Opportunities and Risks for Thailand Water Transfer and
Diversion Scheme for Irrigation Development and Poverty Reduction
and Lessons Learned
Office of Project Management Royal Irrigation Department
Thailand 15 October 2009
Chawee WongrasittipornSenior Civil Engineer
PDF created with pdfFactory Pro trial version www.pdffactory.com
The Case of Chi -Mun River Basin
Northeast RegionThailand
PDF created with pdfFactory Pro trial version www.pdffactory.com
The Poverty
•Problems and Constraints•Poverty of the Poors
PDF created with pdfFactory Pro trial version www.pdffactory.com
• Highly spatial different in Rainfall Distribution• Long period Rain spell• Flat and high elevated topography – Table Mountain• Limited Gravity irrigation System – Mostly pumping
irrigation• Annual flood and drought disaster• Low fertile soil / with high percolation• Short period land utility - one crop a year
• Farmers in Northeast are the poorest Thai - average income is much lower than national average
Problems and Constraints in Irrigation Development in Northeast Thailand
PDF created with pdfFactory Pro trial version www.pdffactory.com
"8 "8
"8
"8
"8
"8
"8
"8
"8
"8
"8"8
"8
"8
"8
"8
"8
"8
"8
จ.เลย
จ.ยโสธร
จ.นครพนมจ.สกลนคร
จ.หนองคาย
จ.ขอนแก น
จ.ช ัยภ ูม ิ
จ.อ ุดรธาน ี
จ.ศร ีษะเกษจ.ส ุร ินทร
จ.ร อยเอ ็ด
จ.กาฬส ินธ จ.ม ุกดาหาร
จ.มหาสารคาม
จ.บ ุร ีร ัมย จ.นครราชส ีมา
จ.อำนาจเจร ิญ
จ.หนองบ ัวลำภ ู
จ.อ ุบลราชธาน ี
1050
1250
1150 1350
1450
1550
9501650
1750
1850
19502050
2150
1100
2250
2450
1000
900
850
2550
1600
2650
1200
14001500 1300
1700
N
EW
Sปร ิมาณฝน(มม.)
800 - 11001101 - 14001401 - 17001701 - 21502151 - 2850
"8 จ ังหว ัด
Highly Spatial Different Rainfall Distribution in Northeast Thailand
Province
Annual Rainfall (mm)
Upstream part of Chi
Mun –ear800 mm/
PDF created with pdfFactory Pro trial version www.pdffactory.com
- p!!ci':' 1: i L. # I a
F,
7(J crr
LI
:': I เสนระดับฝนทิ้งชวงเฉลี่ย เดือน ก.ค.
Upstream of Chi and MunRiver has long period dryspell affecting ot paddy yield
Long Period Dry Spells
PDF created with pdfFactory Pro trial version www.pdffactory.com
Flat and High Elevated Topography – Table Mountain
Causing regulary and annually flood and drought problems
PDF created with pdfFactory Pro trial version www.pdffactory.com
_'\
/
ra
นครราชสีมา
ชัยภูมิ
บุรีรัมยสุรินทร ศรีสะเกษ
อุบลราชธานีอํานาจเจริญ
ยโสธรรอยเอ
็ดกาฬสินธุ
มหาสา
รคาม
ขอนแกน
หนองบัวลําภูเลย อุดร
520 (246)
750 (580) 2,036
(650)
585 (390) 820
(500)2,818
(2,014)6,242 (2,400)
7,000 (2,490)
(river discharge capacity) และ Peak flood of 1998 (cms)
9,000 (2,560)
1,480 (700)
Annual Flood Disaster
PDF created with pdfFactory Pro trial version www.pdffactory.com
4ilnil I Jjrni IIw nr
S SS S a 0.d V *ft)iV
1T7L i'fl 1.h4flI V S V
IiV
Annual Drought Disaster
High risk
Moderate risk
Low risk
No risk
PDF created with pdfFactory Pro trial version www.pdffactory.com
The Poverty
•Problems and Constraints•Poverty of the Poors
PDF created with pdfFactory Pro trial version www.pdffactory.com
Poverty of the PoorsSocio- Economic Problems
• Population of Northeast region 37% of the whole population of Thailand
• Agricultural area in Northeast region is about 44% of whole agricultural area of Thailand
• Average Income (Baht/household/year)National 247,352 Northeast farmers 128,464 (51.93 %)
Avg household size 4.5 persons/household Avg income 2,379 Baht/person/month
PDF created with pdfFactory Pro trial version www.pdffactory.com
The Poverty Reduction
•Irrigation Development -Poverty reduction •Present Irrigation Development
•Intensive River Basin Development Plan
PDF created with pdfFactory Pro trial version www.pdffactory.com
Paddy Yield (kg/rai) Lam Pao Dam Ubolrattana Dam
• Irrigation Area 439 468 *• Rainfed Area (Maha Sarakham province) 286
• Ratio 1.54 1.64
Irrigation Development / Higher Yield
PDF created with pdfFactory Pro trial version www.pdffactory.com
Irrigation Development / Poverty Reduction
Farmers’ Income Lam Pao Dam Ubolrattna Dam
• Irrigation Area 191,341 166,687 • Rain-fed irrigation 102,233 79,291
• Ratio 1.87 2.10
PDF created with pdfFactory Pro trial version www.pdffactory.com
The Poverty Reduction
•Irrigation Development -Poverty reduction •Present Irrigation Development
•Intensive River Basin Development Plan
PDF created with pdfFactory Pro trial version www.pdffactory.com
ชี มูล รวม ชี มูล รวมขนาดใหญ อาง 315,098.00 478,860.00 793,958 197,000.00 187,060.00 384,060.00
ฝาย 55,600.00 - 55,600 - - - ระบบสงน้ํา 261,500.00 335,854.00 597,354 170,000.00 55,851.00 225,851.00 รวม 632,198.00 814,714.00 1,446,912.00 367,000.00 242,911.00 609,911.00
ขนาดกลาง อาง 410,639.00 656,980.00 1,067,619 60,080.60 141,720.80 201,801ฝาย 260,025.00 346,371.00 606,396 45,284.00 47,174.00 92,458ระบบสงน้ํา 6,900.00 5,000.00 11,900 6,900.00 - 6,900เขื่อนทดน้ํา 60,000.00 - 60,000 11,300.00 - 11,300ปตร./ฝาย 33,000.00 10,000.00 43,000.00 - - 0.00รวม 770,564.00 1,018,351.00 1,788,915.00 123,564.60 188,894.80 312,459.40
ขนาดเล็ก อางฝายระบบสงน้ําปตร./ทรบ.อาคารระบายน้ําทํานบขุดลอกปรับปรุงอางสระรวม 0.00 0.00
1,402,762.00 1,833,065.00 3,235,827.00 490,564.60 431,805.80 922,370.401,068,572.00 379,011.00 1,447,583.00 333,189.00 66,992.00 400,181.002,471,334.00 2,212,076.00 4,683,410.00 823,753.60 498,797.80 1,322,551.40
ฤดูแลง
รวมสูบน้ําดวยไฟฟา
ประเภทโครงการ ประเภทโครงการ
รวม
พ้ืนท่ีชลประทาน (ไร)ฤดูฝน
Irrigation Development in Chi Mun RiverIrrigationt Area (rai)
Wet Season Dry Season
Chi ChiMun MunTotal Total
Large Scale
Medium Scale
Small Scale
PDF created with pdfFactory Pro trial version www.pdffactory.com
ชี มูล รวมขนาดใหญ อาง
ฝายระบบสงน้ํารวม
ขนาดกลาง อางฝายระบบสงน้ําเข่ือนทดน้ําปตร./ฝายรวม
ขนาดเล็ก อาง 257,745.00 682,097.00 939,842.00 ฝาย 351,129.60 656,846.00 1,007,975.60 ระบบสงน้ํา 5,905.00 2,000.00 7,905.00 ปตร./ทรบ. 12,100.00 3,950.00 16,050.00 อาคารระบายน้ํา - 1,500.00 1,500.00 ทํานบ 2,977.00 7,004.00 9,981.00 ขุดลอก 1,500.00 - 1,500.00 ปรับปรุงอาง 1,000.00 - 1,000.00 สระ 10,800.00 300.00 11,100.00 รวม 643,156.60 1,353,697.00 1,996,853.60
643,156.60 1,353,697.00 1,996,853.60
643,156.60 1,353,697.00 1,996,853.60รวม
พื้นที่รับประโยชน (ไร)
สูบน้ําดวยไฟฟา
ประเภทโครงการ ประเภทโครงการ
รวม
Benefit Area of Small Scale Development of the Chi-Mun River Basin
Large Scale
Medium Scale
Small Scale
Pumping Station
Benefit Area (rai)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Present Irrigated Area of the Chi – Mun River Basin Khong- Chi- Mun 5.99 million rai
Chi- Mun 4.68 million rai (approx 11%)
Agricultural area Chi Mun 41.84 million rai
*
4.68
37.16
0
5
10
15
20
25
30
35
40
45
ลานไร
ชป.ปจจุบัน พ้ืนท่ีเกษตรนํ้าฝน
37.16
4.68
Rainfed area
Irrigated Area
PDF created with pdfFactory Pro trial version www.pdffactory.com
The Poverty Reduction
•Irrigation Development -Poverty reduction •Present Irrigation Development
•Intensive River Basin Development Plan
PDF created with pdfFactory Pro trial version www.pdffactory.com
Intensive River Basin Development Plan
Strategies
Mutual Flood andDrought Mitigation Planning
