Turnkey site build for MTN Ghana 2008
DescriptionLikusasa was awarded a turnkey contract by Scancom t/a MTN Ghana encompassing project management; site design, equipment supply, and site build for 93 greenfield BTS sites, with tower heights ranging from 35m to 130m.
Scope of WorkProject and construction managementSite survey and designEquipment procurementEquipment warehousing and delivery to siteConstruction of access roadsSite clearing, civil works and tower erectionEquipment shelter installationRF installation, MW installationAC and DC power installationsRBS installation and integrationSite drawings and as-built documentationUtility grid connections ( LV and 11kV )
Facts & FiguresValue: US $14.0 millionLocation: GhanaOwner: Scancom (MTN Ghana)Lead contractor: Likusasa GhanaStart and duration: 2008, 15 monthsTotal number of sites: 93