Demonstrators and Pan-European Services Laboratory
WP5 session
Código 00/00 2
Index
Overview
A1: Trial and European Lab Planning
A2: Integration Tests
A3: User Testing Sessions
A4: (Field) Trial Deployment
A5: (Operational) Trial Support
1
2
3
4
5
6
Código 00/00 3
Index
Overview
A1: Trial and European Lab Planning
A2: Integration Tests
A3: User Testing Sessions
A4: (Field) Trial Deployment
A5: (Operational) Trial Support
1
2
3
4
5
6
Código 00/00 4
Overview: Goals and structure (I)
Provide demonstrators and service laboratories, covering technical and user acceptance as well as related operational and business aspects.
WP5 Leader: ??? (formerly Telenor) Main Tasks:
A1: Trial and European Lab Planning (May 04 – January 05) Leader: ??? (formerly Telenor)
A2: Integration Tests (October 04 – March 06) Leader: Telefónica I+D
A3: User Testing Sessions (January 05 – July 06) Leader: France Telecom
A4: (Field) Trial Deployment (January 05 – September 06) Leader: Belgacom
A5: (Operational) Trial Support (January 05 – September 06) Leader: Alcatel
Código 00/00 5
Overview: Goals and structure (II)
Determine another partner for the key activities of WP5.
WP leader.
A1 leader.
Código 00/00 6
Overview: List of milestones and deliverablesDeliverables (D) and milestones (M)
Type (report, software)
Due date (m/ y):
WP5D1 Trial Execution plan Report 01/ 2005
WP5M2 1st Phase Integration Completed
Software 01/ 2005
WP5M5 2nd Phase I ntegration Completed
Software 06/ 2005
WP5M8 3rd Phase Integration Completed
Software 01/ 2006
WP5M9 Integrated Trial and Test Report
Report 04/ 2006
WP5M3 1st Phase User Testing Session Results
Report 03/ 2005
WP5M6 2nd Phase User Testing Session Results
Report 10/ 2005
WP5M10 3rd Phase User Testing Session Results
Report 07/ 2006
WP5M4 1st Phase Trial Completed
Report 05/ 2005
WP5M7 2nd Phase Trial Completed
Report 12/ 2005
WP5M11 3rd Phase Trial Completed
Report 09/ 2006
WP5D12 Conclusions and Trials report
Report 09/ 2006
Código 00/00 7
Overview: Manpower allocation
WP5 Partners and role (WPL; TL) Effort allocation (PM)
Alcatel Bell (TL WP5A5) 84
Anadrome 6
Belgacom (TL WP5A4) 25
Elisa 22
France Telecom (TL WP5A3) 13
KU Leuven 12
Nokia 12
Telefonica I+D (TL WP5A2) 39
Telvent 16
Thomson R&D 18
Visonic 20
Código 00/00 8
Index
Overview
A1: Trial and European Lab Planning
A2: Integration Tests
A3: User Testing Sessions
A4: (Field) Trial Deployment
A5: (Operational) Trial Support
1
2
3
4
5
6
Código 00/00 9
A1: Main goals and tasks
Main objective: detailed plan describing the different lab and field trials.
Decide the test sites to be included.
Scheduled for first 8 month of the project, until the first iteration of the project begins.
Coordinate with other WP.
Task Leader: ???
Código 00/00 10
A1: Deliverables and contributors
The deliverable related to this activity is: WP5D1 Trial Execution plan (01/2005).
Contributors to this activity are: The different test site contributors:
Belgacom Elisa France Telecom Telefónica I+D...
Services and platform developers: Alcatel, Visonic, Telvent... WP1 main partner (particularly those involved in the trial support
activity).
Código 00/00 11
A1: First steps
Decide the test sites and trials to be done.
Define and plan the different trials and test sites Services to be included in each (with WP1, WP3). Size and resources to be included. Scheduling. Platform integration calendar. Testing calendar.
