WHAT IS CONTROL-M (CTL-M)?

•Control-M is a component member of the INCONTROL family of products by BMC Software

•CTL-M is the automated production control and scheduling system

•CTL-M manages and automates the setup, scheduling and execution of jobs in the OS/390 (MVS) environment

COMPONENTS OF CONTROL-M

•Job Scheduling Definitions

•Active Jobs File (AJF)

•CONTROL-M Monitor

Control-MControl-M

2

CTL-M PRIMARY OPTIONS MENU

• Opt. 2 - Scheduling Definition Facility

• Opt. 3 - Active Environment Screen

• Opt. 4 - Conditions / Resources Map

• Opt. 5 - Log Screen

• Opt. 8 - Calendar Facility

• Opt. C - CMEM Rule Definition Facility

Control-MControl-M

Control M command list

H - Hold jobD - DeleteF - FreeL - Display a jobs control-m logZ - ZOOM (and DOC to see rundoc)O - Force OK completeS - STATISTICS (RUNTIMES)R - Restart (always use options Y and ? to be able to select the step

before starting)C - Confirm a job waiting confirmation.? then A to add a req (post)V - versioning and then S will show joblogs of current day runs.J - Display and edit the JCL for a job.A - Add Condition.

CONTROL-MCONTROL-M

COMPONENT 1 - JOB SCHEDULING DEFINITIONS

• Specifies criteria that identify decisions to be made and actions to be taken regarding the handling of a particular job

• General Parameters

• Basic Scheduling Parameters

• Runtime Scheduling Parameters

• Post-Processing Parameters

Control-MControl-M

Job Scheduling Definitions: GENERAL PARAMETERS

• Information about the job (identifies the library and member where the JCL is stored)

Control-MControl-M

6

Job Scheduling Definitions: BASIC SCHEDULING PARAMETERS

• Criteria according to which CONTROL-M schedules the job

Control-MControl-M

7

Job Scheduling Definitions: RUNTIME SCHEDULING PARAMETERS

• Runtime requirements that must be satisfied before CONTROL-M submits the job

Control-MControl-M

8

Job Scheduling Definitions: POST-PROCESSING PARAMETERS

• Actions CONTROL-M performs after the job ends, depending upon the outcome of job execution (for example, one set of actions if the job ends OK, another set of actions if an abend occurs or job not running, running too long, etc).

Control-MControl-M

9

COMPONENT 2 - ACTIVE JOBS FILE (AJF)

• If a job is scheduled for a particular day, a copy of its job scheduling definition is placed in this file

– How does a job get to the AJF?• Via daily load job• Manually forced• Forced by CMEM (DSNEVENT, JOBARRIVAL, JOBEND)• Forced by another job

• Only jobs in the AJF are candidates for submission by the CTL-M monitor

Control-MControl-M

10

COMPONENT 3 - CONTROL-M MONITOR

• Checks the runtime requirements of each job in the AJF

• Monitors available resources

• Determines that the conditions and resources required by a job are available

• If conditions and resources are available, the monitor allocates the resources and submits the job

• Monitors the execution of the job

• Implements post-processing decisions based on instructions in the job scheduling definition and the results of the job execution

• Operates continually as it evaluates the production environment and implements decisions

Control-MControl-M

11

A LOOK AT CONTROL-M

•New Day Processing

– 6 am daily

– Clean up of old jobs• Jobs that have executed successfully• Jobs that were deleted• Jobs whose MAXWAIT days have been exceeded

– MAXWAIT – number of extra days the job can wait in the AJF for submission– Ordering of new jobs

• Order / Original Date (ODAT) changes

Control-MControl-M

CONTROL-MCONTROL-M

Control-MControl-M

Control-MControl-M

Control-MControl-M

R Rerun , O Force ok and the rest of the options.Enter an R beside the job that has abended and the screen should come up with the Following.

RESTARTING A JOB

Control-MControl-M

Please verify that you are restarting the job that has abended. Now you can enter a Y to confirm that you want to restart the job.

RESTARTING A JOB

Control-MControl-M

FORCE COMPLETING A JOB

You’ll have to reply Y and then hit enter to confirm that you want to force complete

PROCESS DIAGRAMSPROCESS DIAGRAMS

Job Execution

Successful Completion

Abend Job Documentation / JCL

Application Problem

Call the programmer

Tkt for documentation

Issue ResolvedBy Programmer

Yes

No

Follow up again with the programmer till the problem is resolved / Turned over to Counter part at US for Morning problem fixation

Action taken on the job as per the documentation – Restart/ Resubmit/ Force complete/ Cancel

Normal Run

Tkt for documentation

Follow the programmer instructions

Job Documentation / Action taken is not adequate to resolve the problem

Start

End

THANKS

Please feel free to add more Information.