William Donovan
Plant Manager
Bay Park Sewage Treatment Plant
2 Marjorie Lane
East Rockaway, NY 11518-2020
March 24, 2018
CERTIFIED MAIL
Ms. Meredith Streeter, P.E.
Chief, SPDES Compliance Information Section
NYSDEC - Division of Water, Bureau of Water Compliance
625 Broadway – 4th Floor
Albany, New York 12233-3506
Re: Bay Park Sewage Treatment Plant
SPDES Permit Number: NY 0026450
NPDES Electronic NetDMR Report – February 2018
Dear Ms. Streeter:
Please find the NPDES NetDMR Report submission for the Bay Park Sewage Treatment Plant for February 2018. Please note that the facility is still engaged in recovery efforts, repairing and replacing
components of the plant that were damaged by superstorm Sandy in late October 2012.
The County of Nassau entered into an “Agreement for the Operation and Maintenance of the Nassau
County Sewer System” (“O&M Agreement”) with SUEZ Water Long Island Inc. (“SWLI”;
formerly known as United Water Long Island Inc.) on September 10, 2014, with SWLI’s
commencement of operations taking place on January 2, 2015.
The facility was in compliance with all SPDES Permit effluent limitations for the reporting period.
The following laboratories performed the analyses reported in the monthly DMR:
Laboratory ELAP ID
Number
Analyses Performed
Pace Analytical Services Inc. 10478 Metals, Total and Fecal Coliform, TSS, CBOD5,
Volatile and Semi-Volatile Organics
Nassau County Department of Health 10339 Total and Fecal Coliform
The plants TSS effluent composite sample for 2/20/2018 was removed from the monthly and weekly calculation due to a laboratory error, the seed depletion for this sample batch was lower than expected.
Because of this, the seed correction for the LCS was biased low at 84%. The lower limit for the LCS is
84.5%. All samples that have the seed added are thought to be biased low. The Plant Effluent and Primary
Effluent samples were not seeded.
Pace Labs has drafted a letter stating these issues, see attached.
Also, as discussed with the Region 1 office, attached is a summary of the repair and replacement
progress made during February 2018.
Should you have any questions or comments concerning the above, please contact me at (516) 519-5560.
Very truly yours,
William Donovan
Plant Manager
Enc.
c. NCDPW: Commissioner Kenneth G. Arnold, Deputy Commissioner Vincent Falkowski,
Richard Cotugno, Pasquale Assalone
NCHD: Donald Irwin
SWLI: Sunil Mehta
William Donovan
Plant Manager
Bay Park Sewage Treatment Plant
2 Marjorie Lane
East Rockaway, NY 11518-2020
Bay Park S.T.P. – Major Work Activities Started, Continuing and/or Completed for the Month of February, 2018
Contract #S3B119-05G
Generator Controls:
Granted Final Completion on July 11, 2016.
Contract #S35100-01G
Cleaning and Repair of Digesters and Storage Tanks:
Granted Final Completion on November 10, 2015.
Contract #S3B119-06G
Heating the Hot Water Piping System:
Granted Final Completion on March 2, 2017.
Contract #S3B120-01G
Improvements to the Influent Screenings Facility:
Granted Final Completion on December 22, 2017.
Contract #S3B120-02G
Grit Removal Facility Improvements:
Granted Substantial Completion on July 18, 2017.
Contract #S35114-03G
Sludge Thickening Facility:
Granted Final Completion on August 2, 2017.
Odor Control Bio-Filter Projects:
Granted Final Completion on November 7, 2015.
Contract #S35121-01G&E
Final Settling Tanks Project for both (G&E):
General Contractor; Litigation pending pertaining to Liquidated Damages.
General Contractor; Substantial Completion Granted on May, 13, 2016.
Electrical Contractor; Granted Final Completion on June 26, 2017.
Contract #S35121-09G
Sludge Dewatering:
Continued submission of shop drawings, RFIs, and O & M Manuals.
Continued installation of HWS/R & CHWS/R Piping and associated insulations.
Continued installation of Sludge, Service Water, PVC Polymer and effluent Piping.
Continued Power, lighting, fire alarm, and control conduit installations.
Continued compressed air system piping and compressed air system installation for the live bottom hoppers.
Continued HVAC duct and plenum installations.
Continued fire suppression system installation.
Continued electric feeder installation through Manholes 31 & 31A.
Continue misc. painting.
Start framing and GWB assemblies.
Mobilize for replacement of digested sludge transfer pump replacement.
Started pre-testing of the washwater booster pump system.
Contract #S35121-13E
E-1, Electrical Distribution:
Granted Final Completion on April 6, 2017.
Contract #S35121-14E
E-2, USS 2 & Electrical Distribution:
Granted Final Completion on December 22, 2017.
Contract #S35121-14F
E-3 Main Substation and Electrical Distribution:
Continued to submit shop and As-Built drawings, subcontractors, vendors, and RFI’s.
Continued installation of railings (stairs and roof) and fiberglass grating (second floor), MSS.
Continued installation of interior/exterior siding system trim and coping.
Continued miscellaneous HVAC and plumbing piping installation, MSS.
Completed installation of Rooftop and CRAC units, MSS.
Completed installation of Emergency Generator (including stacks), and Cast Coil Transformers, MSS.
Started installation of Utility Service and Substation Transformers, MSS.
Continued installation of Switchgear wiring and bus duct, MSS.
Completed installation of MCC, MSS.
Continued installation of Substation electrical and fire alarm conduits, panels, and pull boxes at MSS.
Continued installation of MSS building wiring.
Continued Switchgear Test, MSS.
Continued installation of USS1 to MCC cables, Grid 12.
Continued backfill and placing top soil, Grid 12.
Continued installation of PSEGLI service, Grid 8.
Continued turnover of spare parts for various systems.
Contract #S35121-17G
Perimeter Flood Protection Berm and Flood Wall:
Substantial Completion Granted on June 9, 2017.
Contractor put County on notice of possible claim.
Contract #S35121-16V
De-chlorination Vault Storm Mitigation:
Substantial Completion Granted on August 11, 2017.
Time Delay Analysis was finalized and was issued to the County for review.
Contract # S35121-18G
Flood Protection Phase 1 Stormwater Pumping Stations:
Completed South Pump Station’s wet well excavation to final grade.
Continued pile cut-off in South Pump Station’s wat well.
Completed the installation and testing of the underground force main piping at North Pump Station.
Removed concrete formwork from the North Pump Station’s top slab arch.
Placed the RCP Connections to North Pump Station’s diversion chamber.
Dismantled North Pump Station’s groundwater dewatering system.
Contract #S35121-16TR
Vehicle Fueling Facility and Tanks Reconstruction:
Beneficial use granted on vehicle fueling station and two fuel tanks.
Contract #S3P311-02G
Pump Stations No. 2 – Cedar Drive, Roosevelt, Whitewood, Biltmore and Alhambra:
Continued working on punch-list items.
Installed the grip eyes on each pump.
Installed plugs on the spare pumps.
Biltmore: Installed quick disconnects for the sewage pumps.
Contract #S3P311-03G
Pump Stations No. 3 – Wantagh, Newbridge, Merrick and Ray Street:
Substantial Completion Granted on January 12, 2018.
Continued working on punch-list items.
Ray Street Pump Station: Install fall protection hatch grates. Raise transformer, install new electric meter and
complete electric service transfer to the station. Paint.
Wantagh Park Pump Station: Install Fire Alarm conduit.
Newbridge Road Pump Station: Install Fire Alarm conduit. Paint.
Contract #S3P311-04G
Pump Stations No. 4 – Felix, Fox, Northern, and Grand:
Granted Substantial Completion on August 29, 2017.
Engineers trailer and temporary electrical removed, continued demobilizing jobsite at Fox Road pump station.
Completed high water float and panic button at Northern Boulevard pump station.
Replaced broken toilet at Grand Avenue pump station.
Continued working on flood damage repair claim.
Contract #S3P311-05G
Pump Stations No. 5 – Miller, Mott, Long Beach, Royal, and Lido:
Granted Substantial Completion on August 29, 2017.
MSP breakers and overloads completed at all pump station locations.
High water floats completed on all pump station locations.
Continued working on flood damage repair claim.
Contract #S3P311-09G
Hempstead Wastewater Pumping Station:
Established temporary power for existing Hempstead Pump Station.
Established permanent power for new Hempstead Pump Station.
Started installation of trolley beam & hoist at NCPS.
Completed fire alarm system, annunciator & gas detection system at NCPS.
Continued installation of electric conduit & wiring for Control Building & Generator Building equipment at
HPS.
Completed installation of exterior cladding with metal wall panels for the Control Building & Generator
Building at HPS.
Installed Generator Building & Control Building doors at HPS.
Installed Generator Building & Control Building gutters & downspouts at HPS.
Installed conduit, wiring & disconnect switches from Wet Well pumps to Control Building Panel CP-1 at HPS.
Installed interior lights for wet wells Nos. 1 & 2 at HPS.
Installed lightening protection system for Generator Building & Control Building at HPS.
Installed access ladder into lower level of Control Building at HPS.
Painted walls, process pipes & manifolds in Control Building at HPS.
Contract #S3P311-09S
Hempstead Wastewater Force Main:
Completed dewatering system installation at the Meadowbrook Pkwy site.
Continued Installation of 30” DIP along Jerusalem Avenue (A) from Sunnyside Ave. to Searing St. (Sta.
70+50 to 80+00) & (B) from Florence Ave. to Paff Ave. (Sta. 89+75 to 92+00).
Installed Manhole SAR-01 on Front St. between Ingraham Blvd & Nassau Place (Sta. 44+25).
Setup MPT & mobilized for Directional Drilling activities to start early next month.
PO No. BPNC16000136
Interim Generators:
Fuel oil tank permit was reviewed by the Nassau County Health Department with comments and was returned
to United Rentals.
Contract #S3P311-06G
Pump Stations No. 6 – Ocean, Mill, Woodmere and Longacre:
Progressed submittals.
Progressed sump pump installation at all pump stations (Blue Tag testing remains to be completed).
Progressed painting at all pump stations.
Progressed electrical platform at Woodmere P.S.
Main sewage pumps delivered for Mill and Woodmere P.S.
Commenced installation of main sewage pumps at Woodmere P.S.
Misc. work at Woodmere P.S. (Beam installation at Fuel Oil Vault, roof fascia/gutter replacement).
Contract #S3P311-07G
Pump Stations No. 7 – Inwood, Doughty, Bayview and Roslyn:
Progressed submittals.
Completed hydraulic grinder installation at Inwood/Bayview/Roslyn Pump Stations.
Commenced louver installation at Inwood P.S.
Platform structural frame for Doughty Blvd. P.S. delivered.
Contract #S3P311-10G
Pump Stations No. 10 – Lawrence STP, and Sage Lake:
Lawrence P.S.
Contractor progressing submittals, RFI, CPM schedule updates, etc.
Continue with installation of new sump pump control panels and relocation of MSP control panel, bubbler air
compressor/UPS cabinet, and service wiring in MCC Room.
Relocated utility meter and service cabinet, and main service disconnect on new generator platform.
Installed hydraulic grinder system.
Installed duplex sump pumps.
Performed flood doors water leak test and door adjustment.
Installed light fixtures in Wet Well.
Continue with installation of gas detection system.
Performed housekeeping.
Sage Lake P.S.
Contractor progressing submittals, RFI, CPM schedule updates, etc.
Maintenance of by-pass operation.
Continue demo work in dry well.
Continue with main sewage pump installation.
Installed generator platform and concrete slab.
Continue excavation for electric conduits and duct banks.
Performed core drilling in Dry Well for 4” force main and 8” duct work.
Started installation of electrical equipment on platform.
Performed connection of new 4” force main - HDPE/ DIP.
Repaired house connection #204 Pond Crossing (2-15-18).
Performed housekeeping, erosion and sediment control.
Contract #S35123-L39G
Level 1 BNR Improvements:
Continued to progress Cost Loaded Baseline Schedule, Subcontractor/Venders Approval, RFI, and Shop
Drawing Submittals.
Set up staging area on the North side of Aeration Tanks.
Started to install conduit supports from Aeration Tank to Substation No.2.
Started to clean and prep the tank cover panel and the passage before draining Aeration Tank No.5.
Contract #S5121-16A
Engine Facility Auxiliary Upgrade:
Continued to process submittals, subcontractor/vendor approvals and RFI’s.
Contract #S35121-12G
Effluent Tide Pump Building:
Continued advancing Shop Drawing Submittals, RFI’s and Subcontractor/Vendors Approval Requests.
Performed test pits and found debris field with concrete, asphalt and timber.
Demoed miscellaneous HVAC equipment and dewatering pump.
Performed survey of the worksite to verify coordinates needed for the implantation of the New Electrical Room
Annex Building.
Contract #S80019-03GR
Cedar Point Lake PS:
Contractor progressing with submittals.
Schedule of Value Approved.
Delivered field office.
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
DISCHARGE NUMBER MAJOR
Facility Bay Park STP WWTP OUTFALL
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
00010 1 0 PERMIT
Effluent Gross REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
Effluent Gross REQUIREMENT
SAMPLE
MEASUREMENT
00530 1 0 PERMIT
Effluent Gross REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 1
519-5560
***** *****
DATE
pH 00400 1 0E ffluent Gross
East Rockaway, NY 11518-2020
TYPED OR PRINTED
William Donovan
Plant Manager
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
***** 1.3
SIGNATURE OF PRICIPAL EXECUTIVE OFFICER
OR AUTHORIZED AGENT
TELEPHONE
516
**********
NY0026450 001-A
Temperature, water deg.
centigrade
PARAMETER
0
0
7.3*****6.7**********
15.7*****
VALUEVALUEVALUEVALUE
SAMPLE
TYPE
FREQUENCY
OF ANALYSIS
NO.
EX
QUALITY OR CONCENTRATIONQUANTITY OR LOADING
02/28/2018
MM/DD/YYYY
02/01/2018
MM/DD/YYYY
Grab
GR
**********
VALUE
SU
Deg C*****
*****
*****
*****
*****
OMB No. 2040-004
Form Approved
11518-2020
External Outfall
(SUBR 01)
DMR Mailing ZIP Code
**********
3/24/2018
MM/DD/YYYY
MONITORING PERIOD
PERMIT NUMBER
No Discharge
MAXIMUM
NUMBER
mg/L
Six per Day
Effluent Gross
00545 1 0
Nitrogen, nitrite total (as N)
UNITSUNITS
06/01
*****
Daily MX
Req. Mon
Comp24Monthly
2401/30
Grab
GR
Six per Day
06/01
Solids, Total Suspended
Daily MX
Req. Mon Comp24
24
Monthly
01/30
*****
0
lb/d7 DA AVG
26,000
7,897
30 DA AVG
18,000
5,211
45
19
MO AVG
30
13
*****
*****
MINIMUM
6
Comp24
24
Daily
01/010
mg/L7 DA AVG
Req. Mon
202
*****
*****
Raw, Sewage Influent
00530 G 0
Solids, Total Suspended*****
Comp24
24
Daily
01/010
mg/L
*****
MO AVG
Effluent Gross
00545 1 0
Solids, Settleable
9
**********
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
0.3
0.3
*****
*****
*****
*****
*****
*****
Grab
GR
Six per Day
06/010
ml/LDaily MX
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
Raw, Sewage Influent
00545 1 0
Nitrogen, nitrite total (as N)
*****
*****
*****
*****
*****
***** 0
mg/LDaily MX
Req. Mon
0.1
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
Nitrogen, ammonia, total (as
NH3)
Effluent Gross
00665 1 0
Phosphorus, total (as P)
Nitrogen, nitrate total (as N)
PARAMETER
TYPED OR PRINTED
Plant Manager
William Donovan
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
Raw Sewage Influent
34726 1 0
Nitrogen, ammonia, total (as
NH3)
Effluent Gross
34726 1 0
MONITORING PERIOD
PERMIT NUMBER
NY0026450
*****
*****
*****
VALUE
QUANTITY OR LOADING
DISCHARGE NUMBER
*****
*****
*****
VALUE
02/01/2018
MM/DD/YYYY MM/DD/YYYY
*****
*****
*****
*****
UNITS VALUE
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
*****
*****
*****
*****
*****
*****
VALUE
9.3
VALUE
External Outfall
(SUBR 01)
DMR Mailing ZIP Code
*****
MO AVG
Req. Mon
1.6
*****
*****
23.6
Daily MX
Req. Mon
25.6
Daily MX
NUMBER
519-5560516
TELEPHONE
23.3
24.3
Req. Mon
Daily MX
mg/L
mg/L
mg/L
OMB No. 2040-004
Form Approved
mg/L
mg/L
mg/L
mg/L
0
0
0
NO.
EX
No Discharge
11518-2020
UNITS
QUALITY OR CONCENTRATION
001-M
02/28/2018
Monthly
01/30
FREQUENCY
OF ANALYSIS
MM/DD/YYYY
3/24/2018
DATE
0
0
0
0
Monthly
01/30
Monthly
01/30
Monthly
01/30 24
Comp24
24
SAMPLE
TYPE
Monthly
01/30
Monthly
01/30
Monthly
01/30 24
Comp24
24
Comp24
24
Comp24
Daily MX
Req. Mon
Nitrogen, Kjeldahl, total (as N)
0.5
Req. Mon
Comp24
24
Comp24
24
Comp24
Raw, Sewage Influent
00625 1 0
Effluent Gross
00620 1 0
Effluent Gross
00625 1 0
Nitrogen, Kjeldahl, total (as N)
Raw, Sewage Influent
00620 1 0
Nitrogen, nitrate total (as N)
*****
Req. Mon
Daily MX
***************
Daily MX
Req. Mon
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
**********
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 3
19
30DA GEO 7 DA GEO
200
*****
7 DA AVG
23,000*****
MO AVG 7 DA AVG
25
RCORDR
RC
RCORDR
50050 G
*****
*****
0.5
DAILYMX
Req. Mon
Daily MX
0
DATE
3/24/2018
MM/DD/YYYY
FREQUENCY
OF ANALYSIS
99/99
Continuous
99/99
Continuous
SAMPLE
TYPE
Form Approved
OMB No. 2040-004
11518-2020
No Discharge
NO.
EX
0 RC
TELEPHONE
516 519-5560
NUMBER
UNITS
*****
*****
mg/L
40
*****
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
VALUE
*****
*****
*****
VALUE
*****
0.12
MM/DD/YYYY
02/28/2018
001-M
DISCHARGE NUMBER
QUALITY OR CONCENTRATION
VALUE
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
*****
*****
UNITS
*****
*****
*****
**********
NY0026450
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
02/01/2018
VALUE
*****
*****
Effluent Gross
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
William Donovan
Plant Manager
TYPED OR PRINTED
PARAMETER
Flow, in conduit or thru
treatment plant
Effluent Gross
Chlorine, total residual
50060 1 0
QUANTITY OR LOADING
VALUE
49.3
*****
*****
*****
*****
*****
Effluent Gross
70507 1 0
Phosphorus, In Total
orthophosphate 1.7
*****
**********
*****
*****
Effluent Gross
74055 1 0
Coliform, Fecal General
Comp24
24
Monthly
01/300
mg/L
*****
*****
*****
*****
*****
*****
*****
*****
Effluent Gross
81383 K
Coliform, Total General
Grab
GR
Daily
01/010
MPN/100
mL
12
*****
*****
*****
*****
*****
*****
*****
Grab
GR
Daily
01/010
MPN/100
mL
MO AVG
15,000
2,471
Effluent Gross
80082 1 0
BOD, carbonaceous, 5 day, 20
C 106*****
Lb/d
4,027
Comp24
24
Daily
01/010
mg/L
*****
*****
Raw Sewage Influent
80082 G 0
BOD, carbonaceous, 5 day, 20
C *****184*****
*****
*****
*****
*****
*****Reg. Mon
MO AVG
MO AVG
70
Comp24
24
Daily
01/010
mg/L*****
400
MO MEDIAN
700
*****
*****
**********
*****
*****79
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 4
*****
*****
MO AV MIN
MO AV MIN
85
85%
0 01/30
Monthly
CA
CALCTD*****
97 *****
*****
*****
*****
Carbonaceous oxygen demand,
% removal
81383 K
Percent Removal
*****
*****
***** *****
CALCTD
MM/DD/YYYY
FREQUENCY
OF ANALYSIS
01/30
Monthly
DATE
3/24/2018
Form Approved
OMB No. 2040-004
11518-2020
No Discharge
NO.