Coordinate with the rest of WP
Código 00/00 12
A1: Belgacom trials
Field trial focused on: community communications. virtual interactive communities.
Demonstrator showing the possibilities of service aggregation platform.
Experiments with new connected home/family services will be carried out
Third parties could be also included.
Trial planned using a VDSL pilot network and/or an ADSL access network with capacity up 3 Mb/s. Between 20-30 customers
Código 00/00 13
A1: Elisa trials
Multi-device multimedia community applications as well as home network management and equipment.
Trial planned on ADSL and/or IP-enabled Cable-TV network in combination with wireless solutions.
Elisa test bed and service trial environment. Elisa Research laboratory and trial environment. Access to other test beds (Test Bed Finland initiative). Access to public networks.
Between 10-20 customers. Coordinated with the test-bed Finland initiative.
Código 00/00 14
A1: France Telecom test site
Home demonstration area situated in Lannion premises. Install all home services and to check their interoperability
(technical and usage). Features:
Telemetry platform able to provide security (alarm management) and comfort (device control and home watching).
OSGi technology enabled on residential gateway. Multimedia gateway.
Código 00/00 15
A1: Telefónica I+D test site
Install and operate the service aggregator in its facilities.
Test lab to check the platform and services of this project, including aspects as interconnectivity and interoperation.
Demostrator facility: The digital home for user experiences Emulates a small flat composed of different ambiances. Residential gateway (OSGi compliant). Combination of fixed and wireless technologies as network
infrastructure.
Código 00/00 16
A1: Budget for equipment
Equipment (trials & test-bed) required
2004 2005 2006 Total
Belgacom 32.000,00 € 22.000,00 € 54.000,00€
France Telecom 10.000,00 € 5.000,00 €
15.000,00€
Telefónica I+D 14.000,00 € 16.000,00 € 30.000,00€
Código 00/00 17
A1: Platforms and equipment
Alcatel platforms: HIPP-controller managing the residential gateway and
networking elements. Open Media Suite application platform for hosting and managing
the multimedia application layer (???)
Visonic Residential Gateway Platform that will function as a Services Gateways platform at home.
New two-phase strategy.
Telvent equipment: Gateway operator application, several services, residential
gateways, a set of home networks and appliances. New test Site (???)
Código 00/00 18
Index
Overview
A1: Trial and European Lab Planning
A2: Integration Tests
A3: User Testing Sessions
A4: (Field) Trial Deployment
A5: (Operational) Trial Support
1
2
3
4
5
6
Código 00/00 19
A2: Main goals and tasks
Proof of concept of the deployment of the services and applications, providing technical feedback to WP2, WP3 and WP4.
Adapt the bouquet of services to the different needs of the different sites.
Done in simulated environments and labs, to validate the services and management platforms.
The interconnection of the different labs will be set up to build the integrated trial.
Task Leader: Telefónica I+D
Código 00/00 20
A2: Deliverables and milestones
No deliverable are directly due on this task. The results and conclusions will be included in the WP5D12, Conclusion of Trials report.
Milestones, regarding the end of each of the services iterations :
WP5M2 1st Phase Integration Completed: 01/2005 WP5M5 2nd Phase Integration Completed: 06/2005 WP5M8 3rd Phase Integration Completed: 01/2006 WP5M9 Integrated Trial and Test Report: 04/2006
Código 00/00 21
A2: Contributors and first steps
Contributors to this activity are: The different test site contributors:
Belgacom Elisa France Telecom Telefónica I+D...
Services and platform developers: Alcatel, Visonic, Nokia, Thompson R&D, Telvent...
First activities: Set up the testing sites for the platforms and services (proof of
concept and demos). Elaborate a testing plan for the different sites.
