Candaba, Pampanga
40,000,000
Rehabilitation/Improvement of Road Slope Along Candaba-San Miguel Road, K0071+000 to K0073+000, Candaba, Pampanga 4th LD
19,980,000
Rehabilitation/Improvement of Road Slope along Apalit-Macabebe-Masantol Road, Masantol Section, K0059+700 to K0063+700, Macabebe & Masantol Pampanga 4th LD
19,995,000
Pampanga 2nd DEO 119,609,000Improvement/Rehabilitation of Dike and Slope Protection along Sapang Maragul and San Jose Creek, Lambac and Natividad Section, Guagua, Pampanga
40,000,000
Construction of Line Canal and Construction of Slope Protection at Barangay Palat, Porac, Pampanga
32,250,000
Construction of Slope Protection Works along Porac River, Barangay Benedicto-Del Carmen Section
17,359,000
Construction of Flood Control Structure along Porac River, Pampanga, 2nd LD 30,000,000
Pampanga 3rd DEO 118,920,000Slope Protection/Rediking at Critical Sections along Quitangil Creek (West Section, St. 0+750-1+600, Brgy. San Nicolas II, Magalang, Pampanga
18,920,000
Repair/Rehabilitation along Abacan River at Brgy. Pampang, Angeles City, Pampanga 1st LD
30,000,000
Repair/Rehabilitation along Abacan River at Brgy. Ninoy Aquino, Angeles City, Pampanga 1st LD
30,000,000
Repair/Rehabilitation along Abacan River, Brgy. Sta. Teresita and Malabanias, Angeles City, Pampanga 1st LD
40,000,000
Tarlac 1st DEO 781,000,000Const. of concrete slope protection along Camiling River at Brgy. Telbang, Camiling, Tarlac 1st LD
49,000,000
Const. of slope protection along Camiling River at Brgy. Tuec (Phase I) Camiling, Tarlac 1st LD
49,000,000
Const. of slope protection along Camiling River at Brgy. Surgui 3rd (Phase I), Camiling, Tarlac 1st LD
49,000,000
Const. of slope protection along Camiling River at Bilad Section, Phase I, Camiling, Tarlac 1st LD
40,000,000
Construction of slope protection along Batacan River PIT-AO Section (Phase 1) Brgy. PIT-AO, San Clemente, Tarlac 1st LD
49,000,000
Construction of Slope Protection along Camiling River Control (Section 1), Libueg Section, Camiling,Tarlac 1st L.D.
49,500,000
Construction of Slope Protection along Camiling Rive Control (Section 1), Bacabac Section, Brgy. Bacabac, Camiling, Tarlac 1st LD
49,500,000
Construction of Slope Protection along Camiling River Control (Section 1), Pindangan 1st Section, Pindangan 1st, Camiling, Tarlac 1st LD
20,500,000
Construction of Slope Protection along Camiling River Control (Left Dike), Pindangan 2nd Section, Purok 1, Brgy. Pindangan, Camiling, Tarlac 1st LD
32,000,000
Construction of Slope Protection along Camiling River Control (Left Dike), Pindangan 2nd Section, Purok 2, Brgy. Pindangan, Camiling, Tarlac 1st LD
12,500,000
Construction of Concrete River Revetment at Purok 2 and Purok 3, Barangay Tambugan, Camiling, Tarlac
20,000,000
Construction of slope protection along Batacan River PIT-AO Section (Phase 2) Brgy. PIT-AO, San Clemente, Tarlac 1st LD
49,000,000
Const. of slope protection along Camiling River at Brgy. Surgui 3rd (Phase II), Camiling, Tarlac 1st LD
41,000,000
Const. of slope protection along Camiling River at Brgy. Surgui 2nd , Camiling, Tarlac 1st LD
40,000,000
Repair/Rehab. of Reinforced Concrete Slope Protction along Tarlac River Control, Brgy. Sta. Cruz, Tarlac City, Tarlac 2nd LD
49,000,000
Repair/Rehab. of Reinforced Concrete Slope Protction along o'Donell River Control, Brgy. Armenia, Tarlac City, Tarlac 2nd LD
23,934,000
Repair/Rehab. of Reinforced Concrete Slope Protction along Tarlac River Control, Villa Paz-Cardona Section, Gerona, Tarlac 2nd LD
35,000,000
Repair/Rehab. of Reinforced Concrete Slope Protction along o'Donell River Control, San jose de Urquico Section, Brgy. San Jose de Urquico, Tarlac City, Tarlac 2nd LD
17,066,000
Page 17 of 162
916 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Slope Protction along Tarlac River Control, Carangian Section, Brgy. Carangian, Tarlac City, Tarlac City 2nd LD
11,000,000
Construction/Rehab. of Rio Chico River, Victoria, Tarlac, Tarlac 2nd LD 48,000,000
Construction of slope protection along Masalasa Creek, Amucao Section, Amucao, Tarlac City, Tarlac 2nd LD
47,000,000
Tarlac 2nd DEO 227,639,000Rehabilitation of Rio Chico with Slope Protection (Upstream of Rio Chico Bridge), La Paz and Parua River (Banaba Section), Bamban, Tarlac
30,000,000
Rehabilitation/Improvement of Exising Dike along Lucung River, D/S Lucung Bridge, Sta. 0+262 - Sta. 0+424.40, Concepcion, Tarlac
14,901,000
Rehab./Improvement of Existing Dike along Lucung River, U/S Lucung Bridge, Sta.(-) 0+425-Sta (-) 0+891, Concepcion, Tarlac
32,920,000
Rehabilitation/ Improvement of Exiting Dike along Marimba River, Sta. 0+000 - Sta. 0+208, Bamban, Tarlac
19,818,000
Rehab./Improvement of Lucung River Control, Malupa Section, Concepcion, Tarlac, Sta. 1+660 to Sta. 2+160
30,000,000
Rehabilitation/Improvement of Existing Dike along Rio Chico River, La Paz Section, La Paz, Tarlac, Sta. 8+768 to Sta. 9+068
35,000,000
Rehab./Improvement of Lucung River Control, Cafe Section, Concepcion, Tarlac, Sta. 2+760 to Sta. 3+260
35,000,000
Rehab./Improvement of Lucung River Control, Culatingan Section, Concepcion, Tarlac, Sta. 5+850 to Sta. 6+350
30,000,000
Zambales 1st DEO 406,823,000Construction of Slope Protection/Flood Control at Bucao Dike, Botolan, Zambales 18,137,000
Construction of Slope Protection/Flood Control at Sagpat Dike, San Felipe, Zambales 18,137,000
Constructionof Slope Protection/Flood Control at Maculcul Dike, San Narciso, Zambales
18,137,000
Construction of Concrete Slope Protection/Flood Control of Kiling Dike (Upstream Section), Cabangan, Zambales, Sta. 0+546 – Sta. 0+861
19,154,000
Construction of Concrete Slope Protection/Flood Control of Kiling Dike (Downstream Section), Cabangan, Zambales, Sta. 0+000 – Sta. 0+315
18,154,000
Raising of Grade along Vega – Maculcol Dike Upstream, San Narciso Side, San Narciso, Zambales, Sta. 0+000 – Sta. 0+612
19,562,000
Raising of Grade along Vega – Maculcol Dike Downstream, San Narciso Side, San Narciso, Zambales, Sta. 5+333.60 – Sta. 4+721.60
18,562,000
Raising of Grade along Paite – Maculcol Dike, San Felipe Side, San Felipe, Zambales, Sta. 4+474.50 – Sta. 4+124.50
9,500,000
Construction of Concrete Slope Protection at Bancal River Downstream, South Approach, Bancal, Botolan, Zambales, Sta. 0+082 – Sta. 0+436
19,822,000
Construction of Concrete Slope Protection at Maloma Dike Downstream, Laoag, San Felipe, Zambales, Sta. 0+759.50 – Sta. 1+099.50
18,534,000
Construction of Slope Protection/Flood Control along Sto. Niño River, Downstream, Cabangan, Zambales, Sta. 0+000 – Sta. 0+692
32,278,000
Construction of Slope Protection/Flood Control along Kiling Dike (North Apprach), Cabangan, Zambales
18,000,000
Improvement/Rehabilitation of Slope Protection/Flood Contro, Gabor Dike (upstream), San Felipe, Zambales
15,000,000
Rehabilitation of Maculcol Dike (Downstream), San Narciso Side, San Narciso,Zambales
15,000,000
Construction of slope protection, Maloma River Downstream, Cabangan Side, Cabangan, Zambales
21,740,000
Slope Protection Works along Pamatawan River in San Antonio, Zambales 49,600,000
Rehabilitation/Improvement of Concrete Slope Protection, Gabor Dike (Upstream), San Felipe, Zambales, Sta. 0+540 - Sta. 1+938
24,506,000
Rehabilitation/Improvement of Concrete Slope Protection, Kiling River, Cabangan, Zambales, Sta. 0+861 - Sta. 2+259
25,000,000
Rehabilitation/Improvement of Concrete Slope Protection, Bancal River, Botolan, Zambales, Sta. 0+095 - Sta. 1+017
28,000,000
Zambales 2nd DEO 158,800,000Improvement of Kalaklan River, Brgy. Kalaklan, Olongapo City 1st LD 46,000,000
Improvement of Sta. Rita River (Upstream), Brgy. Sta. Rita, Olongapo City 1st LD 46,000,000
Improvement of Mabayuan River, Brgy. Mabayuan, Olongapo City 1st LD 19,800,000
Improvement of Pamatawan River, Castillejos, Zambales 1st LD 47,000,000
Region IV-A 3,020,130,000
Page 18 of 162
details of dpwh’s programs/projects 917
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Regional Office IV-A 1,100,000,000Construction of Drainage System including slope protection along Talisay-Laurel-Agoncillo Road, K0094+000-K0102+800
50,000,000
Revetment of East Side along Brgy. Salitran III, sta. 2+760 to sta. 3+220, Dasmariñas, Cavite 4th. L.D.
50,000,000
Revetment of East Side along Brgy. Salitran III, sta. 3+220 to sta. 3+533.82, Dasmariñas, Cavite 4th. L.D.
50,000,000
Revetment of West Side along Brgy. Salitran II and Brgy. Burol Main sta. 2+008.71 to sta. 2+468.71, Dasmariñas, Cavite 4th. L.D.
50,000,000
West River Bank Stabilization Project along Imus River (Phase IV) 50,000,000
Revetment of West Side along Along Imus River, Brgy. Salitran III, Sta. 2+760 to Sta. 3+220, Dasmariñas, Cavite 4th. L.D.
50,000,000
Revetment of West Side along Along Imus River, Brgy. Salitran III, Sta. 3+220 to Sta.3+533.82, Dasmariñas, Cavite 4th. L.D.
50,000,000
Revetment of West Side along Along Imus River, Brgy. Salitran Iiand Brgy. Burol Main, Sta. 1+548.70 to Sta. 2+008.71, Dasmariñas, Cavite 4th. L.D
50,000,000
Construction/Rehabilitation of revetment along San Isidro River, Brgy. San Antonio and brgy. San Vicente, San Pedro, Laguna
50,000,000
Construction/Rehabilitation of revetment along Biñan River, Brgy. San Antonio and Brgy. Tubigan, Biñan City, Laguna
50,000,000
Construction/Rehabilitation of revetment along Biñan River, Dela Paz Section, Biñan City, Laguna
50,000,000
Construction/Rehabilitation of revetment along Biñan River, Brgy. Malabanan Section, Biñan City, Laguna
50,000,000
Construction/Rehabilitation of Flood Control along Pagsanjan River, Brgy. Pinagsanjan, Pagsanjan, Laguna
50,000,000
Construction/Rehabilitation of Flood Control along Pagsanjan River, Lumban Section, Brgy. Maytalang I, Lumban Laguna
50,000,000
Construction/Rehabilitation of Flood Control along Pagsanjan River, Lumban Section, Brgy. Balubad and Maytalang I, Lumban, Laguna
50,000,000
Construction/Rehabilitation of Flood Control along Pagsanjan River, Brgy. Magdapio, Pagsanjan, Laguna
100,000,000
Improvement/Riprapping/Deepening of Sitio Paenaan River along Marikina Infanta Road (Downstream Phase 3), Brgy San Jose, Antipolo City 2nd LD, K0037+484
50,000,000
Improvement/Riprapping/Deepening of Sitio Paenaan River along Marikina Infanta Road (Upstream Phase 3), Brgy San Jose, Antipolo City Antipolo City 2nd LD, K0037+484
50,000,000
Improvement/Riprapping/Deepening of Sitio Kapatagan River along Marikina Infanta Road (Upstream Phase 3), Brgy San Jose, Antipolo City Antipolo City 2nd LD, K0035+900
50,000,000
Improvement/Riprapping/Deepening of Sitio Kapatagan River along Marikina Infanta Road (Downstream Phase 3), Brgy San Jose, Antipolo City Antipolo City 2nd LD, K0035+900
50,000,000
Improvement/Riprapping/Deepening of Creek, Angono River, Brgy. San Isidro, Angono, Rizal
50,000,000
Cavite 2nd DEO 219,130,000Construction/Improvement of Flood Control Structures at Pinagpatayan River, Brgy. Sapang II, Ternate, Cavite 7th LD
20,000,000
Construction of Slope Protection, South Bound along the Critical Sections of Naic Diversion Bridge Km 0046+562, National Highway to Naic-Ternate Road, East Section, Cavite
20,000,000
Repair/Rehabilitation or Construction of Slope Protection along and beneath Kay Alamang Bridge, Naic, North Portion, Cavite
20,000,000
Repair/Rehabilitation or Construction of Slope Protection along and beneath Kay Alamang Bridge, Naic, South Portion, Cavite
20,000,000
Construction of Flood Control at Ligas (Noveleta-Naic-Tagaytay Road), Phase II, Indang, Cavite
29,130,000
Construction of River Protection or Seawall at Brgy. Bucana Sasahan, Naic, Cavite 7th LD
15,000,000
Construction of Flood Control at Timalan Bridge, Naic, Cavite 35,000,000
Construction of Flood Control at Tartaria Bridge, Silang, Cavite 40,000,000
Construction of Flood Control at Poblacion 1 to 6, Amadeo, Cavite 20,000,000
Cavite DEO 1,025,000,000Revetment Along Ilang-Ilang River Brgy. San Juan 1 30,000,000
Revetment Along Ilang-Ilang River Brgy. San Juan 2, Phase II 30,000,000
Revetment Along Ilang-Ilang River Brgy. Magdiwang, Phase II 30,000,000
Revetment Along Ilang-Ilang River Brgy. San Jose, Phase II 30,000,000
Page 19 of 162
918 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Revetment Along Ilang-Ilang River Brgy. San Antonio, Phase II 30,000,000
Revetment Along Ilang-Ilang River Brgy. San Rosa, Phase II 30,000,000
Revetment Along Ilang-Ilang River Brgy. Manggahan, Kawit, Phase II 30,000,000
Construction of Road Dike/River Bank Protection Located at Manggahan to Balsahan Section Phase IV
30,000,000
Construction of Road Dike/River Bank Protection Located at Manggahan to Balsahan Section Phase V
30,000,000
Construction of Road Dike/River Bank Protection Located at Manggahan to Balsahan Section Phase VI
30,000,000
Construction of Road Dike/River Bank Protection Located at Brgy. Gahak, Kawit (East Side)
30,000,000
Construction of Road Dike/River Bank Protection Located at Brgy. Ligtong, Rosario 30,000,000
Construction of Road Dike/River Bank Protection Located at Brgy. Wawa, Rosario 30,000,000
Construction of Road Dike/River Bank Protection Located at Brgy. Tejero Convention, Rosario
30,000,000
Construction of Road Dike/River Bank Protection Located at Brgy. Sta. Isabel, Kawit 30,000,000
Revetment Bacoor River Along Banalo Section Phase I 30,000,000
Revetment Bacoor River Along Mabolo Section Phase I 30,000,000
Revetment Bacoor River Along Habay Section Phase I 20,000,000
Revetment Bacoor River Along Daang Bukid Section Phase I 20,000,000
Construction of Box Culvert at Zapote-Longos Section 30,000,000
Construction of Drainage Structure along Dasmariñas-TMC-Naic Road, Km 36+574 to Km 37+239, Dasmariñas City, Cavite 4th LD
15,000,000
Revetment of East Side of Baluctot River, Paliparan 3, Dasmariñas City, Cavite 4th LD including RROW
20,000,000
Revetment of West Side of Baluctot River, Paliparan 3, Dasmariñas City, Cavite 4th LD including RROW
20,000,000
Revetment of East Side of Baluctot River, Sampaloc IV, Dasmariñas City, Cavite 4th LD including RROW
20,000,000
Revetment of West Side of Baluctot River, Sampaloc IV, Dasmariñas City, Cavite 4th LD including RROW
20,000,000
Revetment of West River Bank Stabilization Project along Imus River (Phase IV), Dasmariñas City, Cavite 4th. L.D. Inc. RROW
20,000,000
Revetment of West Side of Imus River, Brgy Salitran 3, Sta. 2+300 - Sta. 2+760, Dasmariñas City, Cavite 4th. L.D. Inc. RROW
20,000,000
Revetment of East Side along Brgy. Sampaloc I, Dasmariñas City, Cavite 4th. L.D. Inc. RROW
20,000,000
Revetment of East Side along Brgy. San Agustin I, Dasmariñas City, Cavite 4th. L.D. Inc. RROW
20,000,000
Revetment of West Side along Brgy. San Agustin I, Dasmariñas City, Cavite 4th. L.D. Inc. RROW
20,000,000
Revetment of East Side along Brgy. Sampaloc II, Dasmariñas City, Cavite 4th. L.D. Inc. RROW
20,000,000
Revetment of West Side along Brgy. Sampaloc II, Dasmariñas City, Cavite 4th. L.D. Inc. RROW
20,000,000
Revetment Along Ilang-ilang River, Brgy. Bacao 1 Phase II 30,000,000
Revetment Along Ilang-Ilang River, Brgy. Bacao 2 Phase II 30,000,000
Revetment Along Ilang-Ilang River, Brgy. San Gabriel Poblacion 30,000,000
Revetment Along Ilang-Ilang River, Brgy. Dulong Bayan Poblacion 30,000,000
Revetment Along Ilang-Ilang River, Brgy. Gov. Ferrer Poblacion 30,000,000
Revetment Along Ilang-Ilang River, Brgy. Arnaldo Poblacion 30,000,000
Revetment Along Canias River, Brgy. Bukal Section Phase II 30,000,000
Laguana 2nd DEO 100,000,000Construction/Rehabilitation of revetment along Pooc Creek, Brgy. Balibago and Brgy. Macabling, Sta. Rosa, Laguna
20,000,000
Construction/Improvement of Revetment/River Control in San Juan River, Brgy.2, Calamba City
20,000,000
Construction/Improvement of Revetment/River Control in San Cristobal River, Brgy.Banlic, Calamba City
20,000,000
Page 20 of 162
details of dpwh’s programs/projects 919
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Improvement of Revetment/River Control in Bay River, Brgy.Dila, Bay, Laguna
20,000,000
Construction/Improvement of Revetment/River Control in Tabon Waterways, Brgy. Sto. Domingo, Los Banos & Bay Boundary
20,000,000
Laguana 3rd DEO 140,000,000Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas - Construction of Flood Control Structure (Upstream and Downstream) of Malaunod Bridge, San Pablo City, Laguna 3rd LD
30,000,000
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas - Construction of Flood Control Structure (Upstream and Downstream) of Mag-ampon Bridge, San Pablo City, Laguna
30,000,000
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas - Construction of Flood Control Structure (Upstream and Downstream) of Patay na Tubig Bridge, San Pablo City, Laguna
30,000,000
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas - Construction of Flood Control Structure along Tahibing I River, Nagcarlan, Laguna
30,000,000
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas - Construction of Flood Control Structure along Liliw River, Liliw Laguna
20,000,000
Quezon 3rd DEO 1,000,000Construction of Drainage Structure (Lined Canal) along Gumaca (Sisirin)-Pitogo-Mulanay-San Narciso Road K0299+428.50 - K0299+638.50 R/S, Quezon
1,000,000
Rizal 1st DEO 435,000,000Improvement/Riprapping of KULASI Creek along Marikina-Infanta Road (Upstream Phase 2), Brgy San Jose, Antipolo City Antipolo City 2nd LD, K0035+900
30,000,000
Construction of Spillway, Sitio San Joseph, Brgy. San Jose, Antipolo City, 2nd LD 10,000,000
Construction of Spillway, Sitio San Ysiro, Brgy. San Jose, Antipolo City, 2nd LD 10,000,000
Construction of Spillway, Purok Libis Site 1, San Ysiro, Brgy. San Jose, Antipolo City, 2nd LD
10,000,000
Construction of Spillway, Purok Libis Site 2, San Ysiro, Brgy. San Jose, Antipolo City, 2nd LD
10,000,000
Construction of Spillway, Sitio Binayoyo, Brgy. Calawis & Brgy. San Juan, Antipolo City, 2nd LD
15,000,000
Improvement/ Riprapping/ Deepening of Creek, Inday Subdivision, (Phase II), Brgy. San Jose, Antipolo City 2nd LD
25,000,000
Improvement/Riprapping/Deepening of Creek, Angono River, Brgy. San Roque, Angono, Rizal
20,000,000
Improvement/Riprapping/Deepening of Mapandan Creek, Brgys. San Juan and San Isidro, Cainta, Rizal
20,000,000
Improvement/Riprapping/Deepening of Ilog Pugad Creek, Brgy. San Juan, Taytay, Rizal
20,000,000
Improvement/Riprapping/Deepening of Diversion Channel, Brgy. San Juan, Taytay, Rizal
20,000,000
Improvement/Riprapping/Deepening of Maningning Creek, Brgys. San Isidro and Sta. Ana, Taytay, Rizal
20,000,000
Improvement/Riprapping/Deepening of Creek, Angono River, Brgy. Pob. Ibaba, Angono, Rizal
20,000,000
Improvement/Riprapping/Deepening of Kaytickling Creek, Brgy. San Isidro, Taytay, Rizal
20,000,000
Improvement/Riprapping/Deepening of Kaytickling Creek, Brgy. Dolores, Taytay, Rizal
20,000,000
Improvement/Riprapping/Deepening of Buli Creek, Brgys. Sto. Domingo and San Andres, Cainta, Rizal
30,000,000
Improvement/Riprapping/Deepening of Balanti Creek, Brgy. San Isidro, Cainta, Rizal 15,000,000
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas - Rehabilitation/Construction of Flood Control Structures along Teresa River, Teresa, Rizal
20,000,000
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas - Rehabilitation/Construction of Flood Control Structures along Morong River, Morong, Rizal
30,000,000
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas - Construction of Flood Control Structures along Upper Marikina River in Brgy. San Jose, Rodriguez, Rizal
30,000,000
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas - Construction of Flood Control Structures along Upper Marikina River in Brgy Balite to Brgy San Rafael, Rodriguez, Rizal
40,000,000
Page 21 of 162
920 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Region IV-B 1,075,354,000Regional Office IV-B 654,000,000
Construction of Managpi River Control, Calapan City, Mindoro Oriental 50,000,000
Construction of Abaton River Control, Calapan City, Mindoro Oriental 50,000,000
Construction of Gutad River Control, Calapan City, Mindoro Oriental 50,000,000
Construction of Longos River Control, Calapan City, Mindoro Oriental 50,000,000
Construction of Pola River Control and Seawall Project, Pola, Mindoro Oriental 50,000,000
Mag-Asawang Tubig and Allied Rivers Flood Mitigation/Control Projects, Construction of Mag-asawang Tubig Flood Control Structure at Camansihan Section, Mindoro Oriental
64,000,000
Mag-Asawang Tubig and Allied Rivers Flood Mitigation/Control Projects, Rehabilitation/Construction of Gabion Revetment at Gutad, Calapan City (Phase I), Mindoro Oriental
20,000,000
Mag-Asawang Tubig and Allied Rivers Flood Mitigation/Control Projects, Rehabilitation/Construction of Gabion Revetment at San Andres Putik, Calapan City, Mindoro Oriental
70,000,000
Mag-Asawang Tubig and Allied Rivers Flood Mitigation/Control Projects, Rehabilitation/Construction of Gabion Revetment at Naujan (Mag-Asawang Tubig), Mindoro Oriental
30,000,000
Mag-Asawang Tubig and Allied Rivers Flood Mitigation/Control Projects, Rehabilitation/Construction of Gabion Revetment at Gutad, Calapan City (Phase II), Mindoro Oriental
20,000,000
Construction/Rehabilitation of Gabawan River Control along Tablas Circumferential Road, Brgy. Gablawan, Odiongan, Romblon
50,000,000
Amnay Flood Control (Pag-asa-Guitong Section), Sablayan, Mindoro Occidental Lone District
50,000,000
Lumintao Flood Control (Tanyag Section), Calintaan, Mindoro Occidental Lone District
50,000,000
Patrick Flood Control (Victoria Section), Sablayan, Mindoro Occidental Lone District 50,000,000
Marinduque DEO 6,000,000Construction of Balimbing-Battle of Paye Site River Control, Boac, Marinduque 2,000,000
Construction of Libtangin River Control, Gasan, Marinduque 500,000
Construction of Tapuyan River Control, Gasan, Marinduque 500,000
Construction of Bintakay River Control, Mogpog, Marinduque 500,000
Construction of Bocboc River Control, Mogpog, Marinduque 1,000,000
Construction of Lapu-Lapu River Control, Sta. Cruz, Marinduque 1,000,000
Construction of Cabuyo River Control, Torrijos, Marinduque 500,000
Mindoro Occidental DEO 151,000,000Labangan River Control (Murtha-Alitaytayan Section), San Jose, Mindoro Occidental Lone District
49,000,000
Busuanga River Control (Manoot Section), Rizal, Mindoro Occidental Lone District 40,000,000
Busuanga River Control (Adela Section), Rizal, Mindoro Occidental Lone District 40,000,000
Maligaya Flood Control, Lubang, Mindoro Occidental Lone District 22,000,000
Mindoro Oriental DEO 110,000,000Construction of Camansihan River Control, Calapan City, Mindoro Oriental 40,000,000
Construction of Bucayao River Control, Calapan City, Mindoro Oriental 30,000,000
Construction of Burbuli River Control, Calapan City, Mindoro Oriental 40,000,000
Romblon DEO 154,354,000Construction of Calagonsao Flood Control Structure, Alcantara, Romblon 1,769,000
Construction of Bonga Flood Control Structure, San Agustin, Romblon 1,451,000
Construction of Buli Flood Control Structure, San Agustin, Romblon 1,445,000
Construction/Rehabilitation of Calunacon Flood Control, Romblon 1,987,000
Construction of Ilauran Flood Control Structure, Romblon 1,492,000
Const./Rehab. of Gabawan River Control, Brgy. Gabawan, Odiongan, Romblon 20,000,000
Construction of slope protection along Tablas Circumferential Road, K0066+000-K0070+000, Brgy. Bachawan, San Agustin, Romblon
39,160,000
Construction/Rehabilitation of Bitaogan River Control along Tablas Circumferential Road, Brgy. Sto. Niño, Sta. Maria, Romblon
43,000,000
Construction od slope protection along Romblon-Cogon-Sablayan Road, K0014+000-K0016+000, Brgy. Ilauran, Romblon, Romblon
27,160,000
Page 22 of 162
details of dpwh’s programs/projects 921
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Poblacion San Fernando Flood Control Project along Sibuyan Circumferential, K000+000-K0001+325, Brgy. Poblacion, San Fernando
16,890,000
Region V 2,073,854,000Regional Office V 932,483,000
Improvement of Bacacay Flood Control Structure, Albay 50,000,000
Improvement of Revetment SOA Bridge, Malinao, Albay 50,000,000
Rehabilitation/Reconstruction of Pandaya Seawall, Sto. Domingo, Albay 50,000,000
Construction/Extension of Brgy. 3 Seawall, Bacacay, Albay 50,000,000
Construction of Brgy. 3 Seawall, Brgy. Malipot, Albay 50,000,000
Construction of Salvacion Seawall, Tabaco City, Albay 50,000,000
Construction of Oas Flood Control Structure, Calsada Section, Albay 50,000,000
Rehabilitation of Guinobatan Flood Control Structure, San Rafael Section, Albay 60,000,000
Rehabilitation of Quinali River Flood Control Structure, Polangui, Albay 60,000,000
Construction of Bacon River Flood Control, Sorsogon 77,412,000
San Isidro Small Water Impounding Project, Donsol, Sorsogon 1st LD 50,000,000
Construction of Pandan Irrigation Canal, Phase III, Castilla, Sorsogon 1st LD 50,000,000
Construction of Rangas River Flood Control, Juban, Sorsogon 75,071,000
Construction of Flood Control Structure along Binanuahan River (Upstream), Juban, Sorsogon 2nd LD
50,000,000
Construction of Flood Control Structure along San Isidro River including the removal of Old Bridge (Obstruction to River Flow), San Isidro, Bulan, Sorsogon 2nd LD
60,000,000
Construction of Flood Control Structure along Cadac-an River (Upstream, Left side), Irosin, Sorsogon 2nd LD
50,000,000
Rehabilitation/Improvement at Lake Bato Eastern Side, Bato, Camarines Sur 5th LD 50,000,000
Albay 1st DEO 290,000,000Construction of San Francisco River Flood Control, Awang, Malinao, Albay 20,000,000
Construction of Cabunturan Flood Control, Malinao, Albay 20,000,000
Construction/ Rehabilitation of Sitio San Antonio River Control Along Basud River, Sto. Domingo, Albay
45,500,000
Construction/ Rehabilitation of Brgy. San Antonio River Control (Downstream) along an Vicnter River, Tabaco City, Albay
39,000,000
Construction/ Rehabilitation of Brgy. Balsa River Control (Downstream) Along Quinale River, Malinao, Albay
42,000,000
Construction/ Rehabilitation of Brgy. Labnig River Control along Quinale River, Labnig, Malinao, Albay
41,500,000
Construction/ Rehabilitation of Awang River Control(Downstream) Francisco/ Tuliw Creek, Malinao, Albay
40,000,000
Construction/Rehabilitaiton of Brgy. Nabas River Conttrol(Upstream) along Nagas/ Taki River, Nagas, Tiwi, Albay
42,000,000
Albay 2nd DEO 243,194,000Construction/ Rehabilitation of lood Control System along Lava Gully at Mabinit River, Legazpi City, Albay
19,778,000
Rehabilitation of Flood Control System along Salvacion River, Daraga, Albay 19,766,000
Rehabilitaionof Flood Control System along Busay River, Daraga, Albay 29,956,000
Rehabilitation of Flood Control System along Bañag River, Daraga, Albay 39,648,000
Construction ofBrgy. 7-Calzada Flood Control System, Camalig, Albay 14,762,000
Rehabilitation of Gapo-Tinago Flood Control System, Camalig, Albay 20,160,000
Rehabilitation of Flood Control system along Taladong River, Taladong, Camalig, Albay
22,103,000
Rehabilitation of Binanuan Flood Control System, Brgy. 2, Camalig, Albay 22,681,000
Construction of Comun-Cotmon Flood Contrl System, Camalig, Albay 24,641,000
Construction of Bascaran Flood Control System, Libod, Camalig, Albay 29,699,000
Camarines Norte DEO 100,000,000Rehabilitation/Improvement of Daet River Control along Camambugan Section, Camarines Norte 2nd LD
20,000,000
Rehabilitation/Improvement of Daet River Control along Brgy. III Section, Camarines Norte 2nd LD
20,000,000
Rehabilitation/Improvement of Daet River Control along Brgy. VIII Section, Camarines Norte 2nd LD
20,000,000
Page 23 of 162
922 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Rehabilitation/Improvement of Daet River Control along Gubat Section, Camarines Norte 2nd LD
10,000,000
Rehabilitation/Improvement of Mercedes River Control (San Roque Section), Camarines Norte 2nd LD
10,000,000
Rehabilitation/Improvement of Basud River Control (Poblacion Section), Camarines Norte 2nd LD
10,000,000
Rehabilitation/Improvement of Mabulao River Control (Brgy. II, Daet Section), Camarines Norte 2nd LD
10,000,000
Camarines Sur 4th DEO 240,000,000Rehabilitation/Improvement at Waras River, Sta. Lucia-San Antonio-Barit River, Nabua, Camarines Sur 5th LD
40,000,000
Rehabilitation/Improvement at Waras River Outfall, Bula and Nabua Section, Camarines Sur 5th LD
20,000,000
Rehabilitation/Improvement at Sto. Domingo-San Isidro-San Ramon Creek, Bula Section, Camarines Sur 5th LD
20,000,000
Rehabilitation/Improvement at Que Lente River-Outfall (Baao Lake) Baao, Camarines Sur 5th LD
40,000,000
Construction/Improvement at San Jose- San Roque-San Nicolas-San Francisco Drainage System, Baao Camarines Sur 5th LD
20,000,000
Rehabilitation/Improvement/ Revetment at Laganac River-Outfall Balatan, Camarines Sur 5th LD
20,000,000
Rehabilitation/Improvement at Salvacion River-Bicol River(outfall) Bula, Camarines Sur 5th LD
20,000,000
Rehabilitation/Improvement at Waras River, downstream Imban Bridge Nabua, Camarines Sur 5th LD
20,000,000
Rehabilitation/Improvement at Barit River, downstream San Miguel Bridge Nabua, Camarines Sur 5th LD
20,000,000
Rehabilitation/Improvement at Barit River, downstream Mampugal Bridge Santiago Old, Nabua, Camarines Sur 5th LD
20,000,000
Masbate 3rd DEO 60,000,000Baybaydagat Dike, Sitio Bacolod along Bito River, San Fernando, Masbate 1st LD 5,000,000
Baybaydagat Dike, Pier Ste along Bito River, San Fernando, Masbate 1st LD 10,000,000
Poblacion Dike along Panisihan River, Batuan, Masbate 1st LD 30,000,000
Poblacion Dike, Dist. No. 2 along Alisoso River, San Jacinto, Masbate 1st LD 15,000,000
Sorsogon 1st DEO 58,177,000Construction of Pangpang River Control, Brgy. Pangpang, Sorsogon City, Sorsogon 9,203,000
Construction of Donsol River Flood Control, Donsol, Sorsogon 48,974,000
Sorsogon 2nd DEO 150,000,000Construction of Flood Control Structure along San Vicente River, Bulan, Sorsogon 2nd LD
40,000,000
Construction of Flood Control Structure along Cadac-an River (Upstream, Right side), Irosin, Sorsogon 2nd LD
30,000,000
Construction of Flood Control Structure along Binanuahan River (Downstream), Juban, Sorsogon 2nd LD
30,000,000
Construction of Groundsill along Cadac-an River (Upstream), Irosin, Sorsogon 2nd LD
30,000,000
Construction of River Protection and Groundsill along Gulang-gulang River (Downstream), Sorsogon 2nd LD
20,000,000
Region VI 1,840,900,000Regional Office VI 1,157,000,000
Construction of River Control (Revetment Wall) along Aklan River, Banga, Aklan 50,000,000
Construction of River Control (Revetment Wall) along Aklan River, Brgy. Jumarap, Banga, Aklan
50,000,000
Construction of River Control (Revetment Wall) along Aklan River, Palale-Linabuan Sur Banga, Aklan
50,000,000
Construction of Revetment at Sibalom River along Ilo-ilo-Antique Road, Antique 50,000,000
Construction of Revetment at Sibalom River along Odiong-Sibalom-San Remigio-Leon Road, Antique
50,000,000
Construction of Revetment at Dalanas River at San Antonio, Barbaza, Antique 50,000,000
Construction of Revetment at Cangaranan River along Bugasdong-Valderrama Road, at Valderrama Bridge, Antique
50,000,000
Construction of revetment with Floodwall in Mandalagan River, Bacolod City, Sta. 0+000 to Sta. 3+000
148,000,000
Page 24 of 162
details of dpwh’s programs/projects 923
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of revetment with Floodwall in Lupit River, Bacolod City, Sta. 0+000-Sta. 3+000
100,000,000
Construction of revetment with Floodwall in Magsungay River, Bacolod City, Sta. 0+000-Sta. 1+500
100,000,000
Pontevedra River Control (Upstream of Agbalo Bridge), Pontevedra, Capiz 1st LD 50,000,000
Panitan River Control (Downstream of Panitan Bridge I), Panitan, Capiz 1st LD 60,000,000
Upgrading of Panay River Control (Upstream of Punta Tabuc Bridge), Roxas City, Capiz 1st LD
50,000,000
Magubilan River Control, Panay, Capiz 1st LD 50,000,000
Cadio Flood Control along Panay River, Capiiz 1st LD 50,000,000
Guimbal Flood Control Structures (Revetment and Scour Protection), Guimbal, Iloilo 1st LD
99,000,000
Aganan Flood Control Project (Jaro-Aganan River), Poblacion, San Miguel, Iloilo 2nd LD
50,000,000
Tigum Flood Control Project (Jaro-Tigum River), Brgy. Tigum, Pavia, Iloilo 2nd LD 50,000,000
Aklan DEO 228,900,000Construction of Bulwang-Laguinbanwa East Revetment Wall, Numancia, Aklan 15,000,000
Construction of Bulwang-Pusiw Revetment Wall, Numancia, Aklan 15,000,000
Construction of Laguinbanwa East-Aliputos Revetment Wall, Numancia, Aklan 10,000,000
Installation of slope protection along Aklan West Road, Nabas, Aklan 38,900,000
Construction of River Control (Revetment Wall) along Tangalan River, Poblacion, Tangalan, Aklan
25,000,000
Construction of Seawall along Jaime Cardinal Sin Avenue, New Washington, Aklan 25,000,000
Construction of Revetment at Cangaranan River along Bugasdong-Valderrama Road, Ilaures, Bugasong, Antique
30,000,000
Construction of Revetment at Dao River along Anini-y-T. Fornier-Hamtic Road, Antique
10,000,000
Construction of Revetment at Diclum River along Anini-y-T. Fornier-Hamtic Road, Antique
10,000,000
Construction of Revetment at Sibalom River along San Remigio-Bugo Road, Antique 25,000,000
Construction of Revetment at Paliwan River along Iloilo-Antique Road, Antique 25,000,000
Capiz 1st DEO 185,000,000Tico River Control (Upstream), Panay, Capiz 1st LD 40,000,000
Construction/ Upgrading of Slope Protections along Iloilo-Capiz Road, K0108+400-K0109+000,Capiz 1st LD
12,500,000
Construction/ Upgrading of Slope Protections along Iloilo-Coast-Capiz Road, K0139+000, Both Sides, Capiz
15,000,000
Construction/ Upgrading of Slope Protections along Iloilo-Coast-Capiz Road, K0168+000-K0171+773, Both Sides, Capiz
15,000,000
Construction/ Upgrading of Slope Protections along Iloilo-Coast-Capiz Road, K0155+000-K0164+000, Both Sides, Capiz
15,000,000
Construction/ Upgrading of Slope Protections along Iloilo-Coast-Capiz Road, K0119+000-K0123+000, Both Sides, Capiz
15,000,000
Construction/ Upgrading of Slope Protections along Jct. National Road Mianay-Duyoc-Calaan-Panitan Road, K0106+600-K0107+250, Both Sides, Capiz 1st LD
5,000,000
Construction/ Upgrading of Slope Protections along Jct. National Road Mianay-Duyoc-Calaan-Panitan Road, K0105+600-K0106+100, Both Sides, Capiz 1st LD
5,000,000
Construction/ Upgrading of Slope Protections along Maayon Jct.-Bailan Road, K0126+000-K0126+180,Left Side, Capiz 1st LD
4,500,000
Construction/ Upgrading of Slope Protections along Maayon Jct.-Bailan Road, K0128+000-K0129+000,Left Side, Capiz 1st LD
13,000,000
Construction of river control system and slope protection works at Ugatan River, Concordia, Nueva Valencia, Guimaras
15,000,000
Construction of river control system and slope protection works at Tigbaw River, San Antonio, Nueva Valencia, Guimaras
15,000,000
Construction of river control system and slope protection works at Salvacion River, Salvacion, Nueva Valencia, Guimaras
15,000,000
Page 25 of 162
924 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Iloilo 4th DEO 40,000,000Tigum Flood Control Project (Jaro-Tigum River), Brgy. Purok I, Poblacion, Pavia, Iloilo 2nd LD
25,000,000
Aganan Flood Control Project (Jaro-Aganan River), Brgy. Buyo, Sta. Barbara, Iloilo 2nd LD
15,000,000
Negros Occidental 1st DEO 80,000,000Construction of flood control structures of Himogaan River along Bacolod North Road, Sagay City, Negros Occ. 2nd LD
25,000,000
Construction of flood control structures of Sangay River along Bacolod North Road, Sagay City, Negros Occ. 2nd LD
25,000,000
Construction of flood control structures of Tan-ao River along Bacolod North Road, Sagay City, Negros Occ. 2nd LD
25,000,000
Widening of Drainage Channel along Bacolod North Road, K00544+222, Manapla, Negros Occ. 2nd LD
5,000,000
Negros Occidental 4th DEO 150,000,000Improvement/Rehabilitation/Construction of Flood Control along Nabuswang Creek and Construction of shoreline protection and spurdikes facing Guimaras Strait, Brgy. Tabao, Valladolid, Negros Occidental
49,136,000
Construction of Flood Control Structure & Drainage Along S00123NR-Bacolod South National Primary Road K0018+487.00-K0018+819.00 (Cubay Creek as an Outfall)
6,714,000
Construction of Flood Control Structure & Drainage Along (S00155NR)-Bacolod South By-Pass National Primary Road, K0019+ (-175.00)-K0021+100.00 (Sampinit as an Outfall)
18,738,000
Construction of Flood Control Structure & Drainage Along ( S00124NR)-Bacolod South (Old Road) National Secondary Road, K0019+(-184.00)-K0019+694 (Sampinit Creek as an Outfall)
17,433,000
Construction of Flood Control Structure/ Drainage along Bacolod South Road( S00127NR) at Tibsok River and Certain Creek at Utod, all leading to Guimaras Straight San Enrique, Negros Occidental, K0033+947.00 to K0037+081.00
43,310,000
Construction of Drainage System and Revetment Wall along Bacolod South Road (Sibud Creek 2 Section) Brgy. Sampinit, Bago City, Negros Occ. 4th LD
14,669,000
Region VII 1,236,723,000Regional Office VII 335,000,000
Construction/Rehabilitation of Flood Control Structures along Mactan Circumferential Road, Lapu-Lapu City
100,000,000
Construction of Catchbasin of Sabangdaku River (Steel Sheet Pile with Coping) at Upstream of CIP Bridge, Second Avenue, North Reclamation Area, Cebu City
105,000,000
Construction of Flood Mitigation Structure along Estero Parian-Colon, Jakosalem St. to Outfall, Cebu City
50,000,000
Construction/Rehabilitation of Canaway River Control, Negros Oriental 80,000,000
Bohol 2nd DEO 63,705,000Sagbayan Flood Control, Sagbayan, Bohol 2nd LD 10,000,000
Cangawa Flood Control, Buenavista, Bohol 2nd LD 10,000,000
Talibon Flood Control, Talibon, Bohol 2nd LD 10,000,000
Inabanga River Control, Inabanga, Bohol 2nd LD 10,000,000
Bacani Flood Control, Clarin, Bohol 2nd LD 5,000,000
Ubay Flood Control, Ubay, Bohal 2nd LD 5,000,000
Calunasan Flood Control, Getafe, Bohol 2nd LD 2,000,000
Zamora River Control, Talibon, Bohol 2nd LD 1,500,000
Trinidad River Control, Trinidad, Bohol 2nd LD 5,750,000
Malitbog River Control, Dagohoy, Bohol 2nd LD 1,350,000
Isumod River Contro, Danao, Bohol 2nd LD 1,380,000
Damiao River Control, Buenavista, Bohol 2nd LD 1,725,000
Bohol 3rd DEO 16,156,000Repair/Rehabilitation of Damaged slope protection along Jagna-Sierra Bullones Road - Abutment "A" & "B" of Mayana Bridge, Km. 77.895; Km. 82.600, Sampong, Mayana, Jagna, Bohol; and Km. 22.500, Dusita, Sierra Bullones, Bohol
4,600,000
Repair/Rehabilitation of slope protection along Loay Interior Road, Quinoguitan, Loboc, Bohol
500,000
Repair/Reblocking/Rehab of damaged slope protection along Tagbilaran East Road - Km. 237.900, Botoc, Loay; and Km. 224.950, Balbalan, Dimiao, Bohol
1,500,000
Repair/Rehabilitation of damaged slope protection along Carmen-Sierra Bullones-Pilar-Alicia Road, Km. 89.700, Bohol
300,000
Page 26 of 162
details of dpwh’s programs/projects 925
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Repair of slope protection (road slip) along Loay Interior Road, Km. 194+600, Gotozon, Loboc, Bohol
9,256,000
Cebu 1st DEO 136,240,000Construction of Flood Control Drainage/Facilities, Bogo-Curva-Medellin-Daan Bantayan Road, Medellin, Cebu, K0111+000-K0117+000
45,000,000
Construction of Flood Control Drainage/Facilities, Bogo-Curva-Medellin-Daan Bantayan Road, Medellin, Cebu, K0103+213-K0104+520
39,000,000
Construction of Flood Control Drainage/Facilities, Cebu North Hagnaya Wharf Road, Bogo City, Cebu, K099+017-K0100+180
16,000,000
Construction of Flood Control/ Drainage Facilitites along Bogo-Curva-Medellin-Bantayan Road Daanbantayan. K0133+400-K0134+120
9,240,000
Construction of Flood Control/ Drainage Facilitites along Bogo-Curva-Medellin-Bantayan Road Daanbantayan. K0107+000-K0108+750
9,000,000
Construction of Flood Control/ Drainage Facilitites along Bogo-Curva-Medellin-Bantayan Road Daanbantayan. K0136+500-K0138+000
18,000,000
Cebu 2nd DEO 179,464,000Rehabilitation/Construction of Flood Control Structure (Gabion Revetment) along Langtad River, Bagac, Naga City, Cebu
17,837,000
Rehabilitation/Construction of Flood Control Structure (Gabion Revetment) along Pakigne River, Minglanilla, Cebu
17,831,000
Rehabilitation/Construction of Flood Control Structure (Gabion Revetment) along Bolinawan River, Carcar City, Cebu
17,727,000
Rehabilitation/Construction of Flood Control Structure (Gabion Revetment) along San Isidro River, San Fernando, Cebu
17,727,000
Rehabilitation/Construction of Flood Control Structure (Gabion Revetment) along Lamacan River, Sibonga, Cebu
17,582,000
Repair/Rehabilitation of Flood Control along Mananga River (downstream), K0010+200 along Natalio Bacalso Avenue, Talisay City, Cebu
45,320,000
Repair/Rehabilitation of Flood Control along Tina-an River (downstream), K0022+100 along Natalio Bacalso Avenue, Naga City, Cebu
45,440,000
Cebu 4th DEO 216,158,000Rehabilitation of Slope Protection including Drainage along Santander-Barili-Toledo Road, K0154+656, Poblacion, Ginatilan, Cebu
35,570,000
Rehabilitation of Slope Protection along Ginatilan River, K0155+056, Poblacion, Ginatilan, Cebu
43,050,000
Repair/Rehabilitation of Damaged River Control Structures of Tapon Bridge I along Santander-Barili-Toledo Road, K0216+858, Tapon, Dumanjug, Cebu
30,355,000
Repair/Rehabilitation of Damaged River Control Structures of Ylaya Bridge along Argao-Ronda Road, K0088+249, Ronda, Cebu
12,918,000
Repair/Rehabilitation of Anahaw Bridge along Argao-Moalboal Road, K0074+716, Argao, Cebu
17,224,000
Repair/Rehabilitation of damaged slope protection structure and improvement drainage structures along Santander – Barili-Toledo Road, K0210+350, Sta. Cruz, Ronda, Cebu
17,224,000
Repair/Rehabilitation of damaged Slope Protection Structure and damaged asphalt pavement along Santander-Barili-Toledo Road, Tapon, Dumanjug, Cebu
6,053,000
Rehabilitation/Improvement of critical/landslide Section along Dalaguete-Mantalongon-Badian Road (Dalaguete Side) Dalaguete, Cebu, K0103+950-K0108+850
15,675,000
Repair/Maint. of slope protection along Dalaguete-Mantalongon-Badian Road and Improvement of Drainage System (box culverts), Manlapay, Dalaguete, Cebu, K0107+950 - K0108+100
13,874,000
Repair/Maint. of slope protection along Argao-Moalboal Road and Improvement of Drainage System (box culverts), Lengigon, Argao, Cebu,
13,874,000
Repair/Maint. of slope protection along Argao-Moalboal Road and Improvement of Drainage System (box culverts), Lengigon, Argao Cebu, K0070+050
3,064,000
Construction of Polo Bridge along Santander-Barili-Toledo Road, Alcantara, Cebu, K0202+800 - K0202+808
7,277,000
Cebu 5th DEO 50,000,000Construction of Flood Control And Drainage Facility along Cebu North-Hagnaya Wharf Road, Compostela (K0021+800-K0023+000)
20,000,000
Construction of Flood Control And Drainage Facility along Cebu North-Hagnaya Wharf Road, Danao City (K0020+000-K0020+800)
10,000,000
Construction of Flood Control And Drainage Facility along Cebu North-Hagnaya Wharf Road, Danao City, (K0027+970-K0028+650)
20,000,000
Cebu City DEO 45,000,000Improvement of Flood Control & Drainage System along P. Lopez-Colon-A. Borromeo, Brgy. Ermita, Cebu City
25,000,000
Page 27 of 162
926 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Mitigation Structure along Jakosalem St., Imus Road to Lahug River, Cebu City
20,000,000
Negros Oriental 2nd DEO 20,000,000Reconstruction/Rehabilitation of River Control, banica River Control (Bagacay Section), Dumaguete City, Negros Oriental 2nd LD
20,000,000
Siquijor DEO 175,000,000Construction/Rehabilitation of Flood Control Structures - Siquijor Lone District 20,000,000
Construction/Rehabilitation of Flood Control Structures - Siquijor Lone District 10,000,000
Construction/Rehabilitation of Flood Control Structures - Siquijor Lone District 20,000,000
Repair/Maintenance of Existing Revetment, Looc River, Maria, Siquijor Lone District 20,000,000
Repair/Maintenance of Existing Revetment, Señora River, Lazi, Siquijor Lone District 35,000,000
Repair/Maintenance of Existing Revetment, Sawang River, Maria, Siquijor Lone District
20,000,000
Construction of Flood Control Structure, Canlambo, Larena, Siquijor Lone District 25,000,000
Construction of Flood Control Structure, Datag, Larena, Siquijor Lone District 25,000,000
Region VIII 1,086,968,000Regional Office VIII 460,000,000
Construction of Flood Control Projects, Labuyao River Control, Samar 1st LD 50,000,000
Construction of Mahayag Flood Control, Brgy. Mahayag, Albuera, Leyte 4th LD 60,000,000
Rehabilitation/Improvement of Flood Control Structures, Pagsanga-an - Cadac-an River Basin, Abuyog, Leyte
50,000,000
Rehabilitation/Improvement of Flood Control Structures, Dunca-an River Basin, (Diking System Mouth to 5 km Upstream), Baybay City, Leyte
50,000,000
Construction of Flood Control Structure along Salog River, Hilongos Proper, Hilongos Leyte 5th LD
50,000,000
Constructionof River Control Structure along Inayupan River, Javier 50,000,000
Construction/Rehabilitation of Catarman River Control Structures (Catarman River Basin), Catarman, 1st District, Northern Samar
50,000,000
Construction of Bantayan River Control Structures (Bantayan River Basin), San Roque, 2nd District, Northern Samar
50,000,000
Construction of Dale River Control Structures (Dale River Basin), San Roque, 2nd District, Northern Samar
50,000,000
Biliran DEO 120,000,000Construction / Extension of Anas Flood Control along Biliran Circumferential Road, Naval, Biliran
30,000,000
Construction / Extension of Catmon Flood Control along Biliran Circumferential Road, Naval, Biliran
20,000,000
Construction / Extension of Caraycaray Flood Control along Biliran Circumferential Road, Naval, Biliran
20,000,000
Construction / Extension of Mapula Flood Control along Biliran Circumferential Road, Naval, Biliran
30,000,000
Construction / Extension of Amambahag Flood Control along Biliran Circumferential Road, Naval, Biliran
20,000,000
Eastern Samar DEO 201,678,000Repair/Rehabilitation/Improvement of Borongan Seawall Brgy. Baybay, Borongan City, Eastern Samar
44,902,000
Repair/Rehabilitation/Improvement of Bato Seawall Brgy. Bato, Borongan City, Eastern Samar
44,776,000
Rehabilitation/Repair of Brgy. Aroganga River Control 18,000,000
Rehabilitation/Repair of Brgy. Libertad River Control 20,000,000
Rehabilitation/Repair of Brgy. Tanawan River Control 17,000,000
Rehabilitation/Repair of Brgy. Caglao-an River Control 12,000,000
Construction of River Control, Brgy 01, Poblacion to Sitio Salak, Brgy. Hinolaso 20,000,000
Costruction of River Control, Brgy. Rizal 15,000,000
Construction of River Control, Brgy. Villahermosa 10,000,000
Leyte 4th DEO 113,100,000Construction of Mahayahay Flood Control along Ormoc-Baybay So. Leyte Boundary Road, Brgy. Mahayahay, Albuera, Leyte
36,100,000
Construction of Salvacion Flood Control along Ormoc-Baybay So. Leyte Boundary Road, Brgy. Salvacion, Albuera, Leyte
37,000,000
Page 28 of 162
details of dpwh’s programs/projects 927
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Palanay Flood Control along Ormoc-Baybay So. Leyte Boundary Road, Brgy. Balugo & Brgy. Damula-an, Albuera, Leyte
40,000,000
Leyte 5th DEO 70,000,000Construction/Rehabilitation of Baybay City Flood Control Structures, Baybay City, Leyte 5th LD
15,000,000
Construction/Rehabilitation of Bato City Flood Control Structures, Bato City, Leyte 15,000,000
Construction/Rehabilitation of Hilongos Flood Control Structure, Hilongos, Leyte 15,000,000
Construction/Rehabilitation of Matalom Flood Control Structures, Matalom, Leyte 10,000,000
Construction/Rehabilitation of Mahaplag Flood Control Structures, Leyte 15,000,000
Northern Samar 2nd DEO 45,000,000Repair/ Improvement of Bantayan River Control along Catarman-Rawis Road, Bantayan-San Roque Section, K0768+165.20 - K0768+394.00, San Roque, Northern Samar
45,000,000
Samar 1st DEO 50,000,000Construction of Flood Control Projects, Jibatang River Control, Samar 1st LD 35,000,000
Construction of Flood Control Structures Brgy. Napuro, Sta. Margarita, Samar 15,000,000
Southern Leyte DEO 27,190,000Construction/Completion of Maasin Flood Control along Tomas Oppus Street (S00222LT), Maasin City, Leyte
27,190,000
Region IX 359,958,000Regional Office IX 100,000,000
Construction/Extension of flood control structure along Layawan River, Polanco Section (downstream), Polanco-Macleodes National Road, K1827+944 - K1828+540, Zamboanga del Norte 1st LD
50,000,000
Construction/Extension of flood control structure along Layawan River, Polanco Section (upstream), Polanco-Macleodes National Road, K1829+580 - K1830+158, Zamboanga del Norte 1st LD
50,000,000
Zamboanga del Norte 1st DEO 89,680,000Construction/Extension of flood control structure along left bank of Dohinob River, Dohinob, Roxas, Zamboanga del Norte 2nd LD
33,416,000
Construction of flood control structure along the left Bank of Piao River, Piao, Roxas, Zamboanga del Norte 2nd LD
42,984,000
Construction/ Extension of Flood Control Structure along the Right Bank of Piao River (Downstream), Brgy. Lawis, Sindangan, Zamboanga Del Norte
13,280,000
Zamboanga Sibugay 1st DEO 65,350,000Flood Control Structure along Sibuguey River Basin - Construction of Flood Control Structure along Jct. Imelda-Alicia Road, (upstream, K0+000 - K0+795), Zamboanga Sibugay
32,750,000
Flood Control Structure along Sibuguey River Basin - Construction of Flood Control Structure along Jct. Imelda-Alicia Road, (downstream, K0+715 - K1+515), Payao, Zamboanga Sibugay
32,600,000
Zamboanga Sibugay 2nd DEO 104,928,000Flood Control Structure along Sibuguey River Basin - Rehabilitation/Improvement of flood control (Phase II) along Sibugay River Basin, Barangay Sibugay, Siay, Zamboanga Sibugay 2nd District
31,340,000
Flood Control Structure along Sibuguey River Basin - Improvement/Repair/Maintenance of Flood Control along Lanao-Pagadian-Zamboanga City Road, K1840+064, Upper Tungawan Bridge, Tungawan, Zamboanga Sibugay
38,800,000
Flood Control Structure along Sibuguey River Basin - Improvement/Repair/Maintenance of Flood Control along Lanao-Pagadian-Zamboanga City Road, Buayan, Kabasalan, Zamboanga Sibugay
34,788,000
Region X 1,327,345,000Regional Office X 1,029,537,000
Reconstruction of Flood Control Dike along Cagayan de Oro River (Cala-cala-Tibasak-Macasandig), Cagayan de Oro City - Sta. 6+764 - Sta. 7+740
128,390,000
Reconstruction of Flood Control Dike along Cagayan de Oro River (Cala-cala-Tibasak-Macasandig), Cagayan de Oro City - Sta. 7+740 - Sta. 8+380
112,030,000
Reconstruction of Damaged Flood Control Works, Revetment along Cagayan de Oro River, Puntod-Consolacion, Cagayan de Oro City - Sta. 1+852 - Sta. 1+870 and Sta. 1+870 - Sta. 2+000
77,396,000
Reconstruction of Damaged Flood Control Works, Revetment along Cagayan de Oro River, Puntod-Consolacion, Cagayan de Oro City - Sta. 1+530 - Sta. 1+695
81,721,000
Construction of Lumad River Control/Drainage System along CCR, Lumad Bridge, Mambajao, Camiguin
100,000,000
Construction of Lumad River Control/Drainage System along CCR, Baylao Bridge, Mambajao, Camiguin
60,000,000
Construction/Rehabilitation of Revetment along Mandulog Bridge I (Upstream), Iligan City Lone District
60,000,000
Page 29 of 162
928 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Rehabilitation of Revetment along Tubod River (Upstream), Tubod, Iligan City Lone District
60,000,000
Construction of Slope Protection (Usugan River) along Ozamiz-Pagadian Road, Bonifacio, Misamis Occidental 2nd LD
50,000,000
Construction of Tagoloan Flood Control Structure, 1+109.13 - 1+707 upstream right bank along Tagoloan River, Misamis Oriental
50,000,000
Construction of slope protection along BCIR (Upstream of Villanueva bridge), Villanueva Misamis Oriental
50,000,000
Construction of Ozamiz City Drainage System, Misamis Occidental 100,000,000
Construction of Tangub City Drainage System, Misamis Occidental 100,000,000
Bukidnon 3rd DEO 36,598,000Rehabilitation of Sayre Highway with slope protection, and road realignment Alae-Kisolon Road (K1459+378-K1459+458), Maluko, Manolo Fortich, Bukidnon
16,424,000
Rehabilitation of Misamis Oriental Bukidnon Agusan Road with Slope Protection (Phase II), K1445+750-K1445+782, Malitbog, Bukidnon
20,174,000
Camiguin DEO 130,000,000Construction of Lumad River Control/Drainage System along CCR, San Roque Bridge, Mahinog, Camiguin
30,000,000
Construction of Lumad River Control/Drainage System along CCR, Aguran Bridge, Sagay, Camiguin
30,000,000
Construction of Lumad River Control/Drainage System along CCR, Sagay Bridge, Poblacion, Sagay, Camiguin
20,000,000
Construction of Lumad River Control/Drainage System along CCR, Maubog Bridge, Mambajao, Camiguin
20,000,000
Construction of Lumad River Control/Drainage System along CCR, Balabagon Bridge I, Mambajao, Camiguin
10,000,000
Construction of Lumad River Control/Drainage System along CCR, Balabagon Bridge II, Mambajao, Camiguin
20,000,000
Lanao del Norte 1st DEO 40,000,000Construction of revetment at Cabuyao River Bank to ptotect Apprached B of Daligdigan Bridge along Salvador-Sapad-Nunungan Road/SOO965MN, K1612+(-243)
40,000,000
Misamis Occidental 2nd DEO 45,000,000Construction of Slope Protection (Downstream) of Migcanaway Bridge 1 along Ozamiz-Pagadian Road, Tangub City, Misamis Occidental 2nd LD
45,000,000
Misamis Oriental 1st DEO 46,210,000Construction of Mambayaan Concrete Revetment Project, Brgy. Mambayaan, Balingasa alongBbalatukan River, Misamis Oriental 1st LD
22,630,000
Construction of Napaliran Concrete Revetment Project, Brgy. Napaliran, Balingasag along Balatukan River, Misamis Oriental 1st LD
23,580,000
Region XI 1,692,565,000Compostela Valley 1st DEO 43,510,000
Manat River Flood Control Structure along Daang Maharlika Road, Brgy. Tapia, Montevista, Compostela Valley
43,510,000
Regional Office XI 810,000,000Construction of Slope Protection, Hijo River, along Agusan-Davao Road, Mawab, Compostela Valley 2nd LD
50,000,000
Construction of Bank Protection along Matiao River, Pantukan, Compostela Valley 2nd LD
50,000,000
Construction of Bank Protection along Tagbalaobao River, Mabini, Compostela Valley 2nd LD
50,000,000
Rechanneling and Bank Protection of Hijo Bridge 1, Hijo River, Maco (Downstream), Compostela Valley 2nd LD
50,000,000
Construction of Mamay Creek Flood Control, Davao City 2nd LD 100,000,000
Construction of Concrete Revetment, Lasang River Flood Control, Davao City 2nd LD 50,000,000
Improvement/Rehabilitation of Davao City Diversion Road Drainage (Laverna Maindrain), Davao City 2nd LD
50,000,000
Construction of Slope Protection, Davao River Flood Control, Tigatto Section 50,000,000
Construction of Slope Protection, Panacan River Flood Control, Panacan 50,000,000
Improvement of Creek, Cabuyagan Creek, Brgy. Sasa 50,000,000
Construction of Concrete Revetment on Steel Sheet Piles along Lipadas River, Toril, Davao City 3rd LD
60,000,000
Tuganay River Basin Flood Control 50,000,000
Construction of Samtalika Protection Works, Poblacion, Malita, Davao Occidental 50,000,000
Page 30 of 162
details of dpwh’s programs/projects 929
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Pamana Protection Works, Brgy. Fishing Village, Malita, Davao Occidental
50,000,000
Protection works/Rechanneling/ Straightening along Culaman River, Malita, Davao Occidental
50,000,000
Davao City DEO 336,563,000Installation of 36'' diam. RCCP and Manholes with cover at Quimpo Blvd., Ecowest Drive, Ecoland, Brgy. Bucana, 76-A, Davao City 1st LD
18,390,000
Improvement/Rehabilitation of Elpidio Quirino, Camus St., Legazpi St. Drainage, Davao City 1st LD
34,000,000
Improvement/Rehabilitation of F. Torres St. to Jacinto Extension Maindrain, Davao City 1st LD
20,000,000
Construction of Davao River Flood Control, Brgy. Maa, Gem Village Section at GEM Village (Sta. 0+000-Sta. 1+555), Davao City
33,173,000
Construction of concrete revetment along Davao River Flood Control (F. Torres Bridge Section) (Upstream), Davao City
40,000,000
Improvement/Construction of Flood Control at Matina River protecting Davao-Cotabato Road, Davao City
15,000,000
Construction of Davao River Flood Control (Ventusa, El Rio Section), Davao City 46,000,000
Construction of Slope Protection, Bunawan Flood Control, Davao City 2nd LD 30,000,000
Construction of Pagimikan Creek, Brgy. Sasa, Davao City 2nd LD 30,000,000
Construction of Slope Protection, Davao River Flood Control, Mandug Section 20,000,000
Construction of Slope Protection, Lasang River Protecting Mabuhay-Pañalum- Paquibato Road
30,000,000
Construction of Concrete Revetment on Steel Sheet Piles along Talomo River, Davao City 3rd LD
20,000,000
Davao del Norte DEO 155,451,000Improvement of Saug River Flood Control, Asuncion, Sta. 0+000-Sta. 0+125, Davao del Norte 1st LD
18,181,000
Rehabilitation of Libuganon River (Downstream) Maniki Jumbo Bridge, Kapalong, Sta. 9+378-Sta. 9+498, Davao del Norte 1st LD
19,526,000
Construction of River Dike (Downstream) along Libuganon River, Brgy. Maniki, Kapalong,Davao del Norte, Sta. 8+604.40 - Sta. 8+731.00, Sta. 9+320.00 - Sta. 9+413.00
27,145,000
Construction of River Dike (Upstream) along Libuganon River, Brgy. Manilki, Kapalong, Davao del Norte, Sta. 11+420.00- Sta.11+690.00, Sta. 11+700.00 - Sta. 11+766.00
32,200,000
Construction of Slope Protection along Tagum-Panabo Circumferential Road, K1466+940 - K1467+240 (with exception), Davao del Norte 1st LD
30,222,000
Rehabilitation of Tuganay River Control, Carmen, Sta. 0+000 - Sta. 1+000, Davao del Norte 2nd LD
8,177,000
Lasang River Flood Control (Upstream and Downstream of Lasang Bridge 20,000,000
Davao del Sur DEO 113,873,000Construction of Flood Control Structure at Digos River, Curvada Section, Davao del Sur Lone District
35,000,000
Construction of Flood Control Structure at Digos River, Brgy. Zone-1, Jumao-as Section, Davao del Sur Lone District
35,000,000
Construction of concrete revetment, Digos River (Cogon Sction at Digos Bridge II Section), Digos City, Davao del Sur Lone District
23,873,000
Construction of concrete revetment, Digos River (Digos Bridge I Section), Digos City, Davao del Sur Lone District
20,000,000
Davao Oriental 1st DEO 140,558,000Construction of Revetment, Masao Flood Control, Baganga, Davao Oriental 1st LD 10,000,000
Construction of Revetment/Sheet Piles, Taytayan Flood Control, Cateel, Davao Oriental 1st LD
20,000,000
Construction of Cabasagan River Control, Boston, Davao Oriental 1st LD 10,000,000
Construction of Flood Control Project, Baguan River Protection, Upper Sitio Puti to Sitio Baliwagan in Brgy. Cabagayan, Tarragona, Davao Oriental
44,424,000
Repair/Maintenance of Flood Control Structure, Boston, Baganga River Control, Davao Oriental
7,333,000
Construction/Maintenance of Quinonoan Flood Control, Tarragona, Davao Oriental 48,801,000
Davao Oriental 2nd DEO 92,610,000Construction of Caraga River Protection, San Jose, Caraga, Davao Oriental 46,861,000
Construction of Bilawan Flood Control, Mati City, protecting President Diosdado P. Macapagal National Highway, Davao Oriental
41,026,000
Page 31 of 162
930 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Mabua Flood Control, Brgy. Matiao, Mati City, protecting President Diosdado P. Macapagal National Highway, Davao Oriental
4,723,000
Region XII 449,950,000Regional Office XII 202,101,000
Construction of bank protection along Cotabato-Marbel Road,(Ambalgan, Sto Niño), (Bambad, Norala), (Km 1723+000, Banga Bridge Section, Banga), South Cotabato
52,101,000
Construction of River Bank Protection (revetment) along Rio de Grande de Mindanao, South Cotabato (Lugay-Lugay Section, Phase II, Lugay-Lugay), Cotabato City
50,000,000
Construction of River Bank Protection (revetment) along Rio de Grande de Mindanao, South Cotabato (Delta Bridge Approches), Cotabato City
50,000,000
Construction of River Bank Protection (revetment) along Matampay River (Matampay Bridge II Approaches), Cotabato City
50,000,000
North Cotabato 2nd DEO 149,993,000Construction of Ugalingan Flood Control along Pulangi River, Ugalingan, Carmen, North Cotabato
49,998,000
Construction of University of Southern Mindanao (USM) Kabacan Flood Control along Kabacan River, USM, Kabacan, North Cotabato
49,998,000
Construction of Lumayong Flood Control Project, Kabacan, North Cotabato 49,997,000
South Cotabato 2nd DEO 40,000,000Construction of Flood Control/ Concrete Revetment along Silway River, PI 16, Brgy. City Heights.