EX
0
SAMPLE
TYPE
CA
NUMBER
UNITS
%
TELEPHONE
516 519-5560
VALUE
*****
*****
*****
*****
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
94
MM/DD/YYYY
02/28/2018
001-M
DISCHARGE NUMBER
QUALITY OR CONCENTRATION
VALUE VALUE
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
UNITS
*****
*****
NY0026450
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
02/01/2018
VALUE
*****
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
William Donovan
Plant Manager
TYPED OR PRINTED
QUANTITY OR LOADING
VALUE
*****
*****
PARAMETER
Solids, suspended percent
removal
81011 K 0
Percent Removal
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane 8.9
East Rockaway, NY 11518-2020 MAJOR 5.3
7.7
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT) 5.7
Location 2 Marjorie Lane 8.9
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 1
24
Daily MX
SAMPLE
TYPE
24
COMP24
DATE
3/24/2018
MM/DD/YYYY
FREQUENCY
OF ANALYSIS
01/07
Weekly
Form Approved
OMB No. 2040-004
11518-2020
No Discharge
NO.
EX
0
NUMBER
UNITS
*****
*****
TELEPHONE
516 519-5560
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
VALUE
*****
*****
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
VALUE
*****
*****
MM/DD/YYYY
02/28/2018
001-F
DISCHARGE NUMBER
QUALITY OR CONCENTRATION
VALUE
*****
*****
UNITS
lb/d
VALUE
8.9
NY0026450
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
02/01/2018
Plant Manager
TYPED OR PRINTED
QUANTITY OR LOADING
VALUE
*****
*****
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
William Donovan
PARAMETER
Copper. total (as Cu)
01042 1 0
Effluent Gross
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2
Comp24
Comp24
24
Comp24
24
Comp24
2401/30
Monthly
SAMPLE
TYPE
24
Comp24
24
Comp24
24
Comp24
2401/30
Monthly
01/30
Monthly
01/30
Monthly
DATE
3/24/2018
MM/DD/YYYY
FREQUENCY
OF ANALYSIS
01/30
Monthly
01/30
Monthly
01/30
Monthly
0
0
0
0
0
0
Form Approved
OMB No. 2040-004
11518-2020
No Discharge
NO.
EX
0
*****
*****
*****
*****
*****
*****
NUMBER
UNITS
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
TELEPHONE
516 519-5560
*****
*****
*****
*****
*****
*****
*****
*****
*****
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
VALUE
*****
*****
*****
*****
*****
*****
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
lb/d
MM/DD/YYYY
02/28/2018
001-V
DISCHARGE NUMBER
QUALITY OR CONCENTRATION
VALUE
*****
*****
*****
lb/d
lb/d
lb/d
1.7
Daily MX
UNITS
lb/d
lb/d
lb/d
0.9
Daily MX
20.50
87
Daily MX
0.78
4.2
Daily MX
1.70
9
Daily MX
<0.39
1.5
Daily MX
<2.71
5.2
Daily MX
<0.39
*****
*****
*****
NY0026450
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
02/01/2018
VALUE
<0.39
*****
*****
*****
*****
*****
*****
Plant Manager
TYPED OR PRINTED
QUANTITY OR LOADING
VALUE
*****
*****
*****
*****
*****
See Comments
Chloroform
32106 V 0
See Comments
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
William Donovan
Effluent Gross
Silver total (as Ag)
01077 V 0
See Comments
Zinc, total (as Zn)
01092 V 0
See Comments
Lead, total (as Pb)
01051 V 0
See Comments
Nickel, total (as Ni)
01067 V 0
PARAMETER
Cadmium, total (as Cd)
01027 V 0
See Comments
Chromium, total (as Cr)
01034 V 0
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2
Comp24
Comp24
24
Comp24
24
Comp24
2401/30
Monthly
SAMPLE
TYPE
24
Comp24
24
Comp24
24
Comp24
2401/30
Monthly
01/30
Monthly
01/30
Monthly
DATE
3/24/2018
MM/DD/YYYY
FREQUENCY
OF ANALYSIS
01/30
Monthly
01/30
Monthly
01/30
Monthly
0
0
0
0
0
0
Form Approved
OMB No. 2040-004
11518-2020
No Discharge
NO.
EX
0
*****
*****
*****
*****
*****
*****
NUMBER
UNITS
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
TELEPHONE
516 519-5560
*****
*****
*****
*****
*****
*****
*****
*****
*****
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
VALUE
*****
*****
*****
*****
*****
*****
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
lb/d
MM/DD/YYYY
02/28/2018
001-V
DISCHARGE NUMBER
QUALITY OR CONCENTRATION
VALUE
*****
*****
*****
lb/d
lb/d
lb/d
3.8
Daily MX
UNITS
lb/d
lb/d
lb/d
2.4
Daily MX
<0.41
5.9
Daily MX
<0.41
0.6
Daily MX
<0.41
0.6
Daily MX
1.92
47
Daily MX
<0.41
1.1
Daily MX
<0.41
*****
*****
*****
NY0026450
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
02/01/2018
VALUE
15.13
*****
*****
*****
*****
*****
*****
Plant Manager
TYPED OR PRINTED
QUANTITY OR LOADING
VALUE
*****
*****
*****
*****
*****
See Comments
Tetrachloroethylene
34475 V 0
See Comments
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
William Donovan
Effluent Gross
Diethyl Phthalate
34336 V 0
See Comments
Methylene Chloride
34423 V 0
See Comments
Benzene
34030 V 0
See Comments
Benzo (k) Fluoranthe
34242 V 0
PARAMETER
Phenolics, Total
32730 V 0
See Comments
Toluene
34010 V 0
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 3
Comp24
Comp24
24
Comp24
24
Comp24
2401/30
Monthly
SAMPLE
TYPE
24
Comp24
24
Comp24
24
Comp24
2401/30
Monthly
01/30
Monthly
01/30
Monthly
DATE
3/24/2018
MM/DD/YYYY
FREQUENCY
OF ANALYSIS
01/30
Monthly
01/30
Monthly
01/30
Monthly
0
0
0
0
0
0
Form Approved
OMB No. 2040-004
11518-2020
No Discharge
NO.
