Transcript
Page 1: cost segregation studies underway.” Jerry B. | CPA

▪ Cost Basis: $30,468,138▪ Accelerated: $28,655,376 (94%)▪ 1st Year Savings: Over $1,812,000*▪ 10-Year NPV Savings: Over $6,870,000**

NEW CONSTRUCTIONCarbon Fiber Plant

▪ Cost Basis: $34,437,006▪ Accelerated: $10,152,361 (29.5%)▪ 1st Year Savings: Over $153,000*▪ 10-Year NPV Savings: Over $2,420,000**

NEW CONSTRUCTIONFood Manufacturing Plant

▪ Cost Basis: $136,214,739▪ Accelerated: $121,742,226 (89.4%)▪ 1st Year Savings: Over $9,240,000* ▪ 10-Year NPV Savings: Over $33,680,000**

NEW CONSTRUCTIONCarbon Fiber Plant

▪ Cost Basis: $21,033,993▪ Accelerated: $20,559,232 (97.7%)▪ 1st Year Savings: Over $313,000*▪ 10-Year NPV Savings: Over $4,850,000**

NEW CONSTRUCTIONOil Refinery

“cost segregation studies underway.” Jerry B. | CPA

COSTSEGREGATIONSTUDIESINDUSTRIAL

* Estimate of first year savings based on a 40% tax rate.** Estimate of 10-yr net present value savings based on a 40% tax rate and 8% discount rate.

800.257.8962 | www.bedfordteam.com

Recommended