40,000,000
South Cotabato DEO 57,856,000Construction/Upgrading of Luayan Flood Control and Drainage,Structure, Tantangan, South Cotabato
26,449,000
Improvement of Carpenter Hill Flood Control and drainage structures, Barangay Carpenter Hill, Koronadal City, South Cotabato
13,768,000
Construction of bank protection along Cotabato-Marbel Road, Km 1723+000, (Banga Side Section), Banga, South Cotabato
17,639,000
Region XIII 570,000,000Regional Office XIII 500,000,000
Tago CIS Protection Works (Left and Right Bank of Tago River), Surigao del Sur 80,000,000
Construction of Telaje Flood Control, Tandag City, Surigao del Sur 50,000,000
Construction of Main Drainage Canal along Jct. Montilla Blvd-Jct. Ochoa St.-LADP Main Drainage Canal, Butuan City
120,000,000
Construction/Rechanelling of Maon Catchment Area-Villa Kanaga Creek-Calot-Bonbon Creek with Villa Kananga RCBC, Butuan City
150,000,000
Construction/Repair of Butuan City Revetment along Agusan River, Agao Section, Butuan City
100,000,000
Surigao del Norte 2nd DEO 25,000,000Construction/Rehabilitation of General Luna Flood Control Structures, Brgy. Pob. 3, General Luna, Surigao del Norte 1st LD
10,000,000
Construction/Rehabilitation of Dapa-Osmeña Flood Control Structures, Dapa, Surigao del Norte 1st LD
15,000,000
Surigao del Sur 1st DEO 45,000,000Tago CIS Protection Works (Diversion Works), Surigao del Sur 45,000,000
Page 32 of 162
details of dpwh’s programs/projects 931
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
2. 4,050,000,000
National Capital Region 4,050,000,000Central Office 4,050,000,000
Abra River Basin 140,000,000Amburayan River Basin 37,000,000Sinocalan/Marosay River Basin (Dagupan) 29,000,000Patalan/Cayanga/Angalacan River Basin 19,000,000Aringay River Basin 12,000,000Cagayan River Basins 783,000,000Pamplona River Basin 20,000,000Guagua River Basin 46,000,000Santa Rita/Kalaklan River Basin 10,000,000Angat River Basin 26,000,000Malupa-Dian River Basin (Aguang) 19,000,000Agos River Basin 14,000,000Imus River Basin 10,000,000Kinanliman River Basin 10,000,000Kabilugan/Velasco/Batu River Basin (Lake Bicol) 85,000,000Yawa/Basud/Quirangay River Basin 10,000,000Donsol/Manlato River Basin 12,000,000Ilog-Hilabangan River Basin 62,000,000Jalaur River Basin 44,000,000Panay/Mambusao River Basin 66,000,000Bago River Basin 25,000,000Aklan River Basin 29,000,000Mandalagan River Basin (Bacolod City) 10,000,000Cebu-Mandaue River Basin 10,000,000Dungcaan River Basin 10,000,000Daguitan Marabong River Basin 10,000,000Tumaga River Basin 10,000,000Sibugay River Basin 29,000,000Tagoloan River Basin 50,000,000Cagayan de Oro River Basin 39,000,000Dinanggasan River Basin 10,000,000Iponan River Basin 12,000,000Buayan-Malungon River Basin 40,000,000Davao River Basin 57,000,000Tagum-Libuganon River Basin 69,000,000Mindanao River Basin 584,000,000Silway-Apopong-Sinawal River Basin (Polomolok) 17,000,000Tago River Basin 39,000,000Lake Mainit-Tubay River Basin 14,000,000Caguray River Basin 11,000,000Balete River Basin 10,000,000Agus/Buayan River Basin 54,000,000Mataling River Basin 12,000,000Abulug River Basin 79,000,000Bauang River Basin 15,000,000Upstream of Agno River Basin (include Ambayawan, Banila) 162,000,000Pampanga River Basin (Include Rio Chico) 230,000,000Meycauayan River Basin 10,000,000Upper Marikina River Basin 15,000,000East Mangahan River Basin 10,000,000Guinabasan River Basin 10,000,000Tuganay River Basin 22,000,000Lipadas River Basin 10,000,000Talomo River Basin 10,000,000Upper Agusan River Basin 50,000,000
Bararo River 7,000,000Bacarra-Vintar River 18,000,000Balingcuguin/Mabini Pangasinan River 11,000,000Silag-Santa Maria River 9,000,000Buaya River 8,000,000Alaminos/Tagoong River 7,000,000Palanan-Pinacanauan River 22,000,000Banurbour (Lal-loi) River 15,000,000Claveria (Cabicungan) River 8,000,000Baua River 7,000,000Santo Tomas-Gabor River 10,000,000Bucao River 19,000,000Nayum River 7,000,000Calumpang (Kapumpong) River 13,000,000Iyam/Lucena River 7,000,000Domacaa/Tambak (Tayabas) River 7,000,000Umiray River 18,000,000Kaliwa River 14,000,000Tignoan River 7,000,000Lalavinan (Real-2) River 7,000,000General Nakar-2-(b) River 7,000,000General Nakar-2 (a) River 7,000,000Labo River 27,000,000Daet-Basud River 8,000,000Quinale-B River 7,000,000Ragay River 7,000,000Himogaan River 13,000,000Combado (Balamban) River 7,000,000Sapang Dako River 7,000,000Sipocong/Sta. Catalina/Cawitan River 9,000,000Catarman River 18,000,000Pagsanga-an River 15,000,000Disacan-Manukan (Jose Dalman Ponot1) River 8,000,000Mapangi River 37,000,000Maranding River 18,000,000Mandulog River 22,000,000Padada-Mainit River 35,000,000Hijo River 18,000,000Maco River 7,000,000
Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Page 33 of 162
932 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Tran River 23,000,000Siguel River 10,000,000Surigao River 7,000,000Boston River 7,000,000Amnay River 14,000,000Mag-asawang Tubig River 13,000,000Bongabong River 17,000,000Pula River 8,000,000Alag (Malaylay-Baco) River 15,000,000Magbando/Buswanga River 14,000,000Baroc River 7,000,000Pola River 7,000,000Nituan River 11,000,000Mataber River 7,000,000San Juan River 7,000,000Buaya River 13,000,000Cairawan River 7,000,000Sibalom River 20,000,000Dalanas River 7,000,000Tibiao River 7,000,000Sipalay River 10,000,000Mananga River 7,000,000Bantayan River 7,000,000Dale River 7,000,000Cadac-an River 15,000,000Balatukan River 7,000,000
Central Office 50,000,000
Page 34 of 162
details of dpwh’s programs/projects 933
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
c. MFO 3 : MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES 30,463,746,000
1. 29,198,746,000
a. To Airports 1,747,720,000
National Capital Region 1,747,720,000Central Office 1,747,720,000
Region I 20,720,000Ilocos Norte 1st DEO 20,720,000
Ilocos Norte 1st Legislative District 20,720,000Concreting and Improvement of Laoag International Airport-Gabu-Fort Ilocandia Road, Laoag City, Ilocos Norte 1st LD
20,720,000
Region II 48,000,000Batanes DEO 48,000,000
Batanes Lone Legislative District 48,000,000Itbayat Airport to NIA Circumferential Road 48,000,000
Region III 20,000,000Aurora DEO 20,000,000
Aurora Lone Legislative District 20,000,000Construction/Improvement of Access Roads leading to Baler Airport-Airport Road, San Luis, Aurora
20,000,000
Region IV-B 587,500,000Palawan 1st DEO 550,000,000
Palawan 1st Legislative District 550,000,000Access Road to Bantulan-Sandoval Airport, Taytay 250,000,000Concreting of New Ibajay - Mabini - Sandoval Road, Taytay Airport, Palawan 1st LD 100,000,000
Road Opening in Brgy. Port Barton - Brgy. Kemdeng - Brgy. Poblacion leading to San Vicente Airport, Palawan 1st LD
100,000,000
Upgrading (gravel to concrete) of New Quezon-Cheey-San Jose-Decalachao Road leading to Busuanga Airport, Palawan 1st LD
100,000,000
Southern Mindoro DEO 37,500,000Mindoro Oriental 2nd Legislative District 37,500,000
Access road leading to Pinamalayan Airport, Pinamalayan, Oriental Mindoro 37,500,000
Region V 30,000,000Albay 2nd DEO 30,000,000
Albay 2nd Legislative District 30,000,000Access Road Network leading to Bicol International Airport, Construction of Taysan Bridge along Tabon-Tabon - Gabawan - Estanza - Taysan - Puro Road, Legazpi City, Albay 2nd LD
30,000,000
Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations
Page 35 of 162
934 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Region VI 310,000,000Capiz 1st DEO 10,000,000
Capiz 1st Legislative District 10,000,000Upgrading of Access Road (including drainage) leading to Roxas City Airports, Roxas City, Capiz
10,000,000
Iloilo 1st DEO 10,000,000Iloilo 1st Legislative District 10,000,000
Improvement/Construction of Oton-Mambog Road leading to Airport, K0012+(-579)-K0012+(-129), Iloilo 1st
10,000,000
Iloilo 2nd DEO 240,000,000Iloilo 3rd Legislative District 240,000,000
Concreting of Jct. Tabucan-Cabatuan-Consolation-San Miguel (Provincial Road)-Jct. Mandurriao-San Miguel-Alimodia-Maasin-Cabatuan Road leading to Iloilo International Airport, Iloilo 3rd LD
240,000,000
Iloilo 4th DEO 50,000,000Iloilo 2nd Legislative District 50,000,000
Access Road leading to Sta. Barbara Airport, Concreting of Brgy. Café, Sta. Barbara-Radial-Poblacion-Zarraga Road, Iloilo 2nd LD
50,000,000
Region VII 67,000,000Cebu 6th DEO 45,000,000
Cebu 6th Legislative District 45,000,000Rehabilitation/Improvement of Access Road under Marcelo B. Fernan Bridge, Mandaue Side, Mandaue City,Cebu
30,000,000
Rehabilitation/Improvement of U.N. Avenue leading to Mactan-Cebu International Airport and Mactan Beach Resorts, Mandaue City, Cebu
15,000,000
Siquijor DEO 22,000,000Siquijor Lone Legislative District 22,000,000
Improvement of Pasihagon - Cang-alwang Road leading to Siquijor Airport 22,000,000
Region VIII 49,500,000Samar 1st DEO 49,500,000
Samar 1st Legislative District 49,500,000Construction/Widening/Upgrading of Access Roads leading to Brgy. Mangui-noo Seaport to Calbayog Airport
49,500,000
Region IX 30,000,000Zamboanga Sibugay 2nd DEO 30,000,000
Zamboanga Sibugay 2nd Legislative District 30,000,000Construction of Access Roads leading to Ipil Airport, Zamboanga Sibugay 30,000,000
Region X 240,000,000Misamis Oriental 2nd DEO 240,000,000
Misamis Oriental 2nd Legislative District 240,000,000Construction of CDO-Opol-El Salvador-Alubihid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road
100,000,000
Upgrading (gravel to concrete) of road leading to Laguindingan Airport, Alubijid - Laguindingan Airport Section, Misamis Oriental 2nd LD
40,000,000
Upgrading (gravel to concrete) of road leading to Laguindingan Airport, Gitagum - Laguindingan Airport Section, Misamis Oriental 2nd LD
100,000,000
Region XI 80,000,000Davao City DEO 80,000,000
Davao City 1st Legislative District 80,000,000Construction/Improvement/ Widening of Bacaca Road including Bacaca Circumferential Road leading to Davao City International Airport, Davao City 1st LD
80,000,000
Region XIII 15,000,000Surigao del Sur 1st DEO 15,000,000
Surigao del Sur 1st Legislative District 15,000,000Upgrading (gravel to concrete) of NRJ - Tandag Airport - Bioto Road, Tandag City, Surigao del Sur 1st LD
15,000,000
Nationwide 250,000,000Construction/ Improvement of Access Roads leading to Airports 250,000,000
b. To Seaports 3,451,026,000
National Capital Region 3,451,026,000Central Office 3,451,026,000
Region II 83,326,000Batanes DEO 83,326,000
Batanes Lone Legislative District 83,326,000Construction of Basco Port Rotonda, Basco, Batanes 6,000,000Development of Basco Kaychanarianan Port Road to National Road 43,462,470Development of San Antonio Port Road with Bridge including Diversion Canal 33,863,530
Region III 56,900,000Aurora DEO 6,900,000
Aurora Lone Legislative District 6,900,000Construction/Improvement of Access Road leading to Casiguran Seaport, Brgy. Dibacong, Casiguran, Aurora
6,900,000
Zambales 2nd DEO 50,000,000Zambales 1st Legislative District 50,000,000
Subic-Cawag-Balaybay Road, K0000+700-K0001+900, K0005+900-K0007+068 with exception, Subic, Zambales 1st LD
50,000,000
Region IV-A 40,000,000Quezon 2nd DEO 40,000,000
Quezon 2nd Legislative District 40,000,000Construction of Lucena-Diversion Talao-Talao Port Road, Lucena City, Quezon 2nd LD
40,000,000
Region IV-B 969,800,000Palawan 1st DEO 969,800,000
Page 36 of 162
details of dpwh’s programs/projects 935
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Palawan 1st Legislative District 969,800,000Access Road leading to San Fernando Port, El Nido, Palawan 15,000,000Upgrading of Access Road from Coron Town Proper to Borac RoRo Port, Coron, Palawan 1st LD
100,000,000
Little Caramay-TDC-Pandanan leading to proposed port, San Vicente, Palawan 254,800,000
Guadalupe-San Nicolas-Borac RORO Port, Coron, Palawan 300,000,000Decabobo-Buenavista-Turda-Borac RORO Port, Coron, Palawan 300,000,000
Region V 368,400,000Albay 3rd DEO 100,000,000
Albay 3rd Legislative District 100,000,000Construction/Improvement of Guinobatan-Jovellar-Donsol Road leading to Pilar Port, Albay 3rd LD
100,000,000
Camarines Sur 2nd DEO 38,400,000Camarines Sur 3rd Legislative District 38,400,000
Construction/Improvement of Road along Naga-Camaligan Fishing Port, K0441+(-529)-K0443+000, Camaligan, Camarines Sur
38,400,000
Masbate 2nd DEO 150,000,000Masbate 3rd Legislative District 150,000,000
Jct. Morning, Cataingan- Esperanza Port Road, Masbate 3rd LD 150,000,000Sorsogon 1st DEO 80,000,000
Sorsogon 1st LD 40,000,000Construction of Sorsogon City Causeway leading to Sorsogon Port, Sorsogon City, Sorsogon 1st LD
40,000,000
Sorsogon 1st Legislative District 40,000,000Concreting/Rehabilitation of Cumadcad-Macalaya Port Road, Castilla, Sorsogon 1st LD
40,000,000
Region VI 611,600,000Bacolod City DEO 75,000,000
Bacolod City Lone Legislative District 75,000,000Rehabilitation/Improvement of Burgos Extension leading to BREDCO Seaport, Bacolod City Lone District
75,000,000
Iloilo 1st DEO 6,600,000Iloilo 1st Legislative District 6,600,000
Construction of Access Road leading to Guimbal Port, Guimbal, Iloilo 1st LD 6,600,000Iloilo 2nd DEO 350,000,000
Iloilo 4th Legislative District 350,000,000Concreting of Access Road (Poblacion-Naluoyan Section) leading to Dumangas Port, Iloilo
75,000,000
Concreting of Jct. Cayos National Road-Bantud Fabrica-Jct. Coastal Road leading to Dumangas Port, Dumangas, Iloilo 4th LD
35,000,000
Concreting of Jct. Iloilo East Coast Capiz Road Jct. Passi San Enrique Garrita Road leading to Banate Port, Banate, Iloilo 4th
85,000,000
Dilapidated Asphalt Section of the Dumangas-Sapao-Naluoyan Road, Dumangas, Iloilo
75,000,000
Poblacion Zarraga via Brgy Pajo-Libongcogon-Talaugis-Coastal Road leading to RORO Port, Dumangas, Iloilo
80,000,000
Negros Occidental 2nd DEO 160,000,000Negros Occidental 5th Legislative District 160,000,000
Reconstruction of Aguisan Bridge leading to Aguisan Port at Brgy. Aguisan, Himamaylan City, Negros Occidental 5th LD
160,000,000
Page 37 of 162
936 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Negros Occidental 3rd DEO 20,000,000Negros Occidental 6th Legislative District 20,000,000
Access Road leading to Kabankalan RORO Port, Kabankalan City, Negros Occidental 20,000,000
Region VII 64,000,000Bohol 1st DEO 30,000,000
Bohol 1st Legislative District 30,000,000Antequera-Balilihan via Dorol Road leading to Chocolate Hills via Balilihan-Hanopol-Batuan Road from Catagbacan International Cruise Ship Port, Antequera and Balilihan, Bohol
30,000,000
Siquijor DEO 34,000,000Siquijor Lone Legislative District 34,000,000
Rehabilitation/Improvement of Maria-Basac-Larena Road leading to Larena RORO Port, Larena, Siquijor
34,000,000
Region VIII 48,500,000Samar 1st DEO 48,500,000
Samar 1st Legislative District 48,500,000Construction/Widening/Upgrading of Access Roads leading to Brgy. Aguit-Itan Seaport to Calbayog Airport
48,500,000
Region IX 130,000,000Isabela City DEO 50,000,000
Basilan Lone Legislative District 50,000,000Rehabilitation/Concrete Paving of Kinukutan-Lakit Port, Al-Barka, Basilan 50,000,000
Zamboanga Sibugay 2nd DEO 30,000,000Zamboanga Sibugay 2nd Legislative District 30,000,000
Concreting of the Pavement of the Ipil-Magdaup Wharf Road, Ipil, Zamboanga Sibugay
30,000,000
Regional Office IX 50,000,000Tawi-Tawi Lone Legislative District 50,000,000
Construction of Access Road from Sitangkai Port to Tumindao Island, Tawi-Tawi 50,000,000
Region X 20,000,000Misamis Occidental 1st DEO 20,000,000
Misamis Occidental 1st Legislative District 20,000,000Improvement of Access Road from National Highway leading to San Vicente Bajo Port, Oroquieta, Misamis Occidental
20,000,000
Region XI 142,500,000Davao del Sur 2nd DEO 142,500,000
Davao Occidental Lone Legislative District 142,500,000Concreting of Malalag Port, Malalag, Davao del Sur 37,500,000Sitio Alibungog-Brgy. Agdao Road leading to Agdao Port and Tourism destination, Malita, Davao del Sur
25,000,000
Tubalan Road leading to Tubalan Port, Malita, Davao del Sur 80,000,000
Page 38 of 162
details of dpwh’s programs/projects 937
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Region XII 50,000,000Cotabato City DEO 50,000,000
Maguindanao 1st Legislative District 50,000,000Concreting of Access Road leading to Cotabato City Seaport (Timaco Hill Section), Cotabato City, Maguindanao
50,000,000
Region XIII 816,000,000Agusan del Norte DEO 150,000,000
Agusan del Norte 2nd Legislative District 150,000,000Concreting/Improvement of Nasipit-Buenavista-Masao Port Coastal Road, Agusan del Norte 2nd LD
150,000,000
Surigao del Norte 1st DEO 50,000,000Surigao del Norte 2nd Legislative District 50,000,000
Construction of NRJ Cagniog-Cayutan-Canlanipa Port Area Road, Surigao City, Surigao del Norte 2nd LD
50,000,000
Surigao del Norte 2nd DEO 450,000,000Surigao del Norte 1st Legislative District 450,000,000
Concreting/Improvement of Socorro Port-Jct. Songkoy-Sudlon-Sohoton Cove, Siargao, Surigao del Norte 1st LD
150,000,000
Upgrading (gravel to concrete) of Siargao Airport - Cancohoy - Roxas - Sta. Monica Port, Siargao, Surigao del Norte 1st LD
150,000,000
Upgrading (Gravel to Paved) of Dapa Port - Consuelo - Corazon - Sta. Cruz - Sta. Fe -Libertad - Cabitoonan - Catangnan - General Luna Road, Surigao del Norte 1st LD
150,000,000
Surigao del Sur 1st DEO 86,000,000Surigao del Sur 1st Legislative District 86,000,000
Concreting along NRJ to Aras-asan Port, Cagwait, Surigao del Sur 1st LD 10,000,000Concreting along NRJ to Consuelo Port, Cantilan, Surigao del Sur 1st LD 50,000,000Widening of Aras-Asan Port Access Road, Cagwait, Surigao del Sur 1st LD 26,000,000
Surigao del Sur 2nd DEO 80,000,000Surigao del Sur 2nd Legislative District 80,000,000
Construction of Tabon-Labisma Road leading to Lawigan Port, Bislig City, Surigao del Sur 2nd LD
80,000,000
Nationwide 50,000,000Construction/ Improvement of Access Roads leading to Seaports 50,000,000
Page 39 of 162
938 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
c. To Declared Tourism Destinations 24,000,000,000
National Capital Region 24,000,000,000Central Office 24,000,000,000
Region I 2,222,910,000Ilocos Norte 1st DEO 652,910,000
Ilocos Norte 1st Legislative District 652,910,000Construction and Improvement of Lanao-San Isidro Road leading to Bolo River Dam and Darna Falls Road, Dumalneg, Ilocos Norte
150,000,000
Earth and Trail Road leading to Napidad View Deck and Water Falls of Takulao Mataltala and Pao, Dumalneg, Ilocos Norte
150,000,000
Pancian, Pagudpud-Adams Road leading to Difference Waterfalls, Adams, Ilocos Norte
157,660,000
Tangaoan-Pallas Road leading to Paraiso Ecotourism Project Eco and Reforestation Project, Piddig, Ilocos Norte
195,250,000
Ilocos Norte 2nd DEO 300,000,000Ilocos Norte 2nd Legislative District 300,000,000
Improvement/Concreting of Jct. Ilocos Norte-Abra Road leading to Tubeg Viewdeck, Imelda Park, Hercules Mine Access to Mt. Sicapoo Camp Site, Nueva Era, Ilocos Norte
300,000,000
Ilocos Sur 2nd DEO 100,000,000Ilocos Sur 2nd Legislative District 100,000,000
Santiago-San Esteban Coastal Road leading to Santiago Cove, Santiago, Ilocos Sur 100,000,000
La Union 2nd DEO 354,000,000La Union 2nd Legislative District 354,000,000
Construction/Improvement of Aringay-Tubao Alternate Road leading to Asin Hot Spring and Baguio City Aringay-Tubao, La Union
154,000,000
Improvement /Upgrading of Naguilian-Bagulin Road leading to Tuddingan Falls and Kedlap Burial Cave, Naguilian-Bagulin, La Union
200,000,000
Pangasinan 1st DEO 270,000,000Pangasinan 1st Legislative District 270,000,000
Poblacion-Sabangan Road leading to Umbrella Rocks and Abagatanen White Beach, Agno, Pangasinan
100,000,000
Poblacion-San Jose-Namagbagan-Imbo-Tondol Road leading to Tondol Beach, Anda, Pangasinan
170,000,000
Pangasinan 2nd DEO 355,000,000Pangasinan 2nd Legislative District 200,000,000
Concreting of Road from Lingayen Baywalk to Binmaley, Pangasinan 200,000,000Pangasinan 4th Legislative District 155,000,000
Construction and Improvement of San Jacinto-Manaoag Road (From Dagupan City) leading to Our Lady of Manaoag and Miraculous Virgin's Well, San Jacinto-Manaoag, Pangasinan
60,000,000
Construction and Improvement of Urdaneta-Manaoag Road leading to Our Lady of Manaoag Shrine and Miraculous Virgin's Well, Manaoag, Pangasinan
95,000,000
Pangasinan 3rd DEO 113,000,000Pangasinan 6th Legislative District 113,000,000
Concreting of Road leading to Maranum Falls and Sky Plaza, Natividad, Pangasinan 60,000,000
Concreting/Rehabilitation/Improvement of Peralta Road to Mabini San Andres Barangay Road Leading to Mt. Balungao Hot and Cold Springs and Balungao Hilltop Adventure, Balungao, Pangasinan
37,000,000
Rehabilitation/Improvement and Concreting of Barangay Road of San Angel Road leading to San Angel Dam Ecotourism Site, Rosales, Pangasinan
16,000,000
Pangasinan 4th DEO 78,000,000Pangasinan 3rd Legislative District 78,000,000
Concreting/Improvement of Roads leading to Señor Divino Tesoro Shrine, Calasiao, Pangasinan
30,000,000
Construction/Rehabilitation/Improvement along San Carlos to Bocboc Road, San Carlos City, Pangasinan (Phase II)
48,000,000
Cordillera Administrative Region 1,638,469,000Abra DEO 7,500,000
Abra Lone Legislative District 7,500,000Access road leading to Bani Hotspring, Boliney, Abra 7,500,000
Apayao 2nd DEO 315,970,000Apayao Lone District 315,970,000
Poblacion-Lappa-Marag Road leading to Marag Valley,Luna, Apayao 145,200,000Turod-San Gregorio-Shalom-Lussok Road leading to Lussok Cave, Luna, Apayao 170,770,000
Benguet 1st DEO 376,499,000Benguet Lone District 376,499,000
Ballay-Tabio-Tonoman-Bulalacao-Tawangan-Lusod Road leading to Bulalacao Lakes and Mt. Tabeo, Kabayan, Benguet
196,499,000
Guisset-Binga-Baloy-Tinongdan Road leading to Binga Dam and Mt. Ugo, Site for the International Sky Running Event, Itogon, Benguet
180,000,000
Benguet 2nd DEO 271,200,000Benguet Lone District 271,200,000
JNR-Natubleng-Nabalicong-Cabuguiasan-Pacso-Tonglo-Saclalan Road leading to various tourist attractions, Bugias, Benguet
100,000,000
Mangkingao-Am-am via Masca-Sayapot Road leading to Am-am Observatory Rock, Burial Cave, Cada Farm and Kenny Farm, Mankayan, Benguet
171,200,000
Ifugao 1st DEO 195,500,000Ifugao Lone District 195,500,000
Cudog-Mungayang-Kiangan Road leading to Ambuaya Lake, Yamashita Shrine, and Kiyangan Settlement, Kiangan and Lagawe, Ifugao (including construction of bridges)
195,500,000
Ifugao 2nd DEO 150,000,000Ifugao Lone District 150,000,000
Kinakin-Cambulo Road leading to Kinakin and Cambulo Native Villages, Rice Terraces, Banao Rice Terraces, Banaue, Ifugao
150,000,000
Mt. Province DEO 321,800,000Mt. Province Lone District 321,800,000
Page 40 of 162
details of dpwh’s programs/projects 939
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Balili-Suyo-Sagada road leading to Sagada Caves, Burial Caves, Rice Terraces and Waterfalls, Bontoc and Sagada, Mt. Province
36,800,000
Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, Bauko and Tadian, Mt. Province
180,000,000
Maba-ay-Abatan Road leading to various tourism sites, Mabaau-Abatan, Bauko, Mt. Province
35,000,000
Sabangan-Sagada Road leading to Poblacion Sagada, Sumaguing Cave, Hanging Coffins, Bomod-ok Falls,Bokong Falls, "Marcos" Cave, Mt. Province
70,000,000
Region II 572,092,000Cagayan 1st DEO 235,000,000
Cagayan 1st Legislative District 235,000,000Concreting/Improvement of Luga Barangay Road leading to Tabaco, Banggalao, and Ngiwatan Caves, Sta. Teresita, Cagayan
50,000,000
Matara Road leading to Matara Corals & White Sand Beach, Gonzaga, Cagayan 35,000,000
Poblacion Sta. Ana-Marede-Sta. Clara-Patunungan-Sinago Road leading to Boacag Falls & Sinago Coves, Dungeg, Sta. Ana, Cagayan
50,000,000
Poblacion Sta. Ana-Marede-Sta. Clara-Patunungan-Sinago Road leading to Boacag Falls & Sinago Coves, Patunungan, Sta. Ana, Cagayan
50,000,000
Poblacion Sta. Ana-Marede-Sta. Clara-Patunungan-Sinago Road leading to Boacag Falls & Sinago Coves, Sta. Clara, Sta. Ana, Cagayan
50,000,000
Cagayan 2nd DEO 115,092,000Cagayan 2nd Legislative District 115,092,000
Claveria Bay View Boulevard leading to Beach Resorts and Taggat Lagoon and Cave, Claveria, Cagayan
43,480,000
Concreting/Improvement of Magsidel Port-Calayan Poblacion-Sibang Cove Road, Calayan, Cagayan leading to Sibang Cove, Cararangatan Cave, Sibang Cave, Cababaan Cave, Bataraw Fall, Calayan, Cagayan
21,612,000
Paving of shoulders and installation of lightings along Jct. Maguiling-Piat Road leading to Our Lady of Piat Basilica Minore (A National Shrine), Piat, Cagayan
50,000,000
Isabela 1st DEO 22,000,000Isabela 1st Legislative District 22,000,000
Access Road leading to Abuan River-Base Eco-Tourism, Sindon Bayabo, Ilagan City, Isabela
22,000,000
Nueva Vizcaya 1st DEO 36,000,000Nueva Vizcaya Lone Legislative District 36,000,000
Access Road leading to Lower Magat Eco-tourism Park, Diadi, Nueva Vizcaya 36,000,000Nueva Vizcaya 2nd DEO 40,000,000
Nueva Vizcaya Lone Legislative District 40,000,000Upgrading of Jct. Wangal to Capisaan Cave, Kasibu, Nueva Vizcaya 40,000,000
Qurino DEO 124,000,000Qurino Lone District 124,000,000
Road from Maddela River Ecology and Tourism Park to Victoria Waterfalls and Eco-Tourism Park, Aglipay, Quirino
74,000,000
Road leading to Cabaruan Caves and Waterfalls, Maddela, Quirino 50,000,000
Region III 1,107,650,000Aurora DEO 200,000,000
Aurora Lone District 200,000,000Concreting of Road from Casiguran Town Proper leading to Casapsapan Bay and Casapsapan to Diniog Road
200,000,000
Nueva Ecija 2nd DEO 120,000,000Nueva Ecija 4th Legislative District 120,000,000
Construction /Rehabilitation of Access Road through Brgy. Pias leading to Minalungao National Park, General Tinio, Nueva Ecija
120,000,000
Pampanga 1st DEO 113,650,000Pampanga 3rd Legislative District 113,650,000
Aquino By Way-Manila North Road (Via San Jose Malino-Anao Road and Calulut) leading to DMIA Route I, City of San Fernando Pampanga
113,650,000
Pampanga 3rd DEO 124,000,000Pampanga 1st Legislative District 124,000,000
Clark-Angeles-Magalang Road leading to Marquee Mall and Angeles Heritage Zone, Angeles City, Pampanga
124,000,000
Tarlac 2nd DEO 400,000,000Tarlac 3rd Legislative District 400,000,000
Construction of a new Clark-Bamban-Capas Access Road leading to Clark City, Tarlac
200,000,000
Construction of a new Clark Green City-Mac Arthur Access Road leading to Clark Green City, Tarlac
200,000,000
Zambales 1st DEO 150,000,000Zambales 2nd Legislative District 150,000,000
Upgrading of Dampay Salaza Access Road leading to Mount Tapulao Eco Tourism Project, Paluig, Zambales
150,000,000
Region IV-A 1,012,740,000Batangas 1st DEO 1,500,000
Batangas 1st Legislative District 1,500,000Concreting of Barangay Road located in Barangay Nonong Castro, Lemery, Batangas
1,500,000
Batangas 2nd DEO 300,000,000Batangas 2nd Legislative District 300,000,000
Lobo- Malabrigo-Laiya-San Juan Road (Biga Section), Lobo, Batangas 300,000,000Batangas 3rd DEO 200,000,000
Batangas 3rd Legislative District 200,000,000Construction of Coastal Road along Taal Lake Circumferential Road along the Municipalities of San-Nicolas-Sta. Teresita-Alitagtag, Batangas
200,000,000
Batangas 4th DEO 80,000,000Batangas 4th Legislative District 80,000,000
Rehabilitation/Improvement of San Jose-Ibaan Road (Ibaan Section) conjoining the STAR Tollways Entry/Exit at Ibaan, Batangas/Ibaan Section, Ibaan, Batangas
80,000,000
Cavite 2nd DEO 51,540,000Cavite 7th Legislative District 51,540,000
Concreting of Indang-Tagaytay Road via Balagbag Mahabang Kahoy, Cavite 17,340,000Concreting of Maragondon-Alfonso Road, Cavite 34,200,000
Page 41 of 162
940 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Laguna 2nd DEO 40,000,000Laguna 2nd Legislative District 40,000,000
Mt. Makiling Eco-Tourism Road, Los Baños, Laguna 40,000,000Quezon 3rd DEO 122,000,000
Quezon 3rd Legislative District 122,000,000Access Road leading to Catanauan Cove and Beaches, Catanauan, Quezon 122,000,000
Quezon 4th DEO 217,700,000Quezon 4th Legislative District 217,700,000
Construction of Camagong-Villa Norte Eco-Tourism Road, Brgy. Camagong, Brgy. Villa Victoria, Villa Jesus Weste & Villa Norte Alabat, Alabat Island, Quezon
53,300,000
Construction of Concepcion-Ilaya Eco-tourism Road, Plaridel, Quezon 42,400,000Construction of Eco-tourism Road leading to Bantakay Falls and Cave, Brgy. Santa Catalina, Atimonan, Quezon
122,000,000
Region IV-B 2,110,954,000Marinduque DEO 255,812,000
Marinduque Lone Legislative District 255,812,000Construction of access road leading to Luzon Datum Origin National Historical Landmark, Eco-tourism sites and for other purposes, Mogpog, Marinduque
181,765,000
Construction/Improvement of Road Pulang Lupa Historical and Ecotourism Park Road, Poctoy, Torrijos, Marinduque
74,047,000
Mindoro Occidental DEO 140,000,000Mindoro Occidental Lone District 140,000,000
Road leading to Mt. Iglit-Baco National Park, Calintaan, Occidental Mindoro 90,000,000Road leading to Onoda Trail, Brgy. Vigo, Lubang, Occidental Mindoro 50,000,000
Mindoro Oriental DEO 60,000,000Mindoro Oriental 1st Legislative District 60,000,000
Concreting of Malinao-Sta. Isabel-Dao-Bayani Road leading to Naujan Lake National Park, Naujan, Oriental Mindoro
60,000,000
Palawan 1st DEO 340,992,000Palawan 1st Legislative District 340,992,000
Access Road to Jump-off point to Calauit Wildlife Sanctuary, Busuanga, Palawan 33,210,000
New Agutaya-Alimanguhan Tourism Road leading to San Vicente Long Beach, San Vicente, Palawan
45,300,000
Road Connecting Busuanga Airport-Kiwit Road leading to various beaches, island destinations, and World War II Ship Wreck Dive Sites, Busuanga, Palawan
200,000,000
San Jose-Port Barton Road leading to various resorts in Port Barton, San Vicente, Palawan
62,482,000
Palawan 2nd DEO 482,150,000Palawan 2nd Legislative District 482,150,000
Access Road from National Highway leading to Maruyog Eco Park and Mt. Mantalingahan, Brooke's Point, Palawan
115,500,000
Access Road to Sabsaban Falls and Eco Park, Aribungos, Brooke's Point, Palawan 166,650,000
Balabac Circumferential Road (Catagpuan to Melville Lighthouse Road Section), Balabac, Palawan
124,000,000
Construction/Improvement of Access Road from National Road to Tabon Cave 76,000,000
Palawan 3rd DEO 424,500,000Palawan 3rd Legislative District 424,500,000
Bacungan-Simpucan-Bagumbayan-Napsan Road, Puerto Princesa City, Palawan 300,000,000
Construction/Upgrading of Bacungan-Talaudyong Road 124,500,000Romblon DEO 255,000,000
Romblon Lone District 255,000,000Malbog Junction Sta. Fe-Guinbirayan provincial Road leading to San Jose Beaches, San Jose, Romblon
105,000,000
San Jose Circumferential Road leading to various beaches, San Jose, Romblon 150,000,000
Southern Mindoro DEO 152,500,000Mindoro Oriental 2nd Legislative District 152,500,000
Upgrading/Concreting of National Road (Cawacat Jct.) - Balatasan Road leading to white sand coves and various beaches, Bulalacao, Oriental Mindoro
81,000,000
Upgrading/Concreting of San Roque-Libtong-Dangkalan Road leading to Buyayao Island and various beaches, Bulalacao, Oriental Mindoro
71,500,000
Region V 2,369,793,000Albay 1st DEO 360,000,000
Albay 1st Legislative District 360,000,000Cagraray Circumferential Road (Misibis-Cagbulacao-Cagraray-Pigcobohan-Tambilagao Section), Bacacay, Albay leading to Misibis Resort and white beaches, Albay
200,000,000
Sto. Domingo-Misibis Road leading to Cagraray Island via Sula Bridge 160,000,000Albay 2nd DEO 329,846,000
Albay 2nd Legislative District 329,846,000Busay-Pandan-Lacag-Inarado Road leading to Daraga, Albay 21,126,000Construction of Road to Quituinan 67 Japanese Tunnels, Camalig, Albay 95,000,000Mayon-Mariawa-Puro Road leading to Embarcadero de Legazpi and the proposed Bicol International Airport, Albay
173,720,000
Peñafrancia-Gabawan-Kiwalo-Bagumbayan-Ilawod Road leading to Daraga, Albay 40,000,000
Albay 3rd DEO 85,700,000Albay 3rd Legislative District 85,700,000
Upgrading of Pioduran-Donsol road leading to Butanding Site, Pioduran, Albay 85,700,000Camarines Norte DEO 685,000,000
Camarines Norte 1st Legislative District 320,000,000Daet - Talobatib - Batobalani Paracale Road leading to Calaguas Island (Mahabang Buhangin), Pulang Daga Beach & Senakulo to Gumaus Beach and Bula-lakao Beach, Road leading to Calaguas Island(Mahabang Buha-ngin), Pulang Daga Beach & Senakulo to Gumaus Beach and Bulalakao Beach, Camarines Norte
100,000,000
Daet-Labo-Tulay na Lupa Road, Labo - Tulay na Lupa - including Calabasa -Talobatib Road, Camarines Norte
75,000,000
Page 42 of 162
details of dpwh’s programs/projects 941
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Daet-Labo-Tulay na Lupa Road, Matanlang - Calabasa Bridge, Camarines Norte 45,000,000
Daet-Talobatib-Jose Pang. Road leading to Pag asa Beach, Jose Panganiban Monument (National Hero) & Bulalakao beach to Larap to Caroline Island to Bagong Silang - Capalonga Road, Road leading to Pag-asa Beach, Camarines Norte
100,000,000
Camarines Norte 2nd Legislative District 365,000,000Mercedes - Bagasbas Road leading to Bagasbas Beach, Camarines Norte 50,000,000Pres. Cory Aquino Boulevard leading to Bagasbas Beach, Bagasbas-Talisay Section, Camarines Norte
50,000,000
Pres. Cory Aquino Boulevard leading to Bagasbas Beach, Cory Aquino Bridge 1, Camarines Norte
60,000,000
Pres. Cory Aquino Boulevard leading to Bagasbas Beach, Cory Aquino Bridge 2, Camarines Norte
60,000,000
Pres. Cory Aquino Boulevard leading to Bagasbas Beach, San Jose Section, Camarines Norte
110,000,000
Talisay - Vinzons Road, Camarines Norte 35,000,000Catanduanes DEO 150,947,000
Catanduanes Lone District 150,947,000Virac Tourism Corridor (San Andres Virac Coastal Road), Catanduanes 150,947,000
Masbate 1st DEO 327,500,000Masbate 2nd Legislative District 327,500,000
Junction national road Sitio Calulod-B. Titong-Ubongan Dacu Section leading to various tourism sites, Masbate City, Masbate
177,500,000
Road upgrading (Gravel to concrete) of San Juan Alas-Tagpu-Dayao Road leading to Mandaon Ecotourism Sites, Mandaon, Masbate
150,000,000
Sorsogon 1st DEO 130,800,000Sorsogon 1st Legislative District 130,800,000
Upgrading of Donsol-Sta. Cruz Road leading to Butanding, Donsol 130,800,000Sorsogon 2nd DEO 300,000,000
Sorsogon 2nd Legislative District 300,000,000Road improvement of Matnog-Sta. Magdalena-Bulusan Road including construction of two bridges leading to Bulusan National Park, Sorsogon
300,000,000
Region VI 1,732,579,000Aklan DEO 79,500,000
Aklan Lone Legislative District 79,500,000Concreting of Mabini St. leading to Aklan Freedom Shrine, D. Maagma St., Kalibo, Aklan
6,500,000
Const.of Access Rd.to Tourism Site from Sitio Cabudwan leading to Hinugtan Beach. Brgy. Bel-is, Buruanga, Aklan
25,000,000
Construction of Tangalan-Ibajay Road, Aklan 48,000,000Antique DEO 310,509,000
Antique Lone District 310,509,000Brgy. San Antonio-Condez-San Luis-San Vicente-Flores Road leading to Mt. Madia-as (Waterfalls and Mountain Trekking), Culasi, Antique
70,000,000
Concreting of Sto. Rosario - Malumpati Road leading to Malumpati Health Spring and Tourist Resort and Bugang River, Brgys. Sto. Rosario and Guia, Pandan, Antique
40,509,000
Villahermosa-Imparayan-Cabladan-Sitio Apong Road leading to Sibalom Natural Park, Waterfalls Rafflesiaspesiosa Viewing, Gemstone Hunting, Lake "Pako", Bato Pispis and Mountain Trekking, Sibalom, Antique
200,000,000
Bacolod City DEO 50,000,000Bacolod Lone District 50,000,000
Reconstruction/Improvement/Upgrading of Honorato Manalo Road (Buri Road) leading to Bacolod Silay Airport Access Road, Bacolod City
50,000,000
Guimaras DEO 351,570,000Guimaras Lone District 351,570,000
Concordia -Oracon-Botconaway Road, Nueva Valencia, Guimaras 91,324,000Piña-Suclaran Road, San Lorenzo, Guimaras 114,206,000San Miguel - Sebaste Road, Sibunag, Guimaras 146,040,000
Iloilo 1st DEO 560,000,000Iloilo 1st Legislative District 560,000,000
Concreting of Malagyan-Tigmalapad Road leading to Sinuhotan Cave and Tinagong Dagat Lake, Miag-ao, Iloilo
160,000,000
Construction/Improvement of Igbaras-Passi-Igcabugao-Igbolo Road leading to Igcabugao Cave, Igbaras, Iloilo
200,000,000
Construction/Improvement of Tubungan-Igtuble-San Remegio Road leading to Tourism and Agri-Center
200,000,000
Negros Occidental 1st DEO 375,000,000Negros Occidental 1st Legislative District 20,000,000
Road along Jct. National Castellano-Minapasok Road leading to Monkey Sanctuary, Calatrava, Negros Occidental
20,000,000
Negros Occidental 3rd Legislative District 355,000,000Construction/Concreting of Silay-Lantawan-Patag Access Road leading to Patag Valley, Silay City, Negros Occidental
150,000,000
Jct. National Road Talisay-Concepcion-Murcia Road w/exception leading to Campuestuhan Resort, Talisay City, Negros Occidental
205,000,000
Negros Occidental 4th DEO 6,000,000Negros Occidental 4th Legislative District 6,000,000
Concreting of Ayungan-Had-Guadalupe Road leading to Balay Daku, La Carlota City 6,000,000
Region VII 2,188,543,000Bohol 1st DEO 138,375,000
Bohol 1st Legislative District 138,375,000Abatan-Agahay-Busao-Toril-Aghao Road (Cabawan) leading to several tourism sites, Maribojoc, Bohol
138,375,000
Bohol 2nd DEO 254,738,000Bohol 2nd Legislative District 254,738,000
Catigbian-Canmano Road leading to Sagbayan Peak, Chocolate Hills and Danao Adventure Park, Sagbayan, Bohol
37,675,000
Concreting of Cabulao-Ondol (Mabini)-Union (Ubay) Road (access road to nautical highway) leading to Ubay RoRo port, Ubay, Bohol
150,000,000
Concreting of Sinandigan Road (road leading to Sinandigan Boardwalk , Fish Sanctuary and Sinandigan Beach), Ubay, Bohol
52,188,000
Page 43 of 162
942 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Daet-Cambuhat Road leading to Cambuhat Village and Oyster Farm, Buenavista, Bohol
14,875,000
Bohol 3rd DEO 257,080,000Bohol 3rd Legislative District 257,080,000
Jct. (TER) Guindulman-Anda-Badiang Cogtong Road leading to beaches and resorts, Anda, Bohol
61,350,000
Jct. (TER) La-Union-Mabini-Cabulao-Ubay Road (leading to beach areas at Anda and Ubay), Mabini Bohol
195,730,000
Cebu 1st DEO 251,000,000Cebu 4th Legislative District 251,000,000
Completion of Curva - Medellin - Daanbantayan Road, Cebu 151,000,000Upgrading of Sta. Fe-Bantayan-Madredijos Provincial Road, Bantayan Island, Cebu 100,000,000
Cebu 3rd DEO 150,000,000Cebu 3rd Legislative District 150,000,000
Brgy. Bunga-Lamac-Poblacion Road leading to resort and cave, Toledo City, Pinamungajan, Cebu
150,000,000
Cebu 4th DEO 250,000,000Cebu 2nd Legislative District 250,000,000
Brgy. road leading to Malabago-Kalangkang-Sulsogon Kawasan Falls, Badian Cebu 150,000,000
Improvement of Poblacion to Cagsing Road leading to Pedro Calungsod, Ginatilan, Cebu
100,000,000
Cebu 5th DEO 153,000,000Cebu 5th Legislative District 153,000,000
Pilar Circumferential Road leading to beaches, Pilar, Cebu 20,000,000San Francisco-Consuelo-Campo Road, leading to wharf and various resorts, San Francisco, Cebu
66,000,000
San Francisco-Union-Esperanza-Sta Cruz Road leading to beach resorts and Lake Danao, San Francisco, Cebu
32,000,000
Tudela-Poro-San Francisco Road leading to Boho Rock and beaches in Poro, San Francisco, Cebu
35,000,000
Negros Oriental 2nd DEO 322,350,000Negros Oriental 2nd Legislative District 322,350,000
Abante Road leading to Palaypay Falls, Pamplona, Negros Oriental 110,000,000Hanay-Hanay Road Leading to Twin Lake, Negros Oriental 20,350,000Mabinay Road Leading to Niludhan Falls, including Construction of Bridge, Negros Oriental
62,000,000
Poblacion-Bulibulihan-Manlingay-Banban Road leading to Bugsok Falls, Negros Oriental
130,000,000
Negros Oriental 3rd DEO 275,000,000Negros Oriental 3rd Legislative District 275,000,000
Concreting of Road leading to Antulang Resort, Zamboanguita, Negros Oriental 100,000,000
Concreting of Road leading to Casaroro Falls (Poblacion-Calayugan Section), Valencia, Negros Oriental
75,000,000
Improvement of Road leading to Mt. Talinis (Lipayo-Magsaysay Section), Dauin, Negros Oriental
50,000,000
Improvement of Road leading to Twin Bays (Siit-Tambobo Section), Siaton, Negros Oriental
50,000,000
Siquijor DEO 137,000,000Siquijor Lone District 137,000,000
Improvement of Siquijor-Bolos-San Juan Road leading to various beaches, Siquijor 137,000,000
Region VIII 1,864,900,000Biliran DEO 45,000,000
Biliran Lone District 45,000,000Higatangan Circumferential Road leading to Higatangan Island, Naval, Biliran 45,000,000
Eastern Samar DEO 295,000,000Eastern Samar Lone District 295,000,000
Access Road in Brgy. Lalawigan (jump-off point to Divinubo Island), Borongan City, Eastern Samar
10,000,000
Access Road to Borongan-Llorente Closed Canopy Forest Area, Maydolong, Eastern Samar
200,000,000
Construction of Jump-off Point to islands of Makati, San Vicente, and Makalayo, Municipality of Sulat, Eastern Samar
85,000,000
Leyte 4th DEO 289,000,000Leyte 4th Legislative District 289,000,000
Brgy. Magsaysay Buenavista leading to Underwater Cave, Palompon, Leyte 204,000,000Concreting Bgy. Rizal National Highway Tambis Cave, Palompon, Leyte 65,000,000Concreting intersection leading to Liberty Terrestrial Eco Adventure Park, Palompon, Leyte
20,000,000
Leyte 5th DEO 175,000,000Leyte 5th Legislative District 175,000,000
Construction of Junction Abuyog-Silago Road-Cadac-an-Malaguicay Road Section (Malaguicay Falls), Abuyog, Leyte
150,000,000
Rehabilitation/Concreting of Junction Bato-Bontoc Rd.-Buli-Gunhuban Falls Access Road leading to Gunhuban Falls, Bato, Leyte
10,000,000
Rehabilitation/Improvement of Junction National Road to Lintaon Road leading to Lintaon Peak, Baybay City, Leyte
15,000,000
Northern Samar 1st DEO 440,900,000Northern Samar 1st Legislative District 440,900,000
Construction/Concreting of Lagbangan Lake Circumferential Road, San Antonio, Northern Samar
63,400,000
Construction/Concreting of Poblacion (Ward 3) to San Antonio Circumferential Road, San Antonio, Northern Samar
15,000,000
Eco-tourism Roads, Construction of Capul Circumferential Road, Aguin-Landusan-Sawang-Sagaosawan-Jubang-Oson-Poblacion Section, Northern Samar
200,000,000
Eco-tourism Roads, Poblacion- Rock Formation Road, Biri, Northern Samar 162,500,000Samar 1st DEO 50,000,000
Samar 1st Legislative District 50,000,000Access road leading to Bangon Falls, Brgy. Tinaplacan, Calbayog City, Samar 50,000,000
Samar 2nd DEO 250,000,000Samar 2nd Legislative District 250,000,000
Page 44 of 162
details of dpwh’s programs/projects 943
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Concreting of Access Road from Brgy. Polangi - Brgy. Panayuran - Brgy. Literon leading to Lulugayan Falls, Calbiga River and Langun-Gobingob Caves, Calbiga, Samar
150,000,000
Construction of Brgy. Socorro-Guinsorongan-Bunu-anan-Brgy. Ibol Circumferential Road, Catbalogan City, Samar
100,000,000
Southern Leyte DEO 320,000,000Southern Leyte Lone Legislative District 320,000,000
Construction/Improvement of Road leading to Danao Camp Tree Park, Maasin City, Southern Leyte
3,000,000
Construction/Improvement/Concreting of access road leading to Napantao dive site and whale shark watching (Napantao Road), San Francisco, Southern Leyte
40,000,000
Limasawa Circumferential Road, Limasawa, Southern Leyte 45,000,000Ma. Clara-Cagnituan Road leading to Maasin City Tourism Loop (Monte Cueva, Danao Camp Tree Park, St. Francis Javier Shrine, Maasin City Zoo Theme Park, Maasin City, Southern Leyte
132,000,000
Road leading to Cambaro Cave, Macrohon, Southern Leyte 100,000,000
Region IX 1,086,697,000Zamboanga City DEO 221,364,000
Zamboanga City 2nd Legislative District 221,364,000Upgrading (Gravel to Concrete) of Jct.Tagasilay along MCLL Highway Tagasilay-Vitali Section Leading to Merloquet Falls,Vitali, Zamboanga City
221,364,000
Zamboanga del Norte 1st DEO 444,070,000Zamboanga del Norte 2nd Legislative District 444,070,000
Construction/Extension of Dipolog City Boulevard, Dipolog City, Zamboanga del Norte
200,000,000
Junction Manukan town site leading to Libuton Cave, Manukan, Zamboanga del Norte
30,000,000
Road from Jct, Brgy. Cogon Highway leading to Sungkilaw Falls, Dipolog City, Zamboanga del Norte
64,070,000
Upgrading (Gravel to Concrete) of Junction national road Brgy. Don Jose Aguirre section leading to Tulbong Falls, Manukan, Zamboanga del Norte
150,000,000
Zamboanga del Sur 1st DEO 100,000,000Zamboanga del Sur 1st Legislative District 100,000,000
Road Upgrading (Gravel to Concrete) from Junction National Highway Leading to Eriberta Spring Resort, Mahayag, Zamboanga del Sur
100,000,000
Zamboanga Sibugay 2nd DEO 321,263,000Zamboanga Sibugay 2nd Legislative District 321,263,000
Concreting of Road from Jct. National Highway Leading to Busay Falls, Doña Josefa, Ipil, Zamboanga Sibugay
100,000,000
Concreting of Road from Junction National Highway Leading to Looc-Labuan Beach, Tungawan, Zamboanga Sibugay
171,263,000
Impv't./Conc. of Road from Jct. National Highway Leading to Capitol Heights (Phase I - V), Ipil, Zamboanga Sibugay
50,000,000
Region X 1,146,620,000Bukidnon 3rd DEO 100,000,000
Bukidnon 1st Legislative District 100,000,000Access Road leading to Dahilayan Adventure Park, Manolo Fortich, Bukidnon 100,000,000
Cagayan de Oro City 2nd DEO 15,000,000Cagayan de Oro City 2nd legislative District 15,000,000
Access road leading to Dao Heritage Tree and Mapawa Nature Park, Cugman, Cagayan de Oro City
15,000,000
Camiguin DEO 70,000,000Camiguin Lone District 70,000,000
Access road leading to Soda Water Spring, Catarman, Camiguin 30,000,000Upgrading of Cross Country Road from Mainit, Catarman to Mambajao, Camiguin 40,000,000
Misamis Occidental 2nd DEO 789,560,000Misamis Occidental 2nd Legislative District 789,560,000
Concreting of Gandawan-Lake Duminagat Road leading to Lake Duminagat, Bargys Nueva Vista-Gandawan & Lake Duminagat, Don Victoriano, Misamis Occidental
136,400,000
Construction of Banglay-Tangub City to Gala-Ozamiz City, Misamis Occidental 100,000,000
Improvement/Rehabilitation of Tangub City – Cabangcalan – Manga – Bongabong Road leading to watershed park, Tangub City, Misamis Occidental
86,360,000
Ozamiz-Clarin-Tangub-Bonifacio-Don Victoriano Agro-Eco Tourism Hinterland Projects, Gravel portion of SECTION 1: Jct. National Road at Brgy. Segatic, Misamis Occidental
195,000,000
Ozamiz-Clarin-Tangub-Bonifacio-Don Victoriano Agro-Eco Tourism Hinterland Projects, Gravel portions of SECTION 3 of Jct. Stimson Abordo-Jct. Brgy. Kinuman Norte, Misamis Occidental
171,800,000
Sinonoc-Camanse-Tipad Road, Misamis Occidental 100,000,000Misamis Oriental 2nd DEO 172,060,000
Misamis Oriental 2nd Legislative District 172,060,000Road leading to Mahangub, Lubilan & Talabaan Falls, Naawan, Misamis Oriental 119,000,000
Ugrading (Gravel to Concrete) of Road leading to Bible Camp and various beaches, Barra, Opol, Misamis Oriental, Barra, Opol, Misamis Oriental
20,000,000
Upgrading (gravel to Concrrete) of road leading to Sagpulon Waterfalls, Jasaan, Misamis Oriental, Jasaan, Misamis Oriental
33,060,000
Region XI 2,025,784,000Compostela Valley DEO 51,000,000
Compostela Valley 1st Legislative District 51,000,000Concreting of Bantacan Road Leading to Tadia Falls of New Bataan, Compostella Valey
51,000,000
Davao City 2nd DEO 384,000,000Davao City 3rd Legislative District 384,000,000
Improvement/Concreting of Catigan(Jct. Davao-Cotabato Road) - Eden(Uguis) leading to Eden Nature Park, Toril Dist., Davao City
120,000,000
Improvement/Concreting of Mintal-Tacunan-Matina Biao-Biao Escuela Road leading to DECA Wakeboard and Gumamela Caverock Farm, Tugbok Dist., Davao City
32,000,000
Page 45 of 162
944 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Lomondao-Salaysay-Arakan road leading to Mt. Apo, Lomondao, Marilog, Davao City 232,000,000
Davao City DEO 321,460,000Davao City 1st Legislative District 240,960,000
Improvement/Widening of Ecoland Terminal-Aplaya-Jct. Davao-Cotabato Road (Matina Crossing) -Jct. Punta Dumalag Road Leading to Seagull Beach Resort, Pawikan Sanctuary and Felis Beach Resort, Brgy. Matina, Davao City
190,960,000
Mabini Extension w/ Drainage, Road leading to Davao Crocodile Park, Brgy. 9-A, Davao City
50,000,000
Davao City 2nd Legislative District 80,500,000Upgrading/ Reconstruction/ Widening of Buhangin-Cabantian-Communal Road Leading to D' Leonor Inland Resort, Communal, Davao City
80,500,000
Davao Del Norte DEO 670,324,000Davao Del Norte 1st Legislative District 301,000,000
Davao del Norte-Compostela Valley-Agusan del Sur road leading to various tourism sites, San Isidro, Davao del Norte
110,000,000
Del Pilar (San Juan) - New Cortez - San Jose - Carcor leading to Inland Resorts and Panas Waterfalls, Panas, New Corella, Davao del Norte
100,000,000
Impv't/Concreting of Additional 2 Lanes of Jct. Agusan-Davao Road Km.48, Brgy. Canocotan to Jct. Surigao-Davao Coastal Road Leading to Banana Beach, Lanikai Beach Resort & Hijo Port, Tagum City, Davao del Norte
91,000,000
Davao Del Norte 2nd Legislative District 369,324,000Island Garden City of Samal (IGACOS) Circumferential Road, Davao del Norte 150,000,000
Panabo City Coastal Road from Brgy. JP Laurel, Panabo City to La Paz, Carmen leading to Migratory Bird Sanctuary, Mangrove Sanctuary, Mariculture Park, City Baywalk, Panabo City, Davao del Norte
100,000,000
Road Sitio Pasog-Licup-Tagbitan-ag-Sitio Tagluna Leading to Puting Bato and Canibad Resort, Brgy. Aundanao, Island Garden City of Samal, Davao del Norte
119,324,000
Davao Del Sur 1st DEO 360,000,000Davao Del Sur Lone Legislative District 360,000,000
Cogon - Kapatagan - Mainit Road leading to Mt. Apo, Camp Sabros, Mt. Apo Highland Resort, Tudaya Falls, Digos City, Davao del Sur
200,000,000
Construction/Concreting of Kapatagan-Tibolo Road Leading to Cultural/Tribal Communities and School of Living Tradition, Tibolo, Sta. Cruz, Davao del Sur
160,000,000
Davao del Sur 2nd DEO 125,000,000Davao Occidental Lone Legislative District 125,000,000
Concreting of Brgy. Pangyan Road leading to Tudaya Falls, Pangya, Malita, Davao del Sur
100,000,000
Concreting of Tubalan- Alibungog Road leading to Tubalan Cove, Malita, Davao del Sur
25,000,000
Davao Oriental 2nd DEO 114,000,000Davao Oriental 2nd Legislative District 114,000,000
Jct. Menzi-Dahican-Lawigan Road leading to Cinco Masao Beach Resort (Dahican-Lawigan Section), Mati, Davao Oriental
114,000,000
Region XII 520,000,000North Cotabato 1st DEO 80,000,000
North Cotabato 2nd Legislative District 80,000,000Proposed Concreting Ilomavis Highway Jct.-Brgy. Bongolanon Road leading to Tausuvan Falls, Brgy. Bongolanon, Magpet, Cotabato
80,000,000
North Cotabato 2nd DEO 150,000,000North Cotabato 1st Legislative District 150,000,000
Proposed Concreting of Pob. Alamada to Sitio Dulao leading to Asik-asik Falls, Brgy. Dado, Alamada, Cotabato Province
150,000,000
South Cotabato DEO 130,000,000South Cotabato 2nd Legislative District 130,000,000
Concreting of Circumferential Road, Surallah-Lake Sebu-Maitum Junction Purok Rosas -Lamlahak leading to Lang Dulay T'nalak Weaving Center, Lamlahak, Lake Sebu, South Cotabato
50,000,000
Proposed Concreting of Jct. National Highway leading to Tarsier Sanctuary, Tupi, South Cotabato
80,000,000
Sultan Kudarat 1st DEO 120,000,000Sultan Kudarat 1st Legislative District 120,000,000
Concreting of Diversion Road to Norala connecting the Baras Bird Sancturay, Monte Vicenteau and Decela Eco-park, Brgy. Baras, Tacurong City, Sultan Kudarat
120,000,000
Sultan Kudarat 2nd DEO 40,000,000Sultan Kudarat 2nd Legislative District 40,000,000
Concreting of Jct. National Highway leading to Marguez Hotspring, Brgy. Marguez, Esperanza, Sultan Kudarat
40,000,000
Region XIII 1,049,479,000Agusan del Norte DEO 183,042,000
Agusan del Norte 2nd Legislative District 183,042,000Construction/Upgrading of Banza to Magallanes Road leading to Centennial Tree and Beaches, Magallanes, Agusan del Norte
180,000,000
NRJ Tagcatong-Vinapor Road Carmen leading to Jurassic Beach Resort, Bolihon Beach Resort, Diwata Cave, The Rockin Bolihon, Top of the Carmen, Agusan del Norte
3,042,000
Agusan del Sur 1st DEO 153,087,000Agusan del Sur 1st Legislative District 153,087,000
Road Upgrading of NRJ-Azpetia-Mabuhay Road (Leading to BEGA FALLS) Prosperidad, Agusan del Sur
153,087,000
Agusan del Sur 2nd DEO 149,500,000Agusan del Sur 2nd Legislative District 149,500,000
Construction/Improvement of Liboton-Ipas - Hagnaya San Marcos Road leading to Agusan Marsh, Bunawan, Agusan del Sur
149,500,000
Surigao del Norte 1st DEO 203,000,000Surigao del Norte 2nd Legislative District 203,000,000
Circumferential road leading Lake Mainit (Mainit-Poblacion-Tagbuyawan), Mainit Surigao del Norte
200,000,000
Impv't/Conc. of Jct. National Road leading to LUMONDO WATERFALLS & ECO PARK Road, Brgy. Budlingin, Alegria, Surigao del Norte
3,000,000
Surigao del Sur 1st DEO 850,000
Page 46 of 162
details of dpwh’s programs/projects 945
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Surigao del Sur 1st Legislative District 850,000Upgrading of NRJ-Cagwait White Beach Road (WHITE BEACH RESORT), Cagwait, Surigao del Sur
850,000
Surigao del Sur 2nd DEO 360,000,000Surigao del Sur 2nd Legislative District 360,000,000
Concreting of NRJ-Cumawas-TINUY-AN FALLS Road Section with Bridge, Borboanan, Bislig City, Surigao del Sur
160,000,000
NRJ- Dugmanon-Enchanted River- Baculin Road leading to Enchanted River, Talisay, Hinatuan, Surigao del Sur
200,000,000
Nationwide 1,350,790,000Central Office 1,350,790,000
Nationwide 1,350,790,000Construction of Various Access Roads leading to Declared Tourism Destinations 1,350,790,000
Page 47 of 162
946 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
2. Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rain Water Collectors 1,250,000,000
National Capital Region 1,250,000,000Central Office 1,250,000,000
a. Water Supply 350,000,000
b. Septage and Sewerage for Luzon, Visayas, and Mindanao 200,000,000
c. Rain Water Collectors 700,000,000
1. National Capital Region 34,000,0002. Region I 37,400,0003. Cordillera Administrative Region 37,400,0004. Region II 40,800,0005. Region III 51,000,0006. Region IV-A 54,400,0007. Region IV-B 34,000,0008. Region V 54,400,0009. Region VI 54,400,00010. Region VII 51,000,00011. Region VIII 47,600,00012. Region IX 34,000,00013. Region X 44,200,00014. Region XI 30,600,00015. Region XII 30,600,00016. Region XIII 34,000,00017. ARMM 13,600,00018. Nationwide 16,600,000
3. Construction/Rehabilitation of Accessibility Facilities for Physically Challenged Persons 15,000,000
National Capital Region 15,000,000Central Office 15,000,000
Nationwide 15,000,000
II. PROJECTS 94,621,631,000
A. Capital Outlays 94,621,631,000
1. Locally-Funded Projects 78,128,675,000
Buildings and Other Structures 13,341,848,000School Buildings 1,260,950,000
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects 497,100,000National Capital Region 497,100,000
Central Office 247,100,000Construction of the Marine Science Institute (MSI) Building, UP Diliman, Quezon City 4th LD
242,100,000
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Nationwide Allocation
5,000,000
NCR Regional Office 210,000,000Construction of Coastal Laboratory Building of the College of Engineering, UP Diliman, Quezon City 4th LD
60,000,000
Construction of New School of Urban and Regional Planning (SURP) Building - UP Diliman, Quezon City 4th LD
150,000,000
Quezon City 2nd DEO 40,000,000Construction of Wind Tunnel Laboratory Building of the College of Engineering, UP Diliman, Quezon City 4th LD
40,000,000
Local Infrastructure Program 763,850,000National Capital Region 240,950,000
Central Office 47,000,000Construction/Rehabilitation of Various Infrastructure Projects 8,000,000Construction/Rehabilitation of Various Infrastructure Projects, Bataan 2nd LD 12,000,000Construction/Rehabilitation of Various Infrastructure Projects, Cebu 4th LD 3,000,000Construction/Rehabilitation of Various Infrastructure Projects, La Union 1st LD 7,200,000
Construction/Rehabilitation of Various Infrastructure Projects, Palawan 1st LD 2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Pangasinan 5th LD 3,800,000
Construction/Rehabilitation of Various Infrastructure Projects, Sorsogon 2nd DEO 6,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Zambales 2nd LD 5,000,000
Las Piñas-Muntinlupa DEO 43,000,000Construction of School Building, Cupang Senior High School, Barangay Cupang, Muntinlupa City Lone District
30,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Las Piñas City Lone District
2,000,000
Repair / Rehabilitation Jesus Dela Pena National High School, Brgy. Jesus Dela Pena, Marikina City,Las Piñas-Muntinlupa DEO
3,500,000
Repair / Rehabilitation Kalumpang National High School, Brgy. Kalumpang, Marikina City,Las Piñas-Muntinlupa DEO
4,000,000
Repair / Rehabilitation Sto. Nino National High School, Brgy. Sto Nino, Marikina City,Las Piñas-Muntinlupa DEO
3,500,000
Malabon-Navotas DEO 1,000,000Construction of One (1) Classroom School Building, Longos Elementary School, Brgy., Longos, Malabon City, Metro Manila
1,000,000
Metro Manila 1st DEO 112,250,000
Page 48 of 162
details of dpwh’s programs/projects 947
948 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Four (4) Storey Twenty Four (24) Classroom School Building, Salapan Elementary School, San Juan City
48,000,000
Construction/Improvement of Four (4) Storey Sixteen (16) Classroom School Building, Nicanor Ibuna Elementary School, San Juan City Lone District
20,000,000
Construction/Improvement of Four (4) Storey Twenty Eight (28) Classroom School Building, San Juan Elementary School, San Juan City Lone District
5,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Pasig City Lone District 30,000,000
Repair/ Rehabilitation of Two (2) Storey Eighteen (18) Classroom, Rodriguez Building, Kabayanan Elementary School, San Juan City
4,000,000
Repair/Rehabilitation of Two (2) Storey Six (6) Classroom, Industrial Arts Building, San Juan Elementary School, San Juan City
2,750,000
Repair/Rehabilitation of Two (2) Storey Six (6) Classroom, Zamora Building, Pinaglabanan Elementary School, San Juan City
2,500,000
Metro Manila 2nd DEO 5,000,000Construction/Rehabilitation of Various Infrastructure Projects, Parañaque City 1st LD 5,000,000
Metro Manila 3rd DEO 20,000,000Construction/Rehabilitation of Various Infrastructure Projects, Valenzuela City 1st LD 20,000,000
North Manila DEO 1,700,000Construction of Classroom or Academic Building, Gregorio Del Pilar Elementary School, Jose Abad Santos, Tondo, Manila, Metro Manila
1,700,000
Quezon City 1st DEO 2,000,000Construction of Talayan Daycare Extension, Brgy. Talayan, Quezon City, Metro Manila
2,000,000
Quezon City 2nd DEO 8,000,000Construction/Completion of school building, Dona Juana Elementary School 2,000,000Construction/Completion of school building, San Agustin Elementary School 2,000,000Construction/Completion of school building, Tomas Morato Elementary School 1,000,000
Improvement/Repair of School Building, Quirino High School, Molave St. Project 3, Quezon City, Metro Manila
1,000,000
Repair and improvement of day care center, Carlos Albert High School 2,000,000
South Manila DEO 1,000,000Construction Of Daycare Brgy. 775 Dist. V-Manila, Onyx St. Cor. Estrada St., San Andres, Manila
1,000,000
Region I 14,050,000Ilocos Norte 1st DEO 3,500,000
Construction of Bangui Central School Building, Barangay Poblacion, Bangui, Ilocos Norte
2,500,000
Construction/Improvement of Two (2) Classroom School Building, Apaya Elementary School, Brgy. 39, Sta. Rosa, Laoag City, Ilocos Norte
1,000,000
Ilocos Sur 1st DEO 7,150,000Construction of 2-Classroom School Buiding at Lingsat Elementary Sch., Lingsat, Bantay, Ilocos Sur 1st LD
2,000,000
Construction of 2-Classroom School Building at Banaoang Elem. Sch., Banaoang, Bantay, Ilocos Sur 1st LD
2,000,000
Construction of 3-Classroom School Buiding at Caoayan Central School, Poblacion, Caoayan, Ilocos Sur 1st LD
3,150,000
Ilocos Sur 2nd DEO 1,700,000Construction of 2 Classroom Bldg. at Dili National High School, Sta Cruz, Ilocos Sur 1,700,000
La Union 1st DEO 1,700,000Construction of 2 Classroom Bldg. at Patpata Elem. School, Balaoan, La Union 1,700,000
Cordillera Administrative Region 11,000,000Apayao 1st DEO 3,500,000
Construction/Improvement of Apayao State College (Conner Campus) Academic Building, Brgy. Cubet, Conner, Apayao
3,500,000
Apayao 2nd DEO 7,500,000Construction/Improvement of PDMSAT-Sta. Filomena Annex School building, Brgy. Sta. Filomena, Calanasan, Apayao
7,500,000
Region II 57,700,000Batanes DEO 17,000,000
Construction of Batanes General Comprehensive High School Classrooms, Barangay Kayuganan, Uyugan, Batanes
2,200,000
Construction of Batanes National Science High School Classrooms, Barangay San Antonio, Basco, Batanes
4,600,000
Construction of Diptan Elementary School Second Floor, Barangay San Antonio, Basco, Batanes
3,500,000
Construction of Itbayat Agricultural High School Classrooms, Barangay San Rafael, Itbayat, Batanes
3,500,000
Construction of Itbud Integrated School Classrooms, Barangay Itbud, Uyugan, Batanes
2,200,000
Rehabilitation of Basco Central School (Gabaldon Bldg.), Barangay San Antonio, Basco, Batanes
1,000,000
Cagayan 1st DEO 16,000,000Construction of School Building at Aparri East National High School (3 CL), Brgy. Maura, Aparri, Cagayan 1st LD
3,000,000
Construction of School Building at Aparri East National High School, Brgy. Maura, Aparri, Cagayan 1st LD
3,000,000
Page 49 of 162
details of dpwh’s programs/projects 949
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of School Building at Basao Elementary School (3 CL), Brgy. Basao, Gattaran, Cagayan 1st LD
3,000,000
Construction of School Building at Basao Elementary School, Brgy. Basao, Gattaran, Cagayan 1st LD
3,000,000
Construction of School Building at Looc Primary School (2 CL), Sitio Looc, Brgy. Pateng, Gonzaga, Cagayan 1st LD
2,000,000
Construction of School Building at Looc Primary School, Sitio Looc, Brgy. Pateng, Gonzaga, Cagayan 1st LD
2,000,000
Cagayan 3rd DEO 14,200,000Construction of 1 classroom at Casingsingan Elementary School, Casingsingan Sur, Amulung, Cagayan 3rd LD
1,000,000
Construction of 1 classroom at Cordova Elementary School, Brgy. Cordova, Amulung, Cagayan 3rd LD
1,000,000
Construction of 1 classroom at Malabbac Elementary School, Brgy. Malabbac, Iguig, Cagayan 3rd LD
1,000,000
Construction of 1 Classroom at Nangalassauan Elementary School, Brgy. Nangalassauan, Amulung, Cagayan 3rd LD
1,000,000
Construction of 2 Classrooms at Annafunan Elementary School, Annafunan East, Tuguegarao City, Cagayan 3rd LD
1,700,000
Construction of 2 classrooms at Carattacat Elementary Sch. Carattacat, Amulung, Cagayan 3rd LD
1,700,000
Construction of 2 classrooms at Centro Southwest Elementary School, Brgy. Centro Southwest, Solana, Cagayan 3rd LD
1,700,000
Construction of 2 classrooms at Concepcion Elementary School, Brgy. Concepcion, Amulung, Cagayan 3rd LD
1,700,000
Construction of 2 classrooms at Linao Elementary School, Brgy. Linao North, Tuguegarao City, Cagayan 3rd LD
1,700,000
Construction of 2 classrooms at North East District, Brgy. Caggay, Tuguegarao, City 3rd LD
1,700,000
Isabela 1st DEO 6,000,000Construction of a 2 Classroom School building, Gayong-Gayong Sur Integrated School, Brgy. Gayong-Gayong, San Antonio District, Ilagan City, Isabela
2,000,000
Construction of a 4 Classroom School building, Ilagan Sport High School, Annex of Isabela National High School, Brgy. Alibagu, Ilagan City, Isabela
4,000,000
Isabela 2nd DEO 500,000Construction of Barangay Munoz West Day Care Center, Barangay Munoz West, Roxas, Isabela 2nd LD
500,000
Isabela 3rd DEO 2,000,000Construction of 2-Classroom School Building, Barangay Villa Concepcion, Cauayan City, Isabela 3rd LD
2,000,000
Nueva Vizcaya 1st DEO 2,000,000Construction, Quezon NHS Bldg., Quezon, Nueva Vizcaya 2,000,000
Region III 115,000,000Aurora DEO 5,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Aurora Lone District 5,000,000
Bulacan 1st DEO 21,000,000Const. of 1 Storey 2 Classroom Building at Dona Candelaria Meneses Duque H/S, Bulakan,Bulacan
2,000,000
Construction of 1 Storey 2 Classroom Building at Buga E/S, Sta. Elena, Hagonoy, Bulacan
2,000,000
Construction of 1 Storey 2 Classroom Building at Pugad, Hagonoy, Bulacan 2,000,000Construction of 1 Storey 2 Classroom Building at Tibaguin, Hagonoy, Bulacan 2,000,000
Construction of 1-storey, 1-classroom school building Cupang Elementary School Brgy. Cupang, Pandi, Bulacan
1,000,000
Construction of 1-storey, 1-classroom school building Malibong Matanda Elementary School Brgy. Malibong Matanda, Pandi, Bulacan
1,000,000
Construction of Day Care Center Brgy. San Roque, Paombong, Bulacan 1,000,000Construction of Day Care Center Brgy. Camachilihan, Bustos, Bulacan 1,000,000Construction of Day Care Center Brgy. Hinukay, Baliuag, Bulacan 1,000,000Construction of Day Care Center Brgy. Malamig, Bustos, Bulacan 1,000,000Construction of Day Care Center Brgy. Sabang, Baliuag, Bulacan 1,000,000Construction of Day Care Center Brgy. Sto. Niño, Baliuag, Bulacan 1,000,000Construction of Day Care Center Brgy. Tarcan, Baliuag, Bulacan 1,000,000Construction of Day Care Center Brgy. Tibag, Baliuag, Bulacan 1,000,000Construction of Day Care Center Brgy. Zone 1, Bagong Nayon, Baliuag, Bulacan 1,000,000
Construction of two (2) Classroom School Building, Iba Elementary School, Hagonoy, Bulacan 1st LD
2,000,000
Bulacan 2nd DEO 18,300,000Construction of (Day Care Center), Bagong Buhay II, San Jose del Monte City Lone District
1,000,000
Construction of (Day Care Center), Sta.Cruz I, San Jose del Monte City Lone District 1,000,000
Construction of 1-storey, 2-clasroom Trade Building, Binagbag National High School, Brgy. Binagbag, Angat, Bulacan
1,800,000
Construction of Day Care Center Brgy. Ibayo, Marilao, Bulacan 1,000,000Construction of Day Care Center Brgy. Pinaod, San Ildefonso, Bulacan 1,000,000Construction of Day Care Center Brgy. Sapang Putol, San Ildefonso, Bulacan 1,000,000
Construction of Day Care Center, Alagao, San Ildefonso 3rd LD 1,000,000Construction of Day Care Center, Brgy. Calumpang, San Miguel, Bulacan 1,000,000Construction of Day Care Center, Cambio, San Miguel 3rd LD 1,000,000Construction of Day Care Center, Lico, San Rafael 3rd LD 1,000,000Construction of Day Care Center, Poblacion, San Rafael 3rd LD 1,000,000Construction of Day Care Center, San Roque, Angat 3rd LD 1,000,000Construction of Day Care Center, Sumandig, San Ildefonso 3rd LD 1,000,000Construction of Day Care Center, Tukod, San Rafael 3rd LD 1,000,000Construction of School Building, Baybay Elementary School, Baybay, Angat 3rd LD 1,750,000
Page 50 of 162
950 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of School Building,Tibagan Elementary School, Tibagan, San Miguel 3rd LD
1,750,000
Nueva Ecija 1st DEO 2,000,000Construction Of Day Care Center, San Ricardo, Talavera, Nueva Ecija 1st LD 1,000,000
Construction Of Day Care Center, St. John District, Guimba, Nueva Ecija 1st LD 1,000,000
Nueva Ecija 2nd DEO 3,500,000Construction of one (1) Classroom School Building, St. Joseph Elementary School, Brgy. Macabaclay, Gapan City, Nueva Ecija
1,000,000
Construction of School Building at Cesar E. Vergara Memorial High School, Purok 4, Barangay Lagare, Cabanatuan City, Nueva Ecija
2,500,000
Pampanga 1st DEO 6,400,000Construction of 2-classroom School Building, Pescadores ES, Candaba, Pescadores, Candaba, Pampanga 4th LD
1,700,000
Construction of 2-classroom School Building, Sta. Monica ES, San Luis, Sta. Monica, San Luis, Pampanga 4th LD
1,700,000
Improvement of School Building in Suclaban Elementary School, Suclaban, Mexico, Pampanga 3rd LD
3,000,000
Pampanga 2nd DEO 8,000,000Construction of High School Building in Remedios, Lubao, Pampanga 2,000,000Construction of National High School Building in San Pablo 2, Lubao, Pampanga 2,000,000
Construction of School Building in Floridablanca Community College, Solib, Floridablanca, Pampanga
2,000,000
Repair of School Building in San Agustin Elementary School in Brgy. San Agustin, Lubao, Pampanga
2,000,000
Pampanga 3rd DEO 1,700,000Classroom Construction for Sto. Domingo Integrated School, Sto.Domingo, Angeles City, Pampanga 1st LD
1,700,000
Tarlac 1st DEO 40,000,000Construction of Administration Building, Tarlac Agricultural College 40,000,000
Tarlac 2nd DEO 1,000,0001 SPED Classroom, San Jose Elementary Public School, San Jose, Concepcion, Tarlac 1,000,000
Zambales 1st DEO 6,000,000Construction of School Building of Ramon Magsaysay Technological University (Sta. Cruz Campus), Barangay Naulo, Sta. Cruz, Zambales 2nd LD
6,000,000
Zambales 2nd DEO 2,100,000Rehabilitation of Day Care Center, Barangay Central, San Marcelino, Zambales 1st LD
800,000
Rehabilitation of Day Care Center, Barangay Nagbunga, Castillejos, Zambales 1st LD 500,000
Rehabilitation of Day Care Center, Barangay West, Olongapo City, Zambales 1st LD 800,000
Region IV-A 51,150,000Batangas 1st DEO 20,000,000
Construction of 12 CL 2-Storey School Building 20,000,000
Batangas 4th DEO 2,000,000Improvement/Rehabilitation of School Building, Barangay Lumbang, Lipa City, Batangas
2,000,000
Cavite DEO 11,500,000Construction of 2 storey 2 classroom School Building with 1 classroom on top of stage at Longos ES, Longos, Bacoor, Cavite,Cavite DEO
4,500,000
Construction of 2 storey 2 classroom School Building with covered court at Ligas ES, Ligas 2, Bacoor, Cavite ,Cavite DEO
3,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Cavite 5th LD 4,000,000
Laguna 1st DEO 6,550,000Construction of 2sty, 4cl at Laguna State Polytechnic University - Bubukal, Sta. Cruz ,Laguna 4th LD
6,550,000
Quezon 1st DEO 4,600,000Construction of 2CL School Building at San Miguel E/S, Brgy. San Miguel, Mauban, Quezon
2,200,000
Construction/Improvement1 CL at Patnanungan Norte NHS Extension, Brgy. Patnanungan Norte, Patnanungan, Quezon 1st LD
500,000
Construction/Imrpovement of Academic Building at Polillo Central E/S, Brgy. Poblacion, Polillo, Patnanungan, Quezon 1st LD
600,000
Rehabilitation and Repair of 2-Storey, 6-CL E-Type School building at Infanta NHS, Brgy. Poblacion 39, Infanta, Quezon 1st LD
1,300,000
Quezon 2nd DEO 4,500,000Construction of 3-Classroom Building, Del Rosario Elementary School, Brgy. Del Rosario, Tiaong, Quezon
2,500,000
Construction of Two (2) Storey School Building, Barangay Sta. Catalina, Candelaria, Quezon
2,000,000
Rizal 1st DEO 2,000,000Repair/Rehabilitation of Prototype Building, Sta. Ana Elementary School, Sta. Ana, Taytay, Rizal 1st LD
2,000,000
Region IV-B 30,500,000Mindoro Occidental DEO 2,000,000
Repair/Rehabilitation of School Building, Balansay Elementary School, Barangay Balansay, Mamburao, Occidental Mindoro
2,000,000
Page 51 of 162
details of dpwh’s programs/projects 951
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Mindoro Oriental DEO 2,000,000Construction of Puerto Galera Technical and Vocational School Building, Barangay Poblacion, Puerto Galera, Oriental Mindoro
2,000,000
Palawan 2nd DEO 22,000,000Construction of one (1) Classroom School Building, Amas ES, Brgy. Amas, Brooke's Point, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Aramaywan ES, Brgy. Aramaywan II, Narra, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Brgy 3 E/S, Brgy. 3, Poblacion, Balabac, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Bunog ES, Brgy. Bunog, Rizal, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Caguisan Annex ES, Brgy. Campong Salang, Balabac, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Calategas ES, Brgy. Calategas, Narra, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Campung Ulay ES, Brgy. Campung Ulay, Rizal, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Maasin NHS Isugod Annex, Brgy. Isugod, Quezon, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Malitub ES, Brgy. Malitub, Bataraza, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Marangas ES, Brgy. Marangas, Bataraza, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Narra-Narra ES, Brgy. Narra-Narra, Bataraza, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Oring-oring ES, Brgy. Oring-oring, Brooke's Point, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Pinaglabanan NHS, Brgy. Pinaglabanan, Quezon, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Princess Urduja NHS, Brgy. Princess Urduja, Narra, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Pulot Center NHS, Brgy. Pulot Center, S. Española, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Pulot NHS Punang Extension, Brgy. Punang, S. Española, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Puring ES, Brgy. Puring, Bataraza, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Sitio Sicud ES, Brgy. Candawaga, Rizal, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Tabud ES, Brgy. Tabud, Bataraza, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Taburi ES, Brgy. Taburi, Rizal, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Tagolango ES, Brgy. Tagolango, Bataraza, Palawan 2nd LD
1,000,000
Construction of one (1) Classroom School Building, Tubtub ES, Brgy. Tubtub, Brooke's Point, Palawan 2nd LD
1,000,000
Palawan 3rd DEO 2,000,000Construction of School Building, Barangay San Miguel, Puerto Princesa City, Palawan 3rd LD
1,000,000
Construction of School Building, Barangay San Rafael, Puerto Princesa City, Palawan 3rd LD
1,000,000
Romblon DEO 2,500,000Construction of Three (3) Classroom School Building, Barangay Pinamihagan, San Jose, Romblon
2,500,000
Region V 18,400,000Albay 2nd DEO 3,000,000
Construction of School Building, Camalig Community College, Camalig, Albay 2nd LD 3,000,000
Albay 3rd DEO 1,700,000Construction of 2 Classroom Bldg. at La Medalla Elementary School, Pioduran, Albay 1,700,000
Camarines Sur 1st DEO 2,000,000Construction of School Building, Barangay Caranan, Pasacao, Camarines Sur 2,000,000
Camarines Sur 5th DEO 5,000,000Construction of Day Care Center, Barangay Colacling, Lupi, Camarines Sur 1,000,000Construction of Day Care Center, Barangay Lubigan Jr. , Sipocot, Camarines Sur 1,000,000
Construction of Day Care Center, Barangay Malaguico, Sipocot, Camarines Sur 1,000,000
Construction of Day Care Center, Barangay Poblacion Zone 1, Del Gallego, Camarines Sur
1,000,000
Construction of Day Care Center, Barangay San Rafael, Ragay, Camarines Sur 1,000,000
Catanduanes DEO 5,700,000Classroom Construction of Simamla Elem. School, Simamla, Virac, Catanduanes 1,700,000
Construction of 1-classroom school building in Palta National High School, Virac, Catanduanes Lone District
1,000,000
Construction of Alternative Learning System (ALS) Building (1-classroom school building) in Bagamanoc Central Elementary School, Bagamanoc, Catanduanes Lone District
1,000,000
Multi Purpose Building – Bacak Elem School 2,000,000
Sorsogon 2nd DEO 1,000,000Construction of One (1) Classroom School Building, Talainga, Sta. Magdalena, Sorsogon
1,000,000
Region VI 9,700,000Antique DEO 4,000,000
Page 52 of 162
952 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of 2 Classrooms Elementary School, Cabunga-an, San Remigio, Antique Lone District
2,000,000
Construction of 2 Classrooms Elementary School, San Juan, Culasi, Antique Lone District
2,000,000
Iloilo 2nd DEO 1,000,000Construction of School Building, Cag-an Elementary School, Anilao, Iloilo 4th LD 1,000,000
Negros Occidental 2nd DEO 4,700,000Construction of 2 Classroom Bldg. at Isabela East Elementary School, Brgy. 7, Isabela, Negros Occidental
1,700,000
Construction of Three (3) Classroom School Building, Guinpana – an National HighSchool, Montilla Extension, Moises Padilla, Negros Occidental
3,000,000
Region VII 68,900,000Regional Office VII 50,000,000
Construction of HRM Building at Lapu-Lapu City College (Phase II) at Barangay Gun-ob, Lapu-Lapu City Lone District
50,000,000
Bohol 1st DEO 3,400,000Construction of School Building in Alburquerque Central Elementary School in Barangay Poblacion, Municipality of Alburquerque, Province of Bohol
1,700,000
Construction of School Building in San Roque National High School in Barangay Poblacion, Municipality of Alburquerque, Province of Bohol
1,700,000
Bohol 2nd DEO 5,000,000Construction of Day-care Center in Barangay Kauswagan Sur, Municipality of San Isidro, Province of Bohol
1,000,000
Four unit classroom 4,000,000
Cebu 5th DEO 4,000,000Construction of 4 classrooms at Catmon Integrated School (formerly Catmon Central School)
4,000,000
Cebu 6th DEO 6,500,000Construction of 1-Storey, 3-CL School Building (ready for 3-storey building) at Cubacub ES, Brgy. Cubacub, Mandaue City, Cebu 6th LD
4,000,000
Construction of Two Classrooms at Casili ES, Mandaue City 2,500,000
Region VIII 6,900,000Biliran DEO 1,000,000
Construction of DayCare Center, Barangay Marvel, Caluba, Biliran Lone District 1,000,000
Leyte 1st DEO 2,200,000Construction of 2-Classrom School Building Montaño Elementary School 2,200,000
Northern Samar 2nd DEO 2,000,000Construction of Multi-Purpose Building (School Library), Pambujan National High School, Sixto Balanquit Boulevard, Pambujan, Northern Samar
2,000,000
Southern Leyte DEO 1,700,000Construction of School Building in Libagon National High School, Barangay Poblacion, Libagon, Southern Leyte
1,700,000
Region IX 35,500,000Regional Office IX 1,700,000
Classroom Construction of Tagbak Elem. School, Tagbak, Indanan, Sulu 1st LD 1,700,000
Isabela City DEO 5,100,000Classroom Construction of Sta Clara Elem. School, Sta Clara, Lamitan, Basilan 1,700,000
Construction of a Two-Classroom Building with Comfort Room in Bukut-Umus Elementary School, Tubuan-Lasa, Basilan Province
1,700,000
Construction of a Two-Classroom Building with Comfort Room in Pisak-Pisak Elementary School, Tubuan-Lasa, Basilan Province
1,700,000
Zamboanga City DEO 11,000,000Construction of 2-storey 8 classroom Building at San Roque National High School, San Roque, Zamboanga City 1st LD
11,000,000
Zamboanga del Sur 2nd DEO 16,000,000Construction of 1 School Building, 2-classroom at Maruing Elementary School,, Brgy. Maruing, Lapuyan, Zamboanga del Sur 2nd LD
2,000,000
Construction of 1 School Building, 2-classroom, at Bag-ong Kahayag National High School, Brgy., Bag-ong Kahayag, Lakewood, Zamboanga del Sur 2nd LD
2,000,000
Construction of 1 School Building, 2-classroom, at Gatub Elementary School, Bgry. Gatub, Lakewood, Zamboanga del Sur 2nd LD
2,000,000
Construction of 1 School Building, 2-classroom, at Josefina H. Cerilles State College (College of, IT), Main Campus, Brgy. Mati, San Miguel, Zamboanga del Sur 2nd LD
2,000,000
Construction of 1 School Building, 2-classroom, at Josefina H. Cerilles State College (College of, Social Work), Main Campus, Brgy. Mati, San Miguel, Zamboanga del Sur 2nd LD
2,000,000
Construction of 1 School Building, 2-classroom, at Maria Clara Lobregat National High School,, Brgy, Tickwas, Dumalinao, Zambo. del Sur 2nd LD
2,000,000
Construction of 1 School Building, 2-classroom, at Tabina Elementary School, Brgy. Poblacion,, Tabina, Zamboanga del Sur 2nd LD
2,000,000
Construction of 1 School Building, 2-classroom, at Tubo-Pait Elementary Scholl, Brgy. Tubo-Pait, Dumalinao, Zamboanga del Sur 2nd LD
2,000,000
Zamboanga Sibugay 1st DEO 1,700,000Construction of a Two-Classroom Building Limaong National High School, Zamboanga City
1,700,000
Region X 7,000,000
Page 53 of 162
details of dpwh’s programs/projects 953
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Cagayan de Oro City 1st DEO 2,000,000Construction of Two (2)Classroom Building- Iba Elem. School, Dansolihon, Cag. de Oro City, Misamis Oriental
2,000,000
Camiguin DEO 1,000,000Construction/Improvement of Multi-Purpose Building, Sagay National High School, Barangay Poblacion, Sagay, Camiguin Lone District
1,000,000
Misamis Occidental 1st DEO 4,000,000Construction of 4 unit classrooms at the Cebulin Elementary School, Looc National School Extension
4,000,000
Region XI 55,700,000Compostela Valley DEO 28,600,000
Construction of 1CL School Building (Type 1) for Compostela Valley State College (CVSC) in the Municipality of Compostela, Compostella Valley
4,500,000
Construction of 2CL School Building (Academic Building) for Compostela Valley State College (CVSC) in the Municipality of New Bataan, Compostella Valley
2,000,000
Construction of 2CL School Building (Academic Building) for Compostela Valley State College (CVSC) in the Municpality of Montevista, Compostella Valley
2,000,000
Construction of 2CL School Building for Mapawa National High School, Bagong Silang Annex, Maragusan, Compostella Valley
2,000,000
Construction of 2-story School Building (Academic Building) for Compostela Valley State College (CVSC) in the Municipality of Compostela, Compostella Valley
10,500,000
Construction of School Building (Academic Building) for Compostela Valley State College (CVSC) in the Municipality of Montevista, Compostela Valley 1st LD
3,600,000
Construction of Type 1 School Building (Academic Building) for Compostela Valley State College (CVSC) in the Municipality of Maragusan, Compostella Valley
4,000,000
Davao del Norte DEO 22,000,000Construction/Rehabilitation of Various Infrastructure Projects 22,000,000
Davao del Sur 1st DEO 5,100,000Construction of School Building in Guihing Central Elementary School, Barangay Guihing, Hagonoy, Davao del Sur
1,700,000
Construction of School Building in Lower Katipunan Elementary School, Barangay Lower Katipunan, Padada, Davao del Sur
1,700,000
Construction of School Building in Tacul Agricultural High School Kasuga Extension, Barangay Kasuga, Magsaysay, Davao del Sur
1,700,000
Region XII 32,200,000Cotabato City DEO 24,000,000
Construction of 3-storey School Building in Cotabato City State Polytechnic College in Brgy. Rosary Heights IV, Cotabato City
14,000,000
Construction of School Building in Datu Mantato High School in Brgy. Benolen, Datu Odin Sinsuat, Province of Maguindanao
3,000,000
Construction of School Building in F.Barbon Elem. School in Brgy. Rosary Heights IX, Cotabato City
2,500,000
Construction of School Building in Timako Elem. School in Brgy. Kalangan II, Cotabato City
2,500,000
Repair of School Building in Kimpo Elem. School in Brgy. Rosary Heights XIII, Cotabato City
1,000,000
Repair of School Building in Sero Elem. School in Brgy. Rosary Heights Mother in Cotabato City
1,000,000
North Cotabato 1st DEO 4,200,000Classroom Construction of Garsika Elem. School, Garsika, Makilala, North Cotabato 2nd LD
2,500,000
Construction of School Building in Kidapawan City Pilot Elementary School, Barangay Poblacion, Kidapawan City, North Cotabato
1,700,000
South Cotabato 2nd DEO 4,000,000Construction Classrooms of Bentong Elementary School, Lapu, Polomolok, South Cotabato 1st LD
2,000,000
Construction of Francisco Oringo Elementary School Gymnasium, City Heights, General Santos City, South Cotabato 1st LD
2,000,000
Region XIII 9,200,000Agusan del Norte DEO 1,700,000
Construction of School Building in Brgy. Caloc-an, Magallanes, Agusan del Norte 2nd LD
1,700,000
Butuan City DEO 1,500,000Construction of Day Care Center, Brgy. New Society Village, Butuan City 1,500,000
Dinagat Islands DEO 2,000,000Construction of Daycare Center, Brgy. San Roque, Mun. of Tubajon, Dinagat Islands Lone District
2,000,000
Surigao del Sur 1st DEO 4,000,000Construction of School Building, Marihatag, Surigao del Sur 1st LD 4,000,000
Multipurpose/Facilities 12,080,898,000National Building Program 500,000,000
National Capital Region 500,000,000Central Office 500,000,000
National Building Program 500,000,000
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects 3,698,671,000National Capital Region 2,712,471,000
Central Office 2,563,471,000Construction of Cruise Port, Manila 250,000,000Construction of Cruise Port, Palawan 250,000,000
Page 54 of 162
954 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Completion of Multipurpose Building, Batac Cultura (Center Government Center), Callugip, National Highway, Batac City, Ilocos Norte
182,760,000
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Nationwide Allocation
5,000,000
Solid Management - Materials Recovery Facility (SM-MRF) 30,711,000Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Central Office
150,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Cordillera Administrative Region
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, National Capital Region - Las Piñas-Muntinlupa DEO
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, National Capital Region - Malabon-Navotas DEO
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, National Capital Region - Metro Manila 1st DEO
168,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, National Capital Region - Metro Manila 2nd DEO
96,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, National Capital Region - Metro Manila 3rd DEO
96,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, National Capital Region - NCR Regional Office
207,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, National Capital Region - North Manila DEO
120,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, National Capital Region - Quezon City 1st DEO
96,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, National Capital Region - Quezon City 2nd DEO
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, National Capital Region - South Manila DEO
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Region I
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Region II
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Region III
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Region IV-A
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Region IV-B
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Region IX
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Region V
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Region VI
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Region VII
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Region VIII
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Region X
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Region XI
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Region XII
48,000,000
Structural Upgrading for Resiliency of Hospitals, School Buildings, and Other Public Facilities, Region XIII
48,000,000
NCR Regional Office 125,000,000Construction of Disaster Risk Reduction and Management Building and Hazard Training Center, Marikina City 2nd LD
50,000,000
Construction of Multipurpose Building, Rizal Technological University, Boni Avenue, Brgy. Malamig, Mandaluyong City
75,000,000
Metro Manila 1st DEO 24,000,000Construction of Multipurpose Building, Brgy. Burol, Mandaluyong City 10,500,000Construction/Completion of Multi-Purpose Building at Molave Street, Block 32, Barangay Addition Hills, Mandaluyong City
7,500,000
Repair/Rehabilitation of Multipurpose Building, Brgy. Barangka Drive, Mandaluyong City
3,000,000
Repair/Rehabilitation of Multipurpose Building, Brgy. Barangka Ilaya, Mandaluyong City
3,000,000
Cordillera Administrative Region 76,000,000Regional Office CAR 50,000,000
Construction/Rehabilitation/Improvement of the Multi-Purpose Building and Athletic Bowl Oval, Burnham Park, Baguio City Lone District
50,000,000
Baguio City DEO 26,000,000Construction of UP Baguio International House - Phase II, UP Baguio, Baguio City Lone District
26,000,000
Region III 6,200,000Bataan 1st DEO 6,200,000
Construction of Multi-Purpose Building, Brgy. Pandatung, Hermosa, Bataan 6,200,000
Region IV-A 84,000,000Regional Office IV-A 84,000,000
Construction of Faculty and Staff Housing - UP Open University, Laguna 2nd LD 84,000,000
Region VI 60,000,000Regional Office VI 60,000,000
Construction of Faculty and Staff Housing in Miag-ao, UP Visayas, Iloilo 1st LD 60,000,000
Region VII 350,000,000Bohol 1st DEO 350,000,000
Construction of the New Bohol Provincial Capitol Building, Bohol 350,000,000
Page 55 of 162
details of dpwh’s programs/projects 955
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Region IX 285,000,000Regional Office IX 285,000,000
Construction of Bulibuli Eco-Tourism Park , Sumisip (Development Plan), Basilan Lone District
15,000,000
Construction of Terminal and Storage Stations at Buli-Buli Port, Sumisip (Development Plan), Basilan Lone District
20,000,000
Construction of Various Government Offices/Center, Sta. Clara, Lamitan City, Basilan Lone District
250,000,000
Region X 10,000,000Misamis Oriental 1st DEO 10,000,000
Construction of Multipurpose Building (Evacuation Center), Barangay 25, Gingoog City, Misamis Oriental
2,000,000
Construction of Multipurpose Building (Evacuation Center), Barangay Agay-Agay, Gingoog City, Misamis Oriental
2,000,000
Construction of Multipurpose Building (Evacuation Center), Barangay Lunotan, Gingoog City, Misamis Oriental
2,000,000
Construction of Multipurpose Building (Evacuation Center), Barangay Panganiban, Gingoog City, Misamis Oriental
2,000,000
Construction of Multipurpose Building (Evacuation Center), Barangay Santiago, Gingoog City, Misamis Oriental
2,000,000
Region XI 50,000,000Regional Office XI 50,000,000
Construction of Faculty and Staff Housing - UP Mindanao, Davao City 3rd LD 50,000,000
Region XII 65,000,000Regional Office XII 65,000,000
Construction of DPWH-Maguindanao 2nd DEO Building (Phase-2), Maguindanao 2nd LD
65,000,000
Local Infrastructure Program 7,882,227,000National Capital Region 1,583,131,000
Central Office 691,376,000Construction/ Rehabilitation of Various Infrastructure Projects, Batangas 2nd LD 8,000,000
Construction/Improvement of Multipurpose Building 3,000,000Construction/Rehabilitation of Various Infrastructure Projects 416,000,000Construction/Rehabilitation of Various Infrastructure Projects, Albay 3rd LD 32,000,000Construction/Rehabilitation of Various Infrastructure Projects, Bohol 3rd LD 6,000,000Construction/Rehabilitation of Various Infrastructure Projects, Bukidnon 1st LD 2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Bukidnon 4th LD 23,500,000
Construction/Rehabilitation of Various Infrastructure Projects, Cagayan 3rd LD 2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Cagayan De Oro City 1st LD
11,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Compostela Valley 1st LD
3,300,000
Construction/Rehabilitation of Various Infrastructure Projects, Davao del Sur Lone District
25,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Ilocos Norte 1st LD 10,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Ilocos Sur 1st LD 1,476,000
Construction/Rehabilitation of Various Infrastructure Projects, Laguna 3rd LD 4,000,000Construction/Rehabilitation of Various Infrastructure Projects, Negros Occidental 1st LD
7,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Negros Occidental 5th LD
1,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Negros Oriental 2nd LD
2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, North Cotabato 2nd LD
22,500,000
Construction/Rehabilitation of Various Infrastructure Projects, Pampanga 3rd LD 4,200,000
Construction/Rehabilitation of Various Infrastructure Projects, Pangasinan 2nd LD 21,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Pangasinan 5th LD 8,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Quezon 1st LD 18,400,000Construction/Rehabilitation of Various Infrastructure Projects, Southern Leyte Lone District
25,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Surigao del Norte 1st LD
3,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Surigao del Sur 1st LD 12,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Zamboanga City 2nd LD
20,000,000
NCR Regional Office 50,000,000Construction of Tech-Voc Building, Don Alejandro Roces, Sr. High School 50,000,000
Las Piñas-Muntinlupa DEO 81,000,000Construction of Multi Purpose Bldg at Almanza Elementary School T.S.Cruz Annex, Almanza 2, Las Piñas City Lone District
3,000,000
Construction of Multi Purpose Bldg at Casimiro Village Pamplona 3, Las Piñas City Lone District
4,000,000
Construction of Multi Purpose Bldg at Equitable Village Talon 4, Las Piñas City Lone District
5,000,000
Construction of Multi Purpose Bldg at Ilaya Elementary School, Ilaya, Las Piñas City Lone District
3,000,000
Construction of Multi Purpose Bldg at Ilaya, Las Piñas City Lone District 3,000,000Construction of Multi Purpose Bldg at Las Piñas East National High School Equitable Annex, Talon 4, Las Piñas City Lone District
3,000,000
Construction of Multi Purpose Bldg at Las Piñas East National High School, Talon 4, Las Piñas City Lone District
3,000,000
Construction of Multi Purpose Bldg at Manuyo 1 Elementary School, Manuyo 1, Las Piñas City Lone District
3,000,000
Page 56 of 162
956 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi Purpose Bldg at Talon 2, Las Piñas City Lone District 4,000,000Construction of Multi Purpose Bldg at Vergonville Elementary School, Pulanglupa 2, Las Piñas City Lone District
3,000,000
Construction of Multi purpose Building at Dela Costa Homes, Barangay Barangka, Marikina City,Las Piñas-Muntinlupa DEO
5,000,000
Construction of Multi Purpose Building at Olandes, Brgy. Industrial Valley Complex, Marikina City,Las Piñas-Muntinlupa DEO
5,000,000
Construction of Multi-Purpose at Brgy. Talon 2, Las Piñas City 3,000,000Construction of Multi-Purpose Building, Barangay Putatan, Muntinlupa City Lone District
20,000,000
Rehabilitation of Multi Purpose Bldg at Daniel Fajardo, Las Piñas City Lone District 2,000,000
Rehabilitation of Multi Purpose Bldg at E. Aldana, Las Piñas City Lone District 2,000,000Rehabilitation of Multi Purpose Bldg at Pamplona 1, Las Piñas City Lone District 2,000,000
Rehabilitation of Multi Purpose Bldg at Vergonville Pulanglupa 2, Las Piñas City Lone District
2,000,000
Rehabilitation of Multi Purpose Building Las Piñas East National High School (Verdant), Pamplona 3, Las Pinas City Lone District
3,000,000
Rehabilitation of Multi Purpose Building Las Piñas National High School (Municipal), Daniel Fajardo, Las Piñas City Lone District
3,000,000
Malabon-Navotas DEO 2,500,000Construction of Multipurpose Building, Brgy. Tañong, Malabon City 2,500,000
Metro Manila 1st DEO 117,255,000Construction of Multi-Purpose building at Barangay Sta . Ana, Pateros, Taguig City 1st LD
2,000,000
Construction of Multipurpose Building, Brgy. Concepcion Dos, Marikina City (Site Development)
1,500,000
Construction of Balubad Phase 1 Multipurpose Building, Brgy. Nangka, Marikina City 2,500,000
Construction of Multi- Purpose building at Sto. Rosario-Kanluran, Pateros, Taguig City 1st LD
3,000,000
Construction of Multipurpose Building at Apitong 2-B, Brgy. Marikina Heights, Marikina City
3,000,000
Construction of Multi-Purpose Building at Bagong Silang, Brgy. Nangka, Marikina City,Brgy. Nangka,Marikina City,Metro Manila
2,500,000
Construction of Multi-Purpose building at Barangay Aguho, Pateros, Taguig City 1st LD
5,000,000
Construction of Multipurpose Building at Barangay Concepcion Dos, Marikina City 4,000,000
Construction of Multipurpose Building at Barangay Fortune, Marikina City 2,500,000Construction of Multipurpose Building at Barangay Marikina Heights, Marikina City 4,000,000
Construction of Multipurpose Building at Barangay Nangka, Marikina City 2,500,000Construction of Multi-Purpose building at Barangay New Lower Bicutan, Taguig City 1st LD
4,000,000
Construction of Multi-Purpose Building at Brgy. Central Bicutan, Taguig City 2nd LD 2,000,000
Construction of Multi-Purpose Building at Brgy. Central Signal, Taguig City 2nd LD 2,000,000
Construction of Multipurpose Building at Brgy. Concepcion Dos, Marikina City 3,000,000Construction of Multi-Purpose Building at Brgy. Katuparan, Taguig City 2nd LD 2,000,000
Construction of Multi-Purpose Building at Brgy. Maharlika, Taguig City 2nd LD 2,000,000Construction of Multipurpose Building at Brgy. Marikina Heights, Marikina City,Brgy. Marikina Heights,Marikina City,Metro Manila
5,300,000
Construction of Multi-Purpose Building at Brgy. North DaangHari, Taguig City 2nd LD 2,000,000
Construction of Multi-Purpose Building at Brgy. North Signal, Taguig City 2nd LD 2,000,000
Construction of Multi-Purpose Building at Brgy. South DaangHari, Taguig City 2nd LD 2,000,000
Construction of Multi-Purpose Building at Brgy. South Signal, Taguig City 2nd LD 2,000,000
Construction of Multi-Purpose Building at Brgy. Tanyag, Taguig City 2nd LD 2,000,000Construction of Multi-Purpose Building at Brgy. Upper Bicutan, Taguig City 2nd LD 2,000,000
Construction of Multipurpose Building at Fortune Elem and HS, Brgy. Fortune, Marikina City,Brgy. Fortune,Marikina City,Metro Manila
5,500,000
Construction of Multi-Purpose building at Sto. Rosario- Silangan, Pateros, Taguig City 1st LD
2,000,000
Construction of Multipurpose Building at Villa Alegre, Brgy. Pinagbuhatan, Pasig City,Brgy. Pinagbuhatan,Pasig City,Metro Manila
5,000,000
Construction of Multi-Purpose Building, Bgy. Calumpang, Marikina City,Brgy. Calumpang,Marikina,NCR
4,000,000
Construction of Multi-Purpose Building, Bgy. IVC, Marikina City,Brgy. IVC,Marikina,NCR
4,000,000
Construction of Multi-Purpose Building, Bgy. Tañong, Marikina City,Brgy. Tañong,Marikina,NCR
2,000,000
Construction of San Miguel Phase 2 Multipurpose building, Brgy. Fortune, Marikina City
3,000,000
Construction of Torres Bugallon Multipurpose Building, Brgy. Concepcion Uno, Marikina City
2,500,000
Construction of Two (2) Storey Home Economics Building, San Juan Elementary School, San Juan City
5,000,000
Construction/Improvement of Multi-Purpose Building, Brgy. Addition Hills, San Juan City Lone District
4,000,000
Construction/Rehabilitation of Multipurpose Building at Brgy. Parang, Marikina City 3,000,000
Repair/ Rehabilitation of Two (2) Storey Learning Resource Center, San Juan Elementary School, San Juan City
2,750,000
Repair/Rehabilitation of Champaca II Multipurpose Building, Brgy. Fortune, Marikina City ,Brgy. Fortune,Marikina City,Metro Manila
3,000,000
Repair/Rehabilitation of Multipurpose Building at DABA, Brgy. Rosario, Pasig City,Brgy. Rosario,Pasig City,Metro Manila
3,000,000
Repair/Rehabilitation of Multipurpose Building at Villa Balderrama, Brgy. Pinagbuhatan, Pasig City,Brgy. Pinagbuhatan,Pasig City,Metro Manila
2,000,000
Repair/Rehabilitation of Multipurpose Building, Brgy. Concepcion Uno, Marikina City (Site Development)
1,705,000
Page 57 of 162
details of dpwh’s programs/projects 957
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Metro Manila 2nd DEO 9,000,000Completion of Multi-Purpose Bldg. Ph.2, Marcelo Green Village Phase 1 & 2, District 2, Parañaque City, Metro Manila,Metro Manila 2nd DEO
4,000,000
Construction of Multi-Purpose Building - Elementary School-Unit 2,Brgy. Baclaran,Parañaque,Metro Manila
2,000,000
Construction of Multi-Purpose Building (City Library), PUP Campus-Phase III,Brgy. Sto. Niño,Parañaque,Metro Manila
3,000,000
Metro Manila 3rd DEO 63,700,000Construction of Multi-Purpose Building at F. Reyes Subd., Barangay Karuhatan, Valenzuela City 2nd LD
3,200,000
Construction of Multi-Purpose Building at Pacweld Village, Barangay Marulas, Valenzuela City 2nd LD
2,000,000
Construction of Multi-Purpose Building Barangay Bignay, Valenzuela City 1st LD 4,500,000
Construction of Multi-Purpose Building Barangay Dalandanan, Valenzuela City 1st LD 5,000,000
Construction of Multi-Purpose Building Barangay Isla, Valenzuela City 1st LD 4,500,000Construction of Multi-Purpose Building Barangay Lingunan (Phase 2), Valenzuela City 1st LD
5,000,000
Construction of Multi-Purpose Building Barangay Malinta, Dulong Tangke, Valenzuela City 1st LD
5,500,000
Construction of Multi-Purpose Building Barangay Malinta, Sitio Bukid, Valenzuela City 1st LD
5,500,000
Construction of Multi-Purpose Building Barangay Tagalag, Valenzuela City 1st LD 5,000,000
Construction of Multi-Purpose Building in City Homes, Barangay 177, Camarin, Caloocan City 1st LD
2,600,000
Construction of Multi-Purpose Building in Maria Luisa Subdivision, Barangay 177, Camarin, Caloocan City 1st LD
5,200,000
Construction of Multi-Purpose Building including perimeter Fence in Brgy. 52, Caloocan City
6,500,000
Construction of Multi-Purpose Building, Brgy 163, Sta Quiteria, Caloocan City, Metro Manila
1,500,000
Rehabilitation of Multi-Purpose Building at Karuhatan Road, Barangay Karuhatan, Valenzuela City 2nd LD
4,100,000
Upgrading of Multi-Purpose Pavement along Brgy. 31, Caloocan City 3,600,000
North Manila DEO 23,000,000Construction of Covered Courts Bgy.96, Zone 8, Paraiso St., Tondo, Metro Manila,Manila City 1st LD
3,500,000
Construction/Improvement of Barangay Hall, Barangay 629, Sta. Mesa, Manila, Metro Manila
500,000
Construction/improvement of Barangay Hall, Barangay 635, Sta. Mesa, Manila, Metro Manila
1,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Manila City 1st LD 2,000,000
Improvement of Barangay Hall, Barangay 619, Sta. Mesa, Manila, Metro Manila 1,000,000
Improvement of Barangay Hall, Barangay 646, San Miguel, Manila, Metro Manila 1,000,000
Improvement of multipurpose building, Barangay 600, Sta. Mesa, Manila, Metro Manila
2,000,000
Improvement/Rehabilitation of Multi-purpose building, Barangay 604, Sta. Mesa, Manila, Metro Manila
2,000,000
Rehabilitation of Multi-Purpose Building at Zone 25-40, Manila,Manila City 3rd LD 10,000,000
Quezon City 1st DEO 141,500,000Construction of Multi-Purpose Bldg. in Brgy. Batasan Hills, Quezon City, Metro Manila (NCR)
2,000,000
Construction of Multi-Purpose Bldg. in Brgy. Commonwealth, Quezon City, Metro Manila (NCR)
6,000,000
Construction of Multi-Purpose Bldg. in Brgy. Payatas, Quezon City, Metro Manila (NCR)
2,000,000
Construction of Multipurpose Building at Don Jose Heights, Barangay Commonwealth, Quezon City, Metro Manila
2,000,000
Construction of Multipurpose Building, Brgy. Balonbato, Quezon City 6th LD 5,000,000Construction of Multi-Purpose Building, Brgy. Hall, Gulod, Quezon City 5th LD 3,700,000Construction of Multi-Purpose Building, Doña Rosasrio ES, Novaliches Proper, Quezon City 5th LD
5,000,000
Construction of Multi-Purpose Building, La Mesa Heights, Greater Lagro, Quezon City 5th LD
3,500,000
Construction of Multi-Purpose Building, North Fairview High School, North Fairview, Quezon City 5th LD
5,000,000
Construction of Multi-Purpose Building, Sacred Heart Subd., Pasong Putik, Quezon City 5th LD
2,000,000
Construction of Multipurpose Building, San Pedro 6, Brgy. Tandang Sora, Quezon City 6th LD
5,000,000
Construction of UP Corps of Cadets Bldg., University of the Philippines, Diliman, Quezon City, Meto Manila
10,000,000
Construction/Rehabilitation of Various Infrastructure Projects , Quezon City 5th LD 14,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Quezon City 2nd LD 40,000,000
Improvement of Barangay Hall in Brgy. Mariblo, Brgy. Mariblo, Quezon City, Metro Manila
2,000,000
Improvement of Barangay Hall of Brgy. Paraiso, Brgy. Paraiso, Quezon City, Metro Manila
2,000,000
Improvement of Del Monte Senior Citizen Bldg., Brgy. Del Monte, Quezon City, Metro Manila
2,000,000
Improvement of Paltok Senior Citizen Bldg., Brgy. Paltok, Quezon City, Metro Manila 2,000,000
Improvement of Philam Covered Court, Brgy. Philam, Quezon City, Metro Manila 8,000,000
Improvement of Police Community Precinct in Brgy. Sta Catalina, Brgy. Sta Theresita, Quezon City, Metro Manila
2,000,000
Improvement of Veterans Village Covered Court, Brgy. Veterns Village, Quezon City, Metro Manila
8,000,000
Page 58 of 162
958 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Rehabilitation of Multi-Purpose Building, Brgy. Sauyo, Quezon City, Metro Manila 1,500,000
Rehabilitation of Multi-Purpose Building, Kingspoint Subd., Bagbag, Quezon City 5th LD
1,000,000
Rehabilitation of Multi-Purpose Building, Magno Compound, Sta. Monica, Quezon City 5th LD
800,000
Rehabilitation of Multi-Purpose Building, Novaliches HS, San Agustin, Quezon City 5th LD
2,000,000
Rehabilitation of Public Market, Capri Market, Capri, Quezon City 5th LD 3,000,000Renovation of Talayan 503 Covered Court, Brgy. Talayan, Quezon City, Metro Manila 2,000,000
Quezon City 2nd DEO 356,800,000Construction Of Multi-Purpose Bldg. At Area 1 Urphas, Barangay Old Balara 2,300,000Construction Of Multi-Purpose Bldg. At Villa Beatriz, Barangay Old Balara 2,200,000Construction Of Multi-Purpose Bldg., Barangay Escopa 2 2,000,000Construction of Multi-Purpose Building (restrooms), Bagbag Elementary School 1,000,000
Construction of Multi-Purpose Building (Training Center), Skills and livelihood training center
15,000,000
Construction of Multi-Purpose Building for AFP CMO School Camp Aguinaldo, Rizal, Quezon City, Manila
3,000,000
Construction of Multipurpose Building Staff Colleges Compound inside Camp Aguinaldo, Quezon City
5,000,000
Construction of Multi-Purpose Building with site development, N. Domingo corner Big Horseshoe Drive
8,000,000
Construction of Multi-Purpose Building, 4,500,000Construction Of Multi-Purpose Building, Barangay Bagumbuhay, Quezon City, Metro Manila 3rd LD
12,000,000
Construction Of Multi-Purpose Building, Barangay Escopa 2, Quezon City, Metro Manila 3rd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Hall at old slaughterhouse (back of Kamuning Market)
20,000,000
Construction of Multi-Purpose Building, Barangay New Era 8,000,000Construction of Multi-Purpose Building, Batasan Hills National High School 11,500,000Construction of Multi-Purpose Building, Covered Court 3,000,000Construction of Multi-Purpose Building, Day Care Center 3,000,000Construction of Multi-Purpose Building, Day Care Center 3,000,000Construction of Multi-Purpose Building, Feliciano Belmonte, Sr. High School 11,500,000Construction of Multi-Purpose Building, Kaingin 2 Satellite Hall 1,500,000Construction of Multi-Purpose Building, Multi-purpose sports facility (gymnasium) 20,000,000
Construction of Multi-Purpose Building, North Fairview High School 11,500,000Construction of Multi-Purpose Building, P. Bernardo High School 11,500,000Construction of Multi-Purpose Building, P. Tuazon Elementary School 2,000,000Construction of Multi-Purpose Building, Quezon City Dental Association 15,000,000Construction of Multi-Purpose Building, San Mateo Road, IBP Road 15,000,000Construction of Multi-Purpose Building, Site of old Valencia Elem School 8,000,000Construction of Multi-Purpose Building, St. Jude Subdivision 5,000,000Construction of Multi-Purpose Building, Teacher's Bliss 5,000,000Construction of Multi-Purpose Building, to follow 10,000,000Construction of Multi-Purpose Building, Young Mother's Wellness Center 15,000,000Construction Of Multi-Purpose Building,Barangay East Kamias, Quezon City, Metro Manila 3rd LD
3,000,000
Construction Of Multi-Purpose Building,Barangay Quirino 3-B (Claro), Quezon City, Metro Manila 3rd LD
2,500,000
Construction of multi-purpose pavement with site development, Samahan ng Kababaihan
2,000,000
Construction of sliding gate/site development, Senior Citizens SB Building 1,000,000Construction/Completion of Multi-Purpose Building, Barangay Hall 1,000,000Construction/Completion of Multi-Purpose Building, Carlos Albert High School 7,500,000Construction/Completion of Multi-Purpose Building, Dep-Ed, NCR 1,600,000Construction/Completion of Multi-Purpose Building, Sergio Osmena High School 7,000,000
Imporovement of Multi-Purpose Building, Tatalon Health Center 1,500,000Multi-purpose pavement with site development, Sitio Kumunoy, Barangay Bagong Silangan
2,000,000
Rehab and improvement of Multi-Purpose Building, Barangay Holy Spirit (DPWH - 1st ED Office)
2,000,000
Rehabilitation Of Multi-Purpose Bldg. At Barangay Escopa 3 2,000,000Rehabilitation Of Multi-Purpose Bldg. At New York Cor. Ermin Garcia St. Barangay 2,000,000
Rehabilitation Of Multi-Purpose Building, Barangay Libis, Quezon City, Metro Manila 3rd LD
2,000,000