EX
0
*****
*****
*****
*****
*****
*****
NUMBER
UNITS
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
TELEPHONE
516 519-5560
*****
*****
*****
*****
*****
*****
*****
*****
*****
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
VALUE
*****
*****
*****
*****
*****
*****
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
lb/d
MM/DD/YYYY
02/28/2018
001-V
DISCHARGE NUMBER
QUALITY OR CONCENTRATION
VALUE
*****
*****
*****
lb/d
lb/d
lb/d
1.7
Daily MX
UNITS
lb/d
lb/d
lb/d
11
Daily MX
<0.41
11
Daily MX
<0.41
0.6
Daily MX
<0.70
1.0
Daily MX
3.52
0.8
Daily MX
<0.41
1.5
Daily MX
<0.41
*****
*****
*****
NY0026450
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
02/01/2018
VALUE
<0.41
*****
*****
*****
*****
*****
*****
Plant Manager
TYPED OR PRINTED
QUANTITY OR LOADING
VALUE
*****
*****
*****
*****
*****
See Comments
Trichloroethylene
39180 V 0
See Comments
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
William Donovan
Effluent Gross
Bis(2-ethylhexyl)Phtalate
39100 V 0
See Comments
Di-n-Butyl Phthalate
39110 V 0
See Comments
Benzo (a) Anthracine
34526 V 0
See Comments
Pentachlorophenol
39032 V 0
PARAMETER
1,1Dichloroethylene
345010 V 0
See Comments
1,1,1 Trichloroethane
34506 V 0
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 4
See Comments
78028 V 0
Tetrachloroethane
PARAMETER
TYPED OR PRINTED
Plant Manager
William Donovan
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
*****
*****
VALUE
QUANTITY OR LOADING
MM/DD/YYYY
MONITORING PERIOD
PERMIT NUMBER
NY0026450
<0.41
VALUE
02/01/2018
UNITS
lb/d
02/28/2018
MM/DD/YYYY
*****
VALUE VALUE
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
***** *****
VALUE
External Outfall
(SUBR 01)
DMR Mailing ZIP Code
NUMBER
519-5560516
TELEPHONE
*****
*****
OMB No. 2040-004
Form Approved
0
NO.
EX
No Discharge
11518-2020
UNITS
QUALITY OR CONCENTRATION
DISCHARGE NUMBER
001-V
01/30
FREQUENCY
OF ANALYSIS
MM/DD/YYYY
3/24/2018
DATE
Monthly Comp24
24
SAMPLE
TYPE
2.2**********
Daily MX*****
BAY PARK SEWAGE TREATMENT PLANT
MONTHLY LABORATORY REPORT
PLANT PRIMARY GBT RETURN AERATION AERATION PLANT PRIMARY
INFLUENT EFFLUENT FILRATE SLUDGE EFFLUENT AVERAGE INFLUENT EFFLUENT
mg/L mg/L mg/L mg/L mg/L mg/L °C mg/L mg/L mg/L %TS %VS %TS %VS
02/01/18 274 52 74.00 4.8 3,000 1,343 1,760 173 127 15.2 210 99 < 2.0 159 2.6 89.1 2.1 78.7
02/02/18 372 107 4.0 3,075 1,310 1,838 168 123 15.4 242 143 < 2.0 173 3.5 89.1 2.2 77.8
02/03/18 198 56 4.0 165 15.2 166 98 2.1 137 3.6 91.2 2.1 79.4
02/04/18 196 66 5.6 165 15.4 168 130 < 2.0 128 4.0 91.0 2.1 78.0
02/05/18 300 81 6.0 2,575 1,133 1,645 153 131 15.4 226 145 2.1 173 3.5 90.3 2.1 78.4
02/06/18 182 68 122.00 6.8 2,163 1,145 1,645 153 130 15.3 187 129 3.1 169 3.4 90.0 2.1 78.9
02/07/18 158 73 6.4 2,662 1,088 1,610 143 128 15.3 176 160 3.1 170 3.6 88.0 2.1 78.8
02/08/18 190 47 58.00 8.0 2,338 995 1,560 130 127 15.0 200 83 2.3 98 2.8 89.3 2.1 79.0
02/09/18 190 54 6.8 2,513 1,017 1,505 133 128 15.2 175 134 2.8 165 3.3 89.0 2.1 77.6
02/10/18 214 56 7.6 115 15.3 165 89 3.3 120 3.0 89.8 2.1 78.5
02/11/18 170 58 8.4 128 15.5 176 91 4.5 160 2.8 88.5 2.1 77.8
02/12/18 196 73 14.0 2,325 865 1,583 113 130 15.4 189 138 7.2 148 4.0 89.2 2.0 77.9
02/13/18 180 70 40.00 16.0 2,137 1,080 1,628 160 137 15.0 152 116 7.8 166 3.4 87.9 2.0 78.0
02/14/18 190 61 20.4 2,213 853 1,472 105 123 15.1 183 130 9.0 156 4.2 88.7 2.0 78.1
02/15/18 224 74 55.00 25.2 2,250 923 1,475 105 114 15.4 171 119 9.1 143 3.7 88.5 2.0 78.3
02/16/18 236 99 22.8 885 1,540 100 113 15.7 176 152 10.4 194 3.5 89.9 2.1 78.0
02/17/18 186 68 22.8 98 15.4 165 105 8.4 145 2.4 90.6 2.0 77.7
02/18/18 214 66 26.4 98 15.5 160 139 11.3 182 3.5 89.7 1.9 77.8
02/19/18 178 78 26.0 2,000 893 1,495 99 114 15.2 223 133 12.9 247 3.5 87.6 1.9 77.8
02/20/18 170 74 24.8 1,988 1,085 1,763 138 124 15.5 182 116 14.1 194 3.6 90.0 1.9 77.6
02/21/18 204 64 25.6 2,413 1,300 1,738 115 89 15.6 185 147 11.6 178 3.6 86.1 1.8 77.5
02/22/18 166 82 45.00 13.2 2,525 1,187 1,590 123 105 15.9 157 128 5.8 179 3.9 89.9 1.8 77.6
