Download doc - Crew___Equipment

Transcript
Page 1: Crew___Equipment

Production schedule: Equipment & Crew SheetTitle: Fears and Phobia’s exhibitionClient: Tallis Drama DepartmentProducer: George Hales, Lee Dorney, Jack BennettDirector: George Hales, Lee Dorney, Jack BennettDate: 11/11/10

Production equipment required (amount)A large wooden board to hold the fire.

Source of ignition, a stick to hold at arms length that will be lit at the end, this will be used to light the gasoline from a safe distance.

Gasoline, enough to fully cover the wooden board.

Camera (Sony hvr a1e)

Tapes to record on

A spare battery for the camera, just in case

A tripod

A stand to hold the ‘Fire Board’ above the ground, helps prevent the fire from spreading.

A fire extinguisher, just in case

Sand to help put out any spreading fire

Water, again as a precaution to spreading fire

Crewing requirements (make up of teams? How many?)3 people, 1 team.

Exhibition requirements

Projector and walls to project on.

Tallis 10 Productio

ns

Page 2: Crew___Equipment

Transport requirements

People. Carrying the cameras, car or other transport will not be needed.

Post-production requirements (format, effects, music, voice-over)Editing - Final Cut Pro.Graphics - NoneMusic - NoneSound effects - Sound of fire (Crackling, popping), fire alarms. Voice-over narration - NoneFound footage images – All footage in the piece were filmed by us.