Rehabilitation Of Multi-Purpose Building, Barangay Milagrosa, Quezon City, Metro Manila 3rd LD
2,000,000
Rehabilitation Of Multi-Purpose Building, Barangay Old Balara, Quezon City, Metro Manila 3rd LD
2,000,000
Repair and improvement of Multi-Purpose Building, Day Care Center 2,000,000Repair and improvement of Multi-Purpose Building including elevators , Barangay Hall
10,000,000
Repair and improvement of Multi-Purpose Building, 200,000Repair and improvement of Multi-Purpose Building, Barangay Hall 16,000,000Repair and improvement of Multi-Purpose Building, Barangay Hall 2,000,000Repair and improvement of Multi-Purpose Building, Barangay Health Station 3,000,000Repair and improvement of Multi-Purpose Building, Basketball Court 8,000,000Repair and improvement of Multi-Purpose Building, Belmonte Health Center 4,500,000Repair and improvement of Multi-Purpose Building, Cooperative Building 2,000,000Repair and improvement of Multi-Purpose Building, Day care center 4,000,000Repair and improvement of Multi-Purpose Building, Day care/medical clinic 3,000,000Repair and improvement of Multi-Purpose Building, E. Rodriguez, Sr. Elementary School
3,000,000
Repair and improvement of Multi-Purpose Building, Kamuning Health Center - SB 2,000,000
Repair and improvement of Multi-Purpose Building, New Era High School 3,000,000Repair and improvement of Multi-Purpose Building, Pook Palaris 2,000,000Repair and improvement of Multi-Purpose Building, Quezon City Polytechnic University
5,000,000
Repair and improvement of Multi-Purpose Building, Roces Avenue (Barangay Hall) 2,000,000
Repair and improvement of Multi-Purpose Building, Tomas Morato Avenue 2,000,000Repair and improvement, Mabuhay Court 2,500,000
Page 59 of 162
details of dpwh’s programs/projects 959
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Repair and rehab of Multi-Purpose Building, Barangay Hall 3,000,000
South Manila DEO 47,000,000Construction of Multi-Purpose Building, Barangay 660-A, Ermita, Manila City 5th LD 6,000,000
Construction of Multi-Purpose Building, Barangay 777, Sta. Ana, Manila City 5th LD 2,000,000
Construction of Multi-Purpose Building, Barangay 805, San Andres Bukid, Manila City 5th LD
6,000,000
Construction Of Multi-Purpose Building, San Juan St., Barangay 37, Rehabilitation Of Multi-Purpose Building, Maginhawa St., Barangay 14, Pasay City Lone District
2,500,000
Construction Of Multi-Purpose Building, Sgt. Mariano St., Barangay 146, Pasay City Lone District
2,500,000
Construction Of Multi-Purpose Building, Sped Galvez Road, Barangay 88, Pasay City Lone District
3,500,000
Construction/Improvement of Barangay Hall, Barangay 836, Pandacan, Manila, Metro Manila
1,000,000
Construction/Improvement of Multipurpose building, Barangay 905, Punta, Sta. Ana, Manila, Metro Manila
4,000,000
Improvement of Barangay Hall, Barangay 835, Pandacan, Manila, Metro Manila 1,000,000
Improvement of Barangay Hall, Barangay 844, Pandacan, Manila, Metro Manila 500,000
Improvement of Barangay Hall, Barangay 901, Punta, Sta. Ana, Manila, Metro Manila 1,000,000
Rehabilitation of Multi-Purpose Building, Barangay 703, Malate, Manila City 5th LD 2,000,000
Rehabilitation of Multi-Purpose Building, Barangay 812, Paco, Manila City 5th LD 2,000,000
Rehabilitation Of Multi-Purpose Building, Manlunas St., Barangay 183, Pasay City Lone District
2,000,000
Rehabilitation/Improvement of Multipurpose Covered Court w/ Stage, Barangay 726, Manila
1,000,000
Rehabilitation/Improvement of Multipurpose Covered Hall/Court, Barangay 703, Zone 77, District V, Vasquez St., Malate, Manila
3,000,000
Repair/Rehabilitation Multi-Purpose Building, School For The Deaf And Blind Galvez Road, Barangay 73, Pasay City Lone District
7,000,000
Region I 383,221,000Regional Office I 50,000,000
Construction of Multi-Purpose Building, Brgy. Calaguip, National Highway (Batac Cultural Center), Batac City, Ilocos Norte 2nd LD
50,000,000
Ilocos Norte 1st DEO 55,920,000Construction of Multi-purpose Bldg., Barangay Poblacion, Dumalneg, Ilocos Norte 2,000,000
Construction of Multi-purpose Bldg., Barangay Poblacion, Pagudpud, Ilocos Norte 2,000,000
Constructions of Multi-purpose Building at Estancia Elementary School - Brgy 18, Estancia, Piddig, Ilocos Norte
2,000,000
Improvement/Rehabilitation of MPB, 01 San Joaquin, Sarrat, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, 01 San Roque, Vintar, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, 02 San Nicolas, Vintar, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, 02, San Agustin, Sarrat, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, 03 San Andres II, Bacarra, Ilocos Norte 500,000
Improvement/Rehabilitation of MPB, 03 Sta Barbara, Sarrat 500,000Improvement/Rehabilitation of MPB, 04 Sta Maria, Vintar 770,000Improvement/Rehabilitation of MPB, 05 San Vicente, Sarrat, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, 06 San Pedro, Bacarra, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, 06, San Leandro, Sarrat, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, 07 San Pedro II, Bacarra, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, 09 San Lorenzo, Sarrat, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, 12 Sta. Filomena II, Bacarra, Ilocos Norte 500,000
Improvement/Rehabilitation of MPB, 16 San Roque II, Bacarra, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, 18 San Isidro, Sarrat, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, 19 Sto Tomas, Sarrat 2,188,000Improvement/Rehabilitation of MPB, 24 San Roque, Sarrat 500,000Improvement/Rehabilitation of MPB, 24 San Roque, Sarrat, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, 7-B Nuestra Señora de Natividad, Laoag City 600,000
Improvement/Rehabilitation of MPB, Abaca, Bangui 500,000Improvement/Rehabilitation of MPB, Anao, Piddig 500,000Improvement/Rehabilitation of MPB, Anao, Piddig, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Angset, Carasi 600,000Improvement/Rehabilitation of MPB, Banban, Bangui 530,000Improvement/Rehabilitation of MPB, Bengcag, Laoag City 2,000,000Improvement/Rehabilitation of MPB, Bimmanga, Piddig, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Bobon, Burgos, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Brgy. 02 San Andres II, Bacarra 500,000Improvement/Rehabilitation of MPB, Brgy. 03 San Andres II, Bacarra 500,000Improvement/Rehabilitation of MPB, Brgy. 06 San Leandro, Sarrat 500,000Improvement/Rehabilitation of MPB, Brgy. 07 San Pedro II, Bacarra 730,000Improvement/Rehabilitation of MPB, Brgy. 1 Sta Rita, Bacarra 500,000Improvement/Rehabilitation of MPB, Brgy. 13 San Gabriel I, Bacarra 560,000Improvement/Rehabilitation of MPB, Brgy. 16 San Roque II, Bacarra 570,000Improvement/Rehabilitation of MPB, Brgy. 32-C Lapaz, Laoag City 2,500,000Improvement/Rehabilitation of MPB, Brgy. Bacsil, Bangui 500,000Improvement/Rehabilitation of MPB, Brgy. Bobon, Burgos 500,000Improvement/Rehabilitation of MPB, Brgy. Cabaroan, Bacarra 500,000Improvement/Rehabilitation of MPB, Brgy. Cabulalaan, Bacarra 500,000Improvement/Rehabilitation of MPB, Brgy. Cabusligan, Bacarra 500,000Improvement/Rehabilitation of MPB, Brgy. Caruan, Pasuguin 540,000Improvement/Rehabilitation of MPB, Brgy. Corocor, Bacarra 670,000Improvement/Rehabilitation of MPB, Brgy. Lataag, Laoag City 730,000Improvement/Rehabilitation of MPB, Brgy. Natba, Bacarra 712,000Improvement/Rehabilitation of MPB, Brgy. Pasiocan, Bacarra 500,000Improvement/Rehabilitation of MPB, Brgy. Pipias, Bacarra 500,000Improvement/Rehabilitation of MPB, Brgy. Poblacion, Burgos 510,000
Page 60 of 162
960 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Improvement/Rehabilitation of MPB, Brgy. Taguipuro, Casilian, Bacarra 800,000Improvement/Rehabilitation of MPB, Brgy. Tangid, Laoag City 500,000Improvement/Rehabilitation of MPB, Buduan, Burgos, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Cabayo, Vintar, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Caruan, Pasuquin, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Casilian (Taguiporo) Bacarra, Ilocos Norte 500,000
Improvement/Rehabilitation of MPB, Dagupan, Vintar, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Dilavo, Pasuguin 630,000Improvement/Rehabilitation of MPB, Dilavo, Pasuquin, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Esperanza, Vintar, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Lagandit, Piddig, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Loing, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Mabanbanag, Vintar 710,000Improvement/Rehabilitation of MPB, Mabanbanag, Vintar, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Manayon, Bangui 600,000Improvement/Rehabilitation of MPB, Mangitayag, Piddig 860,000Improvement/Rehabilitation of MPB, Mangitayag, Piddig, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Namoroc, Vintar, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, P.F. Alviar, Vintar, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Pagali, Burgos, Ilocos Norte 670,000Improvement/Rehabilitation of MPB, Poblacion 03, Pasuquin, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Poblacion 04, Pasuquin, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Poblacion 3, Pasuguin 700,000Improvement/Rehabilitation of MPB, Pungto, Bacarra, Ilocos Norte 1,000,000Improvement/Rehabilitation of MPB, Salsalamagui, Vintar 500,000Improvement/Rehabilitation of MPB, San Isidro, Dumalneg 550,000Improvement/Rehabilitation of MPB, Saoit, Burgos, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Sapat, Pasuquin, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Sta. Matilde, Pasuquin, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Subec, Pagudpud 500,000Improvement/Rehabilitation of MPB, Sulongan, Pasuguin 500,000Improvement/Rehabilitation of MPB, Sulongan, Pasuquin, Ilocos Norte 500,000Improvement/Rehabilitation of MPB, Talingaan Laoag City 500,000Improvement/Rehabilitation of MPB, Tamdagan, Vintar 690,000Improvement/Rehabilitation of MPB, Tonoton, Piddig, Ilocos Norte 500,000
Ilocos Norte 2nd DEO 9,000,000Construction of Multi-purpose Bldg., Barangay Poblacion, Paoay, Ilocos Norte 4,000,000
Construction of Multi-Purpose Building Barangay Cabaroan, Pinili, Ilocos Norte 3,000,000Construction of Multi-purpose Building, Barangay Poblacion, Badoc, Ilocos Norte 2,000,000
Ilocos Sur 1st DEO 25,251,000Construction of Multi-Purpose Building, Ayusan Norte, Vigan City, Ilocos Sur 1st LD 2,650,000
Construction of Multi-Purpose Building, Bulala, Vigan City, Ilocos Sur 1st LD 2,200,000Construction of Multi-Purpose Building, Capangdanan, Bantay, Ilocos Sur 1st LD 1,945,000
Construction of Multi-Purpose Building, Mindoro, Vigan City, Ilocos Sur 1st LD 2,150,000Construction of Multi-Purpose Building, Pangada-Cabaroan, Sta. Catalina, Ilocos Sur 1st LD
1,505,000
Construction of Multi-Purpose Building, San Pedro, Vigan City, Ilocos Sur 1st LD 2,400,000
Construction of Multi-Purpose Building, Taguiporo, Bantay, Ilocos Sur 1st LD 1,137,000Construction of Multi-Purpose Building, Tay-ac, Bantay, Ilocos Sur 1st LD 2,200,000Construction of Multi-Purpose Building, Villamar, Caoayan, Ilocos Sur 1st LD 2,100,000Construction/Improvement of Multi-Purpose Building, Anonang Mayor, Caoayan, Ilocos Sur 1st LD
1,234,000
Construction/Improvement of Multi-purpose Building, Tamag, Vigan City, Ilocos Sur 1st LD
1,630,000
Construction/Repair of Multi-Purpose Building, San Mariano, Sallacong, Bantay, Ilocos Sur 1st LD
2,100,000
Repair/Rehabilitation of Multipurpose Building, Don Dimas Querubin, Caoayan, Ilocos Sur
2,000,000
Ilocos Sur 2nd DEO 36,000,000Construction of MPB, Covered Court,Brgy. Becques,Tagudin,Ilocos Sur 3,000,000Construction of Multipurpose Building, Bgy Calaoaan-Bgy Parioc 2nd (beside bypass road section), Barangay Calaoaan-Parioc 2nd, Candon City, Ilocos Sur
15,000,000
Construction of Multipurpose Bulding, Tagudin Mun. Hall, Barangay Poblacion, Tagudin, Ilocos Sur
10,000,000
Construction of Pinsal Falls Multipurpose Building-Tourism Destination Development, Barangay Balballasiaoan, Sta Maria, Ilocos Sur
2,000,000
Construction/Completion of Candon Trade Center, Barangay San Nicolas, Candon City, Ilocos Sur
3,000,000
Improvement of Multipurpose Buidling-Mapisi Rock Park-Tourism Destination Development, Barangay Ambucao, Santiago, Ilocos Sur
3,000,000
La Union 1st DEO 12,000,000Construction of Barangay Farmers' Hall and Multi-Purpose Building,Brgy. Sinapangan Sur,Bangar,La Union
2,000,000
Construction of Fisheries Research and Training Institute,Brgy. Paraoir,Balaoan,La Union
5,000,000
Construction of Multi - Purpose Building at Barangay Poblacion,Brgy. Barangay ,Santol,La Union
2,000,000
Construction/Improvement of Multi – Purpose Building at Barangay Ili Sur,Brgy. Ili Sur, San Juan,La Union
3,000,000
La Union 2nd DEO 25,000,000 Construction of Covered Court of Southern Naguilian National High School,Brgy. Amabaracao Sur,Naguilian,La Union
5,000,000
Construction of Multi-Purpose Building,Brgy. Bacuit Sur,Bauang,La Union 2,000,000Construction of Multi-Purpose Building,Brgy. Camp One,Rosario,La Union 5,000,000Construction of Multi-Purpose Building,Brgy. Consolacion,Agoo,La Union 2,000,000Construction of Multi-Purpose Building,Brgy. Dulao,Aringay,La Union 2,000,000Construction of Multi-Purpose Building,Brgy. San Jose,Rosario,La Union 5,000,000Construction of Multi – Pupose Building at Barangay Bangar,Brgy. Bangar,Rosario,La Union
2,000,000
Page 61 of 162
details of dpwh’s programs/projects 961
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Improvement of Multi – Purpose Building at Barangay San Carlos,Brgy. San Carlos, Caba,La Union
2,000,000
Pangasinan 1st DEO 53,500,000Construction Of Multipurpose Building Barangay Allabon, Agno, Pangasinan 1st LD 2,000,000
Construction Of Multipurpose Building Barangay Aloleng, Agno, Pangasinan 1st LD 2,000,000
Construction Of Multipurpose Building Barangay Amalbalan, Dasol, Pangasinan 1st LD
2,000,000
Construction Of Multipurpose Building Barangay Awile, Anda, Pangasinan 1st LD 2,000,000
Construction Of Multipurpose Building Barangay Bamban, Infanta, Pangasinan 1st LD
2,000,000
Construction Of Multipurpose Building Barangay Baruan, Agno, Pangasinan 1st LD 2,000,000
Construction Of Multipurpose Building Barangay Baybay Norte, Sual, Pangasinan 1st LD
2,000,000
Construction Of Multipurpose Building Barangay Binabalian, Bolinao, Pangasinan 1st LD
2,000,000
Construction Of Multipurpose Building Barangay Catuday, Bolinao, Pangasinan 1st LD
2,000,000
Construction Of Multipurpose Building Barangay Dangley, Agno, Pangasinan 1st LD 2,000,000
Construction Of Multipurpose Building Barangay Dewey, Bolinao, Pangasinan 1st LD 2,000,000
Construction Of Multipurpose Building Barangay Imbo, Anda, Pangasinan 1st LD 2,000,000
Construction Of Multipurpose Building Barangay Malacapas, Dasol, Pangasinan 1st LD
2,000,000
Construction Of Multipurpose Building Barangay Malimpin, Dasol, Pangasinan 1st LD 2,000,000
Construction Of Multipurpose Building Barangay Paitan West, Sual, Pangasinan 1st LD
2,000,000
Construction Of Multipurpose Building Barangay Patar, Mabini, Pangasinan 1st LD 2,000,000
Construction Of Multipurpose Building Barangay Salud, Bolinao, Pangasinan 1st LD 2,000,000
Construction Of Multipurpose Building Barangay San Jose, Bani, Pangasinan 1st LD 2,000,000
Construction Of Multipurpose Building Barangay San Vicente, Dasol, Pangasinan 1st LD
2,000,000
Construction Of Multipurpose Building Barangay Siapar, Anda, Pangasinan 1st LD 2,000,000
Construction Of Multipurpose Building Barangay Tambac, Dasol, Pangasinan 1st LD 2,000,000
Construction Of Multipurpose Building Barangay Telbang, Alaminos City Pangasinan 1st LD
2,000,000
Construction Of Multipurpose Building Barangay Tipor, Bani Pangasinan, 1st LD 2,000,000
Construction Of Multipurpose Building Barangay Victory, Bolinao, Pangasinan 1st LD 2,000,000
Construction Of Multipurpose Building Cayungnan Elementary School, Brgy. Cayungnan, Agno Pangasinan 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Dewey, Municipality of Bolinao, Pangasinan 1st LD
2,000,000
Construction of Multi-Purpose Building, Brgy Poblacion, Alaminos, Pangasinan 1,500,000
Pangasinan 2nd DEO 72,000,000Construction of Building, Amansabina, Mangaldan, Pangasinan,Pangasinan 4th LD 2,500,000
Construction of Building, Anonang, San Fabian, Pangasinan,Pangasinan 4th LD 3,000,000
Construction of Building, Brgy. Domalandan, Lingayen, Pangasinan 5,000,000Construction of Building, Calmay, Dagupan City, Pangasinan,Pangasinan 4th LD 2,000,000
Construction of Building, Guesang, Mangaldan, Pangasinan,Pangasinan 4th LD 2,500,000
Construction of Building, Poblacion, San Fabian, Pangasinan,Pangasinan 4th LD 3,000,000
Construction of Multi-Purpose at Brgy. Dumpay, Basista, Pangasinan 2,000,000Construction of Multipurpose Building (Barangay Hall) at Brgy. Bogtong Bolo, Mangatarem, Pangasinan 2nd LD
2,000,000
Construction of Multipurpose Building (Barangay Hall) at Brgy. Bunagan, Mangatarem, Pangasinan 2nd LD
2,000,000
Construction of Multipurpose Building (Legislative Building) at Brgy. Poblacion, Labrador, Pangasinan 2nd LD
4,000,000
Construction of Multipurpose Building (Senior Citizens Hall) at Brgy. Poblacion, Labrador, Pangasinan 2nd LD
2,000,000
Construction of Multipurpose Building at Brgy. Malaca, Urbiztondo, Pangasinan 2nd LD
2,500,000
Construction of Multipurpose Building at Brgy. Malunec, Mangatarem, Pangasinan 2nd LD
2,500,000
Construction of Multipurpose Building at Brgy. Nagpalangan, Binmaley, Pangasinan 2nd LD
2,000,000
Construction of Multipurpose Building at Brgy. Pampano, Mangatarem, Pangasinan 2nd LD
2,500,000
Construction of Multipurpose Building at Brgy. Real, Urbiztondo, Pangasinan 2nd LD 2,500,000
Construction of Multipurpose Building at Malindong Elementary School at Brgy. Malindong, Binmaley, Pangasinan 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Manaoag, Pangasinan 4th LD
25,000,000
Rehabilitation of Multipurpose Building at RTC Hall of Justice, Brgy. Poblacion, Lingayen, Pangasinan 2nd LD
3,000,000
Pangasinan 3rd DEO 37,550,000Construction of Covered Court - Nancalobasaan National High School, Barangay Nancalobasaan, Urdaneta City, Pangasinan
3,000,000
Construction of Multi-Purpose Building in Rosales, Pangasinan 14,000,000
Page 62 of 162
962 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building in San Quintin, Pangasinan 4,000,000Construction of Multi-Purpose Building. Poblacion, Binalonan Pangasinan,Brgy. Poblacion,Binalonan,Pangasinan
3,000,000
Construction/Improvement of Multi-Purpose Building., Bantay Insik Gym,Brgy. Bantay Insik,Sison,Pangasinan
3,400,000
Construction/Improvement of Multi-Purpose Building., Bila Sitio Pajara,Brgy. Bila,Sison,Pangasinan
2,650,000
Construction/Improvement of Multi-Purpose Building., Pozorrubio Central School,Brgy. Poblacion,Pozorrubio,Pangasinan
5,000,000
Construction/Improvement of Multi-Purpose Building., Sugcong Pozorrubio, Pangasinan,Brgy. Sugcong,Pozorrubio,Pangasinan
2,500,000
Pangasinan 4th DEO 7,000,000Construction of Barangay Hall, Brgy. Bongato West, Bayambang, Pangasinan 3rd LD 1,000,000
Construction/Improvement of Barangay Hall, Brgy. Apalen, Bayambang, Pangasinan 3rd LD
1,000,000
Construction/Improvement of Barangay Hall, Brgy. Asin Este, Malasiqui , Pangasinan 3rd LD
1,000,000
Construction/Improvement of Barangay Hall, Brgy. Lokeb Este, Malasiqui , Pangasinan 3rd LD
800,000
Construction/Improvement of Multi-Purpose Building, Brgy. Ano, San Carlos City , Pangasinan 3rd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Payas ES, Brgy. Payas, Sta. Barbara , Pangasinan 3rd LD
1,200,000
Construction/Improvement of Multi-purpose Gymnasium, Brgy. Baldog, San Carlos City , Pangasinan 3rd LD
1,000,000
Cordillera Administrative Region 206,000,000Abra DEO 42,000,000
Construction of 4m x 6m Multi-Purpose Building Brgy. Pagala, Bucay , Abra Lone District
500,000
Construction of 4m x 6m Multi-Purpose Building, Brgy. San Miguel, Bucay , Abra Lone District
500,000
Construction of 4m x 6m Multi-Purpose Building, Brgy. Tabiog, Bucay , Abra Lone District
500,000
Construction of 4m x 6m Multi-Purpose, Building Brgy. Velasco, Tayum , Abra Lone District
500,000
Construction of Multi-Purpose Building, Brgy. Ducligan, Bucloc, Abra Lone District 500,000
Construction of Multi-Purpose Building, Brgy. Lamao, Bucloc, Abra Lone District 500,000
Construction of Multi-Purpose Building, Brgy. Lingey, Bucloc, Abra Lone District 500,000
Construction of Multi-Purpose Building, Brgy. Poblacion, Malibcong, Abra Lone District
500,000
Construction of Multi-Purpose Building, Brgy. Zone 5, Bangued, Abra Lone District 22,500,000
Construction of Multi-Purpose Building, Indigenuous People's Center Building 10,000,000Construction of Multi-Purpose Building, Zone 2, Bangued, Abra Lone District 500,000Improvement of Multi-Purpose Building Phase 2 at Zone 7 Bangued, Abra 5,000,000
Apayao 1st DEO 2,743,000Construction of MPB, Mayor Bartolome Serut National Agricultural and Trade HS, Brgy. Madatag, Kabugao, Apayao
1,500,000
Construction of Poblacion Kabugao MPB, Brgy. Poblacion, Kabugao, Apayao 1,243,000
Apayao 2nd DEO 16,257,000Construction of League of Municipalities of the Phils. (Apayao Chapter) MPB, Brgy. San Gregorio, Luna, Apayao
5,000,000
Construction of MPB, Mayor de San Jose Comprehensive NHS, Brgy. Sta. Maria, Flora, Apayao
2,000,000
Construction of San Mariano MPB, Brgy. San Mariano, Sta. Marcela, Apayao 2,000,000Construction/Improvement of Alem Disaster Evacuation Center, Brgy. Alem, Pudtol, Apayao
2,900,000
Construction/Improvement of GAD MPB, Brgy. Poblacion East, Flora, Apayao 1,857,000
Construction/Improvement of San Isidro Sur Livelihood and Training Multi-purpose Bldg. (TESDA), Brgy. San Isidro, Luna, Apayao
2,500,000
Baguio City DEO 26,000,000Construction and Extension the Barangay Multi-Purpose Hall, Lopez Jaena, Baguio City Lone District
2,000,000
Construction of Barangay Hall at Cabinet Hill - Teacher's Camp, Baguio City Lone District
2,000,000
Construction of Covered Court and Day Care Center at Marcoville, Baguio City Lone District
2,000,000
Construction of Covered Court at Lourdes Proper, Baguio City Lone District 2,000,000Construction of Covered Court at SLU-SVP, Baguio City Lone District 3,000,000Construction of Multi-Purpose Hall and Senior Citizen Center at Padre Burgos, Baguio City Lone District
2,000,000
Construction of Multi-Purpose Hall at Malaya, Dominican - Mirador, Baguio City Lone District
2,000,000
Construction of Multi-Purpose Hall Building at Camdas, Baguio City Lone District 1,000,000
Construction of Multi-Purpose Hall Building at Guisad Central, Baguio City Lone District
2,000,000
Construction/Extension of Barangay Hall at DPS Compound, Baguio City Lone District 1,000,000
Construction/Extension of Barangay Hall at Loakan Liwanag, Baguio City Lone District
1,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Baguio City Lone District
2,000,000
Rehabilitation of Covered Court at Holy Ghost Extension, Baguio City Lone District 2,000,000
Repair and Rehabilitation of Covered Court for Brgy. Engineer's Hill, Engineer's Hill, Baguio City, Benguet
2,000,000
Benguet 1st DEO 25,000,000Construction of Batuan Multi-Purpose Building, Nangalisan, Tuba, Benguet Lone District
2,000,000
Page 63 of 162
details of dpwh’s programs/projects 963
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Bila, Bokod Multi-Purpose Building, Bila, Bokod, Benguet Lone District
2,000,000
Construction of San Pascual Multi-Purpose Building, San Pascual, Tuba, Benguet Lone District
2,500,000
Construction/Rehabilitation of Adaoay Multi-Purpose Building, Adaoay, Kabayan, Benguet Lone District
500,000
Construction/Rehabilitation of Anchukey Multi-Purpose Building , Anchukey, Kabayan, Benguet Lone District
500,000
Construction/Rehabilitation of Ballay Multi-Purpose Building, Ballay, Kabayan, Benguet Lone District
500,000
Construction/Rehabilitation of Bashoy Multi-Purpose Building, Bashoy, Kabayan, Benguet Lone District
500,000
Construction/Rehabilitation of Batan Multi-Purpose Building, Batan, Kabayan, Benguet Lone District
500,000
Construction/Rehabilitation of Bua Multi-Purpose Building , Tuding, Itogon, Benguet Lone District
500,000
Construction/Rehabilitation of Camp 6 Multi-Purpose Building, Camp 6, Tuba, Benguet Lone District
500,000
Construction/Rehabilitation of Cruz, La Trinidad Multi-Purpose Building, Cruz, La Trinidad, Benguet Lone District
500,000
Construction/Rehabilitation of Daclan, Bokod Multi-Purpose Building, Daclan, Bokod, Benguet Lone District
2,500,000
Construction/Rehabilitation of Duacan Multi-Purpose Building, Duacan, Kabayan, Benguet Lone District
500,000
Construction/Rehabilitation of Eddet Multi-Purpose Building, Eddet, Kabayan, Benguet Lone District
500,000
Construction/Rehabilitation of Gumatdang MPB, Gumatdang, Itogon, Benguet Lone District
500,000
Construction/Rehabilitation of Gusaran Multi-Purpose Building, Gusaran, Kabayan, Benguet Lone District
500,000
Construction/Rehabilitation of Kabayan Barrio Multi-Purpose Building, Kabayan Barrio, Kabayan, Benguet Lone District
500,000
Construction/Rehabilitation of Kamora National High School, Gusaran, Kabayan, Benguet Lone District
2,000,000
Construction/Rehabilitation of Lusod Multi-Purpose Building, Lusod, Kabayan, Benguet Lone District
500,000
Construction/Rehabilitation of Nangalisan, Tuba Multi-Purpose Building, Nangalisan, Tuba, Benguet Lone District
500,000
Construction/Rehabilitation of Pacso Multi-Purpose Building, Pacso, Kabayan, Benguet Lone District
500,000
Construction/Rehabilitation of Poblacion Multi-Purpose Building, Poblacion, Kabayan, Benguet Lone District
500,000
Construction/Rehabilitation of Tawangan Multi-Purpose Building, Tawangan, Kabayan, Benguet Lone District
500,000
Construction/Rehabilitation of Tinongdan, Itogon Multi-Purpose Building , Tinongdan, Itogon, Benguet Lone District
1,500,000
Construction/Rehabilitation of Ucab, Itogon Multi-Purpose Building, Ucab, Itogon, Benguet Lone District
1,500,000
Construction/Rehabilitation of Virac, Itogon Multi-Purpose Building , Virac, Itogon, Benguet Lone District
2,000,000
Benguet 2nd DEO 14,000,000Construction of Paoad Elementary School, Acop, Tublay, Benguet Lone District 2,000,000
Construction/Rehabilitation of Abiang Multi-Purpose Building, Abiang, Atok, Benguet Lone District
500,000
Construction/Rehabilitation of Amlimay, Buguias Multi-Purpose Building, Amlimay, Buguias, Benguet Lone District
2,000,000
Construction/Rehabilitation of Balili Multi-Purpose Building , Balili, Mankayan, Benguet Lone District
500,000
Construction/Rehabilitation of Bedbed Multi-Purpose Building, Bedbed, Mankayan, Benguet Lone District
500,000
Construction/Rehabilitation of Bulalacao Multi-Purpose Building, Bulalacao, Mankayan, Benguet Lone District
500,000
Construction/Rehabilitation of Cabiten Multi-Purpose Building, Cabiten, Mankayan, Benguet Lone District
500,000
Construction/Rehabilitation of Caliking Multi-Purpose Building, Caliking, Atok, Benguet Lone District
500,000
Construction/Rehabilitation of Cattubo Multi-Purpose Building, Cattubo, Atok, Benguet Lone District
500,000
Construction/Rehabilitation of Colalo Multi-Purpose Building, Colalo, Mankayan, Benguet Lone District
500,000
Construction/Rehabilitation of Guinaoang Multi-Purpose Building , Guinaoang, Mankayan, Benguet Lone District
500,000
Construction/Rehabilitation of Naguey Multi-Purpose Building, Naguey, Atok, Benguet Lone District
500,000
Construction/Rehabilitation of Paco Multi-Purpose Building, Paco, Mankayan, Benguet Lone District
500,000
Construction/Rehabilitation of Paoay Multi-Purpose Building, Paoay, Atok, Benguet Lone District
500,000
Construction/Rehabilitation of Pasdong Multi-Purpose Building, Pasdong, Atok, Benguet Lone District
500,000
Construction/Rehabilitation of Poblacion Multi-Purpose Building, Poblacion, Atok, Benguet Lone District
500,000
Construction/Rehabilitation of Poblacion Multi-Purpose Building, Poblacion, Mankayan, Benguet Lone District
500,000
Construction/Rehabilitation of Sapid Multi-Purpose Building, Sapid, Mankayan, Benguet Lone District
500,000
Construction/Rehabilitation of Suyoc Multi-Purpose Building, Suyoc, Mankayan, Benguet Lone District
500,000
Construction/Rehabilitation of Taneg Multi-Purpose Building, Taneg, Mankayan, Benguet Lone District
500,000
Construction/Rehabilitation of Topdac Multi-Purpose Building, Topdac, Atok, Benguet Lone District
500,000
Construction/Rehabilitation Tabio Multi-Purpose Building, Tabio, Mankayan, Benguet Lone District
500,000
Ifugao 1st DEO 16,000,000Construction of Barangay Hall, Poblacion East, Lamut, Ifugao Lone District 2,000,000Construction of Gym, Barangay Amduntog, Asipulo, Ifugao Lone District 2,000,000Construction of Gym, Barangay Bangtinon, Hingyon, Ifugao Lone District 2,000,000
Page 64 of 162
964 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Gym, Barangay Gumhang, Tinoc, Ifugao Lone District 2,000,000Construction of Luta Barangay Hall, Luta, Lagawe, Ifugao Lone District 2,000,000Construction of Nangullunan Barangay Hall, Nangullunan, Hungduan, Ifugao Lone District
2,000,000
Construction/Improvement of Tuplac Barangay Hall, Tuplac, Kiangan, Ifugao Lone District
2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Ifugao Lone District 2,000,000
Ifugao 2nd DEO 22,000,000Construction of Bangaan Barangay Hall, Bangaan, Banaue, Ifugao Lone District 2,000,000
Construction of Bato Alatbang Barangay Hall, Bato Alatbang, Mayoyao, Ifugao Lone District
2,000,000
Construction of Bocos Barangay Hall, Bocos, Banaue, Ifugao Lone District 2,000,000Construction of Gym, Barangay Chumang, Mayoyao, Ifugao Lone District 2,000,000Construction of Gym, Barangay Namnama, Alfonso Lista, Ifugao Lone District 2,000,000
Construction of Ibayong Barangay Hall, Ibayong, Banaue, Ifugao Lone District 2,000,000
Construction of Mini Gym, Barangay Viewpoint, Banaue, Ifugao Lone District 2,000,000Construction of Senior Citizen's Building, Barangay Poblacion, Mayoyao, Ifugao Lone District
2,000,000
Construction of Sta. Maria Barangay Hall, Sta. Maria, Alfonso Lista, Ifugao Lone District
2,000,000
Construction of Taang Barangay Hall, Taang, Aguinaldo, Ifugao Lone District 2,000,000Construction of Two (2) Storey Multi-Purpose Building, Barangay Gohang, Banaue, Ifugao
2,000,000
Mountain Province DEO 42,000,000Construction of Livelihood Multipurpose Building at Poblacion, Tadian, Mountain Province
2,000,000
Construction of Multi-Purpose Building, Barangay Alunogan, Natonin, Mountain Province Lone District
2,000,000
Construction of Multi-Purpose Building, Barangay Ankileng, Sagada, Mountain Province Lone District
2,000,000
Construction of Multi-Purpose Building, Barangay Balaoa, Tadian, Mountain Province Lone District
1,000,000
Construction of Multi-Purpose Building, Barangay Bayyo, Bontoc, Mountain Province Lone District
2,000,000
Construction of Multi-Purpose Building, Barangay Bila, Bauko, Mountain Province Lone District
5,000,000
Construction of Multi-Purpose Building, Barangay Busa, Sabangan, Mountain Province Lone District
2,000,000
Construction of Multi-Purpose Building, Barangay Caluttit, Bontoc, Mountain Province Lone District
1,500,000
Construction of Multi-Purpose Building, Barangay Demang, Sadanga, Mountain Province Lone District
2,000,000
Construction of Multi-Purpose Building, Barangay Gawana, Barlig, Mountain Province Lone District
2,000,000
Construction of Multi-Purpose Building, Barangay Lacmaan, Besao, Mountain Province Lone District
2,000,000
Construction of Multi-Purpose Building, Barangay Mainit, Bontoc, Mountain Province Lone District
2,000,000
Construction of Multi-Purpose Building, Barangay Masla, Tadian, Mountain Province Lone District
3,500,000
Construction of Multi-Purpose Building, Barangay Pide, Sagada, Mountain Province Lone District
2,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Bauko, Mountain Province Lone District
2,000,000
Construction of Multi-Purpose Building, Barangay Sacasacan, Sadanga, Mountain Province Lone District
2,000,000
Construction of Multi-Purpose Building, Fatayan, Bontoc Ili, Bontoc, Mountain Province Lone District
2,000,000
Construction of Multi-Purpose Building, Gawaan, Bila, Bauko, Mountain Province Lone District
1,000,000
Construction of Multi-Purpose Building, Pokisan, Bontoc Ili, Bontoc, Mountain Province Lone District
1,000,000
Construction/Improvement/Repair of Multi-Purpose Building, Barangay Cagubatan, Tadian, Mountain Province Lone District
3,000,000
Region II 343,000,000Batanes DEO 19,500,000
Construction of Itbayat Multi-Purpose Building (Covered Court), Brgy. Sta. Maria, Itbayat, Batanes Lone LD
8,000,000
Construction of Itbud Integrated School Multi-Purpose Building (Covered Court), Itbud, Uyugan, Batanes Lone LD
5,000,000
Construction/Improvement of Basco Gymnasium, Brgy. San Antonio, Basco, Batanes Lone LD
2,000,000
Construction/Improvement of San Joaquin Multi-Purpose Building, Brgy. San Joaquin, Basco, Batanes Lone LD
2,000,000
Rehabilitation/Improvement of NCIP Building, Kayhuvukan, Basco, Batanes Lone LD 2,500,000
Cagayan 1st DEO 8,000,000Construction of Multi-purpose Building, Barangay Poblacion, Buguey, Cagayan 2,000,000
Construction of Multipurpose Building, Brgy. Sta. Rosa, Iguig, Cagayan 1st LD 2,000,000
Construction/Improvement of Multipurpose Building, Brgy. Tupang, Alcala, Cagayan 1st LD
4,000,000
Cagayan 2nd DEO 6,000,000Construction of Multi-Purpose Building, LGU Allacapan, Brgy. Centro West, Allacapan, Cagayan 2nd LD
1,000,000
Construction/Improvement of Multi-purpose Building, Barangay Gumaureng, Piat, Cagayan
2,000,000
Construction/Improvement of Multi-purpose Building, Barangay Poblacion, Rizal, Cagayan
2,000,000
Construction/Improvement of Multi-Purpose Building, Libertad National High School, Abulug, Cagayan 2nd LD
1,000,000
Page 65 of 162
details of dpwh’s programs/projects 965
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Cagayan 3rd DEO 17,800,000Construction Multi-Purpose Building Gammad Elem. School, Gammad, Iguig, Cagayan 3rd LD
2,000,000
Construction of Multi-Purpose Building (Completion) at Brgy. Roma Norte, Enrile, Cagayan 3rd LD
1,000,000
Construction of Multi-Purpose Building at Brgy. Centro Northeast, Solana, Cagayan 3rd LD
1,000,000
Construction of Multi-Purpose Building at Brgy. Centro Southeast, Solana, Cagayan 3rd LD
1,000,000
Construction of Multi-Purpose Building at Brgy. Ubong, Solana, Cagayan 3rd LD 2,000,000
Construction of Multi-Purpose Building, Andarayan South, Solana, Cagayan 3rd LD 1,000,000
Construction of Multi-purpose Building, Barangay Poblacion, Tuao, Cagayan 2,000,000Construction of Multi-Purpose Building, Brgy. Bacring, Amulung, Cagayan 3rd LD 1,000,000
Construction of Multi-Purpose Building, Brgy. Centro Northwest, Solana, Cagayan 3rd LD
1,000,000
Construction of Multi-Purpose Building, Brgy. Malalinta, Tuao, Cagayan 3,000,000Construction of Multipurpose Building, Brgy. Sta. Rosa, Iguig, Cagayan 3rd LD 2,000,000
Construction/Improvement of Multi-Purpose Building, Brgy. Gosi Norte, Tuguegarao City, Cagayan 3rd LD
800,000
Isabela 1st DEO 29,000,000Construction of a Multi-Purpose Building/Health Center, Brgy. San Vicente, Ilagan City, Isabela
2,000,000
Construction of a Multi-Purpose Hall/Gym, San Rafael National and Vocational High School, Brgy. San Rafael, Ilagan City, Isabela
2,000,000
Construction of multi-purpose- building (Gymnasium) 10,000,000Construction of Multi-Purpose Building (Gymnasium), Barangay Fely, Maconacon, Isabela 1st LD
5,000,000
Construction of Multi-Purpose Building, Barangay Andarayan, Delfin Albano,Isabela 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Aneg, Delfin Albano,Isabela 1st LD 2,000,000
Construction of Multi-Purpose Building, Barangay Carmencita, Delfin Albano,Isabela 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Maui, Delfin Albano,Isabela 1st LD 2,000,000
Construction of Multi-Purpose Building, Barangay Rizal, Delfin Albano,Isabela 1st LD 2,000,000
Isabela 2nd DEO 48,400,000Construction of Barangay Cadsalan Community Center, Barangay Cadsalan, San Mariano, Isabela 2nd LD
1,000,000
Construction of Barangay Cataguing Community Center, Barangay Cataguing, San Mariano, Isabela 2nd LD
1,500,000
Construction of Barangay Daragutan East Barangay Hall, Barangay Daragutan East, San Mariano, Isabela 2nd LD
1,000,000
Construction of Barangay Del Pilar Community Center, Barangay Del Pilar, San Mariano, Isabela 2nd LD
1,400,000
Construction of Barangay Dipusu Community Center, Barangay Dipusu, San Mariano, Isabela 2nd LD
1,500,000
Construction of Barangay Disusuan Community Center, Barangay Disusuan, San Mariano, Isabela 2nd LD
1,000,000
Construction of Barangay Ibujan Community Center, Barangay Ibujan, San Mariano, Isabela 2nd LD
1,500,000
Construction of Barangay Lucban Community Center, Barangay Lucban, Benito Soliven, Isabela 2nd LD
720,000
Construction of Barangay Manaoag Community Center, Barangay Manaoag, Quirino, Isabela 2nd LD
1,500,000
Construction of Barangay Marannao Community Center, Barangay Marannao, San Mariano, Isabela 2nd LD
1,500,000
Construction of Barangay Rizal Barangay Hall, Barangay Rizal, Roxas, Isabela 2nd LD 1,500,000
Construction of Barangay San Antonio Community Center, Barangay San Antonio, Roxas, Isabela 2nd LD
1,500,000
Construction of Barangay San Jose Community Center, Barangay San Jose, Roxas, Isabela 2nd LD
1,620,000
Construction of Barangay Tappa Community Center, Barangay Tappa, San Mariano, Isabela 2nd LD
1,500,000
Construction of Barangay Ueg Community Center, Barangay Ueg, San Mariano, Isabela 2nd LD
1,400,000
Construction of Barangay Yeban Sur Community Center, Barangay Yeban Sur, Benito Soliven, Isabela 2nd LD
2,000,000
Construction of Barangay Zamora Community Center, Barangay Zamora, San Mariano, Isabela 2nd LD
1,000,000
Construction of Callang NHS Multi purpose bldg., Barangay District 4, San Manuel, Isabela 2nd LD
1,500,000
Construction of DPWH SDEO Multi-purpose Hall, DPWH Second Dist. Office, Roxas, Isabela 2nd LD
2,500,000
Construction of Quezon National HS Multi-purpose Hall, Barangay Alunan, Quezon, Isabela 2nd LD
2,000,000
Construction of Quirino NHS Multi-purpose Hall, Barangay Luna, Quirino, Isabela 2nd LD
1,500,000
Construction/Improvement of Barangay Alibadabad Community Center roofing, Barangay Alibadabad, San Mariano, Isabela 2nd LD
1,200,000
Construction/Improvement of Barangay Anao Community Center roofing, Barangay Anao, Roxas, Isabela 2nd LD
1,300,000
Construction/Improvement of Barangay Catabban Community center (bleachers), Barangay Catabban, Burgos, Isabela 2nd LD
1,000,000
Construction/Improvement of Barangay Dicamay Community Center roofing, Barangay Dicamay, San Mariano, Isabela 2nd LD
1,000,000
Construction/Improvement of Barangay District 3 Barangay Hall, Barangay District 3, San Manuel, Isabela 2nd LD
1,000,000
Construction/Improvement of Barangay Dolores Community Center roofing, Barangay Dolores, Quirino, Isabela 2nd LD
1,200,000
Construction/Improvement of Barangay Macayucayu Community Center, Barangay Macayucayu, San Mariano, Isabela 2nd LD
1,000,000
Page 66 of 162
966 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Improvement of Barangay Magsaysay Barangay Hall, Barangay Magsaysay, Naguilian, Isabela 2nd LD
1,220,000
Construction/Improvement of Barangay Matusalem Barangay Hall, Barangay Matusalem, Roxas, Isabela 2nd LD
1,000,000
Construction/Improvement of Barangay San Luis Community Center & Barangay Hall, Barangay San Luis, Roxas, Isabela 2nd LD
1,500,000
Construction/Improvement of Barangay San Luis Community Center, Barangay San Luis, Roxas, Isabela 2nd LD
1,500,000
Construction/Improvement of Barangay San Pablo Community Center, Barangay San Pablo, San Mariano, Isabela 2nd LD
1,400,000
Construction/Improvement of Barangay Villaluz Community Center, Barangay Villaluz, Benito Soliven, Isabela 2nd LD
1,000,000
Construction/Improvement of Barangay Vintar repair of Community Center, Barangay Vintar, Quirino, Isabela 2nd LD
1,400,000
Repair of Barangay Minagbag Community center, Barangay Minagbag, Quezon, Isabela 2nd LD
640,000
Repair of Burgos CS, Home Economics Bldg. (repair of tiles), Barangay Caliguian, Burgos, Isabela 2nd LD
400,000
Isabela 3rd DEO 6,000,000Construction of Indigenous Peoples' Center, Barangay Mun. Hall, Centro 2, Angadanan, Isabela 3rd LD
1,000,000
Construction of Multi Purpose Building, Barangay Fugaru, Angadanan, Isabela 3rd LD
1,000,000
Construction of Multi Purpose Building, Barangay Macaniao, Luna, Isabela 3rd LD 2,000,000
Construction of Multi Purpose Building, Barangay Rancho Bassit, Angadanan, Isabela 3rd LD
2,000,000
Isabela 4th DEO 48,800,000Construction of Multi Purpose Building 18,000,000Construction/Completion of Community Center 1,000,000Construction/Completion of existing Barangay Hall 500,000Construction/Completion of existing Community Center 7,500,000Construction/Improvement of existing Community Center, Brgy. Cabugao, Echague, Isabela 4th LD
1,000,000
Construction/Improvement of existing Community Center, Brgy. Diasan, Echague, Isabela 4th LD
1,000,000
Construction/Improvement of existing Community Center, Brgy. Magleticia, Echague, Isabela 4th LD
1,000,000
Construction/Improvement of existing Community Center, Brgy. Malibago, Echague, Isabela 4th LD
1,000,000
Construction/Improvement of existing Community Center, Brgy. Nilumisu, Echague, Isabela 4th LD
550,000
Construction/Improvement of existing Community Center, Brgy. San Antonio Ugad, Echague, Isabela 4th LD
1,000,000
Construction/Improvement of existing Community Center, Brgy. San Salvador, Echague, Isabela 4th LD
500,000
Construction/Improvement of existing Community Center, Brgy. Sinabbaran, Echague, Isabela 4th LD
850,000
Construction/Improvement of existing Community Center, Brgy. Sta. Cruz, Echague, Isabela 4th LD
1,000,000
Construction/Improvement of existing Community Center, Brgy. Abra, Santiago City, Isabela 4th LD
500,000
Construction/Improvement of existing Community Center, Brgy. Bannawag, Jones, Isabela 4th LD
850,000
Construction/Improvement of existing Community Center, Brgy. Calimaturud, Cordon, Isabela 4th LD
850,000
Construction/Improvement of existing Community Center, Brgy. Caniguin, Echague, Isabela 4th LD
1,000,000
Construction/Improvement of existing Community Center, Brgy. Caquilingan, Cordon, Isabela 4th LD
500,000
Construction/Improvement of existing Community Center, Brgy. Castillo, Echague, Isabela 4th LD
1,000,000
Construction/Improvement of existing Community Center, Brgy. Gayong, Cordon, Isabela 4th LD
1,000,000
Construction/Improvement of existing Community Center, Brgy. Gud, San Isidro, Isabela 4th LD
850,000
Construction/Improvement of existing Community Center, Brgy. Patul/HS, Santiago City, Isabela 4th LD
1,000,000
Construction/Improvement of existing Community Center, Brgy. San Antonio, Jones, Isabela 4th LD
850,000
Construction/Improvement of existing Community Center, Brgy. Taliktik, Cordon, Isabela 4th LD
850,000
Construction/Improvement of existing Community Center, Brgy. Villaflor, San Isidro, Isabela 4th LD
850,000
Repair of Multi Purpose Buiding 3,800,000
Nueva Vizcaya 1st DEO 62,500,000Construction of Multi-purpose Building at Bonfal West, Bayombong, Neuva Vizcaya 2,000,000
Construction of Multi-purpose Building at Purok 6, Brgy Busilac, Bayombong, Nueva Vizcaya
20,000,000
Construction, Baresbes Multi Purpose Bldg., Brgy. Baresbes, Quezon, Nueva Vizcaya Lone District
2,000,000
Construction, Bayombong Multi Purpose Bldg., Bayombong, Nueva Vizcaya Lone District
3,000,000
Construction, Bonfal East Multi Purpose Bldg., Barangay Bonfal East, Bayombong, Nueva Vizcaya
2,000,000
Construction, Busilac Multi Purpose Bldg., Brgy. Busilac, Bayombong, Nueva Vizcaya Lone District
2,000,000
Construction, Cabuluan Multi Purpose Bldg., Barangay Cabuluan, Villaverde, Nueva Vizcaya
2,000,000
Construction, Decabacan Multi Purpose Bldg., Brgy. Decabacan, Diadi, Nueva Vizcaya Lone District
2,000,000
Construction, Duruarog Multi Purpose Bldg., Barangay Duruarog, Diadi, Nueva Vizcaya
2,000,000
Construction, Escoting Multi Purpose Bldg., Barangay Escoting, Diadi, Nueva Vizcaya 2,000,000
Construction, Ipil-Cuneg Multi Purpose Bldg., Barangay Ipil-Cuneg, Bayombong, Nueva Vizcaya
2,000,000
Page 67 of 162
details of dpwh’s programs/projects 967
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction, Macate Multi Purpose Bldg., Brgy. Macate, Bambang, Nueva Vizcaya Lone District
2,000,000
Construction, Poblacion Multi Purpose Bldg., Barangay Poblacion, Diadi, Nueva Vizcaya
2,000,000
Construction, Rosario Multi Purpose Bldg., Barangay Rosario, Diadi, Nueva Vizcaya 2,000,000
Construction, San Antonio North Multi Purpose Bldg., Brgy. San Antonio North, Bambang, Nueva Vizcaya Lone District
2,000,000
Construction, San Antonio South Multi Purpose Bldg., Brgy. San Antonio South, Bambang, Nueva Vizcaya Lone District
2,000,000
Construction, San Geronimo Drainage System with road, Barangay San Geronimo, Bagabag, Nueva Vizcaya
2,000,000
Construction/Completion of Boliwao Multi Purpose Bldg., Barangay Boliwao , Quezon, Nueva Vizcaya
1,000,000
Construction/Completion of Nalubbunan Multi Purpose Bldg., Barangay Nalubbunan, Quezon, Nueva Vizcaya
1,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Nueva Vizcaya Lone District
2,000,000
Continuation, Caliat Multi Purpose Bldg. , Barangay Caliat, Quezon, Nueva Vizcaya 2,000,000
Continuation, NVSU Bldg. (Dormitory), Bambang, Nueva Vizcaya 3,500,000
Nueva Vizcaya 2nd DEO 41,500,000Construction, Alang-Salacsac Multi Purpose Bldg., Brgy. Alang-Salacsac, Kayapa, Nueva Vizcaya Lone District
2,000,000
Construction, Bagumbayan Multi Purpose Bldg., Brgy. Bagumbayan, Dupax del Sur, Nueva Vizcaya Lone District
2,000,000
Construction, Canarem Multi Purpose Bldg., Barangay Canarem, Aritao, Nueva Vizcaya
2,000,000
Construction, Comon Multi Purpose Bldg., Barangay Comon, Aritao, Nueva Vizcaya 2,000,000
Construction, Dupax del Sur NHS Bldg., Dupax del Sur, Nueva Vizcaya Lone District 2,000,000
Construction, Kasibu Learning Center Bldg., Kasibu, Nueva Vizcaya 2,000,000Construction, KNAS NHS Bldg., Brgy. Pudi, Kasibu, Nueva Vizcaya Lone District 2,000,000
Construction, Lupa Multi Purpose Bldg., Brgy. Lupa, Kasibu, Nueva Vizcaya Lone District
2,000,000
Construction, Mungia Multi Purpose Bldg., Barangay Mungia, Dupax del Norte, Nueva Vizcaya
2,000,000
Construction, Palabotan Multi Purpose Bldg., Barangay Palabotan, Dupax del Sur, Nueva Vizcaya
2,000,000
Construction, Pampanga Multi Purpose Bldg., Brgy. Pampang, Kayapa, Nueva Vizcaya Lone District
2,000,000
Construction, Paquet Multi Purpose Bldg., Brgy. Paquet, Kasibu, Nueva Vizcaya Lone District
2,000,000
Construction, Pinayag Multi Purpose Bldg., Barangay Pinayag, Kayapa, Nueva Vizcaya
2,500,000
Construction, Sinapaoan Multi Purpose Bldg. (Public Market), Barangay Sinapaoan, Sta. Fe, Nueva Vizcaya
2,000,000
Construction, Sta. Cruz Pingkian HS Bldg., Brgy. Pingkian, Kayapa, Nueva Vizcaya Lone District
2,000,000
Construction, Tactac Multi Purpose Bldg., Barangay Tactac, Sta. Fe, Nueva Vizcaya 2,000,000
Construction/Completion of Cutar Multi Purpose Bldg., Barangay Cutar, Aritao, Nueva Vizcaya
2,000,000
Construction/Completion of Lublub Multi Purpose Bldg., Barangay Lublub, Alfonso Castaneda, Nueva Vizcaya
2,000,000
Construction/Improvement, Mabasa Multi Purpose Bldg., Brgy. Mabasa, Dupax del Norte, Nueva Vizcaya Lone District
1,000,000
Rehabilitation, Dupax del Norte Multi Purpose Bldg. Sports Complex , Dupax del Norte, Nueva Vizcaya
4,000,000
Quirino DEO 55,500,000Construction of Multi Purpose Building, Barangay Ponggo, Nagtipunan, Quirino 2,000,000
Construction of Multi Purpose Building, Barangay Rizal, Saguday, Quirino 2,000,000Construction of Multi Purpose Building, Barangay San Leonardo, Aglipay, Quirino 2,000,000
Construction of Multi Purpose Building, Barangay Sto. Domingo, Cabarroguis, Quirino 2,000,000
Construction of Multi-Purpose Building, Aglipay East School, Aglipay, Quirino Lone District
2,700,000
Construction of Multi-Purpose Building, Balligui/HS, Maddela, Quirino Lone District 4,000,000
Construction of Multi-purpose Building, Barangay Poblacion, Nagtipunan, Quirino 2,000,000
Construction of Multi-Purpose Building, Dipintin/HS, Maddela, Quirino Lone District 2,000,000
Construction of Multi-Purpose Building, Dumabato Sur/IS, Maddela, Quirino Lone District
4,000,000
Construction of Multi-Purpose Building, Dungo Osmeña, Aglipay, Quirino Lone District
2,000,000
Construction of Multi-Purpose Building, Salvacion/Es, Saguday, Quirino Lone District 2,700,000
Construction of Multi-Purpose Building, San Isidro /IS, Diffun, Quirino Lone District 4,000,000
Construction of Multi-Purpose Building, San Marcos, Cabarroguis, Quirino Lone District
2,000,000
Construction of Multi-Purpose Building, Sitio Cupianan,Baguio Village, Diffun, Quirino Lone District
2,700,000
Construction of Multi-Purpose Building, Sitio Lumague/ES La Paz, Saguday, Quirino Lone District
2,700,000
Construction of Multi-Purpose Building, Victoria/HS, Aglipay, Quirino Lone District 2,000,000
Construction of Multi-Purpose Building, Villa Ventura/ES, Aglipay, Quirino Lone District
2,700,000
Construction/Completion of Multi Purpose Building, Barangay Asaklat, Nagtipunan, Quirino
2,000,000
Construction/Completion of Multi Purpose Building, Barangay Dibul E/S, Saguday, Quirino
2,000,000
Page 68 of 162
968 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Completion of Multi Purpose Building, Barangay Lapaz E/S, Saguday, Quirino
2,000,000
Construction/Completion of Multi Purpose Building, Barangay San Marcos, Cabarroguis, Quirino
4,000,000
Construction/Completion of Multi Purpose Building, Nagtipunan H/S, Nagtipunan, Quirino
2,000,000
Region III 557,000,000Aurora DEO 31,000,000
Construction of a Multi-Purpose Building (Alternative Learning Class Rooms), Brgy. 03, Maria Aurora, Aurora Province Lone District
4,000,000
Construction of a Multi-Purpose Building (Alternative Learning Class Rooms), Brgy. 4, Baler, Aurora Province Lone District
3,000,000
Construction of a Multi-Purpose Building (Alternative Learning Class Rooms), Brgy. South Poblacion, Dipaculao, Aurora Province Lone District
3,000,000
Construction of a Multi-Purpose Building (Senior Citizens’ Building), Brgy. Paleg, Dinalungan, Aurora Province Lone District
2,000,000
Construction of a Multi-Purpose Building, Brgy. Mijares, Dipaculao, Aurora Province Lone District
2,000,000
Construction of a Multi-Purpose Building, Brgy. Mucdol, Dipaculao, Aurora Province Lone District
2,000,000
Construction of a Multi-Purpose Building, Brgy. Poblacion Zone II, Dinalungan, Aurora Province Lone District
2,000,000
Construction of a Multi-Purpose Building, Brgy. Poblacion, Dingalan, Aurora Province Lone District
2,000,000
Construction of a Multi-Purpose Building, Brgy. Puangi, Dipaculao, Aurora Province Lone District
3,000,000
Construction of a Two-Storey Multi-Purpose Building (Health Center), Brgy. Dibalo, San Luis, Aurora Province Lone District
2,000,000
Construction of a Two-Storey Multi-Purpose Building, Brgy. Bagtu, Maria Aurora, Aurora Province Lone District
2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Aurora Lone District 4,000,000
Bataan 1st DEO 22,700,000Construction of Multipurpose Building (Trade Center), Brgy. Tabing Ilog, Samal, Bataan
5,000,000
Construction of 2nd Floor Multi-Purpose Building, Barangay Sto. Niño, Dinalupihan, Bataan 1st LD
2,500,000
Construction of Multi-Purpose Building (Extension), Barangay Wawa, Abucay, Bataan 1st LD
2,200,000
Construction of Multi-Purpose Building, Balsik Elementary School, Balsik, Hermosa, Bataan 1st LD
2,500,000
Construction of Multi-Purpose Building, Barangay East Calaguiman, Samal, Bataan 1st LD
6,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Puksuan, Orani, Bataan 1st LD
2,000,000
Repair/Rehabilitation of Multi-Purpose Building, Barangay J.C. Payumo, Dinalupihan, Bataan 1st LD
2,500,000
Bataan 2nd DEO 6,000,000Construction of Evacuation Center Phase I at Pilar Municipal Compound, Brgy. Panilao, Pilar, Bataan
6,000,000
Bulacan 1st DEO 74,500,000Const. of Covered Court at Brgy. San Pedro-Hangga, Hagonoy, Bul. 3,000,000Const. of Covered Court at Mambog, City of Malolos, Bulacan 2,500,000Const. of Multi-Purpose Building at Balayong, City of Malolos, Bulacan 2,000,000Const. of Multi-Purpose Building at Barangay Dampol 2nd A, Pulilan, Bulacan 2,000,000Const. of Multi-Purpose Building at Barangay Iba Este, Calumpit, Bulacan 2,000,000Const./Improvement of Multi-Purpose Building at San Isidro II, Paombong, Bulacan 2,000,000
Construction of Baliuag-Federation of Senior Citizens Association of the Philippines (FSCAP) Center Brgy. Poblacion, Baliuag, Bulacan
1,000,000
Construction of Barangay Hall Brgy. Buisan, Bustos, Bulacan 1,000,000Construction of Barangay Hall Brgy. Catacte, Bustos, Bulacan 1,000,000Construction of Health Center Brgy. Sta. Cruz, Guiguinto, Bulacan 1,000,000Construction of Health Center Brgy. Tibagan, Bustos, Bulacan 1,000,000Construction of MSWDO Activity Center Brgy. Zone 2, Bagong Nayon, Baliuag, Bulacan
1,000,000
Construction of Multi Purpose Building (Day Care) at Cofradia, City of Malolos Bulacan
2,000,000
Construction of Multi Purpose Building at Pinagbakahan, City of Malolos, Bulacan 2,000,000
Construction of Multi Purpose Building at San Pedro, Hangga High School, Hagonoy, Bulacan
3,000,000
Construction of Multi Purpose Building at Sta. Cruz, Hagonoy, Bulacan 2,000,000Construction of Multi Purpose Building, Barangay Mojon, City of Malolos, Bulacan 1st LD
2,000,000
Construction of Multi Purpose Building, Barangay Tampok, Hagonoy, Bulacan 1st LD 2,000,000
Construction of Senior Citizens' Hall Brgy. Malis, Guiguinto, Bulacan 1,000,000Construction of Senior Citizens' Hall Brgy. San Pedro, Bustos, Bulacan 1,000,000Construction of Senior Citizens' Hall Multipurpose Building, Poblacion, Bustos, Bulacan 2nd LD
2,000,000
Construction of Two Storey Multi-purpose Training Center Building at LKBP Compound Brgy Ligas, City of Malolos, Bulacan
9,000,000
Construction of Women and Children Center Brgy. Poblacion, Baliuag, Bulacan 1,000,000
Construction/Completion of Multi-Purpose Building at Poblacion Iba, Hagonoy, Bul. 2,000,000
Construction/Improvement of Community Center (Barangay Multi-Purpose Hall) Brgy. Sumapang Matanda, Malolos City
1,000,000
Construction/Improvement of Guiguinto Gym Multipurpose Building, Poblacion, Guiguinto, Bulacan 2nd LD
4,000,000
Construction/Improvement of Gym Multipurpose Building, San Roque, Pandi, Bulacan 2nd LD
1,000,000
Construction/Improvement of Gym Multipurpose Building, Siling Bata, Pandi, Bulacan 2nd LD
2,000,000
Construction/Improvement of Multipurpose Building Northville 5 ES, Batia, Bocaue, Bulacan 2nd LD
1,000,000
Page 69 of 162
details of dpwh’s programs/projects 969
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Improvement of Multipurpose Building, Baliwag North CS, Poblacion, Baliwag, Bulacan 2nd LD
700,000
Construction/Improvement of Multipurpose Building, Banga 2nd, Plaridel, Bulacan 2nd LD
700,000
Construction/Improvement of Multi-Purpose Building, Barangay Bolacan, Bocaue, Bulacan
1,000,000
Construction/Improvement of Multipurpose Building, Bustos CS, Poblacion, Bustos 2nd LD
700,000
Construction/Improvement of Multipurpose Building, Cut-cut ES, Cut-cut, Guiguinto, Bulacan 2nd LD
700,000
Construction/Improvement of Multipurpose Building, Daungan ES, Daungan, Guiguinto, Bulacan 2nd LD
700,000
Construction/Improvement of Multipurpose Building, Lolomboy, Bocaue, Bulacan 2nd LD
700,000
Construction/Improvement of Multipurpose Building, Malamig HS, Malamig, Bustos, Bulacan 2nd LD
700,000
Construction/Improvement of Multipurpose Building, Mariano Ponce HS, Bagong Nayon, Baliwag, Bulacan 2nd LD
1,000,000
Construction/Improvement of Multipurpose Building, Sto. Nino ES, Sto. Nino, Pandi, Bulacan 2nd LD
1,000,000
Construction/Improvement of Multipurpose Building, Sto. Nino HS, Sto. Nino, Baliwag, Bulacan 2nd LD
700,000
Construction/Improvement of Multipurpose Building, Tabang, Plaridel, Bulacan 2nd LD
700,000
Construction/Improvement of Multipurpose Building, Tibagan ES, Tibagan, Bustos 2nd LD
700,000
Construction/Improvement of Pandi Sports Complex Multipurpose Building, Bunsuran I, Pandi, Bulacan 2nd LD
3,000,000
Rehabilitation of Multi-Purpose Building at General Alejo Santos at Guinhawa, Malolos, Bulacan
2,000,000
Repair/Rehabilitation of Multi-Purpose Building, Barangay San Nicolas, Hagonoy, Bulacan 1st LD
2,000,000
Bulacan 2nd DEO 101,000,000Construction of 2 Rooms Multi-Purpose Building, Barangay Kaypian, San Jose Del Monte City Lone District
2,000,000
Construction of Barangay Hall Brgy. Diliman 2, San Rafael, Bulacan 1,000,000Construction of Barangay Hall Brgy. Minuyan IV, San Jose Del Monte City, Bulacan 1,000,000
Construction of Barangay Hall Brgy. San Juan, San Ildefonso, Bulacan 1,000,000Construction of Barangay Hall Phase 2, Barangay Camalig, Meycauayan City, Bulacan 4th LD
2,500,000
Construction of Barangay Hall, Bagong Buhay III, San Jose del Monte City Lone District
1,500,000
Construction of Barangay Hall, Biak-na-Bato, San Miguel 3rd LD 1,000,000Construction of Barangay Hall, Brgy. Capihan, San Rafael, Bulacan 1,000,000Construction of Barangay Hall, Bubulong Munti, San Ildefonso 3rd LD 1,500,000Construction of Barangay Hall, Casalat, San Ildefonso 3rd LD 1,000,000Construction of Barangay Hall, Ciudad Real, San Jose del Monte City Lone District 1,000,000
Construction of Barangay Hall, Kaypian, San Jose del Monte City Lone District 1,500,000
Construction of Barangay Hall, Labne, San Miguel 3rd LD 2,000,000Construction of Barangay Hall, Lapnit, San Ildefonso 3rd LD 2,000,000Construction of Barangay Hall, Lawang Pare, San Jose del Monte City Lone District 1,000,000
Construction of Barangay Hall, Pinagtulayan, Norzagaray 3rd LD 1,000,000Construction of Barangay Hall, San Rafael I, San Jose del Monte City Lone District 1,000,000
Construction of Barangay Hall, Sapang Pahalang, San Rafael 3rd LD 1,000,000Construction of Barangay Hall, Sto.Nino I, San Jose del Monte City Lone District 2,000,000
Construction of Barangay Hall, Telepatio, San Ildefonso 3rd LD 1,000,000Construction of Covered Court Goldenville Elementary School Brgy. Minuyan Proper, San Jose Del Monte City, Bulacan
2,000,000
Construction of Evacuation Center Brgy. Nagbalon, Marilao, Bulacan 2,000,000Construction of Health Center Brgy. Dagat-Dagatan, San Rafael, Bulacan 1,000,000Construction of Health Center Brgy. FH-Mulawin, San Jose Del Monte City, Bulacan 1,000,000
Construction of Health Center Brgy. Matimbubong, San Ildefonso, Bulacan 1,000,000Construction of Health Center Brgy. Pansumaloc, San Rafael, Bulacan 1,000,000Construction of Health Center Brgy. Saluysoy, Meycauayan City, Bulacan 2,000,000Construction of Health Center Brgy.Malhacan, Meycauayan City, Bulacan 2,000,000Construction of Health Center, Bangkal, Norzagaray 3rd LD 1,000,000Construction of Health Center, Brgy. Mabalas-balas, San Rafael, Bulacan 1,000,000Construction of Health Center, Brgy. Saog, Marilao, Bulacan 1,000,000Construction of Multi-Purpose Building (with back filling), Barangay Camalig, Meycauayan City, Bulacan 4th LD
4,500,000
Construction of Multi-Purpose Building , Barangay Bulac, Sta. Maria, Bulacan 4th LD 4,000,000
Construction of Multi-Purpose Building at Sta. Cruz Elementary School, Barangay Sta. Cruz, Sta. Maria, Bulacan 4th LD
4,000,000
Construction of Multi-Purpose Building for Parada Elementary School, Barangay Parada, Sta. Maria, Bulacan 4th LD
4,000,000
Construction of Multi-Purpose Building, Barangay Sibul, San Miguel, Bulacan 3rd LD 2,000,000
Construction of Multipurpose Building, Sta. Cruz V, San Jose del Monte City Lone District
1,000,000
Construction of Multipurpose Building, Sta.Cruz IV, San Jose del Monte City Lone District
1,000,000
Construction of Multi-Purpose Covered Gymnasium Angat National High School, Brgy. Taboc, Angat, Bulacan
2,000,000
Construction of Multipurpose Hall, Bayabas, Dona Remedios Trinidad 3rd LD 1,000,000Construction of Multi-Purpose Hall, Salacot, San Miguel 3rd LD 1,000,000Construction of Persons with Disability (PWD) Hall Brgy. Kaypian, San Jose Del Monte City, Bulacan
1,000,000
Construction of Senior Citizens' Hall Brgy. Poblacion, San Ildefonso, Bulacan 1,000,000Construction of Senior Citizen's Hall Brgy. Gaya-gaya, San Jose Del Monte City, Bulacan
1,000,000
Construction of Senior Citizen's Hall Brgy. Minuyan II, San Jose Del Monte City, Bulacan
1,000,000
Page 70 of 162
970 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Senior Citizen's Hall Brgy. Minuyan V, San Jose Del Monte City, Bulacan
1,000,000
Construction of Senior Citizen's Hall Brgy. San Rafael V, San Jose Del Monte City, Bulacan
1,000,000
Construction of Senior Citizen's Hall, Brgy. FVR, Norzagaray, Bulacan 1,000,000Construction of Senior Citizens Hall, Maasim, San Rafael 3rd LD 1,000,000Construction of Senior Citizens Hall, Tigbe, Norzagaray 3rd LD 1,000,000Construction/Improvement of Multi-Purpose Building, Barangay Niugan, Angat, Bulacan
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Saog, Marilao, Bulacan 4th LD
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Sto. Cristo, Angat, Bulacan
1,000,000
Construction/Improvement of Multipurpose Gymnasium, Poblacion, San Miguel 3rd LD
2,000,000
Construction/Improvement of Senior Citizens' Hall Brgy. Langka, Meycauayan City, Bulacan
1,000,000
Construction/Rehabilitation of Various Infrastructure Projects, San Jose Del Monte City Lone District
13,500,000
Rehabilitation of Multi-Purpose Building, Barangay San Lorenzo, Norzagaray, Bulacan 1,000,000
Repair and Rehabilitation of Municipal Multi-Purpose Building, Sta. Cruz, Angat, Bulacan 3rd LD
4,000,000
Nueva Ecija 1st DEO 128,500,000Construction Of Barangay Hall, Bantug, Guimba, Nueva Ecija 1st LD 1,000,000Construction Of Barangay Hall, Esguerra, Talavera, Nueva Ecija 1st LD 1,000,000Construction Of Barangay Hall, Macatcatuit, Guimba, Nueva Ecija 1st LD 1,000,000Construction Of Barangay Hall, Malasin, Sto. Domingo, Nueva Ecija 1st LD 1,000,000Construction Of Barangay Hall, Maybubon, Guimba, Nueva Ecija 1st LD 1,000,000Construction Of Barangay Hall, Poblacion East 2, Aliaga, Nueva Ecija 1st LD 1,000,000Construction Of Barangay Hall, Sta. Lucia, Guimba, Nueva Ecija 1st LD 1,000,000Construction of Barangay Hall, Sto. Cristo, Quezon , Nueva Ecija 1,000,000Construction Of Barangay Hall, Triala, Guimba, Nueva Ecija 1st LD 1,000,000Construction of Multipurpose building (barangay hall), Brgy. Sto. Domingo, Lupao, Nueva Ecija 2nd LD
1,000,000
Construction of Multipurpose building (Day Care Center), Brgy. Patola, Talugtug, Nueva Ecija 2nd LD
1,000,000
Construction of Multi-Purpose Building, Barangay Curva, Cuyapo, Nueva Ecija 2,000,000
Construction of Multipurpose building, Barangay Curva, Munoz, Nueva Ecija 5,400,000Construction of Multipurpose building, Barangay Labney, Munoz, Nueva Ecija 2,000,000Construction of Multipurpose building, Barangay Marikit, Pantabangan, Nueva Ecija 4,800,000
Construction of Multipurpose building, Barangay Murcon, Llanera, Nueva Ecija 4,000,000
Construction of Multipurpose building, Barangay Plaridel, Llanera, Nueva Ecija 4,000,000Construction of Multipurpose building, Barangay Poblacion West, Pantabangan, Nueva Ecija
4,800,000
Construction of Multipurpose building, Barangay San Agustin, Carranglan, Nueva Ecija
2,400,000
Construction of Multipurpose building, Barangay Sapang Cauayan, Munoz, Nueva Ecija
4,000,000
Construction of Multipurpose building, Barangay Sitio Palasapas, Manicla, San Jose City, Nueva Ecija
2,400,000
Construction of Multipurpose building, Barangay Villa Nati, Munoz, Nueva Ecija 4,000,000
Construction of Multipurpose building, Bical ES, Muñoz, Nueva Ecija 2nd LD 2,400,000Construction of Multi-Purpose Building, Brgy Cavite, Guimba, Nueva Ecija 1,500,000Construction of Multipurpose building, Brgy. Bagong Flores, Lupao, Nueva Ecija 2nd LD
3,200,000
Construction of Multipurpose building, Brgy. Caanawan, San Jose City, Nueva Ecija 2nd LD
2,000,000
Construction of Multipurpose building, Brgy. General Luna, Llanera, Nueva Ecija 2nd LD
2,000,000
Construction of Multipurpose building, Brgy. General Luna, Rizal, Nueva Ecija 2nd LD 2,000,000
Construction of Multipurpose building, Brgy. Osmeña, Talugtug, Nueva Ecija 2nd LD 2,000,000
Construction of Multipurpose building, Brgy. Pag-asa, Rizal, Nueva Ecija 2nd LD 3,200,000
Construction of Multipurpose building, Brgy. Poblacion East, Pantabangan, Nueva Ecija 2nd LD
2,000,000
Construction of Multipurpose building, Brgy. Poblacion North, Lupao, Nueva Ecija 2nd LD
2,000,000
Construction of Multipurpose building, Brgy. San Andres, Muñoz, Nueva Ecija 2nd LD 3,200,000
Construction of Multipurpose building, Brgy. San Antonio Weste, Lupao, Nueva Ecija 2nd LD
3,200,000
Construction of Multipurpose building, Brgy. San Pedro, Lupao, Nueva Ecija 2nd LD 2,000,000
Construction of Multipurpose building, Buted E/S, Talugtug, Nueva Ecija 2,400,000Construction of Multipurpose building, Calabalabaan E/S, Munoz, Nueva Ecija 2,400,000Construction of Multipurpose building, Camanggahan E/S, Gen Luna, Carranglan, Nueva Ecija 2nd LD
1,200,000
Construction of Multipurpose building, Casilagan E/S, Rizal, Nueva Ecija 2,400,000Construction of Multipurpose building, Liberty E/S, Pantabangan, Nueva Ecija 2,400,000Construction of Multipurpose building, Minuli Elem School, Carranglan, Nueva Ecija 2nd LD
1,200,000
Construction of Multipurpose building, New Murcon E/S, Llanera, Nueva Ecija 2,400,000Construction Of Multipurpose Building, Pantoc, Zaragoza, Nueva Ecija 1st LD 2,000,000Construction of Multipurpose building, Sampaloc E/S, Pantabangan, Nueva Ecija 2,400,000
Construction of Multipurpose building, San Antonio Este E/S, Lupao, Nueva Ecija 2,400,000
Construction of Multipurpose building, Sta. Barbara HS, Llanera, Nueva Ecija 2nd LD 3,200,000
Construction of Multipurpose building, Sta. Monica ES, Rizal, Nueva Ecija 2nd LD 1,200,000
Construction of Multipurpose building, Villanueve E/S, Villa Rica, Pantabangan, Nueva Ecija
2,400,000
Page 71 of 162
details of dpwh’s programs/projects 971
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Road with Drainage, Barangay Poblacion West, Lupao, Nueva Ecija 3,000,000
Construction Of Senior Citizen Hall, Calipahan, Talavera, Nueva Ecija 1st LD 1,000,000Construction Of Senior Citizen Hall, Paitan Norte, Cuyapo, Nueva Ecija 1st LD 1,000,000
Construction Of Senior Citizen Hall, Tabacao, Talavera, Nueva Ecija 1st LD 1,000,000Construction/Improvement Of Multi-Purpose Building, Cabaducan West, Nampicuan, Nueva Ecija 1st LD
500,000
Construction/Improvement Of Multi-Purpose Building, Poblacion, Sto. Domingo, Nueva Ecija 1st LD
500,000
Construction/Improvement Of Multi-Purpose Building, San Felipe Matanda, Aliaga, Nueva Ecija 1st LD
500,000
Construction/Improvement Of Multi-Purpose Building, Sta. Cruz, Zaragoza, Nueva Ecija 1st LD
500,000
Construction/Improvement Of Multi-Purpose Building, Sto. Cristo, Guimba, Nueva Ecija 1st LD
500,000
Construction/Improvement Of Multi-Purpose Building, Sto. Rosario Young, Zaragoza, Nueva Ecija 1st LD
500,000
Rennovation of Ospital ng Lungsod ng San Jose, A.O. Pascual St., City Health Office Compound, San Jose City, Nueva Ecija
10,000,000
Nueva Ecija 2nd DEO 23,500,000Consruction of Multipurpose Building (Covered Court), Barangay Sta. Rita, Cabiao, Nueva Ecija 4th LD
3,200,000
Consruction of Multipurpose Building, Barangay Sta. Cruz, San Antonio, Nueva Ecija 4th LD
4,800,000
Construction of Multi-Purpose Building in Brgy. Bitas, Cabanatuan City, Nueva Ecija 3rd LD
4,000,000
Construction of Multi-Purpose Building, Barangay Dampulan, Jaen, Nueva Ecija 2,000,000
Construction of Multi-Purpose Building, Brgy. Adorable, San Leonardo, Nueva Ecija 5,000,000
Construction of Multi-Purpose Center, Palayan City, Nueva Ecija 1,500,000Rehabilitation/ Repair of Senior Citizen’s Hall, Barangay Mayapyap Norte, Cabanatuan City, Nueva Ecija
1,000,000
Renovation of Barangay Hall in Brgy. Sto. Tomas, Penaranda, Nueva Ecija 4th LD 2,000,000
Pampanga 1st DEO 33,700,000Construction of 2-storey Barangay Hall, Malpitic, San Fernando City, Pampanga 3rd LD
1,800,000
Construction of Bagang Barangay Hall, Bagang, Masantol, Pampanga 4th LD 1,000,000
Construction of Buas Barangay Hall, Buas, Candaba, Pampanga 4th LD 1,000,000Construction of Cambasi Barangay Hall, Cambasi, Masantol, Pampanga 4th LD 1,000,000
Construction of Lourdes Barangay Hall, Lourdes, Minalin, Pampanga 4th LD 1,000,000Construction of Multi-purpose Building at Sta Catalina High School, San Luis, Pampanga
2,000,000
Construction of Multipurpose Building, Baliti, Arayat, Pampanga 3rd LD 1,500,000Construction of Multi-Purpose Building, Brgy. San Francisco, Macabebe, Pampanga 1,500,000
Construction of Multipurpose Building, Cabalantian, Bacolor, Pampanga 3rd LD 1,500,000
Construction of Multipurpose Building, Calibutbut, Bacolor, Pampanga 3rd LD 2,000,000Construction of Multipurpose Building, Magliman, San Fernando City, Pampanga 3rd LD
1,000,000
Construction of Multipurpose Building, San Roque Bitas, Arayat, Pampanga 3rd LD 1,500,000
Construction of Senior Citizen Center, Lapaz Turu, Arayat, Pampanga 1,000,000Construction/Rehabilitation of Various Infrastructure Projects, Pampanga 4th LD 11,900,000
Improvement of Sta. Ana National High School, San Agustin, Sta. Ana, Pampanga 3rd LD
2,000,000
Rehabilitation/Repair of Barangay hall, Mapalad, Arayat, Pampanga 3rd LD 500,000Rehabilitation/Repair of Barangay hall, San Agustin Norte, Arayat, Pampanga 3rd LD 500,000
Rehabilitation/Repair of Barangay hall, Suclaban, Mexico, Pampanga 3rd LD 500,000Rehabilitation/Repair/Improvement of San Isidro Matua Barangay Hall, San Isidro Matua, Masantol, Pampanga 4th LD
500,000
Pampanga 2nd DEO 13,500,000Construction of Covered Court in Anon, Floridablanca, Pampanga 2,000,000Construction of Multi-purpose Building in Sto. Domingo, Lubao, Pampanga 2,000,000Construction of Multi-Purpose Covered Court at San Juan Nepomuceno Elementary School, Brgy. San Juan, Nepomuceno, Betis, Guagua, Pampanga
2,000,000
Construction of School Building for Guagua Community College, Sta Filomena, Gua-gua, Pampanga
2,000,000
Construction/Improvement of Multi-purpose Bldg. in Pabanlag, Floridablanca, Pampanga
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Remedios, Lubao, Pampanga
1,500,000
Rehabilitation of Multi-purpose Building in San Antonio, Guagua, Pampanga 2,000,000
Pampanga 3rd DEO 8,000,000Construction of 2 Rooms Multi-Purpose Building, Barangay Mining, Angeles City, Pampanga
2,000,000
Construction of Multi-Purpose Building, Brgy. Lapaz, Magalang, Pampanga 1,500,000Construction of Senior Citizen Center, Barangay Margot, Angeles City, Pampanga 1,000,000
Construction/Improvement of Legislative Building, San Nicolas I, Magalang 1st LD 2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Sto. Domingo, Angeles City, Pampanga
1,500,000
Tarlac 1st DEO 29,000,000Construction of Multipurpose Building (Public Market), Poblacion, San Manuel, Tarlac 5,000,000
Construction Two (2) Storey Barangay Hall at Barangay Laoang, Tarlac City, Tarlac 2nd LD
2,000,000
Page 72 of 162
972 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction Two (2) Storey Barangay Hall at Barangay Luna, Gerona, Tarlac 2nd LD 2,000,000
Construction Two (2) Storey Multi Purpose Hall at Barangay San Juan De Mata, Tarlac City, Tarlac 2nd LD
2,000,000
Construction Two Storey Multi Purpose Hall at Barangay Burot, Tarlac City, Tarlac 2nd LD
2,000,000
Construction Two Storey Multi Purpose Hall at Barangay Capehan, Tarlac City, Tarlac 2nd LD
2,000,000
Construction Two Storey Multi Purpose Hall at Barangay Masalasa, Victoria, Tarlac 2nd LD
2,000,000
Construction Two Storey Multi Purpose Hall at Barangay San Bartolome, Gerona, Tarlac 2nd LD
2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Tarlac 2nd LD 10,000,000
Tarlac 2nd DEO 46,000,000Construction of Building, Brgy. Minane, Concepcion, Tarlac 3,500,000Construction of Building, Brgy. Tinang, Concepcion , Tarlac 2,500,000Construction of Multi-Purpose Building in Barangay Balanoy, La Paz, Tarlac 3rd LD 3,000,000
Construction of Multi-Purpose Building in Barangay Calius Gueco, Concepcion, Tarlac 3rd LD
3,000,000
Construction of Multi-Purpose Building in Barangay Culubasa, Bamban, Tarlac 3rd LD 3,000,000
Construction of Multi-Purpose Building in Barangay Cut-Cut 1, Capas, Tarlac 3rd LD 3,300,000
Construction of Multi-Purpose Building in Barangay La Purisima, La Paz, Tarlac 3rd LD
3,000,000
Construction of Multi-Purpose Building in Barangay Lilibangan, Concepcion, Tarlac 3rd LD
3,000,000
Construction of Multi-Purpose Building in Barangay Malonzo, Bamban, Tarlac 3rd LD 3,000,000
Construction of Multi-Purpose Building in Barangay Malupa, Concepcion, Tarlac 3rd LD
3,000,000
Construction of Multi-Purpose Building in Barangay Mangga, Capas, Tarlac 3rd LD 3,300,000
Construction of Multi-Purpose Building in Barangay Matayumtayum, La Paz, Tarlac 3rd LD
3,000,000
Construction of Multi-Purpose Building in Barangay Navy (Resettlement Area), Capas, Tarlac 3rd LD
3,400,000
Construction of Multi-Purpose Building in Barangay Parulung, Concepcion, Tarlac 3rd LD
3,000,000
Construction of Multi-Purpose Building in Barangay Sto. Nino, Bamban, Tarlac 3rd LD 3,000,000
Zambales 1st DEO 9,700,000Construction of Bangan Multi-Purpose Building, Barangay Bangan, Botolan, Zambales 2nd LD
3,000,000
Construction of Dampay Plaza, Barangay Dampay, Candelaria, Zambales 2nd LD 2,000,000
Construction of Multi-Purpose Building, Barangay Porac, Botolan, Zambales 2nd LD 2,000,000
Construction/Improvement of Brgy. Tanod Outpost, Brgy Alusiis, San Narciso, Zambales
700,000
Construction/Improvement of Lauis Multi-Purpose Building, Barangay Lauis, Candelaria, Zambales 2nd LD
2,000,000
Zambales 2nd DEO 29,900,000Construction of Multi-Purpose Building, Barangay Balaybay, Castillejos, Zambales 1st LD
2,800,000
Construction of Multi-Purpose Building, Barangay Barretto, Olongapo City, Zambales 1st LD
3,500,000
Construction of Multi-Purpose Building, Barangay Ilwas E/S, Subic, Zambales 1st LD 3,500,000
Construction of Multi-Purpose Building, Barangay Linasin, San Marcelino, Zambales 1st LD
1,000,000
Construction of Multi-Purpose Building, Barangay Lucero, San Marcelino, Zambales 1st LD
2,500,000
Construction of Multi-Purpose Building, Barangay New Ilalim, Olongapo City, Zambales 1st LD
3,500,000
Construction of Multi-Purpose Building, Barangay San Isidro, San Marcelino, Zambales 1st LD
3,500,000
Construction of Multi-Purpose Building, Barangay Sta. Fe, San Marcelino, Zambales 1st LD
3,500,000
Construction of Multi-Purpose Building, Barangay Sta. Rita, Olongapo City, Zambales 1st LD
3,600,000
Construction of Multi-Purpose Building, Brgy San Roque, Castillejos, Zambales 1,000,000
Construction of Multi-Purpose Building, Brgy. San Roque, Castillejos, Zambales 1,000,000
Rehabilitation of Multi-Purpose Building, Barangay Buenavista, Castillejos, Zambales 1st LD
500,000
Region IV-A 720,000,000Batangas 1st DEO 18,000,000
Construction of Multipurpose Building (Barangay Hall and Stage), Lemery, Batangas 2,000,000
Construction of Multi-Purpose Building (Barangay Hall), Talibayog, Calatagan, Batangas
1,000,000
Construction of Multipurpose Building (Covered Court), Brgy. Balaytigue, Nasugbu, Batangas
2,000,000
Construction of Multipurpose Building (Covered Court), Brgy. Malibu, Tuy, Batangas 2,000,000
Construction of Multi-Purpose Building (Covered Court), Malibu, Tuy, Batangas 2,000,000
Construction of Multipurpose Covered Court in Barangay Gulod, Calatagan 2,000,000Construction of Multipurpose Covered Court in Barangay Quilitisan, Calatagan 2,000,000Construction/Improvement of Multi-Purpose Building, Taal, Batangas 1st LD 1,000,000Rehabilitation/Improvement of Multi-Purpose Building, Mahayahay, Lemery, Batangas
1,000,000
Rehabilitation/Repair/Improvement of Multipurpose Building (Barangay Hall and Day Care Center), Calaca, Batangas
2,000,000
Page 73 of 162
details of dpwh’s programs/projects 973
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Rehabilitation/Repair/Improvement of Multipurpose Building (Covered Court), Brgy. Poblacion 8, Balayan, Batangas
1,000,000
Batangas 2nd DEO 15,000,000Construction of Multi-Purpose Building (Covered Court), Barangay Balete, Batangas City, Batangas
2,000,000
Construction of Multi-Purpose Building, Barangay 6, Batangas City, Batangas 2,000,000Construction of Multi-Purpose Building, Barangay Kumintang Ibaba, Batangas City, Batangas
2,000,000
Construction of Multi-Purpose Building, Barangay Sampaga, Batangas City, Batangas 2,000,000
Construction of Multi-Purpose Building, Tingloy, Batangas 2nd LD 2,000,000Construction/Improvement of Multi-Purpose Building, Barangay Sta. Monica, San Luis, Batangas
2,000,000
Improvement/Rehabilitation of Multi-Purpose Building, Barangay Poblacion, San Pascual, Batangas
3,000,000
Batangas 3rd DEO 50,000,000Completion/ Improvement Building (Covered Court) in Brgy. Subic Ibaba, Agoncillo, Batangas,Batangas 3rd LD
2,000,000
Construction of Barangay Hall, Brgy. Anastacia, Sto. Tomas, Batangas 1,000,000Construction of Multi-Purpose Building (Covered Court), San Pedro, Malvar, Batangas 1,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Talisay, Batangas 3,000,000
Construction of Multi-purpose Building, Barangay Poblacion, Tanauan, Batangas 2,000,000
Construction of Multi-Purpose Building, Barangay San Sebastian, Balete, Batangas 2,000,000
Construction of Multi-Purpose Building, Poblacion 7, Cuenca, Batangas 1,000,000Construction of Multi-Purpose Building, Poblacion East, Alitagtag, Batangas 1,000,000Construction of Multi-Purpose Building, Poblacion, San Nicolas, Batangas 2,000,000Construction/ Improvement of Multi-Purpose Building (Barangay Hall) Brgy. in Sampaloc , Talisay, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building (Barangay Hall) in Brgy. 1 , Mataasnakahoy, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building (Barangay Hall) in Brgy. Irukan, Sta. Teresita, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building (Barangay Hall) in Brgy. IV, Laurel, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building (Barangay Hall) in Brgy. Poblacion East, Alitagtag, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building (Barangay Hall) in Brgy. Sta. Cruz, Alitagtag, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building (Covered Court) in Brgy. Bilibinwang, Agoncillo, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building (Covered Court) in Brgy. Maabud North, San Nicolas, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building (Covered Court) in Brgy. Munlawin, San Nicolas, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building (Covered Court) in Brgy. Niyugan, Laurel, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building (Covered Court) in Brgy. Sala, Balete, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building (Covered Court) in Brgy. San Isidro, Cuenca, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building (Day Care Center) in Brgy. San Isidro Norte, Sto. Tomas, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building in Brgy. Buco, Talisay, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building in Brgy. San Agustin, Sto. Tomas, Batangas,Batangas 3rd LD
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Lubac, Cuenca, Batangas
2,000,000
Improvement/Rehabilitation of Multi-Purpose Building, San Juan, Sto.Tomas, Batangas
1,000,000
Rehabilitation/Construction of Multi-Purpose Building(Brgy.Hall), Sampa, Sta.Teresita, Batangas
1,000,000
Rehabilitation/Improvement of Multi-Purpose Building, Bancoro, San Nicolas, Batangas
1,000,000
Batangas 4th DEO 90,500,000Construction of Brgy Hall, Brgy. Tamak, Padre Garcia, Batangas 4th LD 2,000,000Construction of Covered Court at Pansol Padre Garcia Batangas National High School, Batangas
5,000,000
Construction of Muliti-purpose building, Brgy banaba, Padre Garcia Batangas,Brgy. Brgy Banaba,Padre Garcia,Batangas
2,000,000
Construction of Multi-purpose Building, Barangay Bukal, Padre Garcia, Batangas 3,000,000
Construction of Multi-Purpose Building, Barangay Dagatan, Taysan, Batangas 2,000,000
Construction of Multi-Purpose Building, Brgy. Poblacion, Padre Garcia, Batangas 10,000,000
Construction/Improvement of Barangay Hall Brgy Banaba, Padre Garcia Batangas,Brgy. Banaba,Padre Garcia,Batangas
4,000,000
Construction/Improvement of Brgy Hall, Barangay Tamak Padre Garcia, Batangas,Brgy. Tamak,Padre Garcia,Batangas
2,000,000
Construction/Improvement of covered court, Brgy tangob, Padre Garcia Batangas,Brgy. Tangob,Padre Garcia,Batangas
2,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay Buhay na Sapa, San Juan, Batangas
3,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay Balete Central School, Balete, Batangas
3,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay Ibaan, Bago, Batangas
1,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay Itlugan, Rosario, Batangas
3,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay Lucsuhin, Ibaan, Batangas
3,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay Lumbang na Anak, Calaca, Batangas
2,000,000
Page 74 of 162
974 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Rehabilitation of Multi-Purpose Building, Barangay Lumbangan, Rosario, Batangas
3,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay Mapulo, Taysan, Batangas
2,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay Pinagkawitan, Lipa City, Batangas
3,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay Pinagsibaan, Rosario, Batangas
4,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay Poblacion 1, Sta. Teresita, Batangas
3,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay San Fernando,, Lipa City, Batangas
2,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay Taklang Anak, , Calaca, Batangas
2,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay Tubahan, Rosario, Batangas
2,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay Tulay, Ibaan, Batangas
3,000,000
Construction/Rehabilitation of Multi-Purpose Building, Barangay Wawa, Nasugbu, Batangas
4,000,000
Constrution of Covered court Brgy payapa padre Garcia Batangas,Brgy.Payapa,Padre Garcia,Batangas
2,000,000
Contruction of covered court brgy maugat East Padre garcia batangas,Brgy. Maugat East,Padre Garcia,Batangas
2,000,000
Contruction of covered court Brgy, tamak padre Garcia batangas,Brgy. Tamak,Padre Garcia,Batangas
2,000,000
Improvement of Barangay Hall, Barangay Quilo, Ibaan, Batangas 2,000,000Improvement/Rehabilitation of Multipurpose Building, Plaridel, Lipa City, Batangas 1,500,000
Repair and rehabilitation of Brgy Hall Brgy Poblacion Padre Garcia Batangas,Brgy. Poblacion,Padre Garcia,Batangas
2,000,000
Repair and rehabilitation of Brgy.Hall, Brgy. Cahigam, Rosario, Batangas 4th LD 2,000,000
Repair and rehabilitation of Multi-purpose building, Brgy, San Miiguel Padre Garcia, Batangas,Brgy. San Miguel,Padre Garcia,Batangas
2,000,000
Cavite 2nd DEO 55,900,000Construction of Barangay Hall, Poblacion I-B, Maragondon, Cavite 4,000,000Construction of Covered Court at Barangay Punta I, Punta I, Amadeo, Cavite 3,200,000
Construction of Covered Court at Loma Elementary School, Loma, Amadeo, Cavite 3,200,000
Construction of Covered Court at Pangil Elementary School, Pangil, Amadeo, Cavite 2,000,000
Construction of Multi-Purpose Building, Brgy. Balite 1, Silang, Cavite 1,000,000Construction of multi-purpose building, Brgy. Sapa, Naic, Cavite 4,000,000Construction of Multi-Purpose Covered Court, Batas Dao, Gen. Emilio Aguinaldo, Cavite
4,000,000
Construction of Multi-Purpose Covered Court, Dalusag, Gen. Emilio Aguinaldo, Cavite 4,000,000
Construction of Multi-Purpose Covered Court, Diane II, Indang, Cavite 4,000,000Construction of Multi-Purpose Covered Court, Esperanza Ilaya, Alfonso, Cavite 4,000,000
Construction of Multi-Purpose Covered Court, Kabulusan, Gen. Emilio Aguinaldo, Cavite
4,000,000
Construction of Multi-Purpose Covered Court, Kaytapos, Indang, Cavite 4,000,000Construction of Multi-Purpose Covered Court, Limbon, Indang, Cavite 4,000,000Construction of Multi-Purpose Covered Court, Ramirez, Magallanes, Cavite 4,000,000Construction/Improvement of Rural Healt Unit (RHU) Building, Brgy. Tibig, Silang, Cavite 5th LD
2,500,000
Construction/Improvement of Senior Citizens Building, Brgy. Kalubkob, Silang, Cavite 5th LD
1,000,000
Rehabilitation/Repair of Brgy. Hall, Brgy. Malabag, Silang, Cavite 5th LD 1,000,000Renovation of old barangay hall to be used as health center, Office of the Senior Citizens, PWD & barangay tanod, Brgy. Asisan, Tagaytay, Cavite
2,000,000
Cavite DEO 167,600,0001Construction of Multi-purpose Building at Progressive Village 12, Molino 3, Bacoor, Cavite,Cavite DEO
2,000,000
Construction of Multi-Purpose Building,Brgy. Pasong Buaya II,Imus,Cavite 5,000,000Construction of Brgy. Hall , Tanauan, Tanza, Cavite 2,000,000Construction of Building at Governor Ferrer Memorial National High School Main, Pinagtipunan, General Trias, Cavite
2,000,000
Construction of Coverd Court at Welligton Subdivision, Pascam, General Trias, Cavite 3,200,000
Construction of Covered Court at Barangay Conchu, Conchu, Trece Martires, Cavite 3,200,000
Construction of Covered Court at Cabezas National High School, Cabezas, Trece Martires, Cavite
3,200,000
Construction of Covered Court at Gen. Trias Memorial Elementary School, San Juan, General Trias, Cavite
3,200,000
Construction of Covered Court at Parklane Elementary School, San Francisco, General Trias, Cavite
3,200,000
Construction of Covered Court at Southville Subdivision Phase 2, Aguado, Trece Martires, Cavite
3,200,000
Construction of Covered Court at Tahanang Yaman Subdivision, Buenavista II, General Trias, Cavite
3,200,000
Construction of Covered Court- General Emilio Aguinaldo High School,Brgy. Palico IV,Imus,Cavite
3,000,000
Construction of Extension of Divison Office- Toclong 1C Imus City, Cavite,Brgy. Toclong,Imus,Cavite
3,000,000
Construction of Livelihood Building, Brgy. Lumbreras, GMA, Cavite 5th LD 2,000,000Construction of multi-purpose building (health center), Brgy. Maduya, Carmona, Cavite
2,000,000
Construction of Multi-Purpose Building (Pugad Ibon), Barangay Sta. Isabel, Kawit, Cavite 1st LD
2,000,000
Construction of Multi-purpose Building at Aniban 1, Bacoor, Cavite,Cavite DEO 3,500,000
Construction of Multi-purpose Building at Astroville Subd., Queensrow West, Bacoor, Cavite ,Cavite DEO
2,000,000
Page 75 of 162
details of dpwh’s programs/projects 975
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building at Barcelona Phase 3,Brgy. Buhay Na Tubig,Imus,Cavite
3,000,000
Construction of Multi-Purpose Building at Barcelona Phase 4,Brgy. Buhay Na Tubig,Imus,Cavite
3,000,000
Construction of Multi-Purpose Building at Cattleya Homes,Brgy. Pag Asa II,Imus,Cavite
3,000,000
Construction of Multi-Purpose Building at Executive Lanes,Brgy. Pinagbuklod ,Imus,Cavite
3,000,000
Construction of Multi-Purpose Building at Fairwoods Subdivision,Brgy. Mariano Espeleta III,Imus,Cavite
3,000,000
Construction of Multi-Purpose Building at Golden Villas Subdivision,Brgy. Carsadang Bago II,Imus,Cavite
3,000,000
Construction of Multi-Purpose Building at La Terraza Subdivision Phase B,Brgy. Bucandala I,Imus,Cavite
3,000,000
Construction of Multi-purpose Building at Malipay ES, Molino 4, Bacoor, Cavite,Cavite DEO
5,000,000
Construction of Multi-purpose Building at Mambog 5, Bacoor, Cavite,Cavite DEO 5,000,000
Construction of Multi-Purpose Building at Metroville Subdivision,Brgy. Alapan I-C,Imus,Cavite
3,000,000
Construction of Multi-purpose Building at Molino 2, Bacoor, Cavite,Cavite DEO 5,000,000
Construction of Multi-purpose Building at Molino 5, Bacoor, Cavite,Cavite DEO 6,000,000
Construction of Multi-purpose Building at Molino 6, Bacoor, Cavite,Cavite DEO 2,000,000
Construction of Multi-Purpose Building at Villa Leticia Subdivision ,Brgy. Tanzang Luma VI,Imus,Cavite
3,000,000
Construction of Multi-Purpose Building at Westwood Homes Subdivision,Brgy. Alapan I-B,Imus,Cavite
3,000,000
Construction of Multi-Purpose Building, Barangay Kanluran, Rosario, Cavite 1st LD 3,500,000
Construction of Multi-Purpose Building, Brgy. Salawag, Dasmarinas, Cavite 1,500,000Construction of Multi-Purpose Building, Cavite City, Cavite 2,000,000Construction of Multi-Purpose Building,Brgy. Anabu I-B,Imus,Cavite 2,000,000Construction of Multi-Purpose Building,Brgy. Bagong Silang I,Imus,Cavite 2,000,000Construction of Multi-Purpose Building,Brgy. Bayan Luma VII,Imus,Cavite 3,000,000Construction of Multi-Purpose Building,Brgy. Bucandala II,Imus,Cavite 3,000,000Construction of Multi-Purpose Building,Brgy. Palico II,Imus,Cavite 3,000,000Construction of Two (2) Storey Multi-Purpose Building, Barangay Tirona, GMA, Cavite
2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Cavite 5th LD 21,500,000Constrution of Covered Court at Belmont Hills, Pasong Kawayan II, General Trias, Cavite
3,200,000
Rehabilitaiton/ Repair of General Trias Sports Complex, San Juan, General Trias, Cavite
2,000,000
Rehabilitation of Multi-purpose Building at Zapote 4, Bacoor, Cavite,Cavite DEO 2,000,000
Rehabilitation/Improvement of Multipurpose Building (Barangay Hall), Barangay Bagbag I, Rosario, Cavite 1st LD
2,000,000
Rehabilitation/Improvement of Multipurpose Building (Barangay Hall), Barangay Gahak, Kawit, Cavite 1st LD
2,000,000
Rehabilitation/Improvement of Multipurpose Building (Barangay Hall), Barangay Wakas I, Kawit, Cavite 1st LD
2,000,000
Rehabilitation/Improvement of Multipurpose Building (Day Care Center), Barangay Magdalo, Kawit, Cavite 1st LD
2,000,000
Rehabilitation/Repair of Brgy. Hall, Brgy. Tiago, GMA, Cavite 5th LD 3,000,000Rehabilitation/Repair of Multi-Purpose Building,Brgy. Malagasang II-G,Imus,Cavite 2,000,000
Laguna 1st DEO 52,450,000Construction of Multi-Purpose Bldg. (OFWC Center), Brgy. Binan, Pagsanjan, Laguna 4th LD
2,000,000
Construction of Multi-Purpose Building at Barangay Poblacion II, Pagsanjan, Laguna 4th LD
2,200,000
Construction of Multi-Purpose Building at Barangay Poblacion, Magdalena, Laguna 4th LD
2,200,000
Construction of Multi-Purpose Building, Barangay Sta. Cruz, San Pablo City, Laguna 3,000,000
Construction of Multi-Purpose Building, Barangay Zone 3 Poblacion, Luisiana, Laguna 2,000,000
Construction of Multi-Purpose Building, Sta. Cruz, Laguna 2,000,000Construction/Rehabilitation of Various Infrastructure Projects, Laguna 4th LD 39,050,000
Laguna 2nd DEO 65,500,000Construction of Multi-purpose Building,Brgy. Anos,Los Baños,Laguna 2,000,000Construction of Multi-purpose Building,Brgy. Diezmo,Cabuyao City,Laguna 2,000,000Construction of Multi-purpose Building,Brgy. Malinta,Los Baños,Laguna 2,000,000Construction of Multi-purpose Building,Brgy. Pittland,Cabuyao City,Laguna 2,000,000Construction of Multi-purpose Building,Brgy. Pulo,Cabuyao City,Laguna 2,000,000Construction of Multi-purpose Building,Brgy. Sala,Cabuyao City,Laguna 2,000,000Construction of Multi-purpose Building,Brgy. San Isidro,Cabuyao City,Laguna 2,000,000Construction of Barangay Hall Pulong Santa Cruz, Sta Rosa City, Laguna 1st LD 2,000,000
Construction of Multi-Purpose Building, Blk 3 and 12, Villa Palao Subdivision, Brgy. Banlic, Calamba City, Laguna
1,500,000
Construction of UP Corps of Cadets Bldg., University of the Philippines, Los Banos, Laguna
10,000,000
Construction/Improvement of Multi-purpose Building,Brgy. Butong,Cabuyao City,Laguna
2,000,000
Construction/Improvement of Multi-purpose Building,Brgy. Dos,Cabuyao City,Laguna 2,000,000
Construction/Improvement of Multi-purpose Building,Brgy. Lalakay,Los Baños,Laguna
2,000,000
Construction/Improvement of Multi-purpose Building,Brgy. Tadlac,Los Baños,Laguna 2,000,000
Improvement of Assembly Hall Dila Golden City, Sta Rosa City, Laguna 1st LD 2,000,000
Improvement of Assembly Hall Labas Olympia Subd, Sta Rosa City, Laguna 1st LD 2,000,000
Page 76 of 162
976 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Improvement of Assembly Hall Malitlit San Lorenzo Ph I, Sta Rosa City, Laguna 1st LD
2,000,000
Improvement of Barangay Hall Balibago, Sta Rosa City, Laguna 1st LD 2,000,000Improvement of Barangay Hall Dita, Sta Rosa City, Laguna 1st LD 2,000,000Improvement of Barangay Hall Don Jose, Sta Rosa City, Laguna 1st LD 2,000,000Improvement of Barangay Hall Macabling, Sta Rosa City, Laguna 1st LD 2,000,000Improvement of Barangay Hall Malusak, Sta Rosa City, Laguna 1st LD 2,000,000Improvement of Barangay Hall Sto Domingo , Sta Rosa City, Laguna 1st LD 2,000,000Improvement of Covered Court / Stage Tagapo, Sta Rosa City, Laguna 1st LD 2,000,000
Improvement of Covered Court Market Area Dictado Village, Sta Rosa City, Laguna 1st LD
4,000,000
Improvement of Covered Court Pooc, Sta Rosa City, Laguna 1st LD 2,000,000Improvement of Tanod Hall Sinalhan, Sta Rosa City, Laguna 1st LD 2,000,000Rehabilitation of Multi-purpose Building,Brgy. San Agustin,Bay,Laguna 2,000,000
Laguna 3rd DEO 13,500,000Construction of Barangay Hall in Brgy. Rizal, Liliw, Laguna,Laguna 3rd LD 1,000,000Construction of Senior Citizens Hall in Brgy. 6-D, San Pablo City, Laguna,Laguna 3rd LD
2,000,000
Rehabilitation and Repair of Barangay Hall in Brgy. 1, Alaminos, Laguna,Laguna 3rd LD
1,000,000
Rehabilitation and Repair of Barangay Hall in Brgy. Alumbrado, Nagcarlan, Laguna,Laguna 3rd LD
1,000,000
Rehabilitation and Repair of Barangay Hall in Brgy. Lamot 1, Calauan, Laguna,Laguna 3rd LD
2,000,000
Rehabilitation and Repair of Barangay Hall in Brgy. Palma 1, Alaminos, Laguna,Laguna 3rd LD
1,500,000
Rehabilitation and Repair of Barangay Hall in Brgy. Poblacion 3, Nagcarlan, Laguna,Laguna 3rd LD
2,000,000
Rehabilitation and Repair of Barangay Hall in Brgy. San Mateo, San Pablo City, Laguna,Laguna 3rd LD
2,000,000
Rehabilitation and Repair of Covered Court in Brgy. San Gregorio, San Pablo City, Laguna,Laguna 3rd LD
1,000,000
Quezon 1st DEO 43,850,000Construction of Anawan E/S Multi-Purpose Building , Brgy. Anawan, Polillo, Quezon 1,000,000
Construction of Brgy Hall, Brgy. Kinalagti, Panukulan, Quezon 1,500,000Construction of Multi-Purpose Building (Brgy. Hall Extension), Brgy. Bagong Bayan, Mauban, Quezon 1st LD
2,000,000
Construction of Multi-Purpose Building (Brgy. Hall Extension), Brgy. San Isidro, Sampaloc, Quezon 1st LD
2,000,000
Construction of Multi-Purpose Building (Brgy. Hall Level 2), Brgy. Catablingan, General Nakar, Quezon 1st LD
1,050,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. San Rafael, Burdeos, Quezon 1st LD
2,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Tamulaya, Polillo, Quezon 1st LD
1,500,000
Construction of Multi-Purpose Building (Community Center), Brgy. Daungan, Mauban, Quezon 1st LD
2,000,000
Construction of Multi-Purpose Building (Food Court), Municipal Patio Brgy. Poblacion, Lucban, Quezon 1st LD
1,000,000
Construction of Multi-Purpose Building (Lying-in Clinic), Brgy. Umiray, General Nakar, Quezon 1st LD
2,000,000
Construction of Multi-Purpose Building for Infanta Public Cemetary, Brgy. Poblacion, Infanta, Quezon
900,000
Construction of Multi-Purpose Building, Brgy. Aluyon, Burdeos, Quezon 1,500,000Construction of Multi-Purpose Building, Brgy. Ilayang Ilasan, Tayabas City, Quezon 2,000,000
Construction of Multi-Purpose Building, Brgy. Nalunao, Lucban, Quezon 1,500,000Construction of Multi-Purpose Building, Brgy. Pamatdan, Polillo, Quezon 600,000Construction of Multipurpose Building, Poblacion, Lucban, Quezon 2,000,000Construction/Completion of Brgy. Hall Library, Brgy. Poblacion, Burdeos, Quezon 500,000
Construction/Completion of Brgy. Hall, Brgy. Libo, Panukulan, Quezon 800,000Construction/Completion of Brgy. Hall, Brgy. Magsikap, General Nakar, Quezon 500,000
Construction/Completion of Brgy. Hall, Brgy. Piis, Lucban, Quezon 600,000Construction/Completion of Cagsiay I NHS Multi-Purpose Building, Brgy. Cagsiay 1, Mauban, Quezon
500,000
Construction/Completion of Covered Court and Flooring, Brgy. Dapdap, Tayabas, Quezon
1,000,000
Construction/Completion of Covered Court, Brgy. Lawigue, Tayabas, Quezon 1,000,000
Construction/Completion of Covered Court, Brgy. Pilaway, Infanta, Quezon 2,000,000Construction/Completion of Ibabang Ilasan Elementary School Covered Court, Brgy. Ibabang Ilasan, Tayabas, Quezon
1,000,000
Construction/Completion of Infanta Central E/S Covered Court, Brgy. Poblacion, Infanta, Quezon
1,200,000
Construction/Completion of Multi-Purpose Building, Brgy. Amot, Burdeos, Quezon 500,000
Construction/Completion of PSHN Covered Court, Brgy. Anoling, General Nakar, Quezon
800,000
Construction/Completion of Sampaloc NHS Bayongon Extension Covered Court, Brgy. Bayongon, Sampaloc, Quezon
1,000,000
Construction/Improvement of Multi-Purpose Building (Brgy. Hall), Brgy. San Roque Zone 2, Tayabas City, Quezon 1st LD
2,000,000
Construction/Improvement of Multi-Purpose Building (LPNHS Alumni Building), Brgy. Ipilan, Tayabas City, Quezon 1st LD
2,000,000
Construction/Improvement of Multi-Purpose Building, Brgy. May-It, Lucban, Quezon 1st LD
1,500,000
Construction/Improvementof Multi-Purpose Building (Brgy. Hall), Brgy. Kalyaat, Lucban, Quezon 1st LD
1,000,000
Extension of Tignoan Elem School Covered Court, Brgy. Tignoan, Real, Quezon 800,000
Rehabilitation of 2 sty 6CL Real Central E/S School building, Brgy. Poblacion, Real, Quezon
600,000
Quezon 2nd DEO 31,500,000Construction of covered court, Brgy. Niing, San Antonio, Quezon 2nd LD 6,500,000
Page 77 of 162
details of dpwh’s programs/projects 977
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Covered Court, Brgy. Poblacion (San Antonio Central School), San Antonio, Quezon 2nd LD
6,500,000
Construction of Multipurpose Building, Arawan, San Antonio, Quezon 2nd LD 2,500,000Construction of Multipurpose Building, Buenavista East, Candelaria, Quezon 2nd LD 2,000,000
Construction of Multipurpose Building, Kinabuhayan, Dolores, Quezon 2nd LD 2,000,000Construction of Multipurpose Building, Malabanan Sur, Candelaria, Quezon 2nd LD 2,000,000
Construction of Multipurpose Building, Mangalang I, Sariaya, Quezon 2nd LD 2,000,000Construction of Multipurpose Building, Masin Norte, Candelaria, Quezon 2nd LD 2,000,000
Construction of Multipurpose Building, Poblacion 6, Sariaya, Quezon 2nd LD 2,000,000Construction of Multipurpose Building, San Francisco, Tiaong, Quezon 2nd LD 2,000,000
Construction of Multipurpose Building, Silangang Mayao, Lucena City, Quezon 2nd LD
2,000,000
Quezon 3rd DEO 30,000,000Construction of Godofredo M. Tan Memorial School Multi-Pupose Building in San Narciso, Quezon 3rd LD
2,000,000
Construction of Multi-Purpose Building (Barangay Hall) in Barangay Canuyip, Malunay, Quezon 3rd LD
1,500,000
Construction of Multi-Purpose Building (Day Care Center with Sanitation) in Agdangan, Quezon 3rd LD
1,200,000
Construction of Multi-Purpose Building (Day Care Center with Sanitation) in Buenavista, Quezon 3rd LD
1,200,000
Construction of Multi-Purpose Building (Day Care Center with Sanitation) in Catanauan, Quezon 3rd LD
1,200,000
Construction of Multi-Purpose Building (Day Care Center with Sanitation) in General Luna, Quezon 3rd LD
1,200,000
Construction of Multi-Purpose Building (Day Care Center with Sanitation) in Macalelon, Quezon 3rd LD
1,200,000
Construction of Multi-Purpose Building (Day Care Center with Sanitation) in Mulanay, Quezon 3rd LD
1,200,000
Construction of Multi-Purpose Building (Day Care Center with Sanitation) in Padre Burgos, Quezon 3rd LD
1,300,000
Construction of Multi-Purpose Building (Day Care Center with Sanitation) in Pitogo, Quezon 3rd LD
1,200,000
Construction of Multi-Purpose Building (Day Care Center with Sanitation) in San Andres, Quezon 3rd LD
1,200,000
Construction of Multi-Purpose Building (Day Care Center with Sanitation) in San Francisco, Quezon 3rd LD
1,200,000
Construction of Multi-Purpose Building (Day Care Center with Sanitation) in San Narciso, Quezon 3rd LD
1,200,000
Construction of Multi-Purpose Building (Day Care Center with Sanitation) in Unisan, Quezon 3rd LD
1,200,000
Construction of Multi-Purpose Building in San Andres, Quezon 3rd LD 10,000,000Improvement / Rehabilitation of Public Market, Poblacion 1, Mulanay, Quezon 2,000,000
Quezon 4th DEO 23,200,000Construction of Multi-Purpose Building - Brgy. Aloneros, Guinayangan, Quezon 4th LD
2,000,000
Construction of Multi-Purpose Building - Brgy. Gapas, Guinayangan, Quezon 4th LD 1,500,000
Construction of Multi-Purpose Building - Brgy. Manguisian, Lopez, Quezon 4th LD 2,000,000
Construction of Multi-Purpose Building - Brgy. Pinagbayanan, Calauag, Quezon 4th LD
2,000,000
Construction of Multi-Purpose Building - Concepcion National High School, Brgy. Concepcion, Plaridel, Quezon 4th LD
2,000,000
Construction of Multi-Purpose Building - Guinayangan Elementary School, Brgy. Poblacion, Guinayangan, Quezon 4th LD
2,000,000
Construction of Multi-Purpose Building - Gumaca National High School, Brgy. Mabini, Gumaca, Quezon 4th LD
2,000,000
Construction of Multi-Purpose Building - Tagkawayan National High School, Brgy. Munting Parang, Tagkawayan, Quezon 4th LD
2,000,000
Construction of Multi-Purpose Building, Brgy. Mapagong, Pagbilao, Quezon 1st LD 2,000,000
Construction/Improvement of Multi-Purpose Building, Brgy. Sta. Catalina, Pagbilao, Quezon 1st LD
500,000
Construction/Imrpovement of Multi-Purpose Building, Brgy. Ikirin, Pagbilao, Quezon 1st LD
700,000
Repair/Rehabilitation of Multi-Purpose Building - Brgy. Caridad Ilaya, Atimonan, Quezon 4th LD
1,000,000
Repair/Rehabilitation of Multi-Purpose Building - Brgy. Malinao Ilaya Elementary School, Atimonan, Quezon 4th LD
500,000
Repair/Rehabilitation of Multi-Purpose Building - Brgy. Malinao Ilaya National High School, Atimonan, Quezon 4th LD
500,000
Repair/Rehabilitation of Multi-Purpose Building - Brgy. Ponon, Atimonan, Quezon 4th LD
1,000,000
Repair/Rehabilitation of Multi-Purpose Building - Brgy. Rizal Poblacion, Lopez, Quezon 4th LD
1,000,000
Repair/Rehabilitation of Multi-Purpose Building - Brgy. San Lorenzo-Bocboc, Lopez, Quezon 4th LD
500,000
Rizal 1st DEO 49,000,000Const. of Multi-Purpose Building So. Tiaong, Barangay MAyamot, Antipolo, Rizal 3,500,000
Const. of Multi-Purpose Building, Cluster I, Barangay Bagong Nayon, Antipolo, Rizal 3,000,000
Const. of Multi-Purpose Building., Fatima Training Center, Barangay San Isidro, Antipolo, Rizal
6,000,000
Const.Of Multipurpose Bldg. At Ruhat Iv, Brgy. Mambugan, Antipolo, Rizal 6,000,000Construction of Multipurpose Building at Lakeside Park, Barangay San Vicente, Angono, Rizal
2,000,000
Construction of Multipurpose Building, Barangay San Isidro, Antipolo, Rizal 4,000,000Construction of Multi-Purpose Building, Brgy. Tayuman, Binangonan, Rizal 1,000,000Construction of Multi-purpose Building, Kalayaan, Angono, Rizal 1st LD 3,000,000Rehabilitation of Multi-purpose Building, , Binangonan, Rizal 1st LD 3,000,000
Page 78 of 162
978 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Rehabilitation of Multi-purpose Building, Rehabilitation of Multi-purpose Covered Court Phase II, San Isidro, Angono, Rizal 1st LD
5,000,000
Repair of Multi-purpose Bldg., Barangay Hall, Brgy. San Roque, Antipolo City, Rizal 2nd LD
2,000,000
San Isidro-Multipurpose Bldg. Impv. of Brgy. Hall Fatima Vill., Barangay San Isidro, Antipolo, Rizal
10,500,000
Rizal 2nd DEO 14,000,000Construction of Multi-purpose Building, Barangay Poblacion, Montalban, Rizal 4,000,000Construction of Multi-Purpose Building, Brgy. Bayugo, Jala-Jala, Rizal 1,500,000Construction/Repair/Rehabilitation/Improvement of multi-purpose building at Barangay Ampid I, San Mateo, Rizal
2,000,000
Construction/Repair/Rehabilitation/Improvement of multi-purpose building at Barangay Guinayang, San Mateo, Rizal
2,000,000
Construction/Repair/Rehabilitation/Improvement of various multi-purpose building at Barangay Dalig, Teresa, Rizal
1,600,000
Construction/Repair/Rehabilitation/Improvement of various multi-purpose building at Barangay Bagumbayan, Teresa, Rizal
1,300,000
Construction/Repair/Rehabilitation/Improvement of various multi-purpose building at Barangay San Roque,Teresa, Rizal
1,600,000
Region IV-B 260,000,000Marinduque DEO 16,000,000
Construction of Multipurpose Building, Brgy. Amoingon, Boac, Marinduque Lone District
2,000,000
Construction of Multipurpose Building, Brgy. Dawis, Gasan, Marinduque Lone District 2,000,000
Repair/Rehabilitation of Multipurpose Building, Brgy. Bacong-Bacong, Gasan, Marinduque Lone District
1,500,000
Repair/Rehabilitation of Multipurpose Building, Brgy. Bangbangalon, Boac, Marinduque Lone District
1,500,000
Repair/Rehabilitation of Multipurpose Building, Brgy. Laon, Mogpog, Marinduque Lone District
2,000,000
Repair/Rehabilitation of Multipurpose Building, Brgy. Laylay, Boac, Marinduque Lone District
1,500,000
Repair/Rehabilitation of Multipurpose Building, Brgy. Lipa, Sta. Cruz, Marinduque Lone District
2,000,000
Repair/Rehabilitation of Multipurpose Building, Brgy. Lupac, Boac, Marinduque Lone District
1,000,000
Repair/Rehabilitation of Multipurpose Building, Brgy. Matuyatuya, Torrijos, Marinduque Lone District
1,500,000
Repair/Rehabilitation of Multipurpose Building, Brgy. Puyog, Boac, Marinduque Lone District
1,000,000
Mindoro Occidental DEO 43,000,000Construction of Covered Court- Bgy. Tanyag, Calintaan, Occidental Mindoro,Brgy. Tanyag,Calintaan,Occidental Mindoro
4,000,000
Construction of Multi-Purpose Building at Brgy. Agkawayan, Looc, Occidental Mindoro
3,000,000
Construction of Multi-Purpose Building at Brgy. Batasan, San Jose, Occidental Mindoro
2,500,000
Construction of Multi-Purpose Building at Brgy. Cabra, Lubang, Occidental Mindoro 3,000,000
Construction of Multi-Purpose Building at Brgy. Concepcon, Calintaan, Occidental Mindoro
2,000,000
Construction of Multi-Purpose Building at Brgy. Harrison, Paluan, Occidental Mindoro 2,000,000
Construction of Multi-Purpose Building at Brgy. Ibud, Sablayan, Occidental Mindoro 2,000,000
Construction of Multi-Purpose Building at Brgy. Manoot, Rizal, Occidental Mindoro 2,000,000
Construction of Multi-Purpose Building at Brgy. Mapaya, San Jose, Occidental Mindoro
2,500,000
Construction of Multi-Purpose Building at Brgy. Mulawin, Sta. Cruz, Occidental Mindoro
2,000,000
Construction of Multi-Purpose Building at Brgy. Murtha, San Jose, Occidental Mindoro
2,000,000
Construction of Multi-Purpose Building at Brgy. Payompon, Mamburao, Occidental Mindoro
2,000,000
Construction of Multi-Purpose Building at Brgy. Pitogo, Rizal, Occidental Mindoro 2,000,000
Construction of Multi-Purpose Building at Brgy. Sibalat, Magsaysay, Occidental Mindoro
2,000,000
Construction of Multi-Purpose Building at Brgy. Wawa, Abra de Ilog,Occidental Mindoro
2,000,000
Construction of Multi-Purpose Building, Barangay Ligang, Sablayan, Occidental Mindoro
2,000,000
Construction of Multi-Purpose Building, Barangay Municipal Grounds, Looc, Occidental Mindoro
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Mamburao, Mamburao, Occidental Mindoro
4,000,000
Mindoro Oriental DEO 20,000,000Construction of Multi-Purpose Building,Brgy. San Vicente West,Calapan City,Or. Mdo. 2,000,000
Construction of Multi-Purpose Covered Court,Brgy. Apitong,Naujan,Or. Mdo. 3,000,000Construction of Multi-Purpose Covered Court,Brgy. Bucayao,Calapan City,Or. Mdo. 2,000,000
Construction of Multi-Purpose Covered Court,Brgy. Guinobatan,Calapan City,Or. Mdo.
2,000,000
Construction of Multi-Purpose Covered Court,Brgy. Ilaya,Calapan City,Or. Mdo. 2,000,000
Construction of Multi-Purpose Covered Court,Brgy. Maidlang,Calapan City,Or. Mdo. 2,000,000
Construction of Multi-Purpose Covered Court,Brgy. San Antonio,Calapan City,Or. Mdo.
2,000,000
Construction of Municipal Legislative Building,Brgy. Zone 4,Socorro,Or. Mdo. 2,000,000Construction/Improvement of Construction of Multi-Purpose Covered Court,Brgy. Inarawan,Naujan,Or. Mdo.
3,000,000
Palawan 1st DEO 37,000,000
Page 79 of 162
details of dpwh’s programs/projects 979
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction Multi-Purpose Building Western Command AFP Pag-asa Island , Pag-asa, Kalayaan, Palawan 1st LD
2,000,000
Construction of Barangay Hall/ Evacuation Center, Barangay Salvacion, Roxas, Palawan 1st LD
2,000,000
Construction of Barangay Hall/ Evacuation Center, Barangay Tinitian, Roxas, Palawan 1st LD
2,000,000
Construction of Barangay Hall/Evacuation Center, Barangay Manlag, El Nido, Palawan 1st LD
2,000,000
Construction of Barangay Hall/Evacuation Center, Barangay Masagana, El Nido, Palawan 1st LD
2,000,000
Construction of Barangay Hall/Evacuation Center, Barangay New Ibajay, El Nido, Palawan 1st LD
2,000,000
Construction of Barangay Hall/Evacuation Center, Barangay Nicanor Zabala, Roxas, Palawan 1st LD
2,000,000
Construction of Barangay Hall/Evacuation Center, Barangay Salvacion, Busuanga, Palawan 1st LD
2,000,000
Construction of Barangay Hall/Evacuation Center, Barngay Taytay, Calawag, Palawan 1st LD
2,000,000
Construction of Birthing Clinic - So. Boayan Is., Poblacion, San Vicente, Palawan 1st LD
2,000,000
Construction of Birthing Clinic, Barngay Taytay, Casian, Palawan 1st LD 2,000,000Construction of Multi-Purpose Building - Culion Police Station, Barangay Culion, Libis (Poblacion), Palawan 1st LD
2,000,000
Construction of Multi-Purpose Building (CSO Activity Center), Freedom Park, Poblacion, Roxas, Palawan
2,000,000
Construction of Multi-Purpose Building/Evacuation Center, Barangay Calandagan, Araceli, Palawan 1st LD
2,500,000
Construction of Multi-Purpose Building/Evacuation Center, Barangay Coron, San Jose, Palawan 1st LD
2,000,000
Construction of Multi-Purpose Building/Evacuation Center, Barangay Nangalao, Linapacan, Palawan 1st LD
2,500,000
Construction of Multi-Purpose Building/Evacuation Center, Barangay Roxas, Abaroan, Palawan 1st LD
2,000,000
Construction of Womens Center, Port Barton, San Vicente, Palawan 1st LD 2,000,000
Palawan 2nd DEO 2,000,000Construction of Multi-Purpose Building (Barangay Hall) in Brgy. Panitian, S. Espanola, Palawan 2nd LD
1,000,000
Construction of Multi-Purpose Building (Barangay Health Center), Brgy. Tacras, Narra, Palawan 2nd LD
1,000,000
Palawan 3rd DEO 37,500,000Construction of Barangay Hall, Barangay Maunlad, Puerto Princesa City, Palawan 3rd LD
1,000,000
Construction of Community Center, Barangay Bacungan, Puerto Princesa City, Palawan 3rd LD
1,750,000
Construction of Community Center, Barangay Bagong Pagasa, Puerto Princesa City, Palawan 3rd LD
1,000,000
Construction of Community Center, Barangay Princesa, Puerto Princesa City, Palawan 3rd LD
1,000,000
Construction of Indigenous Peoples' Center, Barangay Municipal Hall, Poblacion, Aborlan, Palawan 3rd LD
1,500,000
Construction of Multi-Purpose Building in Hall of Justice Compound, Puerto Princesa City, Palawan 3rd LD
2,000,000
Construction of Multipurpose Building, Barangay Apo-Aporawan, Aborlan, Palawan 3,750,000
Construction of Multipurpose Building, Barangay Barake, Aborlan, Palawan 3rd LD 3,750,000
Construction of Multipurpose Building, Barangay Mabini, Aborlan, Palawan 3rd LD 3,750,000
Construction of Multipurpose Building, Barangay Manggahan, Puerto Princesa City, Palawan 3rd LD
2,000,000
Construction of Multipurpose Building, Barangay Sagpangan, Aborlan, Palawan 3rd LD
3,750,000
Construction of Multipurpose Building, Barangay San Juan, Aborlan, Palawan 3rd LD 3,750,000
Construction of Multipurpose Building, Barangay San Manuel, Puerto Princesa City, Palawan 3rd LD
3,750,000
Construction of Multipurpose Building, Barangay Tagpait, Aborlan, Palawan 3rd LD 3,750,000
Construction of Senior Citizen Building, Barangay San Miguel, Puerto Princesa City, Palawan 3rd LD
1,000,000
Romblon DEO 104,500,000Construction of Multi-Purpose at Cambijang, Cajidiocan, Romblon 2,000,000Construction of Multi-Purpose at Sitio Kabaliwan, Bachawan, San Agustin, Romblon 2,500,000
Construction of Multi-Purpose Building at Danao National High School, Barangay Danao, Cajidiocan, Romblon
3,500,000
Construction of Multi-Purpose Building at Romblon State University, Odiongan Campus ,Odiongan, Romblon
5,000,000
Construction of Multi-Purpose Building, Barangay Agojo, Looc Lone District 4,500,000Construction of Multi-Purpose Building, Barangay Balogo, Banton Lone District 5,000,000
Construction of Multi-Purpose Building, Barangay Bangon, Odiongan, Romblon 4,500,000
Construction of multi-Purpose Building, Barangay Bunsuran, Ferrol, Romblon 4,500,000Construction of Multi-Purpose Building, Barangay Cobrador, Romblon, Romblon 5,000,000
Construction of Multi-Purpose Building, Barangay Concepcion Sur, Sta. Maria Lone District
4,500,000
Construction of Multi-Purpose Building, Barangay Dubduban, San Agustin, Romblon 3,000,000
Construction of Multi-Purpose Building, Barangay España, San Fernando Lone District
4,500,000
Construction of Multi-Purpose Building, Barangay Gutivan, Cajidiocan Lone District 4,500,000
Construction of Multi-Purpose Building, Barangay Hinag-Oman, Ferrol Lone District 4,500,000
Construction of Multi-Purpose Building, Barangay Linao, Calatrava Lone District 4,500,000
Page 80 of 162
980 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building, Barangay Lonos, Romblon , Romblon 4,500,000Construction of Multi-Purpose Building, Barangay Magsaysay, Sta. Fe, Romblon 4,500,000
Construction of Multi-Purpose Building, Barangay Palje, Romblon Lone District 4,500,000Construction of Multi-Purpose Building, Barangay San Isidro, Alcantara Lone District 4,500,000
Construction of Multi-Purpose Building, Barangay San Jose, Lanas, Romblon 5,000,000Construction of Multi-Purpose Building, Barangay Tabugon, Sta. Fe, Romblon 4,500,000Construction of Multi-Purpose Building, Barangay Tampayan proper, Magdiwang Lone District
4,500,000
Construction of Multi-Purpose Building, Sitio San Roque, Barangay Lusong, San Agustin Lone District
4,500,000
Construction/Completion of Multi-Purpose Building , Barangay Poblacion, Concepcion, Romblon
3,000,000
Repair/Improvement of Multi-Purpose Building , Barangay Brgy. !V, Romblon, Romblon
1,000,000
Repair/Rehab of Multi-Purpose Building , Barangay Agnipa, Romblon, Romblon 800,000
Repair/Rehab of Multi-Purpose Building , Barangay Nasunugan, Banton, Romblon 1,200,000
Region V 353,000,000Albay 1st DEO 22,000,000
Const. of Multi-Purpose Building at Misibis Elementary School, Misibis, Bacacay, Albay
2,000,000
Construction of Bacacay East Central School MPB (Covered Court) , Poblacion, Bacacay, Albay 1st LD
8,500,000
Construction of Brgy. Cormidal MPB (Phase 2), Cormidal, Tabaco City, Albay 1st LD 3,500,000
Construction of Brgy. Estancia MPB (Phase 2), Estancia, Malinao, Albay 1st LD 6,000,000
Construction of Brgy. Guinobat MPB, Guinobat, Tabaco City, Albay 1st LD 2,000,000
Albay 2nd DEO 25,000,000Const. of Multi-Purpose Building at Puro Elementary School, Puro, Legazpi City, Albay
2,000,000
Construction of Multi-Purpose Building, Banquerohan National High School, Legazpi City 2nd LD
5,000,000
Construction of Multi-Purpose Building, Brgy. Sagpon, Daraga, Albay 2nd LD 4,000,000Construction of Multi-Purpose Building, Cotmon National High School, Camalig, Albay 2nd LD
4,000,000
Construction of Multi-Purpose Building, Manito National High School, Manito, Albay 2nd LD
5,000,000
Construction of Two (2) Storey Multi-Purpose Building, Barangay Maroroy, Daraga, Albay
2,000,000
Multi-Purpose Covered Court 3,000,000
Albay 3rd DEO 17,000,000Construction of Multi-Purpose Building (Barangay Hall), Barangay Banao, Oas, Albay 3rd LD
1,000,000
Construction of Multi-Purpose Building (Barangay Hall), Barangay Rawis, Libon, Albay 3rd LD
1,000,000
Construction of multi-purpose building, Brgy. Dona Mercedes, Guinobatan, Albay 2,000,000
Construction of multi-purpose building, Brgy. San Rafael, Guinobatan, Albay 2,000,000Construction of Multipurpose Open Court at Libon Community College, Barangay Poblacion, Libon, Albay 3rd LD
3,000,000
Construction of Multipurpose Open Court at Oas Community College, Barangay Calzada, Oas, Albay 3rd LD
4,000,000
Construction of Open Basketball Court at Barangay La Medalla, Pio Duran, Albay 2,000,000
Construction of Open/Basketball at Macabugos High School, Barangay Macabugos, Libon, Albay 3rd LD
2,000,000
Camarines Norte DEO 71,000,000Completion of Multi-Purpose Building, Brgy. Bautista, Labo, Camarines Norte,Camarines Norte 1st LD
1,000,000
Completion of Multi-Purpose Building, Brgy. Dumagmang, Labo, Camarines Norte,Camarines Norte 1st LD
1,000,000
Completion of Multi-Purpose Building, Brgy. Guiisican, Labo, Camarines Norte,Camarines Norte 1st LD
1,000,000
Completion of Multi-Purpose Building, Brgy. Maulawin, Sta. Elena, Camarines Norte,Camarines Norte 1st LD
1,000,000
Completion of Multi-Purpose Building, Brgy. Pinabirayan Munti, Paracale, Camarines Norte,Camarines Norte 1st LD
1,000,000
Completion of Multi-Purpose Building, Brgy. Salvacion, Jose Panganiban, Camarines Norte,Camarines Norte 1st LD
1,000,000
Completion of Multi-Purpose Building, Brgy. San Isidro, Capalonga, Camarines Norte,Camarines Norte 1st LD
1,000,000
Completion of Multi-Purpose Building, Brgy. Submakin, Labo, Camarines Norte,Camarines Norte 1st LD
1,000,000
Completion of Multi-Purpose Building, Brgy. Talusan, Paracale, Camarines Norte,Camarines Norte 1st LD
1,000,000
Completion of Multi-Purpose Building, Brgy. Tamisan, Jose Panganiban, Camarines Norte,Camarines Norte 1st LD
1,000,000
Conmpletion of Multi-Purpose Building, Barangay Laniton, San Lorenzo Ruiz, Camarines Norte 2nd LD
1,000,000
Construction of Multi-Purpose Building , Brgy. Fundado, Labo, Camarines Norte,Camarines Norte 1st LD
2,000,000
Construction of Multi-Purpose Building , Brgy. Gumaus, Paracale, Camarines Norte,Camarines Norte 1st LD
2,000,000
Construction of Multi-Purpose Building , Brgy. Mabini, Capalonga, Camarines Norte,Camarines Norte 1st LD
2,000,000
Construction of Multi-Purpose Building , Brgy. Malibago, Labo, Camarines Norte,Camarines Norte 1st LD
2,000,000
Construction of Multi-Purpose Building , Brgy. Maot, Labo, Camarines Norte,Camarines Norte 1st LD
2,000,000
Construction of Multi-Purpose Building , Brgy. Plaridel, Jose Panganiban, Camarines Norte,Camarines Norte 1st LD
2,000,000
Construction of Multi-Purpose Building , Brgy. Tigbinan, Labo, Camarines Norte,Camarines Norte 1st LD
2,000,000
Page 81 of 162
details of dpwh’s programs/projects 981
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building, Barangay Angas, Basud, Camarines Norte 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Bibirao, Daet, Camarines Norte 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Calangcawan Norte, Vinzons, Camarines Norte 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Calangcawan Sur, Vinzons, Camarines Norte 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Cayucyucan, Mercedes, Camarines Norte 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Gaboc, Mercedes, Camarines Norte 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Hamoraon, Mercedes, Camarines Norte 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Lalawigan, Mercedes, Camarines Norte 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Lanot, Mercedes, Camarines Norte 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Man-ogob, San Vicente, Camarines Norte 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Matacong, San Lorenzo Ruiz, Camarines Norte 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay San Pascual, Basud, Camarines Norte 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Taba-Taba, Basud, Camarines Norte 2nd LD
2,000,000
Construction/ Improvement of Multi-Purpose Building, Brgy. Patag-Ibaba, Sta. Elena, Camarines Norte,Camarines Norte 1st LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay 2, Daet, Camarines Norte 2nd LD
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay 8, Daet, Camarines Norte 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Gahonon, Daet, Camarines Norte 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Guinacutan, Vinzons, Camarines Norte 2nd LD
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Guinatungan, Basud, Camarines Norte 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Mantugawe, Basud, Camarines Norte 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Napilihan, Vinzons, Camarines Norte 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Salvacion, San Lorenzo Ruiz, Camarines Norte 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay San Antonio, San Lorenzo Ruiz, Camarines Norte 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay San Isidro, San Lorenzo Ruiz, Camarines Norte 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay San Ramon, San Lorenzo Ruiz, Camarines Norte 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Sta. Elena,Talisay, Camarines Norte 2nd LD
2,000,000
Construction/Improvement of Multi-Purpose Building, F. David Elem. School, Barangay Binanuaan, Talisay, Camarines Norte 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Vinzons Pilot High School, Barangay Poblacion 1, Vinzons, Camarines Norte 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building,San Lorenzo Ruiz National High School, Barangay Mampurog, San Lorenzo Ruiz, Camarines Norte 2nd LD
1,000,000
Construction/Improvement of Roofings of Vicente Agro Sports and Freedom Complex, Barangay Kanluran, San Vicente, Camarines Norte 2nd LD
1,000,000
Camarines Sur 1st DEO 14,000,000Construction of Multipurpose Building with stage, Brgy. Candami, Libmanan, Camarines Sur 2nd LD
2,000,000
Construction of Multipurpose Building, Brgy. Malbogon, Libmanan, Camarines Sur 2nd LD
2,000,000
Construction of Multipurpose Building, Brgy. Poblacion, Libmanan, Camarines Sur 2nd LD
2,000,000
Construction of Multipurpose Building, Brgy. Salvacion, Libmanan, Camarines Sur 2nd LD
2,000,000
Construction of Multipurpose Building, Brgy. Sigamot, Libmanan, Camarines Sur 2nd LD
2,000,000
Construction of Multipurpose Building, Brgy. Tanag, Libmanan, Camarines Sur 2nd LD
2,000,000
Construction of Multipurpose Covered Area, Brgy. Alimbuyog, Milaor, Camarines Sur 2nd LD
2,000,000
Camarines Sur 2nd DEO 40,000,000Construction of Multi-Purpose Building, Barangay Iquin, Canaman, Camarines Sur 3rd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Poblacion Central, Ocampo, Camarines Sur 3rd LD
2,000,000
Construction of Multi-Purpose Building, Barangay San Francisco, Canaman, Camarines Sur 3rd LD
2,000,000
Construction of Multi-Purpose Building, Barangay San Juan, Canaman, Camarines Sur 3rd LD
2,000,000
Construction of Multi-Purpose Building, Barangay San Pantaleon, Magarao, Camarines Sur 3rd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Sta. Rosa, Magarao, Camarines Sur 3rd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Sto. Domingo, Camaligan, Camarines Sur 3rd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Tibgao, Canaman, Camarines Sur 3rd LD
2,000,000
Construction/Rehabilitation of Various Infrastructure Projects 24,000,000
Camarines Sur 3rd DEO 50,000,000Construction of Community Center, Poblacion, Siruma, Camarines Sur,Camarines Sur 4th LD
1,500,000
Page 82 of 162
982 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Community Center, Sulpa, Siruma, Camarines Sur,Camarines Sur 4th LD
1,500,000
Construction of Community Center, Vito, Siruma, Camarines Sur,Camarines Sur 4th LD
1,000,000
Construction of Multi-Purpose Building, Bitaogan, Presentacion, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Canlong, Garchitorena, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Gibgos, Caramoan, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Gogon, Caramoan, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Haponan, Caramoan, Camarines Sur,Camarines Sur 4th LD
1,500,000
Construction of Multi-Purpose Building, Kinahulugan, Lagonoy, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Maligaya, Caramoan, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Manzana, San Jose, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Maqueda, Caramoan, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Oring, Caramoan, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Pandanan, Caramoan, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Sagrada, Garchitorena, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Salvacion, Caramoan, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, San Roque, Sagnay, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Sta. Cruz, Caramoan, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Sta. Cruz, San Jose, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Sta. Maria, Presentacion, Camarines Sur,Camarines Sur 4th LD
1,000,000
Construction of Multi-Purpose Building, Tabgon, Caramoan, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction of Multi-Purpose Building, Tawog, Caramoan, Camarines Sur,Camarines Sur 4th LD
1,000,000
Construction of Multi-Purpose Building, Toboan, Caramoan, Camarines Sur,Camarines Sur 4th LD
1,500,000
Construction of Multi-Purpose Building, Toytoy, Garchitorena, Camarines Sur,Camarines Sur 4th LD
2,000,000
Construction/Improvement of Community Center, Abo, Tigaon, Camarines Sur,Camarines Sur 4th LD
3,000,000
Improvement For Energy Efficiency And Conservation Program - Retrofitting Of Partido Development Administration Government Office With Energy Efficient Air-Conditioning Units W/ Inverters & Solar Energy Systems, Caraycayon, Tigaon, Camarines Sur,Camarines Sur 4th LD
4,000,000
Camarines Sur 4th DEO 6,000,000Construction of legislative bldg. Municipal hall, Barangay , Balatan, Camarines Sur 5th LD
4,000,000
Construction/Improvement of multi-purpose bldg.,, Barangay Sto. Domingo, Nabua, Camarines Sur 5th LD
2,000,000
Camarines Sur 5th DEO 21,000,000Construction of Barangay Hall, Barangay Anib, Sipocot, Camarines Sur 1,000,000Construction of Barangay Hall, Barangay Gabi, Sipocot, Camarines Sur 1,000,000Construction of Barangay Hall, Barangay Laguio, Ragay, Camarines Sur 1,000,000Construction of Barangay Hall, Barangay Bagong Silang, Del Gallego, Camarines Sur 1,000,000
Construction of Health Center, Barangay Binahan Upper, Ragay, Camarines Sur 1,000,000
Construction of Health Center, Barangay Sabang, Del Gallego, Camarines Sur 1,000,000
Construction of Multipurpose Building, Barangay Catabangan Proper, Ragay, Camarines Sur 1st LD
3,000,000
Construction of Multipurpose Building, Barangay Tagbac, Ragay, Camarines Sur 1st LD
3,000,000
Construction of Multipurpose, Building, Barangay Barcelonita, Cabusao, Camarines Sur
2,000,000
Construction of Multipurpose, Building, Barangay Binahan Proper, Ragay, Camarines Sur
2,000,000
Construction of Senior Citizen Building, Barangay Colacling, Lupi, Camarines Sur 1,000,000
Construction of Senior Citizen Building, Barangay Poblacion Zone 2, Del Gallego, Camarines Sur
1,000,000
Construction of Senior Citizen Building, Munipal Hall Compound, Barangay , Poblacion Ilaod, Ragay, Camarines Sur
1,000,000
Rehabilitation of Multipurpose Building, Barangay Impig, Sipocot, Camarines Sur 1st LD
2,000,000
Catanduanes DEO 41,000,000Construction of a multipurpose building at the Municipal Plaza, Panganiban, Catanduanes
5,000,000
Construction of Multi-Purpose Building in Agban Elementary School, Brgy. Agban, Baras, Catanduanes Lone District
1,500,000
Construction of Multi-Purpose Building in Brgy. Casoocan, Virac, Catanduanes Lone District
1,500,000
Construction of Multi-Purpose Building in Brgy. Cavinitan Elementary School, Virac, Catanduanes Lone District
1,500,000
Construction of Multi-Purpose Building in Brgy. San Roque, San Andres, Catanduanes Lone District
6,500,000
Construction of Multi-Purpose Building in Calatagan High School, Virac, Catanduanes Lone District
1,500,000
Construction of Multi-Purpose Building in Codon Elementary School, Brgy. Codon, San Andres, Catanduanes Lone District
1,500,000
Page 83 of 162
details of dpwh’s programs/projects 983
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building in Gogon Elementary School, Brgy. Gogon, Virac, Catanduanes Lone District
1,500,000
Construction of Multi-Purpose Building in Kilikilihan Elementary School, Brgy. Kilikilihan, San Miguel, Catanduanes Lone District
1,500,000
Construction of Multi-Purpose Building in Milaviga Integrated School, Brgy. Milaviga, Caramoran, Catanduanes Lone District
1,500,000
Construction of Multi-Purpose Building in Panganiban Central Elementary School, Panganiban, Catanduanes Lone District
1,500,000
Construction of Multi-Purpose Building in Paniquihan Elementary School, Baras, Catanduanes Lone District
1,500,000
Construction of Multi-Purpose Building in San Jose (Oco), Viga, Catanduanes Lone District
3,000,000
Construction of Multi-Purpose Building in Simamla Elementary School, Brgy. Simamla, Virac, Catanduanes Lone District
1,500,000
Construction of Multi-Purpose Building in Supang Datag National High School, Brgy. Datag East, Caramoran, Catanduanes Lone District
1,500,000
Construction of Multi-Purpose Building in Valencia Elementary School, Virac, Catanduanes Lone District
1,500,000
Construction of multi-purpose building, Brgy. Tucao, Caramoran, Catanduanes 2,000,000
Construction of Multi-Purpose Building, Danicop Elementary School 2,000,000Construction of Multi-Purpose Building, Dugui Too Elementary School 2,000,000Construction/Rehabilitation of Various Infrastructure Projects, Catanduanes Lone District
500,000
Improvement/Repainting of Multi-Purpose Buildings in Virac, Catanduanes Lone District
500,000
Masbate 1st DEO 6,000,000Construction of Civil Service Building, Masbate City, Masbate 2nd LD 2,000,000Construction of Multi Purpose Building, Barangay Dao, Balud, Masbate 2nd LD 2,000,000
Construction of Multi Purpose Building, Barangay Luy-a, Aroroy, Masbate 2nd LD 2,000,000
Masbate 2nd DEO 30,000,000Construction of Multi-Purpose Covered Court (14mx15m), Brgy. Aurora, Uson, Masbate 3rd LD
2,000,000
Construction of Multi-Purpose Covered Court (14mx15m), Brgy. Balocawe, Dimasalang, Masbate 3rd LD
2,000,000
Construction of Multi-Purpose Covered Court (14mx15m), Brgy. Banahao, Dimasalang, Masbate 3rd LD
2,000,000
Construction of Multi-Purpose Covered Court (14mx15m), Brgy. Banco. Palanas, Masbate 3rd LD
2,000,000
Construction of Multi-Purpose Covered Court (14mx15m), Brgy. Biga-a, Palanas, Masbate 3rd LD
2,000,000
Construction of Multi-Purpose Covered Court (14mx15m), Brgy. Bontod, Palanas, Masbate 3rd LD
2,000,000
Construction of Multi-Purpose Covered Court (14mx15m), Brgy. Cabrera, Dimasalang, Masbate 3rd LD
2,000,000
Construction of Multi-Purpose Covered Court (14mx15m), Brgy. Campana, Uson, Masbate 3rd LD
2,000,000
Construction of Multi-Purpose Covered Court (14mx15m), Brgy. Jose Abenir, Sr. (JAS), Palanas, Masbate 3rd LD
2,000,000
Construction of Multi-Purpose Covered Court (14mx15m), Brgy. Parina, Palanas, Masbate 3rd LD
2,000,000
Construction of Multi-Purpose Covered Court (14mx15m), Brgy. Rizal, Dimasalang, Masbate 3rd LD
2,000,000
Construction of Multi-Purpose Covered Court (14mx15m), Brgy. Salvacion, Palanas, Masbate 3rd LD
2,000,000
Construction of Multi-Purpose Covered Court (14mx15m), Brgy. San Isidro, Palanas, Masbate 3rd LD
2,000,000
Construction of Multi-Purpose Covered Court (14mx15m), Brgy. San Vicente, Dimasalang, Masbate 3rd LD
2,000,000
Construction of Multi-Purpose Covered Court (14mx15m), Brgy. Suba, Dimasalang, Masbate 3rd LD
2,000,000
Sorsogon 1st DEO 1,000,000Construction of Barangay Hall, Buhatan East District, Sorsogon 1,000,000
Sorsogon 2nd DEO 9,000,000Construction of Barangay Hall, Bagacay, Bulusan, Sorsogon 1,000,000Construction of multi-purpose bldg.,Brgy. Jupi,Gubat,Sorsogon 2,000,000Construction of multi-purpose building (evacuation center),Brgy. Poblacion,Gubat,Sorsogon
4,000,000
Repair/improvement of Multi-Purpose Building,Brgy. Union,Gubat,Sorsogon 2,000,000
Region VI 619,139,000Aklan DEO 26,000,000
Construction of Additional Jail Building at Aklan District Jail, Brgy. Nalook, Kalibo, Aklan
2,000,000
Construction of Barangay Multipurpose Building, Brgy. Alaminos, Madalag, Aklan 2,000,000
Construction of Barangay Multipurpose Building, Brgy. Guinbaliwan, New Washington, Aklan
2,000,000
Construction of Barangay Multipurpose Building, Brgy. Mayapay, Buruanga, Aklan 2,000,000
Construction of Barangay Multipurpose Building, Brgy. Panayakan, Tangalan, Aklan 2,000,000
Construction of Multipurpose Building for Altavas Central School, Poblacion, Altavas, Aklan
2,000,000
Construction of Multipurpose Building, Lupo Elem School, Brgy. Lupo, Altavas, Aklan 2,000,000
Construction of Multipurpose Buillding, Poblacion, Ibajay, Aklan 10,000,000Construction/Improvement of Multipurpose Building at Aklan Capitol Tennis Court, Brgy. Poblacion, Kalibo, Aklan
2,000,000
Antique DEO 23,000,000Construction of Multi-purpose Bldg. at Sibalom National High School, Poblacion, Sibalom, Antique
2,000,000
Construction of Multipurpose Building , Brgy. Agila, Sebaste, Antique 5,000,000
Page 84 of 162
984 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building, Barangay Magcalon, San Jose De Buenavista, Antique
2,000,000
Construction of Multi-Purpose Building, Fragante, Pandan, Antique Lone District 2,000,000
Construction of Multi-Purpose Building, Lindero, Tobias Fornier, Antique Lone District 2,000,000
Construction of Multi-Purpose Building, Sto. Rosario, Tibiao, Antique Lone District 2,000,000
Construction of Multi-Purpose Building, Tene, Tobias Fornier, Antique Lone District 2,000,000
Construction of Multi-Purpose Building, Trinidad, San Remigio, Antique Lone District 2,000,000
Construction of Multi-Purpose Building, Villahermosa, Sibalom, Antique Lone District 2,000,000
Multi-Purpose Building, Bitadtun Elementary School, Culasi, Antique 2,000,000
Bacolod City DEO 28,000,000Construction of Multipurpose Building (Bata Elementary School II), Brgy. Bata, Bacolod City
2,000,000
Construction of Multipurpose Building, Brgy. 22, Bacolod City 2,000,000Construction of Multipurpose Building, Brgy. 35, Bacolod City 2,500,000Construction of Multipurpose Building, Brgy. Montevista, Bacolod City 2,000,000Construction of Multi-Purpose Building,Brgy. 16,Bacolod City,Negros Occidental 3,000,000
Covered Court Singcang Airport 3,000,000Rehabilitation/Improvement of Multipurpose Building (Bata Elementary School I), Brgy.Bata, Bacolod City
500,000
Rehabilitation/Improvement of Multipurpose Building (Paglaum Village National High School), Brgy. Mansilingan, Bacolod City
500,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. 30, Bacolod City 1,000,000Rehabilitation/Improvement of Multipurpose Building, Brgy. Alijis, Bacolod City 500,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. Estefania, Bacolod City 1,000,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. Singcang, Bacolod City 2,000,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. Taculing, Bacolod City 500,000
Rehabilitation/Improvement of Multipurpose Building, Brgy.27, Bacolod City 500,000Rehabilitation/Improvement of Multipurpose Building, Brgy.38, Bacolod City 500,000Rehabilitation/Improvement of Multipurpose Building, Villa Esperanza, Brgy. Tangub, Bacolod City
500,000
Repair/Rehab./Improvement of Existing Multi-Purpose Building,Brgy. Alijis,Bacolod City,Negros Occidental
1,000,000
Repair/Rehab./Improvement of Existing Multi-Purpose Building,Brgy. Cabug,Bacolod City,Negros Occidental
1,000,000
Repair/Rehab./Improvement of Existing Multi-Purpose Building,Brgy. Estefania,Bacolod City,Negros Occidental
1,000,000
Repair/Rehab./Improvement of Existing Multi-Purpose Building,Brgy. Singcang Airport,Bacolod City,Negros Occidental
2,000,000
Repair/Rehab./Improvement of Existing Multi-Purpose Building,Brgy. Taculing,Bacolod City,Negros Occidental
1,000,000
Capiz 1st DEO 7,000,000Construction of Barangay Hall, Barangay Cabugao, Panitan, Capiz 1st LD 1,000,000Construction of Community Center, Barangay Agkilo, Panitan, Capiz 1st LD 1,000,000Construction of Community Center, Barangay Ambilay, Panitan, Capiz 1st LD 1,000,000
Construction of Community Center, Barangay Balatucan, Panitan, Capiz 1st LD 2,000,000
Construction of Community Center, Barangay Cabangahan, Panitan, Capiz 1st LD 1,000,000
Construction of Multipurpose Building (Brgy Hall), Sitio Bliss, Brgy Cagay, Roxas City, Capiz
1,000,000
Guimaras DEO 73,000,000Construction of Multi-Purpose Building, Brgy. Sto. Rosario, Buenavista, Guimaras Lone District
5,000,000
Construction of Multi-Purpose Building, Municipality of Buenavista, Guimaras 10,500,000Construction of Multi-Purpose Building, Municipality of Jordan, Guimaras 21,000,000Construction of Multi-Purpose Building, Municipality of Nueva Valencia, Guimaras 2,000,000
Construction of Multi-Purpose Building, Municipality of San Lorenzo, Guimaras 5,000,000Construction of Multi-Purpose Building, Municipality of Sibunag, Guimaras 7,000,000Construction of Multi-Purpose Building, San Lorenzo National High School, Brgy. Suclaran, San Lorenzo, Guimaras Lone District
5,000,000
Improvement of Multi-Purpose Building, Brgy. Poblacion, Nueva Valencia, Guimaras Lone District
10,000,000
Improvement of Multi-Purpose Building, Brgy. Rizal, Jordan, Guimaras 2,500,000Improvement of Multi-Purpose Building, Brgy. Rizal, Jordan, Guimaras Lone District 5,000,000
Iloilo 1st DEO 15,000,000Construction of Multipurpose Building with Stage, 1st District, Iloilo 1st LD 4,000,000Construction/Improvement of Oton Multipurpose Building, Brgy. Poblacion, Oton, Iloilo 1st LD
2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Iloilo 1st LD 5,000,000Improvement of Multipurpose Building and Pavement, Guimbal National High School, Rizal St. Guimbal, Iloilo 1st LD
4,000,000
Iloilo 2nd DEO 78,500,000Construction of Community Center, Aglalana, Passi City, Iloilo 4th LD 2,000,000Construction of Community Center, Agtatabo, Passi City, Iloilo 4th LD 2,000,000Construction of Community Center, Bantud Fabrica, Dumangas, Iloilo 4th LD 1,000,000Construction of Community Center, Bita-ogon, Passi City, Iloilo 4th LD 3,000,000Construction of Community Center, Bolilao, Dumangas, Iloilo 4th LD 1,000,000Construction of Community Center, Dacutan, Dumangas, Iloilo 4th LD 1,000,000Construction of Community Center, Nanding Lopez, Dumangas, Iloilo 4th LD 1,000,000Construction of Community Center, Nueva Union, Passi City, Iloilo 4th LD 2,000,000Construction of Community Center, Paloc So-ol, Dumangas, Iloilo 4th LD 1,000,000Construction of Community Center, Poblacion, Passi City, Iloilo 4th LD 2,000,000
Page 85 of 162
details of dpwh’s programs/projects 985
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Community Center, Rosario, Dumangas, Iloilo 4th LD 1,000,000Construction of Multi Purpose Covered Area, Brgy. Tabucan, Dumangas, Iloilo 2,500,000
Construction of Multi-Purpose Building (Community Center), Poblacion, Anilao, Iloilo 4th LD
5,000,000
Construction of Multipurpose Building, Brgy. Bug-ot, Maasin, Province of Iloilo 2,000,000Construction of Multipurpose Buillding, Poblacion, Badiangan, Iloilo 2,000,000Construction/Improvement of the barangay multi-purpose covered gym, Barangay Ilaya 3rd, Dumangas, Iloilo
1,500,000
Construction/Rehabilitation of Multi-Purpose Buildings of the Municipality of Badiangan, Iloilo 3rd LD
3,000,000
Construction/Rehabilitation of Multi-Purpose Buildings of the Municipality of Bingawan, Iloilo 3rd LD
3,000,000
Construction/Rehabilitation of Multi-Purpose Buildings of the Municipality of Cabatuan, Iloilo 3rd LD
4,000,000
Construction/Rehabilitation of Multi-Purpose Buildings of the Municipality of Calinog, Iloilo 3rd LD
4,000,000
Construction/Rehabilitation of Multi-Purpose Buildings of the Municipality of Janiuay, Iloilo 3rd LD
6,000,000
Construction/Rehabilitation of Multi-Purpose Buildings of the Municipality of Lambunao, Iloilo 3rd LD
6,000,000
Construction/Rehabilitation of Multi-Purpose Buildings of the Municipality of Maasin, Iloilo 3rd LD
5,000,000
Construction/Rehabilitation of Multi-Purpose Buildings of the Municipality of Mina, Iloilo 3rd LD
3,000,000
Construction/Rehabilitation of Multi-Purpose Buildings of the Municipality of Pototan, Iloilo 3rd LD
6,000,000
Rehabilitation of Community Center, Poblacion C, Dueñas, Iloilo 4th LD 3,000,000Rehabilitation of Multi-Purpose Building, Poblacion C, Dueñas, Iloilo 4th LD 5,000,000Rehabilitation/Improvement of Multipurpose Building, Brgy. Calmay, Janiuay, Province of Ilo Ilo
500,000
Iloilo 3rd DEO 28,939,000Construction of Brgy. Hall in Brgy. Poblacion Southeast, Lemery, Iloilo 5th LD 2,000,000Construction of Gymnasium in Brgy. Ardemil, Sara, Iloilo 5th LD 2,000,000Construction of Gymnasium in Brgy. Bakabak, Sara, Iloilo 5th LD 2,000,000Construction of Gymnasium in Brgy. Marapal, Lemery, Iloilo 5th LD 2,000,000Construction of Multi-Purpose Building in Brgy. Apologista, Sara, Iloilo 5th LD 2,639,000Construction/Improvement of Brgy. Hall in Brgy. Calapdan, Estancia, Iloilo 5th LD 800,000
Construction/Improvement of Brgy. Hall in Brgy. San Antonio, Barotac Nuevo, Iloilo 5th LD
800,000
Construction/Improvement of Brgy. Hall in Brgy. Taabu-an, Estancia, Iloilo 5th LD 1,000,000
Construction/Improvement of Gymnasium in Bancal Elementary School at Brgy. Bancal, Carles, Iloilo 5th LD
2,000,000
Construction/Improvement of Gymnasium in Brgy. Asluman, Carles, Iloilo 5th LD 1,500,000
Construction/Improvement of Gymnasium in Brgy. Igbon, Concepcion, Iloilo 5th LD 1,000,000
Construction/Improvement of Gymnasium in Brgy. Poblacion Ilawod, Sara, Iloilo 5th LD
1,500,000
Construction/Improvement of Multi-Purpose Building (Stage) in Brgy. Aripdip, San Rafael, Iloilo 5th LD
600,000
Construction/Improvement of Multi-Purpose Building in Lemery National High School at Brgy. Poblacion, Lemery, Iloilo 5th LD
2,000,000
Construction/Improvement of Municipal Gymnasium in Municipality of Lemery, Iloilo 5th LD
4,000,000
Repair of Multi-Purpose Building in Brgy. Aranjuez, Balasan, Iloilo 5th LD 600,000Repair of Multi-Purpose Building in Brgy. Lawis, Balasan, Iloilo 5th LD 1,500,000Repair/Rehabilitation of Multi-Purpose Building in Brgy. Kinalkalan, Balasan, Iloilo 5th LD
1,000,000
Iloilo 4th DEO 50,000,000Construction of Multi-Purpose Building, Brgy. Aganan, Pavia, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Amparo, Pavia, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Anonang, Leon, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Balabag (Kasadyahan), Pavia, Iloilo 2,000,000
Construction of Multi-Purpose Building, Brgy. Balabag (Proper), Pavia, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Bancal, Alimodian, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Bucari National High School, Leon, Iloilo
2,000,000
Construction of Multi-Purpose Building, Brgy. Cabugao Norte, Pavia, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Calaboa Este, Leganes, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Guinobatan, New Lucena, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Inagdangan Norte, Zarraga, Iloilo 2,000,000
Construction of Multi-Purpose Building, Brgy. Jibao-an, Pavia, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Mali-ao, Pavia, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Omambong, Leon, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Pagsanga-an, Pavia, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Pal-agon, Pavia, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Pandac, Pavia, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Payao National High School, Sta. Barbara, Iloilo
2,000,000
Construction of Multi-Purpose Building, Brgy. Poblacion (Zone V), Sta. Barbara, Iloilo
2,000,000
Construction of Multi-Purpose Building, Brgy. Poblacion, Pavia, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Poblacion, San Miguel, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Sta. Barbara National Comprehensive High School, Sta. Barbara, Iloilo
2,000,000
Construction of Multi-Purpose Building, Brgy. Tigum, Pavia, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Ungka I, Pavia, Iloilo 2,000,000Construction of Multi-Purpose Building, Brgy. Ungka II, Pavia, Iloilo 2,000,000
Iloilo City DEO 47,000,000Construction Of 2 Storey Multi Purpose Building (Health Center), Brgy. Veterans Village, , Iloilo City Lone District
2,000,000
Construction Of Multi Purpose Building (Activity Center), Inside Of Main Office Of Cswdo , Molo, Brgy. San Pedro, Molo, Iloilo City Lone District
1,200,000
Page 86 of 162
986 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction Of Multi Purpose Building (Day Care Center), Brgy. South Fundidor. Molo, Iloilo City Lone District
2,000,000
Construction Of Multi Purpose Building (Day Care Center), Brgy. Tanza-Bonifacio, City Proper, Iloilo City Lone District
2,500,000
Construction Of Multi Purpose Building (Gym), Bito-On Elem. School, Brgy. Bito-On, Jaro, Iloilo City Lone District
1,000,000
Construction Of Multi Purpose Building (Gym), Brgy. West Habog-Habog, Molo, Iloilo City Lone District
2,500,000
Construction Of Multi Purpose Building (Gym), District Gym, Brgy. Sta. Felomina, Arevalo, Iloilo City Lone District
2,000,000
Construction Of Multi Purpose Building (Gym), Jaro Ii Elem. School Brgy. Ccel98, Jaro, Iloilo City Lone District
2,500,000
Construction Of Multi Purpose Building (Gym), Telof Site, Brgy. Quintin Salas, Jaro, Iloilo City Lone District
2,500,000
Construction of multi-purpose building (barangay hall), Tagbac, Jaro, Iloilo City, Iloilo
2,000,000
Construction of multi-purpose building (day care center), Calumpang, Molo, Iloilo City, Iloilo
2,500,000
Construction of multi-purpose building (gym), MV Hechanova, Jaro at Gran Plains - San Isidro Relocation Site, Iloilo City, Iloilo
2,500,000
Construction of Multipurpose Building, Brgy. Bo. Obrero, Lapuz, Ilo Ilo City, Province of Iloilo
2,000,000
Construction of Multipurpose Building, Brgy. Concepcion, Ilo Ilo City, Province of Iloilo
2,000,000
Construction Of Of Mpb (Hall), Brgy. Baldoza, Lapaz, Iloilo City Lone District 2,500,000Construction/Improvement of multi-purpose building (gym), Simon Ledesma, Jaro, Iloilo City, Iloilo
5,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Iloilo City Lone District 650,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. Tabuc Suba, Jaro, Iloilo City, Province of Ilo Ilo
1,000,000
Repair/Rehabilitation Of 2 Storey Multi Purpose Building (Hall) , Brgy. Boulevard, Molo, Iloilo City Lone District
2,500,000
Repair/Rehabilitation Of 2 Storey Multi Purpose Building (Hall) , Brgy. North Baluarte, Iloilo City Lone District
2,500,000
Repair/Rehabilitation Of Multi Purpose Building (Brgy. Hall), Inside Lopez Subd., Bry. Dulonan, Arevalo, Iloilo City Lone District
1,250,000
Repair/Rehabilitation Of Multi Purpose Building (Gym) , Bry. Concepcion, City Proper, Iloilo City Lone District
1,600,000
Repair/Rehabilitation Of Multi Purpose Building (Gym), Brgy. Bolilao, Mandurriao, Iloilo City Lone District
800,000
Negros Occidental 1st DEO 88,500,000Construction of Multi-purpose Building (School Campus), Barangay Punta Salong, Manapla, Negros Occidental 2nd LD
2,000,000
Construction of Multi-Purpose Building (Alejandro Acuña Yap Quiña Memorial Elementary School), Brgy. 4, Victorias City,Negros Occidental
2,500,000
Construction of multi-purpose building (barangay hall), Mabini, Cadiz City, Negros Occidental
2,000,000
Construction of Multi-Purpose Building (Don Simplicio E. Lizarez National High School), Brgy. Matab-ang, Talisay City,Negros Occidental
3,400,000
Construction of Multi-Purpose Building (Guimbala-on Elementary School), Brgy. Guimbala-on, Silay City,Negros Occidental
2,000,000
Construction of Multi-Purpose Building (Guinhalaran Integrated School), Brgy. Guinhalaran, Silay City,Negros Occidental
3,000,000
Construction of Multipurpose Building , Barangay Poblacion I, Sagay City, Negros Occidental 2nd LD
4,000,000
Construction of Multi-purpose Building in Barangay Rafaela Barrera, Sagay City, Negros Occidental 2nd LD
2,000,000
Construction of Multi-purpose Building in Barangay Tiglawigan, Cadiz City, Negros Occidental 2nd LD
2,000,000
Construction of Multi-Purpose Building, Ani-e, Calatrava, Negros Occidental 1st LD 2,850,000
Construction of Multi-Purpose Building, Brgy. 13, Victorias City,Negros Occidental 2,500,000
Construction of Multi-Purpose Building, Brgy. 4, Silay City,Negros Occidental 2,800,000Construction of Multi-Purpose Building, Brgy. Alacaygan, Municipality of EB Magalona,Negros Occidental
3,000,000
Construction of Multi-Purpose Building, Brgy. Consing, Municipality of EB Magalona,Negros Occidental
3,000,000
Construction of Multi-Purpose Building, Brgy. Cudangdang, Municipality of EB Magalona,Negros Occidental
3,000,000
Construction of Multi-Purpose Building, Brgy. Rizal, Silay City,Negros Occidental 2,800,000
Construction of Multi-Purpose Building, Brgy. Zone 2, Municipality of Murcia,Negros Occidental
6,000,000
Construction of Multi-Purpose Building, Brgy. Zone 3, Municipality of Murcia,Negros Occidental
2,000,000
Construction of Multi-Purpose Building, Cabungahan, Calatrava, Negros Occidental 1st LD
2,850,000
Construction of Multi-Purpose Building, Igmayaan, Don Salvador Benedicto, Negros Occidental 1st LD
2,850,000
Construction of Multi-Purpose Building, Kumaliskis, Don Salvador Benedicto, Negros Occidental 1st LD
2,850,000
Construction of Multi-Purpose Building, Libertad, Escalante City, Negros Occidental 1st LD
2,850,000
Construction of Multi-Purpose Building, Maaslob, Calatrava, Negros Occidental 1st LD 2,850,000
Construction of Multi-Purpose Building, Malasibog, Escalante City, Negros Occidental 1st LD
2,850,000
Construction of Multi-Purpose Building, Old Poblacion, Escalante City, Negros Occidental 1st LD
2,850,000
Construction of Multi-Purpose Building, Pai-tan, Escalante City, Negros Occidental 1st LD
2,850,000
Construction of Multi-Purpose Building, Patun-an, Calatrava, Negros Occidental 1st LD
2,850,000
Construction of Multi-Purpose Building, Pinagpugasan , Escalante City, Negros Occidental 1st LD
2,850,000
Construction of Multi-Purpose Building, Pinocutan, Calatrava, Negros Occidental 1st LD
2,800,000
Construction of Multi-Purpose Building, Telim, Calatrava, Negros Occidental 1st LD 2,850,000
Page 87 of 162
details of dpwh’s programs/projects 987
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Rehabilitaiton of Multi-Purpose Building, Brgy. Dos Hermanas, Talisay City,Negros Occidental
2,000,000
Rehabilitation of Multi-Purpose Building, Brgy. Damsite, Municipality of Murcia,Negros Occidental
1,500,000
Negros Occidental 2nd DEO 37,500,000Construction of 2 Storey Multi-Purpose Building, Barangay 4, Hinigaran, Negros Occidental
2,000,000
Construction of Multipurpose Building, Brgy. Inolingan, Magallon/Moises Padilla, Negros Occidental
2,000,000
Construction of Multipurpose Building, Poblacion, Isabela, Negros Occidental 2,000,000Construction of Multipurpose Building,Brgy. 6,Moises Padilla,Negros Occidental 1,000,000
Construction of Multipurpose Building,Brgy. Candumarao,Hinigaran,Negros Occidental
2,000,000
Construction of Multipurpose Building,Brgy. Canmoros,Binalbagan,Negros Occidental 2,000,000
Construction of Multipurpose Building,Brgy. Enclaro,Binalbagan,Negros Occidental 2,000,000
Construction of Multipurpose Building,Brgy. Lalagsan,La Castella,Negros Occidental 2,000,000
Construction of Multipurpose Building,Brgy. Manghanoy,La Castella,Negros Occidental
1,000,000
Construction of Multipurpose Building,Brgy. Montilla,Moises Padilla,Negros Occidental 1,000,000
Construction of Multipurpose Building,Brgy. Nanunga,Hinigaran,Negros Occidental 2,000,000
Construction of Multipurpose Building,Brgy. Panaquiao,Isabela,Negros Occidental 1,000,000
Construction of Multipurpose Building,Brgy. Paticui,Hinigaran,Negros Occidental 2,000,000
Construction of Multipurpose Building,Brgy. Progreso,Binalbagan,Negros Occidental 1,000,000
Construction of Multipurpose Building,Brgy. Sto. Rosario,Binalbagan,Negros Occidental
2,000,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. 1, Magallon/Moises Padilla, Negros Occidental
1,000,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. 3, Hinigaran, Negros Occidental
1,000,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. Biaknabato, La Castellana, Negros Occidental
500,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. Nanunga, Hinigaran, Negros Occidental
1,000,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. Puso, La Castellana, Negros Occidental
500,000
Rehabilitation/Improvement of Multipurpose Building, Brgy.Lalagsan, La Castellana, Negros Occidental
500,000
Rehabilitation/Improvement of Multipurpose Building, Brgy.Mansalanao, La Castellana, Negros Occidental
500,000
Rehabilitation/Improvement of Multipurpose Building, Brgy.Sag-Ang, La Castellana, Negros Occidental
500,000
Repair of Multipurpose Building,Brgy. 2,Hinigaran,Negros Occidental 1,000,000Repair of Multipurpose Building,Brgy. Aguisan,Himamaylan City,Negros Occidental 1,000,000
Repair of Multipurpose Building,Brgy. Bagroy,Binalbagan,Negros Occidental 1,000,000Repair of Multipurpose Building,Brgy. Magallon Cadre,Moises Padilla,Negros Occidental
1,000,000
Repair of Multipurpose Building,Brgy. Mansalanao,La Castella,Negros Occidental 1,000,000
Repair of Multipurpose Building,Brgy. Paglaum,Binalbagan,Negros Occidental 1,000,000Repair/Improvement of Multipurpose Building,Brgy. Cabagna-an,La Castella,Negros Occidental
1,000,000
Negros Occidental 3rd DEO 93,200,000Construction of Brgy Hall, Brgy. 4, Sipalay City, Negros Occidental 2,000,000Construction of Brgy Hall, Brgy. Canturay, Sipalay City, Negros Occidental 2,200,000Construction of Brgy Hall, Brgy. Mambaroto, Sipalay City, Negros Occidental 3,000,000Construction of Multipurpose Building (covered court), Barangay Inayawan, Cauayan, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Barangay Isio, Cauayan, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Barangay 4, Sipalay, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Barangay Balicotoc, Ilog, Negros Occidental
2,500,000
Construction of Multipurpose Building (covered court), Barangay Bulata, Cauayan, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Barangay Cabadiangan, Sipalay, Negros Occidental 6th LD
2,500,000
Construction of Multi-Purpose Building (covered court), Barangay Camalandaan, Cauayan, Negros Occidental
2,500,000
Construction of Multipurpose Building (covered court), Barangay Camindangan, Sipalay, Negros Occidental 6th LD
2,500,000
Construction of Multi-Purpose Building (covered court), Barangay Caningay, Candoni, Negros Occidental
2,000,000
Construction of Multipurpose Building (covered court), Barangay Canlamay, Ilog, Negros Occidental
2,500,000
Construction of Multipurpose Building (covered court), Barangay Carol-an, Kabankalan, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Barangay Cartagena, Sipalay, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Barangay Consuelo, Negros Occidental
2,500,000
Construction of Multipurpose Building (covered court), Barangay Culipapa, Hinobaan, Negros Occidental
2,500,000
Construction of Multi-Purpose Building (covered court), Barangay Gatuslao, Candoni, Negros Occidental
2,500,000
Construction of Multipurpose Building (covered court), Barangay Linao, Kabankalan, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Barangay Mambugsay, Cauayan, Negros Occidental 6th LD
2,500,000
Page 88 of 162
988 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multipurpose Building (covered court), Barangay Manalad, Ilog, Negros Occidental
2,500,000
Construction of Multipurpose Building (covered court), Barangay Manlucahoc, Sipalay, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Barangay Maricalum, Sipalay, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Barangay Masaling, Cauayan, Negros Occidental 6th LD
2,000,000
Construction of Multipurpose Building (covered court), Barangay Nauhang, Sipalay, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Barangay Payauan, Candoni, Negros Occidental
2,500,000
Construction of Multipurpose Building (covered court), Barangay Salong, Kabankalan, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Barangay San Jose, Sipalay, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Barangay Tabu, Ilog, Negros Occidental
2,500,000
Construction of Multipurpose Building (covered court), Barangay Tagukon, Kabankalan, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Barangay Tampalon, Kabankalan, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Barangay Tapi, Kabankalan, Negros Occidental 6th LD
3,000,000
Construction of Multi-Purpose Building (covered court), Barangay West, Candoni, Negros Occidental
2,500,000
Construction of Multipurpose Building (covered court), Florentino Galang, Sr. National High School, Barangay Oringao, Kabankalan, Negros Occidental 6th LD
2,500,000
Construction of Multipurpose Building (covered court), Sitio Malabong, Barangay Andulauan, Negros Occidental
2,000,000
Construction of Multi-purpose Building at Brgy. 9, Kabankalan City, Negros Occidental
3,000,000
Construction of Multipurpose Building, Brgy. Magballo, Kabankalan City, Negros Occidental
2,000,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. Bacuyangan, Hinoba-an, Negros Occidental
500,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. Talacagay, Hinoba-an, Negros Occidental
500,000
Rehabilitation/Improvement of Multipurpose Building, Brgy.Alim, Hinoba-an, Negros Occidental
500,000
Rehabilitation/Improvement of Multipurpose Building, Brgy.Sangke, Hinoba-an, Negros Occidental
500,000
Negros Occidental 4th DEO 23,500,000Construction of Multipurpose Bldg., Brgy. Abuanan, Bago City, Negros Occidental 4th LD
2,000,000
Construction of Multipurpose Bldg., Brgy. Cubay, La Carlota City, Negros Occidental 4th LD
3,000,000
Construction of Multipurpose Bldg., Brgy. Dol-Dol, Municipality of Valladolid, Negros Occidental 4th LD
3,000,000
Construction of Multipurpose Bldg., Brgy. Don Jorge Araneta, Bago City, Negros Occidental 4th LD
2,500,000
Construction of Multipurpose Bldg., Brgy. III, La Carlota City, Negros Occidental 4th LD
4,500,000
Construction of Multipurpose Bldg., Brgy. Napoles, Bago City, Negros Occidental 4th LD
2,000,000
Construction of Multipurpose Bldg., Brgy. Pacol, Municipality of Valladolid, Negros Occidental 4th LD
2,500,000
Construction of Multipurpose Bldg., Brgy. Tabao Proper, Municipality of Valladolid, Negros Occidental 4th LD
2,000,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. Zone 2, Pulupandan, Negros Occidental
500,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. Zone 3, Pulupandan, Negros Occidental
500,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. Zone 4, Pulupandan, Negros Occidental
500,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. Zone 6, Pulupandan, Negros Occidental
500,000
Region VII 506,400,000Bohol 1st DEO 12,500,000
Construction of Brgy. Habitat Health Center, Habitat Liloy, Tagbilaran city, Bohol 1st LD
1,500,000
Construction of Multi-Purpose Building (Covered Court), Bgy. Sta. Cruz, Calape, Bohol
5,000,000
Construction of Multi-Purpose Building, Dao, Dauis, Bohol 1st LD 2,000,000Construction/Improvement of Multi-Purpose Building (RIC Health Center), Matabao, Tubigon, Bohol 1st LD
2,000,000
Construction/Improvement of Multi-Purpose Building, Sambog, Corella, Bohol 1st LD 2,000,000
Bohol 2nd DEO 61,200,000Construction of Barangay Hall Brgy. Fatima, Ubay, Bohol 1,000,000Construction of Covered Court in Barangay Tapon, Municipality of Ubay, Province of Bohol
2,500,000
Construction of Covered Court in Barangay Calangaman, Municipality of Ubay, Province of Bohol
2,500,000
Construction of Covered Court in Barangay Imelda, Municipality of Ubay, Province of Bohol
2,500,000
Construction of Covered Court in Barangay Mandawa, Municipality of Bienunido, Province of Bohol
2,500,000
Construction of Covered Court in Barangay Zamora, Municipality of Talibon, Province of Bohol
2,500,000
Construction of Multi-Purpose Building, Barangay Bantuan, Buenavista, Bohol 2nd LD 2,000,000
Construction of Multi-Purpose Building, Barangay Bugang, San Miguel, Bohol 2nd LD 2,000,000
Construction of Multi-Purpose Building, Barangay Bulilis, Ubay, Bohol 2nd LD 2,000,000Construction of Multi-Purpose Building, Barangay Calanggaman, Ubay, Bohol 2nd LD 2,000,000
Page 89 of 162
details of dpwh’s programs/projects 989
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building, Barangay Catigbian, Buenavista, Bohol 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Corazon, San Miguel, Bohol 2nd LD 2,000,000
Construction of Multi-Purpose Building, Barangay Eastern Cabul-an, Buenavista, Bohol 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Hingotanan West, Bien Unido, Bohol 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Imelda, Ubay, Bohol 2nd LD 2,000,000
Construction of Multi-Purpose Building, Barangay Mahayag, San Miguel, Bohol 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Mandawa, Bien Unido, Bohol 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Nocnocan, Talibon, Bohol 2nd LD 2,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Clarin, Bohol 2nd LD 4,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Danao, Bohol 2nd LD 3,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, San Miguel, Bohol 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Talibon, Bohol 2nd LD 2,000,000
Construction of Multi-Purpose Building, Barangay San Francisco, Ubay, Bohol 2nd LD 2,000,000
Construction of Multi-Purpose Building, Barangay San Pascual, Ubay, Bohol 2nd LD 2,000,000
Construction of Multi-Purpose Building, Barangay San Pedro, Talibon, Bohol 2nd LD 2,000,000
Construction of Multi-Purpose Building, Barangay Tapon 2,350,000Construction of Multi-Purpose Building, Barangay Tapon, Ubay, Bohol 2nd LD 2,000,000
Construction of Multi-Purpose Building, San Francisco, Ubay, Bohol 2,350,000
Bohol 3rd DEO 38,000,000Construction of Multi-Purpose Building, Loboc Public Market 10,000,000Construction/Improvement of Multi-Purpose Building/Evacuation Center, Barangay Guinsularan, Duero, Bohol 3rd LD
2,000,000
Construction/Improvement of Multi-Purpose Building/Evacuation Center, Barangay Poblacion, Alicia, Bohol 3rd LD
4,000,000
Construction/Improvement of Municipal Multi-Purpose Building, Barangay Poblacion, Anda, Bohol 3rd LD
4,000,000
Construction/Improvement of Municipal Multi-Purpose Building, Barangay San Pedro (Poblacion), Duero, Bohol 3rd LD
3,000,000
Construction/Improvement of Municipal Public Market, Barangay Poblacion Norte, Batuan, Bohol 3rd LD
4,000,000
Construction/Improvement of Municipal Public Market, Barangay Poblacion, Dimiao, Bohol 3rd LD
2,000,000
Construction/Improvement/Rehabilitation of Loay Municipal Public Market, Barangay Poblacion Ubos, Loay, Bohol 3rd LD
8,000,000
Rehabilitation of Multi-Purpose Building, Barangay San Isidro, Sierra Bullones, Bohol 3rd LD
1,000,000
Cebu 1st DEO 17,500,000Construction of Covered Court in Barangay Curva, Municipality of Medellin, Province of Cebu
2,500,000
Improvement of Multi-Purpose Building, Barangay Curva, Medellin, Cebu 4th LD 4,000,000
Improvement of Multi-Purpose Building, Barangay Poblacion, Tabuelan, Cebu 4th LD
5,000,000
Improvement of Multi-Purpose Building, Barangay Alang-alang, Tabogon, Cebu 4th LD
500,000
Improvement of Multi-Purpose Building, Barangay Bakhawan, Daanbantayan, Cebu 4th LD
500,000
Improvement of Multi-Purpose Building, Barangay Ilihan, Tabogon, Cebu 4th LD 500,000
Improvement of Multi-Purpose Building, Barangay Kal-anan, Tabogon, Cebu 4th LD 500,000
Improvement of Multi-Purpose Building, Barangay Loong, Tabogon, Cebu 4th LD 500,000
Improvement of Multi-Purpose Building, Barangay Malbago, Daanbantayan, Cebu 4th LD
500,000
Improvement of Multi-Purpose Building, Barangay Manlagtang, Tabogon, Cebu 4th LD
500,000
Improvement of Multi-Purpose Building, Barangay Maslog, Tabogon, Cebu 4th LD 500,000
Improvement of Multi-Purpose Building, Barangay Paypay, Daanbantayan, Cebu 4th LD
500,000
Improvement of Multi-Purpose Building, Barangay Poblacion, Daanbantayan, Cebu 4th LD
500,000
Improvement of Multi-Purpose Building, Barangay Sambag, Tabogon, Cebu 4th LD 500,000
Improvement of Multi-Purpose Building, Barangay San Vicente, Tabogon, Cebu 4th LD
500,000
Cebu 2nd DEO 28,000,000Construction of One (1) unit of Day care center, Carcar, Cebu 1,000,000Construction/Improvement of Multi-Purpose Building, Barangay Abuyog, Sibonga, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Alpaco, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Bagacay, Sibonga, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Bahay, Sibonga, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Bairan, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Balirong, Naga City, Cebu 1st LD
500,000
Page 90 of 162
990 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Improvement of Multi-Purpose Building, Barangay Banlot, Sibonga, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Biasong, Talisay City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Bolinawan, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Buenavista, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Cabungahan, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Cadulawan, Minglanilla, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Calidngan, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Cana-sujan, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Cantao-an, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Central Poblacion, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Cogon, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Colon, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay East Poblacion, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Guadalupe, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Guimbangco-an, Sibonga, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Inayagan, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Inoburan, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Jaguimit, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Lanas, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Langtad, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Liburon, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Lutac, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Magcagong, Sibonga, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Mainit, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Mangyan, Sibonga, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Mayana, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Naalad, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Napo, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay North Poblacion, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Ocana, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Pangdan, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Parrelos, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Patag, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Poblacion I, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Poblacion II, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Poblacion III, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay South Poblacion, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Tagjaguimit, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Tangke, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Tinaan, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Tuyan, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Tuyom, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Uling, Naga City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Valencia, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Valladolid, Carcar City, Cebu 1st LD
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Vito, Minglanilla, Cebu 1st LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay West Poblacion, Naga City, Cebu 1st LD
500,000
Cebu 3rd DEO 21,500,000Construction of Multi-Purpose at Poblacion, Loboc, Bohol 3,000,000Construction of Multi-Purpose Building, Barangay Kabangkalan, Tuburan, Cebu 3rd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Pangpang, Barili, Cebu 3rd LD 2,500,000
Page 91 of 162
details of dpwh’s programs/projects 991
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building, Barangay Poblacion, Aloguinsan, Cebu 3rd LD
2,500,000
Construction of Multi-Purpose Building, Barangay Poblacion, Toledo City, Cebu 3rd LD
2,500,000
Construction of Multi-Purpose Building, Barangay Sayaw, Barili, Cebu 3rd LD 2,500,000Construction of Multi-Purpose Building, Barangay Vito, Barili, Cebu 3rd LD 2,500,000Construction of multi-purpose building, Brgy. Abucayan, Balamban, Cebu 2,000,000Construction of multi-purpose building, Brgy. Nasipit, Barili, Cebu 2,000,000
Cebu 4th DEO 58,800,000Construction of covered court (Phase II) Poblacion, Argao, Cebu 1,300,000Construction of Multi-purpose Building, Babag, Cebu City, Cebu,Cebu City 2nd LD 4,000,000
Construction of Multi-Purpose Building, Bala-as, Argao, Cebu 2nd LD 2,000,000Construction of Multi-Purpose Building, Balabagon, Moalboal, Cebu 2nd LD 2,000,000Construction of Multi-Purpose Building, Banhigan, Badian, Cebu 2nd LD 2,000,000Construction of Multi-purpose Building, Barangay Poblacion, Argao, Cebu 4,000,000Construction of Multi-Purpose Building, Bug-ot, Argao, Cebu 2nd LD 2,000,000Construction of Multi-Purpose Building, Capio - an, Argao, Cebu 2nd LD 2,000,000Construction of Multi-Purpose Building, Casay, Argao, Cebu 2nd LD 2,000,000Construction of Multi-purpose Building, Cogon-Pardo, Cebu City, Cebu,Cebu City 2nd LD
4,000,000
Construction of Multi-Purpose Building, Colase, Samboan, Cebu 2nd LD 2,000,000Construction of Multi-Purpose Building, Compostela, Alegria, Cebu 2nd LD 2,000,000Construction of Multi-Purpose Building, Daanlungsod, Oslob, Cebu 2nd LD 2,000,000Construction of Multi-Purpose Building, Dalahikan, Samboan, Cebu 2nd LD 2,000,000Construction of Multi-purpose Building, Guadalupe, Cebu City, Cebu,Cebu City 2nd LD
4,000,000
Construction of Multi-Purpose Building, Guiwanon, Argao, Cebu 2nd LD 2,000,000Construction of Multi-Purpose Building, Malalay, Ronda, Cebu 2nd LD 2,000,000Construction of Multi-Purpose Building, Malones, Dalaguete, Cebu 2nd LD 2,000,000Construction of Multi-Purpose Building, Poblacion, Ginatilan, Cebu 2nd LD 2,000,000Construction of Multi-Purpose Building, Sumaguan, Argao, Cebu 2nd LD 2,000,000Construction of Multi-Purpose Building, Tabon, Dalaguete, Cebu 2nd LD 2,000,000Construction of School Building, Alcantara, Cebu 1,500,000Construction/Improvement of Multi-Purpose Building, Anajao, Argao, Cebu 2nd LD 1,500,000
Construction/Improvement of Multi-Purpose Building, Banhigan, Dalaguete, Cebu 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay I (Poblacion Uno), Malabuyoc, Cebu 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Lumbang, Dalaguete, Cebu 2nd LD
1,500,000
Construction/Improvement of Multi-Purpose Building, Poblacion West, Moalboal, Cebu 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Sto. Niño (Saliring),, Malabuyoc, Cebu 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Tuble, Moalboal, Cebu 2nd LD 1,000,000
Cebu 5th DEO 48,000,000Construction of Cabol-anonan Brgy. Health Center, Cabol-anonan, Tudela, Cebu 5th LD
1,000,000
Construction of Multi-Purpose at Brgy. Catagdaan, Pilar, Bohol 2,000,000Construction of Multipurpose Building, Brgy. Bactas, Catmon, Cebu 5th LD 2,500,000Construction of Multipurpose Building, Brgy. Bagacay, Sogod, Cebu 5th LD 2,000,000Construction of Multipurpose Building, Brgy. Cabadiangan, Compostela, Cebu 5th LD 2,500,000
Construction of Multipurpose Building, Brgy. Cabadiangan, Liloan, Cebu 5th LD 2,500,000
Construction of Multipurpose Building, Brgy. Cajel, Borbon, Cebu 5th LD 2,500,000Construction of Multipurpose Building, Brgy. Calmante, Tudela, Cebu 5th LD 2,750,000Construction of Multipurpose Building, Brgy. Cambayog, Compostela, Cebu 5th LD 2,500,000
Construction of Multipurpose Building, Brgy. Clavera, Borbon, Cebu 5th LD 2,500,000Construction of Multipurpose Building, Brgy. Lanipga, Carmen, Cebu 5th LD 2,500,000Construction of Multipurpose Building, Brgy. Lawaan, Danao, Cebu 5th LD 2,500,000Construction of Multipurpose Building, Brgy. Libertad, Poro, Cebu 5th LD 2,750,000Construction of Multipurpose Building, Brgy. Moabog, Pilar, Cebu 5th LD 2,750,000Construction of Multipurpose Building, Brgy. North Poblacion, San Francisco, Cebu 5th LD
2,750,000
Construction of Multipurpose Building, Brgy. Tag-Ube, Compostela, Cebu 5th LD 2,500,000
Construction of Multipurpose Building, Brgy. Togonon, Danao, Cebu 5th LD 2,500,000Construction/Completion of Multi-Purpose Building (Barangay Hall) Bgy. Jubay, Liloan, Cebu
1,000,000
Construction/Completion of Multi-Purpose Building (Barangay Hall) Bgy. San Roque, Liloan, Cebu
3,000,000
Construction/Completion of Multi-Purpose Building (Barangay Hall) Bgy. Yati, Liloan, Cebu
1,000,000
Improvement/Rehabilitation of Multipurpose Building, Brgy. Catarman, Liloan, Cebu 5th LD
2,000,000
Cebu 6th DEO 52,500,000Construction of Multi-Purpose Building (Covered Court), Bgy. Gilutongan, Cordova, Cebu
2,000,000
Construction of Multi-Purpose Building (Covered Court), Bgy. Poblacion, Cordova, Cebu
2,000,000
Construction of Multipurpose Building , Brgy Centro, Mandaue City, Cebu 5,000,000Construction of Multi-Purpose Building at Brgy. Banilad, Mandaue City, Cebu 6th LD 4,000,000
Construction of Multi-Purpose Building at Brgy. Canduman, Mandaue City 5,000,000Construction of Multi-Purpose Building at Brgy. Guizo, Mandaue City, Cebu 6th LD 4,000,000
Construction of Multi-Purpose Building at Brgy. Mantuyong, Mandaue City, Cebu 6th LD
4,000,000
Construction of Multi-Purpose Building at Brgy. Pakna-an, Mandaue City 5,000,000Construction of Multi-Purpose Building at Brgy. Tabok, Mandaue City, Cebu 6th LD 4,000,000
Construction of Multi-Purpose Building, Barangay Cansaga, Consolacion, Cebu 2,000,000
Page 92 of 162
992 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Improvement of Existing Multi-Purpose Bldg. at Brgy. Pagsabungan, Mandaue City 2,000,000
Improvement of Existing Multi-Purpose Bldg. at Brgy. Umapad, Mandaue City 2,000,000
Improvement of Multi-Purpose Building at PNP Training Center, Brgy. Jugan,Consolacion, Cebu
2,500,000
Improvement of Multi-Purpose Building at Brgy. Basak, Mandaue City, Cebu 2,000,000Improvement of Multi-Purpose Building at Brgy. Tawason, Mandaue City 2,500,000Improvement/Construction of Multi-Purpose Building at Brgy. Ibabao-Estancia, Mandaue City
2,500,000
Rehabilitation / Improvement of Multi-Purpose Building (Gym), Bgy. Catarman, Liloan, Cebu
2,000,000
Cebu City DEO 2,000,000Repair and Improvement of 3ATG (Mess hall,Barracks)Centcom AFP, Apas, Cebu City, Cebu 1st LD
2,000,000
Negros Oriental 1st DEO 11,000,000Construction of Multipurpose,Brgy. Amdus,Ayungon,Negros Oriental 2,000,000Construction of Multipurpose,Brgy. Jandalamanon,Ayungon,Negros Oriental 2,000,000Construction of Multipurpose,Brgy. Tamao,Tayasan,Negros Oriental 2,000,000Construction of Multipurpose,Brgy. Tanglad,Manjuyod,Negros Oriental 2,000,000Multi Purpose Covered Court (Jimalalud National High School) 3,000,000
Negros Oriental 2nd DEO 59,900,000Construction of covered court, Mansangaban, Bais City, Oriental Negros,Negros Oriental 2nd LD
2,200,000
Construction of Health Center, Barangay Tara, Mabinay, Negros Oriental 1,500,000Construction of Mayaposi High School Gym, Mayaposi, Mabinay, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Construction of MPB, Brgy. Basak, Bais City, Negros Oriental 2,500,000Construction of MPB, Brgy. Batinguel MPB, Dumaguete City, Negros Oriental 2,500,000Construction of MPB, Brgy. Looc, Bais City, Negros Oriental 2,500,000Construction of MPB, Brgy. Maningcao, Sibulan, Negros Oriental 2,500,000Construction of MPB, Brgy. Pantao, Mabinay, Negros Oriental 2,500,000Construction of MPB, Brgy. Polo MPB, Tanjay City, Negros Oriental 2,500,000Construction of MPB, Mangnao Elementary School, Brgy. Mangnao, Dumaguete City, Negros Oriental
1,500,000
Construction of MPB, Tanjay Central School, Tanjay City, Negros Oriental 1,000,000Construction of Multi-Purpose at Brgy. Dara, Dumaguete City, Negros Oriental 5,000,000
Construction of multi-purpose building, Banawe, Pamplona, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Construction of multi-purpose building, Bulwang, Mabinay, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Construction of multi-purpose building, Cambaloctot, San Jose, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Construction of multi-purpose building, Enawasan, Pamplona, Oriental Negros,Negros Oriental 2nd LD
2,200,000
Construction of multi-purpose building, Hagtu, Mabinay, Oriental Negros,Negros Oriental 2nd LD
2,200,000
Construction of multi-purpose building, Luca, Tanjay City, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Construction of multi-purpose building, Mamburao, Pamplona, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Construction of multi-purpose building, Okiot, Bais City, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Construction of multi-purpose building, Panalaan, Bais City, Oriental Negros,Negros Oriental 2nd LD
2,200,000
Construction of multi-purpose building, San Miguel, Tanjay City, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Construction of Multipurpose Building, Sibulan, Negros Oriental 2,000,000Construction of multi-purpose building, Tamisu, Bais City, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Construction of multi-purpose building, Tara, Mabinay, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Construction/ Imrovement of covered court, Poblacion, Sibulan, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Improvement/Rehabilitation of MPB, Brgy. Abis, Mabinay, Negros Oriental 600,000Improvement/Rehabilitation of MPB, Brgy. Bajumpandan MPB, Dumaguete City, Negros Oriental
100,000
Improvement/Rehabilitation of MPB, Brgy. Naiba MPB, Sanjose, Negros Oriental 400,000
Repair and Rehabilitation of PDRRMC Building, Capitol Compound, Dumaguete City, Negros Occidental
2,000,000
Negros Oriental 3rd DEO 95,500,000Construction of Multipurpose Building, Barangay Combado, Bacong, Negros Oriental 2,000,000
Construction of Multipurpose Building, Barangay Kalamtukan, Bayawan City, Negros Oriental
2,000,000
Construction of Multipurpose Building, Barangay Tinago, Bayawan City, Negros Oriental
2,000,000
Construction of Health Center, Banaybanay, Bayawan City, Negros Oriental 1,500,000Construction of Multipurpose Building (GYM), Barangay Malabuhan, Siaton, Negros Oriental
4,000,000
Construction of Multi-Purpose Building, Barangay Kabukalan, Sta. Catalina, Negros Oriental 3rd LD
3,000,000
Construction of Multi-Purpose Building, Barangay Mantuyop, Siaton, Negros Oriental 3rd LD
5,000,000
Construction of Multipurpose Building, Barangay Masaplod, Dauin, Negros Oriental 5,000,000
Construction of Multipurpose Building, Barangay Nagbalaye, Sta Catalina, Negros Oriental
2,000,000
Construction of Multi-Purpose Building, Barangay Nagbalaye, Sta. Catalina, Negros Oriental 3rd LD
3,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Zamboanguita, Negros Oriental 3rd LD
2,000,000
Construction of Multipurpose Building, Barangay South Poblacion, Bacong, Negros Oriental
2,000,000
Page 93 of 162
details of dpwh’s programs/projects 993
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building, Barangay Sto. Rosario, Sta. Catalina, Negros Oriental 3rd LD
5,000,000
Construction of Multipurpose Building, Barangay West Balabag, Valencia, Negros Oriental
2,000,000
Construction of Multipurpose Building, Brgy. Malabo, Valencia, Negros Oriental 2,000,000
Construction/Completion of Multipurpose Building (GYM), Barangay Bonbonon, Siaton, Negros Oriental
2,000,000
Construction/Completion of Multipurpose Building (Health Center), Barangay Boyco, Bayawan City, Negros Oriental
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Banaybanay, Bayawan City, Negros Oriental 3rd LD
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Bulak, Dauin, Negros Oriental 3rd LD
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay East Balabag, Valencia, Negros Oriental 3rd LD
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Manalungon, Sta. Catalina, Negros Oriental 3rd LD
3,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Poblacion 2, Dauin, Negros Oriental 3rd LD
4,000,000
Construction/Improvement of Multi-Purpose Building, Barangay San Miguel, Bacong, Negros Oriental 3rd LD
5,000,000
Rehabilitation of Multipurpose Building, Barangay Albiga, Siaton, Negros Oriental 2,000,000
Rehabilitation of Multi-Purpose Building, Barangay Anhawan, Dauin, Negros Oriental 3rd LD
2,000,000
Rehabilitation of Multi-Purpose Building, Barangay Bagacay, Dauin, Negros Oriental 3rd LD
2,000,000
Rehabilitation of Multipurpose Building, Barangay Boloc-Boloc, Dauin, Negros Oriental
2,000,000
Rehabilitation of Multipurpose Building, Barangay Bongbong, Valencia, Negros Oriental
1,000,000
Rehabilitation of Multipurpose Building, Barangay Calayugan, Valencia, Negros Oriental
1,000,000
Rehabilitation of Multipurpose Building, Barangay Cambucad, Valencia, Negros Oriental
1,000,000
Rehabilitation of Multipurpose Building, Barangay Jawa, Valencia, Negros Oriental 1,000,000
Rehabilitation of Multipurpose Building, Barangay Lunga, Valencia, Negros Oriental 1,000,000
Rehabilitation of Multipurpose Building, Barangay Malabo, Valencia, Negros Oriental 1,000,000
Rehabilitation of Multipurpose Building, Barangay Malaunay, Valencia, Negros Oriental
2,000,000
Rehabilitation of Multipurpose Building, Barangay Mampas, Valencia, Negros Oriental 1,000,000
Rehabilitation of Multipurpose Building, Barangay Manalongon, Sta Catalina, Negros Oriental
2,000,000
Rehabilitation of Multipurpose Building, Barangay Poblacion, Basay, Negros Oriental 2,000,000
Rehabilitation of Multipurpose Building, Barangay Pulangbato, Valencia, Negros Oriental
1,000,000
Rehabilitation of Multipurpose Building, Barangay San Jose, Bayawan City, Negros Oriental
2,000,000
Rehabilitation of Multipurpose Building, Barangay Sumaliring, Siaton, Negros Oriental 5,000,000
Rehabilitation of Multipurpose Building, Barangay Villasol, Bayawan City, Negros Oriental
2,000,000
Region VIII 348,700,000Biliran DEO 21,000,000
Construction of Barangay Hall, Barangay Haguikhikan, Naval, Biliran Lone District 1,000,000
Construction of Gym Phase 1, Barangay Palanay, Caibiran, Biliran Lone District 2,000,000
Construction of Gym Phase 2, Barangay Atipolo, Naval, Biliran Lone District 2,000,000Construction of Gym Phase 3, Barangay Sto. Niño, Naval, Biliran Lone District 2,000,000
Construction of Gym Phase 4, Barangay Apangi, Naval, Biliran Lone District 2,000,000Construction of Gym, Barangay Balaquid, Cabucgayan, Biliran Lone District 3,500,000Construction of Gym, Barangay Julita, Biliran, Biliran Lone District 3,000,000Construction of Gym, Barangay Poblacion, Kawayan, Biliran Lone District 4,000,000Construction of Plaza, Barangay Victory, Caibiran, Biliran Lone District 1,500,000
Eastern Samar DEO 97,000,000Completion of Multi-Purpose Building, Barangay San Vicente, Sulat, Eastern Samar Lone District
2,000,000
Construction of DNHS Multi-Purpose Building, Barangay Poblacion, Dolores, Eastern Samar
2,000,000
Construction of Multi-purpose Bldg. at MIG 8, Brgy. Alang-alang, Borongan City, Eastern Samar
2,000,000
Construction of Multi-Purpose Building (Barangay Hall), Barangay Malbog, Salcedo, E. Samar
1,000,000
Construction of Multipurpose Building (Barangay Hall), Barangay San Saturnino, Borongan City, Eastern Samar
1,500,000
Construction of Multipurpose Building (Day Care Center), Barangay Cabong, Borongan City, Eastern Samar
1,000,000
Construction of Multi-Purpose Building, Barangay 6, Taft, Eastern Samar Lone District
3,000,000
Construction of Multi-Purpose Building, Barangay Abejao, Salcedo, E. Samar 3,000,000Construction of Multi-Purpose Building, Barangay A-et, Sulat , Eastern Samar 3,000,000Construction of Multi-Purpose Building, Barangay Alang-alang, Borongan City, E. Samar
3,000,000
Construction of Multi-Purpose Building, Barangay Bantayan, Oras, E. Samar 3,000,000Construction of Multi-Purpose Building, Barangay Campidhan, San Julian, Eastern Samar Lone District
2,500,000
Construction of Multi-Purpose Building, Barangay Canjaway, Borongan City, Eastern Samar Lone District
3,000,000
Construction of Multi-Purpose Building, Barangay Caraycay, Maslog, Eastern Samar Lone District
3,500,000
Page 94 of 162
994 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building, Barangay Jicontol, Dolores, Eastern Samar Lone District
3,500,000
Construction of Multi-Purpose Building, Barangay Maramag, Balangkayan, Eastern Samar Lone District
3,000,000
Construction of Multi-Purpose Building, Barangay Mayana, Guiuan, E. Samar 3,000,000Construction of Multi-Purpose Building, Barangay Nadacpan, Oras, Eastern Samar Lone District
2,000,000
Construction of Multi-Purpose Building, Barangay Naga, Quinapondan , Eastern Samar
3,000,000
Construction of Multi-Purpose Building, Barangay Nato, Taft, Eastern Samar Lone District
3,000,000
Construction of Multi-Purpose Building, Barangay Ngolos, Guiuan, Eastern Samar 3,000,000
Construction of Multi-Purpose Building, Barangay Pinag-an, Borongan City, Eastern Samar Lone District
3,000,000
Construction of Multi-Purpose Building, Barangay Rawis, Arteche, Eastern Samar Lone District
3,000,000
Construction of Multi-Purpose Building, Barangay Riverside, Sulat, Eastern Samar 3,000,000
Construction of Multi-Purpose Building, Barangay Rizal, Dolores, Eastern Samar Lone District
3,500,000
Construction of Multi-Purpose Building, Barangay Roxas, Jipapad, E. Samar 3,000,000Construction of Multi-Purpose Building, Barangay San Isidro, Gen. MacArthur, E. Samar
3,000,000
Construction of Multi-Purpose Building, Barangay San Isidro, San Julian, E. Samar 3,000,000
Construction of Multi-Purpose Building, Barangay San Juan, Tubabao Is., Guiuan, E. Samar
3,000,000
Construction of Multi-Purpose Building, Barangay San Miguel, San Julian, Eastern Samar Lone District
3,000,000
Construction of Multi-Purpose Building, Barangay Taguite, Lawaan, Eastern Samar Lone District
3,000,000
Construction of Multi-Purpose Building, Eastern Samar State University, Borongan City, E. Samar
5,000,000
Construction of Senior Citizen's Building, Barangay Poblacion, Dolores , Eastern Samar
1,000,000
Construction/Completion of Multipurpose Building (Barangay Hall), Barangay Brgy. 13, Dolores, Eastern Samar
500,000
Construction/Completion of Multi-Purpose Building, Barangay Aroganga, Dolores, Eastern Samar
500,000
Construction/Completion of Multi-Purpose Building, Barangay Cabaguan, Dolores, Eastern Samar
500,000
Construction/Completion of Multi-Purpose Building, Barangay Casuguran, Guiuan, Eastern Samar
1,500,000
Construction/Completion of Multi-Purpose Building, Barangay Gigoso, Giporlos, Eastern Samar
500,000
Construction/Completion of Multi-Purpose Building, Barangay Hilabaan, Dolores, Eastern Samar
500,000
Construction/Completion of Multi-Purpose Building, Barangay Hindang, Borongan City, Eastern Samar
500,000
Construction/Completion of Multi-Purpose Building, Barangay Libas, San Julian, Eastern Samar
500,000
Construction/Completion of Multi-Purpose Building, Barangay San Roque, Llorente, Eastern Samar
1,500,000
Leyte 1st DEO 9,000,000Construction of Multi-Purpose Building 4,000,000Construction of Multi-Purpose Building (Covered Court) 5,000,000
Leyte 2nd DEO 14,000,000 Construction/Improvement of Legislative Building – Brgy. Poblacion, Burauen, Leyte
2,000,000
Construction of ABC Building- Brgy. Poblacion, Barugo, Leyte 2,000,000Construction of Covered Court-Brgy. Poblacion, Pastrana, Leyte 2,000,000Construction of Multipurpose Bldg. Brgy. Paglaum, Carigara, Leyte 2,000,000Construction/Completion of Multipurpose Bldg. Brgy. Caghalo, Carigara, Leyte 2,000,000
Construction/Rehabilitation of Covered Court- Brgy. Pinamopoan, Capoocan 2,000,000Repair/Rehabilitation/Construction of Multipurpose Building, Brgy. Limba, 2,000,000
Leyte 3rd DEO 20,000,000Construction of Multi-Purpose Building, Barangay Burabod, Leyte, Leyte 3rd LD 3,000,000
Construction of Multi-Purpose Building, Barangay Cabunga-an, Villaba, Leyte 3rd LD 3,000,000
Construction of Multi-Purpose Building, Barangay Cagnocot, Villaba, Leyte 3rd LD 3,000,000
Construction of Multi-Purpose Building, Barangay Consuegra, Leyte, Leyte 3rd LD 3,000,000
Construction of Multi-Purpose Building, Barangay Macupa, Leyte, Leyte 3rd LD 3,000,000
Construction of Multi-Purpose Building, Barangay Sambulawan, Leyte, Leyte 3rd LD 3,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Silad, Villaba, Leyte 3rd LD
2,000,000
Leyte 4th DEO 10,000,000Kananga Public Market Construction 10,000,000
Leyte 5th DEO 16,000,000Completion of Multi-Purpose Building, Barangay Liberacion, Mahaplag, Leyte 5th LD 1,000,000
Completion of Multi-Purpose Building, Barangay Mahayahay, Mahaplag, Leyte 5th LD 1,000,000
Completion of Multi-Purpose Building, Barangay Punong, Matalom, Leyte 5th LD 1,000,000
Completion of Multi-Purpose Building, Barangay Upper, Mahaplag, Leyte 5th LD 2,000,000
Construction of Multi-Purpose Building, Barangay Balinsasayao, Abuyog, Leyte 5th LD
1,000,000
Page 95 of 162
details of dpwh’s programs/projects 995
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building, Barangay Guadalupe, Inopacan, Leyte 5th LD 2,000,000
Construction of Multi-Purpose Building, Barangay Halapnitan, Baybay City, Leyte 5th LD
2,000,000
Construction of Multi-Purpose Building, Barangay Owak, Hilongos, Leyte 5th LD 2,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Javier, Leyte 5th LD 2,000,000
Construction of Multi-Purpose Building, Barangay San Roque, Hilongos, Leyte 5th LD 2,000,000
Northern Samar 1st DEO 61,000,000Construction of Barangay Hall, Barangay Aguinaldo, Catarman, Northern Samar 1st LD
1,000,000
Construction of Barangay Hall, Barangay Cabayhan, Catarman, Northern Samar 1st LD
1,000,000
Construction of Barangay Hall, Barangay Cawayan, Catarman, Northern Samar 1st LD
1,000,000
Construction of Barangay Hall, Barangay Daganas, Catarman, Northern Samar 1st LD
1,000,000
Construction of Barangay Hall, Barangay Doña Polquetia, Catarman, Northern Samar 1st LD
1,000,000
Construction of Barangay Hall, Barangay Hinatad, Catarman, Northern Samar 1st LD 1,000,000
Construction of Barangay Hall, Barangay Libjo, Catarman, Northern Samar 1st LD 1,000,000
Construction of Barangay Hall, Barangay Old Rizal, Catarman, Northern Samar 1st LD
1,000,000
Construction of Barangay Hall, Barangay Salvacion, San Isidro, Northern Samar 1st LD
1,000,000
Construction of Barangay Hall, Barangay San Juan, Lavezares, Northern Samar 1st LD
1,000,000
Construction of Barangay Hall, Barangay Talisay, Catarman, Northern Samar 1st LD 1,000,000
Construction of Barangay Hall, Barangay Tinowaran, Catarman, Northern Samar 1st LD
1,000,000
Construction of Brgy. Hall 11,000,000Construction/Concreting of Caburihan, Lavezares, Northern Samar 1st LD 2,000,000Construction/Concreting of Cahicscan, Mondragon, Northern Samar 1st LD 2,000,000Construction/Concreting of Doña Lucia, Mondragon, Northern Samar 1st LD 2,000,000Construction/Concreting of Guba, Catarman, Northern Samar 1st LD 2,000,000Construction/Concreting of Imelda, Catarman, Northern Samar 1st LD 2,000,000Construction/Concreting of Imelda, Mondragon, Northern Samar 1st LD 2,000,000Construction/Concreting of Junction Highway-Sitio Sta. Rosa Seven Hills, San Isidro, Northern Samar 1st LD
2,000,000
Construction/Concreting of Mabolo, Catarman, Northern Samar 1st LD 2,000,000Construction/Concreting of Makiwalo, Mondragon, Northern Samar 1st LD 2,000,000Construction/Concreting of Mirador, Mondragon, Northern Samar 1st LD 2,000,000Construction/Concreting of Pio Del Pilar, Biri, Northern Samar 1st LD 2,000,000Construction/Concreting of Salvacion, Catarman, Northern Samar 1st LD 2,000,000Construction/Concreting of San Antonio, Biri, Northern Samar 1st LD 2,000,000Construction/Concreting of San Antonio, Mondragon, Northern Samar 1st LD 2,000,000Construction/Concreting of San Juan, Mondragon, Northern Samar 1st LD 2,000,000Construction/Concreting of Sitio Matanyaron-Poblacion, Biri, Northern Samar 1st LD 2,000,000
Construction/Concreting of Somoge, Catarman, Northern Samar 1st LD 2,000,000Construction/Concreting of Sto. Niño, Biri, Northern Samar 1st LD 2,000,000Construction/Concreting of UEP Zone III, Catarman, Northern Samar 1st LD 2,000,000
Northern Samar 2nd DEO 11,000,000Construction of Anito Multi-Purpose Building,Brgy. Anito, Gamay, Northern Samar,Northern Samar 2nd DEO
4,000,000
Construction of Multi-Purpose Building,Brgy. Cahayagan, Laoang, Northern Samar,Northern Samar 2nd DEO
3,000,000
Repair/Improvement of Bobolosan Covered Court, Brgy. Bobolosan, Laoang, Northern Samar,Northern Samar 2nd DEO
2,000,000
Repair/Improvement of Rawis Covered Court, Brgy. Rawis, Laoang, Northern Samar,Northern Samar 2nd DEO
2,000,000
Samar 1st DEO 51,000,000Construction of Multi-purpose Building (Phase I), Brgy. Anislag, Calbayog City, Samar
3,000,000
Construction of Multi-Purpose Building, Barangay Bagacay, Calbayog City, Samar 1st LD
5,000,000
Construction of Multi-Purpose Building, Barangay Central, Calbayog City, Samar 1st LD
3,000,000
Construction of Multi-purpose Building, Brgy. Guin-ansan, Almagro, Samar 2,000,000Construction of Multi-purpose Building, Brgy. Hinayagan, Gandara, Samar 2,000,000Construction of Multi-purpose Building, Brgy. Palanas Cara, Calbayog City, Samar 3,000,000
Construction of Multi-purpose Building, San Jorge National High School, Brgy. Poblacion 2, San Jorge, Samar
4,000,000
Repair/Improvement of Multi-Purpose Building, Barangay East Awang, Calbayog City, Samar 1st LD
2,000,000
Repair/Improvement of Multi-Purpose Building, Barangay Trinidad, Calbayog City, Samar 1st LD
2,000,000
Repair/Rehab./Improvement of Multi-purpose Building, Brgy. Poblacion, Almagro, Samar
5,000,000
Repair/Rehabilitation/ Improvement of Multi-purpose Building (Calbayog City Sports Center), Brgy. Capoocan, Calbayog City, Samar
20,000,000
Samar 2nd DEO 2,700,000Construction of Multi-Purpose Building for 8MIB,8ID PA Camp Lukban AFP, Maulong, Catbalogan City, Samar 2nd LD
2,700,000
Siquijor DEO 32,000,000Construction of Covered Court, Barangay Canlasog, Larena, Siquijor Lone District 2,000,000
Construction of Covered Court, Barangay Tignao, Lazi, Siquijor Lone District 2,000,000Construction of Covered Court, Barangay Upper Cabangcalan, Lazi, Siquijor Lone District
2,000,000
Page 96 of 162
996 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Covered Court, Barangay Ytaya, Lazi, Siquijor Lone District 2,000,000Construction of Multi-Purpose Building, Barangay Ibabao, Siquijor, Siquijor Lone District
2,000,000
Construction of Multi-Purpose Building, Barangay Pangi, Siquijor, Siquijor Lone District
2,000,000
Construction of Multi-Purpose Building, Barangay South Poblacion, Larena, Siquijor Lone District
2,000,000
Construction/Improvement of Covered Court, Barangay Camogao, Enrique Villanueva, Siquijor Lone District
2,000,000
Construction/Improvement of Covered Court, Barangay Catulayan, Lazi, Siquijor Lone District
2,000,000
Construction/Improvement of Covered Court, Barangay Lala-o, San Juan, Siquijor Lone District
2,000,000
Construction/Improvement of Covered Court, Barangay Libo, Enrique Villanueva, Siquijor Lone District
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Cabal-asan, Maria, Siquijor Lone District
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Calalinan, Siquijor, Siquijor Lone District
1,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Canal, Siquijor, Siquijor Lone District
1,500,000
Construction/Improvement of Multi-Purpose Building, Barangay Luzong, Siquijor, Siquijor Lone District
1,500,000
Improvement of Barangay Hall, Barangay Bolot, Enrique Villanueva, Siquijor Lone District
1,000,000
Improvement of Barangay Hall, Barangay Cangmunag, San Juan, Siquijor Lone District
1,000,000
Improvement of Barangay Hall, Barangay Lambojon, Siquijor, Siquijor Lone District 1,000,000
Improvement of Barangay Hall, Barangay Manan-ao, Enrique Villanueva, Siquijor Lone District
1,000,000
Improvement of Multi-Purpose Building, Barangay Capalasanan, Lazi, Siquijor Lone District
1,000,000
Southern Leyte DEO 4,000,000Construction of Multi-Purpose Bldg., Brgy. Laboon, Maasin, Southern Leyte 4,000,000
Region IX 407,200,000Regional Office IX 124,500,000
Construction of Mulitpurpose Building (Youth Center) in Barangay Tubig-boh, Bongao, Tawi-Tawi
2,500,000
Construction of Multipurpose Building (Cultural Center) in Sulu State College, Jolo, Sulu
1,000,000
Construction of Multipurpose Building ,Brgy. Ungus Matata,Tandubas ,Tawi-Tawi 4,000,000
Construction of Multi-Purpose Building, Alu Layag, Parang, Sulu 5,000,000Construction of Multi-Purpose Building, Taglibi, Patikul, Sulu 5,000,000Construction of Multipurpose Building,Brgy. Bacungan ,Turtle Islands ,Tawi-Tawi 2,000,000
Construction of Multipurpose Building,Brgy. Banaran Tong-Gusong ,Sapa-Sapa ,Tawi-Tawi
4,500,000
Construction of Multipurpose Building,Brgy. Bintawlan ,South Ubian ,Tawi-Tawi 4,500,000
Construction of Multipurpose Building,Brgy. Boheh Sallang, Sanga-Sanga ,Bongao ,Tawi-Tawi
2,000,000
Construction of Multipurpose Building,Brgy. Karungdong ,Bongao ,Tawi-Tawi 2,000,000Construction of Multipurpose Building,Brgy. Latuan ,Sapa-Sapa ,Tawi-Tawi 2,000,000Construction of Multipurpose Building,Brgy. Lupa Pula ,Mapun ,Tawi-Tawi 5,000,000Construction of Multipurpose Building,Brgy. Mongkay ,Simunul ,Tawi-Tawi 2,000,000Construction of Multipurpose Building,Brgy. Panglima Alari ,Sitangkai ,Tawi-Tawi 2,000,000
Construction of Multipurpose Building,Brgy. Poblacion ,Sibutu ,Tawi-Tawi 2,000,000Construction of Multipurpose Building,Brgy. Sipangkot,Sitangkai ,Tawi-Tawi 2,000,000Construction of Multipurpose Building,Brgy. Tabawan ,South Ubian ,Tawi-Tawi 4,500,000
Construction of Multipurpose Building,Brgy. Taganak ,Turtle Islands ,Tawi-Tawi 2,000,000
Construction of Multipurpose Building,Brgy. Tapian Sokah ,Tandubas ,Tawi-Tawi 2,000,000
Construction of Multipurpose Building,Brgy. Tong-Gusong,Simunul ,Tawi-Tawi 2,000,000Construction of Multipurpose Building,Brgy. Tongmageng ,Sitangkai ,Tawi-Tawi 2,000,000
Construction of Multipurpose Building,Brgy. Tubig Basag ,Bongao ,Tawi-Tawi 2,000,000Construction of Multipurpose Center - Type B, Barangay Hambilan, Pandami, Sulu 2nd LD
4,000,000
Construction of Multipurpose Center - Type B, Barangay Poblacion, Siasi, Sulu 2nd LD
4,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Sulu 2nd LD 2,000,000Construction/Rehabilitation of Various Infrastructure Projects, Tawi-Tawi Lone District
1,500,000
Construction/Rehabilitation of Various Infrastructure Projects, Zamboanga del Norte 3rd LD
50,000,000
Renovation/Improvement of Mulitpurpose Building (Women's Support Group Center) in Barangay Kasalamatan Village, Jolo, Sulu
1,000,000
Isabela City DEO 2,500,000Construction of Multipurpose Building (Basketball Court) at Bliss Compound, Barangay Lanote, Isabela City, Basilan
2,500,000
Zamboanga City DEO 19,200,000Construction of Multi-Purpose Building (Day Care Center at Sta. Barbara), Sta. Barbara, Zamboanga City 1st LD
2,200,000
Construction of Multipurpose Building (Training Center) in Sitio Buena-Kapok, Barangay Lanzones, Zamboanga City
4,000,000
Construction of Multi-Purpose Building, Barangay Pasonangca, Zamboanga City, Zamboanga del Sur
2,000,000
Improvement of Multi-Purpose Building (Sinunuc Covered Court), Sinunuc, Zamboanga City 1st LD
2,000,000
Repair/Improvement of Multi-Purpose Building (Barangay Hall at Campo Islam), Barangay Campo Islam, Zamboanga City, Zamboanga del Sur
1,500,000
Page 97 of 162
details of dpwh’s programs/projects 997
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Repair/Improvement of Multi-Purpose Building (Barangay Hall at San Jose Cawa-Cawa), San Jose Cawa-Cawa, Zamboanga City 1st LD
2,000,000
Repair/Improvement of Multi-Purpose Building (Barangay Hall at Zone 4), Barangay Zone 4, Zamboanga City, Zamboanga del Sur
1,000,000
Repair/Improvement of Multi-Purpose Building (Covered Court), Sta. Barbara, Zamboanga City 1st LD
500,000
Repair/Improvement of Multi-Purpose Building (Recodo Fire Station), Recodo, Zamboanga City 1st LD
1,000,000
Repair/Improvement of Multi-Purpose Building at Little Angel's Day Care Center, Tulungatung, Zamboanga City 1st LD
1,000,000
Repair/Improvement of Multi-Purpose Building at St. Baranaba's Day Care Center, Tulungatung, Zamboanga City 1st LD
1,000,000
Repair/Improvement of Multi-Purpose Building at Zone 1, Barangay Zone 1, Zamboanga City, Zamboanga del Sur
1,000,000
Zamboanga del Norte 1st DEO 44,400,000Construction of Multi Purpose Building , Brgy. B. Aquino, Sindangan, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building , Brgy. Bucana, Sindangan, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building , Brgy. Dipolog School of Fisheries, Olingan, Dipolog, Zamboanga del Norte
1,000,000
Construction of Multi Purpose Building , Brgy. Disud, Sindangan, Zamboanga del Norte
850,000
Construction of Multi Purpose Building , Brgy. Sitio Lumbia, Brgy. Bago, Sindangan, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building , Brgy. Sitio Magay, East Poblacion, Manukan, Zamboanga del Norte
1,300,000
Construction of Multi Purpose Building , Brgy. Sitio Sta. Felomina, Linay, Manukan, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building , Brgy. Titik, Sindangan, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building, Brgy. Binuangan, Sindangan, Zamboanga del Norte
850,000
Construction of Multi Purpose Building, Brgy. Bitoon, Jose Dalman, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building, Brgy. Denoman, Roxas, Zamboanga del Norte
850,000
Construction of Multi Purpose Building, Brgy. Domogok, Siayan, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building, Brgy. Guibo, Siayan, Zamboanga del Norte 1,500,000
Construction of Multi Purpose Building, Brgy. Mandih, Sindangan, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building, Brgy. Mawal, Sindangan, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building, Brgy. Meses, Manukan, Zamboanga del Norte 1,500,000
Construction of Multi Purpose Building, Brgy. Moyo Centro, Siayan, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building, Brgy. Panampalay, Roxas, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building, Brgy. Pangandao, Manukan, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building, Brgy. Pange, Siayan, Zamboanga del Norte 1,500,000
Construction of Multi Purpose Building, Brgy. Patagan, Manukan, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building, Brgy. Piao, Roxas, Zamboanga del Norte 850,000
Construction of Multi Purpose Building, Brgy. Pinamar, Roxas, Zamboanga del Norte 850,000
Construction of Multi Purpose Building, Brgy. Seroan, Katipunan, Zamboanga del Norte
850,000
Construction of Multi Purpose Building, Brgy. Sitio Parke, Mangilay, Siayan, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building, Brgy. Sitio Pase, Moyo, Siayan, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building, Brgy. Sitio Tubalan, Dona Josefa, Sindangan, Zamboanga del Norte
1,300,000
Construction of Multi Purpose Building, Brgy. Suisayan, Manukan, Zamboanga del Norte
1,500,000
Construction of Multi Purpose Building, Brgy. Tabon, Jose Dalman, Zamboanga del Norte
850,000
Construction of Multi Purpose Building, Brgy. Tamil, Jose Dalman, Zamboanga del Norte
850,000
Construction of Multi Purpose Building, Brgy. Tinaplan, Sindangan, Zamboanga del Norte
1,500,000
Construction of School Building for Sindangan Pilot Demonstration School , Poblacion, Sindangan, Zamboanga del Norte
4,000,000
Zamboanga del Norte 2nd DEO 1,000,000Construction of Sto. Nino Brgy. Health Center, Sto. Nino, Liloy, Zamboanga del Norte 3rd LD
1,000,000
Zamboanga del Norte 3rd DEO 30,000,000Construction of Covered Court, Brgy. Dampalan, Dapitan City, Zamboanga del Norte, Zamboanga del Norte 1st LD
2,000,000
Construction of Covered Court, Brgy. Desin, Piñan, Zamboanga del Norte, Zamboanga del Norte 1st LD
2,000,000
Construction of Covered Court, Brgy. Libay, Sibutad, Zamboanga del Norte, Zamboanga del Norte 1st LD
2,000,000
Construction of Covered Court, Brgy. Napo, Dapitan City, Zamboanga del Norte, Zamboanga del Norte 1st LD
2,000,000
Construction of Covered Court, Brgy. New Argao, La Libertad, Zamboanga del Norte, Zamboanga del Norte 1st LD
2,000,000
Construction of Covered Court, Brgy. New Dapitan, Rizal, Zamboanga del Norte, Zamboanga del Norte 1st LD
2,000,000
Construction of Covered Court, Brgy. New Libangon, Polanco, Zamboanga del Norte, Zamboanga del Norte 1st LD
2,000,000
Page 98 of 162
998 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Covered Court, Brgy. Oro, Dapitan City, Zamboanga del Norte, Zamboanga del Norte 1st LD
2,000,000
Construction of Covered Court, Brgy. San Jose, Sergio Osmeña, Zamboanga del Norte, Zamboanga del Norte 1st LD
2,000,000
Construction of Covered Court, Brgy. Sicayab Bocana, Dapitan City, Zamboanga del Norte, Zamboanga del Norte 1st LD
2,000,000
Construction of Covered Court, Brgy. Totongon, Mutia, Zamboanga del Norte, Zamboanga del Norte 1st LD
2,000,000
Construction of Fire Station, Brgy. Taguilon, Dapitan City, Zamboanga del Norte, Zamboanga del Norte 1st LD
2,000,000
Construction of Police Station, Brgy. Poblacion, Sibutad, Zamboanga del Norte, Zamboanga del Norte 1st LD
2,000,000
Construction of Tribal Hall, Brgy. Dawo, Dapitan City, Zamboanga del Norte, Zamboanga del Norte 1st LD
4,000,000
Zamboanga del Sur 1st DEO 82,000,000Construction of Multi-Purpose Building, Barangay Gubac, Pagadian City 1st LD 2,000,000
Construction of Multi-Purpose Building, Barangay Tinotongan, Tukuran, Zamboanga del Sur 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Kaangayan, Mahayag, Zamboanga del Sur 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Campo Uno, Aurora, Zamboanga del Sur 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Caniangan, RamonMagsaysay, Zambo. del Sur 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Bag-ong Argao, Molave,Zamboanga del Sur 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Tungawan, Sominot,Zamboanga del Sur 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Upper Bag ong Tudela, Josefina, Zamboanga del Sur 1st LD
2,000,000
Construction of Multi-Purpose Building, Phase 2 Barangay Sto. Nino, PagadianCity 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Bagong Maslog, Aurora, Zamboanga del Sur 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Tawagan Norte, Labangan,Zamboanga del Sur 1st LD
2,000,000
Construction of Multi-Purpose Building, Phase 2, Pagadian City 1st LD 20,000,000Construction of Multi-Purpose Building, Barangay Lower Landing, Dumingag, Zamboanga del Sur 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Poblacion A, Midsalip, Zamboanga del Sur 1st LD
2,000,000
Construction of Barangay Hall Brgy. Libertad, Aurora, Zamboanga Del Sur 2,000,000Construction of Building, Brgy. Canipay Norte, Midsalip, Zamboanga Del Sur 2,000,000Construction of Building, Brgy. Dalaon, Molave, Zamboanga Del Sur 2,000,000Construction of Building, Brgy. Laperian, Tukuran, Zamboanga Del Sur 2,000,000Construction of Building, Brgy. Tuluan, Tambulig, Zamboanga Del Sur 2,000,000Construction of Building, Brgy. Upper Landing, Dumingag, Zamboanga Del Sur 2,000,000
Construction of Multi-Purpose Building, Barangay Gabunon, Tambulig, Zamboanga del Sur 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Kagawasan, Pagadian, Zamboanga del Sur
1,000,000
Construction of multi-purpose building, Brgy. Lenienza, Pagadian City, Zamboanga del Sur
2,000,000
Construction of multi-purpose building, Brgy. Poloyagan, Pagadian City, Zamboanga del Sur
2,000,000
Construction of multi-purpose building, Brgy. Tiguma, Pagadian City, Zamboanga del Sur
2,000,000
Construction of Multipurpose Builldingg, Provincial Capitol, Pagadian City, Zamboanga del Sur
5,000,000
Construction/Completion of Covered Court (Gymnasium) in Brgy. Madasigon, Municipality of Molave, Province of Zamboanga Del Sur
10,000,000
Zamboanga del Sur 2nd DEO 28,000,000Construction of Multi-Purpose Building Phase III, Brgy. Poblacion, Dumalinao, Zamboanga del Sur 2nd LD
12,000,000
Construction of Multi-Purpose Building, Bgry. Poblacion, Lakewood, Zamboanga del Sur 2nd LD
2,000,000
Construction of Multi-Purpose Building, Brgy. Bag-ong Kahayag, Lakewood, Zamboanga del Sur 2nd LD
2,000,000
Construction of Multi-Purpose Building, Brgy. Lower Dimaya, Dinas, Zamboanga del Sur 2nd LD
2,000,000
Construction of Multi-Purpose Building, Brgy. Poblacion, Dinas, Zambonga del Sur 2nd LD
2,000,000
Construction of Multi-Purpose Building, Brgy. Poblacion, Tigbao, Zamboanga del Sur 2nd LD
2,000,000
Construction of Multi-Purpose Building, Brgy. Sumpot, Dimataling, Zamboanga del Sur 2nd LD
2,000,000
Construction of Multi-Purpose Building, Bulawan Elementray School, Brgy. Bulawan,, Lapuyan, Zamboanga del Sur 2nd LD
2,000,000
Construction of Multi-Purpose Building, Laureano Salusod National High School, Brgy., Kagawasan, Dimataling, Zamboanga del Sur 2nd LD
2,000,000
Zamboanga Sibugay 1st DEO 48,000,000Construction of Multi-Purpose Building (Covered Court), Bgy. Bateria, Olutanga, Zamboanga Sibugay
3,000,000
Construction of Multi-Purpose Building (Covered Court), Bgy. Pulo Laum, Olutanga, Zamboanga Sibugay
3,000,000
Construction of Multi-Purpose Building, Barangay Bliss, Buug, Zamboanga Sibugay 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Candiis, Malangas, Zamboanga Sibugay 1st LD
10,000,000
Construction of Multi-Purpose Building, Barangay Datu Panas, Buug, Zamboanga Sibugay 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Dawa-dawa, Alicia, Zamboanga Sibugay 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Fama, Olutanga, Zamboanga Sibugay 1st LD
2,000,000
Page 99 of 162
details of dpwh’s programs/projects 999
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building, Barangay Fatima, Payao, Zamboanga Sibugay 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Guinoman, Diplahan, Zamboanga Sibugay 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Kawilan, Talusan, Zamboanga Sibugay 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Kigay, Malangas, Zamboanga Sibugay 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Naga-Naga, Alicia, Zamboanga Sibugay 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Alicia, Zamboanga Sibugay 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Diplahan, Zamboanga Sibugay 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Imelda, Zamboanga Sibugay 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Mabuhay, Zamboanga Sibugay 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Payao, Zamboanga Sibugay 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Pulo Mabao, Olutanga, Zamboanga Sibugay 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Villacastor, Buug, Zamboanga Sibugay 1st LD
2,000,000
Zamboanga Sibugay 2nd DEO 27,600,000Construction Multipurpose Building (Barangay Hall), Brgy. San Isidro, Naga, Zamboanga Sibugay, Zamboanga Sibugay 2nd LD
2,000,000
Construction Multipurpose Building Project, Kabasalan National High School, Brgy. Poblacion, Kabasalan, Zamboanga Sibugay, Zamboanga Sibugay 2nd LD
2,000,000
Construction Multipurpose Building Project, Zamboanga Sibugay National High School, Brgy. Pangi, Ipil, Zamboanga Sibugay, Zamboanga Sibugay 2nd LD
2,000,000
Construction of Barangay Flea Market in Barangay Poblacion, Municipality of Titay, Province of Zamboanga Sibugay
1,600,000
Construction of DSWD Building, Brgy. Ipil Heights, Ipil, Zamboanga Sibugay, Zamboanga Sibugay 2nd LD
2,000,000
Construction of Mamagon Multipurpose Building Project, Brgy. Mamagon, Naga, Zamboanga Sibugay, Zamboanga Sibugay 2nd LD
2,000,000
Construction of Multipurpose Building Project, Brgy. Ali Alsree, RT Lim, Zamboanga Sibugay, Zamboanga Sibugay 2nd LD
2,000,000
Construction of Multipurpose Building Project, Brgy. Tigbangagan, Kabalasan, Zamboanga Sibugay, Zamboanga Sibugay 2nd LD
2,000,000
Construction of Palinta Multipurpose Building Project, Brgy. Palinta, Kabalasan, Zamboanga Sibugay, Zamboanga Sibugay 2nd LD
2,000,000
Construction/Improvement of MPB-Covered Courts, Brgy. Mabini, Titay, Zamboanga Sibugay, Zamboanga Sibugay 2nd LD
1,000,000
Construction/Improvement of MPB-Covered Courts, Brgy. Pres. Roxas, R.T. Lim, Zamboanga Sibugay, Zamboanga Sibugay 2nd LD
1,100,000
Construction/Improvement of MPB-Covered Courts, Brgy. Tupilac, R.T. Lim, Zamboanga Sibugay, Zamboanga Sibugay 2nd LD
1,100,000
Construction/Rehabilitation of Various Infrastructure Projects 6,800,000
Region X 416,600,000Regional Office X 68,100,000
Construction of Multipurpose Building (Community Centers) in Barangay Sawer, Masiu, Lanao del Sur
1,100,000
Construction of Multi-Purpose Building, Brgy. Sandab, Darul Iman, Municipality of Butig, Lanao del Sur 2nd LD
5,000,000
Construction of Multi-Purpose Building, Brgy. Tambara, Municipality of Malabang, Lanao del Sur 2nd LD
10,000,000
Construction of Multi-Purpose Building, Bubong, Saguiaran, Lanao del Sur 1st LD 3,000,000
Construction of Multi-Purpose Building, Dasomalong, Tamparan, Lanao del Sur 1st LD
2,500,000
Construction of Multi-Purpose Building, Dilausan Poblacion, Maguing, Lanao del Sur 1st LD
2,500,000
Construction of Multi-Purpose Building, Dimayon Proper, Bubong, Lanao del Sur 1st LD
3,000,000
Construction of Multi-Purpose Building, Ilian Proper, Piagapo, Lanao del Sur 1st LD 3,000,000
Construction of Multi-Purpose Building, Kianibong, Tagoloan, Lanao del Sur 1st LD 3,000,000
Construction of Multi-Purpose Building, Madanding, Poona-Bayabao, Lanao del Sur 1st LD
3,000,000
Construction of Multi-Purpose Building, Madaya Poblacion, Maguing, Lanao del Sur 1st LD
5,000,000
Construction of Multi-Purpose Building, Manacab, Buadiposo-Buntong, Lanao del Sur 1st LD
3,000,000
Construction of Multi-Purpose Building, Maranaw Timber Dalama, Ditsaan-Ramain, Lanao del Sur 1st LD
2,000,000
Construction of Multi-Purpose Building, Maul Ilian, Marantao, Lanao del Sur 1st LD 2,500,000
Construction of Multi-Purpose Building, Pindolonan, Kapai, Lanao del Sur 1st LD 3,000,000
Construction of Multi-Purpose Building, Poblacion , Marantao, Lanao del Sur 1st LD 2,000,000
Construction of Multi-Purpose Building, Pugaan, Marawi City, Lanao del Sur 1st LD 2,000,000
Construction of Multi-Purpose Building, Ramitan, Picong, Lanao del Sur 1st LD 3,000,000
Construction of Multi-Purpose Building, Saduc, Marawi City, Lanao del Sur 1st LD 2,500,000
Construction of Multi-Purpose Building, Sumogot, Bumbaran, Lanao del Sur 1st LD 3,000,000
Construction of Multi-Purpose Building, Upper Pugaan, Ditsaan-Ramain, Lanao del Sur 1st LD
2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Bukidnon 4th LD 2,000,000
Page 100 of 162
1000 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Bukidnon 1st DEO 28,500,000Construction of Multi-Purpose Building, Barangay Aglayan, Malaybalay, Bukidnon 2nd LD
3,000,000
Construction of Multi-Purpose Building, Barangay Bulalang, San Fernando, Bukidnon 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Cananga-an, Cabanglasan, Bukidnon 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Cawayan, San Fernando, Bukidnon 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Dao, San Fernando, Bukidnon 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Malayanan, San Fernando, Bukidnon 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Mandahican, Cabanglasan, Bukidnon 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Impasug-ong, Bukidnon 2nd LD
7,000,000
Construction of Multi-Purpose Building, Barangay San Jose, San Fernando, Bukidnon 2nd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Townsite, Cabanglasan, Bukidnon 2nd LD
3,000,000
Repair of Multi-Purpose Building, Barangay Busdi, Malaybalay City, Bukidnon 500,000Repair of Multi-Purpose Building, Barangay Caburacanan, Malaybalay City, Bukidnon 500,000
Repair of Multi-Purpose Building, Barangay Kulaman, Malaybalay City, Bukidnon 500,000
Bukidnon 2nd DEO 1,500,000Repair of Multi-Purpose Building, Barangay Poblacion, Dangcagan, Bukidnon 500,000Repair of Multi-Purpose Building, Barangay Poblacion, Kibawe, Bukidnon 500,000Repair of Multi-Purpose Building, Barangay Poblacion, Maramag, Bukidnon 500,000
Bukidnon 3rd DEO 23,000,000Const. of Multipurpose Bldg. (Manolo Public Market), Tankulan, Manolo Fortich, Bukidnon,Bukidnon 1st LD
9,000,000
Construction of Multipurpose Bldg., Kiabo, Malitbog, Bukidnon,Bukidnon 1st LD 2,000,000
Construction of Multipurpose Bldg., San Roque, Sumilao, Bukidnon,Bukidnon 1st LD 2,000,000
Improvement of ABC Bldg., Tankulan, Manolo Fortich, Bukidnon,Bukidnon 1st LD 2,000,000
Improvement of MPB Libona Nat'l Highschool, Crossing, Libona, Bukidnon,Bukidnon 1st LD
1,000,000
Improvement of Multi-Puprose Bldg. (Covered Court), Sankanan, Manolo Fortich, Bukidnon,Bukidnon 1st LD
500,000
Improvement of Multi-Puprose Bldg., Sto Niño, Talakag, Bukidnon,Bukidnon 1st LD 500,000
Improvement of Multipurpose Bldg (Covered Court), Brgy. 4, Talakag, Bukidnon,Bukidnon 1st LD
800,000
Improvement of Multipurpose Bldg., Omagling, Malitbog, Bukidnon,Bukidnon 1st LD 500,000
Improvement of Multipurpose Bldg., Poblacion, Libona, Bukidnon,Bukidnon 1st LD 500,000
Improvement of Multi-Purpose Bldg., San Isidro, Talakag, Bukidnon,Bukidnon 1st LD 500,000
Improvement of Multipurpose Bldg., San Vicente, Sumilao, Bukidnon,Bukidnon 1st LD
1,500,000
Improvement of Tikalaan Natl Highschool MPB (Covered Court), Tikalaan, Talakag, Bukidnon,Bukidnon 1st LD
800,000
Repair and Improvement of Multipurpose Bldg., Brgy. 2, Talakag, Bukidnon,Bukidnon 1st LD
1,400,000
Cagayan de Oro City 1st DEO 22,000,000Construction of Multi-Purpose Building, Barangay Canitoan, Cagayan de Oro City, Misamis Oriental
3,000,000
Construction of Multi-Purpose Building, Barangay Carmen, Cagayan de Oro City, Misamis Oriental
2,000,000
Construction of Multi-Purpose Building, Zone 11, Carmen, Cag. de Oro City, Misamis Oriental
2,000,000
Construction/ Improvement of Covered Court, Zone 8, Mother Ignacia Village , Carmen, Cag. de Oro City, Misamis Oriental
2,000,000
Rehabilitation of Multi-Purpose Building, Carmen, Cag. de Oro City, Misamis Oriental 2,000,000
Rehabilitation of Multi-Purpose Hall/West City High School, Carmen, Cag. de Oro City, Misamis Oriental
2,000,000
Repair of Multi-Purpose Building (Senior Citizen's Center), Zone 6, Carmen, Cag. de Oro City, Misamis Oriental
2,000,000
Repair of Multi-Purpose Building, Barangay Lumbia, Cagayan de Oro City, Misamis Oriental
500,000
Repair of Multi-Purpose Building, Barangay Mambuaya, Cagayan de Oro City, Misamis Oriental
500,000
Repair of Multi-Purpose Building, Barangay Patag, Cagayan de Oro City, Misamis Oriental
500,000
Repair of Multi-Purpose Building, Barangay Tuburan, Cagayan de Oro City, Misamis Oriental
500,000
Repair of Multi-Purpose Building, Tumpagon, Cag. de Oro City, Misamis Oriental 3,000,000
Repair of Multi-Purpose Building, Zone 6, Bayabas, Cag. de Oro City, Misamis Oriental
2,000,000
Cagayan de Oro City 2nd DEO 3,500,000Construction of Multi-Purpose Building, Barangay Lapasan, Cagayan de Oro City, Misamis Oriental
2,000,000
Repair of Multi-Purpose Building, Barangay 6, Cagayan de Oro City, Misamis Oriental 500,000
Repair of Multi-Purpose Building, Barangay FS Catanico, Cagayan de Oro City, Misamis Oriental
500,000
Repair of Multi-Purpose Building, Barangay Puerto, Cagayan de Oro City, Misamis Oriental
500,000
Camiguin DEO 24,000,000
Page 101 of 162
details of dpwh’s programs/projects 1001
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Improvement of Multi-Purpose Building (Municipal Hall), Barangay Poblacion, Guinsiliban, Camiguin Lone District
1,000,000
Construction/Improvement of Multi-Purpose Building (Municipal Hall), Barangay Poblacion, Mambajao, Camiguin Lone District
20,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Magting, Mambajao, Camiguin Lone District
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Pandan, Mambajao, Camiguin Lone District
1,000,000
Lanao del Norte 1st DEO 4,000,000Construction of Multi-Purpose Building, Barangay Poblacion, Matungao, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Somiorang, Matungao, Lanao del Norte 1st LD
2,000,000
Lanao del Norte 2nd DEO 74,000,000Construction of Barangay Hall, Brgy. Lanipao, Iligan City Lone District 2,500,000Construction of Barangay Hall, Brgy. Mahayahay, Iligan City Lone District 2,000,000Construction of Barangay Hall, Brgy. Suarez, Iligan City Lone District 2,000,000Construction of Barangay Hall, Brgy. Tubod, Iligan City Lone District 3,000,000Construction of Barangay Health Center, Brgy. Kiwalan, Iligan City Lone District 2,000,000
Construction of Multipurpose Bldg. at Francisco Laya Memorial School, Brgy. Tipanoy, Iligan City Lone District
3,000,000
Construction of Multipurpose Bldg., Brgy. Dulag, Iligan City Lone District 2,500,000Construction of Multipurpose Bldg., Brgy. Ma.Cristina, Iligan City Lone District 2,000,000Construction of Multipurpose Bldg., Brgy. Tambacan, Iligan City Lone District 2,000,000Construction of Multi-Purpose Building, Barangay Andil, Baroy, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Babalaya, Bacolod , Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Binuni, Bacolod, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Bualan, Tubod, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Dalama, Baroy, Lanao del Norte 1st LD
2,500,000
Construction of Multi-Purpose Building, Barangay Kawit Oriental, Kauswagan, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Larapan, Linamon, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Licapao, Tubod, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Malingao, Tubod, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Palao, Kolambugan, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Pantar, Kolambugan, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Pinpin, Tubod, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Poblacion, Bacolod, Lanao del Norte 1st LD
2,500,000
Construction of Multi-Purpose Building, Barangay Poblacion, Baroy, Lanao del Norte 1st LD
3,000,000
Construction of Multi-Purpose Building, Barangay Princesa, Baroy, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Pualas, Tubod, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Samburun, Linamon, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay San Antonio, Tubod, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Small Banisilon, Kolambugan, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Sto. Niño, Tubod, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Tingin-tingin, Kauswagan, Lanao del Norte 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Tubaran, Tubod, Lanao del Norte 1st LD
2,000,000
Construction of Multipurpose Gym, Brgy. Tomas Cabili, Iligan City Lone District 2,000,000
Repair of Covered court, Brgy. Buruun, Iligan City Lone District 2,000,000Repair of Covered Court, Brgy. Mainit, Iligan City Lone District 3,000,000
Misamis Occidental 1st DEO 28,000,000Construction of multi-purpose building, Brgy. Poblacion 1, Oroquieta City, Misamis Occidental
2,000,000
Construction of Multipurpose Building,Brgy. Casusan,Aloran,Misamis Occidental 2,000,000
Construction of Multipurpose Building,Brgy. Lower Rizal,Oroquieta,Misamis Occidental
2,000,000
Construction of Multipurpose Building,Brgy. Poblacion,Conccepcion,Misamis Occidental
4,000,000
Construction of Paglaum MPC Farmers Training Center, Southern Looc, Misamis Occidental
4,000,000
Repair of Multi-Purpose Building, Barangay Poblacion, Calamba, Misamis Occidental 500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Lopez Jaena, Misamis Occidental
500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Orquieta City, Misamis Occidental
500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Panaon, Misamis Occidental 500,000
Repair/Rehab. of Multipurpose Building,Brgy. Langub,Calamba,Misamis Occidental 2,000,000
Repair/Rehab. of Multipurpose Building,Brgy. Northern Poblacion,Baliangao,Misamis Occidental
3,000,000
Repair/Rehab. of Multipurpose Building,Brgy. Southwestern Poblacion,Calamba,Misamis Occidental
4,000,000
Page 102 of 162
1002 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Repair/Rehab. of Multipurpose Building,Brgy. Sta. Cruz,Jimenez,Misamis Occidental 3,000,000
Misamis Occidental 2nd DEO 50,000,000Construction of Multipurpose Building in Brgy. Tinacla-an, Clarin, Misamis Occidetal 2nd LD
2,000,000
Construction/Improvement of Multipurpose Building in Brgy. Poblacion, Sinacaban, Misamis Occidental 2nd LD
1,700,000
Rehabilitation of Multi-Purpose Building, Barangay Sta. Cruz, Ozamis City, Misamis Occidental
1,000,000
Repair/Improvement of Mulitpurpose Hall in Brgy. Kinangay Norte, Clarin, Misamis Occidetal 2nd LD
700,000
Repair/Improvement of Multipurpose Building in Brgy. 6, Tangub City, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. 7, Tangub City, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Bag-ong Anonang, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Bagong Clarin, Don Victoriano, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Balatacan, Tangub City, Misamis Occidental 2nd LD
700,000
Repair/Improvement of Multipurpose Building in Brgy. Banadero (Pob.), Ozamiz City, Misamis Occidental 2nd LD
1,000,000
Repair/Improvement of Multipurpose Building in Brgy. Barangay 4, Tangub City, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Bocator, Tangub City, Misamis Occidental 2nd LD
800,000
Repair/Improvement of Multipurpose Building in Brgy. Bolinsong, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Buenavista, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Buracan, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Calolot, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Canipacan, Clarin, Misamis Occidetal 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Capalaran, Tangub City, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Catagan, Tangub City, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Dimalco, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Dolores, Clarin, Misamis Occidetal 2nd LD
600,000
Repair/Improvement of Multipurpose Building in Brgy. Dullan, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Fertig Hills, Tangub City, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Gandawan, Don Victoriano, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Garang, Tangub City, Misamis Occidental 2nd LD
700,000
Repair/Improvement of Multipurpose Building in Brgy. Gata Daku, Clarin, Misamis Occidetal 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Gata Diot, Clarin, Misamis Occidetal 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Guinalaban, Tangub City, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Isidro D. Tan, Tangub City, Misamis Occidental 2nd LD
600,000
Repair/Improvement of Multipurpose Building in Brgy. Kanaokanao, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Kinangay Sur, Clarin, Misamis Occidetal 2nd LD
1,000,000
Repair/Improvement of Multipurpose Building in Brgy. Labuyo, Tangub City, Misamis Occidental 2nd LD
700,000
Repair/Improvement of Multipurpose Building in Brgy. Lake Duminagat, Don Victoriano, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Lalud, Don Victoriano, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Lampasan, Don Victoriano, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Lapasan, Clarin, Misamis Occidetal 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Liboron, Don Victoriano, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Liloan, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Linconan, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Lodiong, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Lower Usogan, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Lupagan, Clarin, Misamis Occidetal 2nd LD
1,500,000
Repair/Improvement of Multipurpose Building in Brgy. Maloro, Tangub City, Misamis Occidental 2nd LD
900,000
Repair/Improvement of Multipurpose Building in Brgy. Manga, Tangub City, Misamis Occidental 2nd LD
600,000
Repair/Improvement of Multipurpose Building in Brgy. Mantic, Tangub City, Misamis Occidental 2nd LD
1,000,000
Repair/Improvement of Multipurpose Building in Brgy. Mapurog (Migsale), Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Maramara, Don Victoriano, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Matugnao, Tangub City, Misamis Occidental
500,000
Repair/Improvement of Multipurpose Building in Brgy. Mialen, Clarin, Misamis Occidetal 2nd LD
600,000
Page 103 of 162
details of dpwh’s programs/projects 1003
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Repair/Improvement of Multipurpose Building in Brgy. Migcanaway, Tangub City, Misamis Occidental 2nd LD
900,000
Repair/Improvement of Multipurpose Building in Brgy. Minsubong, Tangub City, Misamis Occidental 2nd LD
700,000
Repair/Improvement of Multipurpose Building in Brgy. Montol, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Napangan, Don Victoriano, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Nueva Vista (Masawan), Don Victoriano, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Pan-ay, Clarin, Misamis Occidetal 2nd LD
1,000,000
Repair/Improvement of Multipurpose Building in Brgy. Pangabuan, Tangub City, Misamis Occidental 2nd LD
1,000,000
Repair/Improvement of Multipurpose Building in Brgy. Petianan, Don Victoriano, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Pisa-an, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Poblacion (Centro), Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Poblacion II, Clarin, Misamis Occidetal 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Poblacion III, Clarin, Misamis Occidetal 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Prenza, Tangub City, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Remedios, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Rufino Lumapas, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Salimpuno, Tangub City, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. San Apolinario, Tangub City, Misamis Occidental 2nd LD
600,000
Repair/Improvement of Multipurpose Building in Brgy. Segatic Daku, Clarin, Misamis Occidetal 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Sibuyon, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Silanga, Tangub City, Tangub City, Misamis Occidental 2nd LD
900,000
Repair/Improvement of Multipurpose Building in Brgy. Silangit, Tangub City, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Simasay, Tangub City, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Sta. Cruz, Tangub City, Misamis Occidental 2nd LD
800,000
Repair/Improvement of Multipurpose Building in Brgy. Sta. Maria, Tangub City, Misamis Occidental 2nd LD
700,000
Repair/Improvement of Multipurpose Building in Brgy. Tangab, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Tugas, Tangub City, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Tuno, Don Victoriano, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Tusik, Bonifacio, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building in Brgy. Villaba, Tangub City, Misamis Occidental 2nd LD
500,000
Repair/Improvement of Multipurpose Building with Water System in Brgy. Upper Usogan, Bonifacio, Misamis Occidental 2nd LD
800,000
Misamis Oriental 1st DEO 35,500,000Construction of Health Center Brgy. Inobulan, Salay, Misamis Oriental 1,000,000Construction of Multi-Purpose Building, Barangay Bauk Bauk, Balingoan, Misamis Oriental 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Buko, Kinoguitan, Misamis Oriental 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Cabug, Medina, Misamis Oriental 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Calubo, Kinoguitan, Misamis Oriental 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Kabangasan, Balingoan, Misamis Oriental 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Kauswagan, Lagonglong, Misamis Oriental 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Manaol, Lagonglong, Misamis Oriental 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Mandahilag, Talisayan, Misamis Oriental 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Mapua, Balingoan, Misamis Oriental 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Mimbunga, Gingoog City, Misamis Oriental 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay San Roque, Medina, Misamis Oriental 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Sangalan, Gingoog City, Misamis Oriental 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Sibantang, Talisayan, Misamis Oriental 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Tagpako, Gingoog City, Misamis Oriental 1st LD
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Bonifacio, Magsaysay, Misamis Oriental 1st LD
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Cabantian, Magsaysay, Misamis Oriental 1st LD
2,000,000
Construction/Improvement of Multi-Purpose Building, Barangay Cabubuhan, Magsaysay, Misamis Oriental 1st LD
2,000,000
Repair of Central Elementary School Stage (MPB), Barangay Poblacion, Magsaysay, Misamis Oriental
500,000
Misamis Oriental 2nd DEO 54,500,000
Page 104 of 162
1004 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi- Purpose Bldg./ Evacuation Center at Poblacion, Laguindingan, Misamis Oriental
2,000,000
Construction of Multi-Purpose Building (Open Court), Bgy. Nangkaon, Opol, Misamis Oriental
2,000,000
Construction of Multi-Purpose Building, Barangay Bolisong, El Salvador, Misamis Oriental
1,000,000
Construction of Multi-Purpose Building, Barangay Lubluban, Libertad, Misamis Oriental
2,000,000
Construction of Multi-purpose Building, Barangay Poblacion, Opol, Misamis Oriental 2,000,000
Multi Purpose Covered Court 3,000,000Multi-purpose Building Open Court, Brgy. Natubo, Jasaan, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Aya-Aya, Lugait, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Bobontugan, Jasaan, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Calacapan, Initao, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Calangahan, Lugait, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Camelon, Initao, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Dulong, Libertad, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Gasi, Laguindingan, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Lanise, Claveria, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Liberty, Laguindingan, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Loguilo, Alubijid, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Lourdes, Alubijid, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Mat-i, Claveria, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Pelaez, Claveria, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Poblacion, Initao, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Poblacion, Naawan, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Quibonbon, City of El Salvador, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Solana, Jasaan, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Talaba, Alubijid, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Tangcob, Libertad, Misamis Oriental 2,000,000Multi-Purpose Building, Brgy. Taytay, City of El Salvador, Misamis Oriental 2,000,000Repair of Multi-Purpose Building, Barangay Kabaghot, Laguindingan, Misamis Oriental
500,000
Region XI 578,900,000Regional Office XI 50,000,000
Construction of Multi-Purpose Building at UP-Mindanao Campus, Brgy. Bago Oshiro, Tugbok Dist., Davao City, Davao del Sur
50,000,000
Compostela Valley DEO 106,200,000Construction of MPB in Municipalities of Laak, Nabunturan, Maco, Pantukan, Mawab, Mabini, Maragusan, Compostela, Montevista, Monkayo and New Bataan, Compostela Valley
36,600,000
Construction of Multi-Purpose Building (Barangay Hall) for Barangay Bahi of Maragusan, Compostela Valley
2,000,000
Construction of Multi-Purpose Building (Barangay Hall) for Barangay Concepcion of Montevista, Compostela Valley
2,000,000
Construction of Multipurpose Building (Barangay Halll Building) in Barangay Bongbong, Pantukan, Compostela Valley
1,500,000
Construction of Multi-Purpose Building (Covered Court) in Bgy. Poblacion, Compostela, Compostela Valley
2,000,000
Construction of Multi-Purpose Building (Covered Court) in Bgy. Tubo-tubo, Monkayo, Compostela Valley
2,500,000
Construction of Multi-Purpose Building (Municipal Hall, phase 4) for the local government of Maragusan, Compostela Valley 1st LD
5,000,000
Construction of Multi-Purpose Building (Public Market) in Bgy. Poblacion, Compostela, Compostela Valley
5,000,000
Construction of Multi-Purpose Building for Council of Women, in Bgy. Ngan, Compostela Valley 1st LD
1,100,000
Construction of Multi-Purpose Building w/ enclosures (Barangay Hall) for the local government of Bgy. Langgawisan, Maragusan, Compostela Valley 1st LD
2,000,000
Construction of Multi-Purpose Building, (Open Hall), in Bgy. Linoan, Montevista, Compostela Valley 1st LD
1,000,000
Construction of Multi-Purpose Building, (Provincial Tribal Building) for the Province of Compostela Valley, Nabunturan, Compostela Valley , Compostela Valley
5,000,000
Construction of Multi-Purpose Building, Barangay Hall, in Bgy. Camanlangan, New Bataan, Compostela Valley 1st LD
1,700,000
Construction of Multi-Purpose Building, Barangay Hall, in Bgy. Mayaon, Montevista, Compostela Valley 1st LD
1,700,000
Construction of Multi-Purpose Building, Barangay Hall, in Bgy. New Cebulan, Montevista, Compostela Valley 1st LD
1,700,000
Construction of Multi-Purpose Building, Barangay Hall, in Bgy. New Dalaguete, Montevista, Compostela Valley 1st LD
1,800,000
Construction of Multi-Purpose Building, Barangay Hall, in Bgy. Panansalan, Compostela Valley 1st LD
1,800,000
Construction of Multi-Purpose Building, Barangay Stage, in Bgy. Mapaca, Compostela Valley 1st LD
1,000,000
Construction of Multi-Purpose Building, Barangay Stage, in Bgy. San Miguel, Compostela Valley 1st LD
1,000,000
Construction of Multi-Purpose Building, Barangay Stage, in Bgy. Tamia, Compostela Valley 1st LD
1,000,000
Construction of Multi-Purpose Building, Covered Court, in Monkayo National High School, Monkayo, Compostela Valley
2,500,000
Construction of Multi-Purpose Building, Evacuation Center, in Bgy. Fatima, New Bataan, Compostela Valley 1st LD
1,000,000
Construction of Multi-Purpose Building, Senior Citizen Center, in Bgy. Bantacan, New Bataan, Compostela Valley 1st LD
1,000,000
Construction of Multi-Purpose Building, Tribal Hall, in Bgy. Batinao, New Bataan, Compostela Valley 1st LD
1,100,000
Construction of Multi-Purpose Building, Warehouse, in Bgy. Poblacion, Monkayo, Compostela Valley 1st LD
1,000,000
Construction/Completion of Multi-Purpose Building (Barangay Hall) in Bgy. San Jose, Montevista, Compostela Valley
1,500,000
Construction/Completion of Multi-Purpose Building (Covered Court) in Bgy. Casoon, Monkayo, Compostela Valley
1,600,000
Construction/Completion of Multi-Purpose Building (Covered Court) in Bgy. New Visayas, Montevista, Compostela Valley
1,500,000
Page 105 of 162
details of dpwh’s programs/projects 1005
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Improvement of Multi-Purpose Building, Barangay Hall, in Bgy. Kahayag, New Bataan, Compostela Valley 1st LD
1,700,000
Construction/Improvement of Multi-Purpose Building, Covered Court, in Bgy. Magsaysay, New Bataan, Compostela Valley 1st LD
1,200,000
Construction/Improvement of Multi-Purpose Building, Covered Court, in Bgy. Tapia, Montevista, Compostela Valley 1st LD
1,500,000
Construction/Improvement of Multi-Purpose Building, Covered Court, in Bgy. Upper Ulip, Monkayo, Compostela Valley 1st LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Municipal Tribal Hall, in Bgy. Poblacion, New Bataan, Compostela Valley 1st LD
1,800,000
Improvement of Barangay Hall in Bgy. Paloc, Maragusan, Compostela Valley 1,000,000
Improvement of Multi-Purpose Building (Bgy. Hall) in Barangay Siocon, Compostela, Compostela Valley
1,500,000
Improvement of Multi-Purpose Building (Bgy. Hall) in Bgy. Cogonon, New Bataan, Compostela Valley
1,400,000
Improvement of Multi-Purpose Building (Covered Court) in Barangay Gabi, Compostela, Compostela Valley
1,000,000
Improvement of Multi-Purpose Building (Covered Court) in Bgy. Magangit, New Bataan, Compostela Valley
1,500,000
Improvement of Multi-Purpose Building (Stage) in Bgy. Camantangan, Montevista, Compostela Valley
1,000,000
Improvement of Multi-Purpose Building in Bgy. Macopa, Monkayo, Compostela Valley 1,000,000
Improvement of Multi-Purpose Building in Bgy. Panag, New Bataan, Compostela Valley
1,000,000
Improvement/Rehabilitation of Multi-Purpose Building (Barangay Stage) in Bgy. Aurora, Compostela Valley 1st LD
1,000,000
Davao City 2nd DEO 173,000,000Construction of (Gymnasium or covered court), Brgy. Mintal, Tugbok District, Davao City 3rd LD
20,000,000
Construction of a School Gym, Tawan-Tawan Elementary School, Baguio District, Davao City
4,000,000
Construction of Multi-Purpose Bldg, Brgy. Malagos, Baguio Dist., Davao City, Davao del Sur
5,000,000
Construction of Multi-Purpose Bldg., Brgy. Bato, Toril Dist., Davao City, Davao del Sur
3,500,000
Construction of Multi-Purpose Bldg., Brgy. Bayabas, Toril Dist., Davao City, Davao del Sur
3,500,000
Construction of Multi-Purpose Bldg., Brgy. Daliao, Toril District, Davao City, Davao del Sur
4,000,000
Construction of Multi-Purpose Bldg., Brgy. Lacson, Calinan District, Davao City, Davao del Sur
3,500,000
Construction of Multi-Purpose Bldg., Brgy. Lampianao, Calinan District, Davao City, Davao del Sur
5,000,000
Construction of Multi-Purpose Bldg., Brgy. Lizada, Toril Dist., Davao City, Davao del Sur
3,500,000
Construction of Multi-purpose Bldng, Sitio San Roque, Brgy. Cawayan, Calinan Dist., Davao City, Davao del Sur
5,000,000
Construction of Multi-Purpose Building (Day Care Center), Brgy. Talandang, Tugbok Dist., Davao City, Davao del Sur
1,000,000
Construction of Multi-Purpose Building 2 at Phil. Eagle Reservation Center, Brgy. Malagos, Baguio District, Davao City, Davao del Sur
2,000,000
Construction of Multi-Purpose Building at 84th Infantry Battalion, Brgy. Malagos, Baguio Dist., Davao City, Davao del Sur
5,000,000
Construction of Multi-Purpose Building at Brgy. Tacunan, Tugbok District, Davao City, Davao del Sur
6,000,000
Construction of Multi-Purpose Building at Phil. Eagle Reservation Center, Brgy. Malagos, Baguio Dist., Davao City, Davao del Sur
2,000,000
Construction of Multi-purpose Building, Brgy. Buda, Baguio District, Davao City, Davao del Sur
5,000,000
Construction of Multi-Purpose Building, Brgy. Dalagdag, Calinan Dist., Davao City, Davao del Sur
6,000,000
Construction of Multi-Purpose Building, Brgy. Eden, Toril District, Davao City, Davao del Sur
5,000,000
Construction of Multi-Purpose Building, Brgy. Pangyan, Calinan Dist., Davao City, Davao del Sur
5,000,000
Construction of Multi-Purpose Building, Brngy Lubogan, Toril District, Davao City, Davao del Sur
5,000,000
Construction of Police Station, Brgy. Baguio Poblacion, Baguio District, Davao City, Davao del Sur
5,000,000
Construction of Senior Citizen's Bldg., Brgy. Lizada, Toril Dist., Davao City, Davao del Sur
2,000,000
Improvement of Multi-Purpose Bldg., Baracayo ES, Brgy. Daliaon, Toril Dist., Davao City, Davao del Sur
3,000,000
Improvement of Multi-Purpose Bldg., Biao Guianga ES, Brgy. Biao Guianga, Tugbok Dist., Davao City, Davao del Sur
3,000,000
Improvement of Multi-Purpose Bldg., Binugao NHS, Brgy. Binugao, Toril Dist., Davao City. Davao del Sur
3,000,000
Improvement of Multi-Purpose Bldg., Brgy. Bangkas Heights, Toril Dist., Davao City, Davao del Sur
3,000,000
Improvement of Multi-Purpose Bldg., Brgy. Bayabas, Toril District, Davao City, Davao del Sur
3,000,000
Improvement of Multi-Purpose Bldg., Brgy. Cawayan, Calinan Dist., Davao City, Davao del Sur
3,000,000
Improvement of Multi-Purpose Bldg., Brgy. Lampianao, Calinan Dist., Davao City, Davao del Sur
3,000,000
Improvement of Multi-Purpose Bldg., Brgy. Los Amigos, Tugbok Dist., Davao City, Davao del Sur.
5,000,000
Improvement of Multi-Purpose Bldg., Brgy. Malagos, Baguio Dist., Davao City, Davao del Sur
3,000,000
Improvement of Multi-Purpose Bldg., Brgy. Riverside, Calinan District, Davao City, Davao del Sur
3,000,000
Improvement of Multi-Purpose Bldg., Brgy. Tawan-tawan, Baguio District, Davao City, Davao del Sur
3,000,000
Improvement of Multi-Purpose Bldg., Brgy. Wangan, Calinan Dstrict, Davao City, Davao del Sur
3,000,000
Improvement of Multi-Purpose Bldg., Brgy. Wines, Baguio Dist., Davao City, Davao del Sur
3,000,000
Improvement of Multi-Purpose Bldg., Gasco ES, Brgy. Bato, Toril Dist., Davao City, Davao del Sur
3,000,000
Page 106 of 162
1006 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Improvement of Multi-Purpose Bldg., Tamugan ES, Brgy. Tamugan, Marilog District, Davao City, Davao del Sur
3,000,000
Improvement of Multi-Purpose Building Gym, Brgy. Toril Poblacion, Toril District, Davao City, Davao del Sur
10,000,000
Improvement of Multi-Purpose Building, Bago Oshiro ES, Brgy. Bago Oshiro, Tugbok Dist., Davao City, Davao del Sur
2,000,000
Improvement of Multi-Purpose Building, Brgy. Anggalan, Tugbok District, Davao City 3rd LD
3,000,000
Improvement of Multi-Purpose Building, Brgy. Dalagdag, Calinan Dist., Davao City, Davao del Sur
1,000,000
Improvement of Multi-Purpose Building, Brgy. Daliaon Plantation, Toril Dist., Davao City, Davao del Sur
1,000,000
Improvement of Multi-Purpose Building, Brgy. Gumalang, Baguio Dist., Davao City, Davao del Sur
2,000,000
Improvement of Multi-Purpose Building, Brgy. Sirawan, Toril Dist., Davao City, Davao del Sur
1,000,000
Davao City DEO 65,300,000Building Project (Construction), Brgy. Bucana 76-A, Talomo, Davao City 1st LD 3,500,000
Building Project (Construction), Brgy. Magtuod, Talomo, Davao City 1st LD 3,500,000Building Project (Construction), Brgy. Talomo, Talomo, Davao City 1st LD 3,000,000Building Project (Construction/Improvement), Brgy. 9-A, Poblacion, Davao City 1st LD
3,000,000
Building Project (Construction/Improvement), Brgy. Baliok, Talomo, Davao City 1st LD
2,000,000
Building Project (Repair/Rehabilitation), Brgy. 22-C, Poblacion, Davao City 1st LD 2,000,000
Building Project (Repair/Rehabilitation), Brgy. 26-C, Poblacion, Davao City 1st LD 2,000,000
Construction of a Multi-Purpose Building, Brgy. 76-A, Bucana, Davao City 3,000,000Construction of a Multi-Purpose Hall, Bacsarpa Vilage, Sitio Ipil, Brgy. Sumimao, Paqiubato District, Davao City
2,000,000
Construction of a Multi-Purpose Hall/Gym, Purok 1 & Purok 7, Brgy. 37-D, Trading Blvd., Davao City
2,000,000
Construction of multi-purpose bldg. (covered court), Angliongto ES, Brgy. Angliongto, Davao City
2,700,000
Construction of multi-purpose bldg. (covered court), Brgy. Buhangin, Davao City 2,750,000
Construction of multi-purpose bldg. (covered court), Brgy. Centro, Davao City 3,000,000
Construction of pedestrian overpass, J.P. Laurel near Junction Mamay Road 10,000,000Construction/Improvement of multi-purpose bldg., Brgy. Tigatto, Davao City 2,000,000
Construction/Improvement of dormitory, University of Southeastern Phils., Brgy. Bo.Obrero, Davao City
2,000,000
Construction/Improvement of multi-purpose bldg. (gymnasium), Brgy. Pampanga, Davao City
2,000,000
Construction/Improvement of multi-purpose bldg.(covered court), Brgy. Lasang, Davao City
1,300,000
Construction/Improvement of multi-purpose bldg.(covered court), Brgy. Mandug, Davao City
550,000
Construction/Improvement of multi-purpose bldg.(covered court), Callawa ES, Brgy. Callawa, Davao City
1,500,000
Construction/Improvement of multi-purpose bldg.(covered court), Lampa Lapidan Arabic School, Brgy. Mandug, Davao City
500,000
Construction/Improvement of Multi-Purpose Building, Barangay Barrio Obrero, Paquibato, Davao del Sur
5,000,000
Construction/Improvement of Multi-Purpose Building, Bgy. Matina Aplaya, Davao City, Davao del Sur
4,000,000
Rehabilitation/Improvement of Multipurpose Building, Brgy. Tibungko, Davao City, Davao
2,000,000
Davao del Norte DEO 61,500,000Construction of Barangay Hall, Magdum, Tagum City, Davao Del Norte 2,000,000Construction of Barangay Hall, Magugpo West, Tagum City, Davao Del Norte 1,000,000
Construction of Multipurpose Building, Herculina Bldg. ES, Canocotan, Tagum City, Davao Del Norte
2,000,000
Construction of Multipurpose Building, La Filipina, Tagum City, Davao Del Norte 2,000,000
Construction of a Multi-Purpose Building/Health Center, Brgy. Conocotan, Tagum City, Davao del Norte
2,000,000
Construction of Barangay Hall, Brgy. Toril, IGACOS, Davao del Norte, Davao del Norte 2nd LD
2,000,000
Construction of Brgy. Hall, Sawata, San Isidro, Davao Del Norte 1,500,000Construction of Multipurpose Building (Training Center) Barangay Sibangan in San Isidro, San Isidro Municipality, Davao del Norte
1,500,000
Construction of Multi-Purpose Building, Barangay Gredu, Panabo City, Davao del Sur 2,000,000
Construction of Multipurpose Building, Magugpo North, Tagum City, Davao Del Norte 2,000,000
Construction of Multi-Purpose Building,CORRECTIONAL INSTITUTE FOR WOMEN, Juan Acenas Sub-colony, DAPECOL, Mun. of Sto. Tomas, Davao del Norte
4,000,000
Construction of Womens's Development Center, Brgy. Poblacion, New Corella, Davao del Norte, Davao del Norte 2nd LD
2,000,000
Construction/Improvement of Multipurpose Building, , Asuncion, Davao Del Norte 2,000,000
Construction/Improvement of Multipurpose Building, , Kapalong, Davao Del Norte 3,000,000
Construction/Improvement of Multipurpose Building, , New Corella, Davao Del Norte 2,000,000
Construction/Improvement of Multipurpose Building, , Tagum City, Davao Del Norte 9,500,000
Construction/Improvement of Multipurpose Building, Binancian, Asuncion, Davao Del Norte
2,000,000
Construction/Improvement of Multipurpose Building, Busaon, Tagum City, Davao Del Norte
2,000,000
Construction/Improvement of Multipurpose Building, Magatos, Asuncion, Davao Del Norte
2,000,000
Page 107 of 162
details of dpwh’s programs/projects 1007
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Improvement of Multipurpose Building, New Sambog, New Corella, Davao Del Norte
2,000,000
Construction/Improvement of Multipurpose Building, Pamacuan, Asuncion, Davao Del Norte
2,000,000
Construction/Improvement of Multipurpose Building, San Jose, New Corella, Davao Del Norte
3,000,000
Construction/Improvement of Multipurpose Building, San Miguel, San Isidro, Davao Del Norte
8,000,000
Davao del Sur 1st DEO 13,000,000Construction of Covered Court, Barangay Nicholas Carbonael Ordaneza, Padada, Davao del Sur
10,000,000
Construction of Multi-Purpose Building, Barangay Alemandras, Padada, Davao del Sur
1,000,000
Construction of Multi-Purpose Building, Barangay Tagansule, Malalag, Davao Del Sur 2,000,000
Davao Oriental 1st DEO 34,900,000Construction of Multi-Purpose Building, Lambajon Central ES, Barangay Lambajon, Baganga, Davao Oriental 1st LD
2,600,000
Construction of Multi-Purpose Building, Baganga NHS, Barangay Poblacion, Baganga, Davao Oriental 1st LD
2,600,000
Construction of Multi-Purpose Building, Barangay Lambog, Manay, Davao Oriental 1st LD
2,600,000
Construction of Multi-Purpose Building, Barangay Poblacion, Cateel, Davao Oriental 1st LD
5,000,000
Construction of Multi-Purpose Building, Barangay Salingcomot, Baganga, Davao Oriental 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay San Antonio, Cateel, Davao Oriental 1st LD
2,600,000
Construction of Multi-Purpose Building, Barangay Sauquegue, Baganga, Davao Oriental 1st LD
2,600,000
Construction of Multi-Purpose Building, Barangay Sibahay, Boston, Davao Oriental 1st LD
2,600,000
Construction of Multi-Purpose Building, Gregorio Moralizon Central ES I, Barangay Central, Manay, Davao Oriental 1st LD
2,600,000
Construction of Multi-Purpose Building, Manay NHS, Barangay San Ignacio, Manay, Davao Oriental 1st LD
2,600,000
Construction of Multi-Purpose Building, Sitio 13, Barangay Tubaon, Tarragona, Davao Oriental 1st LD
2,600,000
Construction/Improvement of Multi-Purpose Building, Barangay Barangay San Miguel, Caraga, Davao Oriental 1st LD
800,000
Construction/Improvement of Multi-Purpose Building, Barangay Central, Manay, Davao Oriental 1st LD
2,000,000
Construction/Improvement of Multi-Purpose Building, Caraga NHS, Barangay Poblacion, Caraga, Davao Oriental 1st LD
1,200,000
Construction/Improvement of Multi-Purpose Building, Zaragoza E.S., Barangay Zaragoza, Manay, Davao Oriental 1st LD
500,000
Davao Oriental 2nd DEO 75,000,000Construction/Improvement of MPB, Banaybanay, Davao Oriental,Davao Oriental 2nd LD
3,500,000
Construction/Improvement of MPB, City of Mati, Davao Oriental,Davao Oriental 2nd LD
15,000,000
Construction/Improvement of MPB, Gov. Generoso, Davao Oriental,Davao Oriental 2nd LD
5,000,000
Construction/Improvement of MPB, Lupon, Davao Oriental,Davao Oriental 2nd LD 4,000,000
Construction/Improvement of MPB, San Isidro, Davao Oriental,Davao Oriental 2nd LD
3,500,000
Construction/Improvement of Multi-Purpose Building, Banaybanay 6,000,000Construction/Improvement of Multi-Purpose Building, City of Mati 13,000,000Construction/Improvement of Multi-Purpose Building, Gov. Generoso 9,000,000Construction/Improvement of Multi-Purpose Building, Lupon 8,000,000Construction/Improvement of Multi-Purpose Building, San Isidro 5,000,000Multi Purpose Covered Court 3,000,000
Region XII 318,400,000Regional Office XII 42,800,000
Construction of Multipurpose Building in Barangay Tamontaka, Datu Odin Sinsuat, Maguindanao
2,800,000
Construction of Multipurpose Building, Barangay Kalian, Mangudadatu 2nd LD 2,000,000
Construction of Multipurpose Building, Barangay Malangit, Pandag 2nd LD 3,000,000Construction of Multipurpose Building, Barangay Manongkaling, Mamasapano 2nd LD 3,000,000
Construction of Multipurpose Building, Barangay Maslabeng, Buluan 2nd LD 3,000,000Construction of Multipurpose Building, Barangay Poblacion, Ampatuan 2nd LD 3,000,000
Construction of Multipurpose Building, Barangay Poblacion, Buluan 2nd LD 3,000,000Construction of Multipurpose Building, Barangay Poblacion, Datu Abdullah Sangki 2nd LD
4,000,000
Construction of Multipurpose Building, Barangay Poblacion, Datu Montawal 2nd LD 3,000,000
Construction of Multipurpose Building, Barangay Poblacion, Datu Piang 2nd LD 3,000,000
Construction of Multipurpose Building, Barangay Poblacion, Datu Salibo 2nd LD 3,000,000
Construction of Multipurpose Building, Barangay Poblacion, Shariff Aguak 2nd LD 2,000,000
Construction of Multipurpose Building, Barangay Poblacion, South Upi 2nd LD 2,000,000Construction of Multipurpose Building, Barangay Poblacion, Talayan 2nd LD 3,000,000Construction of Multipurpose Building, Barangay Popol, Buluan 2nd LD 3,000,000
Cotabato City DEO 38,000,000Construction of Covered Court in Buaya Buaya High School in Kalanganan 2, Cotabato City
2,500,000
Construction of Covered Court in Bubong Elementary School in Kalanganan 2, Cotabato City
2,500,000
Construction of Covered Court in Cotabato City National High School Main Campus, Brgy.Rosary Heights 4, Cotabato City
2,500,000
Page 108 of 162
1008 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Covered Court in Darping Elementary School in Kalanganan 1, Cotabato City
2,500,000
Construction of Covered Court in Datu Kalantungan High School in Brgy. Tamontaka 4, Cotabato City
2,500,000
Construction of Covered Court in Don Sero Elementary School in Brgy.Rosary Heights 5, Cotabato City
2,500,000
Construction of Covered Court in J. Marquez Elem. School in Brgy. Poblacion Mother, Cotabato City
2,500,000
Construction of Covered Court in Mohammad Elem. School in Poblacion IX, Cotabato City
2,500,000
Construction of Covered Court in PC Elementary School in Rosary Heights I, Cotabato City
2,500,000
Construction of Covered Court in Usman Boanga Elementary School in Brgy. Tamontaka 2, Cotabato City
2,500,000
Construction of Multi-Purpose Bldg in Brgy. Poblacion VIII, Cotabato City 1st LD 5,000,000
Construction of Multi-Purpose Bldg in L.R. Sebastian Elem. School, Brgy RH II, Cotabato City 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Dinganen, Buldon, Maguindanao 3,000,000
Construction/Completion of Covered Court in Rosary Heights VII , Cotabato City 3,000,000
North Cotabato 1st DEO 22,000,000Construction of Multi-Purpose Building in Brgy. Buayan, M'lang, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building in Brgy. Dalapitan, Matalam, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building in Brgy. Dalipe, M'lang, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building in Brgy. Genoveva Baynosa, Tulunan, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building in Brgy. Kilada, Matalam, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building in Brgy. Latagan, Matalam, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building in Brgy. Luz Village, M'lang, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building in Brgy. Manubuan, Matalam, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building in Brgy. Sarayan, Matalam, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building in Brgy. Tibao, M'lang, North Cotabato 3rd LD 2,000,000
Construction of Multi-Purpose Building in Pag-asa Elementary School, Brgy. Pag-asa, M'lang, North Cotabato 3rd LD
2,000,000
North Cotabato 2nd DEO 74,000,000Construction of Multi-Purpose Building at Barangay Baliki, Midsayap, North Cotabato 1st LD
2,000,000
Construction of Multi-Purpose Building at Barangay Poblacion 8, Midsayap, North Cotabato 1st LD
2,000,000
Construction of Multi-Purpose Building at Dalengaoen, Pikit, North Cotabato 1st LD 2,000,000
Construction of Multi-Purpose Building in Brgy. Katidtuan, Kabacan, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building in Brgy. Kibudtungan, Carmen, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building in Brgy. Miguel Macasarte, Banisilan, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building in Brgy. Poblacion I, Banisilan, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building in Brgy. Poblacion, Kabacan, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building in Town Plaza, Brgy. Poblacion, Banisilan, North Cotabato 3rd LD
2,000,000
Construction of Multi-Purpose Building, Barangay Malagakit, Pigcawayan, North Cotabato 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay Montay, Libungan, North Cotabato 1st LD
2,000,000
Construction of Multi-Purpose Building, Barangay South Manuagan, Pigcawayan, North Cotabato 1st LD
2,000,000
Construction of Multi-Purpose Building, Brgy. Bambad, Isulan, Sultan Kudarat 1st LD 2,600,000
Construction of Multi-Purpose Building, Brgy. Blingkong, Lutayan, Sultan Kudarat 1st LD
2,600,000
Construction of Multi-Purpose Building, Brgy. Datablao, Columbio, Sultan Kudarat 1st LD
2,600,000
Construction of Multi-Purpose Building, Brgy. Didtaras, Lambayong, Sultan Kudarat 1st LD
2,500,000
Construction of Multi-Purpose Building, Brgy. Kalawag 3, Isulan, Sultan Kudarat 1st LD
2,600,000
Construction of Multi-Purpose Building, Brgy. Katico, Pres. Quirino, Sultan Kudarat 1st LD
2,600,000
Construction of Multi-Purpose Building, Brgy. Lagandang, Isulan, Sultan Kudarat 1st LD
2,600,000
Construction of Multi-Purpose Building, Brgy. Laguilayan, Isulan, Sultan Kudarat 1st LD
2,600,000
Construction of Multi-Purpose Building, Brgy. Lancieta, Tacurong City, Sultan Kudarat 1st LD
2,500,000
Construction of Multi-Purpose Building, Brgy. Libertad, Columbio, Sultan Kudarat 1st LD
2,600,000
Construction of Multi-Purpose Building, Brgy. Madanding, Lambayong, Sultan Kudarat 1st LD
2,500,000
Construction of Multi-Purpose Building, Brgy. Maligaya, Columbio, Sultan Kudarat 1st LD
2,600,000
Construction of Multi-Purpose Building, Brgy. Maligaya, Lambayong, Sultan Kudarat 1st LD
2,500,000
Construction of Multi-Purpose Building, Brgy. Manili, Lutayan, Sultan Kudarat 1st LD 2,600,000
Page 109 of 162
details of dpwh’s programs/projects 1009
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building, Brgy. Romualdez, Pres. Quirino, Sultan Kudarat 1st LD
2,600,000
Construction of Multi-Purpose Building, Brgy. Sucob, Columbio, Sultan Kudarat 1st LD
2,600,000
Construction of Multi-Purpose Building, Brgy. Tamnag, Lutayan, Sultan Kudarat 1st LD
2,000,000
Construction of Multi-Purpose Building, Brgy. Tinaungan, Pres. Quirino, Sultan Kudarat 1st LD
2,600,000
Construction of Multi-Purpose Building, Brgy. Udtong, Lambayong, Sultan Kudarat 1st LD
2,200,000
Construction/Improvement of Multi-Purpose Building, Brgy. Buenaflor, Tacurong City, Sultan Kudarat 1st LD
2,000,000
Saranggani DEO 40,500,000Construciton of Multi-Purpose Buildings-School Dormitory, Sison, Maitum, Sarangani 2,000,000
Construction of Indigenous Peoples' Center, Barangay Prov'l Capitol, Poblacion, Alabel, Saranggani
2,500,000
Construction of Multi-Purpose Buildings-Barangay Hall, Banate, Malungon, Sarangani 2,000,000
Construction of Multi-Purpose Buildings-Barangay Hall, Kayupo, Kiamba, Sarangani 2,000,000
Construction of Multi-Purpose Buildings-Barangay Hall, Nagpan, Malungon, Sarangani
2,000,000
Construction of Multi-Purpose Buildings-Barangay Hall, Patag, Malapatan, Sarangani 2,000,000
Construction of Multi-Purpose Buildings-Barangay Hall, San Vicente , Glan , Sarangani
2,000,000
Construction of Multi-Purpose Buildings-Barangay Hall, Sison, Maitum, Sarangani 2,000,000
Construction of Multi-Purpose Buildings-Barangay Hall, Upper Sayan, Malapatan, Sarangani
2,000,000
Construction of Multi-Purpose Buildings-Barangay Stage & Bleacher, Datal Anggas, Alabel, Sarangani
2,000,000
Construction of Multi-Purpose Buildings-Covered Court, Atlae, Malungon, Sarangani 3,000,000
Construction of Multi-Purpose Buildings-Covered Court, Kinam, Malapatan, Sarangani 3,000,000
Construction of Multi-Purpose Buildings-Covered Court, Libi, Malapatan, Sarangani 3,000,000
Construction of Multi-Purpose Buildings-Covered Court, Mudan, Glan, Sarangani 3,000,000
Construction of Multi-Purpose Buildings-Covered Court, Pinol, Maitum, Sarangani 3,000,000
Construction of Multi-Purpose Buildings-Covered Court, Upper Sayan, Malapatan, Sarangani
3,000,000
Construction of Multi-Purpose Buildings-Municipal Gymnasium, Poblacion, Maitum, Sarangani
2,000,000
South Cotabato 2nd DEO 21,500,000Construction of Barangay Gymnasium, Bawing/Siguel, General Santos City, South Cotabato 1st LD
2,000,000
Construction of Indigenous Peoples' Center, Barangay Municipal Hall, Poblacion, Polomolok, South Cotabato 1st LD
1,500,000
Construction of Multi-Purpose Building, Barangay Poblacion, Tupi, South Cotabato 2,000,000
Construction of Multi-Purpose Building, Crossing Rubber, Tupi, South Cotabato 1st LD
2,000,000
Construction of Multi-Purpose Building, Kipalbig, Tampakan, South Cotabato 1st LD 2,000,000
Construction of Multi-Purpose Building, Palian, Tupi, South Cotabato 1st LD 2,000,000Construction/Rehabilitation of Various Infrastructure Projects, South Cotabato 1st LD 10,000,000
South Cotabato DEO 39,600,000Construction of Brgy. Hall, Brgy. Improgo, Banga, South Cotabato 2nd LD 1,200,000Construction of Indigenous Peoples' Center, Barangay Municipal Hall, Poblacion, Surallah, South Cotabato 2nd LD
1,500,000
Construction of Multipurpose Bldg., Brgy. Libertad, Surallah, South Cotabato 2nd LD 1,200,000
Construction of New Gym, Brgy. Lambangan, T'boli, South Cotabato 2nd LD 2,500,000Construction of New Gym, Brgy. Little Baguio, Surallah, South Cotabato 2nd LD 2,500,000
Construction of New Gym, Brgy. Magon, Tantangan, South Cotabato 2nd LD 2,500,000
Construction of New Gym, Brgy. New Pangasinan, Koronadal City, South Cotabato 2nd LD
2,500,000
Construction of New Gym, Brgy. Sta. Cruz, Bayanihan, Koronadal City, South Cotabato 2nd LD
2,500,000
Construction of New Gym, Brgy. Yangco, Banga, South Cotabato 2nd LD 2,500,000Construction of New Gym, Sto. Nino Elementary School, Koronadal City, South Cotabato 2nd LD
2,500,000
Construction/Extension/Repair of Brgy. Hall, Brgy. Poblacion, Norala, South Cotabato 2nd LD
1,000,000
Construction/Improvement of Gym, Brgy. Simsiman, Norala, South Cotabato 2nd LD 1,200,000
Construction/Improvement of Multipurpose Bldg, Brgy. Paraiso, Koronadal City, South Cotabato 2nd LD
1,200,000
Construction/Rehabilitation of Various Infrastructure Projects, South Cotabato 2nd LD
2,000,000
Repair or Improvement of Gym, Brgy. Cacub, Koronadal City, South Cotabato 2nd LD
1,200,000
Repair or Improvement of Gym, Brgy. Carpenter Hill, Koronadal City, South Cotabato 2nd LD
1,200,000
Repair or Improvement of Gym, Brgy. Kusan, Banga, South Cotabato 2nd LD 1,200,000
Repair or Improvement of Gym, Brgy. Lamba, Banga, South Cotabato 2nd LD 1,200,000
Repair or Improvement of Gym, Brgy. Lampari, Banga, South Cotabato 2nd LD 1,000,000
Page 110 of 162
1010 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Repair or Improvement of Gym, Brgy. Maibo, Tantangan, South Cotabato 2nd LD 1,200,000
Repair or Improvement of Gym, Brgy. New Lambunao, Tantangan, South Cotabato 2nd LD
1,200,000
Repair or Improvement of Gym, Brgy. Punong Grande, Banga, South Cotabato 2nd LD
1,200,000
Repair or Improvement of Gym, Brgy. Sepaka, Surallah, South Cotabato 2nd LD 1,200,000
Repair or Improvement of Gym, Brgy. Sinolon, T'boli, South Cotabato 2nd LD 1,000,000
Repair or Improvement of Gym, Brgy. Talahik, Surallah, South Cotabato 2nd LD 1,200,000
Sultan Kudarat 1st DEO 2,000,000Construction of Multi-Purpose Building for 601st Bde 6ID PA AFP Brgy.Kalandagan, Kalandagan, Tacurong City, Sultan Kudarat 1st LD
2,000,000
Sultan Kudarat 2nd DEO 38,000,000Construction of Multi-Purpose Bldg. (Brgy. Hall), Barangay Dukay, Esperanza, Sultan Kudarat 2nd LD
2,000,000
Construction of Multi-Purpose Bldg. (Brgy. Hall), Barangay Salabaca, Esperanza, Sultan Kudarat 2nd LD
2,000,000
Construction of Multi-Purpose Bldg. (Mini Gym), Barangay Baliango, Palimbang, Sultan Kudarat 2nd LD
2,500,000
Construction of Multi-Purpose Bldg. (Mini Gym), Barangay Kapatagan, Sen. Ninoy Aquino, Sultan Kudarat 2nd LD
2,500,000
Construction of Multi-Purpose Bldg. (Mini Gym), Barangay Kuden, Sen. Ninoy Aquino, Sultan Kudarat 2nd LD
2,500,000
Construction of Multi-Purpose Bldg. (Mini Gym), Barangay Maguid, Palimbang, Sultan Kudarat 2nd LD
2,500,000
Construction of Multi-Purpose Bldg. (Mini Gym), Barangay Malatunol, Palimbang, Sultan Kudarat 2nd LD
2,500,000
Construction of Multi-Purpose Bldg. (Mini Gym), Barangay Midtungok, Sen. Ninoy Aquino, Sultan Kudarat 2nd LD
2,500,000
Construction of Multi-Purpose Bldg. (Mini Gym), Barangay San Roque, Palimbang, Sultan Kudarat 2nd LD
2,500,000
Construction of Multi-Purpose Bldg. (Mini Gym), Barangay Tagadtal, Palimbang, Sultan Kudarat 2nd LD
2,500,000
Construction of Multi-Purpose Bldg. (Mini Gym), Barangay Tinalon, Sen. Ninoy Aquino, Sultan Kudarat 2nd LD
2,500,000
Construction of Multi-Purpose Bldg. (Mini Gym), Barangay Wasag, Palimbang, Sultan Kudarat 2nd LD
2,500,000
Construction of Multi-Purpose Bldg. (Mini Gym), Sitio Legodon, Barangay Salumping, Esperanza, Sultan Kudarat 2nd LD
2,500,000
Construction of Multi-Purpose Bldg. (Mini Gym), Sitio Paghedait, Barangay Paitan, Esperanza, Sultan Kudarat 2nd LD
2,500,000
Construction of Multi-Purpose Bldg. (Municipal Gym), Barangay Poblacion I, Lebak, Sultan Kudarat 2nd LD
2,000,000
Construction of Multi-Purpose Bldg. (Senior Citizens Bldg.), Barangay Poblacion II, Lebak, Sultan Kudarat 2nd LD
2,000,000
Region XIII 281,536,000Agusan del Norte DEO 22,300,000
Construction of Covered Court, Brgy. Ambacon, Municipality of Las Nieves 2,000,000Construction of Covered Court, Brgy. Bonifacio, Municipality of Las Nieves 2,000,000Construction/Improvement of Multi - Purpose Building in Brgy. Ata-atahon, Nasipit, Agusan del Norte 2nd LD
2,000,000
Construction/Improvement of Multi - Purpose Building in Brgy. Doña Rosario, Tubay, Agusan del Norte 2nd LD
2,000,000
Construction/Improvement of Multi - Purpose Building in Brgy. San Vicente, Jabonga, Agusan del Norte 2nd LD
4,300,000
Improvement (Phase 2) of RT Romualdez Public Market, Poblacion 2, RT Romualdez, Agusan Del Norte
2,000,000
Rehabilitation of Barangay Hall, Brgy. Durian, Municipality of Las Nieves 500,000Rehabilitation of Barangay Hall, Brgy. Ibuan, Municipality of Las Nieves 500,000Repair & Improvement of the Municipal Building of RTR, Remedios T. Romualdez, Agusan del Norte
5,000,000
Repair of Multi-Purpose Building, Barangay Poblacion, Carmen, Agusan del Norte 500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Jabonga, Agusan del Norte 500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Kitcharao, Agusan del Norte 500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Nasipit, Agusan del Norte 500,000
Agusan del Sur 1st DEO 22,000,000Construction/Improvement of Multi-Purpose Bldg. (Phase 3), Brgy. San Agustin, Talacogon, Agusan del Sur 1st LD
20,000,000
Repair of Multi-Purpose Building, Barangay Poblacion, Bayugan City, Agusan del Sur 500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Esperanza, Agusan del Sur 500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Prosperidad, Agusan del Sur 500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Sibagat, Agusan del Sur 500,000
Agusan del Sur 2nd DEO 42,000,000Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Awao, Sta. Josefa, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Bacay, Veruela, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Bataan, La Paz, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Borbon, San Francisco, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Cabawan, Rosario, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Concepcion, Sta. Josefa, Agusan del Sur 2nd LD
1,000,000
Page 111 of 162
details of dpwh’s programs/projects 1011
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Ebro, San Francisco, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Kasapa, Loreto, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. La Fortuna, Veruela, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Ladgadan, San Francisco, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Lucac, San Francisco, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Lydia, La Paz, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Mambalili, Bunawan, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Marfil, Rosario, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Novele, Rosario, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Nueva Gracia, Loreto, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Osmeña, La Paz, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Rizal, San Francisco, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Salvacion, Trento, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. San Ignacio, Trento, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. San Isidro, Trento, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. San Patricio, La Paz, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Sawagan, Veruela, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Tagapua, San Francisco, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building (DPWH), Brgy. Karaos, San Francisco, Agusan del Sur 2nd LD
2,000,000
Construction of Multi-Purpose Building (DRRM), Brgy. Poblacion, Veruela, Agusan del Sur 2nd LD
2,000,000
Construction of Multi-Purpose Building (PNP-Provincial HQ-Women's Quarter), Brgy. Patin-ay, Prosperidad, Agusan del Sur 2nd LD
2,000,000
Construction of Multi-Purpose Building (Senior Citizen Bldg.), Brgy. Manat, Trento, Agusan del Sur 2nd LD
1,000,000
Construction of Multi-Purpose Building, Brgy. Kauswagan, Loreto, Agusan del Sur 2nd LD
4,000,000
Construction/Completion of Multi-Purpose Building, Brgy. Waloe, Loreto, Agusan del Sur 2nd LD
3,000,000
Construction/Improvement of Multi-Purpose Building, Brgy. Caimpugan, San Francisco, Agusan del Sur 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building, Brgy. Wasian, Rosario, Agusan del Sur 2nd LD
1,000,000
Repair of Multi-Purpose Building, Barangay Poblacion, La Paz, Agusan del Sur 500,000Repair of Multi-Purpose Building, Barangay Poblacion, Loreto, Agusan del Sur 500,000Repair of Multi-Purpose Building, Barangay Poblacion, Trento, Agusan del Sur 500,000Repair of Multi-Purpose Building, Barangay Poblacion, Veruela, Agusan del Sur 500,000
Butuan City DEO 23,000,000Construction of Barangay Hall, Brgy. Rajah Soliman, Butuan City 3,000,000Construction of Brgy Hall, Brgy. Camayahan, Butuan City 2,000,000Construction of Senior Citizen Center, Brgy.Pagatpatan, Butuan City 1,500,000Construction/Improvement of Barangay Hall, Brgy. Ampayon, Butuan City 1,000,000Construction/Improvement of Covered Court Butuan City Elementary School, Brgy. Diego Silang, Butuan City
2,000,000
Construction/Improvement of Covered Court with Bleacher and Stage, Brgy. Pangabugan, Butuan City
1,500,000
Construction/Improvement of Covered Court with Bleacher and Stage, Brgy. Taligaman, Butuan City
1,500,000
Construction/Improvement of Covered Court, Brgy. Sto. Niño, Butuan City 1,500,000Construction/Improvement of Multipurpose Center, Barangay Pigdaluan, Butuan City 2,000,000
Rehabilitation of Barangay Hall, Brgy. Agao, Butuan City 500,000Rehabilitation of Barangay Hall, Brgy. Bading, Butuan City 500,000Rehabilitation of Barangay Hall, Brgy. Dankias, Butuan City 500,000Rehabilitation of Barangay Hall, Brgy. Humabon, Butuan City 500,000Rehabilitation of Barangay Hall, Brgy. Lapu Lapu, Butuan City 500,000Rehabilitation of Barangay Hall, Brgy. Sikatuna, Butuan City 500,000Rehabilitation of Barangay Hall, Brgy. Urduja, Butuan City 500,000Rehabilitation of Brgy. Hall, Brgy. Leon Kilat, Butuan City 500,000Repair of Covered Court with Bleachers and Stage, Brgy. Masao, Butuan City 1,500,000
Repair of Multi-Purpose Building, Barangay Obrero, Butuan City, Agusan del Norte 500,000
Repair of Multi-Purpose Building, Barangay Ong Yui, Butuan City, Agusan del Norte 500,000
Repair of Multi-Purpose Building, Barangay San Vicente, Butuan City, Agusan del Norte
500,000
Dinagat Islands DEO 38,000,000Construction of Barangay Hall, Brgy. Poblacion, Mun. of Cagdianao, Dinagat Islands Lone District
3,000,000
Construction of Barangay Hall, Brgy. San Juan, Mun. of Loreto, Dinagat Islands Lone District
3,000,000
Construction of Barangay Hall, Brgy. Valencia, Mun. of Cagdianao, Dinagat Islands Lone District
3,000,000
Construction of Covered Court, Brgy. Bayanihan, Mun. of Libjo, Dinagat Islands Lone District
3,000,000
Construction of Covered Court, Brgy. Dona Helen, Mun. of Libjo, Dinagat Islands Lone District
3,000,000
Page 112 of 162
1012 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building (Barangay Hall), Barangay Maatas, Cagdianao, Dinagat Islands
3,000,000
Construction/Improvement of Don Ruben Gymansium, Brgy. Don Ruben, Mun. of San jose, Dinagat Islands Lone District
5,000,000
Construction/Improvement of Tubajon Legislative Building, Brgy. San Vicente, Mun. of Tubajon, Dinagat Islands Lone District
10,000,000
Rehabilitation of Dinagat Old Municipal Hall, Brgy. Mauswagon, Mun. of Dinagat, Dinagat Islands Lone District
5,000,000
Surigao del Norte 1st DEO 48,500,000Construction of Barangay Hall, Alipao, Alegria, Surigao del Norte 2,000,000Construction of Barangay Hall, Balete, San Francisco, Surigao del Norte 2,000,000Construction of Multipurpose Building, Bad-as, Placer, Surigao Del Norte 3,000,000Construction of Multipurpose Building, Barangay Gamuton, Alegria, Surigao Del Norte
3,000,000
Construction of Multipurpose Building, Biyabid, Sison, Surigao Del Norte 3,000,000Construction of Multipurpose Building, Gacepan, Sison, Surigao Del Norte 3,000,000Construction of Multipurpose Building, Magupangi, Placer, Surigao Del Norte 3,000,000Construction of Multipurpose Building, Patino, Taganaan, Surigao Del Norte 3,000,000Construction of Multipurpose Building, Pongtod, Bacuag, Surigao Del Norte 2,500,000Construction of Multipurpose Building, San Isidro, Sison, Surigao Del Norte 3,000,000Construction of Multipurpose Building, Santo Rosario, Bacuag, Surigao Del Norte 2,500,000
Construction of Multipurpose Building, Tagbongabong, Placer, Surigao Del Norte 3,000,000
Construction of Multipurpose Building, Timamana Elementary School, Timamana, Tubod, Surigao Del Norte
3,000,000
Construction of Multipurpose Building,Cambuayon, Bacuag, Surigao Del Norte 2,500,000
Construction of Senior Citizen, Poblacion, Tubod, Surigao del Norte 1,000,000Covered Court 3,000,000Repair of Multipurpose Buildig, Washington, Surigao City 2,000,000Repair of Multi-Purpose Building, Barangay Poblacion, Alegria, Surigao del Norte 500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Claver, Surigao del Norte 500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Guigaquit, Surigao del Norte 500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Mainit, Surigao del Norte 500,000
Repair of Multipurpose Building, Lipata, Surigao City 2,000,000
Surigao del Norte 2nd DEO 38,200,000Construction of Day Care Center, Brgy. Baybay, Burgos 700,000Construction of Day Care Center, Brgy. Bongso, San Benito 700,000Construction of Day Care Center, Brgy. Maribojoc, San Benito; 700,000
Construction of Day Care Center, Brgy. Osmena, Dapa 700,000Construction of Day Care Center, Brgy. Pelaez, San Isidro 700,000Construction of Day Care Center,Brgy. La Januza, General Luna 700,000Construction of Evacuation Center, Pilaring, Pilar, Surigao del Norte 1st LD 2,000,000Construction of Multipurpose Building, Brgy. Gen. Luna, Siargao, Surigao del Norte 2,000,000
Construction of Municipal Market, Talisay, San Benito, Surigao del Norte 1st LD 2,000,000
Construction/Improvement of Legislative Bldg., Socorro, Socorro, Surigao del Norte 1st LD
2,000,000
Construction/Improvement of Municipal Gym, Barangay 6, Dapa, Surigao del Norte 1st LD
10,000,000
Construction/Improvement of Municipal Gym, Del Carmen, Del Carmen, Surigao del Norte 1st LD
5,000,000
Construction/Improvement of Municipal Gym, Poblacion 1, Burgos, Surigao del Norte 1st LD
2,000,000
Construction/Improvement of Municipal Gym, Poblacion 1, Gen. Luna, Surigao del Norte 1st LD
2,000,000
Construction/Improvement of Municipal Gym, Socorro, Socorro, Surigao del Norte 1st LD
2,000,000
Construction/Improvement of Municipal Gym, T. Arlan, Sta. Monica, Surigao del Norte 1st LD
2,000,000
Rehabilitation/Renovation of Municipal Legislative Building, Del Carmen, Del Carmen, Surigao del Norte 1st LD
3,000,000
Surigao del Sur 1st DEO 19,000,000Construction of MPB (slaughter house class AAA), Calagda-an,Cantilan, Surigao del Sur
2,000,000
Construction of Multipurpose Bldg, Barangay Calagdaan, Cantilan, Surigao del Sur 1st LD
2,000,000
Construction of Multipurpose Bldg, Barangay Linibunan, Madrid, Surigao del Sur 1st LD
2,000,000
Construction of Multipurpose Bldg, Barangay Linintian, Cantilan, Surigao del Sur 1st LD
2,000,000
Construction of Sports Complex, Barangay Magosilom, Cantilan, Surigao del Sur 1st LD
9,000,000
Repair of Multi-Purpose Building, Barangay Poblacion, Cantilan, Surigao del Sur 500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Lanuza, Surigao del Sur 500,000Repair of Multi-Purpose Building, Barangay Poblacion, Marihatag, Surigao del Sur 500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Tago, Surigao del Sur 500,000
Surigao del Sur 2nd DEO 28,536,000Construction of Multi-Purpose Building at Barangay Bigaan, Surigao del Sur 2nd LD 2,500,000
Construction of Multi-Purpose Building at Barangay Cumawas, City of Bislig, Surigao del Sur 2nd LD
2,500,000
Construction of Multi-Purpose Building at Barangay Poblacion, Lingig, Surigao del Sur 2nd LD
2,000,000
Construction of Multi-Purpose Building at Barangay Sta. Cruz, City of Bislig, Surigao del Sur 2nd LD
2,000,000
Page 113 of 162
details of dpwh’s programs/projects 1013
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Multi-Purpose Building at Barangay Tagpoporan, Lingig, Surigao del Sur 2nd LD
2,000,000
Construction of Multi-Purpose Building at Market Site District, Barangay Mangagoy, City of Bislig, Surigao del Sur 2nd LD
2,000,000
Construction/Improvement of Multi-Purpose Building (MPB) at Barangay Malixi, Tagbina, Surigao del Sur (SDS) 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building (Senior Citizen) at Castillo Village, Barangay Mangagoy, City of Bislig, Surigao del Sur 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building at Barangay Campbagang, City of Bislig, Surigao del Sur 2nd LD
2,000,000
Construction/Improvement of Multi-Purpose Building at Barangay Kinayan, Barobo, Surigao del Sur 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building at Barangay Magsaysay, Tagbina, Surigao del Sur 2nd LD
1,125,000
Construction/Improvement of Multi-Purpose Building at Barangay Poblacion, Tagbina, Surigao del Sur 2nd LD
1,091,000
Construction/Improvement of Multi-Purpose Building at Barangay Sabang, Lingig, Surigao del Sur 2nd LD
1,600,000
Construction/Improvement of Multi-Purpose Building at Barangay San Jose, Barobo, Surigao del Sur 2nd LD
850,000
Construction/Improvement of Multi-Purpose Building at Barangay San Vicente II, Tagbina, Surigao del Sur 2nd LD
1,870,000
Construction/Improvement of Multi-Purpose Building at Barangay Sta. Maria, Tagbina, Surigao del Sur 2nd LD
1,000,000
Construction/Improvement of Multi-Purpose Building at Barangay Tambis, Barobo, Surigao del Sur 2nd LD
1,000,000
Repair of Multi-Purpose Building, Barangay Poblacion, Barobo, Surigao del Sur 500,000Repair of Multi-Purpose Building, Barangay Poblacion, Bislig City, Surigao del Sur 500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Hinatuan, Surigao del Sur 500,000
Repair of Multi-Purpose Building, Barangay Poblacion, Tagbina, Surigao del Sur 500,000
Flood Control and Drainage 875,985,000Flood Control Structures/Facilities 638,105,000
Disaster-Related and Emergency Rehabilitation Fund 300,000,000National Capital Region 300,000,000
Central Office 300,000,000Disaster-Related and Emergency Rehabilitation Fund 300,000,000
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects 338,105,000National Capital Region 55,500,000
Central Office 5,000,000Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Nationwide Allocation
5,000,000
Metro Manila 1st DEO 50,500,000Rehabilitation of Buhangin Creek and its vicinity, Brgy. Plainview and Brgy. Old Zaniga, Mandaluyong City
34,000,000
Rehabilitation of Maytanus Creek and its vicinity, Brgy. Addition Hills and Brgy. Hagdan Bato Libis, Mandaluyong City
16,500,000
Region I 64,105,000Ilocos Sur 1st DEO 17,939,000
Construction of River Flood Control, Gabion Revetment Wall/Stone Masonry, Laoingen, Ilocos Sur 1st LD
7,316,000
Construction of River Flood Control, Gabion Revetment Wall/Stone Masonry, Nagbettedan, Ilocos Sur 1st LD
2,624,000
Construction of River Flood Control, Gabion Revetment Wall/Stone Masonry, Nambaran, Ilocos Sur 1st LD
2,023,000
Construction of River Flood Control, Gabion Revetment Wall/Stone Masonry, Quimmarayan, Ilocos Sur 1st LD
1,899,000
Construction of River Flood Control, Gabion Revetment Wall/Stone Masonry, Sto. Tomas, Ilocos Sur 1st LD
4,077,000
Ilocos Sur 2nd DEO 46,166,000Deepening and Rechanneling of Candon River, Caterman-Darapidad Section, Darapidap, Candon City, Ilocos Sur
33,208,000
Deepening of Oaig Daya River, Paypayad, Candon City, Ilocos Sur 12,958,000
Region II 68,500,000Batanes DEO 68,500,000
Improvement of Ivana Flood Control/Seawall, Ivana, Batanes 20,000,000Improvement of Sabtang Seawall/Flood Control, Sinakan, Batanes 48,500,000
Region III 150,000,000Regional Office III 100,000,000
Construction of Flood Control Structures, Balibago Creek, Pampanga 1st LD 50,000,000Rehabilitation/Slope Protection Works along Abacan River, Mexico, Pampanga, 3rd LD
50,000,000
Pampanga 3rd DEO 50,000,000Repair/Rehabilitation of Sapangbalen Creek, Brgy. Mangalit, Mabalacat, Pampanga 1st LD
10,000,000
Repair/Rehabilitation of Sapangbalen Creek, Brgy. Sta. Ines, Magalang, Pampanga 1st LD
20,000,000
Repair/Rehabilitation of Sapangbalen Creek, Brgy. Sta. Maria, Magalang, Pampanga 1st LD
20,000,000
Drainage/Protection Works 237,880,000Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects 237,880,000
National Capital Region 139,000,000Central Office 5,000,000
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Nationwide Allocation
5,000,000
Metro Manila 1st DEO 94,000,000
Page 114 of 162
1014 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Rehabilitation of Drainage System along Araullo Street, Brgy. Hagdan Bato Libis, Mandaluyong City
20,000,000
Construction/Rehabilitation of Drainage System along Fabella Street, Brgy. Plainview, Mandaluyong City
10,000,000
Construction/Rehabilitation of Drainage System along Guerrero Street, Brgy. Hagdan Bato Libis, Mandaluyong City
20,000,000
Construction/Rehabilitation of Drainage System along Lerma Street, Brgy. Old Zaniga, Mandaluyong City
20,000,000
Construction/Rehabilitation of Drainage System along Mariveles Street and vicinity, Brgy. Highway Hills, Mandaluyong City
10,000,000
Construction/Rehabilitation of Drainage System along P. Cruz Street, Brgy. Old Zaniga, Mandaluyong City
10,000,000
Rehabilitation of drainage system at Griarte Street and alleys, Brgy. Hulo, Mandaluyong City
4,000,000
Metro Manila 2nd DEO 20,000,000Drainage Improvement & Upgrading of Yague St., Makati City 1st LD 20,000,000
Quezon City 2nd DEO 20,000,000Construction/Rehabilitation of Drainage System at D. Tuazon Ave. (Quezon Ave to N. Ramirez St) Intermittent Section, Quezon City 4th LD
20,000,000
Region I 3,880,000Ilocos Sur 1st DEO 3,880,000
Construction of Drainage Canal at Zone I to Zone VI, Bantay, Ilocos Sur 3,880,000
Region IX 95,000,000Regional Office IX 95,000,000
Construction of Bulibuli Causeway, Sumisip (Development Plan), Basilan Lone District 30,000,000
Construction of Buton shore Protection, Sapa-Sapa, Tawi-Tawi Lone District 5,000,000Construction of River Bank Protection, Mangal, Sumisip, Basilan Lone District 10,000,000Construction of Sallangan Shore Protection, Tandubas, Tawi-Tawi Lone District 5,000,000
Construction of Shore Protection along Pahut Road Approach to Sanga-Sanga Bridge, Bongao, Tawi-Tawi Lone District
20,000,000
Construction of Sibutu Proper Shore Protection, Sibutu, Tawi-Tawi Lone District 5,000,000
Construction of South Larap Shore Protection, Sitangkai, Tawi-Tawi Lone District 5,000,000
Construction of Taganak shore Protection, Turtle Island, Tawi-Tawi Lone District 5,000,000
Construction of Tangngah shore Protection, Sapa-Sapa, Tawi-Tawi Lone District 5,000,000
Construction of Tonggusong Shore Protection, Sitangkai, Tawi-Tawi Lone District 5,000,000
Roads and Bridges 60,245,892,000National Roads 24,100,726,000
Public-Private Partnership Strategic Support Fund (including ROW) 21,128,226,000National Capital Region 21,128,226,000
Central Office 21,128,226,000Public-Private Partnership Strategic Support Fund (including ROW) 21,128,226,000
Disaster-Related and Emergency Rehabilitation Fund 900,000,000National Capital Region 900,000,000
Central Office 900,000,000Disaster-Related and Emergency Rehabilitation Fund 900,000,000
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects 2,017,500,000National Capital Region 1,480,000,000
Central Office 1,480,000,000Construction/Improvement of Basilan Circumferential Road 675,000,000Construction/Rehabilitation of Various Infrastructure in Siquijor Lone District 150,000,000Construction/Rehabilitation of Various Infrastructures in Cavite 1st LD 150,000,000Construction/Rehabilitation of Various Infrastructures in Manila City 6th LD/ South Manila DEO
150,000,000
Construction/Rehabilitation of Various Infrastructures in Nueva Ecija 3rd LD 150,000,000Construction/Rehabilitation of Various Infrastructures in Quezon City 5th LD 50,000,000Construction/Rehabilitation of Various Projects in Isabela 2nd LD 50,000,000Construction/Rehabilitation of Various Projects in Quezon City 1st LD 95,000,000Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Nationwide Allocation
10,000,000
Region IX 537,500,000Regional Office IX 537,500,000
Construction of Romandier Camp Andres National Road, Km 50+000 - Km 50+700, Km 51+000 - Km 51+700, Km 53+000 - Km 53+700, Km 48+000 - Km 48+700, Sulu 2nd LD
75,000,000
Construction of Tawi-Tawi Mainland Circumferential Road, Lapid-Lapid-Sumangat-Tarawakan, Tawi-Tawi Lone District
50,000,000
Construction of Tawi-Tawi Mainland Circumferential Road, Marang-Marang-Bacung, Tawi-Tawi Lone District
50,000,000
Construction of Tawi-Tawi Mainland Circumferential Road, Tarawakan-Marang-Marang, Tawi-Tawi Lone District
50,000,000
Improvement/Upgrading/Rehabilitation of Jct. Timbangan-Romandier Road, K0018+000 - K0018+800, Talipao, Sulu 1st LD
20,000,000
Improvement/Upgrading/Rehabilitation of Jct. Timbangan-Romandier Road, K0019+503 - K0021+283 (with exception), Talipao, Sulu 1st LD
20,000,000
Improvement/Upgrading/Rehabilitation of Romandier-Camp Andres Road, K0022+740 - K0024+300, Talipao, Sulu 1st LD
40,000,000
Improvement/Upgrading/Rehabilitation of Romandier-Camp Andres Road, K0024+392 - K0025+932 (with exception), Talipao, Sulu 1st LD
20,000,000
Road Widening along BCR, Isabela-Lamitan Road (Lamitan Proper-Kalybato Section), Basilan
50,000,000
Road Widening along BCR, Lamitan-Tipo-Tipo-Tumahubong Road (Tipo-Tipo-Tumahubong Road Tipo-Tipo Proper Section), Basilan
35,000,000
Upgrading of Asphalt Road to Concrete Pavement along BCR Lamita-TipoTipo-Tumahubong Road (Camalig Section), Basilan
42,000,000
Page 115 of 162
details of dpwh’s programs/projects 1015
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Upgrading of Gravel Road to Concrete Pavement along BCR, Maluso-Sumisip-Tumahubong Road (Pali Section), Basilan
10,500,000
Widening of Seit Tayungan National Road, Km 43+300 - Km 44+000, Km 40+700 - Km 41+300, Km 38+000 - Km 38+700, Km 39+000 - Km 39+700, Sulu 2nd LD
75,000,000
Local Infrastructure Program 55,000,000National Capital Region 30,000,000
Metro Manila 2nd DEO 30,000,000Improvement of Kalayaan Avenue from C-5 to EDSA, District II, Makati City 20,000,000Rehabilitation/Improvement of Kalayaan Flyover, District II, Makati City 10,000,000
Cordillera Administrative Region 10,000,000Benguet 1st DEO 10,000,000
Widening of national highway, National Arterial Road along Tagaytay-Nagusbo Road 10,000,000
Region IX 15,000,000Zamboanga del Norte 1st DEO 15,000,000
Widening of Dipolog-Sindangan-Liloy Road including drainage (Manukan section, Zamboanga del Norte) K1872 +273.00- K1873+ 096.50
15,000,000
National Bridges 1,289,106,000National Bridge Construction/Replacement Program (Design and Build Bridges) 1,279,106,000
National Capital Region 1,279,106,000Central Office 1,279,106,000
National Bridge Construction/Replacement Program - Various Bridges 36,200,000National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon - Biyoy Bridge and Approaches along Aritao-Quirino Road, Nueva Vizcaya Lone District
77,012,000
National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon - Disinaba Bridge and Approaches along Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato), Quirino Lone District
30,089,000
National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon - Ganano Bridge and Approaches along Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato), Quirino Lone District
101,076,000
National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon - Kongkong Bridge and Approaches along Bambang-Kasibu-Solano Road, Nueva Vizcaya Lone District
11,189,000
National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon - Maguiti Bridge and Approaches along Jct Abbag-Gingin Bdry Rd, Quirino Lone District
85,995,000
National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon - Maldanum Bridge and Approaches along Echague-Jones-Madella Rd (Villa Norte-Panang Sect), Quirino Lone District
79,359,000
National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon - Ngilinan Bridge and Approaches along NRJ Villa Sur-SanPedro Cabuan-Ysmael-Disimungal, Quirino Lone District
153,289,000
National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon - Sevilla Bridge and Approaches along Manila North Road, Ilocos Sur 2nd District
37,671,000
National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon - Siguem I Bridge and Approaches along Aritao-Quirino Road, Nueva Vizcaya Lone District
60,074,000
National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon - Tadji Bridge and Approaches Papaya-Malabing-Wangal-Tadji-Runruno, Nueva Vizcaya Lone District
112,828,000
National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon, Bucao Creek Bridge and Approaches along Jct Abbag-Gingin Bdry Rd, Quirino
69,142,000
National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon, Didungo Bridge and Approaches along NRJ Villa Sur-SanPedro Cabuan-Ysmael-Disimungal, Quirino
203,168,000
National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon, La Conwap Bridge and Approaches along Jct Abbag-Gingin Bdry Rd, Quirino
68,985,000
National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon, Mactol Bridge and Approaches along Jct Abbag-Gingin Bdry Road, Quirino
123,769,000
National Bridge Construction/Replacement Program (Design and Build Bridges)-Bridge Construction and Replacement Program I - Design and Build Bridges for Luzon, Tungcab Bridge and Approaches along Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato), Quirino
29,260,000
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects 10,000,000National Capital Region 10,000,000
Central Office 10,000,000Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Nationwide Allocation
10,000,000
Local Roads 33,024,850,000Disaster-Related and Emergency Rehabilitation Fund 100,000,000
National Capital Region 100,000,000Central Office 100,000,000
Disaster-Related and Emergency Rehabilitation Fund 100,000,000
Page 116 of 162
1016 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects 23,964,987,000National Capital Region 8,685,373,000
Central Office 7,983,397,000Completion of Sawang-Agpanabat Road, Romblon 175,000,000Concreting (existing gravel road), Kauswagan - Bugdangan - Ferdinand - Sabud - Marang Road with Bridge
200,000,000
Concreting (existing gravel road), Mahanub - Poyawon Road 228,000,000Concreting of Bayang - Marogong Road, Lanao del Sur 2nd LD 360,000,000Concreting of Buldon-Butig Road, Butig, Lanao del Sur 2nd LD 180,000,000Concreting of By Pass Road, Brgy. Parang to Naujan Proper, Calapan City-Naujan, Mindoro Oriental
180,000,000
Concreting of Dicalungan - Eka - Kakal - Dimaampao - Sapakan - Pidsandawan - Bakat Road (Phase 2), Ampatuan, Maguindanao 2nd LD
220,500,000
Concreting of Ligawasan Provincial Road (Phase 3), Rajah Buayan-Shariff Saidona-Datu Piang-Kabuntalan, Maguindanao 2nd LD
252,000,000
Concreting of Maimbung-Ipil-Bilaan Road (Phase II), Maimbung/Talipao, Km 19+400 - Km 28+400, Sulu 1st LD
180,000,000
Concreting of Maimbung-Parang Road (Phase III), Maimbung/Parang Km 26+600 - Km 34+800, Sulu 1st LD
164,000,000
Concreting of Nabalawag - Buldon Road, Buldon, Maguindanao 1st LD
276,000,000
Concreting of Road, Road rehabilitation from Junction National Highway, Brgy. Banlag, Monkayo - Brgy. Kidawa, Laak (Provincial Road), Compostela Valley (1st and 2nd Congressional Districts)
200,000,000
Concreting of Sugala - Tarawakan - Marang Marang - Tumahubong - Minaring Road, Panglima Sugala, Tawi-Tawi Lone District
225,000,000
Construction of Access Roads leading to Provincial Hospitals 407,809,000Construction of Alimanguan-Binga Road, San Vicente, Palawan 1st LD 254,800,000Construction of Balulang-Macasandig Bridge and Access road, Cagayan de Oro City 2nd LD
285,000,000
Construction of Cabadbaran-Puting Bato-Lanuza Road, Lanuza, Surigao del Sur 1st LD
200,000,000
Construction of Macabalan-Bonbon Bridge and Access Road, Cagayan de Oro City 2nd LD
384,259,000
Construction of Tinago Pre-Stressed Concrete Girder Bridge w/River Control & Dredging (120 linear meters), Malimono, Surigao del Norte
200,000,000
Construction/Concreting of Access Road including Camandag Bridge from Jct. National Road, Brgy. Bucari to Brgy. Camandag leading to Imoy Falls, Iloilo 2nd LD
160,000,000
Construction/Opening of Road, Brgy. Lokilokon (Paranas)-Lawaan-Concepcion-Canligues-Paco-Calapi-Hinaca-an-Caranas-Babaclayon-Hiduroma-Hilumot-San Jose De Buan-Canaponte-San Nicolas-Sitio Salvacion-Aguingayan-Gusa, Samar
310,000,000
Construction/Opening of Road, Construction of Bugay-Guiguinta-Bugtusan-Mabini-Taylor-Victory-El Empon-Poponton- Cuenco Road, Las Navas, Northern Samar
199,000,000
Construction/Rehabilitation of Various Projects in Maguindanao 1st LD 150,000,000Construction/Rehabilitation of Various Projects in Maguindanao 2nd LD 150,000,000Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Nationwide Allocation
5,000,000
Jolo Island Circumferential Roads, Concreting of Patikul-Panamao Road (Phase II), Km 22+000 - Km 35+000, Sulu 1st LD
260,000,000
Jolo Island Circumferential Roads, Reconstruction of Liang-Tagbak Road, Patikul Km 3+900 - Km 10+900, Sulu 1st LD
154,000,000
Luuk - Panamao - Patikul Circumferential Road, Sulu 2nd LD 220,000,000Mindanao Logistics Infrastructure Network 776,729,000Opening/Construction of Road, Opening/Construction of Brgy. Manurigao-Boundary Baganga
179,100,000
Rehabilitation/Improvement of Road, Brgy. Lokilokon (Paranas)-Lawaan-Concepcion-Canligues-Paco-Calapi-Hinaca-an-Caranas-Babaclayon-Hiduroma-Hilumot-San Jose De Buan-Canaponte-San Nicolas-Sitio Salvacion-Aguingayan-Gusa, Samar
207,500,000
Road Opening, Opening of Piasusuan - Binugsayan Road 200,000,000Road Opening, Opening of Tagugpo - Piasusuan Road 159,700,000Road Rehabilitation, Rehabilitation of San Luis-Binicalan Road (Phase 3), San Luis, Agusan del Sur
280,000,000
NCR Regional Office 150,000,000Construction/Repair/Rehabilitation of Road, Buendia to Arandia Streets, Brgy. Tunasan, Muntinlupa City
50,000,000
Improvement/Concreting of Mindanao Extension, Quezon City 5th LD 50,000,000Improvement/Concreting of Zabarte Road, Quezon City 5th LD 50,000,000
Las Piñas-Muntinlupa DEO 9,500,000Construction/Repair/Rehabilitation of Road, Soldiers Hills 3,000,000Construction/Repair/Rehabilitation of Road, Victoria Homes, Brgy. Tunasan, Muntinlupa City
6,500,000
Metro Manila 1st DEO 238,986,000Construction of Road and Drainage System at Sto. Rosario St., Mandaluyong City 16,000,000
Construction of roads at Blocks 6, 36, 39 and vicinity (concreting/drainage system), Brgy. Addition Hills, Mandaluyong City
10,000,000
Improvement (Concreting/Drainage System) at Block 38 and vicinity, Brgy. Addition Hills, Mandaluyong City
7,500,000
Rehabilitation of Road Network along Japan Street and vicinity, Marikina City 2nd LD 20,000,000
Rehabilitation of Road Network along Spain Street and vicinity, Marikina City 2nd LD 20,000,000
Rehabilitation of Road Network at Mira Verde Subd., Brgy. Nangka, Marikina City 2nd LD
20,000,000
Rehabilitation of Road Network at Tierra Vista Subd., Brgy. Nangka, Marikina City 2nd LD
10,000,000
Repair of Potholes and Asphalt Overlay of the Road Network inside the compound of DOST Complex, Gen. Santos Avenue, Bicutan, Taguig City
15,486,000
Repair/Rehabilitation of G. Fernando and vicinity, Brgy. San Roque & Brgy. Sta. Elena, Marikina City 1st LD
40,000,000
Repair/Rehabilitation of General F. Santos St. and vicinity, Brgy. Kalumpang, Marikina City 1st LD
30,000,000
Page 117 of 162
details of dpwh’s programs/projects 1017
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Repair/Rehabilitation of N. Roxas St., and vicinity, Brgy. San Roque and Brgy. Kalumpang, Marikina City 1st LD
20,000,000
Repair/Rehabilitation of Road Network at Anastacia Subd., Brgy. Nangka, Marikina City 2nd LD
10,000,000
Repair/Rehabilitation of Road Network at Brgy. Concepcion Dos, Marikina City 2nd LD
20,000,000
Metro Manila 2nd DEO 30,000,000Rehabilitation/Improvement & Upgrading of J.P. Rizal St., & Its Vicinity (Xyris St. to South Sea St.) Brgy. Rizal, Makati City 2nd LD
15,000,000
Rehabilitation/Improvement & Upgrading of Martinez & Woodpecker St., & Its Vicinity, Brgy. Rizal, Makati City 2nd LD
15,000,000
Quezon City 1st DEO 273,490,000Construction of Bridge at GK/ Brookside Area 5 (Bonifacio Extension going to Sitio Bakal), Quezon City 2nd LD
15,000,000
Construction of Bridge at Sitio Pugot (Barangay Payatas leading to San Lorenzo Ruiz Street), Quezon City 2nd LD
15,000,000
Construction of Bridge at Upna Road 6 Kumunoy, Quezon City 2nd LD 25,000,000Improvement/Concreting of Ascension Street, Brgy. Greater Lagro, Quezon City 5th LD
10,000,000
Improvement/Concreting of Belfast Street, Quezon City 5th LD 20,000,000Improvement/Concreting of Chestnut Street, Quezon City 5th LD 20,000,000Improvement/Concreting of Dahlia Street, Quezon City 5th LD 10,000,000Improvement/Concreting of Maligaya Street, Quezon City 5th LD 30,000,000Improvement/Concreting of P. Dela Cruz, Brgy. San Bartolome, Quezon City 5th LD 10,000,000
Repair/Rehabilitation of Baler St., Quezon City 1st LD 15,000,000Repair/Rehabilitation of Banawe St., Quezon City 1st LD 20,000,000Repair/Rehabilitation of D. Tuazon St., Quezon City 1st LD 20,000,000Repair/Rehabilitation of House of Representatives Road Network Project, Quezon City 2nd LD
8,490,000
Repair/Rehabilitation of Judge Juan Luna St., Quezon City 1st LD 20,000,000Repair/Rehabilitation of NS Amoranto St., Quezon City 1st LD 15,000,000Repair/Rehabilitation with drainage of Mayon St., Quezon City 1st LD 20,000,000
Region I 153,216,000Regional Office I 90,100,000
Upgrading/Completion of Caniaw Communication Road (Phase IV & V) including drainage system and stone masonry works (Phase I & II), Bantay, Ilocos Sur
90,100,000
Ilocos Sur 1st DEO 14,116,000Concreting of Municipal Road at Poblacion (Processional Road), Bantay, Ilocos Sur 4,554,000
Construction of Guimod-Capangdanan Farm-to-Market Road, Bantay, Ilocos Sur 9,562,000
Ilocos Sur 2nd DEO 20,000,000Concreting of Farm-To-Market Road along Brgy. Cappa-Cappa-Ansad Road, San Esteban, Ilocos Sur
1,600,000
Concreting of Farm-To-Market Road, Brgy. Ansad, San Esteban, Ilocos Sur 3,800,000Concreting of Farm-To-Market Road, Brgy. Cappa-Cappa, San Esteban, Ilocos Sur 4,600,000
Concreting of Lubong-Suagayan-Sabuanan FMR, Sta. Lucia, Ilocos Sur 5,000,000Concreting of Salvador-Langlangca FMR, Candon City, Ilocos Sur 5,000,000
Pangasinan 3rd DEO 29,000,000Rehabilitation/Upgrading of Cayambanan-Nancalobasaan Provincial Road, Urdaneta City, Pangasinan
29,000,000
Cordillera Administrative Region 40,000,000Mountain Province DEO 40,000,000
Construction of RCDG Bridge , Construction of Besao, Mt. Province-Tubo, Abra Bridge 1, Tamboan, Mountain Province
25,000,000
Construction of Slab Bridge, Construction of Besao, Mt. Province-Tubo, Abra Bridge 2, Tamboan, Mountain Province
15,000,000
Region II 71,700,000Batanes DEO 71,700,000
Improvement of Vayang Rolling Hills Road, Batanes 35,700,000Improvement/Rehabilitation/Upgrading of Tukon-Radar Road, Batanes 36,000,000
Region III 661,838,000Regional Office III 200,000,000
Access Road leading to Biak na Bato and Northwoods Country Club, Viola Highways, San Rafael, Bulacan
50,000,000
Construction/Rehabilitation/Improvement of Minuyan-Poblacion Roads leading to Sports Arena, San Jose Del Monte City, Bulacan
50,000,000
Construction/Rehabilitation/Improvement of Road leading to Sapang Palay Sport Complex, San Jose Del Monte City, Bulacan
50,000,000
Construction/Rehabilitation/Improvement of Roads, Paradise Farm, Tungkong Mangga, San Jose Del Monte City, Bulacan
50,000,000
Bulacan 1st DEO 255,098,000Rehabilitation of Roads, Brgy. Igulot - Brgy. Biñang 1st, Brgy. Turo, Bocaue, Bulacan 36,674,000
Rehabilitation of Roads, Taal-Tambubong-Sta. Maria By-Pass Road, Bocaue, Bulacan 48,424,000
Repair/Rehabilitation/Improvement of Balucuc-Pulilan Road, Pulilan, Bulacan 20,000,000Upgrading/Improvement of Bulusan-Sta. Lucia Road, Calumpit, Bulacan 20,000,000Upgrading/Improvement of Hagonoy-San Nicolas-Sto. Rosario Road, Calumpit, Bulacan 1st LD
25,000,000
Upgrading/Improvement of Malolos-Paombong-Hagonoy-Calumpit Road, San Agustin, Hagonoy, Bulacan 1st LD
15,000,000
Upgrading/Improvement of Malolos-Paombong-Hagonoy-Calumpit Road, San Juan & San Miguel Section, Hagonoy, Bulacan 1st LD
25,000,000
Upgrading/Improvement of Road at San Jose-Sta. Monica, Hagonoy, Bulacan 30,000,000
Page 118 of 162
1018 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Upgrading/Improvement of San Agustin-Meyto-Panducot Road, Calumpit, Bulacan 1st LD
20,000,000
Upgrading/Improvement of San Agustin-Meyto-Panducot Road, Hagonoy, Bulacan 1st LD
15,000,000
Bulacan 2nd DEO 120,000,000Construction/Rehabilitation/Improvement of Igay-San Isidro-Montalban Roads, San Jose Del Monte City, Bulacan
30,000,000
Construction/Rehabilitation/Improvement of Roads, Brgy. Kaypian, San Jose Del Monte City, Bulacan
30,000,000
Construction/Rehabilitation/Improvement of Roads, Brgy. Poblacion, San Jose Del Monte City, Bulacan
20,000,000
Construction/Rehabilitation/Improvement of Roads, Brgy. Sto. Cristo,San Jose Del Monte City, Bulacan
20,000,000
Construction/Upgrading of Local Road (MNR-Saluysoy Road), Saluysoy, Marilao, Bulacan
10,000,000
Rehabilitation/Improvement of Caingin-Lawa Road, Meycauayan City, Bulacan 10,000,000
Nueva Ecija 2nd DEO 10,000,000Rehabilitation of Brgy. Road, Sta. 0+000 - Sta. 1+500, Maugat, San Antonio, Nueva Ecija
10,000,000
Pampanga 1st DEO 60,000,000Concreting of Road from Jose Abad Santos Avenue along Del Carmen-Balimbing Creek to Brgy. San Jose, San Fernando City, Pampanga 3rd LD
15,000,000
Improvement/Reconstruction of Roads, Drainage Canal including the covered walkway at Diosdado Macapagal Government Center, Maimpis, San Fernando City, Pampanga 3rd LD
25,000,000
Repair/Rehabilitation/Improvement of Balucuc Road including Road Reblocking, Apalit, Pampanga 4th LD
10,000,000
San Fernando-Lubao Road- Rehab. of Access Road between San Fernando-Lubao Road & GSO Road including Drainage, Pampanga 3rd LD
10,000,000
Tarlac 2nd DEO 16,740,000Construction/Rehabilitation of Brgy. Guevarra (Sitio Kabyawan) Farm-to-Market Road with Slope Protection, La Paz, Tarlac
16,740,000
Region IV-A 251,000,000Regional Office IV-A 201,000,000
Construction of Carmona Bypass Road with Drainage, Laguna 1st LD 61,000,000Construction/Opening of a Detour Road, Municipality of Nasugbu, Batangas 140,000,000
Laguna 2nd DEO 50,000,000Concreting of FMR, Brgy. Dela Paz, Laguna 1st LD 17,000,000Concreting/Rehabilitation of Road, Brgy. Ganado, Laguna 1st LD 18,000,000Concreting/Rehabilitation of Road, Brgy. Tagapo, Laguna 1st LD 15,000,000
Region IV-B 305,000,000Regional Office IV-B 150,000,000
Concreting of the Army Road (Bagubag-Sorville-Gozar-Binakas) leading to PAF Gozar Radar Station in Mt. Ambulong, Brgy. Sorville, Lubang, Mindoro Occidental
100,000,000
Construction of Road from CBNR Junction to Calauit Safari Park, Busuanga, Palawan 1st LD
50,000,000
Marinduque DEO 5,000,000Concreting of Tiguion-Talao FMR, Brgy. Tiguion, Gasan, Marinduque 5,000,000
Mindoro Occidental DEO 150,000,000Rehabilitation/Concreting of Burol Road, Lubang, Mindoro Occidental 16,000,000Rehabilitation/Concreting of Frenza Road, Lubanga, Mindoro Occidental 43,000,000Rehabilitation/Concreting of Tangal-Bansalaguin-Tumibo Road, Lubang, Mindoro Occidental
35,000,000
Rehabilitation/Concreting of Tangal-Longos-Tagbac Road, Lubang, Mindoro Occidental
17,000,000
Rehabilitation/Concreting of Tangal-Putat-Tambo Road, Lubang, Mindoro Occidental 39,000,000
Region V 73,071,000Albay 2nd DEO 37,321,000
Rehabilitation/Improvement of Cotmon-Solong-Calbidongon Farm-to-Market Road, Municipality of Camalig, Albay
26,801,000
Rehabilitation/Improvement of Quirangay-Sua-Tumpa Farm-to-Market Road, Municipality of Camalig, Albay
10,520,000
Albay 3rd DEO 35,750,000Concreting of Road, Concreting of Sinungtan-Palanas Road, Guinobatan, Albay 16,750,000
Concreting/Rehabilitation of Road, Concreting/Rehabilitation/Improvement of Sinungtan-Batbat Road, Guinobatan, Albay
19,000,000
Region VI 49,500,000Iloilo 4th DEO 49,500,000
Construction/Improvement of Poblacion, Alimodian-Brgy. Taban-Manquining to Agony Hill, Alimodian, Iloilo 2nd LD
5,000,000
Rehabilitation/Improvement of Road with Drainage and Sidewalk of Western Visayas Sanitarium Hospital, Sta. Barbara, Iloilo 2nd LD
9,500,000
Road Improvement at Tourism Site, Brg. Bucari (Tabuanan Reforestation Area), Iloilo 2nd LD
35,000,000
Region VII 1,689,541,000Regional Office VII 1,388,810,000
Concreting of Guirellero St. leading to Pacific Cebu Resort Road, Suba-Basbas, Lapu-Lapu City
50,000,000
Concreting/Improvement of Bantayan-Madridejos Road Section, Cebu 295,620,000Concreting/Improvement of Cogon-Cantumog-Corte Road Section, Cebu 81,950,000Concreting/Improvement of Libertad-Poblacion-Teguis Road Section, Cebu 174,140,000Concreting/Improvement of Luka-Tumalog-Canang Road Section, Cebu 78,370,000
Page 119 of 162
details of dpwh’s programs/projects 1019
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Concreting/Improvement of Madridejos-Bantayan Road Section, Cebu 201,590,000Concreting/Improvement of Poblacion-McArthur-Bukilat Road Section, Cebu 126,480,000Concreting/Improvement of San-Isidro-Ylaya-Cabatbatan Road Section, Cebu 77,630,000
Concreting/Improvement of Sta. Fe-Bantayan Road Section, Cebu 122,550,000Improvement/Rehabilitation of Buyong-Maribago Road leading to Cebu Beach Club, Costabella, Tambuli Seaside Living, Lapu-Lapu City
50,000,000
Improvement/Rehabilitation of Road at Brgy. Mactan leading to Mactan Shrine, Lapu-Lapu City
50,000,000
Reconcreting/Improvement of Dayhagon-Lamintak Road Section, Cebu 80,480,000
Bohol 1st DEO 26,541,000Improvement of Access Road leading to New Transfer Site, Cortes, Bohol, Governor Celestino Gallares Memorial Regional Hospital, Tagbilaran City, Bohol 1st LD
26,541,000
Cebu 2nd DEO 18,550,000Concreting/Improvement of Mainiit Spring Road Section, Cebu 18,550,000
Cebu 3rd DEO 83,840,000Concreting/Improvement of Mangga-Sto Niño Road Section, Cebu 49,290,000Concreting/Improvement of Poblacion-Boho Road Section, Cebu 34,550,000
Cebu 4th DEO 67,700,000Concreting/Improvement of Montaneza Mainit Spring Road, Cebu 22,680,000Concreting/Improvement of Poblacion-Saavedra Road Section, Cebu 45,020,000
Cebu 5th DEO 91,100,000Concreting/Improvement of Cabungaan-Esperanza Road Section, Cebu 49,840,000Concreting/Improvement of Poblacion-General Road Section, Cebu 41,260,000
Cebu 6th DEO 13,000,000Improvement of Road leading to Buot Causeway in Punta Engaño, Lapu-Lapu City 10,000,000
Improvement/Rehabilitation of Angasil-Shangrila Road leading to Punta Engaño resorts, Lapu-Lapu City
3,000,000
Region VIII 1,527,250,000Regional Office VIII 1,254,000,000
Concrete Paving of Road, Completion (Concreting) of the Imelda, Lapinig to Jipapad ES Road (Phase 5), Jipapad, Eastern Samar
50,000,000
Concreting of Farm-to-Market Road, Brgy. Gajo-Brgy. Cinco, Sta. Margarita, Samar 1st LD
50,000,000
Const. of RCDG Bridge & Approaches (1 Br.), Construction of Mondragon - Silvino Lubos Road (Phase 6), Mondragon, Northern Samar
95,000,000
Const./Opening/Concrete Paving of Road, Construction of Lope de Vega - Silvino Lubos Road (Phase 4), Lope de Vega, Northern Samar; Length = 12 kms.
100,000,000
Construction of Bridge, Brgy. Lokilokon (Paranas)-Lawaan-Concepcion-Canligues-Paco-Calapi-Hinaca-an-Caranas-Babaclayon-Hiduroma-Hilumot-San Jose De Buan-Canaponte-San Nicolas-Sitio Salvacion-Aguingayan-Gusa, Samar
150,000,000
Construction of Bridge, Poblacion (Motiong) - New Minarog-Maypange-Candumacol-Bunga-Angyap-Pusongan-Canliguis, Samar
77,000,000
Construction of Gandara-Matuguinao Road, Sta. 0+000 - Sta. 22+000, Samar 1st LD 100,000,000
Construction of RCBC (Single Barrel), Construction of Bugay-Guiguinta-Bugtusan-Mabini-Taylor-Victory-El Empon-Poponton- Cuenco Road, Las Navas, Northern Samar
120,000,000
Construction of RCDG Bridge and Approaches, Construction of Jipapad Bridge located at Brgy. 1 Poblacion (96.80 linear meters) (Phase 2), Jipapad, Eastern Samar
100,000,000
Construction of Sto. Rosario-Villaba Diversion Road, leading to Hibulangan Small Reservoir Irrigation Project, Villaba, Leyte
60,000,000
Construction/Opening of Road, 33km road traversing Matuguinao proper-Mahanud-Angyap-Deit-Libertad-Mahayag-Rizal-Inubod-Carolina-San Roque-Ligaya-Del Rosario (Matuguinao)-Poponton (Las Navas), Samar (Western Samar)
100,000,000
Construction/Opening of Road, Concreting of a Section of Can-avid Town to Malogo, Brgy. Can-ilay (Phase 4), Can-Avid, Eastern Samar
92,000,000
Rehabilitation/Improvement of Road, Poblacion (Can-avid)-Mabuhay-Salvacion, Eastern Samar
80,000,000
Rehabilitation/Improvement of Road, Poblacion (Motiong) - New Minarog-Maypange-Candumacol-Bunga-Angyap-Pusongan-Canliguis, Samar
80,000,000
Eastern Samar DEO 40,000,000Construction/Opening of Road, Camantang-Jepaco, Can-avid Access Road, Eastern Samar
40,000,000
Leyte 4th DEO 49,500,000Concreting of Brgy. Antipolo-Brgy. Salvacion FMR, Brgy. Antipolo, Albuera, Leyte 33,000,000
Concreting of Brgy. Balugo-Brgy. Mahayahay FMR, Brgy. Balugo & Brgy. Mahayahay, Albuera, Leyte
16,500,000
Northern Samar 1st DEO 5,000,000Const./Opening/Concrete Paving of Road, Construction of Mondragon - Silvino Lubos Road (Phase 6), Mondragon, Northern Samar
5,000,000
Northern Samar 2nd DEO 40,000,000Construction of RCDG Bridge (1 Bridge), Construction of Bugay-Guiguinta-Bugtusan-Mabini-Taylor-Victory-El Empon-Poponton- Cuenco Road, Las Navas, Northern Samar
40,000,000
Samar 1st DEO 40,000,000Concreting of Road, Brgy. Cacaransan-Brgy. Saputan, Calbayog City, Samar 1st LD 40,000,000
Samar 2nd DEO 45,000,000
Page 120 of 162
1020 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Opening of Road, Poblacion (Motiong) - New Minarog-Maypange-Candumacol-Bunga-Angyap-Pusongan-Canliguis, Samar
45,000,000
Southern Leyte DEO 40,000,000Construction of Lilo-an-San Ricardo Circumferential Road, San Ricardo, Southern Leyte Lone District
40,000,000
Tacloban City DEO 13,750,000Construction and Relocation of Access Road from National Highway leading to DOH Philippine Institute of Traditional Alternative Health Care Building (along National Road), Brgy. Cabalawan, Tacloban City (Length = 404.61, Thickness = 0.28m, Width = 6.70m)
8,507,000
Construction and Relocation of Access Road from National Highway leading to DOH Philippine Institute of Traditional Alternative Health Care Building (including of Construction of Slope Protection) Brgy. Cabalawan, Tacloban City (Length = 219.56m, Thickness = 0.23m, Width = 6.10m)
5,243,000
Region IX 4,368,900,000Regional Office IX 4,114,400,000
Concreting from Babag - Boloh Boloh - Suligan Road, Tabuan Lasa , Basilan Lone District
42,000,000
Concreting from Baguindan - Silangkum - Matata Road, Tipo-Tipo Phase II, Basilan Lone District
28,000,000
Concreting from Balobo - Danit Puntukan - Bulingan - Bohe Yakan Road, Lamitan City, Basilan Lone District
56,000,000
Concreting from Bohe Bakung - Mangalut - Mangguso Road, Akbar, Basilan Lone District
42,000,000
Concreting from Isabela Highway - Begang - Baluno Road, Isabela City, Basilan Lone District
84,000,000
Concreting from Lamitan Highway - Limook - Balobo - Bulingan Road and Tourism Dev. , Lamitan City Phase IV, Basilan Lone District
70,000,000
Concreting from Lamitan Highway - Maloong San Jose - Maloong Canal Road, Lamitan City, Basilan Lone District
42,000,000
Concreting from Lamitan Highway - Sta. Clara - Tumakid Road, Lamitan City (Phase II), Basilan Lone District
42,000,000
Concreting from Lamitan Highway - Ubit - Buahan - Calugusan - Luksumbang Road, Lamitan City, Basilan Lone District
56,000,000
Concreting from Lamitan Highway-Lumutun-Look-Arco-Bohe Sapa Road, Lamitan City, Basilan Lone District
42,000,000
Concreting from Lantawan Highway - Pamucalin - Parian Baunoh - Canibungan Road, Lantawan (Phase II), Basilan Lone District
56,000,000
Concreting from Lower Sinangkapan - Upper Sinangkapan Road, Akbar (Phase II), Basilan Lone District
21,000,000
Concreting from Sumisip Highway - Mangal-Tolong Road, Sumisip, Basilan Lone District
21,000,000
Concreting from Tairan - Bagbagen Road, Lantawan, Basilan Lone District 42,000,000Concreting from Tairan - Lawila Road, Lantawan (Phase II), Basilan Lone District 15,400,000
Concreting from Tipotipo Highway - Badja - Danit - Simbangon road, Tipo-tipo, Basilan Lone District
44,800,000
Concreting from Ungkaya Pukan Highway - Puno Bohepahu Road, Ungkaya Pukan, Basilan Lone District
14,000,000
Concreting of Ambutong Road, Sibutu, Tawi-Tawi Lone District 14,000,000Concreting of Andalan - Huwit-Huwit Road, Omar, Sulu 2nd LD 14,000,000Concreting of Andalan - Sucuban Road, Omar, Sulu 2nd LD 14,000,000Concreting of Angilan - Niangkaan Road, Omar, Sulu 2nd LD 56,000,000Concreting of Bakong Tubig indangan Road, Simunul, Tawi-Tawi Lone District 10,000,000Concreting of Balagtasan - Tumakid Road, Lamitan City (Phase II), Basilan Lone District
42,000,000
Concreting of Balas Junction To Calugusan Coastal Road, Lamitan City, Basilan Lone District
28,000,000
Concreting of Baligtang - Sibaud Proper Road, Pandami, Sulu 2nd LD 14,000,000Concreting of Bangcuang - Bohe Baka Road, Tipo-tipo, Basilan Lone District 42,000,000Concreting of Basak - Bacung Road, Sumisip, Basilan Lone District 35,000,000Concreting of Batu-Batu - Kulape Road, Panglima Sugala, Tawi-Tawi Lone District 14,000,000
Concreting of Batu-Batu - Parangan Road, Panglima Sugala, Tawi-Tawi Lone District 144,000,000
Concreting of Bikad - Upper Mahalu Road, Mapun, Tawi-Tawi Lone District 11,000,000Concreting of Bohe Pahu-National Highway, Ungkaya Pukan, Basilan Lone District 28,000,000
Concreting of Bohe Sallang Road, Sibutu, Tawi-Tawi Lone District 28,000,000Concreting of Brgy Kagay - Malimbaya Road, Indanan, Sulu 1st LD 14,000,000Concreting of Brgy Kagay - Sawaki - Taran - Kuppong Road, Indanan, Sulu 1st LD 14,000,000
Concreting of Brgy Kan Islam Road Phase II, Indanan, Sulu 1st LD 14,000,000Concreting of Brgy Lihbug Kabaw from National Road - Masjid P. Estino, Sulu 2nd LD 14,000,000
Concreting of Brgy Road Sitio Bulaghaw - Sitio Taluk Taluk Capual, Omar, Sulu 2nd LD
62,000,000
Concreting of Brgy. Kalang - Brgy. Puok, Tapul, Sulu 2nd LD 14,000,000Concreting of Brgy. Kamaunggi to Brgy. Puok, Tapul, Sulu 2nd LD 14,000,000Concreting of Brgy. Pitogo Road, K. Caluang, Sulu 2nd LD 14,000,000Concreting of Brgy. Road Sitio Lumagtih - Tangkuan, Omar, Sulu 2nd LD 28,000,000Concreting of Brgy. Sumambat to Brgy. Pangdan,Tapul, Sulu 2nd LD 14,000,000Concreting of Brgy. Suuh - Brgy. Sayaw Sayaw, Panamao, Sulu 2nd LD 14,000,000Concreting of Brgy.Road Sitio Pati Bud Lahing Lahing - Patutol, Omar, Sulu 2nd LD 28,000,000
Concreting of Bualo-Lapa Road, Maimbung, Sulu 1st LD 14,000,000Concreting of Bukt Umus - Balanting Road, Tabuan Lasa, Basilan Lone District 42,000,000
Concreting of Bulibuli Road, Sumisip (Development Plan), Basilan Lone District 42,000,000
Concreting of Buton - Kepeng Road, Tandubas, Tawi-Tawi Lone District 33,000,000Concreting of Danlog - Sibakloon Road, Tandubas, Tawi-Tawi Lone District 7,000,000Concreting of Darulakram - Sikullis Circumferential Road, Languyan, Tawi-Tawi Lone District
41,800,000
Concreting of Darussalam Fish Port Road, Languyan, Tawi-Tawi Lone District 11,900,000Concreting of Datu Amilhamja Jaafar - Talisay Road, Sibutu, Tawi-Tawi Lone District 11,200,000
Page 121 of 162
details of dpwh’s programs/projects 1021
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Concreting of Fr. Echavez Road, Batu-Batu, Panglima Sugala, Tawi-Tawi Lone District
11,200,000
Concreting of Gaggil - Seit Higad Road, Panamao, Sulu 2nd LD 14,000,000Concreting of Golden Harvest - Tairan Road, Lantawan (Phase II), Basilan Lone District
28,000,000
Concreting of Gupah - BatutaiRoad, Mapun, Tawi-Tawi Lone District 11,000,000Concreting of Kaha-Alu Layag Road, Parang, Sulu 1st LD 28,000,000Concreting of Kamagong Road, Bongao, Tawi-Tawi Lone District 5,000,000Concreting of Kamamburingan-Bohe Pahu, Ungkaya Pukan, Basilan Lone District 42,000,000
Concreting of Kan Asali - Puhagan - Kamalig Road, Panamao, Sulu 2nd LD 14,000,000Concreting of Kan Lagay - Pitogo Road, Kalingalan Caluang, Sulu 2nd LD 18,000,000Concreting of Kan Muni - Lianutan Road, Omar, Sulu 2nd LD 14,000,000Concreting of Kan Muni -Piyayo Road, Omar, Sulu 2nd LD 49,000,000Concreting of Kan Salasain - Samak - Sanao Road, Luuk, Sulu 2nd LD 14,000,000Concreting of Karungdong - Pitogo Road, Kalingalan Caluang, Sulu 2nd LD 66,000,000Concreting of Lahing-Lahing - KalianTanah, Omar, Sulu 2nd LD 28,000,000Concreting of Lambago - Masjid Bayli - Pang Road Phase II, Kalingalan Caluang, Sulu 2nd LD
14,000,000
Concreting of Laminusa Road Phase II, Siasi, Sulu 2nd LD 28,000,000Concreting of Lapid Lapid - Silubbog Road, Bongao, Tawi-Tawi Lone District 88,000,000Concreting of Liang Spring Road, Patikul, Sulu 1st LD 20,000,000Concreting of Look Datan Road, Simunul, Tawi-Tawi Lone District 21,000,000Concreting of Lugus Proper Huwit Huwit Road, Lugus, Sulu 2nd LD 28,000,000Concreting of Lumbang, Isabela City - Mahayahay, Maluso, Basilan Lone District 84,000,000
Concreting of Mahalu - Boki Road, Mapun, Tawi-Tawi Lone District 44,000,000Concreting of Malassa Road, Bongao, Tawi-Tawi Lone District 42,000,000Concreting of Maluso Town Proper, Maluso, Basilan Lone District 23,000,000Concreting of Manukmangkaw Road, Simunul, Tawi-Tawi Lone District 25,000,000Concreting of Matatal-Anak Jati Road, Maimbung, Sulu 1st LD 14,000,000Concreting of Mebak - Bukbuk Road, Sumisip, Basilan Lone District 42,000,000Concreting of MSU Access Road, Mapun, Tawi-Tawi Lone District 7,000,000Concreting of North Larap - Tandu Diwata Road, Sitangkai, Tawi-Tawi Lone District 21,000,000
Concreting of Nunukan - Sibutu Proper Road, Sibutu, Tawi-Tawi Lone District 5,600,000Concreting of Parang Pantay-Kulakula Road, Languyan, Tawi-Tawi Lone District 88,000,000
Concreting of Parian Baunuh - Kasawi - Baungis, Lantawan, Basilan Lone District 42,000,000
Concreting of Pawan Road, Mapun, Tawi-Tawi Lone District 5,000,000Concreting of Provincial Road along Brgy. Delusom-Tinuyop, Municipality of Leon B. Postigo, Zamboanga del Norte
50,000,000
Concreting of Provincial Road along Calican-Villarico, Piñan, Zamboanga del Norte 50,000,000
Concreting of Saimbangun Road Phase II, Pata, Sulu 2nd LD 21,000,000Concreting of Sallangan - Buton Road, Tandubas, Tawi-Tawi Lone District 7,000,000Concreting of Sallangan - Kepeng Road, Tandubas, Tawi-Tawi Lone District 14,000,000Concreting of Sallangan - Sapa Road, Tandubas, Tawi-Tawi Lone District 14,000,000Concreting of Sapa-Tandubas Proper Road, Tandubas, Tawi-Tawi Lone District 11,000,000
Concreting of Siasi Port-Sablay Raod, Siasi, Sulu 2nd LD 50,000,000Concreting of Siasi Proper Road/Boulevard, Siasi, Sulu 2nd LD 14,000,000Concreting of Sigumbal Road, Tongkil, Sulu 2nd LD 10,800,000Concreting of Sikullis Fish Pond Road, Languyan, Tawi-Tawi Lone District 21,000,000Concreting of Simbahan Road, Pangutaran, Sulu 1st LD 14,000,000Concreting of Sironggon - Mangalut Road, Hadji Mohammad Ajul , Basilan Lone District
42,000,000
Concreting of Sitio Kandurah - Sitio Kanjarera Brgy. Niog Niog, Luuk, Sulu 2nd LD 28,000,000
Concreting of Sitio Kansimba - Sitio Kanbusi,Brgy Tubig Putih, Luuk, Sulu 2nd LD 35,000,000
Concreting of Sitio Kungan - Brgy. Tubig Putih Road, Luuk, Sulu 2nd LD 28,000,000Concreting of Sitio Lio Proper Subah-Subah Pandami, Sulu 2nd LD 14,000,000Concreting of Sitio madraza to Burgos, Basilan Lone District 42,000,000Concreting of Sitio Masjid Duguhan - Brgy. Lianutan, Luuk, Sulu 2nd LD 28,000,000Concreting of Sta. Barbarra - Lukbuton (White Beach), Basilan Lone District 70,000,000Concreting of Sta. Barbarra - Lukbuton Road, Malamawi, Isabela City, Basilan Lone District
70,000,000
Concreting of Sta. Busay - Tabiawan Road, Isabela City, Basilan Lone District 56,000,000
Concreting of Suba-Suba Siganggang Road, Pandami, Sulu 2nd LD 28,000,000Concreting of Tabuh Pangdan-Sition Buhanginan, Omar, Sulu 2nd LD 28,000,000Concreting of Taganak Road, Turtle Island, Tawi-Tawi Lone District 10,000,000Concreting of Tagbak--Bud Daho Road, Indanan Km 4+800 - Km 6+800, Sulu 1st LD 20,000,000
Concreting of Tairan - Subaan, Lantawan , Basilan Lone District 28,000,000Concreting of Tanah Ipil Road, Sibutu, Tawi-Tawi Lone District 14,000,000Concreting of Tandu Bato Road, Sibutu, Tawi-Tawi Lone District 7,000,000Concreting of Tangkuan - Kan Ummal Road, Omar, Sulu 2nd LD 14,000,000Concreting of Tapian - Umus Mataha Road, Mapun, Tawi-Tawi Lone District 7,000,000Concreting of Tapian Bohe North Road, Sapa-Sapa, Tawi-Tawi Lone District 7,000,000Concreting of Tapian Bohe South Road, Sapa-Sapa, Tawi-Tawi Lone District 7,000,000Concreting of Tarawakan Road, Bongao, Tawi-Tawi Lone District 10,000,000Concreting of Taungoh - Sowang Maheya Road, Sibutu, Tawi-Tawi Lone District 15,400,000
Concreting of Tong Tampakan - Sollogan Road, South Ubian, Tawi-Tawi Lone District
14,000,000
Concreting of Tongbakkaw - Tandubas Proper Road, Tandubas, Tawi-Tawi Lone District
7,000,000
Concreting of Tongbangkaw Road, Tandubas, Tawi-Tawi Lone District 7,000,000Concreting of Tonggusong - North & South Larap Road, Sitangkai, Tawi-Tawi Lone District
21,000,000
Concreting of Tubig Boh - Nalil Road, Bongao, Tawi-Tawi Lone District 10,000,000Concreting of Tugas-Maligay Road, Patikul Km 2+500 - Km 7+500, Sulu 1st LD 100,000,000
Concreting of Ungus Matata - Sapa Road, Tandubas, Tawi-Tawi Lone District 14,000,000
Concreting of Unpaved Shoulder from Lamitan - Isabela (Baroy-Sta. Clara Section), Basilan Lone District
56,000,000
Concreting of Unpaved Shoulder from Lamitan-Campo Uno, Basilan Lone District 56,000,000
Page 122 of 162
1022 eXpeNditUre program fY 2016 VolUme ii
details of dpwh’s programs/projects 1023
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Concreting of Malungun Proper Road, Maguing, Lanao del Sur 1st LD 12,000,000Concreting of Matanog-Balabagan-Kapatagan Road, Lanao del Sur 2nd LD 108,000,000Concreting of Matling Road, Malabang, Lanao del Sur 2nd LD 12,000,000Concreting of Palao-Sugod Road, Bayang, Lanao del Sur 2nd LD 9,000,000Concreting of Pantao-Tapocan Road,Piagapo, Lanao del Sur 1st LD 12,000,000Concreting of Pawak - Salocod Road, Saguiaran, Lanao del Sur 1st LD 10,000,000Concreting of Poblacion-Batuan Road, Balabagan, Lanao del Sur 2nd LD 12,000,000Concreting of Poblacion-Lubo Municipal Road, Marantao, Lanao del Sur 1st LD 6,000,000
Concreting of Poblacion-Tringun Road, Lumbaca Unayan, Lanao del Sur 2nd LD 6,000,000
Concreting of Pugaan Road, Ditsaan Ramain, Lanao del Sur 1st LD 10,000,000Concreting of Ragayan-Poktan Road, Butig, Lanao del Sur 2nd LD 12,000,000Concreting of Romayas-Maribo-Buad Road, Lumba Bayabao, Lanao del Sur 1st LD 12,000,000
Concreting of Rumayas-Maribo-Buad Barangay Road, Lumba Bayabao, Lanao del Sur 1st LD
12,000,000
Concreting of Sheik Berua Provincial Road, Poona bayabao, Lanao del Sur 1st LD 18,000,000
Concreting of Tambo-Palao Road, Madamba, Lanao del Sur 2nd LD 12,000,000Concreting of Tangkal-Mindamdag-Proper-Malaganding Road, Tubaran, Lanao del Sur 2nd LD
12,000,000
Concreting of Tangkal-Paigoay-Guiarong Road, Tubaran, Lanao del Sur 2nd LD 12,000,000
Concreting of Tarik Road, Buadi Puso Buntong, Lanao del Sur 1st LD 12,000,000Concreting of Wao Provincial Road, Wao, Lanao del Sur 1st LD 25,200,000Concreting/Rehab of Bangon-Bacolod Chico Road, Marawi City, Lanao del Sur 1st LD 40,000,000
Concretring of Mantapoli-Picotaan Road, Lanao del Sur 2nd LD 6,000,000Const./Upgrading of Pitakus Road, Taraka, Lanao del Sur 1st LD 6,000,000Const/Rehab/Upgrading of Bucalan-Nat'l Road,Taraka, Lanao del Sur 1st LD 12,000,000Construction of Brgy. Samay-Ricorro-Lunotan Road, Gingoog City, Misamis Oriental 1st LD
50,000,000
Construction of Dilabayan - Luboga Mulondo Bdry Road, Taraka, Lanao del Sur 1st LD
12,000,000
Construction of Supangan-Kawit Road, Taraka, Lanao del Sur 1st LD 6,000,000Rehab./Repair of Banga Cabingan Road, Marawi City, Lanao del Sur 1st LD 40,000,000Rehabilitation of Malabang-Lanao del Norte Road, Balabagan-Malabang Section, Km 1926+000 - Km 1931+000 (with exception), Lanao del Sur 2nd LD
100,000,000
Rehabilitation of Marawi-Malabang Road, Tugaya Section, Km 1582+000 - Km 1587+000 (with exception), Lanao del Sur 2nd LD
50,000,000
Rehabilitation of Norhaya Village - Moncado Colony Road , Marawi City , Lanao del Sur 1st LD
20,000,000
Repair/Rehabilitation of Marawi-Masiu Road, K1589+701 - K1588+701, K1593+700 - K1597+370, Lanao del Sur 1st LD
75,000,000
Road for Tourism-Brgy. Banga National Highway km. 9 Mt. Spring Resort, Wao, Lanao del Sur 1st LD
30,000,000
Road Repair Lumbatan-Lumbaca Unayan Road (Poblacion Lumbatan Section), Lumbatan, Lanao del Sur 2nd LD
18,000,000
Road Upgrading (Gravel to Paved), Kapai-Tagoloan (Tagoloan Section), K1593+326.462 - K1607+656.462, Lanao del Sur 1st LD
75,000,000
Upgrading of Bypass Roads, Cagayan de Oro City 110,000,000
Bukidnon 1st DEO 125,830,000Construction of Bridge, Construction of Canangaan Bridge and Approaches including Access Road along Mandahican - Canangaan Road, Cabanglasan, Bukidnon
37,500,000
Construction of Bridge, Construction of Kinaputan Bridge and Approaches, Bontongon, Impsug-ong, Bukidnon
22,500,000
Construction of Bridge, Construction of Mandahican Bridge and Approaches including Access Road along Iba - Mandahican - Canangaan, Cabanglasan, Bukidnon
37,500,000
Construction of Bridge, Construction of Pulangi Bridge and Approaches, Sitio Ulayanon, Impasug-ong, Bukidnon
22,500,000
Construction of Spillway, Tagoloan River, Impasug-ong, Bukidnon 5,830,000
Bukidnon 3rd DEO 60,000,000Concreting of Road, Construction & Concreting of Sitio Impahanong to Sitio Cagahuman, Malitbog, Bukidnon
14,000,000
Concreting of Road, Construction & Concreting of Sitio Sabangaan - Sitio Moyong to Sitio Victory, Malitbog Bukidnon
16,000,000
Construction of Bridge, Construction of Itoy Bridge and Approaches at Cagahuman, Malitbog, Bukidnon
30,000,000
Cagayan de Oro City 2nd DEO 80,000,000Alternate Road to Berjaya Resettlement from Right side of Bolonsori Cemetery, Barangay Camaman-an, Cagayan de Oro City
20,000,000
Road Concreting for the Gusa Resettlement Area from Roa Property in Kamacawan, Gusa exit to J.R. Borja Extension, Barangay Gusa, Cagayan de Oro City
30,000,000
Road Concreting in the Macapaya Resettlement Site to Rosewood, Barangay Camaman-an, Cagayan de Oro City
30,000,000
Misamis Oriental 1st DEO 40,000,000Construction of Brgy. Binakalan-Capitulangan-Alagatan Road, Gingoog City, Misamis Oriental 1st LD
40,000,000
Region XI 1,401,800,000Regional Office XI 1,198,534,000
Concreting of Road and construction of drainage and slope protection, 19 km Road Concreting from National Junction Road Brgy Panikian - Brgy Maragatas (Phase 2), Davao Oriental (2nd Congressional District)
100,000,000
Concreting of Road with coconet slope protection and grouted slope protection, Road Concreting from JNH Brgy. San Miguel - Poblacion, Caningag, Davao Oriental(1st Congressional District)
60,000,000
Concreting of Road with coconet slope protection, Concreting of 7.44km Batawan Proper, Brgy. Batawan-Nursery, Brgy. Binondo, Davao Oriental (1st Congressional District)
148,800,000
Page 124 of 162
1024 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Concreting of Road with coconet slope protection, Concreting of Brgy. Proper to Sitio Mantapay, Binondo, Baganga, Davao Oriental (1st Congressional District)
75,000,000
Construction of Bridge including protection works (Slope Protection), Construction of Panaga Bridge and Slope Protection in Brgy. Colosas, Davao City (2nd Congressional District)
50,000,000
Construction of Bridge, Construction of Patil-Kapatagan 2-lane RCDG Bridge with slope protection (Revetment)
108,000,000
Improvement/Gravelling of Road, Rehabilitation/Improvement/Construction of Patil-Kapatagan Road including geomatting in applicable areas where landslides are prone
100,000,000
Rehab./Impv't./Const. of Km. 28 to Thru-cut of Panansalan, Compostela including Opening of Junction Purok 2 to Purok 1, Compostela Valley
50,000,000
Rehabilitation/Improvement of Road, Opening/Construction/Rehab. Of Baganga-Binondo-Boundary Davao Oriental/Comval
100,000,000
Rehabilitation/Improvement of Road, Rehabilitation of San Jose-Simulao Road 70,000,000
Rehabilitation/Improvement/Construction of Road, Opening/Rehabilitation of Thru-cut, Brgy. Panansalan-La Fortuna, Brgy. Malibago, Cateel, Davao Oriental
100,000,000
Rehabilitation/Improvement/Construction of Road, Rehab./Impv't. of Panoraon - Bukal Road
60,000,000
Road Opening, Opening of Barigyan - Brgy. Golden Valley 50,000,000Road Opening, Opening/Rehab./Improvement of Chromite-Tagaras, BarangayPintatagan and Barangay Mahayag Road
126,734,000
Compostela Valley DEO 95,000,000Construction of Bridge, Opening/Construction of Brgy. Manurigao-Boundary Baganga 45,000,000
Construction of one (1) lane RCDG bridge, Opening of Tagugpo - Piasusuan Road 15,000,000
Opening of Road, Opening of Candinuyan - Junction Cambaratic - Barigyan 35,000,000
Davao del Norte DEO 30,000,000Concreting (Bridge approaches), Concreting of approaches A and B of Patil-Kapatagan 2-lane RCDG Bridge
30,000,000
Davao Oriental 1st DEO 70,000,000Rehabilitation/Improvement of Road, Opening/Rehabilitation of Thru-cut, Brgy. Panansalan-La Fortuna, Brgy. Malibago, Cateel, Davao Oriental
30,000,000
Road Opening, Opening/Rehabilitation of Thru-cut, Brgy. Panansalan-La Fortuna, Brgy. Malibago, Cateel, Davao Oriental
40,000,000
Davao Oriental 2nd DEO 8,266,000Construction of one (1) lane RCDG bridge, Opening/Rehab./Improvement of Chromite-Tagaras, Barangay Pintatagan and Barangay Mahayag Road
6,000,000
Construction of single barrel box culvert, Opening/Rehab./Improvement of Chromite-Tagaras, Barangay Pintatagan and Barangay Mahayag Road
2,266,000
Region XII 1,598,500,000Regional Office XII 1,357,500,000
Concrete Widening of Madia Section, Datu Saudi, Maguindanao 2nd LD 15,000,000Concrete Widening of Midsayap - Dulawan - Makar Road (Datu Piang - Pagatin Section), Datu Piang, Maguindanao 2nd LD
90,000,000
Concreting Barangay Campo to Damalusay Road, Paglat, Maguindanao 2nd LD 18,000,000
Concreting of 4 km Barira - Pindulunan Road, Barira, Maguindanao 1st LD 48,000,000Concreting of 5 km Gumagadong Calawag - Making Road, Parang, Maguindanao 1st LD
50,000,000
Concreting of 6.5 km brgy roads connecting Kurintem-Ambolodto-Sapalan-Bugawas, DOS, Maguindanao 1st LD
40,500,000
Concreting of 7 km Matanog - Pindulunan Road, Matanog, Maguindanao 1st LD 84,000,000
Concreting of 7.5 km brgy roads connecting Poblacion Dalican-Dados-Kakar-Ambolodto, DOS, Maguindanao 1st LD
67,500,000
Concreting of 8 km brgy roads connecting Darugao-Margues-Bayabas, Upi, Maguindanao 1st LD
45,000,000
Concreting of Badak-Sumakubay Road, Gen. SK Pendatun, Maguindanao 2nd LD 18,000,000
Concreting of Brgy Tumbao - Sitio Upper Saidan Road, Mangudadatu, Maguindanao 2nd LD
12,000,000
Concreting of Bugawas-Baka Road, Datu Odin Sinsuat, Maguindanao 1st LD 16,500,000Concreting of Buluan Poblacion Road, Buluan, Maguindanao 2nd LD 24,000,000Concreting of Dado - Muntay Road, Datu Piang, Maguindanao 2nd LD 18,000,000Concreting of Darugao-Rempis Road, North Upi, Maguindanao 1st LD 30,000,000Concreting of Edcor-Dinganen-Pigcawayan Road, (Phase II), Buldon, Maguindanao 1st LD
84,000,000
Concreting of Highway-Nunangen Road, Guindulungan, Maguindanao 2nd LD 24,000,000Concreting of Katubo-Kapatagan Provincial Road, Matanog (Phase II), Maguindanao 1st LD
12,000,000
Concreting of Kitaan-Renede-Boundary DBS, Upi, Maguindanao 1st LD 18,000,000Concreting of Labio-Gayonga Road, Northern Kabuntalan, Maguindanao 1st LD 12,000,000
Concreting of Ladia-Ibotegen Road, Sultan Kudarat, Maguindanao 1st LD 36,000,000Concreting of Madia-Andavit Road(Phase-2), Datu Salibo, Maguindanao 2nd LD 12,000,000
Concreting of Malala-Lipao Road, Datu Paglas, Maguindanao 2nd LD 18,000,000Concreting of Malingao-Libutan Road, Mamasapano (Road Opening), Maguindanao 2nd LD
18,000,000
Concreting of Mileb-Sampao Road, Sultan sa Barongis, Maguindanao 2nd LD 12,000,000Concreting of New York Road, Paglat, Maguindanao 2nd LD 24,000,000Concreting of Nunangen-Tugal Road, Datu Anggal Midtimbang, Maguindanao 2nd LD
18,000,000
Concreting of Parang - Barira - Buldon Road (Unpaved Gap Section), Barira, Maguindanao 1st LD
27,500,000
Concreting of Parang - Buldon Road (Cabayuan - Poblacion) Unpaved Gap Section, Buldon, Maguindanao 1st LD
36,000,000
Concreting of Poblacion to Sitio Bagundang Road, Paglat, Maguindanao 2nd LD 12,000,000
Concreting of Pura-Pinansaran-Tubuan Coastal Road, Datu Blah Sinsuat, Maguindanao 1st LD
84,000,000
Page 125 of 162
details of dpwh’s programs/projects 1025
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Concreting of Road, Concreting of Kimarayag-So. Lampaki-Mapurok-Alamada Road (So. Tiwasay-So. Dalumangkum Section), Pigcawayan, North Cotabato
50,000,000
Concreting of Sapakan-Pidsandawan Road, Rajah Buayan, Maguindanao 2nd LD 18,000,000
Concreting of Sitio Bulit Road, Datu Montawal, Maguindanao 2nd LD 18,000,000Concreting of Tunggol - Katitisan Provincial Road, Pagalungan, Maguindanao 2nd LD 15,000,000
Construction of Columbio-Koronadal Road, including bridge and bank protection, Sultan Kudarat 1st LD
70,000,000
Reblocking of Kidapawan - Ala - Junction Road (Kayaga - Poblacion Paglas Section), Datu Paglas, Maguindanao 2nd LD
80,000,000
Reblocking of Kidapawan - Ala - Junction Road (Madidis - Paglas Section), Datu Paglas, Maguindanao 2nd LD
20,000,000
Reblocking of Marbel - Ala (Shariff Aguak - Ampatuan Section), Shariff Aguak, Maguindanao 2nd LD
40,000,000
Widening of Marbel - Ala (Poblacion Shariff Aguak - Labulabu Section), Shariff Aguak, Maguindanao 2nd LD
22,500,000
North Cotabato 1st DEO 25,000,000Concreting of Kampo Uno-Katipunan Napaliko Road, Phase II, Arakan, North Cotabato
25,000,000
North Cotabato 2nd DEO 192,000,000Concreting of Road, Concreting of Baliki-So Bakyawan - So Sulok - Dungguan Road, North Cotabato
20,000,000