02/23/18 182 49 11.6 2,350 1,128 1,560 123 109 15.9 194 85 6.1 131 3.8 90.5 2.0 77.5
02/24/18 180 56 6.8 120 16.0 202 93 6.8 121 3.1 89.9 1.8 77.2
02/25/18 216 46 6.8 125 15.9 214 87 4.2 131 3.0 89.0 1.8 77.5
02/26/18 184 78 7.2 2,050 945 1,445 105 111 15.4 188 131 3.8 146 3.1 89.8 1.9 77.6
02/27/18 152 68 60.00 6.4 2,388 950 1,415 115 123 15.8 158 127 4.5 160 3.0 88.1 1.8 77.5
02/28/18 158 38 8.4 2,088 1,148 1,498 120 104 15.8 168 145 4.6 112 3.0 87.8 1.9 76.9
MAXIMUM 372.00 107.00 122.00 26.40 3075.00 1342.80 1837.60 172.50 137.40 16.00 242 160 14.10 247.00 4.20 91.20 2.20 79.41
MINIMUM 152.00 38.00 40.00 < 4.00 1988.00 852.60 1415.00 97.50 89.32 14.97 152 83 2.00 98.20 2.40 86.10 1.80 76.87
AVERAGE 202 67 65 < 13 2371 1064 1588 128 119 15 184 121 6 157 3 89 2 78
mg/L mg/L
SLUDGE SOLIDS
PLANT PLANTPRIMARY SETTLING
TANKSDIGESTERS
EFFLUENT EFFLUENT
COUNTY OF NASSAUFebruary, 2018
DEPARTMENT OF PUBLIC WORKS
DATE
TOTAL SUSPENDED SOLIDS
AERATION 30
MINUTE
SETTLING
SLUDGE
INDEX
AERATION
EFFLUENT
TEMPERATURE
CBOD5
INFLUENT
CHLORIDES
INFLUENTEFFLUEN
TINFLUENT
EFFLUEN
T%TS %TVS %TS %Solids mg/L mg/L mg/L mg/L mL/L mL/L Minimum Maximum Minimum Maximum °C °C MGD
02/01/18 5 88 1.89 17.94 283 7.34 4,848 151 0.03 0.06 10.7 <0.10 7.1 7.6 7.1 7.3 14.2 14.9 45.2
02/02/18 1.51 17.36 165 7.35 0.04 9.3 <0.10 7.2 7.6 7.0 7.2 14.1 14.7 45.7
02/03/18 7.36 0.04 10.1 <0.10 7.2 7.7 7.0 7.2 13.0 13.6 45.6
02/04/18 0.05 8.4 <0.10 7.1 7.6 7.0 7.1 13.9 14.8 47.5
02/05/18 1.66 17.13 300 0.07 10.3 <0.10 7.1 7.7 6.9 7.3 13.8 14.4 47.1
02/06/18 5 88 1.66 13.21 188 7.33 6,053 132 0.02 0.08 10.0 <0.10 7.1 7.6 7.1 7.3 13.8 14.4 46.4
02/07/18 1.67 17.24 248 7.32 0.05 9.8 <0.10 7.2 7.7 7.1 7.3 13.3 14.4 48.1
02/08/18 6 88 1.70 17.42 273 5,365 136 0.03 0.04 10.3 <0.10 7.2 7.7 7.0 7.3 13.8 14.3 47.3
02/09/18 180 7.31 0.05 11.5 <0.10 7.1 7.5 6.8 7.3 14.0 14.5 48.6
02/10/18 1.65 16.95 7.35 0.04 8.3 <0.10 7.0 7.5 6.9 7.2 14.6 15.4 47.3
02/11/18 0.11 9.4 <0.10 7.1 7.3 7.0 7.2 13.9 15.2 56.1
02/12/18 1.70 17.27 278 0.08 8.5 <0.10 7.0 7.4 6.9 7.2 13.9 14.9 51.3
02/13/18 5 88 1.68 17.59 250 7.35 5,235 120 0.02 0.10 9.2 <0.10 7.2 7.5 7.1 7.3 14.5 15.0 49.0
02/14/18 1.71 13.13 220 7.28 0.12 8.8 <0.10 7.2 7.4 7.0 7.2 14.5 15.3 47.9
02/15/18 10 73 1.36 17.70 288 7.36 0.08 9.5 0.2 7.1 7.4 7.0 7.2 14.7 15.7 49.9
02/16/18 1.59 17.11 228 0.12 8.0 0.3 7.1 7.4 7.0 7.2 15.1 15.7 53.2
02/17/18 1.56 17.27 7.22 0.07 8.4 0.2 7.1 7.6 7.0 7.2 14.4 15.1 48.4
02/18/18 0.08 7.8 <0.10 7.1 7.4 7.0 7.2 14.2 14.8 50.2
02/19/18 1.71 17.39 178 0.05 7.8 0.2 7.1 7.5 6.9 7.1 14.2 14.9 48.9
02/20/18 1.68 17.12 205 7.26 4,970 178 0.04 0.08 9.3 0.3 7.1 7.4 7.0 7.2 15.0 15.5 50.7
02/21/18 1.61 17.59 318 7.20 0.06 7.7 <0.10 7.1 7.5 7.0 7.1 15.1 15.7 48.3
02/22/18 6 88 1.56 13.47 203 7.26 4,185 174 0.04 0.08 9.0 <0.10 7.0 7.5 6.8 7.1 14.9 15.4 48.6
02/23/18 1.50 16.81 220 7.29 0.08 9.2 <0.10 7.0 7.4 6.8 7.0 14.8 15.4 49.4
02/24/18 7.32 0.05 8.1 <0.10 6.9 7.3 6.7 7.1 15.2 15.7 47.7
02/25/18 0.11 8.8 <0.10 7.0 7.3 6.8 7.0 14.6 15.4 54.7
02/26/18 1.70 17.38 388 0.07 7.9 <0.10 7.0 7.4 6.8 7.1 14.8 15.3 54.1
02/27/18 6 87 1.60 17.38 148 7.29 4,775 269 0.06 0.08 8.7 <0.10 7.0 7.5 6.9 7.1 15.0 15.7 51.6
02/28/18 1.49 17.25 263 0.10 9.3 <0.10 7.1 7.5 6.9 7.1 15.2 15.6 51.0
MAXIMUM 9.80 88.00 1.89 17.94 388 7.36 6053 269 0.06 0.12 11.5 0.33 7.2 7.7 7.1 7.3 15.2 15.7 56.1
MINIMUM 5.10 73.00 1.36 13.13 148 7.20 4185 120 0.02 0.04 7.68 <0.10 6.9 7.3 6.7 7.0 13.0 13.6 45.2
AVERAGE 6 86 2 17 241 7 5062 166 0 0 9 <0.10 7.1 7.5 6.9 7.2 14.4 15.0 49.3
PLANT PRIMARY PLANT
INFLUENT EFFLUENT EFFLUENT
TSS - mg/L 202 67 67 13 94
CBOD5 - mg/L 184 121 34 6 97
% REMOVED % REMOVED
INFLUENT EFFLUENT
THICKENED SLUDGE DAILY DAILY
TREATMENT PLANT EFFICIENCY - MONTHLY AVERAGE
pH pH AVERAGE DAILY
TEMPERATURES
PLANT
EFFLUENT
FLOW
FEED
SLUDGE CAKE FILTRATE AVERAGE
pH
ALKALINITYVOLATILE
ACIDSDATE
GRAVITY BELT
THICKENERS
DE-WATERED SLUDGE DIGESTERS AVERAGE
DAILY
CHLORINE
RESIDUAL
AVERAGE DAILY
SETTLEABLE SOLIDSVOLATILE
ACIDS/
ALKALINITY
February, 2018
WEEK WEEK WEEK WEEK WEEK MONTHLY
PERMIT OF OF OF OF OF TOTALS
LIMIT 28-Jan-18 04-Feb-18 11-Feb-18 18-Feb-18
03-Feb-18 10-Feb-18 17-Feb-18 24-Feb-18 Date Sampled:
02/13/18 mg/L
TEMPERATURE; INFLUENT [°C] HIGHEST DAILY VALUE 15.2
TEMPERATURE; EFFLUENT [°C] HIGHEST DAILY VALUE 15.7 INFLUENT 1 23.30
EFFLUENT 1 24.30
pH; INFLUENT LOWEST DAILY VALUE 6.9
HIGHEST DAILY VALUE 7.7 INFLUENT 1 0.1
EFFLUENT 1 1.3
pH; EFFLUENT LOWEST DAILY VALUE 6.00 6.7
HIGHEST DAILY VALUE 9.00 7.3 INFLUENT 1 0.5
EFFLUENT 1 9.3
MONTHLY AVERAGE [lbs/day] 82,708
MONTHLY AVERAGE [mg/L] 202 INFLUENT 1 23.6
EFFLUENT 1 25.6
MONTHLY AVERAGE [lbs/day] 18000 lbs/d 5,211
WEEKLY AVERAGE [lbs/day] 26000 lbs/d 1,934 2,669 7,772 7,897 7,897 INFLUENT 1 2.4
MONTHLY AVERAGE [mg/L] 30 mg/L 13 EFFLUENT 1 1.6
WEEKLY AVERAGE [mg/L] 45 mg/L 5 7 19 19 19
INFLUENT 1 1.7
SETTLEABLE SOLIDS; INFLUENT DAILY MAXIMUM 11.5 EFFLUENT 1 1.7
SETTLEABLE SOLIDS; EFFLUENT DAILY MAXIMUM 0.3 mL/L 0.3
NUMBER OF READINGS >0.3 0
EFFLUENT FLOW MONTHLY AVERAGE [MGD] 70 MGD 49.3
Date Sampled: LBS/DAY LBS/DAY
COLIFORM, FECAL MONTHLY GEOMETRIC MEAN 200/100mL 12 METHYLENE CHLORIDE 5.90 <0.41
WEEKLY GEOMETRIC MEAN 400/100mL 5 6 16 19 19 1,1-DICHLOROETHYLENE 0.80 <0.41
# OF DAYS>2400 (Interstate Parameter) 0 1,1,1-TRICHLOROETHANE 1.40 <0.41
TRICHLOROETHYLENE 1.70 <0.41
COLIFORM, TOTAL MONTHLY MEDIAN <700 700/100mL 79 TETRACHLOROETHANE 2.20 <0.41
COLIFORM, TOTAL NO MORE THAN 10% EXCEEDING 2300 10% 0 TETRACHLOROETHYLENE 3.80 <0.41
BENZO (a) ANTHRACENE 0.60 <0.41
MONTHLY AVERAGE LBS/DAY 75,606 BENZO (k) FLUORANTHENE 0.60 <0.41
MONTHLY AVERAGE mg/L 184 DIETHYL PHTHALATE 2.40 1.92
DI-N-BUTHYL PHTHALATE 11.00 <0.41
MONTHLY AVERAGE [lbs/day] 15000 lbs/d 2,471 BIS (2-ETHYLHEXYL) PHTHALATE 11.00 3.52
WEEKLY AVERAGE [lbs/day] 23000 lbs/d 775 1,058 3,394 4,027 4,027 PENTACHLOROPHENOL 1.00 <0.70
MONTHLY AVERAGE [mg/L] 25 mg/L 6 CHLOROFORM 1.70 0.78
WEEKLY AVERAGE [mg/L] 40 mg/L 2 3 8 10 10 BENZENE 0.60 <0.41
TOLUENE 1.10 <0.41
TSS; % REMOVAL MONTHLY PERCENT REMOVAL 85% 94 PHENOLICS, TOTAL 47.00 15.13
CBOD5; % REMOVAL MONTHLY PERCENT REMOVAL 85% 97
CHLORINE, TOTAL RESIDUAL LOWEST DAILY VALUE 0.01
DAILY MAX 0.5 mg/L 0.12
01/28/18 02/04/18 02/11/18 02/18/18
02/03/18 02/10/18 02/17/18 02/28/18
Max Lbs 5.3 7.7 5.7 8.9 8.9
Date 02/03/18 02/10/18 02/17/18 02/24/18 02/20/18
MERCURY, TOTAL 200 ng/L
METALS ACTION LEVEL
02/03/18 02/10/18 02/17/18 02/24/18 03/03/18
CADMIUM, TOTAL 1.5 LBS/DAY <0.39 <0.39
CHROMIUM, TOTAL 5.2 LBS/DAY <2.71 <2.71
LEAD, TOTAL 4.2 LBS/DAY <0.39 <0.39
NICKEL, TOTAL 9.3 LBS/DAY 1.70 1.70
SILVER, TOTAL 0.9 LBS/DAY <0.39 <0.39
ZINC, TOTAL 87 LBS/DAY 20.50 20.50
COPPER, TOTAL 24 LBS/DAY
DATE MAXIMUM
METALS PERMIT LIMIT
DATE
MAXIMUMWeek
ORGANIC COMPOUNDSACTION
LEVEL
ANALYTICAL
RESULTS
CBOD5 INFLUENT
CBOD5 EFFLUENT
AMMONIA AS NH3-N
NITRITE AS N
NITRATE AS N
TOTAL SUSPENDED SOLIDS;
INFLUENT
TOTAL KJELDAHL NITROGEN
TOTAL SUSPENDED SOLIDS;
EFFLUENT
PHOSPHORUS, TOTAL AS P
ORTHOPHOSPHATE AS P
BAY PARK SEWAGE TREATMENT PLANT
OPERATIONS AND LABORATORY ANALYSES
SUMMARY
MONITORING REQUIREMENTS NUMBER OF
SAMPLES
MAXIMUM
VALUE
February,
2018
Effluent
Dissolved
Oxygen
Effluent
Temperatu
re
Chlorine
Residual
Eff Cl2
Process
Residual
(HDL)
FlowTotal
ColiformFecal Coilform Sampler Name (HDL)
[mg/L] [°C] [mg/L] mg/L [MGD][MPN/100mL
][MPN/100mL] Date
Thursday 2/1/18 11:20am 8.38 14.1 0.05 2.22 53.3 33 5 C. Hemphill
Thursday 2/1/18 11:20am 8.38 14.1 0.05 2.22 53.3 <2 <2 C. Hemphill
Friday 2/2/18 11:20am 8.05 14.5 0.03 1.98 55.6 49 13 C. Hemphill
Friday 2/2/18 11:20am 8.05 14.5 0.03 1.98 55.6 13 2 C. Hemphill
Saturday 2/3/18 11:43am 8.93 15.5 0.04 2.19 54.0 33 2 R. Cerasoli
Saturday 2/3/18 11:43am 8.93 15.5 0.04 2.19 54.0 <2 <2 R. Cerasoli
Sunday 2/4/18 12:20pm 8.58 16.2 0.03 1.89 56.0 49 4 R. Cerasoli
Sunday 2/4/18 12:20pm 8.58 16.2 0.03 1.89 56.0 22 7 R. Cerasoli
Monday 2/5/18 5:26am 8.26 15.5 0.03 2.47 27.1 110 8 S. L. Murphy
Monday 2/5/18 12:21pm 7.81 15.2 0.04 1.92 61.2 33 11 K. Peterson