Código 00/00 22
Index
Overview
A1: Trial and European Lab Planning
A2: Integration Tests
A3: User Testing Sessions
A4: (Field) Trial Deployment
A5: (Operational) Trial Support
1
2
3
4
5
6
Código 00/00 23
A3: Main goals and tasks
Implementation of user testing sessions. Adaptation to the country. Different services and platforms to be tested.
Provide feedback to the other WPs about user reactions.
Inclusion of real users.
Major topics to be addressed: Application usability. Community aspects. Interconnection of service, platforms and trial interoperability.
Task Leader: France Telecom.
Código 00/00 24
A3: Deliverables and milestones
No deliverable are directly due on this task. The results and conclusions will be included in the WP5D12, Conclusion of Trials report.
Milestones, regarding the end of each of the services iterations :
WP5M3 1st Phase User Testing Session Results: 03/2005 WP5M6 2nd Phase User Testing Session Results: 10/2005 WP5M10 3rd Phase User Testing Session Results: 07/2006
Código 00/00 25
A3: Contributors and first steps
Contributors to this activity are: The different site contributors, where user sessions are planned:
Belgacom France Telecom Telefónica I+D Telvent (???)
First activities: Elaborate a method to gather the feedback from users for the
different sites. Set up the process to choose the users that will take part in the
sessions. Set up the demonstrators and enable services and platforms.
Código 00/00 26
Index
Overview
A1: Trial and European Lab Planning
A2: Integration Tests
A3: User Testing Sessions
A4: (Field) Trial Deployment
A5: (Operational) Trial Support
1
2
3
4
5
6
Código 00/00 27
A4: Main goals and tasks
Implementation of field trials in different European countries. Deploying the relevant applications and service bundles.
Provide feedback to the other WPs, compiling the results of the trials.
Evolve their existing pilot and trial network infrastructures for establishing a pan-European service laboratory
Performing relevant infrastructure upgrades. Providing coordination or interconnection between trials site. Connecting and/or upgrading live customer base.
Task Leader: Belgacom.
Código 00/00 28
A4: Deliverables and milestones
The deliverable, WP5D12, Conclusion of Trials report, is due on this task. (09/2006)
All other tasks in WP5 will also contribute to the document.
Milestones, regarding the end of each of the services iterations :
WP5M4 1st Phase Trial Completed: 05/2005 WP5M7 2nd Phase Trial Completed: 12/2005 WP5M11 3rd Phase Trial Completed: 09/2006
Código 00/00 29
A4: Contributors and first steps
Contributors to this activity are: The different site contributors, where field trials are planned:
Belgacom Elisa
First activities: Elaborate a method to gather the feedback from users for the
different sites. Set up the process to modify the current trials, in order to
integrate Encompas with existing infrastructure. Set up the infrastructures and enable services and platforms.
Código 00/00 30
Index
Overview
A1: Trial and European Lab Planning
A2: Integration Tests
A3: User Testing Sessions
A4: (Field) Trial Deployment
A5: (Operational) Trial Support
1
2
3
4
5
6
Código 00/00 31
A5: Main goals and tasks
Implement the required customer and technical support needed to run a successful lab and field trial operations.
Underlying infrastructure. Demonstrators. Service laboratory.
Main focuses: Customer care centre function Technical operations support Systems engineering support
Task Leader: Alcatel.
Código 00/00 32
A5: Deliverables and contributors
No deliverable are directly due on this task. The results and conclusions will be included in the WP5D12, Conclusion of Trials report.
Contributors to this activity are: Platform developers
Server side: Alcatel, Telefónica I+D. RG side: Telvent, Thompson R&D, Visonic
Services developers TV centered: Alcatel, Androme, K.U. Leuven Home security, monitoring: Elisa, France Telecom, Telvent AV community applications: Alcatel, Elisa, Nokia.
Código 00/00 33
A5: First steps
Identify the persons who will be responsible for offering the support (regarding the different components).
Form the different supporting groups, which should be coordinated with the other tasks.
Set the support process to be ready before the beginning of the A2, A3 and A4 tasks within this WP.