Concreting of Road, Concreting of Kimarayag - So Lampaki-Mapurok-Alamada Road (So. Lampaki Section), Pigcawayan, North Cotabato
20,000,000
Concreting of Road, Concreting of Pagangan-Tubak Road, North Cotabato 12,000,000Concreting of Road, Concreting of Road, Libungan River-Sitio Baugan, Dado-Sitio Rabi, Pigcawaran Road, Alamada, North Cotabato
20,000,000
Concreting of Road, Construction/Concreting of Dado-Terenteren Road, Alamada, North Cotabato
20,000,000
Concreting of Road, Construction/Concreting of Terenteren-So. Barurawon Road, Alamada, North Cotabato
30,000,000
Construction of Road, Construction of Maracabak-Pidatan-Guiling Road, Alamada, North Cotabato (North Cotabato 1st legislative) - Cotabato 2nd DEO
30,000,000
Construction of Road, Construction/Concreting of Campo 10-Pidatan-Maracabak Road, Alamada, North Cotabato
40,000,000
South Cotabato 2nd DEO 24,000,000Concreting of Bololmal-Toclabong Farm-to-Market Road, Tupi, South Cotabato 18,000,000
Concreting of Road, Concreting of FMR Sta.0+000-Sta.070, Sumbakil, Polomolok, South Cotabato
6,000,000
Region XIII 1,166,868,000Regional Office XIII 1,059,068,000
Concreting (existing gravel road), Brgy. Cabangahan -Brgy. Lobo Road with Bridge 100,000,000
Concreting (existing gravel road), Camp Edward - Ferlda - Poyawon - Sitio Tumorok Road
100,000,000
Concreting (existing gravel road), KM. 25 - Sitio San Roque Road with Bridge, Mahaba, Marihatag
65,000,000
Concreting (existing gravel road), NRJ Bacay II - Johnson - Sta. Teresa Road with 2 Bridge
100,000,000
Concreting (existing gravel road), Pangaylan - Matingue Road with Bridge, Santiago 70,000,000
Concreting and upgrading, Construction of Cabadbaran - Puting Bato - Lanuza Road (Phase 4), Cabadbaran
100,000,000
Construction of concrete bridge, Bagsac - San Vicente Flat Slab Bridge, Madrid 100,000,000
Construction of NRJ Rizal - Togbongon - Mat-I - Mabini - Trinidad Road, including Bridge, Surigao del Norte 2nd LD
148,000,000
Construction of Tago-Lapaz Alternate Road, Lapaz, Surigao del Sur 1st LD 141,068,000Construction/Opening of Road , Cabadbaran-Puting Bato-Sitio Lusong-ADN/SDS Boundary with Bridge, Cabadbaran City
135,000,000
Agusan del Norte DEO 30,000,000Construction of concrete bridge, Cabadbaran-Puting Bato-Sitio Lusong-ADN/SDS Boundary with Bridge, Cabadbaran City
30,000,000
Surigao del Norte 2nd DEO 22,800,000Concreting of Dapa-Brgy. Malinao-General Luna Road, Surigao del Norte 1st LD 22,800,000
Surigao del Sur 1st DEO 55,000,000Construction of concrete bridge, Sitio Magkahunaw Bridge, San Agustin 40,000,000Construction of various Telaje Brgy. Road, Tandag City, Surigao del Sur 7,000,000Improvement of Roads with Drainage, Brgy. Telaje, Tandag City, Surigao del Sur 1st LD
8,000,000
Local Infrastructure Program 8,959,863,000National Capital Region 3,157,429,000
Central Office 1,593,634,000Construction/ Rehabilitation of Various Infrastructure Projects, Batangas 2nd LD 23,000,000
Construction/Rehabilitation of Various Infrastructure Projects 720,000,000Construction/Rehabilitation of Various Infrastructure Projects , Iloilo 5th LD 1,061,000Construction/Rehabilitation of Various Infrastructure Projects, Albay 3rd LD 7,000,000Construction/Rehabilitation of Various Infrastructure Projects, Antipolo City 1st LD 6,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Antique Lone District 2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Bacolod City Lone District
9,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Bataan 2nd LD 18,000,000Construction/Rehabilitation of Various Infrastructure Projects, Batangas 1st LD 4,000,000
Page 126 of 162
1026 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Rehabilitation of Various Infrastructure Projects, Batangas 3rd LD 10,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Benguet Lone District 6,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Biliran Lone District 14,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Bulacan 1st LD 16,000,000Construction/Rehabilitation of Various Infrastructure Projects, Bulacan 4th LD 24,000,000Construction/Rehabilitation of Various Infrastructure Projects, Cagayan 1st DEO 20,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Cagayan 3rd LD 16,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Cagayan De Oro City 1st LD
4,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Camarines Sur 1st LD 4,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Camarines Sur 5th LD 2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Capiz 1st LD 14,000,000Construction/Rehabilitation of Various Infrastructure Projects, Cavite 7th LD 12,000,000Construction/Rehabilitation of Various Infrastructure Projects, Cebu City 1st LD 20,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Cebu City 2nd LD 8,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Compostela Valley 2nd LD
28,500,000
Construction/Rehabilitation of Various Infrastructure Projects, Davao City 2nd LD 4,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Davao City 3rd LD 22,500,000
Construction/Rehabilitation of Various Infrastructure Projects, Davao del Sur Lone District
25,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Davao Oriental 2nd LD 3,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Ilocos Norte 1st LD 10,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Ilocos Sur 1st LD 2,223,000
Construction/Rehabilitation of Various Infrastructure Projects, Ilocos Sur 2nd LD 25,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Iloilo 2,000,000Construction/Rehabilitation of Various Infrastructure Projects, Isabela 1st LD 10,000,000Construction/Rehabilitation of Various Infrastructure Projects, Isabela 4th LD 22,000,000Construction/Rehabilitation of Various Infrastructure Projects, Kalinga Lone District 13,500,000
Construction/Rehabilitation of Various Infrastructure Projects, La Union 1st LD 12,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Laguna 2nd LD 4,000,000Construction/Rehabilitation of Various Infrastructure Projects, Laguna 3rd LD 21,000,000Construction/Rehabilitation of Various Infrastructure Projects, Leyte 1st LD 7,200,000Construction/Rehabilitation of Various Infrastructure Projects, Leyte 2nd LD 32,000,000Construction/Rehabilitation of Various Infrastructure Projects, Leyte 3rd LD 2,000,000Construction/Rehabilitation of Various Infrastructure Projects, Leyte 5th LD 29,000,000Construction/Rehabilitation of Various Infrastructure Projects, Masbate 2nd LD 11,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Mindoro Occidental Lone District
9,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Mindoro Oriental 1st LD
12,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Misamis Occidental 1st LD
10,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Misamis Occidental 2nd LD
1,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Mountain Province Lone District
10,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Negros Occidental 1st LD
3,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Negros Occidental 2nd LD
4,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Negros Occidental 5th LD
8,000,000
Construction/Rehabilitation of Various Infrastructure Projects, North Cotabato 2nd LD
22,500,000
Construction/Rehabilitation of Various Infrastructure Projects, Northern Samar 1st LD
6,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Northern Samar 2nd LD
27,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Northern Samar 2nd LD
3,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Pagadian City 1st LD 2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Pampanga 3rd LD 13,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Pangasinan 3rd LD 30,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Pangasinan 5th LD 14,700,000
Construction/Rehabilitation of Various Infrastructure Projects, Quezon 1st LD 4,950,000Construction/Rehabilitation of Various Infrastructure Projects, Rizal 1st LD 15,000,000Construction/Rehabilitation of Various Infrastructure Projects, Rizal 2nd LD 6,500,000Construction/Rehabilitation of Various Infrastructure Projects, Samar 1st LD 40,000,000Construction/Rehabilitation of Various Infrastructure Projects, Sorsogon 2nd DEO 26,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Southern Leyte Lone District
25,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Surigao del Sur 1st LD 9,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Zambales 2nd LD 20,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Zamboanga City 1st LD
6,000,000
Page 127 of 162
details of dpwh’s programs/projects 1027
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Rehabilitation of Various Infrastructure Projects, Zamboanga City 2nd LD
20,000,000
Las Piñas-Muntinlupa DEO 4,000,000Repair / Rehabilitation of Mabini Street, Brgy, San Roque, Marikina City,Las Piñas-Muntinlupa DEO
4,000,000
Malabon-Navotas DEO 137,500,000Rehabilitation of Alleys, Brgy. Tonsuya, Malabon City 2,000,000Rehabilitation of Local Road, Araneta Ave., Brgy Potrero, Malabon City 2,500,000Rehabilitation Of Local Road, Bagong Lote St., Brgy. Potrero, Malabon City,Malabon City Lone District
8,500,000
Rehabilitation Of Local Road, Borromeo St., Brgy. Longos, Malabon City,Malabon City Lone District
14,000,000
Rehabilitation of Local Road, Del Monte Ave., Brgy. Potrero Malabon City 10,000,000Rehabilitation of Local Road, Dulong Herrera St., Brgy. Ibaba Malabon City 3,000,000Rehabilitation Of Local Road, Isagani And Elias St., Brgy. Acacia, Malabon City ,Malabon City Lone District
8,000,000
Rehabilitation Of Local Road, Liwayway St., Brgy. Acacia, Malabon City,Malabon City Lone District
2,000,000
Rehabilitation of Local Road, Mango St., Brgy. Potrero, Malabon City 10,000,000Rehabilitation Of Local Road, Mercurio St.,Brgy. Tugatog, Malabon City,Malabon City Lone District
7,500,000
Rehabilitation of Local Road, Simoun St., Brgy. Acacia, Malabon City 2,500,000Rehabilitation of Local Road, Sta. Hernandez St., Brgy. Catmon, Malabon City 10,500,000
Rehabilitation of Local Road, Sta. Isabel St., Brgy. Baritan, Malabon City 5,000,000Rehabilitation of Local Road, University Ave., Brgy Potrero, Malabon City 8,000,000Rehabilitation of Local Road, Valdez Extension., Brgy. Catmon Malabon City 4,000,000Rehabilitation of Road, A. Santiago St., (from M. Naval St. to Gov. A. PAscual St.) Brgy. Sipac Almacen, Navotas City Lone District
5,000,000
Rehabilitation of Road, Daanghari St., (Gov. A. Pascual St. to Tabing Dagat) Brgy. Daanghari, Navotas City Lone District
5,500,000
Rehabilitation of Road, Daanghari St., (M. Naval St. to Gov. A. Pascual St.) Brgy. Daanghari, Navaotas City Lone District
7,000,000
Rehabilitation of Road, Los Martires St., (from Gov. A. Pascual St. Tabing Dagat) Brgy. San Jose, Navotas City Lone District
4,000,000
Rehabilitation of Road, Muling Pagsilang St., Brgy. San Rafael Village, Navotas City Lone District
6,500,000
Rehabilitation of Road, Raha Humabon St., Brgy. Daanghari, Navotas City Lone District
4,000,000
Rehabilitation of Road, Raha Kalantiao St., Brgy. Daanghari, Navotas City Lone District
3,000,000
Rehabilitation of Road, Waling waling St., Brgy. Tanza, Navotas City Lone District 5,000,000
Metro Manila 1st DEO 150,495,000Construction of Road Network with Drainage System at of Barangay Kalawaan, Pasig City
20,000,000
Construction of Roads and Drainage System Ka Pepe St., St. Peter St. and Ka Terio St.at Barangay Palingon, Taguig City 1st LD
5,000,000
Construction of Roads and Drainage System M. Lucas St., Valencia St. at Barangay Napindan, Taguig City 1st LD
4,000,000
Construction of Roads and Drainage System P. Herrera St. at Barangay Pateros, Taguig City 1st LD
5,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Taguig City 1st LD 6,000,000
Contsruction of Roads and Drainage System E. Quiogue St. and Menguito St. at Barangay Aguho, Pateros, Taguig City 1st LD
4,000,000
Rehabilitation of Wilson St., Brgy. Sta. Lucia, San Juan City 6,800,000Rehabilitation/ Improvement of Drainage System at Gen. Bautista Street, Brgy. Batis, San Juan City
5,000,000
Rehabilitation/Improvement Drainage System at Lloyd George. Arellano, and Corta Streets, Brgy. Addition Hills, San Juan City
12,900,000
Rehabilitation/Improvement of Drainage System at Barangay Onse and Vicinity, San Juan City
20,000,000
Rehabilitation/Improvement of Drainage System at A. Bonifacio Street and Vicinity, Brgy. Kabayanan, San Juan City
16,300,000
Rehabilitation/Improvement of Drainage System at Pilar and P. Burgos Streets, Brgy. Addition Hills, San Juan City
7,200,000
Rehabilitation/Improvement of R. Pascual and S. Tuaño Streets, Brgy. Batis, San Juan City
6,800,000
Rehabilitation/Improvement of Roads w/ Drainage System along Lt. Artiaga St., San Juan City Lone District
11,000,000
Rehabilitation/Improvement of Roads w/ Drainage System along P. Parada St., San Juan City Lone District
10,000,000
Repair/Rehabilitation of Road Network including drainage along Fortune Village and Ana Compound, Brgy. Marikina Heights, Marikina City
3,795,000
Repair/Rehabilitation of Road Network including drainage at Cruz Compound, Brgy. Parang, Marikina City
3,000,000
Repair/Rehabilitation of Road Network including Drainage system at Herbosa Compound, Brgy. Parang, Marikina City,Brgy. Parang,Marikina City,Metro Manila
3,700,000
Metro Manila 2nd DEO 186,000,000Concreting of Ninoy Aquino Ave., Phase III,Brgy. Sto. Niño,Parañaque,Metro Manila 2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Makati City 2nd LD 70,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Parañaque City 1st LD 28,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Parañaque City 2nd LD 24,500,000
Proposed Road Improvement at Purok Libas, Sampaloc 1, Brgy B.F District 2, Parañaque City, Metro Manila (Sta.0 + 000 - Sta .0 + 272),Metro Manila 2nd DEO
9,500,000
Proposed Road Improvement with Box Culvert at Merville Gate 1, Brgy. Merville, District 2, Parañaque City, Metro Manila,Metro Manila 2nd DEO
12,000,000
Rehabilitation/Improvement & Upgrading of Archimedes Street and its Vicinity, Brgy. La Paz, Makati City 1st LD
20,000,000
Page 128 of 162
1028 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Rehabilitation/Improvement & Upgrading of Pasong Tirad Street and its Vicinity, Brgy. Singkamas and Brgy. La Paz, Makati City 1st LD
20,000,000
Metro Manila 3rd DEO 367,300,000Concreting of local roads & Drainage in Barangay 14, Zone 2, Caloocan City 2nd LD 6,500,000
Concreting of local roads & Improvement of Drainage in Barangay 35, Zone 3, Caloocan City 2nd LD
6,000,000
Concreting of Road along Industrial Road, Barangay Karuhatan, Valenzuela City 2nd LD
2,700,000
Concreting of Road with Drainage Improvement along First Street, Barangay Karuhatan, Valenzuela City 2nd LD
4,000,000
Concreting of Road with Drainage Improvement along San Francisco Street, Barangay Karuhatan, Valenzuela City 2nd LD
8,000,000
Concreting of Roads and Improvement of Drainage along Service Road of Estero de Maypajo, Brgy. 28, Caloocan City 2nd LD
20,000,000
Concreting of Roads and Improvement of Drainage along Service Road of Estero de Maypajo, Brgy. 35, Caloocan City 2nd LD
20,000,000
Concreting of Various Roads with Drainage Improvement along Azicate Homes, Barangay Gen. T. De Leon, Valenzuela City 2nd LD
8,200,000
Concreting/Upgrading of Roads with Drainage Improvement, D. Alger Street and 2nd Avenue, Barangay 41, Caloocan City 2nd LD
5,000,000
Construction of Road and Drainage in Indiana, Ph. 10 Bagong Silang, Caloocan City 1st LD
5,300,000
Construction of Road and Drainage in Kaunlaran, Ph. 9 Bagong Silang, Caloocan City 1st LD
6,900,000
Drainage Improvement along 3rd St. between 8th and 11th Ave., Caloocan City 5,000,000
Drainage Improvement along 4th St. between 8th and 11th Ave., Caloocan City 5,000,000
Improvement of local roads, alleys and Drainage in Barangay 18, Zone 2, Caloocan City 2nd LD
6,300,000
Improvement of local roads, alleys and Drainage in Santiago St., Barangay 59, Zone 6, Caloocan City 2nd LD
3,500,000
Improvement of Roads and Drainage along Brgy. 26 and 30, Caloocan City 10,600,000Improvement of Roads and Drainage along Brgy. 8, Caloocan City 10,000,000Improvement of Roads and Drainage along Bulacan St., Brgy. 67, Caloocan City 4,500,000
Rehabiliitation of local road at Kapanalig St., Malaya St., and other alleys in Barangay 28, Zone 3, Caloocan City 2nd LD
7,700,000
Rehabilitation of Drainage along Brgy. 126, Caloocan City 4,000,000Rehabilitation of Drainage along Busa St. and Buagan St. Brgy. 128, Caloocan City 4,600,000
Rehabilitation of Road with Drainage Improvement along Batimana Street, Barangay Marulas, Valenzuela City 2nd LD
2,900,000
Rehabilitation of Road with Drainage Improvement along La Huerta Subdivision-Phase 2, Barangay Marulas, Valenzuela City 2nd LD
2,600,000
Rehabilitation of Road with Drainage Improvement along Parada Road, Barangay Parada, Valenzuela City 2nd LD
2,300,000
Rehabilitation of Roads & Drainage along Barangay 20, Caloocan City 2nd LD 3,700,000Rehabilitation of Roads with Drainage Improvement along 10th Street between 10th and 12th Ave, Caloocan City
9,000,000
Rehabilitation of Roads with Drainage Improvement along Brgy. 125, Caloocan City 4,000,000
Rehabilitation of Roads with Drainage Improvement along Brgy. 129, Caloocan City 5,000,000
Rehabilitation of Roads with Drainage Improvement along Brgy. 130, Caloocan City 4,000,000
Rehabilitation of Roads with Drainage Improvement along Brgy. 49, Caloocan City 2,000,000
Rehabilitation of Roads with Drainage Improvement along Dagat-Dagatan Ave. (North Bound), Caloocan City 2nd LD
20,000,000
Rehabilitation of Roads with Drainage Improvement along Dagat-Dagatan Ave. (South Bound), Caloocan City 2nd LD
20,000,000
Rehabilitation of Roads with Drainage Improvement along Del Mundo (8th to C-3), Caloocan City 2nd LD
20,000,000
Rehabilitation of Roads with Drainage Improvement along Josefina St. Brgy. 114, Caloocan City
5,000,000
Rehabilitation of Roads with Drainage Improvement along Talakitok (C3-Tanigue), Caloocan City 2nd LD
11,000,000
Rehabilitation of Roads with Drainage Improvement along Tanigue St. (Dagat-Dagatan-Talakitok), Caloocan City 2nd LD
14,000,000
Rehabilitation of Roads with Drainage Improvement along Tanigue St. (Pampano to C-3), Caloocan City 2nd LD
20,000,000
Rehabilitation of Roads with Drainage Improvement along Torsillo St. (C3 to Camada), Caloocan City 2nd LD
8,000,000
Rehabilitation of Roads with Drainage Improvement along Torsillo St. (Camada to Dagat-Dagata Ext.), Caloocan City 2nd LD
20,000,000
Rehabilitation of Roads with Drainage Improvement along Tuna St. (Dagat-Dagatan-Marcela St.), Caloocan City 2nd LD
14,000,000
Rehabilitation of Roads with Drainage Improvement along William Shaw St., Brgy. 87, De Jesu St. - A. Cruz, Caloocan City
19,000,000
Rehabilitation of Roads with Drainage Improvement of Various Alleys along Block 11 and Block 12, Barangay 12, Caloocan City 2nd LD
7,000,000
North Manila DEO 186,500,000Construction/Rehabilitation of Various Infrastructure Projects, Manila City 2nd LD 40,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Manila City 4th LD 30,000,000
Improvement of Roads w/ Drainage Bgy. 91, Zone 8, Franco St.,Tondo, Metro Manila,Manila City 1st LD
4,000,000
Improvement of Roads w/ Drainage Bgy. 91, Zone 8,Aeta St.,Tondo, Metro Manila,Manila City 1st LD
4,000,000
Improvement of Roads w/ Drainage Bgy. 91, Zone 8,Kahanding St. Tondo, Metro Manila,Manila City 1st LD
2,500,000
Improvement of Roads w/ Drainage Bgy. 91, Zone 8,Tioco St,. Tondo, Metro Manila,Manila City 1st LD
4,000,000
Rehabilitation of Road with Drainage Network Zone 25-40, Manila,Manila City 3rd LD 10,000,000
Page 129 of 162
details of dpwh’s programs/projects 1029
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Rehabilitation of Roads with Drainage Improvement along Batangas St., Sta. Cruz, Manila
10,000,000
Rehabilitation of Roads with Drainage Improvement along Estrella St., Binondo, Manila
5,000,000
Rehabilitation of Roads with Drainage Improvement along Madrid St., Binondo, Manila
10,000,000
Rehabilitation of Roads with Drainage Improvement along S Reyes St., Sta. Cruz, Manila
5,000,000
Rehabilitation of Roads with Drainage Improvement along San Nicolas St., Binondo, Manila
10,000,000
Rehabilitation of Roads with Drainage Improvement along Veronica St., Binondo, Manila
10,000,000
Rehabilitation of Roads with Drainage Improvement along Yuchenco St., Binondo, Manila
10,000,000
Rehabilitation of Roads with Drainage Improvement along Laguna St., Sta. Cruz, Manila,Manila City 3rd LD
10,000,000
Rehabilitation of Roads with Drainage Improvement along M de Santos St., Binondo, Manila,Manila City 3rd LD
10,000,000
Rehabilitation of Roads with Drainage Improvement along P. Guevarra Sta. Cruz, Manila,Manila City 3rd LD
5,000,000
Rehabilitation of Roads with Drainage Improvement along T. Mapua St., Sta. Cruz, Manila,Manila City 3rd LD
5,000,000
Road and drainage improvement, Barangay 647 and vicinity, San Miguel, Manila, Metro Manila
2,000,000
Quezon City 1st DEO 20,000,000Rehabilitation of Golden Lane and Diamond Lane, Brgy. Culiat, Quezon City 6th LD 5,000,000
Rehabilitation of Old Samson Rd., Brgy. Apolonio Samson, Quezon City 6th LD 5,000,000
Rehabilitation of Sauyo Road, Brgy. Sauyo, Quezon City 6th LD 10,000,000
Quezon City 2nd DEO 454,500,000Concreting and drainage , Unang Hakbang St. 8,000,000Concreting and drainage improvement including streetlights, 9th St. (Gilmore to Hemady St)
10,000,000
Concreting and drainage improvement, Matimtiman St. 15,500,000Concreting and drainage improvement, Sct. Borromeo 3,000,000Concreting and drainage improvement, Sct. Madrinan St. (Tomas Morato to Mother Ignacia)
13,500,000
Concreting and improvement, Landargun St. 3,000,000Construction Of Local Road Kaingin 1, Barangay Pansol, Quezon City 2,000,000Construction Of Local Road @Barangay E. Rodriguez Sr., Quezon City, Metro Manila 3rd LD
5,000,000
Construction Of Local Road @Barangay Pansol, Quezon City, Metro Manila 3rd LD 2,000,000
Construction Of Local Road Barangay San Roque, Quezon City, Metro Manila 3rd LD 4,000,000
Construction Of Local Road With Drainage System At Area 1 Urphas, Barangay Old 5,500,000
Construction Of Local Road With Drainage System Daan Tubo, Barangay Loyola Heights, Quezon City, Metro Manila 3rd LD
3,500,000
Construction/Rehabilitation of Road Network Staff Colleges Camp Aguinaldo, Quezon City
15,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Quezon 4th LD 12,000,000Drainage and sidewalk improvement with site development, Anonas Extension 5,000,000
Improvement Of Local Road At New York St. Barangay E. Rodriguez Sr. 4,000,000Improvement Of Local Road With Drainage System At Katipunan Avenue Ext. Brgy. White Plains, Quezon City
18,000,000
improvement, Liberation St. 5,000,000improvement, Rural St. 800,000improvement, Union Civica St. 5,500,000Pathwalk and drainage improvement, Areas 1, 2, 3 and 4 Victory Avenue (Kaliraya to Quezon Ave)
3,000,000
Rehabilitation of Pathwalk, Area VII Purok 11, Clusters 24, 25, 26 and 27 2,000,000Rehabilitation of Pathwalk, Area VII Purok 9 Tag-upo St Block 529-A 3,000,000Rehabilitation of Pathwalk, Purok 10 Galilan Block 2,000,000Road and drainage improvement, Hemady Extension 10,000,000Road and drainage improvement , Cadena de Amor St. 4,000,000Road and drainage improvement , Gladiola St. 5,000,000Road and drainage improvement, Agno St. Extension 11,000,000Road and drainage improvement, Block 7 Extension Phase 2 Lupang Pangako 7,000,000
Road and drainage improvement, Familara St. (completion) 6,500,000Road and drainage improvement, Ilang-ilang St. 7,500,000Road and drainage improvement, Lower Empire 8,000,000Road and drainage improvement, Mapayapa St. 5,500,000Road and drainage improvement, Mother Ignacia Avenue 20,000,000Road and drainage improvement, Phase 1 Lupang Pangako 5,000,000Road and drainage improvement, Phase 1 Purok 12 Lupang Pangako 5,000,000Road and drainage improvement, Roces Avenue 15,000,000Road and drainage improvement, Sct. De Guia St. 35,000,000Road and drainage improvement, Tag-upo-Kaliraya St. 3,000,000Road and drainage improvement, Upper Empire and Upper Empire Extension 5,000,000
Road construction , Umbel St. connecting Serbisyong Bridge 15,000,000Road improvement , Sauyo Road 20,000,000Road improvement , Wayan St. (completion) 9,700,000Road improvement, 1st to 8th Streets, Veterans Village 15,000,000Road improvement, Antique St. (completion) 7,500,000Road improvement, F. Bautista St. (completion) 3,500,000Road improvement, Freedom St. 2,000,000Road improvement, Himlayan Road (Aramis to Tandang Sora-Congressional Ave. Ext)
10,000,000
Road improvement, Jasmin St. 3,000,000Road improvement, Jordan Valley, Barangay Baesa 5,000,000Road improvement, Munoz St. 10,000,000Road improvement, P. Tuazon Avenue 20,000,000Road improvement, Purok 3, Nepomuceno St. 3,000,000Road improvement, San Agustin and Sta. Lucia St. 8,000,000
Page 130 of 162
1030 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Road improvement, Temperance and Freedom St. 5,000,000Widening and drainage improvement, Sct. Reyes St. 15,000,000
South Manila DEO 57,500,000Construction/Rehabilitation of Various Infrastructure Projects, Manila City 5th LD 2,000,000
Repair/Rehabilitation Of Road With Drainage, Almazor St., Barangay 185, Pasay City Lone District
3,000,000
Repair/Rehabilitation Of Road With Drainage, Barangay 143, Pasay City Lone District 2,000,000
Repair/Rehabilitation Of Road With Drainage, Barangay 171, Pasay City Lone District 2,000,000
Repair/Rehabilitation Of Road With Drainage, Barangay 188, Pasay City Lone District 2,000,000
Repair/Rehabilitation Of Road With Drainage, D. Masalang St., Barangay 113, Pasay City Lone District
6,500,000
Repair/Rehabilitation Of Road With Drainage, Sampaguitta, Camia, Champaca & Ilang-Ilang Streets, Barangay 137, Pasay City Lone District
7,000,000
Repair/Rehabilitation Of Road With Drainage, St. Claire, St. Elena And St. Isabel Sts., Barangay 186, Pasay City Lone District
2,500,000
Repair/Rehabilitation Of Road With Drainage, Tengo & D. Reyes Sts., Barangay 106, Pasay City Lone District
4,000,000
Repair/Rehabilitation Of Road With Drainage, Ventanilla St., Barangay 124 And Pilapil St., Barangay 84, Pasay City Lone District
3,500,000
Road and drainage improvement, Zone 91 and vicinity, Pandacan, Manila, Metro Manila
7,000,000
Road and drainage improvement, Zone 92/93/95 and vicinity, Pandacan, Manila, Metro Manila
6,000,000
Road and drainage improvement, Zone 99/100 and vicinity, Sta. Ana, Manila, Metro Manila
10,000,000
Region I 401,270,000Ilocos Norte 1st DEO 43,880,000
Concreting of Barangay Road from Barangay Poblacion 1 to Barangay Poblacion 2, Pagudpud, Ilocos Norte
500,000
Concreting of Barangay Road from Barangay Poblacion to Barangay Buduan, Burgos, Ilocos Norte
5,000,000
Concreting of Road, 03 Sta Barbara to San Pedro, Sarrat 2,800,000Concreting of Road, Brgy. Balaoi, Pagudpud to Brgy. Lanao, Bangui 4,750,000Concreting of Road, Caaoacan to Calayab, Laoag City 3,060,000Concreting of Road, Calambeg to Suqsuquen, Ilocos Norte 5,500,000Concreting of Road, Natba to Pangasinan, Bacarra, Ilocos Norte 2,000,000Concreting of Road, P.F. Alviar to Canaam, Vintar, Ilocos Norte 8,000,000Concreting of Road, Susugaen-San Isidro-Carusikis, Pasuquin, Ilocos Norte 9,270,000Concreting of Road, Tubburan to 15 San Roque II, Bacarra 2,000,000Construction of Road, Barangay Poblacion, Laoag, Ilocos Norte 1,000,000
Ilocos Norte 2nd DEO 23,500,000Concreting of Barangay Road from Barangay Sta Asuncion to Barangay Marcos to Barangay San Pablo, San Nicolas, Ilocos Norte
10,000,000
Construction of Batac Eco-Park Road, Barangay Poblacion, Batac City, Ilocos Norte 4,000,000
Construction of Road, Barangay Poblacion, Badoc, Ilocos Norte 2,000,000Construction of Road, Barangay Poblacion, Solsona, Ilocos Norte 2,000,000Construction/Concreting of Barangay Rd., Barangay Poblacion, Paoay, Ilocos Norte 3,000,000
Construction/Concreting of Barangay Rd., Barangay Suyo, Dingras, Ilocos Norte 2,500,000
Ilocos Sur 1st DEO 19,900,000Concreting of Barangay Road, Bayubay Norte, San Vicente, Ilocos Sur 1st LD 2,500,000
Concreting of Barangay Road, Cabittaoagan, Sta. Catalina, Ilocos Sur 1st LD 2,000,000Concreting of Barangay Road, Ermita-San Sebastian, San Vicente, Ilocos Sur 1st LD 2,500,000
Concreting of Barangay Road, Pantay Fatima, Vigan City, Ilocos Sur 1st LD 2,400,000Concreting of Barangay Road, Pudoc Norte-Pudoc Centro, San Vicente, Ilocos Sur 1st LD
2,500,000
Concreting of Barangay Road, Sinabaan, Sta. Catalina, Ilocos Sur 1st LD 2,000,000Concreting of Barangay Road, Tamorong, Sta. Catalina, Ilocos Sur 1st LD 2,000,000Construction of Road, Barangay Salupsop, Pug-os, Cabugao, Ilocos Sur 4,000,000
Ilocos Sur 2nd DEO 34,000,000Construction of Barangay Road, Barangay Aluling, Cervantes, Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Ag-aguman,Tagudin,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Ampandula,Santa,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Banaoang ,Santa,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Bario-an,Tagudin,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Basug,Santa,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Bimmanga,Tagudin,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Bio,Tagudin,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Bitalag,Tagudin,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Borono,Tagudin,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Bucalag,Santa,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Cabangaran,Santa,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Casiber,Santa,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Dardarat,Tagudin,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Mabibila Sur,Santa,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Manueva,Santa,Ilocos Sur 2,000,000Construction of Barangay Road,Brgy. Tampugo,Tagudin,Ilocos Sur 2,000,000
La Union 1st DEO 23,800,000Conrete Paving of Barangay Road at Barangay Rimos #2 to Barangay Suyo,Brgy. Suyo, Luna,La Union
2,000,000
Construction of Barangay Road at Barangay Bumbuneg to Barangay Bucao,Brgy. Bucao, San Gabriel,La Union
2,000,000
Construction of Barangay Road at Barangay Paratong No. 4,Brgy. No. 4, Bangar,La Union
4,000,000
Construction of Barangay Road at Barangay Raois,Brgy. Raois,Bacnotan,La Union 2,000,000
Page 131 of 162
details of dpwh’s programs/projects 1031
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Barangay road at Sitio Calaungan of Barangay Nagyubuyuban to boundary of Naguilian, La Union,Brgy. Nagyubuyuban,San Fernando,La Union
2,000,000
Construction of Barangay road located at Purok 1 and 2,Brgy. Masicong,San Fernando,La Union
2,000,000
Rehabilitation of processional road ,Brgy. ,San Fernando,La Union 7,800,000Rehabilitation of the Barangay road from Purok 1 to Purok 4 ,Brgy. Bato,San Fernando,La Union
2,000,000
La Union 2nd DEO 45,000,000 Construction of Bail-Fernando Barangay Road,Brgy. Bail-Fernando,Sto. Tomas,La Union
5,000,000
Construction of Barangay Road at Barangay Alibangsay,Brgy. Alibangsay,Bagulin,La Union
2,000,000
Construction of Barangay Road at Barangay Dalipaoen,Brgy. Dalipaoen,Naguilian,La Union
3,000,000
Construction of Barangay Road at Barangay Palina,Brgy. Palina, Pugo,La Union 2,000,000
Construction of Barangay Road,Brgy. Cardiz,Bagulin,La Union 2,000,000Construction of Barangay Road,Brgy. Delles,Burgos,La Union 2,000,000Construction of Barangay Road,Brgy. Leones West,Tubao,La Union 2,000,000Construction of Barangay Road,Brgy. Saytan,Pugo,La Union 2,000,000 Construction of Tudingan-San Antonio Barangay Road,Brgy. Tudingan-San Antonio,Naguilian,La Union
2,000,000
Improvement of Barangay Road,Brgy. Parian Oeste,Bauang,La Union 2,000,000Improvement of Barangay Road,Brgy. Sta. Barbara,Agoo,La Union 7,000,000Construction of Barangay Road at Barangay Bagbag to Barangay Sta. Monica,Brgy. Bagbag, Bauang,La Union
2,000,000
Construction of Barangay Road at Barangay Cabisilan,Brgy. Cabisilan, Bauang,La Union
2,000,000
Construction of Barangay Road at Barangay Caoige,Brgy. Caoige,Tubao,La Union 2,000,000
Construction of Barangay Road at Barangay Imelda,Brgy. Imelda, Burgos,La Union 2,000,000
Construction of Barangay Road at Barangay Ubagan,Brgy. Ubagan, Sto. Tomas,La Union
2,000,000
Construction of Barangay Road from Barangays Sobredillo to San Gregorio and to San Cornelio,Brgy. Sobredillo, San Gregorio and San Cornelio, Caba,La Union
2,000,000
Rehabilitation of Barangay Road from Barangays San Pedro to San Vicente Norte and to Sta. Rita East,Brgy. San Pedro, San Vicente Norte and Sta. Rita East,Aringay,La Union
2,000,000
Pangasinan 1st DEO 68,000,000Asphalting of Brgy. Balayang Road, Alaminos City, Pangasinan 1st LD 5,000,000Asphalting of Brgy. Bisocol Road, Alaminos City, Pangasinan 1st LD 5,000,000Asphalting of Brgy. Maawi Road, Alaminos City, Pangasinan 1st LD 5,000,000Concreting of Barangay Dewey Road, Barangay Dewey, Bolinao, Pangasinan 5,000,000Concreting of Barangay Dewey Road, Municipality of Bolinao, Pangasinan 1st LD 3,000,000
Concreting of Barangay Macaboboni Road, Municipality of Agno, Pangasinan 1st LD 3,000,000
Concreting of Barangay Road in Brgy. San Simon, Agno, Pangasinan 1st LD 2,000,000Concreting of Barangay Tupa Road, Municipality of Bolinao, Pangasinan 1st LD 3,000,000
Concreting of Road - Bgy. Ballag, Bani Pangasinan,Brgy. Ballag,Bani,Pangasinan 3,000,000
Concreting of Road - Bgy. Luciente 2, Bolinao Pangasinan,Brgy. Luciente 2,Bolinao,Pangasinan
2,000,000
Concreting of Road - Bgy. Tugui Norte, Bani Pangasinan,Brgy. Tugui Norte,Bani,Pangasinan
2,000,000
Concreting of Road- Bgy. Baleyadaan, Alaminos Pangasinan,Brgy. Baleyadaan,Alaminos,Pangasinan
2,000,000
Concreting of Road- Bgy. Catungi, Bolinao Pangasinan,Brgy. Catungi,Bolinao,Pangasinan
2,000,000
Concreting of Road- Bgy.Carot, Anda Pangasinan,Brgy. Carot,Anda,Pangasinan 2,000,000
Concreting of Road Catungi, Bolinao, Pangasinan 2,000,000Concreting of Road in Brgy. Centro Toma Bani, Pangasinan 1st LD 2,000,000Concreting of Road in Brgy. Luciente I, Bolinao, Pangasinan 1st LD 3,000,000Concreting of Road in Brgy. Luciente II, Bolinao, Pangasinan 1st LD 2,000,000Concreting of Road, Arnedo, Bolinao, Pangasinan 2,500,000Concreting of Road, Binabalian, Bolinao, Pangasinan 2,500,000Concreting of Road, Goyoden, Bolinao, Pangasinan 5,000,000Concreting of Road, Lucero, Bolinao, Pangasinan 2,500,000Concreting of Road, P Callado St. (Victory), Bolinao, Pangasinan 2,500,000
Pangasinan 2nd DEO 82,000,000Concreting of Road (Extension of Lingayen Baywalk) from Brgy. Maniboc to Brgy. Pangapisan, Lingayen, Pangasinan, Region I
30,000,000
Concreting of RoadBgy. Nibaliw West, San Fabian, Pangasinan
5,000,000
Concreting of roads, Pugaro, Dagupan City, Pangasinan,Pangasinan 4th LD 2,000,000Construction of Bay Walk Barangay Maniboc, Lingayen, Pangasinan 10,000,000Construction of Road with Shoulder on both sides, Brgy. Maniboc, Pangasipan, Lingayen, Pangasinan
10,000,000
Construction of roads and drainage, Herrero Perez, Dagupan City, Pangasinan,Pangasinan 4th LD
2,000,000
Construction of roads, Bonuan Binloc, Dagupan City, Pangasinan,Pangasinan 4th LD 3,000,000
Construction of roads, Lucao, Dagupan City, Pangasinan,Pangasinan 4th LD 2,000,000Construction of roads, Tambac/ Tebeng, Dagupan City, Pangasinan,Pangasinan 4th LD
14,000,000
Construction/rehabilitation of road and drainage, Bonuan Boquig, Dagupan City, Pangasinan,Pangasinan 4th LD
2,000,000
Construction/rehabilitation of road and drainage, Sagud Baley, San Fabian, Pangasinan,Pangasinan 4th LD
2,000,000
Pangasinan 3rd DEO 48,190,000Concreting of Barangay Roads in San Manuel, Pangasinan 2,000,000
Page 132 of 162
1032 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Concreting of Bobonan-Coldit Road, Barangay Bobonan, Asingan, Pangasinan 5,000,000
Construction/Rehabilitation of Various Infrastructure Projects 2,000,000Construction/Rehabilitation of Various Infrastructure Projects, Pangasinan 6th LD 26,000,000
Improvement/Repair/Rehab of Bypass Tayug-Sta. Maria Road, Barangobong-San Vicente, Tayug-Sta. Maria, Pangasinan 6th LD
4,000,000
Request for funds for the construction of Two (2) Barangay Roads in Pozorrubio, Pangasinan
2,240,000
Road Concreting with drainage, Bila, Sitio Pajara,Brgy. Bila,Sison,Pangasinan 2,600,000Road Construction with drainage, Poblacion Central, Sison,Brgy. Poblacion Central,Sison,Pangasinan
4,350,000
Pangasinan 4th DEO 13,000,000Concreting of Local Road, Brgy. Alinggan - Laringan, Macayocayo, Bayambang, Pangasinan 3rd LD
3,000,000
Concreting of Local Road, Brgy. Amanoaoac, Mapandan, Pangasinan 3rd LD 2,000,000Concreting of Local Road, Brgy. Torres, Mapandan, Pangasinan 3rd LD 2,000,000Construction of Local Road, Brgy. Balaoit, Malasiqui, Pangasinan 3rd LD 2,000,000Construction of Local Road, Brgy. Pangdel, Bayambang, Pangasinan 3rd LD 2,000,000Construction of Local Road,Brgy. Bawer, Malasiqui, Pangasinan 3rd LD 2,000,000
Cordillera Administrative Region 84,500,000Abra DEO 17,000,000
Concreting of Bayaan-Kemmel Road, Brgy. Bayaan, Dolores, Abra 4,000,000Concreting of Calungbuyan-Pulot Road, Brgy. Pulot, Lagayan, Abra Lone District 2,000,000
Concreting of Road, Brgy. Cardona, Dolores, Abra 5,000,000Concreting of Roads, Brgy. Patucannay, Bangued, Abra Lone District 2,000,000Concreting of Tui- Ableg, Daguioman Road, Brgy. Tui, Daguioman, Abra Lone District
3,000,000
Rehabilitaion/Repair of road with Line Canal, Brgy. North Poblacion, Bucay, Abra Lone District
1,000,000
Apayao 2nd DEO 10,000,000Improvement of Cadaclan-Marag Road, Brgy. Cadaclan, Calanasan, Apayao 10,000,000
Baguio City DEO 12,000,000Construction of Road Concreting at Purok 1, Sunnyside, Fairview, Baguio City Lone District
2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Baguio City Lone District
2,000,000
Road Construction at Lower Rock Quarry, Baguio City Lone District 2,000,000Road Construction at Purok 24, Irisan, Baguio City Lone District 2,000,000Road Construction at Purok Lower Balacbac and Purok Teachers Village, Sto. Tomas Proper, Baguio City Lone District
2,000,000
Road Widening at Balsigan, Baguio City Lone District 2,000,000
Benguet 1st DEO 2,000,000Improvement/Rehabilitation of Luding Road, Taloy, Tuba, Benguet Lone District 2,000,000
Ifugao 1st DEO 18,000,000Construction of Barangay Road, Cudog, Lagawe, Ifugao Lone District 2,000,000Construction/Rehabilitation of Various Infrastructure Projects, Ifugao Lone District 12,000,000
Rehabilitation and Concreting of Bannit-Nabangan Barangay Road, Barangay Payawan, Lamut, Ifugao
2,000,000
Rehabilitation and Concreting of Dalligan Barangay Road, Barangay Dalligan, Kiangan, Ifugao
2,000,000
Kalinga DEO 25,500,000Construction of Bado Dangwa Local Road,Brgy. Bado Dangwa,Tabuk City,Kalinga 2,000,000
Construction of Balani-Amlao Local Road,Brgy. Lucog,Tabuk City,Kalinga 2,000,000Construction of Banagao-Anggacan Local Road,Brgy. Anggacan,Tabuk City,Kalinga 2,000,000
Construction of Cagaluan-Liglig Local Road,Brgy. Tanglag,Lubuagan,Kalinga 2,000,000Construction of Calaccad-Balabal-Makilo Local Road,Brgy. Calaccad,Tabuk City,Kalinga
6,000,000
Construction of Wagud-Ballayangon-Ab-abaan Local Road,Brgy. Wagud, Ballayangon, Ab-abaan,Pinukpuk/Balbalan,Kalinga
10,000,000
Construction/Improvement of Gaogao Local Road,Brgy. Dupag,Tabuk City,Kalinga 1,500,000
Region II 321,200,000Batanes DEO 29,000,000
Construction of Road Shoulder for Underground Cables, Barangay Chanarian-Tukon/Uvoy (Diura), Basco/Mahatao, Batanes
12,000,000
Improvement/Rehabilitation of Caspo Road, Barangay Kaychanarianan, Basco, Batanes
3,000,000
Improvement/Rehabilitation of Kaychanarianan Road, Barangay Kaychanarianan, Basco, Batanes
2,000,000
Improvement/Rehabilitation of Kayhuvukan Road, Barangay Kayhuvukan, Basco, Batanes
2,000,000
Improvement/Rehabilitation of Kayvaluganan Road, Barangay Kayvaluganan, Basco, Batanes
2,000,000
Improvement/Rehabilitation of San Antonio Road, Barangay San Antonio, Basco, Batanes
2,000,000
Rehabilitation of Caspo Road with Drainage, Kaychanarianan, Basco, Batanes Lone LD
2,000,000
Rehabilitation/Improvement of J. Imperial II and Elizondo Roads, Brgy. Malakdang, Sabtang, Batanes Lone LD
2,000,000
Rehabilitation/Improvement of S. Faronillo Road, Brgy. Malakdang, Sabtang, Batanes Lone LD
2,000,000
Cagayan 1st DEO 16,000,000Construction of Road, Barangay Poblacion, Gonzaga, Cagayan 2,000,000Construction of Road, Brgy. Paranum, Lal-lo, Cagayan 1st LD 4,000,000
Page 133 of 162
details of dpwh’s programs/projects 1033
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of San Esteban Road, Brgy. San Esteban, Alcala, Cagayan 1st LD 2,000,000
Construction of San Esteban Road, Brgy. San Esteban, Cagayan 1st LD 2,000,000Rehabilitation of Minanga Road, Brgy. Minanga, Peñablanca, Cagayan 1st LD 2,000,000Rehabilitation of Pattao-Centro Road, Brgy. Pattao and Brgy. Centro, Buguey, Cagayan 1st LD
2,000,000
Rehabilitation of Pattao-Centro Road, Brgys. Pattao and Centro, Buguey, Cagayan 1st LD
2,000,000
Cagayan 2nd DEO 35,000,000Concreting of Barangay Road, Santa Barbara, Piat, Cagayan 2,000,000Concreting of Calapangan Sur Road, Brgy. Calapangan Sur, Lasam, Cagayan 2nd LD 2,000,000
Concreting of Centro Uno-Laptong Road, Brgys. Centro Uno and Laptong, Sta. Praxedes, Cagayan 2nd LD
2,000,000
Concreting of Colony Road, Barangay Libertad, Abulug, Cagayan 2nd LD 2,000,000Concreting of Duyun Road, Brgy. Duyun, Rizal, Cagayan 2nd LD 2,000,000Concreting of Gen. Claveria St., Brgy. Centro Uno, Claveria, Cagayan 2nd LD 2,000,000
Concreting of Labben-Utan Road, Brgys. Labben and Utan, Allacapan, Cagayan 2nd LD
2,000,000
Concreting of Old Provincial Road (Bonifacio Cortez St.), Brgy. Sta. Cruz,, Ballesteros, Cagayan 2nd LD
2,000,000
Concreting of Poblacion Road, Brgy. Poblacion, Piat, Cagayan 2nd LD 2,000,000Concreting of Tabba Road, Brgy. Tabba, Pamplona, Cagayan 2nd LD 2,000,000Construction of Road, Barangay Poblacion, Sanchez Mira, Cagayan 2,000,000Construction of Road, Barangay Poblacion, Santo Nino, Cagayan 2,000,000Construction of Road, Brgy. Poblacion, Piat, Cagayan 2nd LD 2,000,000Construction of Road, Brgy. Villarey, Piat, Cagayan 2nd LD 2,000,000Construction/Concreting of Barangay Rd., Barangay Alimoan, Claveria, Cagayan 2,000,000
Construction/Concreting of Barangay Rd., Barangay San Juan, St. Praxedes, Cagayan
2,000,000
Construction/Improvement of Nacionalista Road, Brgy. Centro East and Brgy. Centro West, Ballesteros, Cagayan 2nd LD
3,000,000
Cagayan 3rd DEO 19,000,000Construction of Road from Bayabat Public Cemetery to Provicial Road, Brgy. Bayabat, Amulung, Cagayan 3rd LD
3,000,000
Construction of Road, Barangay Calamagui, Solana, Cagayan 4,000,000Construction of Road, Barangay Poblacion, Amulung, Cagayan 2,000,000Construction of Road, Barangay Poblacion, Enrile, Cagayan 2,000,000Rehabilitation of Carilucud Road to Bantay Road, Brgy. Cariculud and Brgy. Bantay, Solana, Cagayan 3rd LD
2,000,000
Rehabilitation of Minanga Road, Brgy. Minanga, Peñablanca, Cagayan 3rd LD 2,000,000
Road Concreting of local road at Brgy. Cataggaman Pardo, Tuguegarao City, Cagayan 3rd LD
2,000,000
Road Concreting of local road at Brgy. Sitio San Juan, Brgy. 4, Enrile, Cagayan 3rd LD
2,000,000
Isabela 1st DEO 15,000,000Concreting of Catabayungan Brgy. Road, Cabagan, Isabela 1st LD 5,000,000Concreting of roads at Brgy. Simanu Sur to Brgy. Dalena, San Pablo, Isabela 1st LD 5,000,000
Concreting of roads, Barangay Colunguan to Barangay Bubug, Santo Tomas, Isabela 1st LD
5,000,000
Isabela 2nd DEO 40,500,000Barangay Palattao Road Concreting, Barangay Palattao, Naguilian, Isabela 2nd LD 500,000
Concreting Binatug Brgy. Road with Exception San Mariano Isabela 5,000,000Concreting Disulap Brgy. Road with Exception San Mariano Isabela 10,000,000Concreting of Casala Brgy. Road with Exception San Mariano Isabela 5,000,000Concreting of Dicamay Brgy. Road with Exception San Mariano Isabela 5,000,000Concreting of Libertad Brgy. Road with Exception San Mariano Isabela 5,000,000Concreting of Old San Mariano Brgy. Road with Exception San Mariano Isabela 10,000,000
Isabela 3rd DEO 67,000,000Concreting of Bella Luz - Sinamar Norte Barangay Road, Barangay Bella Luz, San Mateo, Isabela 3rd LD
2,000,000
Concreting of Buyon Barangay Road, Barangay Buyon, Cauayan City, Isabela 3rd LD 2,000,000
Concreting of Consular - Ezperanza - Fugaru Barangay Road, Barangay Consular, Angadanan, Isabela 3rd LD
5,000,000
Concreting of Ingud Norte - Ramona Barangay Road, Barangay Ingud Norte, Angadanan, Isabela 3rd LD
7,000,000
Concreting of La Suerte - Bunnay Barangay Road, Barangay La Suerte, Angadanan, Isabela 3rd LD
6,000,000
Concreting of MH Del Pilar - San Francisco Barangay Road, Barangay MH Del Pilar, Alicia, Isabela 3rd LD
5,000,000
Concreting of Rizal - Salvacion Barangay Road, Barangay Rizal, Alicia, Isabela 3rd LD
5,000,000
Concreting of Sinamar Norte - San Marcos Barangay Road, Barangay Sinamar Norte, San Mateo, Isabela 3rd LD
2,000,000
Concreting of Sto. Domingo - Mataas Na Kahoy Barangay Road, Barangay Sto. Domingo, Alicia, Isabela 3rd LD
5,000,000
Concreting of Sto. Domingo - Salvacion Barangay Road, Barangay Sto. Domingo, Alicia, Isabela 3rd LD
5,000,000
Concreting of Sto. Tomas - Dagupan Barangay Road, Barangay Dagupan, Alicia, Isabela 3rd LD
5,000,000
Concreting of Villa Domingo - Viga Barangay Road, Barangay Villa Domingo, Angadanan, Isabela 3rd LD
3,000,000
Concreting of Villa Sanchez - San Francisco Norte Barangay Road, Barangay Villa Sanchez, San Guillermo, Isabela 3rd LD
5,000,000
Repair/Rehab/Improvement of Barangay Magsaysay-Nueva Era-Lapaz Road, Barangay Magsaysay-Nueva Era-La Paz, Cabatuan, Isabela
10,000,000
Isabela 4th DEO 29,200,000
Page 134 of 162
1034 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Concreting of Roads at Barangay Camarag and Barangay Cebu, San Isidro, Isabela 4th LD
4,200,000
Road Repair 25,000,000
Nueva Vizcaya 1st DEO 16,000,000Construction, Sitio Mayabuang, Prk 2, Aurora Road, Barangay Aurora, Quezon, Nueva Vizcaya
2,000,000
Construction, Upper Dayog-Mt. Palale Road, Brgy. Madiangat, Quezon, Nueva Vizcaya Lone District
2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Nueva Vizcaya Lone District
12,000,000
Nueva Vizcaya 2nd DEO 8,000,000Construction, Anayo-Banila Road, Barangay Anayo, Aritao, Nueva Vizcaya 2,000,000Construction, Cabarroguis Road, Barangay Kongkong, Kasibu, Nueva Vizcaya 2,000,000
Construction, Dine Road, Barangay Dine, Kasibu, Nueva Vizcaya 2,000,000Construction, Parai Road, Barangay Parai, Dupax del Norte, Nueva Vizcaya 2,000,000
Quirino DEO 46,500,000Construction/Concreting of Roads, Barangay Aklan Village, Diffun, Quirino 2,000,000Construction/Concreting of Roads, Barangay Bannawag, Diffun, Quirino 2,000,000Construction/Concreting of Roads, Barangay Bonifacio, Diffun, Quirino 2,000,000Construction/Concreting of Roads, Barangay Doña Imelda, Diffun, Quirino 2,000,000Construction/Concreting of Roads, Barangay Dumabato Sur, Maddela, Quirino 2,000,000
Construction/Concreting of Roads, Barangay Gulac, Diffun, Quirino 2,000,000Construction/Concreting of Roads, Barangay P-5 Balligui, Maddela, Quirino 2,000,000Construction/Concreting of Roads, Barangay Palacian, Aglipay, Quirino 2,000,000Construction/Concreting of Roads, Barangay Poblacion Norte, Maddela, Quirino 2,000,000
Construction/Concreting of Roads, Barangay Villa Pagaduan, Aglipay, Quirino 2,000,000Construction/Concreting of Roads, Barangay Zamora, Cabarroguis, Quirino 4,000,000Construction/Concreting of Roads/Box Culvert, Bonifacio, Diffun, Quirino Lone District
2,000,000
Construction/Concreting of Roads/Box Culvert, Macate, Diffun, Quirino Lone District 2,500,000
Construction/Concreting of Roads/Box Culvert, Sto. Niño, Maddela, Quirino Lone District
2,000,000
Construction/Concreting of Roads/Box Culvert/Canal Lining, Barangay Cardenas, Saguday, Quirino
2,000,000
Construction/Concreting of Roads/Box Culvert/Canal Lining, Barangay Don Mariano Perez, Diffun, Quirino
2,000,000
Construction/Concreting of Roads/Box Culvert/Canal Lining, Barangay Gulac, Diffun, Quirino
2,000,000
Construction/Concreting of Roads/Box Culvert/Canal Lining, Barangay Pedlisan, Maddela, Quirino
2,000,000
Construction/Concreting of Roads/Box Culvert/Canal Lining, Barangay Rang-ayan, Aglipay, Quirino
2,000,000
Construction/Concreting of Roads/Box Culvert/Canal Lining, Barangay Rizal, Saguday, Quirino
2,000,000
Construction/Concreting of Roads/Box Culvert/Canal Lining, Barangay San Antonio, Aglipay, Quirino
2,000,000
Construction/Concreting of Roads/Box Culvert/Canal Lining, Barangay Sto. Tomas, Saguday, Quirino
2,000,000
Region III 623,000,000Regional Office III 100,000,000
Rehabilitation of Jose Abad Santos Avenue-National Highway from San Fernando up to the boundary of Arayat and Nueva Ecija, Pampanga 3rd LD
100,000,000
Aurora DEO 19,000,000Construction/Rehabilitation of Various Infrastructure Projects, Aurora Lone District 14,000,000
Road improvement , Dona Aurora St., Barangay South Poblacion 5,000,000
Bataan 1st DEO 13,300,000Concreting of Barangay Road in Brgy. Mabiga, Hermosa, Bataan 1st LD 4,000,000Concreting of Barangay Road, Daang Liputan, Barangay Mabatang, Abucay, Bataan 1st LD
2,980,000
Concreting of Road, Purok I, Purok 2 and Purok 3 from Market up to the Plaza and Barangay Hall, Barangay Payangan, Dinalupihan, Bataan 1st LD
4,320,000
Repair/Rehabilitation of Barangay Road, Barangay Daungan to Barangay Almacen,Hermosa, Bataan 1st LD
2,000,000
Bataan 2nd DEO 4,000,000Concreting of Road at Sitio Naswe, Brgy. Ipag, Mariveles, Bataan 2,000,000Concreting of Sierra Madre St., Brgy. Mt. View, Mariveles, Bataan 2,000,000
Bulacan 1st DEO 57,000,000Conc. Of Brgy. Santiago-Canalate Roads at Malolos, Bulacan 2,000,000Concreting of Roads, Barangay Caingin, City of Malolos, Bulacan 1st LD 2,000,000Concreting of Humel Heritage Homes Roads, Barangay Longos, City of Malolos, Bulacan 1st LD
2,000,000
Concreting of Meyto Road with Drainage System at Calumpit, Bulacan 2,000,000Concreting of Road at Canalate, City of Malolos, Bulacan 5,000,000Concreting of Roads at Barangay Santiago, City of Malolos, Bulacan 2,000,000Concreting of Roads, Barangay San Juan, City of Malolos, Bulacan 1st LD 2,000,000Construction of Barangay Road, Barangay Bintog, Plaridel, Bulacan 2,000,000Construction of Barangay Road, Barangay Concepcion, Baliwag, Bulacan 2,000,000Construction of Barangay Road, Barangay Ligas, Malolos City, Bulacan 2,000,000Construction of Road with Drainage, Barangay Lugam, City of Malolos, Bulacan 1st LD
2,000,000
Construction of Road with Drainage, Barangay Matungao, Bulacan, Bulacan 1st LD 2,000,000
Construction of Road with Drainage, Barangay Maysantol, Bulacan, Bulacan 1st LD 2,000,000
Construction of Road with Drainage, Barangay Stma. Trinidad, City of Malolos, Bulacan 1st LD
2,000,000
Page 135 of 162
details of dpwh’s programs/projects 1035
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Road with Drainage, Barangay Tibig, Bulacan, Bulacan 1st LD 2,000,000
Construction of Roads, Barangay San Sebastian, Hagonoy, Bulacan 1st LD 2,000,000Improvement of Roads, Barangay San Miguel, Hagonoy, Bulacan 1st LD 2,000,000Repair and Rehabilitation of Local Road, Banga 2nd, Plaridel, Bulacan 2nd LD 2,000,000Repair and Rehabilitation of Local Road, Bunducan, Bocaue, Bulacan 2nd LD 2,000,000Repair and Rehabilitation of Local Road, Cacarong Matanda, Pandi, Bulacan 2nd LD 2,000,000
Repair and Rehabilitation of Local Road, Catacte, Bustos, Bulacan 2nd LD 2,000,000Repair and Rehabilitation of Local Road, Catulinan, Baliwag, Bulacan 2nd LD 2,000,000Repair and Rehabilitation of Local Road, Malawak, Bustos, Bulacan 2nd LD 2,000,000Repair and Rehabilitation of Local Road, Manatal, Pandi, Bulacan 2nd LD 2,000,000Repair and Rehabilitation of Local Road, Sta. Cruz, Guiguinto, Bulacan 2nd LD 2,000,000
Repair and Rehabilitation of NIA Road, Pinagbarilan, Baliwag, Bulacan 2nd LD 2,000,000Upgrading of Sitio Kislap Roads, San Miguel-San Juan, Hagonoy, Bulacan 1st LD 2,000,000
Bulacan 2nd DEO 38,500,000Concreting of Road Kaybiten with drainage, Barangay San Gabriel, Sta. Maria, Bulacan 4th LD
2,000,000
Construction of Local Road, Bagong Pag-Asa, San Miguel 3rd LD 2,000,000Construction of Local Road, Baraka, Norzagaray 3rd LD 2,000,000Construction of Local Road, Camachin, Dona Remedios Trinidad 3rd LD 2,000,000Construction of Local Road, Sacdalan, San Miguel 3rd LD 2,000,000Construction of Local Road, Salapungan, San Rafael 3rd LD 2,000,000Construction of Overflow Bridge, Banaban, Angat 3rd LD 2,000,000Construction/Rehabilitation of Various Infrastructure Projects, San Jose Del Monte City Lone District
4,500,000
Rehabilitation and Concreting of Road , Barangay Abangan Norte, Marilao, Bulacan 4th LD
3,000,000
Rehabilitation of Barangay Road, Barangay Marungko, Angat, Bulacan 2,000,000Rehabilitation of Road and Drainage in Brgy. Buliran, Municipality of San Miguel, Province of Bulacan
5,000,000
Rehabilitation of Road and Drainage in Brgy. San Juan, Municipality of San Miguel, Province of Bulacan
5,000,000
Rehabilitation of Roads, Brgy. Buliran, Mun. of San Miguel, Province of Bulacan 5,000,000
Nueva Ecija 1st DEO 41,000,000Concreting of Road, Brgy. Agcano, Guimba, Nueva Ecija 2,500,000Concreting of Road, Brgy. Calem, Guimba, Nueva Ecija 2,500,000Construction of Barangay Road, Barangay Baloc, Sto. Domingo, Nueva Ecija 2,000,000Construction/Rehabilitation of Various Infrastructure Projects 2,000,000Construction/Rehabilitation of Various Infrastructure Projects, Nueva Ecija 1st LD 22,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Nueva Ecija 2nd LD 2,000,000
Farm to Market Road, Zaragoza, Nueva Ecija 8,000,000
Nueva Ecija 2nd DEO 97,000,000Concreting of Barangay Road in Brgy. Mabini Home Site, Cabanatuan City Nueva Ecija 3rd LD
3,000,000
Concreting of Farm to Market Road, Barangay Picaleon-Balaring, Gen. Natividad, Nueva Ecija 3rd LD
10,000,000
Concreting of Farm to Market Road, Barangay San Isidro, Laur, Nueva Ecija 3rd LD 10,000,000
Concreting of Local Road, Barangay Lourdes, Sta. Rosa, Nueva Ecija 3rd LD 2,000,000Concreting of Local Road, Barangay Manggahan (formerly Mapaet), Palayan City, Nueva Ecija 3rd LD
2,000,000
Concreting of Local Road, Barangay Marcos Village, Palayan City, Nueva Ecija 3rd LD 2,000,000
Concreting of Local Road, Barangay Militar, Palayan City, Nueva Ecija 3rd LD 2,000,000Concreting of Local Road, Barangay Rizal, Sta. Rosa, Nueva Ecija 3rd LD 2,000,000Concreting of Local Road, Barangay Sto. Rosario, Sta. Rosa, Nueva Ecija 3rd LD 2,000,000
Concreting of Local Road, De Lara St., Barangay Sapsap, Sta. Rosa, Nueva Ecija 3rd LD
2,000,000
Concreting of Local Road, J. Manubay St., Barangay Valenzuela, Sta. Rosa, Nueva Ecija 3rd LD
2,000,000
Concreting of Local Road, M. Gonzales St., Barangay Rajal Centro, Sta. Rosa, Nueva Ecija 3rd LD
2,000,000
Concreting of Local Road, Sitio Tramo 1, Barangay Gomez, Sta. Rosa, Nueva Ecija 3rd LD
2,000,000
Concreting of Road, Barangay Bulak, Gapan City, Nueva Ecija 4th LD 2,000,000Concreting of Road, Barangay Calaba, San Isidro, Nueva Ecija 4th LD 3,000,000Concreting of Road, Barangay Concepcion, Cabiao, Nueva Ecija 4th LD 2,000,000Concreting of Road, Barangay Julo, San Antonio Nueva Ecija 4th LD 2,000,000Concreting of Road, Barangay Malapit, San Isidro, Nueva Ecija 4th LD 2,000,000Concreting of Road, Barangay Pambuan, Gapan City, Nueva Ecija 4th LD 2,000,000Concreting of Road, Barangay Papaya, San Antonio, Nueva Ecija 4th LD 3,000,000Concreting of Road, Barangay San Carlos, Cabiao, Nueva Ecija 4th LD 2,500,000Concreting of Road, Barangay San Roque, Gapan City, Nueva Ecija 4th LD 3,500,000Concreting of Road, Barangay San Roque, San Isidro, Nueva Ecija 4th LD 2,000,000Concreting of Road, Barangay Sta. Barbara, San Antonio, Nueva Ecija 4th LD 2,000,000
Concreting of Road, Barangay Sto. Cristo Norte, Gapan City, Nueva Ecija 4th LD 2,000,000
Concreting of Road, Barangay Sto. Cristo, San Isidro, Nueva Ecija 4th LD 2,000,000Concreting of Road, Barangay Sto. Tomas South, Jaen, Nueva Ecija 4th LD 2,000,000Construction of Barangay Road, Barangay Aulo, Palayan City, Nueva Ecija 2,000,000Construction of Barangay Road, Barangay Caingin, Cabanatuan City, Nueva Ecija 2,000,000
Construction of Barangay Road, Brgy Bagong Buhay, Palayan City, Nueva Ecija 3,000,000
Repair/Rehab of Road, Brgy. Castellano-Nieves Road, San Leonardo Nueva Ecija 10,000,000
Road Improvement, Barangay Nieves 5,000,000
Pampanga 1st DEO 59,200,000
Page 136 of 162
1036 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Barangay Road, Barangay San Juan Nepomuceno, Betis, Guagua, Pampanga
2,000,000
Construction of Barangay Road, Barangay San Nicolas, San Fernando City, Pampanga
2,000,000
Construction of Barangay Road, Barangay San Pedro, Sta. Ana, Pampanga 2,000,000Construction of Road, Apalit, Pampanga 4th LD 2,000,000Construction of Road, Candaba, Pampanga 4th LD 3,700,000Construction of Road, Macabebe, Pampanga 4th LD 2,000,000Construction of Road, Masantol, Pampanga 4th LD 3,500,000Construction of Road, Minalin, Pampanga 4th LD 2,000,000Construction of Road, Sto. Tomas, Pampanga 4th LD 2,000,000Construction of Road,San Simon, Pampanga 4th LD 2,000,000Improvement / Upgrading of Road, Barangay Sto. Nino, San Fernando City, Pampanga
2,000,000
Improvement/Upgrading of Road, Becuran, Sta. Rita, Pampanga 2,000,000Road Concreting Sto. Tomas-Minalin Road (Minalin section) 30,000,000Road Concreting, Barangay Balete, San Fernando City, Pampanga 2,000,000
Pampanga 2nd DEO 24,000,000Barangay Road Concreting in Manibaug Libutad, Porac, Pampanga 2,000,000Concreting of Barangay Road in Purok I, Fortuna, Floridablanca, Pampanga 2,000,000Concreting of Road in LM Purok 4, Sta. Filomena, Guagua, Pampanga 2,000,000Construction of Barangay Road, Barangay Castuli, Macabebe, Pampanga 2,000,000Construction of Barangay Road, Nanay St., Barangay San Pedro, San Simon, Pampanga
2,000,000
Construction of Line Canal in Balubad, Porac, Pampanga 2,000,000Construction of Pias-Salu Road, Pias, Porac, Pampanga 2,000,000Construction of Road in San Pedro-San Roque, Floridablanca, Pampanga 2,000,000Road Concreting, Barangay Sta. Barbara, Bacolor, Pampanga 2,000,000Road upgrading and concreting at Purok V Lalam Sampaloc, San Agustin Guagua, Pampanga
2,000,000
Upgrading of Barangay Road in San Matias, Lubao, Pampanga 2,000,000Upgrading of sidewalk along Plaza Burgos in Brgy. Plaza Burgos, Guagua, Pampanga 2,000,000
Pampanga 3rd DEO 38,000,000Road Concreting at Barangay Anunas, Angeles City 1st LD 2,000,000Road Concreting at Barangay Atlu Bola, Mabalacat City 1st LD 2,000,000Road Concreting at Barangay Bical, Mabalacat City 1st LD 2,000,000Road Concreting at Barangay Calumpang, Mabalacat City 1st LD 2,000,000Road Concreting at Barangay Capaya, Angeles City 1st LD 2,000,000Road Concreting at Barangay Cuayan, Angeles City 1st LD 2,000,000Road Concreting at Barangay Mabiga, Mabalacat City 1st LD 2,000,000Road Concreting at Barangay Mamatitang, Mabalacat City 1st LD 2,000,000Road Concreting at Barangay Margot, Angeles City 1st LD 2,000,000Road Concreting at Barangay Navaling, Magalang 1st LD 2,000,000Road Concreting at Barangay San Francisco, Magalang 1st LD 2,000,000Road Concreting at Barangay San Joaquin, Mabalacat City 1st LD 2,000,000Road Concreting at Barangay San Nicolas I, Magalang 1st LD 2,000,000Road Concreting at Barangay San Vicente, Magalang 1st LD 2,000,000Road Concreting at Barangay Sapang Bato, Angeles City 1st LD 2,000,000Road Concreting at Barangay Sapang Bato, Mabalacat City 1st LD 2,000,000Road Concreting at Barangay Sta. Lucia, Magalang 1st LD 2,000,000Road Concreting at Barangay Tabun, Mabalacat City 1st LD 2,000,000Road Concreting of Santol Road, Barangay Dau, Mabalacat City 1st LD 2,000,000
Tarlac 1st DEO 95,000,000Concreting of Barangay Road in Brgy. San Jose, Gerona, Tarlac 2nd LD 5,000,000Concreting of Brgy. Road along Mauricio Tejada St., Brgy. Taguiporo, Sta. Ignacia, Tarlac
8,100,000
Concreting of Moncada-Paniqui Road, Brgy. Burgos, Paniqui, Tarlac 15,000,000Concreting of Purok Rang-ay to Purok Namnama Road, Brgy. Padapada, Sta. Ignacia, Tarlac
6,900,000
Concreting of Road at Brgy. Lalapac (Going to Brgy. Batang-Batang, Tarlac City), Victoria, Tarlac 2nd LD
8,950,000
Concreting of Road Brgy. Balayang (Going to Brgy. Batang-Batang, Victoria), Victoria, Tarlac 2nd LD
2,750,000
Concreting of Road Brgy. Carangian (Going to Brgy. San Vicente, Tarlac City), Tarlac City, Tarlac 2nd LD
4,300,000
Construction of Barangay Road at Barangay Malayep to Cardona, Gerona, Tarlac 2,000,000
Construction of Road at Sitio Malinta to Sitio Catigaacan, Barangay Villa Aglipay, San Jose, Tarlac
2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Tarlac 1st LD 40,000,000
Tarlac 2nd DEO 10,000,000Construction of FMR, Brgy. Alfonso, Concepcion 2,000,000Construction of FMR, Brgy. Castillo, Concepcion 2,000,000Construction of FMR, Brgy. Magao, Concepcion 2,000,000Construction of FMR, Brgy. Pando, Concepcion 2,000,000Construction of FMR, Brgy. Sta. Rosa, Concepcion 2,000,000
Zambales 1st DEO 11,000,000Concreting of Anuling-Sta. Barbara Road in Brgy. Sta. Barbara, Iba, Zambales 2nd LD
5,000,000
Construction of Barangay Road, Barangay Amungan, Iba, Zambales 2,000,000Construction of Roads at Brgy. Batonlapoc, Botolan, Zambales 2,000,000Construction of Roads at Brgy. Beddeng, San Narciso, Zambales 2,000,000
Zambales 2nd DEO 16,000,000Concreting of Sitio Alusiis Road, Barangay Looc, Municipality of Castillejos, Zambales 1st LD
10,000,000
Construction of Barangay Road, Barangay Pamatawan, Subic, Zambales 2,000,000Construction of Roads at Brgy. Gordon Heights, Olongapo City, Zambales 4,000,000
Region IV-A 532,600,000Regional Office IV-A 60,000,000
Concreting of Road-Don Placido Campos Avenue, Brgys. Sabang to San Jose to Zone 1 to Zone 2 to Zone 3 to Zone 4 to San Agustin 3 to San Agustin 2, City of Dasmariñas Cavite
60,000,000
Page 137 of 162
details of dpwh’s programs/projects 1037
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Batangas 1st DEO 47,500,000Concreting of Barangay Road in Brgy. Paraiso, Calatagan 2,000,000Concreting of Road, Barangay Cantandaan, Nasugbu, Batangas 2,000,000Concreting of Roads, Balayan, Batangas 2,000,000Concreting of Roads, Brgy. , Calaca, Batangas 2,500,000Concreting of Roads, Brgy. , Calatagan, Batangas 2,000,000Concreting of Roads, Brgy. , Lemery, Batangas 2,000,000Concreting of Roads, Brgy. , Lian, Batangas 2,000,000Concreting of Roads, Brgy. , Nasugbu, Batangas 2,000,000Concreting of Roads, Brgy. , Tuy, Batangas 2,500,000Concreting/Rehabilitation of Gulod-Lucsuhin-Hukay Provincial Road, Calatagan 2,000,000Concreting/Rehabilitation of Lucsuhin-Duhatan Provincial Road, Calatagan 2,000,000Construction / Improvement of Road, Cubamba - Gahol Road, Cubamba, Taal, Batangas
2,000,000
Construction/Concreting of Barangay Rd., Barangay Tanagan, Calatagan, Batangas 5,000,000
Improvement of Road with Drainage Facilities, Bucana, Nasugbu, Batangas 1,000,000Improvement of Road with Drainage Facilities, Poblacion, Taal, Batangas 1,000,000Improvement of Roads including Drainage, Brgy. Navotas, Balayan, Batangas 1,000,000
Improvement of Roads including Drainage, Brgy. Poblacion 4, Calaca, Batangas 1,000,000
Improvement of Roads including Drainage, Calatagan, Batangas 1,500,000Improvement of Roads including Drainage, Nasugbu, Batangas 2,500,000Improvement of Roads including Drainage, Taal, Batangas 2,000,000Opening/Concreting of Road, Brgy. Cahilan 1, Lemery, Batangas 1st LD 3,000,000Opening/Concreting of Road, Sitio Mabilog, Brgy. Mataas Na Bayan, Lemery, Batangas 1st LD
2,500,000
Rehabilitation/Improvement of Road, Sambat, Balayan, Batangas 1,000,000Rehabilitation/Repair/Improvement of Roads, Brgy. , Taal, Batangas 1,000,000
Batangas 2nd DEO 35,000,000Concreting of Barangay Malapad na Parang - Calumpit Road, Municipality of Lobo, Batangas 2nd LD
6,000,000
Construction of Road, Barangay Manalupang, Bauan, Batangas 2,000,000Construction of Road, Barangay Sico, Batangas City, Batangas 2,000,000Construction of Road, Barangay Talahib Pandayan, Batangas City, Batangas 2,000,000Construction of Road, Barangay Talumpok Silangan, Batangas City, Batangas 2,000,000
Construction/Improvement of Road Bilogo, Batangas City, Batangas 2,000,000Improvement / Widening of Road, Tinga Itaa - Sorosoro Ilaya Section, Tinga Itaas and Sorosoro Ilaya, Batangas City, Batangas
10,000,000
Improvement of Drainage Facilities, Barangay Alangilan, Batangas City, Batangas 2,000,000
Improvement of Road with Drainage Facilities, Poblacion, Mabini, Batangas 1,000,000Improvement of Road, Barangay Balagtas, Batangas City, Batangas 2,000,000Improvement of Road, Barangay Bolbok, Batangas City, Batangas 2,000,000Improvement of Road, Barangay Sta. Rita, Batangas City, Batangas 2,000,000
Batangas 3rd DEO 33,500,000Concreting of Road, Brgy. Barigon, Agoncillo, Batangas 3rd LD 2,000,000Construction / Improvement of Barangay Road, Janopol Oriental, Tanauan City, Batangas
2,000,000
Construction / Improvement of Road, San Vicente, Sto. Tomas, Batangas 2,000,000Construction /Improvement of Road Libjo, Batangas City, Batangas 2,000,000Construction of barangay road, Brgy. Cale, Tanauan, Batangas 10,000,000Improvement of Local Road in Brgy. IV, Tanauan City, Batangas,Batangas 3rd LD 2,000,000
Improvement of Local Road in Brgy. Pantay Matanda, Tanauan City, Batangas,Batangas 3rd LD
2,000,000
Improvement of Road with Drainage Canal, Poblacion 5, Tanauan, Batangas 1,000,000Improvement of Road, Calingatan, Mataas na, Batangas 2,000,000Improvement of Road, Poblacion 3, Laurel, Batangas 1,000,000Improvement of Road, Sta. Clara, Sto. Tomas, Batangas 1,500,000Improvement of Road, Sta.Maria, Talisay, Batangas 1,000,000Improvement of Road, Sulpoc, Ambulong, Bilog Bilog, Bagumbayan, Tanauan, Batangas
4,000,000
Improvement/Rehabilitation of Road, Aya, Talisay, Batangas 1,000,000
Batangas 4th DEO 57,000,000Concreting of Barangay Road, Sitio Langkaan, Brgy. Lipahan, San Juan, Batangas 7,500,000
Concreting of Brgy. Pinagsibaan Road, Sitio Luz Farm, Rosario, Batangas 4th LD 2,000,000
Concreting of Brgy. Tangway Road, Lipa City, Batangas 4th LD 2,500,000Concreting of Palindan-Lapu-Lapu Brgy. Road, Ibaan, Batangas 4th LD 2,000,000Concreting of Road, Tugtug, San Jose, Batangas 2,000,000Construction of Palindan-Lapo-Lapo Road, Barangay Palindan, Ibaan, Batangas 2,000,000
Construction of Road, Barangay Bulaklakan, Lipa City, Batangas 2,000,000Construction/Rehabilitation of Local Roads, Barangay Balete , Batangas City, Batangas
3,000,000
Construction/Rehabilitation of Spillway, Barangay Mabunga, Rosario, Batangas 2,000,000
Construction/Rehabilitation of Spillway, Barangay Pag-asa, Taysan, Batangas 2,000,000Rehabilitation/improvement of road link from Star Tollway , San Jose-Ibaan Road, Ibaan Section, Ibaan, Batangas
10,000,000
Road concreting of Brgy Poblacion,Brgy. PoblacionPadre Garcia,Padre,Garcia,Batangas
2,000,000
Road concreting, Brgy Mangas Padre Garcia, Batangas,Brgy. Mangas,Padre Garcia,Batangas
2,000,000
Road concreting, Brgy payapa Padre Garcia, Batangas,Brgy. Payapa,Padre Garcia,Batangas
2,000,000
Road concreting, Brgy. Bukal, Padre Garcia, Batangas 4th LD 4,000,000Road concreting, Brgy. Lumbangan, Rosario, Batangas 4th LD 2,000,000Road concreting, Brgy. Manggas/ Pansol, Padre Garcia, Batangas 4th LD 2,000,000Road concreting, Brgy. Mayuro, Rosario, Batangas 4th LD 2,000,000Road concreting, Brgy. Namuco, Rosario, Batangas 4th LD 2,000,000Road concreting, Brgy. Payapa, Padre Garcia, Batangas 4th LD 2,000,000
Page 138 of 162
1038 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Cavite 2nd DEO 14,000,000Concreting of Road, Barangay Acacia, Silang, Cavite 5th LD 2,500,000Concreting of Road, Barangay Banaba, Acacia, Narra, Silang, Cavite 5th LD 9,500,000Concreting of Road, Barangay Lumil, Silang, Cavite 5th LD 2,000,000
Cavite DEO 62,500,000Concreting of Road - DBB Resettlement Area Road, Brgys. San Dionisio, Sto. Cristo, Sto. Niño 1, Sto. Nino 2 and Sta. Lucia, City of Dasmarinas, Cavite
30,000,000
Concreting of Road Shoulder, Barangay Pob. 5 to De Las Alas, GMA, Cavite 5th LD 7,000,000
Concreting of Road, Barangay Lantic, Carmona, Cavite 5th LD 4,000,000Concreting of Road-Governor Camerino Avenue - Brgys. Zone 1, Zone 2, Zone 3 and Zone 4, City of Dasmarinas, Cavite
10,000,000
Construction of Road with Drainage System, Barangay F. De Castro, GMA, Cavite 5th LD
5,000,000
Improvement of Road with Drainage, Barangay Silangan I, Rosario, Cavite 1st LD 2,000,000
Improvement of Road, Barangay Manggahan, Kawit, Cavite 1st LD 4,500,000
Laguna 2nd DEO 12,000,000Concreting of Local Road,Brgy. Maahas,Los Baños,Laguna 2,000,000Improvement of Road With Drainage Aplaya, Sta Rosa City, Laguna 1st LD 2,000,000Improvement of Road With Drainage Caingin, Sta Rosa City, Laguna 1st LD 2,000,000Improvement of Road With Drainage Ibaba, Sta Rosa City, Laguna 1st LD 2,000,000Improvement of Road With Drainage Kanluran, Sta Rosa City, Laguna 1st LD 2,000,000
Improvement of Road With Drainage Market Area, Sta Rosa City, Laguna 1st LD 2,000,000
Laguna 3rd DEO 26,500,000Construction of Local Road in Brgy. San Rafael, San Pablo City, Laguna,Laguna 3rd LD
1,500,000
Rehab/Improvement Of Road Calauan-Nagcarlan Ko 77-Ko 82 25,000,000
Quezon 1st DEO 1,000,000Improvements of Roads with Drainage, Brgy. Poblacion, Polillo, Quezon 1,000,000
Quezon 2nd DEO 23,000,000Construction of Local Road, Balubal, Sariaya, Quezon 2nd LD 4,000,000Construction of Local Road, Del Rosario, Tiaong, Quezon 2nd LD 4,000,000Construction/Rehabilitation of Various Infrastructure Projects, Quezon 2nd LD 10,000,000
Farm to Market Road, Tiaong, Quezon 5,000,000
Quezon 4th DEO 23,000,000Construction of Local Road - Brgy. Calantipayan-Jongo-San Rafael Road, Lopez, Quezon 4th LD
2,000,000
Construction of Local Road - Brgy. Dungawan Pantay-Lubigan-Villa Hiwasayan Road, Guinayangan, Quezon 4th LD
2,000,000
Construction of Local Road - Brgy. Hondagua-Guites Road, Lopez, Quezon 4th LD 2,000,000
Construction of Local Road - Brgy. Payapa-Munting Parang-Bukal Road, Tagkawayan, Quezon 4th LD
2,000,000
Construction of Local Road - Brgy. Poblacion-Sabang Road, Quezon, Quezon 4th LD 2,000,000
Construction of Local Road - Brgy. San Miguel Dao Road, Lopez, Quezon 4th LD 2,000,000
Construction of Local Road - Brgy. San Miguel-Triumpo-Cabibihan Road, Guinayangan, Quezon 4th LD
2,000,000
Construction of Local Road - Brgy. Tagbakin Road, Atimonan, Quezon 4th LD 2,000,000
Construction of Local Road - Brgy. Tiniguiban-Buli-Anas Road, Calauag, Quezon 4th LD
2,000,000
Construction of Road, Barangay Cabong Norte, Cabong Sur, Guinayangan, Quezon 5,000,000
Rizal 1st DEO 102,600,000Concreting of Roads with Drainage System, along L. Wood Street, San Isidro, Taytay, Rizal 1st LD
5,000,000
Concreting of Roads with Drainage System, Cainta, Rizal 1st LD 5,000,000Concreting of Roads with Drainage System, Construction/Rehabilitationof Road, Karangalan, Cainta, Rizal 1st LD
5,000,000
Concreting of Roads with Drainage System, Rehabilitation of Road, Phase II Sto. Nino, Bilibiran, Binangonan, Rizal 1st LD
3,000,000
Concreting of Roads, Rehabilitation of Road with Drainage System, Gulod, Binangonan, Rizal 1st LD
4,000,000
Concreting/Construction Of Road At So. Tiaong, Brgy. Mayamot, Antipolo, Rizal 5,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Rizal 2nd LD 8,000,000Improvement of Roads with Drainage System, Boncan Road, Brgy. San Luis, Antipolo City, Rizal 2nd LD
5,000,000
Improvement of Roads with Drainage System, Gloria Heights, Brgy. Dalig, Antipolo City, Rizal 2nd LD
5,000,000
Improvement of Roads with Drainage System, Peace Village Subd., Phase 1, Brgy. San Luis, Antipolo City, Rizal 2nd LD
5,000,000
Improvement of Roads with Drainage System, Purok 1 and 5 Zone 8, Brgy. Cupang, Antipolo City, Rizal 2nd LD
5,000,000
Improvement of Roads with Drainage System, South Carolina St., Joyous Heights Subd., Brgy. San Jose, Antipolo City, Rizal 2nd LD
5,000,000
Improvement of Roads with Drainage System, St. Therese Phase III, Peñafrancia, Brgy. Cupang, Antipolo City, Rizal 2nd LD
5,000,000
Rehab of NHA Road, Barangay Dela Paz, Antipolo, Rizal 5,000,000Rehab of Road P. Oliveros St., Barangay Mayamot, Antipolo, Rizal 3,600,000Rehab/Impv Of Olalia Rd., Brgy. Dela Paz, Antipolo, Rizal 9,000,000Rehab/Impv of Olalia Road, Barangay Sta. Cruz, Antipolo, Rizal 5,000,000Rehab/Impv of Road Villa Leyva II, Barangay Sta. Cruz, Antipolo, Rizal 5,000,000Rehab/Impv of Road, Gertrude St., Barangay Mambugan, Antipolo, Rizal 5,000,000Rehab/Impv. Of Roads, Brgy. Beverly Hills, Antipolo, Rizal 5,000,000
Page 139 of 162
details of dpwh’s programs/projects 1039
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Rizal 2nd DEO 35,000,000Construction/Repair/Rehabilitation/Improvement at Barangay Mascap-Puray road, Barangay Mascap and Puray, Rodriguez, Rizal
5,000,000
Construction/Repair/Rehabilitation/Improvement of road and drainage structure at Barangay Guinayang, San Mateo, Rizal
5,000,000
Construction/Repair/Rehabilitation/Improvement of road and drainage structure at Barangay Guitnangbayan I, San Mateo, Rizal
2,000,000
Construction/Repair/Rehabilitation/Improvement of road and drainage structure at Barangay San Jose, Rodriguez, Rizal
2,000,000
Construction/Repair/Rehabilitation/Improvement of road and drainage structure at Barangay Sto. Niño, San Mateo, Rizal
2,000,000
Construction/Repair/Rehabilitation/Improvement of road at Barangay Ampid II, San Mateo, Rizal
2,000,000
Construction/Repair/Rehabilitation/Improvement of road at Barangay Bombongan, Morong, Rizal
2,000,000
Construction/Repair/Rehabilitation/Improvement of road at Barangay Del Remedio to Barangay Calahan, Cardona, Rizal
3,000,000
Construction/Repair/Rehabilitation/Improvement of road at Barangay Pagkalinawan, Jalajala, Rizal
3,000,000
Construction/Repair/Rehabilitation/Improvement of road at Barangay San Isidro, Rodriguez, Rizal
3,500,000
Construction/Repair/Rehabilitation/Improvement of road at Barangay Sipsipin, Jalajala, Rizal
2,500,000
Construction/Repair/Rehabilitation/Improvement of road at Barangay Tuna to Barangay Lambac, Cardona, Rizal
3,000,000
Region IV-B 185,000,000Marinduque DEO 32,000,000
Concreting of Local Road, Brgy. Apitong, Boac, Marinduque Lone District 2,000,000Concreting of Local Road, Brgy. Bolo, Torrijos, Marinduque Lone District 2,000,000Concreting of Local Road, Brgy. Danao, Mogpog, Marinduque Lone District 2,000,000Concreting of Local Road, Brgy. Haguimit, Sta. Cruz, Marinduque Lone District 2,000,000
Concreting of Local Road, Brgy. Lapu-Lapu, Sta. Cruz, Marinduque Lone District 2,000,000
Concreting of Local Road, Brgy. Malayak, Mogpog, Marinduque Lone District 2,000,000Concreting of Local Road, Brgy. Maligaya, Boac, Marinduque Lone District 2,000,000Concreting of Local Road, Brgy. Masalukot, Sta. Cruz, Marinduque Lone District 2,000,000
Concreting of Local Road, Brgy. Mendez, Mogpog, Marinduque Lone District 2,000,000Concreting of Local Road, Brgy. Paye, Mogpog, Marinduque Lone District 2,000,000Concreting of Local Road, Brgy. Pulong Parang, Sta. Cruz, Marinduque Lone District 2,000,000
Concreting of Local Road, Brgy. Sabong, Boac, Marinduque Lone District 2,000,000Concreting of Local Road, Brgy. Tambunan, Boac, Marinduque Lone District 2,000,000Construction/Rehabilitation of Various Infrastructure Projects, Marinduque Lone District
6,000,000
Mindoro Occidental DEO 52,000,000Construction of Barangay Road, Barangay San Luis, Mamburao, Occidental Mindoro 4,000,000
Construction of Poblacion-Mananao FMR, Brgy. Alipaoy, Paluan 20,000,000Construction of Slope Protection in Barangays 2, 4, 5, & 7, Municipality of Mamburao, Province of Occidental Mindoro
5,000,000
Construction/Rehabilitation of Various Infrastructure Projects 3,000,000Construction/Upgrading of Poblacion-Harrison Road, Brgy. Harrison, Paluan 20,000,000
Mindoro Oriental DEO 40,000,000Concreting of Local Road,Brgy. Baclayan,Puerto Galera,Or. Mdo. 2,000,000Concreting of Local Road,Brgy. Fortuna,Socorro,Or. Mdo. 2,000,000Concreting of Local Road,Brgy. Lumangbayan,San Teodoro,Or. Mdo. 2,000,000Concreting of Local Road,Brgy. Mayabig,Baco,Or. Mdo. 2,000,000Concreting of Local Road,Brgy. Putican Cabulo,Baco,Or. Mdo. 2,000,000Concreting of Local Road-Sitio Ilaya,Brgy. Camansihan,Calapan City,Or. Mdo. 2,000,000
Concreting of Mayabig -Bangkatan Road, Barangay Mayabig-Bangkatan, Baco, Oriental Mindoro 1st LD
20,000,000
Construction of Barangay Road, Barangay Matungao, Socorro, Oriental Mindoro 2,000,000
Construction/Improvement of Concreting of Local Road,Brgy. Biga,Pola,Or. Mdo. 2,000,000
Construction/Improvement of Concreting of Local Road,Brgy. Villa Cerveza,Victoria,Or. Mdo.
2,000,000
Construction/Improvement of Construction of Local Road- Sitio Malamig,Brgy. Leido,Victoria,Or. Mdo.