Monday 2/5/18 5:32am 8.26 15.5 0.03 2.47 27.1 7 <2 S. L. Murphy
Monday 2/5/18 12:21pm 7.81 15.2 0.04 1.92 61.2 8 2 C. Campbell
Tuesday 2/6/18 1:16pm 9.29 11.9 0.10 2.26 57.2 49 5 J. Schuhle
Tuesday 2/6/18 1:16pm 9.29 11.9 0.10 2.26 57.2 33 5 J. Schuhle
Wednesday 2/7/18 5:22am 8.60 15.7 0.02 1.93 23.0 130 8 A. Vicino
Wednesday 2/7/18 11:50am 8.21 13.6 0.03 2.00 61.2 79 17 C. Campbell
Wednesday 2/7/18 5:22am 8.60 15.7 0.02 1.93 23.0 22 17 A. Vicino
Wednesday 2/7/18 11:50am 8.21 13.6 0.03 2.00 61.2 13 <2 C. Campbell
Thursday 2/8/18 10:58am 8.16 15.0 0.03 1.93 59.0 79 17 S. Hill
Thursday 2/8/18 10:58am 8.16 15.0 0.03 1.93 59.0 <2 <2 K. Peterson
Friday 2/9/18 11:35am 8.81 15.2 0.02 1.81 56.3 79 17 C. Hemphill
Friday 2/9/18 11:35am 8.81 15.2 0.02 1.81 56.3 33 8 C. Hemphill
Saturday 2/10/18 11:15am 6.66 17.5 0.07 1.79 58.2 330 33 K. Peterson
Saturday 2/10/18 11:15am 6.66 17.5 0.07 1.79 58.2 11 2 J. Merz
Sunday 2/11/18 1:40pm 8.15 16.1 0.05 2.17 73.0 130 13 R. Cerasoli
Sunday 2/11/18 1:40pm 8.15 16.1 0.05 2.17 73.0 230 27 R. Cerasoli
Monday 2/12/18 12:22pm 7.32 14.5 0.18 2.28 65.6 110 33 K. Peterson
Monday 2/12/18 12:22pm 7.32 14.5 0.18 2.28 65.6 79 33 M. Adamovich
Tuesday 2/13/18 1:14pm 8.09 14.4 0.06 1.44 58.1 490 49 C. Hemphill
Tuesday 2/13/18 1:14pm 8.09 14.4 0.06 1.44 58.1 170 17 C. Hemphill
Wednesday 2/14/18 5:23am 8.00 16.0 0.03 3.88 30.0 33 <2 A. Vicino
Wednesday 2/14/18 12:26pm 8.72 16.0 0.07 4.21 59.2 220 46 J. Schuhle
Wednesday 2/14/18 5:28am 8.60 14.6 0.03 3.88 30.0 33 <2 A. Vicino
Wednesday 2/14/18 12:26pm 8.72 16.0 0.07 4.21 59.2 <2 <2 J. Schuhle
Thursday 2/15/18 12:25pm 7.68 15.0 0.06 3.68 59.4 110 33 C. Campbell
Thursday 2/15/18 12:25pm 7.68 15.0 0.06 3.68 59.4 11 <2 C. Campbell
Friday 2/16/18 5:24am 8.00 17.5 0.03 2.93 33.0 49 13 A. Vicino
Friday 2/16/18 12:46pm 7.74 16.7 0.06 3.00 62.7 490 79 K. Peterson
Friday 2/16/18 5:28am 9.10 14.3 0.03 2.93 33.0 130 17 A. Vicino
Friday 2/16/18 12:46pm 7.94 16.7 0.06 3.00 62.7 330 49 Mike A.
Saturday 2/17/18 12:26pm 7.56 15.8 0.06 3.13 58.4 490 49 C. Hemphill
Saturday 2/17/18 12:26pm 7.56 15.8 0.06 3.13 58.4 79 17 J. Merz
Sunday 2/18/18 1:05pm 10.31 15.7 0.05 2.82 62.0 79 23 R. Cerasoli
Sunday 2/18/18 1:05pm 10.31 15.7 0.05 2.82 62.0 330 79 R. Cerasoli
Monday 2/19/18 12:20pm 7.85 15.4 0.10 3.20 58.3 490 49 J. Schuhle
Monday 2/19/18 12:20pm 7.85 15.4 0.10 3.20 58.3 230 13 J. Schuhle
Tuesday 02/20/2018 12:45 pm 7.87 16.1 0.17 3.89 63.1 490 130 C. Campbell
Tuesday 02/20/2018 12:45 pm 7.87 16.1 0.17 3.89 63.1 79 8 C. Campbell
Wednesday 02/21/2018 5:25 am 8.10 17.3 0.03 3.52 26.0 79 17 A. Vicino
Wednesday 02/21/2018 11:15 am 7.58 18.0 0.06 2.53 58.6 79 13 J. Schuhle
Thursday 02/22/2018 12:15 pm 7.86 15.7 0.05 2.25 54.8 170 22 J. Schuhle
Thursday 02/22/2018 12:15 pm 7.86 15.7 0.05 2.25 54.8 130 23 C. Hemphill
Friday 2/23/18 5:23am 8.30 16.9 0.03 3.67 27.0 79 13 A. Vicino
Friday 2/23/18 11:42am 8.08 15.1 0.05 2.58 54.9 790 49 K. Peterson
Friday 2/23/18 5:23am 8.30 16.9 0.03 3.67 27.0 170 17 A. Vicino
Friday 2/23/18 11:42am 8.08 15.1 0.05 2.58 54.9 13 <2 Lorenzo S.
Saturday 02/24/2018 11:51 am 7.85 16.9 0.08 3.05 56.1 170 33 J. Merz
Saturday 02/24/2018 11:51 am 7.85 16.9 0.08 3.05 56.1 330 23 J. Merz
Sunday 02/25/2018 11:11 am 7.35 13.7 0.05 2.28 62.7 490 79 J. Schuhle
Monday 2/26/18 5:30am 8.25 16.0 0.03 2.53 31.5 49 23 S. L. Murphy
Monday 2/26/18 11:50am 8.49 16.5 0.07 2.50 65.0 790 33 R. Cerasoli
Tuesday 2/27/18 11:45am 9.25 15.8 0.07 2.51 58.6 230 79 C. Campbell
Wednesday 2/28/18 5:30am 7.10 15.6 0.06 2.47 26.0 70 11 A. Vicino
Wednesday 2/28/18 11:20am 8.14 16.5 0.07 2.58 58.5 170 33 C. Hemphill
LIMITS
79 700 5
12 200 6
19 400 16
19
5.60
MONTHLY COLIFORM RESULTS
Day Date Time
Bay Park Sewage Treatment Plant
Total and Fecal Coliform Sampling Results and Miscellaneous Effluent Data
WEEKLY COLIFORM GEOMETRIC MEAN
February, 2018
Week Three
Week Four
Week Five
Total Coliform Monthly Median
Fecal Coliform Monthly Geometric Mean
Fecal Coliform Weekly Max
Monthly Minimum DO
Week One
Week Two