WORKS AND MAINTENANCE DEPARTMENT CALL FOR TENDER
CONTRACTOR'S
NAME:
SUBJECT:
Installation of Electrical Power Lines as at When Needed Bases
Closing Date Thursday 30th May, 2013 by 10:00am
ITEM DESCRIPTION QTY UNIT RATE (N) TOTAL (N)
HSE REQUIREMENT
The contract or is expected to prov ide PPE (s) for his w orkers on Site. Note that the use of High
Ladders and dril l ing m achine will be involed in this job.Contractor m ust not terminate the power
lines in the distr ibution panel except wit h the presence of a nominated personel from Facilit ies
section (Low voltage)
HSE REQUIREMENTS meet up cost 1 Lot
PROJECT WORK DESCRIPTION AND EXPECTATION
Installation of UPS power lines using 10/16A French sockets Legrand Type.
Power cables shall run from the power distribution panel to the socket point. There
might be need to run trunking/Conduit pipes on the wall in some areas. TEPNGwill provide the socket to be installed.
Installation of raw power lines using 13A ABB sing le socket. Power cables shall
run from the power distribution panel to the socket point. There might be need to
run trunking/Conduit pipes on the wall in some areas.
Installation of raw power lines using 13A ABB Double socket . Power cables
shall run from the power distribution panel to the socket point. There might be
need to run trunking/Conduit pipes on the wall in some areas.
Installation of raw power lines using 15A ABB socket . Power cables shall run
from the power distribution panel to the socket point. There might be need to run
trunking/Conduit pipes on the wall in some areas.
MAJOR MATERIAL SCHEDULE
Name of material, part number, manufactur er
Contractor shall factor into the cost of the major material cost of other items required to integrate
and make the major material perform the funct ions expected of them
1 Fixed charge for mobilisation demobilisation 1 lot
2 15A ABB socket & patt ress 1 pcs
3 13A ABB single socket & patt ress 1 pcs
4 13A ABB Double socket & pattress 1 pcs
5 Doncaster 3-core 2.5mmsq Cable 1 m
6 Doncaster 3-core 1.5mmsq Cable 1 m
7 White Conduit pipe 20mm and saddle clips 1 m
8 White Conduit pipe 25mm 1 m
9 Flexible Conduit pipe 25mm 1 m
10 White Trunking 16 X 25mm 1 m
11 White Trunking 16 X 38mm 1 m
12 White Trunking 10 X 25mm 1 m
13 Cost for ONE lead technic ian and ONE assistant. The technicians sh all be expected to install
minim um four to seven lines of power and terminate same into the socket and panel PER DAY
1 Lot
WORKMANSHIP AND HOUSEKEEPING
Good housekeeping is a must in th is project. Constractor shall leave site tidy everyday. At the end
of the project all debris and waste shall be disposed off in a responsible manner without
destruct ion of the environment.
JOB COMPLETION CERTIFICATE
Job Progress Certif ic ate (JPC) shall NOT be issued for any project n ot delivered to TEPNG
Expectations and other elements as defined in this tender docum ent
Total
NB :
All HSE rules shall be strict ly adhered to by Contracto r.
Sign . Date.
Prepared By:
Approve by Head: