County of Fairfax, Virginia
1
Design Public Hearing Presentation for:
Wiehle Avenue at W&OD Trail
March 17, 2016
County of Fairfax, Virginia
2
Location Map
Department of Transportation
WIE
HLE
AVE
NU
E
TO D
ULL
ES
TOLL
RO
AD
PROJECT SITE N
SUNSET HILLS ROAD
WIEHLE-RESTON METRO STATION
ISSA
C
NEW
TON
SQ
MIC
HAE
L FA
RAD
AY C
TW&ODTRAIL
County of Fairfax, Virginia
3
Existing Conditions
Department of Transportation
• W&OD Trail – 10 ft. wide paved asphalt trail– 10 ft. wide gravel/dirt trail
• Wiehle Ave (Urban Arterial)– 24,000 AADT– 2 NB lanes, grass median, 4
SB lanes• At-Grade Crossing
– Crosswalk (75’ L x 40’ W)– Pedestrian/Bicycle Signs
County of Fairfax, Virginia
4
Safety Concerns
Department of Transportation
• Crash Data– 7 reported crashes from
June 2011 to June 2015 • Crash Types
– Vehicle vs. Vehicle– Vehicle vs. Trail User
• Different Behaviors– Cautious– Confused– Oblivious– Careless
Is she really going?
Are they going to stop?
County of Fairfax, Virginia
5
• Safety Improvements– Eliminate conflicts between vehicles and trail users– Minimize vehicle rear-end crashes
• Free-Flow Traffic– Alleviate sudden stops for vehicles traveling through
intersection– Provide an uninterrupted route for trail users
• Public Enhancement– Present viable options to the local community for their
input– Adhere to the aesthetics and history of W&OD Trail
Purpose & Need
Department of Transportation
County of Fairfax, Virginia
6
Dominion Virginia Power (DVP)
Department of Transportation
Single-Circuit 230 kV Monopoles Double-Circuit 230 kV Towers
County of Fairfax, Virginia
7
DVP Electrical Lines• Initial Relocation Plan
– 5 to 6 concrete monopoles– 15 ft. south (CL of poles)
• Guidelines for Design– 25 ft. from conductor lines– 25 ft. workspace around
poles– 20 ft. through access for
maintenance vehicles– 18 ft. maximum width for
structures
• Ongoing Coordination
Department of Transportation
County of Fairfax, Virginia
8
Underground Utilities
Department of Transportation
Water Gas Electric AT&T, Cox, Comcast, Verizon, L3, Zayo
County of Fairfax, Virginia
9
Proposed Trail Alignment
Department of Transportation
• Grade separate W&OD Trail over Wiehle Avenue
• Merging paved trail with gravel trail for bridge crossing
• W&OD Trail Profile– 3% vertical grade vs. 5% vertical grade
County of Fairfax, Virginia
10
Design Details
Department of Transportation
• Access to Wiehle Avenue will be provided• At-grade trail crossing at Wiehle Avenue
will be CLOSED• Widen sidewalk along Wiehle Avenue• Designed to follow DVP offset guidelines
County of Fairfax, Virginia
11
Typical Section
Department of Transportation
Trails merge to meet DVP structure width requirements
County of Fairfax, Virginia
12
Bridge Typical Section
Department of Transportation
County of Fairfax, Virginia
13
Ongoing StudiesVertical Grade
• 3% Vertical Grade– Preferred grade per NVRPA– Easier ride for bicyclists– Bigger project footprint– More impacts and higher costs
• 5% Vertical Grade– Allowable grade per AASHTO– Harder ride for bicyclists– Smaller project footprint– Less impacts and lower costs
• 4% Vertical Grade?
Other Items• Wiehle Avenue Connection
– Prohibit mid-block crossing– Evaluate crosswalk just north of
Sunset Hills Road• Trail Merging
– Unite paved and gravel trails before bridge
– Provide signing to trail users• Drainage/SWM
– Provide closed drainage system to collect storm runoff
– Consider water quality and quantity
Department of Transportation
County of Fairfax, Virginia
14
Maintenance of Traffic
Wiehle Avenue• Road and Bridge
– Temporary traffic controls – Off-peak hours
• Midday• Nighttime
• Adjacent Sidewalk– Bypass Options– Detour Options
W&OD Trail• Gravel Trail
– Permanent controls– Prohibit use
• Paved Trail Open– Leave open– Safe from work areas
Department of Transportation
County of Fairfax, Virginia
15
Requested Feedback• Bridge Type/Finish• Retaining Wall Formliner Finish• Medallion• Other
Department of Transportation
County of Fairfax, Virginia
16
Prestressed Concrete
Department of Transportation
County of Fairfax, Virginia
17
Steel Girder
Department of Transportation
County of Fairfax, Virginia
18
Truss
Department of Transportation
County of Fairfax, Virginia
19
Truss
Department of Transportation
County of Fairfax, Virginia
20
• Retaining Wall Formliner Finish
• Medallions
Aesthetic Options
Department of Transportation
County of Fairfax, Virginia
21
Anticipated Schedule• Public Hearing – Winter 2016• Environmental – Winter 2016• Land Acquisition – Spring 2018• Final Design – Winter 2018• Utility Relocation – Summer 2019• Construction – Winter 2021
Department of Transportation
County of Fairfax, Virginia
22
Questions
Department of Transportation