Page 1: CS ˜DENTON COUNTY˚ DISTRICT S US 380 PROECT 0… · 2006-01-17  · Travis Owens, P.E. TxDOT Dallas Advance Project Development 214-320-6625 Travis.Owens@txdot.gov Dallas District

“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”

0682

_121

216

SUMMER • 2017TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

US 380 PROJECTCSJS: 0135-10-050; 0135-10-057 (DENTON COUNTY)

PROGRAMMING STATUS

MTP (2040 Metropolitan Transportation Plan) MTP ID: RSA1- 2.225.425 to RSA1- 2.225.475

YES

UTP (2017 Unified Transportation Program) YES

STIP (Statewide Transportation Im-plementation Program, 2017-2020) PHASE: 0135-10-050: C ; 0135-10-057: E,R

YES

SOURCE: TxDOT TxDOT graphic

CONSTRUCTION FUNDING STATUSFunded $102.7 M

Unfunded $23.6 M

SOURCE: TxDOT TxDOT graphic

ESTIMATED COSTSEstimated Construction Cost $126.3 M

Estimated Right of Way Cost $11.8 M

Estimated Total Cost* $138.1 M

*Subject to change TxDOT graphic

SOURCE: TxDOT TxDOT graphic

PROJECT TIMELINE

20182014

2017 2021

December 2014 – Public Meeting Held

June 2018 – ENV Clearance

Spring 2018 – Public Involvement

May 2021 – Construction Letting

April 2017 – Schematic Approval

Mainlanes MainlanesFrontage Roads w/Turnlanes

FrontageRoad

MainlanesMainlanesMainlanesMainlanes MainlanesMainlanes

Sidewalk Sidewalk SidewalkSidewalkSidewalkSidewalk

Mainlanes Mainlanes

EXISTING TYPICAL SECTIONPROPOSED TYPICAL SECTION PROPOSED GRADE SEPARATION TYPICAL SECTIONPROPOSED TYPICAL SECTIONEXISTING TYPICAL SECTION

Within the Project Section of CSJ: 0135-10-050

Within the Project Section of CSJ: 0135-10-057 Within the Project Section of CSJ: 0135-10-050

Within the Project Section of CSJ: 0135-10-057

NOTE: Illustrations are simplified depictions of the highway upgrades, and are not exact. TxDOT graphic

PURPOSE AND NEEDThe purpose of the proposed project is to improve mobil-ity by increasing capacity and reducing traffic congestion. Widening and increasing the number of traffic lanes, and adding additional grade separations would improve mobility. This project will also create a pedestrian friendly corridor with safe access to businesses and schools.

PROJECT DETAILSLimits: Loop 288 to west of CR 26 (Collin County Line)

CSJs: 0135-10-050; 0135-10-057

Description: Widen 4 to 6 lanes divided urban with grade separations at major intersections. Also raised medians and left/right turn lanes from LP 288 to W of US 377.

Estimated Project Let: May 2021

Total Length: 14.773 miles

PROJECT STATUSThe project engineering (schematic and environmental) is being worked on by a TxDOT consultant and being man-aged by TxDOT Advance Project Development. Currently the schematic is being designed.

CONTACT INFORMATIONTravis Owens, P.E.

TxDOT Dallas Advance Project Development214-320-6625

[email protected]

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

NOTE: Highlighted areas are not drawn to exact scale. TxDOT graphic

35W

35E

35E

35E

35E

380 380380 380

377

377

377

377

75

75

75

75

289

289

289

289

289

289

2164

29311385

13852931

121

121

121

121

121

DNT

DNT

35

35

455455

543

543

455

428

428428

720

428

423

407

407

423

288

288

288

N

4 miles

DENTON

Mustang

AubreyGreenValley

Krugerville

Argyle

Hackberry

Little Elm

The Colony

ShadyShores

Oak Point

Lake Dallas

Corinth

Copper Canyon Highland

Village

Double Oak Lewisville

Celina

Weston

Prosper

Parker

Allen

Fairview

PLANO

FRISCO

MCKINNEY

DENT

ON CO

.

COLL

IN CO

.

DENT

ON CO

.

COLL

IN CO

.

5

5

5

MCKINNEY

77

77

77

Lewisville Lake

Clear Creek Heritage Center

380380

380 377

Milam Rd.

Custe

r Rd.

Lake

Fores

t Dr.

Rockhill Pkwy.

Dallas Pkwy.

Virginia Pkwy.

Sam Rayburn Tollway

Coit R

d.

Custe

r Rd.

Coit R

d.Parker Rd.

Ange

l Pkw

y.

Stacy Rd.

Main St.

Friendship Rd.

Stacy Rd.

W McDermott Dr.

W University Dr.

2181

1830

1461

0135-10-057 0135-10-050

75