2,000,000
Palawan 1st DEO 5,000,000Concreting of Roads at Sitio Landing leading to municipal roads, Barangay New Agutaya, San Vicente, Palawan 1st LD
5,000,000
Palawan 2nd DEO 4,000,000Road Concreting from Brgy. Rizal, Aborlan to Brgy. Dumanguena, Narra, Palawan 2nd LD
2,000,000
Road Concreting from the National Highway to Barangay Proper, Brgy. Elvita, Narra, Palawan 2nd LD
2,000,000
Palawan 3rd DEO 10,000,000Concreting of Roads, Barangay Iwahig, Puerto Princesa City, Palawan 3rd LD 2,000,000Construction/Rehabilitation of Various Infrastructure Projects, Palawan 3rd LD 8,000,000
Romblon DEO 5,000,000Construction of Roads at Sitio Bongoy, Brgy. Liwanag, Odiiongan, Romblon 2,500,000Construction/Rehabilitation of 270m Local Road of Elpidio Quirino Street, Tabing Dagat ,Odiongan, Romblon
2,500,000
Southern Mindoro DEO 37,000,000Conc. Of Brgy. Wasig Rd and Sitio Naalin, Brgy. Maliwanag, Barangay Wasig & Maliwanag, Mansalay, Oriental Mindoro 2nd LD
2,000,000
Page 140 of 162
1040 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Conc. Of K.I. to Batuhan Road, Brgy. Poblacion, Bongabong, Barangay Poblacion, Bongabong, Oriental Mindoro 2nd LD
3,000,000
Conc. Of So. Coro-Coro to So. Alimawan, San Francisco, and Imbuyungan-Kalong,Nasucob,, Barangay San Francisco & Nasucob, Bulalacao, Oriental Mindoro 2nd LD
3,500,000
Concreting of of Conrazon-Poblacion Prov'l Road (1 km.), Barangay Conrazon & Poblacion, Bansud, Oriental Mindoro 2nd LD
2,000,000
Concreting of Brgy. Mina De Oro and So. Centro-So. Ibaba II, San Jose Rd., Barangay Mina De Oro & San Jose, Bongabong, Oriental Mindoro 2nd LD
3,000,000
Concreting of Brgy. San Miguel and Brgy. Libertad and So. Bayanihan Rd., Odiong , Barangay San Miguel & Libertad & Odiong, Roxas, Oriental Mindoro 2nd LD
3,000,000
Concreting of Brgy. Bacungan Rd and Panggulayan Rd, Barangay Bacungan &Panggulayan, Pinamalayan, Oriental Mindoro 2nd LD
2,000,000
Concreting of Ipil-Sagana Bridge Approaches A and B and Brgy. Sta Cruz Rd., Barangay Ipil & Sagana & Sta. Cruz, Bongabong, Oriental Mindoro 2nd LD
3,500,000
Concreting of Maligaya Road, Kawit Road & M. Adriatico Rd, Barangay Maligaya & Kawit & M. Adriatico, Gloria, Oriental Mindoro 2nd LD
4,000,000
Concreting of So. Narra Villa Pag-asa Road, Barangay Villa Pag-asa, Bansud, Oriental Mindoro 2nd LD
2,000,000
Concreting of So.San Pedro,Nabuslot and So. Silangang Babahurin, Guinhawa Road, Barangay Nabuslot & Guinhawa , Pinamalayan, Oriental Mindoro 2nd LD
2,000,000
Construction of Bagong Bayan 2 Road with Drainage Canal, Barangay Bagong Bayan 2, Bongabong, Oriental Mindoro 2nd LD
2,000,000
Improvement of Roads, Brgy. Pambisan Malaki to Brgy. Sabang, Pinamalayan, Oriental Mindoro
5,000,000
Region V 519,000,000Albay 1st DEO 38,000,000
Const. of Salog-Damacan Road, Damacan, Bacacay, Albay 18,000,000Construction of Bariw - San Vicente Brgy. Roads, Bariw, Malinao, Albay 1st LD 2,500,000
Construction of Estancia - Awang Brgy. Roads, Awang, Malinao, Albay 1st LD 2,500,000
Construction of San Vicente - Estancia Brgy. Roads, Estancia, Malinao, Albay 1st LD 2,000,000
Construction of Soa - Bulang Brgy. Roads, Bulang, Malinao, Albay 1st LD 3,000,000Construction/Rehabilitation of Various Infrastructure Projects, Albay 1st LD 10,000,000
Albay 2nd DEO 82,000,000Concreting of Road to Mt. Kitwinan World War 2 Hospital Tourism Area 10,000,000Construction of Barangay Burgos Road (leading to Bicol International Airport), Daraga, Albay
5,000,000
Construction of Brgy. Road, Brgy. Burgos, Daraga, Albay 2nd LD 12,000,000Construction of Brgy. Road, Brgy. Sua, Camalig, Albay 2nd LD 12,000,000Rehabilitation/Improvement of Estanza-Kiwalo Road 16,000,000Rehabilitation/Improvement of Tinago-Quitiuinan-Mina Road 22,000,000Road widening/concreting Brgy. Bagacay, Legazpi City 2nd LD 5,000,000
Camarines Norte DEO 24,000,000Concreting of Local Road, Barangay Awitan, Daet, Camarines Norte 2nd LD 2,000,000Concreting/Construction of Anameam Road, Brgy. Anameam, Labo, Camarines Norte,Camarines Norte 1st LD
2,000,000
Concreting/Construction of Calero Road, Brgy. Calero, Jose Panganiban, Camarines Norte,Camarines Norte 1st LD
2,000,000
Concreting/Construction of Camagsaan Road, Brgy. Camagsaan, Capalonga, Camarines Norte,Camarines Norte 1st LD
2,000,000
Concreting/Construction of Canapawan Road, Brgy. Canapawan, Labo, Camarines Norte,Camarines Norte 1st LD
2,000,000
Concreting/Construction of Itok-Lucbanan Road, Brgy.Itok, Capalonga, Camarines Norte,Camarines Norte 1st LD
2,000,000
Concreting/Construction of Lucbanan – Itok Road, Brgy. Lukbanan, Capalonga, Camarines Norte,Camarines Norte 1st LD
2,000,000
Concreting/Construction of Macogon Road, Brgy. Macogon, Labo, Camarines Norte,Camarines Norte 1st LD
2,000,000
Concreting/Construction of Pulongguit-guit Road, Brgy. Pulongguit-guit, Sta. Elena,Camarines Norte 1st LD
2,000,000
Concreting/Construction of Sta. Cruz Road, Brgy. Sta. Cruz, Labo, Camarines Norte,Camarines Norte 1st LD
2,000,000
Concreting/Construction of Sta. Rosa Sur Road, Brgy. Sta. Rosa Sur, Jose Panganiban, Camarines Norte,Camarines Norte 1st LD
2,000,000
Concreting/Construction of Veterans Road, Brgy. Poblacion, Capalonga, Camarines Norte,Camarines Norte 1st LD
2,000,000
Camarines Sur 1st DEO 26,000,000Concreting of Roads, Brgy. Alianza, San Fernando, Camarines Sur 2nd LD 2,000,000Concreting of Roads, Brgy. Baliuag Nuevo, Minalabac, Camarines Sur 2nd LD 2,000,000
Concreting of Roads, Brgy. Beguito Nuevo, Libmanan, Camarines Sur 2nd LD 2,000,000
Concreting of Roads, Brgy. Bikal, Libmanan, Camarines Sur 2nd LD 2,000,000Concreting of Roads, Brgy. Buenavista, San Fernando, Camarines Sur 2nd LD 2,000,000
Concreting of Roads, Brgy. Malbong, Gainza, Camarines Sur 2nd LD 2,000,000Concreting of Roads, Brgy. Mambulo Viejo, Libmanan, Camarines Sur 2nd LD 2,000,000
Concreting of Roads, Brgy. Manapao, Minalabac, Camarines Sur 2nd LD 2,000,000Concreting of Roads, Brgy. Palong, Libmanan, Camarines Sur 2nd LD 2,000,000Concreting of Roads, Brgy. San Antonio, Minalabac, Camarines Sur 2nd LD 2,000,000Improvement of Roads with Drainage, Brgy. Bonifacio, San Fernando, Camarines Sur 2nd LD
2,000,000
Improvement of Roads with Drainage, Brgy. Del Pilar, San Fernando, Camarines Sur 2nd LD
2,000,000
Improvement of Roads with Drainage, Brgy. San Vicente, Libmanan, Camarines Sur 2nd LD
2,000,000
Camarines Sur 2nd DEO 25,000,000
Page 141 of 162
details of dpwh’s programs/projects 1041
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Lugsad-Sibao Farm-to-Market Road, Lugsad, Calabanga, Camarines Sur 3rd LD
10,000,000
Construction of Pawili Circumferential Road, Pili, Camarines Sur 3rd LD 5,000,000Construction of Quinale Farm-to-Market Road, Calabanga, Camarines Sur 3rd LD 10,000,000
Camarines Sur 4th DEO 57,000,000Concreting at Masoli Bato, Camarines Sur, Barangay Masoli, Bato, Camarines Sur 5th LD
2,000,000
Concreting at San Jose Salay, Barangay San Jose, Buhi, Camarines Sur 5th LD 2,000,000
Concreting at Sta. Isabel, Barangay Sta. Isabel, Buhi, Camarines Sur 5th LD 2,000,000Concreting of Aranga and Tamaway Streets, Brgy. Santiago, Iriga, Camarines Sur 2,000,000
Concreting of Divino Rostro, Barangay Divino Rostro/ Antipolo, Buhi, Camarines Sur 5th LD
2,000,000
Concreting of Kalye Napabayaan, Barangay San Ramon, Nabua, Camarines Sur 5th LD
2,000,000
Concreting of Local Road, Brgy. Old Lourdes to Young Lourdes, Nabua, Camarines Sur 5th LD
5,000,000
Concreting of Nobleza Street, Brgy. San Roque, Buhi, Camarines Sur 3,000,000Concreting of Palsong - La Purisima road, Barangay Palsong, Bula, Camarines Sur 5th LD
2,000,000
Concreting of San Pedro, Barangay San Pedro, Iriga City, Camarines Sur 5th LD 2,000,000
Concreting of Sta. Barbara - Sta. Cruz road, Barangay Sta. Barbara, Nabua, Camarines Sur 5th LD
2,000,000
Concreting of Zone 2, 5, 7 , Barangay Siramag, Balatan, Camarines Sur 5th LD 2,000,000
Concreting of Zone 2, Barangay Sto. Nino, Iriga City, Camarines Sur 5th LD 2,000,000Concreting of Zone 4 and 7, Barangay San Vicente, Bato, Camarines Sur 5th LD 2,000,000
Concreting of Zone 5 & 6 , Barangay Cristo Rey, Iriga City, Camarines Sur 5th LD 2,000,000
Concreting of Zone 5 & 6, Barangay Lobong, Bato, Camarines Sur 5th LD 2,000,000Concreting of Zone 6, Barangay La Purisima, Iriga City, Camarines Sur 5th LD 2,000,000
Concreting of Zone 6, Barangay Pararao, Balatan, Camarines Sur 5th LD 2,000,000Concreting ofr Zone 1 & 2, Barangay Perpetual Help, Iriga City, Camarines Sur 5th LD
2,000,000
Widening of Nabua-Balatan Road 15,000,000
Camarines Sur 5th DEO 69,000,000Concreting of Barangay Road Barangay Agao-ao, Ragay Camarines Sur 2,000,000Concreting of Barangay Road Barangay Bangon, Lupi Camarines Sur 2,000,000Concreting of Barangay Road Barangay Baya, Ragay Camarines Sur 2,000,000Concreting of Barangay Road Barangay Lohong, Ragay Camarines Sur 2,000,000Concreting of Barangay Road Barangay Port Junction Norte , Ragay Camarines Sur 2,000,000
Concreting of Barangay Road Barangay San Ramon going to Barangay San Rafael, Lupi
2,000,000
Concreting of Barangay Road Barangay Serranzana Sipocot, Camarines Sur 2,000,000Concreting of Barangay Road Barangay Sta. Rita II, Del Gallego Camarines Sur 2,000,000
Concreting of Barangay Road Barangay Tula-tula Sipocot, Camarines Sur 2,000,000Concreting of Barangay Road Calampinay going to Manga Barangay Manga 2,000,000Concreting of Barangay Road Sitio Villasan, Barangay Castillo Cabusao, Camarines Sur
2,000,000
Concreting of Barangay Road, Barangay Aldezar, Sipocot, Camarines Sur 1st LD 2,000,000
Concreting of Barangay Road, Barangay Awayan, Sipocot, Camarines Sur 2,000,000Concreting of Barangay Road, Barangay Azucena, Sipocot, Camarines Sur 1st LD 2,000,000
Concreting of Barangay Road, Barangay Barrera Sr. , Lupi, Camarines Sur 2,000,000Concreting of Barangay Road, Barangay Cabasag, Del Gallego, Camarines Sur 1st LD 2,000,000
Concreting of Barangay Road, Barangay Cabinitan, Ragay, Camarines Sur 1st LD 2,000,000
Concreting of Barangay Road, Barangay Caditaan, Ragay, Camarines Sur 1st LD 2,000,000
Concreting of Barangay Road, Barangay Castillo, Cabusao, Camarines Sur 2,000,000Concreting of Barangay Road, Barangay Cristo Rey, Lupi, Camarines Sur 1st LD 2,000,000
Concreting of Barangay Road, Barangay La Purisima, Lupi, Camarines Sur 1st LD 2,000,000
Concreting of Barangay Road, Barangay Magais 2, Del Gallego, Camarines Sur 1st LD
2,000,000
Concreting of Barangay Road, Barangay Mangcawayan, Lupi, Camarines Sur 1st LD 2,000,000
Concreting of Barangay Road, Barangay Palaspas, Del Gallego, Camarines Sur 1st LD 2,000,000
Concreting of Barangay Road, Barangay Sagrada, Lupi, Camarines Sur 2,000,000Concreting of Barangay Road, Barangay Sagrada, Sipocot, Camarines Sur 2,000,000Concreting of Barangay Road, Barangay San Pedro, Lupi, Camarines Sur 1st LD 2,000,000
Concreting of Barangay Road, Barangay Sooc to Barangay Haluban, Lupi, Camarines Sur 1st LD
2,000,000
Concreting of Barangay Road, Barangay Sooc, Lupi, Camarines Sur 2,000,000Concreting of Barangay Road, Barangay Sugsugin, Del Gallego, Camarines Sur 1st LD
2,000,000
Concreting of Barangay Road, Cotmo-San Vicente Road, Barangay Cotmo, Sipocot, Camarines Sur 1st LD
3,000,000
Concreting of Barangay Road, NASA Village, Barangay Camagong, Cabusao, Camarines Sur 1st LD
2,000,000
Construction of Barangay Road Barangay Sta. Lutgarda Cabusao, Camarines Sur 2,000,000
Rehabilitation of Barangay Road, Barangay Sta. Cruz, Cabusao, Camarines Sur 1st LD
2,000,000
Catanduanes DEO 31,000,000
Page 142 of 162
1042 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Road in Brgy. Bagong Sirang, San Andres, Catanduanes Lone District 2,000,000
Construction of Road in Brgy. Banawang, Bato, Catanduanes Lone District 2,000,000Construction of Road in Brgy. Carangag, San Andres, Catanduanes Lone District 2,000,000
Construction of Road in Brgy. Palnab del Sur, Virac, Catanduanes Lone District 2,000,000
Construction of Road in Brgy. Palta Salvacion, Virac, Catanduanes Lone District 2,000,000
Construction of Road in Brgy. Poniton, Virac, Catanduanes Lone District 2,000,000Construction of Road in Brgy. Rizal, Viga, Catanduanes Lone District 2,000,000Construction of Road in Brgy. San Isidro Village, Virac, Catanduanes Lone District 2,000,000
Road Concreting of Eco Tourism Road at Brgy. Solong Road- Solong Falls, San Miguel
15,000,000
Masbate 1st DEO 33,000,000Concreting of Barangay Road, Barangay Ayat, Mandaon, Masbate 2nd LD 3,000,000Concreting of Barangay Road, Barangay Bangad, Milagros, Masbate 2nd LD 3,000,000Concreting of Barangay Road, Barangay Biong, Masbate City, Masbate 2nd LD 3,000,000
Concreting of Barangay Road, Barangay Bugtong, Mandaon, Masbate 2nd LD 3,000,000
Concreting of Barangay Road, Barangay Buri, Mandaon, Masbate 2nd LD 3,000,000Concreting of Barangay Road, Barangay Calanay, Aroroy, Masbate 2nd LD 3,000,000Concreting of Barangay Road, Barangay Dayhagan, Aroroy, Masbate 2nd LD 3,000,000
Concreting of Barangay Road, Barangay Jangan, Balud, Masbate 2nd LD 3,000,000Concreting of Barangay Road, Barangay Nabulwang, Narangasan, Milagros, Masbate 2nd LD
3,000,000
Concreting of Barangay Road, Barangay Villa Alvarez, Balud, Masbate 2nd LD 6,000,000
Masbate 2nd DEO 20,000,000Concreting of Puro-Villa Hermosa Road, Brgy. Puro and Villa Hermosa, Cawayan, Masbate 3rd LD
20,000,000
Masbate 3rd DEO 74,000,000Concreting of Daraga, Placer - Divisoria, Cawayan Road, Barangays Daraga & Divisoria, Placer & Cawayan, Masbate
30,000,000
Concreting of Farm-to-Market Road, Barangay Burgos, San Jacinto, Masbate 1st LD 10,000,000
Concreting of Farm-to-Market Road, Barangay Nasandig - Barangay Mabuhay, Batuan, Masbate 1st LD
12,000,000
Concreting of Farm-to-Market Road, Barangay Real - Barangay Cantorna, Monreal, Masbate 1st LD
10,000,000
Concreting of Farm-to-Market Road, Junction National Road Barangay Valparaiso - Barangay Buenas Aires, San Fernando, Masbate 1st LD
12,000,000
Sorsogon 1st DEO 40,000,000Concreting of road, Barangay Bonga, Castilla, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Gura, Donsol, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Lapinig, Magallanes, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Mabanate-Cagdogan, Pilar, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Mabanate-Lipason, Pilar, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Macabog, Sorsogon City, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Malbog-Siuton, Magallanes, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Malinao, Donsol, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Mayon-Maracabac, Castilla, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Oras-Bagong Sirang, Castilla, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Panlayaan, Sorsogon City, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Pinagsalog-Ilona-Migabod, Pilar, Sorsogon 1st LD 2,000,000
Concreting of road, Barangay Sacnangan, Pilar, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Salvacion (Sitio Banao), Sorsogon City, Sorsogon 1st LD
2,000,000
Concreting of road, Barangay San Ramon, Donsol, Sorsogon 1st LD 2,000,000Concreting of road, Barangay San Vicente, Donsol, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Sta. Elena-Anibog, Magallanes, Sorsogon 1st LD 2,000,000
Concreting of road, Barangay Tigbao, Casiguran, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Tiris, Casiguran, Sorsogon 1st LD 2,000,000Concreting of road, Barangay Trece Martirez (storeroom), Casiguran, Sorsogon 1st LD
2,000,000
Region VI 346,000,000Aklan DEO 18,000,000
Concreting of Barangay Road, Brgy. Calangcang, Makato, Aklan 2,000,000Concreting of Barangay Road, Brgy. Ogsip, Libacao, Aklan 2,000,000Concreting of Barangay Road, Brgy. Talon, Altavas, Aklan 2,000,000Concreting of Farm-to-Market Road, Brgy. Arcangel, Balete, Aklan 2,000,000Construction of Barangay Road , Brgy. Camanci Sur, Numancia, Aklan 2,000,000Construction of Farm-to-Market Road, Brgy. Santa Cruz, Lezo, Aklan 2,000,000Construction of Farm-to-Market Road, Brgy. Tabon, Batan, Aklan 2,000,000Construction of Farm-to-Market Road, Brgy. Unidos, Nabas, Aklan 2,000,000Construction of Road , Brgy Talon, Altavas, Aklan 2,000,000
Antique DEO 68,000,000Construction of Roads at Brgy. Old Town, San Remegio, Antique 2,000,000Construction of Local Road, Bitas, Patnongon, Antique Lone District 2,000,000Construction of Local Road, Bongbongan 1-2, Hamtic, Antique Lone District 2,000,000Construction of Local Road, Buhang, Hamtic, Antique Lone District 2,000,000Construction of Local Road, Carmelo I, San Remigio, Antique Lone District 2,000,000Construction of Local Road, Gen. Luna, San Remigio, Antique Lone District 2,000,000Construction of Local Road, Inabasan, Sibalom, Antique Lone District 2,000,000Construction of Local Road, Intao, Laua-an, Antique Lone District 2,000,000Construction of Local Road, Mablad, Barbaza, Antique Lone District 2,000,000Construction of Local Road, Nauhon, Sebaste, Antique Lone District 2,000,000Construction of Local Road, Osorio I, San Remigio, Antique Lone District 2,000,000Construction of Local Road, Vilvar, San Remigio, Antique Lone District 2,000,000Construction of Local Road, Vista Alegre, Patnongon, Antique Lone District 2,000,000
Page 143 of 162
details of dpwh’s programs/projects 1043
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Roads at Brgy. San Pedro, San Jose, Antique 2,000,000Construction/Rehabilitation of Brgy. Igsoro, Sitio Nawili Road, Bugasong 20,000,000Construction/Rehabilitation of Pangalcagan, Sitio Ignato Road, Sitio Babangan Section, Bugasong
20,000,000
Capiz 1st DEO 20,000,000Repair/Rehabilitation/Widening of Dayao-Libas Road, Roxas City 20,000,000
Capiz 2nd DEO 42,000,000Concreting of Barangay Concepcion-Barangay Sta. Teresa Road, Dumalag, Capiz Lone District
20,000,000
Concreting of Barangay Consolacion, Sitio Bulakanag-Barangay Proper, Dumalag, apiz Lone District
10,000,000
Concreting of Junction National Road Ayuyan-Barangay San Miguel Proper, Dumalag, Capiz Lone District
10,000,000
Local Road Concreting, Brgy. Carida-Brgy. Abangay, Tapaz, Capiz 2,000,000
Guimaras DEO 85,500,000Concreting of Barangbang, Millan Road with Box Culvert, Brgy. Millan, Sibunag, Guimaras
5,000,000
Concreting of Carazan, Avila Road, Brgy. Avila, Buenavista, Guimaras Lone District 2,000,000
Concreting of Dasal – Alegria Road, Brgy. Sibunag, Guimaras Lone District 5,000,000Concreting of Magamay – Pandaraonan Road, Nueva Valencia, Guimaras 8,500,000Concreting of Purok 1, New Poblacion Road, Brgy. New Poblacion, Buenavista, Guimaras Lone District
2,000,000
Concreting of Roads, Municipality of Buenavista, Guimaras 10,000,000Concreting of Roads, Municipality of Jordan, Guimaras 25,000,000Concreting of Roads, Municipality of Nueva Valencia, Guimaras 12,000,000Concreting of Tago-on, Salvacion Road, Brgy. Salvacion, Buenavista, Guimaras Lone District
2,000,000
Concreting of Tangaw, Cabano Road, Brgy. Cabano, San Lorenzo, Guimaras 10,000,000
Concreting of Wawan, San Isidro Road, Brgy. San Isidro, Buenavista, Guimaras Lone District
2,000,000
Concreting of Wayang, Mc Lain Road, Brgy. Mc Lain, Buenavista, Guimaras Lone District
2,000,000
Iloilo 1st DEO 18,000,000Concreting of Igpuro Road Leading to Miagao National High School, Brgy. Igpuro, Miagao, Iloilo 1st LD
2,500,000
Concreting of Nalundan Road Leading to Nalundan National High School, Brgy. Nalundan, Guimbal, Iloilo 1st LD
2,500,000
Construction of Binanua-an-Ubos Road, Guimbal, Iloilo 3,000,000Construction of Camangahan-Bacong Road, Guimbal, Iloilo 4,000,000Construction of Igbugo-Igsoligue Road, Miag-ao, Iloilo 3,000,000Construction of Pitogo-Cubay Road, San Joaquin, Iloilo 3,000,000
Iloilo 2nd DEO 19,000,000Construction of Local Road (Arenga Street), Capuling, Dingle, Iloilo 4th LD 2,000,000Construction of Local Road (From Brgy. Tabugon to Brgy. Buenavista), Tabugon - Buenavista, Dingle, Iloilo 4th LD
6,000,000
Construction of Local Road (Public Market Road), Poblacion, Anilao, Iloilo 4th LD 2,000,000
Construction of Local Road with Drainage System, Poblacion Ilawod, San Enrique, Iloilo 4th LD
4,000,000
Construction of Local Road, Cag-an, Anilao, Iloilo 4th LD 5,000,000
Negros Occidental 1st DEO 16,000,000Concreting of Barangay Road (Sitio Alimatok), Cadiz City, Negros Occidental 2nd LD 2,000,000
Concreting of Barangay Road in Barangay Jerusalem, Cadiz City, Negros Occidental 2nd LD
2,000,000
Concreting of Barangay Road in Barangay V.F. Gustilo, Caadiz City, Negros Occidental 2nd LD
2,000,000
Concreting of Barangay Road, Barangay Andres Bonifacio, Cadiz City, Negros Occidental 2nd LD
2,000,000
Concreting of Barangay Road, Barangay Cadiz Viejo, Cadiz City, Negros Occidental 2nd LD
2,000,000
Concreting of Barangay Road, Barangay Tadlong, Sagay City, Negros Occidental 2nd LD
2,000,000
Improvement of Road with Drainage, Barangay Maquiling, Sagay City, Negros Occidental 2nd LD
2,000,000
Improvement of Road with Drainage, Barangay Old Sagay City, Sagay City, Negros Occidental 2nd LD
2,000,000
Negros Occidental 3rd DEO 31,000,000Construction of Road, Buyog-Buyogan to Gamao Road, Barangay Magballo, Kabankalan, Negros Occidental
2,000,000
Construction of Road, Camingawan to Carol-an Road, Sitio Banga, Barangay Camingawan, Kabankalan, Negros Occidental
4,000,000
Construction of Road, Crossing Ambush Road, Barangay Manalad, Ilog, Negros Occidental
2,500,000
Construction of Road, Crossing Malasbalas to Proper Road, Barangay Orong, Kabankalan, Negros Occidental
2,000,000
Construction of road, Magballo to Pinggot Road, Barangay Pinggot, Ilog, Negros Occidental
2,500,000
Construction of Road, Nabilog Daup-Daupan Road, Barangay Tagoc, Kabankalan, Negros Occidental
2,000,000
Construction of Road, Phase II Sitio Overflow Road, Barangay Hilamonan, Kabankalan City, Negros Occidental
2,000,000
Construction of Road, Purok 3 Road Barangay Asia, Hinoba-an, Negros Occidental 2,000,000
Construction of Road, Purok 6 Road, Barangay Culipapa, Hinobaan, Negros Occidental
2,000,000
Construction of Road, Purok Cantomanyog, Barangay Haba, Candoni, Negros Occidental
2,000,000
Construction of Road, Purok Mahogany Road, Barangay Agboy, Candoni, Negros Occidental
2,000,000
Construction of Road, Purok Sandana Road, Barangay Tabugon, Kabankalan, Negros Occidental
2,000,000
Page 144 of 162
1044 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Road, Sitio Buyong Road, Barangay Cabia-an, Candoni, Negros Occidental
2,000,000
Construction of Road, Sitio Ilan Road, Barangay Locotan, Kabankalan, Negros Occidental
2,000,000
Negros Occidental 4th DEO 28,500,000Construction of Roads, Brgy. Antipolo, Municipality of Pontevedra, Negros Occidental 4th LD
3,000,000
Construction of Roads, Brgy. Cambarus, Municipality of Pontevedra, Negros Occidental 4th LD
3,000,000
Construction of Roads, Brgy. Lag-asan, Bago City, Negros Occidental 4th LD 4,000,000Construction of Roads, Brgy. Lunao, Bago City, Negros Occidental 4th LD 6,000,000Construction of Roads, Brgy. Mabini, Municipality of Pontevedra, Negros Occidental 4th LD
3,000,000
Construction of Roads, Brgy. Nagasi, La Carlota City, Negros Occidental 4th LD 3,000,000
Construction of Roads, Employees Village II, Brgy. Batuan, La Carlota City, Negros Occidental 4th LD
3,500,000
Construction of Roads, Valderama St. Brgy II, La Carlota City, Negros Occidental 4th LD
3,000,000
Region VII 195,200,000Bohol 1st DEO 14,000,000
Concreting of Barangay Road, Fatima, Cortes, Bohol 1st LD 2,000,000Concreting of Barangay Road, Monserat, Cortes, Bohol 1st LD 2,000,000Concreting of Barangay Road, Talenceras, Tubigon, Bohol 1st LD 2,000,000Widening/Concreting of Lourdes-Libaong Barangay Road, Panglao, Bohol 1st LD 8,000,000
Bohol 2nd DEO 6,000,000Brgy. Road for Brgy. Pinamgo Brgy.Bien Unido to Brgy.Busalian Talibon, Pinamgo-Busalian, Bien Unido-Talibon, Bohol 2nd LD
2,000,000
Concreting of Barangay Road, Barangay Aguining, C.P. Garcia, Bohol 2nd LD 4,000,000
Bohol 3rd DEO 4,000,000Concreting of Barangay Bugang Norte-Cambigsi Road, Barangay Bugang Norte-Cambigsi, Bilar, Bohol 3rd LD
2,000,000
Concreting of Barangay Villa Aurora-Subayon Road, Barangay Villa Aurora-Subayon, Bilar, Bohol 3rd LD
2,000,000
Cebu 1st DEO 4,000,000Construction of Local Roads in Barangay, Barangay Poblacion, Medellin, Cebu 4th LD 2,000,000
Construction of Roads at Brgy. Logon Malapaz, Daanbantayan, Cebu 2,000,000
Cebu 2nd DEO 12,000,000Construction of Roads with Drainage, Barangay Poblacion-Tangke, Talisay City, Cebu 1st LD
10,000,000
Construction of Roads with Drainage, Barangay Pooc, Talisay City, Cebu 1st LD 2,000,000
Cebu 3rd DEO 30,500,000Concreting of Barangay Road, Barangay Amatogan, Tuburan, Cebu 3rd LD 2,000,000Concreting of Barangay Road, Barangay Luyo, Barili, Cebu 3rd LD 2,000,000Concreting of Barangay Road, Barangay Mayana to Salay, Barili, Cebu 3rd LD 2,000,000
Concreting of Barangay Road, Barangay Prenza to Hingatmonan, Balamban, Cebu 3rd LD
4,000,000
Concreting of Barangay Road, Barangay Tubod, Toledo City, Cebu 3rd LD 2,000,000Concreting of Barangay Road, Barangay Ubongon to Tag-amakan, Asturias, Cebu 3rd LD
4,000,000
Concreting of Barangay Road, Duangan to Binabag Road, Duangan, Pinamungahan, Cebu 3rd LD
2,500,000
Concreting of Barangay Road, Punay-Kandigan Road, Aloguinsan, Cebu 3rd LD 2,000,000
Construction of Road including Storm Drainage, Cebu 10,000,000
Cebu 4th DEO 28,000,000Construction of Roads at Cansayahon, Ronda Cebu 2,000,000Concreting of Barangay Liptong - Pasil Road, Municipality of Santander, Cebu 2nd LD 7,000,000
Construction of Barangay Cansaluay, Oslob- Barangay San Antonio, Bolho-on, Cebu 7,000,000
Construction of Barangay Road along Barangay Manga, Alcantara, Cebu 2,000,000Road Improvement of Lagundi to Nangka-on, Oslob, Cebu 2nd LD 5,000,000Road Improvement of Lanao to Cawayan, Dalaguete Cebu 2nd LD 5,000,000
Cebu 5th DEO 13,000,000Construction of Roads at Poblacion, Pilar, Bohol 2,000,000Concreting of RoadBgy. Catarman, Liloan, Cebu
5,000,000
Concreting of RoadBgy. Cotcot, Liloan, Cebu
2,000,000
Concreting of RoadBgy. Mulao, Liloan, Cebu
2,000,000
Concreting of RoadBgy. Tabla, Liloan, Cebu
2,000,000
Cebu 6th DEO 32,000,000Improvement of Flood Control Structure (Revetment) at Brgy. Subangdaku, Mandaue City
2,000,000
Improvement/Rehab. of Road with drainage facilities at Sudlon, Brgy. Maguikay, Mandaue City
2,500,000
Improvement/Rehab./Repair of Road at A. Soriano/S. B. Cabahug St., Centro, Mandaue City
2,000,000
Improvement/Rehab./Repair of Road with drainage facilities at Brgy. Jagobiao, Mandaue City, Cebu
2,000,000
Improvement/Repair/Rehab. of Road at at Brgy. Alegria, Cordova, Cebu 3,500,000Improvement/Repair/Rehab. of Road at Brgy. Alang-alang, Mandaue City, Cebu 2,500,000
Page 145 of 162
details of dpwh’s programs/projects 1045
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Improvement/Repair/Rehab. of Road at Brgy. Bakilid, Mandaue City, Cebu 2,500,000Improvement/Repair/Rehab. of Road at Brgy. Casuntingan, Mandaue City, Cebu 2,500,000
Improvement/Repair/Rehab. of Road at Brgy. Labogon, Mandaue City, Cebu 2,000,000
Improvement/Repair/Rehab. of Road at Brgy. Tingub, Mandaue City, Cebu 3,500,000Improvement/Repair/Rehab. of Road at Brgy. Tipolo, Mandaue City, Cebu 2,500,000Improvement/Repair/Rehabilitation of Road with drainage facilties at Brgy. Cabancalan, Mandaue City, Cebu
2,500,000
Rehabilitation/Improvement of Road with drainage facilities at Brgy. Cambaro, Mandaue City
2,000,000
Negros Oriental 1st DEO 2,000,000Construction of Roads with Drainage System at Brgy. Poblacion, Manjuyod, Negros Oriental
2,000,000
Negros Oriental 2nd DEO 29,700,000Concreting of Bahian, Tanjay City, Negros Oriental 2,000,000Concreting of Barangay road, Banawe, Pamplona, Oriental Negros,Negros Oriental 2nd LD
2,200,000
Concreting of Brgy. Bagacay-Junob-Cadawinonan Road, Dumaguete City, Negros Oriental
2,000,000
Concreting of Brgy. Bantayan-Piapi road, Bantayan-Piapi, Dumaguete City, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Concreting of Brgy. Basiao Road, San Jose, Negros Oriental 2,000,000Concreting of Brgy. Bio-os to Jantianon Road, Amlan, Negros Oriental 2,000,000Concreting of Brgy. Poblacion 5, Tanjay City (Asphalt Overlay), Negros Oriental 2,000,000
Concreting of Brgy. Tugas to Sitio Asiotes, Brgy. Polo Road, Tanjay City, Negros Oriental
2,000,000
Concreting of City Street near City Engineer's Office, Brgy. 1, Bais City, Negros Oriental
1,500,000
Concreting of Divinagracia Street, Poblacion, Sibulan, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Concreting of Purok 7 road, Poblacion, Mabinay, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Concreting of San Jose Village road, Banilad, Dumaguete City, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Concreting of Sitio Canghatap, Brgy. Pal-ew to Sto. Niño Road, Tanjay City, Negros Oriental
2,000,000
Concreting of Sitio San Jose, Brgy 2 Road, Bais City, Negros Oriental 2,000,000Concreting/Reblocking of Brgy. Azagra Road, Tanjay City, Negros Oriental 2,000,000
Negros Oriental 3rd DEO 20,000,000Road Widening Dumaguete South Road 20,000,000
Region VIII 624,300,000Regional Office VIII 95,000,000
Concreting of Barangay Road (Barangay Cogon Road Leading to Evacuation Center), Guiuan, Eastern Samar Lone District
10,000,000
Concreting of Municipal Road (Managantan St. Extension Road), Guiuan, Eastern Samar Lone District
10,000,000
Construction of Barangay Calzada to Barangay Casulongan/Javier Port, Leyte 5th LD 25,000,000
Construction of San Agustin- Pagsanghan Road 50,000,000
Biliran DEO 25,000,000Concreting of Sitio Alang-Alang Road, Brgy. Lucsoon, Naval, Biliran 5,000,000Concreting of Sitio Balic-Balic Road, Brgy. Lico, Naval, Biliran 5,000,000Consrtuction of PCPP, Sitio San Jose, Brgy. Capinahan Naval, Biliran 5,000,000Construction of Local Roads, Brgy. Larrazabal, Naval, Biliran 5,000,000Construction of PCPP, Sitio Bagacay, Brgy. Haguikhikan, Naval, Biliran 5,000,000
Eastern Samar DEO 15,000,000Concreting of Barangay Alugan - Sta. Cruz Road, Municipality of San Policarpio, Eastern Samar
7,000,000
Concreting of Local Roads, Barangay Canteros, Can-avid, Eastern Samar 2,000,000Concreting of Local Roads, Barangay Poblacion, Dolores, Eastern Samar 2,000,000Concreting of Local Roads, Barangay Poblacion, Lawaan, Eastern Samar 2,000,000Construction of Local Road, Barangay Jepaco, Can-avid, Eastern Samar Lone District 2,000,000
Leyte 1st DEO 21,600,000Construction of Road with Drainage 6,600,000Rehabilitation of Road with Drainage 2,200,000Road Construction with Drainage 7,000,000Road Construction with Drainage (Brgy. Castilla to Brgy. San Agustin) 2,800,000Road Construction with Drainage (Brgy. Villa Magsaysay to Brgy. Pagsulhugon) 3,000,000
Leyte 2nd DEO 60,000,000 Road Concreting - Brgy. Poblacion – Brgy. Tingib, Pastrana, Leyte 5,000,000 Road Concreting of Burauen – Tabon-tabon via Brgy. Libas, Burauen, Leyte 3,000,000
Road Concreting – Barugo – Tunga Road, Brgy. Barugo, Leyte 5,000,000Road Concreting – Brgy. Amahit-Brgy. Bukid, Barugo, Leyte 2,000,000Road Concreting – Brgy. Anibong, Julita Leyte 2,000,000Road Concreting – Brgy. Cogon- Brgy. Binibihan, Carigara, Leyte 2,000,000Road Concreting – Brgy. Cuta -Brgy. Busay Road, Barugo, Leyte 5,000,000Road Concreting – Brgy. Dist. 3, MacArthur, Leyte 5,000,000Road Concreting – Brgy. San Antonio-Brgy. Bolongtohan, Dulag, Leyte 2,000,000Road Concreting – Brgy. Tangnan, Carigara, Leyte 2,000,000Road Concreting - Brgy. Tingib- Brgy. Poblacion, Pastrana, Leyte 5,000,000Road Concreting- Barugo-Tunga Road, Barugo, Leyte 3,000,000Road Concreting- Brgy. Camansi-Brgy. Macalpi, Carigara, Leyte 2,000,000Road Concreting- Brgy. Manloy, Capoocan, Leyte 2,000,000Road Concreting- Brgy. Parena- Brgy. Tagak, Carigara, Leyte 2,000,000Road Concreting -Brgy. Romualdez- Brgy. Liwayway, MacArthur, Leyte 2,000,000Road Concreting- Brgy. San Roque- Brgy. Poblacion, Zone 1 Road, Mayorga, 5,000,000
Page 146 of 162
1046 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Road Concreting- Brgy. Santa Fe, Carigara, Leyte 2,000,000Road Concreting-Brgy. Candigahub-Brgy. Canfabi, Carigara, Leyte 2,000,000Road Concreting-Brgy. Talisay, Mayorga, Leyte 2,000,000
Leyte 3rd DEO 14,000,000Construction of Local Road from Barangay Consuegra to Barangay Wague, Leyte, Leyte 3rd LD
2,000,000
Construction of Local Road from Barangay Hibulangan to Barangay Capiñahan, Villaba, Leyte 3rd LD
2,000,000
Construction of Local Road, Sitio Colonia, Barangay Manlawaan, Tabango , Leyte 3rd LD
2,000,000
Construction of Local Road, Barangay Elizabeth, Leyte, Leyte 3rd LD 5,000,000Construction of Local Road, Barangay Libas, Leyte, Leyte 3rd LD 3,000,000
Leyte 4th DEO 50,000,000Concreting of Road, Brgy. Anislag, Isabel, Leyte 2,000,000Concreting of Road, Brgy. Antipolo, Isabel, Leyte 2,000,000Concreting of Road, Brgy. Cabulihan, Ormoc City, Leyte 2,000,000Concreting of Road, Brgy. Cambalading, Albuera, Leyte 2,000,000Concreting of Road, Brgy. Can-Andan, Isabel, Leyte 2,000,000Concreting of Road, Brgy. Cansoso, Matag-Ob, Leyte 2,000,000Concreting of Road, Brgy. Dolores, Ormoc City, Leyte 2,000,000Concreting of Road, Brgy. Domonar, Ormoc City, Leyte 2,000,000Concreting of Road, Brgy. Don Potenciano, Ormoc City, Leyte 2,000,000Concreting of Road, Brgy. Esperanza, Ormoc City, Leyte 2,000,000Concreting of Road, Brgy. Guiwan, Palompon, Leyte 2,000,000Concreting of Road, Brgy. Himarco, Palompon, Leyte 2,000,000Concreting of Road, Brgy. Ipil, Ormoc City, Leyte 2,000,000Concreting of Road, Brgy. Luna, Ormoc City, Leyte 2,000,000Concreting of Road, Brgy. Manlilinao, Ormoc City, Leyte 2,000,000Concreting of Road, Brgy. Mansaha-On, Matag-Ob, Leyte 2,000,000Concreting of Road, Brgy. Patag, Ormoc City, Leyte 2,000,000Concreting of Road, Brgy. RM Tan, Ormoc City, Leyte 2,000,000Concreting of Road, Brgy. San Isidro, Ormoc City, Leyte 2,000,000Concreting of Road, Brgy. San Vicente, Ormoc City, Leyte 2,000,000Concreting of Road, Brgy. Sherwood, Albuera, Leyte 2,000,000Concreting of Road, Brgy. Sta. Cruz, Isabel, Leyte 2,000,000Concreting of Road, Brgy. Sumangga, Sitio , Ormoc City, Leyte 2,000,000Concreting of Road, Brgy. Taberna, Palompon, Leyte 2,000,000Concreting of Road, Brgy. Tinag-an, Albuera, Leyte 2,000,000
Leyte 5th DEO 2,000,000Concreting of Municipal Road with Drainage, Barangay Poblacion, Abuyog, Leyte 5th LD
2,000,000
Northern Samar 1st DEO 35,000,000Construction/ Concreting 13,000,000Construction/Concreting 15,000,000Construction/Concreting of Roads with Drainage 3,000,000Construction/Concreting of Roads with Drainage 1,000,000Construction/Concreting of Roads with Drainage 3,000,000
Northern Samar 2nd DEO 69,000,000Concreting of Brgy. Aguadahan AccessRoad, Laoang, Northern Samar,Northern Samar 2nd DEO
5,000,000
Concreting of Brgy. Cabarasan - Brgy. Dao Farm-to-Market Road, Gamay, Northern Samar
10,000,000
Concreting of Las Navas Poblacion - Pinipisakan Road Section, Las Navas, Northern Samar
10,000,000
Concreting of Malaguinara - Naperes Road,San Roque, Northern Samar,Northern Samar 2nd DEO
6,000,000
Concreting of Pagsang-an - Coroconog Road, San Roque, Northern Samar,Northern Samar 2nd DEO
6,000,000
Concreting of Pambujan Circumferential Road,Cababtoan - Cabarian - Canjumadal - Manajao - Camparanga Section, Pambujan, Northern Samar
10,000,000
Concreting of Poblacion - Manajao Road,Palapag, Northern Samar,Northern Samar 2nd DEO
6,000,000
Concreting of Poblacion - Siljagon - Naparasan Road, Mapanas, Northern Samar,Northern Samar 2nd DEO
7,000,000
Concreting of Sumoroy - Monbon Road,Palapag, Northern Samar,Northern Samar 2nd DEO
6,000,000
Construction of Cahayagan Slope Protection, Brgy. Cahayagan, Laoang, Northern Samar
3,000,000
Samar 1st DEO 187,700,000Concreting of Road, Barangay Bayo - Barangay Dawo, Calbayog City, Samar 1st LD 30,000,000
Concreting of Road, Barangay San Jose - Barangay Canhumadac, Calbayog City, Samar 1st LD
40,000,000
Construction of Road, Brgy. Cautod-Diversion Road, Sta. Margarita, Samar 8,000,000Construction of Road, Brgy. San Agustin, Gandara, Samar to Brgy. Canlapwas, Pagsanghan, Samar 1st LD
10,000,000
Construction of Road, from Brgy. Napuro II-Brgy. Canmuros, Sta. Margarita, Samar 4,000,000
Construction of Road, Purok No. 4, Brgy. Payahan, Calbayog City, Samar 1st LD 10,000,000
Rehabilitation/Upgrading of Cagbilwang-Panlayahan Road, Samar 1st LD 30,000,000Rehabilitation/Upgrading of Oquendo-Cabugawan Road, Samar 1st LD 18,700,000Repair/Rehab. of Road, from Brgy. Tarabucan-Brgy. Obo-ob-Brgy. Lapaan (with exceptions), Calbayog City, Samar
5,000,000
Repair/Rehab./Improvement of Road, Brgy. Pilar, Calbayog City 2,000,000Repair/Rehabilitation/Improvement of Road, Barangay Caybago, Calbayog, Samar 1st LD
10,000,000
Repair/Rehabilitation/Improvement of Road, Magsaysay Blvd. and Extension, Calbayog, Samar 1st LD
20,000,000
Samar 2nd DEO 50,000,000Concreting of Calapi Road, Barangay Calapi, Motiong, Samar 2nd LD 10,000,000Concreting of Catalina-Camarabuan, Barangay Catalina Camarubo-an, Jiabong, Samar 2nd LD
10,000,000
Page 147 of 162
details of dpwh’s programs/projects 1047
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Concreting of Jct. National Highway to Pinabacdao, Barangay Poblacion, Pinabacdao, Samar 2nd LD
10,000,000
Concreting of Jct. National Highway to San Sebastian Road, Barangay Poblacion, San Sebastian, Samar 2nd LD
10,000,000
Concreting of Jct. National Highway-Villareal Road, Barangay Poblacion, Villareal, Samar 2nd LD
10,000,000
Region IX 392,300,000Regional Office IX 190,000,000
Concreting of barangay roads in Barangays Payuhan, Bawisan, & Alu Pangko all in Parang, Sulu
30,000,000
Concreting of Provincial Road along Mapang-Sipaon Road, Rizal, Zamboanga del Norte
50,000,000
Construction/Opening of Miputak to Galas Road along Miputak Creek, Dipolog City, Zamboanga del Norte 2nd LD
20,000,000
Construction/Rehabilitation of Various Infrastructure Projects , Basilan Lone LD 50,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Sulu 2nd LD 40,000,000
Zamboanga City DEO 80,800,000Concreting of Local Road at Cabatangan Elementary School to Barangay Hall Phase II, Cabatangan, Zamboanga City 1st LD
4,000,000
Concreting of Local Road at Cawit-Baluno, Barangay Cawit, Zamboanga City, Zamboanga del Sur
4,000,000
Concreting of Local Road at Malagutay, Malagutay, Zamboanga City 1st LD 3,500,000Concreting of Local Road at Pamucutan, Pamucutan, Zamboanga City 1st LD 4,000,000
Concreting of Local Road at Sitio Sto. Niño, Sinunuc, Barangay Sinunuc, Zamboanga City, Zamboanga del Sur
5,000,000
Concreting of Local Road at Sitio Tumanday - Capisan, Barangay Capisan, Zamboanga City, Zamboanga del Sur
4,000,000
Concreting of Local Road at Sitio Zambales, Barangay Baluno, Zamboanga City, Zamboanga del Sur
4,000,000
Concreting of Masalag - Cabonegro Road with Drainage Facility, Limpapa, Zamboanga City 1st LD
5,000,000
Concreting of Road along Luyahan-Pasonanca Road at Tamarindo Drive, Pasonanca, Zamboanga City 1st LD
2,300,000
Concreting of Road at Labuan, Barangay Labuan, Zamboanga City, Zamboanga del Sur
4,000,000
Construction of Drainage System at Brgy. Baliwasan, Barangay Baliwasan, Zamboanga City, Zamboanga del Sur
2,300,000
Construction of Drainage System at Gov. Camins Ave.-Sta. Maria, Barangay Sta. Maria, Zamboanga City, Zamboanga del Sur
3,200,000
Construction of Drainage System at Maasin, Barangay Maasin, Zamboanga City, Zamboanga del Sur
2,000,000
Construction of Road (Asphalting of 545th Engineer Construction Battalion, 52nd Engineer Brigade Road net) , Cabatangan, Zamboanga City
3,000,000
Construction of Slope Protection at Cawit River, Barangay Cawit, Zamboanga City, Zamboanga del Sur
4,000,000
Construction of Slope Protection at Maasin, Barangay Maasin, Zamboanga City, Zamboanga del Sur
4,000,000
Construction of Slope Protection at School site (San Ramon River), Barangay Talisayan, Zamboanga City, Zamboanga del Sur
4,000,000
Construction/Rehabilitation of Drainage System at Tumaga, Barangay Tumaga, Zamboanga City, Zamboanga del Sur
4,000,000
Construction/Repair Drainage System at Southcom Village, Barangay Calarian, Zamboanga City, Zamboanga del Sur
2,000,000
Rehabilitation/Improvement/Construction of Road at Campaner St., Zone 3, Zone 3, Zamboanga City 1st LD
4,500,000
Road Opening at Sitio Cabonegro -Limpapa, Barangay Limpapa, Zamboanga City, Zamboanga del Sur
4,000,000
Road Opening of Local Road at Sinubong to Mountain View, Sinubong, Zamboanga City 1st LD
4,000,000
Zamboanga del Norte 1st DEO 44,500,000Concrete Paving Corazon Aquino Hospital 10,000,000Concreting of Provincial Road along Brgy. Denoman, Municipality of Roxas, Zamboanga del Norte
10,000,000
Construction of Manukan Boulevard, Manukan, Zamboanga del Norte 20,000,000Road Concreting Jose Abad Santos St. to E. Aguinaldo St , Brgy. Ramon Magsaysay, Sindangan, Zamboanga del Norte
1,500,000
Road Concreting Osmena St. from Rizal Avenue Extension connecting to Brgy. R. Magsaysay, Brgy. Dapaon, Sindangan, Zamboanga del Norte
1,500,000
Road Rehabilitation/with Concreting from National Highway to Lamac, Balintongan, Brgy. Poblacion, Jose Dalman, Zamboanga del Norte
1,500,000
Zamboanga del Norte 3rd DEO 40,000,000Concreting of Provincial Road along Alvenda, Mutia - Tuburan, Osmeña, Mutia-Sergio Osmeña, Zamboanga del Norte
40,000,000
Zamboanga del Sur 1st DEO 3,000,000Road Concreting Upper Landing, Dumingag, Zamboanga Del Sur 3,000,000
Zamboanga del Sur 2nd DEO 6,000,000Concreting of Road from Brgy. Kalingayan to , Brgy. Cuatro-Cuatro, Dumalinao, Zamboanga, del Sur 2nd LD
6,000,000
Zamboanga Sibugay 1st DEO 4,000,000Construction/Rehabilitation of Various Infrastructure Projects 4,000,000
Zamboanga Sibugay 2nd DEO 24,000,000Concreting of Barangay Tenan-Bacalan Farm-to-Market Road (Phase II), Ipil, Zamboanga Sibugay 2nd LD
10,000,000
Concreting of Bolo Batalion-Sininan Road, Kabasalan, Zamboanga Sibugay 2nd LD 10,000,000
Construction/Rehabilitation of Various Infrastructure Projects 4,000,000
Region X 551,000,000Regional Office X 287,000,000
Page 148 of 162
1048 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Concreting of Barangay Caniangan to Barangay Taguite, Tangub City, Misamis Occidental 2nd LD
20,000,000
Concreting of Local Road , Brgy. Tambara, Municipality of Malabang, Lanao del Sur 2nd LD
5,000,000
Concreting of Road - Brgy. Montay to Brgy. Pialot Road, Malabang, Lanao del Sur 30,000,000
Construction of Local Road, Brgy. Betayan, Malabang, Lanao del Sur 2,000,000Construction of Local Road, Brgy. Cabasaran, Malabang, Lanao del Sur 4,000,000Construction of Local Road, Brgy. Macaurandig, Malabang, Lanao del Sur 2,000,000Construction of Local Road, Brgy. Mananayo, Malabang, Lanao del Sur 4,000,000Construction of Local Road, Brgy. Masao, Malabang, Lanao del Sur 2,000,000Construction of Local Road, Brgy. Matling Airport, Malabang, Lanao del Sur 2,000,000Construction of Local Road, Brgy. Sarang, Malabang, Lanao del Sur 2,000,000Construction of Local Road, Brgy. Tiongcop, Pualas, Lanao del Sur 2,000,000Construction of Local Road, Brgy. Tubok, Malabang, Lanao del Sur 2,000,000Construction of Local Roads, Barangay Kalipay-Sangalan-Eureka Road, Gingoog City, Misamis Oriental 1st LD
50,000,000
Construction of Local Roads, Barangay San Luis-Bantawaan Road, Gingoog City, Misamis Oriental 1st LD
110,000,000
Road Project (Concreting), Barangay Poblacion, Kapatagan-Sapad, Lanao del Norte 2nd LD
50,000,000
Bukidnon 1st DEO 16,000,000Concreting of Barangay Road with Drainage, Barangay Bangcud, Malaybalay, Bukidnon 2nd LD
4,000,000
Construction of Local Roads, Brgy. Banlag Valencia City, Bukidnon 4th LD 2,000,000Construction of Local Roads, Brgy. Guinoroyan, Valencia City, Bukidnon 4th LD 2,000,000
Construction of Local Roads, Brgy. Lumbo, Valencia City, Bukidnon 4th LD 2,000,000Construction of Local Roads, Brgy. Mt. Nebo, Valencia City, Bukidnon 4th LD 2,000,000Construction of Local Roads, Brgy. Sinayawan, Valencia City, Bukidnon 4th LD 2,000,000
Construction of Local Roads, Brgy. Vintar, Valencia City, Bukidnon 4th LD 2,000,000
Bukidnon 3rd DEO 14,000,000Concreting of Crossing-Sta Fe. Access Road Crossing, Libona, Bukidnon,Bukidnon 1st LD
2,000,000
Construction of Road, Barangay Pualas, Baungon, Bukidnon 2,000,000Road concreting, Fortich St. - Malambago FMR, Barangay Maluko, Manolo Fortich 10,000,000
Cagayan de Oro City 1st DEO 10,000,000Concreting of Road, Coop Village, Mambuaya, Cag. de Oro City, Misamis Oriental 2,000,000
Concreting of Road, Nipa, Zone 5, Bonbon, Cag. de Oro City, Misamis Oriental 2,000,000
Concreting of Road, Zone 10 (Gucor Area), Carmen, Cag. de Oro City, Misamis Oriental
2,000,000
Construction of Road, Barangay Calaanan, Cagayan de Oro City, Misamis Oriental 2,000,000
Construction of Roads with Drainage System, Patag, Cag. de Oro City, Misamis Oriental
2,000,000
Cagayan de Oro City 2nd DEO 140,000,000Concreting of Road at Barangay Agusan, Cagayan de Oro City 5,000,000Concreting of Road at Barangay Macasandig, Cagayan de Oro City 10,000,000Concreting of Road with drainage at Barangay Bugo, Cagayan de Oro City 10,000,000Concreting of Road with drainage at Barangay Camaman-an, Cagayan de Oro City 5,000,000
Concreting of Road with drainage at Barangay Consolacion, Cagayan de Oro City 5,000,000
Concreting of Road with drainage at Barangay Cugman, Cagayan de Oro City 5,000,000
Concreting of Road with drainage at Barangay Gusa, Cagayan de Oro City 5,000,000Concreting of Road with drainage at Barangay Tablon, Cagayan de Oro City 5,000,000Construction of Balubal-Agusan Road, Cagayan de Oro City 6,250,000Construction of Besigan-Tignapoloan Road, Cagayan de Oro City 12,500,000Construction of Indahag-Camaman-an Road, Cagayan de Oro City 6,250,000Construction of Lumbia-Pahiran Road (without PCCP), Cagayan de Oro City 10,000,000Construction of PN Roa Road, Cagayan de Oro City 6,250,000Construction of Tumpagon-Dannsolihon Road, Cagayan de Oro City 10,000,000Construction of Tumpagon-Pigsag-an Road, Cagayan de Oro City 12,500,000Construction of Western Colambog Road, Cagayan de Oro City 6,250,000Roads for Barangay Agusan, Cagayan de Oro City 2nd LD 2,000,000Roads for Barangay Bugo, Cagayan de Oro City 2nd LD 2,000,000Roads for Barangay Camaman-an, Cagayan de Oro City 2nd LD 3,000,000Roads for Barangay Indahag, Cagayan de Oro City 2nd LD 2,000,000Roads for Barangay Lapasan, Cagayan de Oro City 2nd LD 4,000,000Roads for Barangay Macasandig, Cagayan de Oro City 2nd LD 7,000,000
Camiguin DEO 2,000,000Concreting of Poblacion Road to Bacnit Road, Barangay Poblacion & Bacnit, Sagay, Camiguin Lone District
2,000,000
Lanao del Norte 2nd DEO 22,000,000Construction/Rehabilitation of Various Infrastructure Projects, Iligan City Lone District
4,000,000
Rehabilitation of Road at Cabili Ave. Ext , Brgy. Saray, Iligan City Lone District 3,000,000
Road Concreting at Purok 1, Brgy. Sta.Elena, Iligan City Lone District 2,000,000Road Concreting at Purok 14, Brgy. Pala-O, Iligan City Lone District 2,000,000Road Concreting at Purok 4, Brgy. Del Carmen, Iligan City Lone District 2,000,000Road Concreting at Purok 5A, Brgy. Santiago, Iligan City Lone District 2,000,000Road Concreting at Sitio Kadiis, Brgy. Panoroganan, Iligan City Lone District 3,000,000Road Concreting from Purok 8 to Purok 5A, Brgy. Luinab, Iligan City Lone District 2,000,000
Road Concreting going to Urban Poor, Brgy. Acmac, Iligan City Lone District 2,000,000
Misamis Occidental 1st DEO 10,000,000Road Concreting,Brgy. Napilan-Locus,Sapang Daga,Misamis Occidental 10,000,000
Page 149 of 162
details of dpwh’s programs/projects 1049
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Misamis Occidental 2nd DEO 2,000,000Construction of Road, Barangay Sta. Maria, Tangub City, Misamis Occidental 2,000,000
Misamis Oriental 1st DEO 37,000,000Concreting of Cala-Cala Road, Barangay Cogon, Balingasag, Misamis Oriental 1st LD 2,000,000
Concreting of Guinalaban Road, Barangay Guinalaban, Salay, Misamis Oriental 1st LD
2,000,000
Concreting of Kibungsod-Lilo-Kabubahan Road at Brgy. Kibungsod, Magsaysay, Misamis Oriental
2,000,000
Concreting of Kidampas-Kaulayanan Road, Barangay Kidampas, Sugbongcogon, Misamis Oriental 1st LD
2,000,000
Concreting of Local Road, Brgy. Dampias, Binuangan, Misamis Oriental 2,000,000Concreting of Local Roads from Barangay Duka to Dig-aguyan, Medina, Misamis Oriental
10,000,000
Concreting of Mambayaan-Sigaoc Road , Barangay Mambayaan, Balingasag, Misamis Oriental 1st LD
2,000,000
Concreting of Mangga-Silad Road, Barangay Mangga, Sugbongcogon, Misamis Oriental 1st LD
2,000,000
Concreting of Mimbuahan-Ampianga-Kidampas Road, Barangay Mimbuahan, Sugbongcogon, Misamis Oriental 1st LD
4,000,000
Construction of Road, Barangay 23, Gingoog, Misamis Oriental 2,000,000Construction of Waterworks System, Dig-aguyan, Medina, Misamis Oriental 7,000,000
Misamis Oriental 2nd DEO 11,000,000Concreting Bgy Roadwith Drainage Phase I 3,000,000Construction of Local Road in Purok 7,Barangay Kilangit, Municipality of Gitagum, Province of Misamis Oriental
2,000,000
Construction of Road, Barangay Himaya, El Salvador, Misamis Oriental 2,000,000Construction of Road, Barangay Kilangit, Gitagum, Misamis Oriental 2,000,000Construction of Road, Barangay Sambulawan, El Salvador, Misamis Oriental 2,000,000
Region XI 767,200,000Regional Office XI 50,000,000
Improvement/Rehabilitation of Tibal-og-Kinamayan-Salvacion Road, Sto. Tomas, Davao del Norte
50,000,000
Compostela Valley DEO 9,000,000Improvement of Road-Antequera-Ogao Junction, Antequera, Nabunturan, Compostela Valley
2,000,000
Improvement of Road-Laak Central ES Road, Poblacion, Laak, Compostela Valley 2,000,000
Improvement of Road-Mainit NHS Road, Mainit, Nabunturan, Compostela Valley 1,000,000
Improvement of Road-Pindasan to Pangibiran, Pindasan, Mabini, Compostela Valley 2,000,000
Improvement of Road-Prk 15 Pob to P5 Libasan, Poblacion, Nabunturan, Compostela Valley
2,000,000
Davao City 2nd DEO 393,000,000Road Concreting at Barangay Sibulan, Toril District, Davao City, Davao del Sur 10,000,000
Road Concreting at Brgy Biao Escuela, Tugbok District, Davao City, Davao del Sur 5,000,000
Road Concreting at Brgy. Biao Guianga, Tugbok District, Davao City, Davao del Sur 5,000,000
Road Concreting at Brgy. Binugao, Toril Dist., Davao City, Davao del Sur 2,000,000Road Concreting at Brgy. Camansi, Toril District, Davao city, Davao del Sur 5,000,000Road Concreting at Brgy. Manuel Guianga, Tugbok District, Davao City, Davao del Sur
5,000,000
Road Concreting at Brgy. Megcawayan, Calinan District, Davao city, Davao del Sur 5,000,000
Road Concreting at Brgy. New Carmen, Tugbok District, Davao City, Davao del Sur 5,000,000
Road Concreting at Brgy. New Valencia, Tugbok District, Davao City, Davao del Sur 5,000,000
Road Concreting at Brgy. Tagluno, Toril District, Davao City, Davao del Sur 5,000,000Road Concreting at Brgy. Tungkalan, Toril District, Davao City, Davao del Sur 5,000,000
Road Concreting, Brgy. Bago Oshiro, Tugbok Dist., Davao City, Davao del Sur 5,000,000
Road Concreting, Barangay Bayabas, Toril District, Davao City, Davao del Sur 5,000,000
Road Concreting, Brgy Tugbok Proper, Tugbok Dist., Davao Cty, Davao del Sur 5,000,000
Road Concreting, Brgy. Anggalan, Tugbok Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Atan-awe, Toril Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Bantol, Marilog Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Bato, Toril Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Biao Escuela, Tugbok Dist., Davao City, Davao del Sur 5,000,000
Road Concreting, Brgy. Biao Guianga, Tugbok Dist., Davao City, Davao del Sur 5,000,000
Road Concreting, Brgy. Binugao, Toril Dist., Davao City, Davao del Sur 2,000,000Road Concreting, Brgy. Calinan Poblacion, Calinan Dist., Davao City, Davao del Sur 10,000,000
Road Concreting, Brgy. Carmen, Baguio Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Catigan, Toril Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Cawayan, Calinan Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Crossing Bayabas, Toril Dist., Davao City, Davao del Sur 5,000,000
Road Concreting, Brgy. Dacudao, Calinan Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Daliao, Toril Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Daliaon Plantation, Toril Dist., Davao City, Davao del Sur 5,000,000
Road Concreting, Brgy. Datu Salomay, Marilog District, Davao City, Davao del Sur 5,000,000
Road Concreting, Brgy. Gumalang, Baguio Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Inayangan, Calinan Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Lacson, Calinan Dist., Davao City, Davao del Sur 5,000,000
Page 150 of 162
1050 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Road Concreting, Brgy. Lizada, Toril Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Los Amigos,Tugbok Dist., Davao City, Davao del Sur 5,000,000
Road Concreting, Brgy. Magsaysay, Marilog District, Davao City, Davao del Sur 5,000,000
Road Concreting, Brgy. Malagos, Baguio District, Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Malamba, Marilog Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Megcawayan, Calinan Dist., Davao City, Davao del Sur 5,000,000
Road Concreting, Brgy. Mintal, Tugbok, Davao City, Davao del Sur 10,000,000Road Concreting, Brgy. Riverside, Calinan Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Salaysay, Marilog Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Saloy Calinan Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Sirib, Calinan District, Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Sto. Nino, Tugbok Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Suawan, Marilog Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Subasta, Calinan Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Tacunan, Tugbok Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Tagluno, Toril Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Tagurano, Toril Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Talandang, Tugbok Dist., Davao City, Davao del Sur 20,000,000Road Concreting, Brgy. Tambobong, Baguio Dist., Davao City, Davao del Sur 10,000,000
Road Concreting, Brgy. Tawan-tawan, Baguio Dist., Davao City, Davao del Sur 5,000,000
Road Concreting, Brgy. Tibuloy, Toril District, Davao City, Davao del Sur 5,000,000Road Concreting, Brgy. Tungkalan, Toril Dist., Davao City, Davao del Sur 5,000,000Road Concreting, Toril Poblacion, Toril District, Davao City, Davao del Sur 5,000,000Road Concreting,Rasay Road to Brgy. Daliao, Toril Dist., Davao City, Davao del Sur 15,000,000
Road Conctruction, Purok 7, Brgy. Carmen, Baguio District, Davao City 2,000,000Road Construction at Brgy Balengaeng, Tugbok Dist., Davao City, Davao del Sur 5,000,000
Road Construction at Brgy. Kilate, Toril District., Davao City, Davao del Sur 5,000,000Road Construction, Barangay Tamugan, Marilog District, Davao City, Davao del Sur 5,000,000
Road Construction, Brgy. Dominga, Calinan District, Davao City, Davao del Sur 5,000,000
Road Construction, Brgy. Gumalang, Baguio Dist., Davao City, Davao del Sur 5,000,000
Road Construction, Brgy. Gumitan, Marilog Dist., Davao City. Davao del Sur 5,000,000Road Construction, Brgy. Los Amigos, Tugbok Dist., Davao City, Davao del Sur 5,000,000
Road Construction, Brgy. Marilog Proper, Marilog Dist., Davao City, Davao del Sur 5,000,000
Road Construction, Brgy. Matina Biao, Tugbok District, Davao City, Davao del Sur 5,000,000
Road Construction, Brgy. Sirawan, Toril Dist., Davao City, Davao del Sur 5,000,000Road Construction, Brgy. Ula, Tugbok Dist., Davao City, Davao del Sur 5,000,000Road Construction, Brgy. Wangan, Calinan Dist., Davao Dity, Davao del Sur 10,000,000Road Improvement/Construction, Purok 7, Brgy. Tagluno, Toril District, Davao City 2,000,000
Davao City DEO 99,700,000Concreting of road with drainage, Brgy. Indangan, Davao City 2,000,000Concreting of road with drainage, Brgy. Tibungco, Davao City 2,000,000Concreting of RoadBgy. Mintal, Davao City, Davao del Sur
2,000,000
Concreting of RoadBgy. Tagurano, Davao City, Davao del Sur
13,000,000
Concreting of Road, Bgy. 10-A, Davao City, Davao del Sur 2,000,000Concreting of Road, Bgy. Bago Gallera, Davao City, Davao del Sur 2,000,000Concreting of Road, Bgy. Ma-a, Davao City, Davao del Sur 2,000,000Concreting of roads, Brgy. Cabantian, Davao City 2,000,000Concreting of roads, Brgy. Hizon, Davao City 2,500,000Concreting of roads, Brgy. Panacan, Davao City 2,700,000Concreting of roads, Brgy. Pañalum, Davao City 2,000,000Concreting of roads, Brgy. R. Castillo, Davao City 2,000,000Concreting of roads, Brgy. Sasa, Davao City 2,500,000Concreting/Improvement of Road, Bgy. Matina Aplaya, Davao City, Davao del Sur 8,000,000
Concreting/Improvement of Road, Bgy. Panacan, Davao City, Davao del Sur 2,000,000
Improvement/Rehabilitation of Malagamot, Davao City 10,000,000Improvement/Rehabilitation of Maligaya St., Matina Aplaya, Davao City 2,500,000Improvement/Rehabilitation of Regodon St., Matina Aplaya, Davao City 2,500,000Improvement/Rehabilitation of Tupaz St., Gem Village, Maa, Davao City 5,000,000Road Concreting of Barangay Road of Purok 1, Brgy. San Isidro, Bunawan District, Davao City
2,000,000
Road Concreting of Barangay Road of Purok 7, Sitio Sto. Niño up to Purok 6 of Sitio San Jose, Brgy. Waan, Buhangin District, Davao City
2,000,000
Road Concreting, Block 19, Kabayan Relocation, Purok 3-D, Brgy. Tibungco, Davao City
2,000,000
Road Concreting, Brgy. Antonio, Agdao District, Davao City 2,000,000Road Conctruction Epol Highway to Man-Omanan Tribal Village, Purok 10, Brgy. Baganihan, Marilog District, Davao City
2,000,000
Road Conctruction, Kaunlaran St., Lower Ledesma, Brgy. 10-A, Poblacion, Davao City
3,000,000
Road Project (Construction), Brgy. 11-B, Poblacion, Davao City 1st LD 2,000,000Road Project (Construction), Brgy. 19-B, Poblacion, Davao City 1st LD 2,000,000Road Project (Construction), Brgy. 40-D, Poblacion, Davao City 1st LD 2,000,000Road Project (Construction), Brgy. 5-A, Poblacion, Davao City 1st LD 2,000,000Road Project (Construction), Brgy. 9-A, Poblacion, Davao City 1st LD 2,000,000Road Project (Construction), Brgy. Bucana 76-A, Talomo, Davao City 1st LD 2,000,000
Road Project (Construction), Brgy. Maa, Talomo, Davao City 1st LD 2,000,000Road Project (Construction), Brgy. Talomo, Talomo, Davao City 1st LD 2,000,000Road Repair of Brgy. San Rafael Castilo Agdao District, Davao City, Agdao, Agdao, Davao City 2nd LD
2,000,000
Davao del Norte DEO 129,000,000
Page 151 of 162
details of dpwh’s programs/projects 1051
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Concreting of Road, Bgy. Mambago A to Bgy. Sampao, Island Garden City of Samal, Davao del Norte
10,000,000
Construction of road , Poblacion, Municipality of New Corella, Davao del Norte 10,000,000
Construction/Rehabilitation of Various Infrastructure Projects 24,000,000Revetment Station 3+620 to Station 500, Barangay Tuganay, Carmen , Davao del Norte
30,000,000
Revetment Station 5+000 to Station 6+200, Barangay Tuganay, Carmen , Davao del Norte
30,000,000
Road Construction/Concreting - Brgy. Poblacion, Kapalong, Davao del Norte 15,000,000Road Construction/Concreting - Brgy. Poblacion, New Corella, Davao del Norte 10,000,000
Davao del Sur 1st DEO 5,000,000Farm-to-market road concreting project for Osmena Street and Roxas Street, Almedras District, Padada, Davao del Sur
5,000,000
Davao del Sur 2nd DEO 57,500,000Concreting of Relocation-SPAMAST Road (including drainage structures), Barangay Poblacion, Malita, Davao Occidental
17,500,000
Concreting of Fatima Road, Sta. 0+000-Sta. 0+286, Brgy. Poblacion, Malita, Davao Occidental Lone District
4,290,000
Concreting of Junction National Higway to Marwasa Road, Sta. 0+000-Sta. 0+537, Brgy. Poblacion, Malita, Davao Occidental Lone District
8,055,000
Concreting of Kolo Road, Sta. 0+000-Sta. 0+272, Brgy. Poblacion, Malita, Davao Occidental Lone District
4,080,000
Concreting of Samtalika- Dumoy Road, Sta. 0+000-Sta. 0+668, Brgy. Poblacion, Malita, Davao Occidental Lone District
10,000,000
Concreting of Slaughter-Public Market Rd., Sta. 0+000-Sta. 0+565, Brgy. Poblacion, Malita, Davao Occidental Lone District
8,475,000
Concreting of Tambakan Road, Sta. 0+000-Sta. 0+342, Brgy. Poblacion, Malita, Davao Occidental Lone District
5,100,000
Davao Oriental 2nd DEO 24,000,000Construction of Road, Barangay Calapagan, Lupon, Davao Oriental 2,000,000Construction of Road, Barangay Tagbinongan, Mati City, Davao Oriental 2,000,000Construction of Roads and Bridges, Banaybanay 2,000,000Construction of Roads and Bridges, Gov. Generoso 3,000,000Construction of Roads and Bridges, Gov. Generoso, Davao Oriental,Davao Oriental 2nd LD
2,000,000
Construction of Roads and Bridges, Lupon 6,000,000Construction of Roads and Bridges, Lupon, Davao Oriental,Davao Oriental 2nd LD 5,000,000
Construction of Roads and Bridges, Mati 2,000,000
Region XII 64,900,000Regional Office XII 5,000,000
Construction of Local Road (FMR) Ibotigen-Narra road, Sultan Kudarat Municipality, Maguindanao
5,000,000
Cotabato City DEO 22,000,000Concreting of Road in Brgy. G. Kalawag, Parang, Maguindanao 2,000,000Concreting of Road in Brgy. Poblacion Mother, Cotabato City 1st LD 2,000,000Concreting of Road in Brgy. Rosary Heights II, Cotabato City 1st LD 2,000,000Concreting of Road in Brgy. Rosary Heights IX, Cotabato City 1st LD 2,000,000Concreting of Road in Brgy. Rosary Heights XIII, Cotabato City 1st LD 5,000,000Concreting of Road in MSU, Maguindanao Brgy. Poblacion Mother, Datu Odin Sinsuat 4,000,000
Concreting of Road with DrainageBgy. Poblacion A, M'lang, Cotabato
3,000,000
Concreting of RoadBgy. Inas, M'lang, Cotabato
2,000,000
North Cotabato 2nd DEO 28,000,000Concreting of Barangay Dalengaoen Road, Barangay Dalengaoen, Pikit, North Cotabato 1st LD
2,000,000
Concreting of Barangay Inug-ug Road, Barangay Inug-ug, Pikit, North Cotabato 1st LD
2,000,000
Concreting of Barangay Midpapan 2 Road, Barangay Midpapan 2, Pigcawayan, North Cotabato 1st LD
3,000,000
Concreting of Barangay Pentil (Aleosan - Malamote Midsayap) Road, Barangay Pentil - Malamote, Aleosan-Midsayap, North Cotabato 1st LD
2,000,000
Concreting of Barangay road (Barangay Hall to Upper Ulamian), Barangay Ulamian, Libungan, North Cotabato 1st LD
2,000,000
Concreting of barangay road fronting New Culasi High School to CHS Annex, Barangay New Culasi, Pigcawayan, North Cotabato 1st LD
2,000,000
Concreting of Barangay Tubon Road, Barangay Tubon, Pigcawayan, North Cotabato 1st LD
2,000,000
Concreting of Barangay Villarica Macao - Toribio St. Abaga, Barangay Villarica - Abaga, Midsayap-Libungan, North Cotabato 1st LD
2,000,000
Concreting of Manuel Roxas Street, Barangay Poblacion 4, Midsayap, North Cotabato 1st LD
2,000,000
Concreting of Patindeguen Barangay Road to Lagumbingan Barangay Road, Barangay Patindeguen, Midsayap, North Cotabato 1st LD
5,000,000
Concreting of Rizal St. - Magsaysay St., Barangay Poblacion, Libungan, North Cotabato 1st LD
2,000,000
Concreting of Waling-Waling St., Barangay Poblacion 2, Midsayap, North Cotabato 1st LD
2,000,000
South Cotabato 2nd DEO 8,000,000Construction of Road Concreting at Purok 3, Katangawan, General Santos City, South Cotabato 1st LD
2,000,000
Road Concreting along Purok Maunlad, Purok Luwalhati and Purok Honeyville, Silway 8, Polomolok, South Cotabato 1st LD
2,000,000
Road Concreting of Purok 5 to 18 to 19 and 20, Fatima, General Santos City, South Cotabato 1st LD
2,000,000
Road Concreting of Zone 6 and 7, Bula, General Santos City, South Cotabato 1st LD 2,000,000
South Cotabato DEO 1,900,000
Page 152 of 162
1052 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Rehabilitation of Various Infrastructure Projects, South Cotabato 2nd LD
1,900,000
Region XIII 194,964,000Agusan del Norte DEO 40,000,000
Concreting of Road in Brgy. Balang-balang, Remedios T. Romualdez, Agusan del Norte 2nd LD
2,000,000
Concreting of Road in Brgy. Rojales, Carmen, Agusan del Norte 2nd LD 2,000,000Concreting of Road in Brgy. San Isidro, Kitcharao, Agusan del Norte 2nd LD 2,000,000Construction/Rehabilitation of Various Infrastructure Projects, Agusan del Norte 2nd LD
34,000,000
Agusan del Sur 1st DEO 5,000,000Road Construction, Brgy. Langag, Esperanza, Agusan del Sur 1st LD 5,000,000
Butuan City DEO 44,000,000Construction of Local Road (Diversion Road), Brgy. Mahay, Butuan City 2,000,000Construction of Local Road (Purok 1 and 2).Brgy. Sumile, Butuan City 2,000,000Construction of Local Road (Purok 4 to 5), Brgy. MJ Santos, Butuan City 2,000,000Construction of Local Road (Purok 7 Road going to Provincial Road), Brgy. Maibu, Butuan City
2,000,000
Construction of Local Road (Purok Ilang Ilang Ochoa to Lawin Road), Brgy. Limaha, Butuan City
2,000,000
Construction of Local Road from National Highway going to Purok 5 and 6 , Brgy. Sumilihon, Butuan City
2,000,000
Construction of Local Road Purok 10 to Purok 10A, Brgy. San Mateo, Butuan City 2,000,000
Construction of Local Road( Baobawan Road to Los Angeles), Brgy. Baobawan, Butuan City
2,000,000
Construction of Local Road, Brgy. Dagohoy, Butuan City 2,000,000Construction of Local Road, Cemetery St., P-16A, Brgy. San Vicente, Butuan City 2,000,000
Construction of Road going Brgy. Hall, Brgy. Mandamo, Butuan City 2,000,000Construction of Road Purok 6 Calbog, Brgy. Don Francisco, Butuan City 2,000,000Road Concreting from NRJ to Sitio Badiangon, Brgy. Ampayon, Butuan City 10,000,000Road Concreting from Tiniwisan (end of pavement) to Junction Cabcabon-Bobon Road (800 meters), Butuan City
10,000,000
Dinagat Islands DEO 38,000,000Construction of 200m Barangay Road, Brgy. Imelda, Municipality of Tubajon, Dinagat Islands Lone District
2,000,000
Construction of 300m Barangay Road, Brgy. Carmen, Municipality of Loreto, Dinagat Islands Lone District
3,000,000
Construction of 300m Barangay Road, Brgy. Malinao, Municipality of Tubajon, Dinagat Islands Lone District
3,000,000
Construction of 300m Barangay Road, Brgy. Sta. Rita, Mun. of Cagdianao, Dinagat Islands Lone District
3,000,000
Construction of Barangay San Jose to Barangay Bayanihan Road, Libjo, Dinagat Islands Lone District
25,000,000
Contruction of 200 meter Barangay Road, Barangay Rita Glenda, Basilisa, Dinigat Islands
2,000,000
Surigao del Norte 1st DEO 16,500,000Concreting of Del Rosario Road, Del Rosario, Tubod, Surigao del Norte 3,000,000Concreting of Marga-Capayahan Road, Capayahan, Tubod, Surigao del Norte 3,000,000
Concreting of Sitio Lambuyo Road, Marga, Tubod, Surigao del Norte 2,000,000Concreting of Songkoy-Mahukdam Road, Capayahan, Tubod, Surigao del Norte 4,500,000
Road Concreting, Cabugao, Bacuag, Surigao del Norte 2,000,000Road Concreting, Cagniog, Surigao City, Surigao del Norte 2,000,000
Surigao del Norte 2nd DEO 35,000,000Construction of Barangay Road, Junction Brgy. Nueva Estrella to Brgy. Honrado, Socorro, Surigao del Norte 1st LD
4,000,000
Construction of Barangay Road, Junction Sitio Katansay, Brgy. Honrado to Brgy. Pamosaingan, Socorro, Surigao del Norte 1st LD
4,000,000
Construction of Barangay Road, Sitio Lobo to Brgy. Nueva Estrella, Socorro, Surigao del Norte 1st LD
5,000,000
Construction of Barangay Road, Sitio Minakoyon, Brgy. Del Carmen to Sitio Buyod, Brgy. Buhing Kalipay, San Isidro, Surigao del Norte 1st LD
2,000,000
Construction of Farm-to-Market Road, Barangay Magsaysay to Barangay Cabitoonan, General Luna, Siargao, Surigao del Norte 1st
20,000,000
Surigao del Sur 2nd DEO 16,464,000Construction of Flood Control Structure/Drainage Canal at Barangay Osmena, Tagbina, Surigao del Sur (1000 LM) 2nd LD
2,000,000
Construction of Local Roads at Barangay Bitoon to Barangay Maharlika, Hinatuan, Surigao del Sur 2nd LD
14,464,000
Local Bridges 1,831,210,000Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects 1,448,960,000
National Capital Region 420,525,000Central Office 330,525,000
Construction of Pigalo Bridge and Approaches along Alicia-Angadanan-San Guillermo Provincial Road, Angadanan, Isabela 3rd LD
160,000,000
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Nationwide Allocation
5,000,000
Repair/Retrofitting of Tago-Lapaz Bridge along Surigao-Davao Coastal Road, Tago, Surigao del Sur 1st LD
165,525,000
North Manila DEO 90,000,000Construction of Bambang Bridge at Estero de Magdalena, Manila City 2nd LD 30,000,000
Construction of Bridge at Batangas St., Crossing and Improvement of Estero de San Lazaro, Sta. Cruz, Manila City 3rd LD
30,000,000
Construction of Flat Slab Bridge (Laguna Bridge) & Improvement of Estero de Magdalena, Manila City 2nd LD
30,000,000
Region I 72,500,000
Page 153 of 162
details of dpwh’s programs/projects 1053
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Ilocos Sur 1st DEO 15,500,000Construction of Sagpat Bridge, Sagpat, Bantay, Ilocos Sur 10,000,000Construction of Taleb Bridge, Bantay, Ilocos Sur 5,500,000
Pangasinan 1st DEO 45,000,000Replacement of Bogtog Bridge, Bani, Pangasinan 1st LD 45,000,000
Pangasinan 4th DEO 12,000,000Replacement/Construction of Paki Bridge, Brgy. Tanolong, Bayambang, Pangasinan 12,000,000
Region III 131,300,000Regional Office III 70,000,000
Reconstruction of Luyos-Buliran Bridge across Pampanga River, San Antonio, Nueva Ecija
70,000,000
Bataan 1st DEO 13,500,000Construction of Catmon Bridge, Brgy. Calaylayan, Abucay, Bataan 13,500,000
Bulacan 1st DEO 47,800,000Construction/Improvement at Sta. Monica-San Agustin Bridge, Hagonoy, Bulacan 27,800,000
Construction/Improvement of San Isidro Bridge, Paombong, Bulacan 20,000,000
Region IV-A 153,735,000Regional Office IV-A 130,000,000
Construction of San Francisco-San Juan Bridge including Approaches, Tiaong, Quezon
80,000,000
Widening of Permanent Bridges, Malagasang-Pascam Bridge, Cavite 3rd LD 50,000,000
Batangas 3rd DEO 14,000,000Construction of Magapi Bridge and Approaches, Brgy. Magapi, Balete, Batangas 14,000,000
Quezon 2nd DEO 9,735,000Restoration of San Jose Bridge, Brgy. San Jose, Tiaong, Quezon 3,760,000Restoration of Usiw Bridge, Brgy. Quipot, Tiaong, Quezon 5,975,000
Region VII 60,000,000Regional Office VII 60,000,000
Construction of C200 Mabey Steel Bridges, Bohol 60,000,000
Region IX 324,000,000Regional Office IX 274,000,000
Construction fo Boki Concrete Footbridge, Mapun, Tawi-Tawi Lone District 10,000,000Construction of Balimbing Concrete Footbridge with Pierhead, Panglima Sugala, Tawi-Tawi Lone District
10,000,000
Construction of Bas-Bas Concrete Footbridge, Languyan, Tawi-Tawi Lone District 5,000,000
Construction of Basnunuk Bridge, Single Lane, Languyan, Tawi-Tawi Lone District 6,000,000
Construction of Diving Concrete Footbridge, Bongao, Tawi-Tawi Lone District 5,000,000Construction of footbridge, Pisak Pisak, Tabuan Lasa, Basilan Lone District 5,000,000Construction of footbridge, Saluping Proper, Tabuan Lasa, Basilan Lone District 8,000,000
Construction of Kakoong Concrete Footbridge, Tandubas, Tawi-Tawi Lone District 5,000,000
Construction of Kannaway Bridge, Parang, Sulu 1st LD 50,000,000Construction of Lambug Bridge, Panglima Sugala, Tawi-Tawi Lone District 30,000,000Construction of Lato-Laato Concrete Footbridge, Bongao, Tawi-Tawi Lone District 5,000,000
Construction of Laum Tabawan Concrete Footbridge, South Ubian, Tawi-Tawi Lone District
20,000,000
Construction of Lihiman Island Concrete Footbridge, Turtle Island, Tawi-Tawi Lone District
10,000,000
Construction of Limbo Upas Bridge, Tipo-tipo, Basilan Lone District 40,000,000Construction of Mantabuan north Concrete Footbridge with Pierhead, Sapa-Sapa, Tawi-Tawi Lone District
10,000,000
Construction of Manukmangkaw Concrete Footbridge, Simunul, Tawi-Tawi Lone District
5,000,000
Construction of Mongkai Concrete Footbridge, Simunul, Tawi-Tawi Lone District 10,000,000
Construction of North Larap Concrete Footbridge, Sitangkai, Tawi-Tawi Lone District 10,000,000
Construction of Nunukan Concrete Footbridge, Sibutu, Tawi-Tawi Lone District 5,000,000
Construction of Pakias Concrete Footbridge, Bongao, Tawi-Tawi Lone District 5,000,000Construction of Tapian Sokah Concrete Footbridge, Tandubas, Tawi-Tawi Lone District
5,000,000
Construction of Tongmageng Concrete Footbridge, Sitangkai, Tawi-Tawi Lone District
10,000,000
Construction of Tubig Tanah Concrete Footbridge, Bongao, Tawi-Tawi Lone District 5,000,000
Isabela City DEO 40,000,000Construction of Baluno Bridge, Isabela City, Basilan Lone District 40,000,000
Zamboanga del Sur 1st DEO 10,000,000Completion of the Repair/Reconstruction of Lower Pulacan Bridge, along Lower Pulacan Provincial Road, Zamboanga del Sur
10,000,000
Region X 25,000,000Regional Office X 25,000,000
Construction of Maradugao Bridge, Brgy Milaya, Wao, Lanao del Sur 1st LD 25,000,000
Region XII 200,000,000Regional Office XII 200,000,000
Page 154 of 162
1054 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Bridge, Brgy Matuber, Datu Blah Sinsuat, Maguindanao 1st LD 100,000,000
Construction of Bridge, Brgy Tubuan, Datu Blah Sinsuat, Maguindanao 1st LD 100,000,000
Region XIII 61,900,000Surigao del Sur 1st DEO 61,900,000
Construction of Telaje Bridge, leading to Adela Serra Ty Memorial Medical Center, Tandag, Surigao del Sur 1st LD
42,400,000
Rehabilitation of the Reinforced Concrete Deck Girders (RCDG) Bridge, Bayabas, Surigao del Sur 1st LD
19,500,000
Local Infrastructure Program 382,250,000National Capital Region 50,500,000
Central Office 20,500,000Construction/ Rehabilitation of Various Infrastructure Projects, Batangas 2nd LD 5,000,000
Construction/Rehabilitation of Various Infrastructure Projects 3,000,000Construction/Rehabilitation of Various Infrastructure Projects, Bacolod City Lone District
2,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Bohol 3rd LD 1,000,000Construction/Rehabilitation of Various Infrastructure Projects, Kalinga Lone District 7,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Negros Occidental 1st LD
2,500,000
Metro Manila 1st DEO 10,000,000Construction of bridge, Barangay Palingon-Tipas, Taguig City 10,000,000
Quezon City 2nd DEO 20,000,000Construction of bridge, Judge Jimenez (Lagarian) 20,000,000
Region I 2,000,000Pangasinan 2nd DEO 2,000,000
Construction of Footbridge at Brgy. Duplac, Urbiztondo, Pangasinan 2nd LD 2,000,000
Cordillera Administrative Region 19,000,000Abra DEO 15,000,000
Construction of San Antonio Bridge, Brgy. San Antonio, Bangued, Abra Lone District 15,000,000
Baguio City DEO 4,000,000Construction of Bridge at Amsing Road, East Modernsite, Baguio City Lone District 2,000,000
Construction of Footbridge with Railings at Siapno Road, Pacdal, Baguio City Lone District
2,000,000
Region II 45,600,000Isabela 1st DEO 45,000,000
Construction of Bagabag Bridge, Sto. Tomas, Isabela 16,400,000Construction of Culalabo Bridge, Sto. Tomas, Isabela 15,200,000Construction of San Roque Bridge, Sto. Tomas, Isabela 13,400,000
Isabela 2nd DEO 600,000Construction of Simimbaan Reinfored concrete Box Culvert Bridge, Barangay Simimbaan, Roxas, Isabela 2nd LD
600,000
Region III 24,500,000Bataan 1st DEO 9,000,000
Construction of Footbridge, Sitio Pulo, Barangay Kabalutan, Orani, Bataan 1st LD 3,000,000
Rehabilitation of Pulo Bridge Phase 2, Barangay Pulo, Hermosa, Bataan 1st LD 6,000,000
Bulacan 1st DEO 8,500,000Const. of Reinforced Concrete Footbridge at Sto. Nino, Hagonoy, Bul. 3,000,000Const./Improvement of Bailey Bridge at Abulalas, Hagonoy, Bul. 5,500,000
Pampanga 1st DEO 3,000,000Construction of Footbridges, Minalin, Pampanga 4th LD 3,000,000
Pampanga 2nd DEO 4,000,000Construction of Bridge going to Sto. Cristo- San Pedro, Guagua, Pampanga 2,000,000Construction of Footbridge in Purok 5, Lambac, Guagua, Pampanga 2,000,000
Region IV-A 31,000,000Cavite 2nd DEO 2,000,000
Construction of Magabi Bridge, Daine, Indang, Cavite 2,000,000
Cavite DEO 23,000,000Construction of Foot Bridge (4pcs.), Brgy. Pob. 5 & Kua, GMA, Cavite 5th LD 3,000,000
Construction of Piela Bridge - Brgy. Sampaloc 3, City of Dasmariñas, Cavite 20,000,000
Quezon 1st DEO 2,000,000Construction of Foot Bridge, Brgy. Anibawan, Burdeos, Quezon 2,000,000
Quezon 2nd DEO 4,000,000Construction of concrete bridge, Brgy. Briones, San Antonio, Quezon 2nd LD 4,000,000
Region IV-B 10,000,000Palawan 3rd DEO 2,000,000
Construction of Footbridge, Barangay Poblacion, Aborlan, Palawan 3rd LD 2,000,000
Southern Mindoro DEO 8,000,000Construction of Ipil-Sagana Bailey Bridge, Barangay Ipil-Sagana, Bongabong, Oriental Mindoro 2nd LD
4,000,000
Page 155 of 162
details of dpwh’s programs/projects 1055
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Tawas Bailey Bridge (28.8M), Barangay Tawas, Bongabong, Oriental Mindoro 2nd LD
4,000,000
Region V 11,000,000Camarines Sur 5th DEO 9,000,000
Construction of Bridge, Barangay Pinugusan, Del Gallego, Camarines Sur 1st LD 2,000,000
Construction of Cotmo-Anib Bridge, Barangay Cotmo, Sipocot, Camarines Sur 1st LD 3,000,000
Rehabilitation of Bridge, Andasan Bridge, New Poblacion, Cabusao, Camarines Sur 1st LD
2,000,000
Rehabilitation of Sinibaan Bridge Barangay Camagong, Cabusao Camarines Sur 2,000,000
Catanduanes DEO 2,000,000Construction of Footbridge in Brgy. Concepcion, Virac, Catanduanes Lone District 2,000,000
Region VI 15,000,000Antique DEO 2,000,000
Construction of Local Bridge, Villaflor, Tobias Fornier, Antique Lone District 2,000,000
Negros Occidental 1st DEO 8,000,000Construction of Bridge (Purok Gerard), Barangay Bato, Sagay City, Negros Occidental 2nd LD
2,000,000
Construction of Bridge going to Barangay 1, Barangay Punta Mesa Manapla, Negros Occidental 2nd LD
2,000,000
Construction of Foot Bridge, Barangay CPO Himogaan, Sagay City, Negros Occidental 2nd LD
4,000,000
Negros Occidental 3rd DEO 5,000,000Construction of Bridge (Overflow), Bayawan River, Sitio Hamham, Brgy. Locotan, Kabankalan City, Negros Occidental
5,000,000
Region VII 7,000,000Cebu 2nd DEO 1,000,000
Construction of Foot Bridge, Barangay Jaclupan, Talisay City, Cebu 1st LD 1,000,000
Cebu 6th DEO 2,000,000Construction of Bridge at Brgy. Looc, Mandaue City, Cebu 2,000,000
Negros Oriental 3rd DEO 4,000,000Construction of (steel) Footbridge, Barangay Obat, Sta Catalina, Negros Oriental 2,000,000
Construction of Hanging Bridge, Barangay Talalak, Sta Catalina, Negros Oriental 2,000,000
Region VIII 36,000,000Eastern Samar DEO 2,000,000
Construction of Local Bridge, Barangay Bitaugan, Guiuan, Eastern Samar Lone District
2,000,000
Leyte 2nd DEO 4,000,000Repair/Rehabilitation of Lower Hiraan Hanging Bridge, Brgy. Lower Hiraan, 2,000,000Repair/Rehabilitation/Restoration of Uyawan Hanging Bridge, Brgy. Uyawan, 2,000,000
Samar 1st DEO 30,000,000Replacement of Payahan Bridge, Brgy. Payahan, Calbayog City, Samar 1st LD 30,000,000
Region IX 8,000,000Regional Office IX 2,000,000
Construction of Timber Foot Bridge for Barangay Capual, Omar, Sulu 2,000,000
Isabela City DEO 2,000,000Construction of Foot Bridge at Barangay Kaumpurnah, Tabuan-Lasa, Basilan 2,000,000
Zamboanga City DEO 2,000,000Repair/Improvement of Bridge at Sitio Pole Diutay, La Paz, Zamboanga City 1st LD 2,000,000
Zamboanga Sibugay 1st DEO 2,000,000Rehabilitation of Bridge, Barangay Guiwan, Payao, Zamboanga Sibugay 1st LD 2,000,000
Region X 56,750,000Regional Office X 8,000,000
Construction of Local Bridge-Apo Bridge, Brgy. Dapao, Pualas, Lanao del Sur 2,000,000Construction of Local Bridge-Sakay Bridge, Brgy. Dapao, Pualas, Lanao del Sur 2,000,000
Construction of Local Bridge-Tanaon Bridge, Brgy. Dapao, Pualas, Lanao del Sur 2,000,000
Construction of Local Bridge-Yaran Bridge, Brgy. Yaran, Pualas, Lanao del Sur 2,000,000
Bukidnon 2nd DEO 36,750,000Construction of hanging bridge (from Brgy. Macapare to Brgy. Pinamangguhan), Damulog, Bukidnon 3rd LD
8,000,000
Construction of hanging bridge (from Brgy. Maican to Brgy. Balaoro), Damulog, Bukidnon 3rd LD
8,000,000
Construction of Tugas bridge, Brgy. Camp I, Maramag, Bukidnon 3rd LD 20,750,000
Bukidnon 3rd DEO 5,000,000Construction of Makabundol Hanging Bridge Danatag, Baungon, Bukidnon,Bukidnon 1st LD
5,000,000
Camiguin DEO 7,000,000
Page 156 of 162
1056 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction of Overpass, Barangay Poblacion, Sagay, Camiguin Lone District 4,000,000
Construction/Improvement of Overpass, Barangay Poblacion, Mambajo, Mahinog & Catarman, Camiguin Lone District
3,000,000
Region XI 56,900,000Compostela Valley DEO 15,400,000
Construction of Bridges in Municipalities of Maco, Nabunturan and Mawab, Compostela Valley
3,200,000
Construction of Bridges in Municipalities of Mawab, Nabunturan, Pantukan and Mabini, Compostela Valley
10,200,000
Hanging Bridge-, Liboton, Laak, Compostela Valley 1,000,000Hanging Bridge, Mainit , Nabunturan, Compostela Valley 1,000,000
Davao City 2nd DEO 41,500,000Construction of Bridge, Brgy. Dacudao, Calinan Dist., Davao City, Davao del Sur 8,000,000
Construction of Bridge, Rosalina I Village, Brgy. Bago Gallera, Davao City, Davao del Sur
2,500,000
Construction of Hanging Bridge at Barangay Tagakpan, Tugbok District, Davao City, Davao del Sur
5,000,000
Construction of Hanging Bridge, Brgy. Cadalian, Baguio Dist., Davao City, Davao del Sur
5,000,000
Construction of Hanging Bridge, Brgy. Dalag, Marilog Dist., Davao City, Davao del Sur
5,000,000
Construction of Hanging Bridge, Sitio Awid, Brgy. Malamba, Marilog Dist., Davao City, Davao del Sur
5,000,000
Construction of Hanging Bridge, Sitio Bulan, Brgy. Lamanan, Calinan District, Davao City, Davao del sur
3,000,000
Construction of Hanging Bridge, Sitio Kulabol, Brgy. Lamanan, Calinan District. Davao City, Davao del Sur
3,000,000
Construction of Hanging Bridge, Sitio Pegalongan, Brgy. Malamba, Marilog Dist., Davao City, Davao del Sur
5,000,000
Region XIII 9,000,000Dinagat Islands DEO 2,000,000
Repair of Caniyog Timber Bridge, Brgy. Sto. Nino, Mun. of Libjo, Dinagat Islands Lone District
2,000,000
Surigao del Sur 2nd DEO 7,000,000Construction of Local Bridge at Barangay Carpenito, Tagbina, Surigao del Sur (100 LM) 2nd LD
5,000,000
Construction of Local Bridge at Purok 4 to 6 at Barangay Tidman, Hinatuan, Surigao del Sur 2nd LD
2,000,000
Water Management 3,664,950,000Water Supply 3,664,950,000
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects 3,142,200,000National Capital Region 3,000,000,000
Central Office 3,000,000,000Water Supply and Sanitation for poverty areas and tourism priority sites 3,000,000,000
Region II 65,000,000Batanes DEO 65,000,000
Construction of Basco Water Works System, Batanes 35,000,000Construction of Sabtang Water Works System, Batanes 30,000,000
Region III 2,200,000Bulacan 1st DEO 2,200,000
Construction of Water Supply System at Barangay Sta. Ana, Bulakan, Bulacan 2,200,000
Region IX 40,000,000Regional Office IX 40,000,000
Construction of Sta. Clara Water System, Lamitan City, Basilan Lone District 40,000,000
Region XII 35,000,000Regional Office XII 35,000,000
Construction of BATNA Water System Level II, Brgy Nabalawag, Barira, Maguindanao 1st LD
5,000,000
Construction of Matanog Water System Level II (Spring Development), Matanog, Maguindanao 1st LD
30,000,000
Local Infrastructure Program 522,750,000National Capital Region 18,000,000
Central Office 16,000,000Construction/Rehabilitation of Various Infrastructure Projects 2,000,000Construction/Rehabilitation of Various Infrastructure Projects, Benguet Lone District 3,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Davao Oriental 2nd LD 1,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Kalinga Lone District 4,000,000
Construction/Rehabilitation of Various Infrastructure Projects, Leyte 5th LD 1,000,000Construction/Rehabilitation of Various Infrastructure Projects, Negros Occidental 1st LD
5,000,000
Quezon City 2nd DEO 2,000,000Provision of Water Supply Level II Quirino High School, Molave St. Project 3, Quezon City, Metro Manila
2,000,000
Region II 51,500,000Batanes DEO 34,500,000
Rehabilitation of Basco Waterworks System (Source and Reservoir), San Joaquin, Uyugan, Batanes Lone LD
6,000,000
Rehabilitation of Mahatao Waterworks System, Mahatao, Batanes Lone LD 12,000,000Rehabilitation/Improvement of Basco Water Works System (Source and Reservoir) (Level II), Barangay San Joaquin, Basco, Batanes
8,000,000
Page 157 of 162
details of dpwh’s programs/projects 1057
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Rehabilitation/Improvement of Uyugan Waterworks System (Source and Reservoir), Centro, Uyugan, Batanes Lone LD
8,500,000
Isabela 1st DEO 15,000,000Construction of water system 15,000,000
Nueva Vizcaya 2nd DEO 2,000,000Construction, Malasin-Ineangan Water System, Brgy. Malasin-Ineangan, Dupax del Norte, Nueva Vizcaya Lone District
2,000,000
Region III 8,000,000Bataan 1st DEO 4,000,000
Construction of Water System (Construction of Elevated Steel Water Tank), Barangay Mambog, Hermosa, Bataan 1st LD
2,000,000
Repair/Rehabilitation of Water System, Barangay Palili, Samal, Bataan 1st LD 2,000,000
Pampanga 2nd DEO 2,000,000Water System in Planas, Porac, Pampanga 2,000,000
Pampanga 3rd DEO 2,000,000Provision of Water Supply Level II, Barangay Turu, Magalang, Pampanga 2,000,000
Region IV-A 51,900,000Batangas 1st DEO 5,000,000
Rehabilitation/Repair/Improvement of Water System, Brgy. Dacanlao, Calaca, Batangas
1,500,000
Rehabilitation/Repair/Improvement of Water System, Brgy. Papaya, Nasugbu, Batangas
1,500,000
Water System Project in Brgy. Paraiso, Calatagan 2,000,000
Batangas 2nd DEO 5,000,000Construction of Water Supply II, San Luis, Batangas 2nd LD 2,000,000Improvement of Waterworks, Barangay Sorosoro Ilaya, Batangas City, Batangas 1,000,000
Improvement of Waterworks, Barangay Tinga Itaas, Batangas City, Batangas 1,000,000
Rehabilitation/Improvement of Water System, Malabrigo, Lobo, Batangas 1,000,000
Batangas 3rd DEO 7,000,000Construction/ Improvement of Water System (Level II) in Brgy. Cuta East, Sta. Teresita, Batangas,Batangas 3rd LD
2,000,000
Construction/ Improvement of Water System (Level II) in Brgy. Sto. Niño, San Nicolas, Batangas,Batangas 3rd LD
2,000,000
Improvement of Waterworks, Bagumbayan, Tanauan City, Batangas 2,000,000Improvement/ Rehabilitation of Water System, Dalipit West, Alitagtag, Batangas 1,000,000
Batangas 4th DEO 7,000,000Construction of Water Supply (Level II), Brgy. Banaba, Padre Garcia, Batangas 4th LD
2,000,000
Construction of Water Supply (Level II), Brgy. Bawi, Padre Garcia, Batangas 4th LD 2,000,000
Improvement of Water System, Salaban 2, Ibaan, Batangas 1,000,000Improvement of Waterworks, Barangay Bago, Ibaan, Batangas 1,000,000Improvement of Waterworks, Barangay Sabang, Ibaan, Batangas 1,000,000
Cavite 2nd DEO 2,000,000Installation of Water Suply, Brgy. Lalaan II, Silang, Cavite 5th LD 2,000,000
Quezon 1st DEO 3,000,000Construction of Water System , Brgy. Silangang Malicboy, Pagbilao, Quezon 2,000,000Improvement of Potable Water Supply Project, Brgy. Tanauan, Real, Quezon 1,000,000
Quezon 2nd DEO 5,500,000Construction of Water Supply (Level II), Brgy. Pury, San Antonio, Quezon 2nd LD 2,000,000
Construction of Water Supply Level II, Sto Cristo, Sariaya, Quezon 2nd LD 3,500,000
Quezon 3rd DEO 12,000,000Construction of Level II Water Supply System with Water Filtration in Unisan, Quezon 3rd LD
6,000,000
Construction of Level II Water Supply System with Water Filtration in San Narciso, Quezon 3rd LD
6,000,000
Quezon 4th DEO 2,000,000Construction of Water Supply (Level II Water System) - Brgy. Progreso, Gumaca, Quezon 4th LD
2,000,000
Rizal 1st DEO 3,400,000Rehab./Construction of 3 Units Water System, Barangay Mayamot, Antipolo, Rizal 3,400,000
Region IV-B 15,500,000Marinduque DEO 2,000,000
Construction of Waterworks System, Brgy. Mercado, Boac, Marinduque Lone District 2,000,000
Mindoro Occidental DEO 4,000,000Construction of Water Supply Level II, Barangay Tayamaan, Mamburao, Occidental Mindoro
2,000,000
Construction of Water System Level II, Barangay Talabaan, Mamburao, Occidental Mindoro
2,000,000
Palawan 3rd DEO 2,000,000Construction of Babuyan Water System, Barangay Babuyan, Puerto Princesa City, Palawan 3rd LD
2,000,000
Page 158 of 162
1058 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Romblon DEO 7,500,000Construction of Bachawan Water System Level II, Barangay Bachawan, San Agustin, Romblon
5,500,000
Construction of Bachawan Water System Level II, Barangay Poblacion, Ferrol, Romblon
2,000,000
Region V 101,000,000Albay 1st DEO 48,000,000
Construction of water supply system at Damacan River 20,000,000Rehabilitation/Improvement of Brgy. Basud Water System , Basud, Bacacay, Albay 1st LD
3,000,000
Rehabilitation/Improvement of Brgy. Bongabong Water System, Bonagbong, Tabaco City, Albay 1st LD
2,000,000
Rehabilitation/Improvement of Brgy. Quinastillojan Water System, Quinastillojan, Tabaco City, Albay 1st LD
2,000,000
Rehabilitation/Improvement of Brgy. San Jose Water System, San Jose, Malilipot, Albay 1st LD
3,000,000
Upgrading of Cagraray Water Distribution System, Salog/Bahi, Bacacay, Albay 18,000,000
Albay 2nd DEO 30,000,000Southern Legazpi Upland Barangay Federation Water System, Banquerohan/ Homapon, Legazpi City, Albay
30,000,000
Camarines Norte DEO 5,000,000Construction of Water System –water supply, Brgy. Villa Aurora, Capalonga, Camarines Norte,Camarines Norte 1st LD
2,000,000
Construction/ Improvement of Water System,Brgy. Malancao- Basud, Labo, Camarines Norte ,Camarines Norte 1st LD
1,000,000
Small Water Impounding Project, Barangay Man-ogob, San Vicente, Camarines Norte 2nd LD
2,000,000
Camarines Sur 5th DEO 2,000,000Construction of Water Supply, Barangay Panaytayan, Ragay, Camarines Sur 1st LD 2,000,000
Masbate 3rd DEO 6,000,000Construction of Water System - Level II at Brgy. Buenas Suerte, San Fernando, Masbate 1st LD
2,000,000
Construction of Water System - Level II at Brgy. Buenos Aires, San Fernando, Masbate 1st LD
2,000,000
Construction of Water System - Level II at Brgy. Progreso, San Fernando, Masbate 1st LD
2,000,000
Sorsogon 2nd DEO 10,000,000Construction of Water Supply,Brgy. Catanusan,Juban,Sorsogon 2,000,000Construction of water supply,Brgy. San Antonio,Prieto Diaz,Sorsogon 2,000,000Construction of Water Supply ,Brgy. San Antonio,Barcelona,Sorsogon 2,000,000Construction of Water Supply,Brgy. Calomayon,Juban,Sorsogon 2,000,000Construction/improvement of water supply (phase II),Brgy. Fabrica-Putiao,Barcelona,Sorsogon
2,000,000
Region VI 18,500,000Aklan DEO 2,000,000
Construction of Level II Water System, Brgy. Santa Cruz, Ibajay, Aklan 2,000,000
Antique DEO 6,000,000Construction of Water Supply System, Abaca, Tobias Fornier, Antique Lone District 2,000,000
Construction of Water Supply System, Bagumbayan, San Remigio, Antique Lone District
2,000,000
Construction of Water Supply System, Tubudan, San Remigio, Antique Lone District 2,000,000
Capiz 1st DEO 2,000,000Provision of Water Supply Level II, Barangay Yatingan, Pontevedra, Capiz 2,000,000
Guimaras DEO 1,500,000Extension of Water Supply – Level III , Municipality of Jordan, Guimaras 1,500,000
Iloilo 1st DEO 2,000,000Construction of Level 2 Water Supply System, Guimbal, Iloilo 2,000,000
Negros Occidental 1st DEO 5,000,000Construction of Water Supply System Level II, Poblacion, Toboso, Negros Occidental 1st LD
3,000,000
Construction of Water System , Barangay Paraiso , Sagay City, Negros Occidental 2nd LD
2,000,000
Region VII 23,000,000Bohol 2nd DEO 3,000,000
Construction of Waterworks System, Barangay Poblacion, Dagohoy, Bohol 2nd LD 3,000,000
Bohol 3rd DEO 11,000,000Construction/Improvement of Level II Water Supply System, Dimiao, Bohol 3rd LD 2,000,000
Construction/Improvement of Level II Water Supply System, Lila, Bohol 3rd LD 4,000,000
Construction/Improvement of Level II Water Supply System, Sierra Bullones, Bohol 3rd LD
5,000,000
Negros Oriental 2nd DEO 5,000,000Construction of water supply system, Manlipac, Bais City, Oriental Negros,Negros Oriental 2nd LD
2,000,000
Improvement of Water Supply System, brgy. Jilocon, San Jose, Negros Oriental 1,000,000
Improvement of Water Supply, Brgy. Banawe- Sta. Agueda, Pamplona, Negros Oriental
2,000,000
Page 159 of 162
details of dpwh’s programs/projects 1059
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Negros Oriental 3rd DEO 4,000,000Construction of Deep Well, Barangay Basak, Zamboanguita, Negros Oriental 2,000,000Rehabilitation of Waterworks System, Barangay San Jose & Poblacion, Sta Catalina, Negros Oriental
2,000,000
Region VIII 56,000,000Biliran DEO 14,000,000
Repair/Rehabilitation of Water Sytem, Barangay Capiñahan, Naval, Biliran Lone District
2,000,000
Repair/Rehabilitation of Water Sytem, Barangay Caray-Caray, Naval, Biliran Lone District
2,000,000
Repair/Rehabilitation of Water Sytem, Barangay Catmon, Naval, Biliran Lone District 2,000,000
Repair/Rehabilitation of Water Sytem, Barangay Mapuyo, Kawayan, Biliran Lone District
2,000,000
Repair/Rehabilitation of Water Sytem, Barangay P.S. Eamiguel, Naval, Biliran Lone District
2,000,000
Repair/Rehabilitation of Water Sytem, Barangay Sangalang, Biliran, Biliran Lone District
2,000,000
Repair/Rehabilitation of Water Sytem, Sitio Magtaran-an, Talustusan to Barangay Larrazabal, Naval, Biliran Lone District
2,000,000
Leyte 3rd DEO 14,000,000Construction of Water System (Level III), Barangay Poblacion, Leyte, Leyte 3rd LD 14,000,000
Leyte 5th DEO 2,000,000Construction/Rehabilitation of Water System, Barangay Sto. Nino, Cahagnaan & Tigbao, Matalom, Leyte 5th LD
2,000,000
Northern Samar 1st DEO 8,000,000Construction of Water Supply Level II 8,000,000
Siquijor DEO 18,000,000Construction of Covered Court, Barangay Lower Cabangcalan, Lazi, Siquijor Lone District
2,000,000
Construction of Water System (Level II), Barangay Calunasan, Larena, Siquijor Lone District
2,000,000
Construction of Water System (Level II), Barangay Candura, San Juan, Siquijor Lone District
2,000,000
Construction of Water System (Level II), Barangay Cang-Isad, Siquijor, Siquijor Lone District
2,000,000
Construction of Water System (Level II), Barangay Cantugbas, Maria, Siquijor Lone District
2,000,000
Construction of Water System (Level II), Barangay Gabayan, Lazi, Siquijor Lone District
2,000,000
Construction of Water System (Level II), Barangay Sawang, Maria, Siquijor Lone District
2,000,000
Construction of Water System (Level II), Barangay Talayong, Lazi, Siquijor Lone District
2,000,000
Construction of Water System (Level II), Barangay Tinago, Siquijor, Siquijor Lone District
2,000,000
Region IX 10,000,000Regional Office IX 2,000,000
Construction of Water Supply at Lupah Pula, Bongao, Tawi-Tawi 2,000,000
Isabela City DEO 2,000,000Construction of Water Supply at Semut, Akbar, Basilan Province 2,000,000
Zamboanga City DEO 4,000,000Construction of Level II Water Supply, Marine Base Arturo Asuncion, Cabatangan, Zamboanga City 1st LD
2,000,000
Construction of Water Supply Level 2 in Hawaii 2, Logoy Diutay, Barangay Talon-Talon, Zamboanga City
2,000,000
Zamboanga Sibugay 1st DEO 2,000,000Rehabilitation of Water System Level II, Barangay Milagrosa, Alicia, Zamboanga Sibugay 1st LD
2,000,000
Region X 41,750,000Bukidnon 1st DEO 9,000,000
Construction of Water System, Barangay Alanib, Poblacion, Lantapan, Bukidnon 2nd LD
9,000,000
Bukidnon 2nd DEO 12,250,000Repair/expansion of water system, Brgy. Bayabason, Maramag, Bukidnon 3rd LD 3,000,000
Repair/expansion of water system, Brgy. Maray-Maray, Don Carlos, Bukidnon 3rd LD 3,000,000
Repair/expansion of water system, Brgy. Omonay, Damulog, Bukidnon 3rd LD 2,250,000
Repair/expansion of water system, Brgy. Sampagar, Damulog, Bukidnon 3rd LD 4,000,000
Bukidnon 3rd DEO 10,500,000Construction of Level II Water System, Brgy. Bangbang Kalilangan, Bukidnon 4th LD 2,500,000
Construction of Water Supply Level II Sta. Fe, Libona, Bukidnon,Bukidnon 1st LD 2,000,000
Improvement of Water Supply Level III Sta. Ines, Malitbog, Bukidnon,Bukidnon 1st LD
2,000,000
Repair and Improvement of Kayumangon Water System Patpat, Malitbog, Bukidnon,Bukidnon 1st LD
2,000,000
Repair and Improvemnt of Water System Tagmaray Elem. School San Luis, Malitbog, Bukidnon,Bukidnon 1st LD
2,000,000
Camiguin DEO 6,000,000
Page 160 of 162
1060 eXpeNditUre program fY 2016 VolUme ii
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Construction/Improvement of Waterworks System, Barangay Yumbing, Mambajao, Camiguin Lone District
3,000,000
Rehabilitation of Waterworks System, Barangay Magiting, Mambajao, Camiguin Lone District
3,000,000
Misamis Oriental 1st DEO 2,000,000Construction of Water Works System, Barangay Tup-on, Medina, Misamis Oriental 1st LD
2,000,000
Misamis Oriental 2nd DEO 2,000,000Improvement of Water System Level-II in Barangay Cogon, Municipality of Gitagum, Province of Misamis Oriental
2,000,000
Region XI 113,600,000Compostela Valley DEO 10,500,000
Improvement of Water System, Bollukan, Laak, Compostela Valley 2,000,000Improvement of Water System, Calabcab, Maco, Compostela Valley 1,000,000Improvement of Water System, Kaligutan, Laak, Compostela Valley 1,000,000Improvement of Water System, Kidawa, Laak, Compostela Valley 1,000,000Improvement of Water System, Manat, Nabunturan, Compostela Valley 500,000Improvement of Water System, Mipangi, Nabunturan, Compostela Valley 1,000,000Improvement of Water System, Naga, Laak, Compostela Valley 2,000,000Improvement of Water System, Ogao, Nabunturan, Compostela Valley 1,000,000Improvement of Water System, San Antonio, Laak, Compostela Valley 1,000,000
Davao City 2nd DEO 92,000,000Construction of Water Supply Level 2 in Purok 12 Barangay Sirawan, Toril, Davao City, Davao del Sur
2,000,000
Construction of Water System at Brgy. Sirawan, Toril Dist., Davao City, Davao del Sur
5,000,000
Construction of Water System at Puroks 1, 3 and 6, Barangay Matina Biao, Tugbok District, Davao City, Davao del Sur
6,000,000
Construction of Water System at Puroks 4, 5, and 8, , Brgy. Subasta, Calinan Dist., Davao City, Davao del Sur
6,000,000
Construction of Water System at three (3) Puroks , Brgy. Talomo River, Calinan Dist., Davao City, Davao del Sur
6,000,000
Construction of Water System, Brgy. Alambre, Toril District, Davao City, Davao del Sur
5,000,000
Construction of Water System, Brgy. Baganihan, Marilog District, Davao City, Davao del Sur
5,000,000
Construction of Water System, Brgy. Baguio Proper, Baguio Dist., Davao City, Davao del Sur
5,000,000
Construction of Water System, Brgy. Bantol, Marilog Dist., Davao City, Davao del Sur 5,000,000
Construction of Water System, Brgy. Baracatan, Toril District, Davao City, Davao del sur
5,000,000
Construction of Water System, Brgy. Biao Joaquin, Calinan District, Davao City 3rd LD
5,000,000
Construction of Water System, Brgy. Binugao, Toril District, Davao City 3rd LD 3,000,000
Construction of Water System, Brgy. Lampianao, Calinan District, Davao City, Davao del Sur
5,000,000
Construction of Water System, Brgy. Los Amigos, Tugbok District, Davao City 3rd LD 4,000,000
Construction of Water System, Brgy. Manambulan, Tugbok District, Davao City 3rd LD
5,000,000
Construction of Water System, Brgy. Marapangi, Toril District Davao City, Davao del Sur
5,000,000
Construction of Water System, Brgy. Mulig, Toril District, Davao City, Davao del Sur 5,000,000
Construction of Water System, Brgy. Sibulan, Toril District, Davao City, Davao del Sur
5,000,000
Construction of Water System, Brgy. Wines, Baguio Dist., Davao City, Davao del Sur 5,000,000
Davao del Norte DEO 2,000,000Construction/Improvement of Water System Level II, Maniki, Kapalong, Davao Del Norte
2,000,000
Davao Oriental 1st DEO 5,100,000Construction of Water System Level II, Barangay Zaragoza, Manay, Davao Oriental 1st LD
2,000,000
Construction of Water System Level III, Barangay Central, Manay, Davao Oriental 1st LD
3,100,000
Davao Oriental 2nd DEO 4,000,000Construction/Rehab of Water Supply System, Banaybanay 500,000Construction/Rehab of Water Supply System, Lupon 2,000,000Construction/Rehab of Water Supply System, Mati 1,500,000
Region XII 14,000,000Regional Office XII 2,000,000
Construction of Water System Level II in Brgy Gambar, Mother Kabuntalan, Maguindanao 1st LD
2,000,000
Cotabato City DEO 2,000,000Construction of Water System Level II in Brgy. Benolen, Datu Odin Sinsuat, Maguindanao
2,000,000
North Cotabato 1st DEO 4,000,000Construction of Water Supply Level-II in Brgy. La Esperanza, Tuluan, North Cotabato 3rd LD
2,000,000
Construction of Water Supply Level-II in Brgy. Salvacion, Matalam, North Cotabato 3rd LD
2,000,000
North Cotabato 2nd DEO 2,000,000Construction of Water Supply Level-II in Brgy. Kitulaan, Carmen, North Cotabato 3rd LD
2,000,000
Saranggani DEO 2,000,000
Page 161 of 162
details of dpwh’s programs/projects 1061
7/21/2015
AMOUNT (Php)PROGRAMS/ACTIVITIES/PROJECTS
Water Supply System- Level II, Paraiso, Alabel, Sarangani 2,000,000
Sultan Kudarat 2nd DEO 2,000,000Construction of Water Supply (Level III), Sitio Paraiso, Barangay Lagubang, Sen. Ninoy Aquino, Sultan Kudarat 2nd LD
2,000,000
Page 162 of 162
1062 eXpeNditUre program fY 2016 VolUme ii