Area - Whole River Networks upstream to downstream
Develop Internal River Basin to achieve its Potential before Water diversion
Intensive Water Resource Development i.e; increasing irrigation efficiency,
water saving, small scale development
Minimize water use in dry season i.e; Shifting crop calendar, Dry season upland crop
PDF created with pdfFactory Pro trial version www.pdffactory.com
Structural Strategies for Flood Mitigation
1.Increasing drainage discharge
2.Develop flood protection system
3.Upstream Flood Delaying
Irrigation area
River
Irrigation area
Building upstream weir 33 project
Urban
Drainage system 9 project
Dredging 23 project .Improving weir
Pumping Station 8 projects Flood channel 10 projects
1.City drainage ditches 3 projects 2.Flood dike along river 41 projects 3.Improving road as flood dike 3 projects 4. Improving city drainage system 1 project
Urban
Communities along foothill
4.Removing water obstruction Road culvert 10 projects
Improving bridge 27 projects
5.Improving groundwater system 1. เGroundwater well 7 project2. Recharge to groundwater 1 project
1.Intercept drain 4 projects
PDF created with pdfFactory Pro trial version www.pdffactory.com
Non Structural Strategies for Flood mitigation Plan
1.Upstream re-forestration 129 projects2.Tele metering 2 projects 3.Land use control in flood retarding area 3 projects 4.Reservoir management 2 project 5. Living with Flood 18 Projects 6.Center for Flood Warning 10 projects7.Awareness in watershed conservation 8 projects8.City and River Basin Planning 1 project 9.Soil and Water Conservation Project 29 projects 10.Enforcing law
PDF created with pdfFactory Pro trial version www.pdffactory.com
Structural Strategies for Drought Mitigation Plan
•Increasing storage capacity
•Develop water distribution system
•Developing water networks
•Water Diversion from intra basins
PDF created with pdfFactory Pro trial version www.pdffactory.com
Non Structural Strategies for Drought Mitigation Plan
•Promoting upland crops
•Shifting cropping calendars
•Integrated farming
•Promoting water user group
•Increasing irrigation efficiency
•Increasing on farm efficiency
•Training for water saving techniques
PDF created with pdfFactory Pro trial version www.pdffactory.com
พื้นท่ีชลประทานและเกษตรน้ําฝน
Present
Irrigationชป. 4.68 ลานไรRainfedเกษตรน้ําฝน 37.16 ลานไร
Plan
ชป. 10.5 ลานไรเกษตรน้ําฝน 31.34 ลานไร
4.68
37.16
0
5
10
15
20
25
30
35
40
45
ลานไร
ชป.ปจจุบัน พ้ืนท่ีเกษตรนํ้าฝน
4.68
5.82
31.34
0
5
10
15
20
25
30
35
40
45
ลานไรชป.ปจจุบัน ชป.ในแผนชี-มูล พ้ืนท่ีเกษตรนํ้าฝน
Agriculture area 41.84 ลานไร
PDF created with pdfFactory Pro trial version www.pdffactory.com
Intra River Basin Development Plan
Million rai5.82Grand total Million rai2.95Total Million rai0.07River networking / diversionMillion rai2.68Increasing irrigation efficiency Million rai0.20Developing irrigation in benefit area
Intensive Strategies
Million rai2.87Total Million rai1.95Developing (LS, MS,SS) Million rai0.92Improving
Normal Strategies
PDF created with pdfFactory Pro trial version www.pdffactory.com
Intra River Basin Development of Chi-Mun Basin
74.9%31.34 million rai
Rainfed area 41.84 million raiAgricultural Area
25.09%10.50 million raiTotal
11.19%4.68 million raiPresent irrigation area
13.91%5.82 million raiPlanned Irrigation area
PDF created with pdfFactory Pro trial version www.pdffactory.com
Opportunities / Risks in Water Diversion and
Lesson Learned
•Opportunities and Risks•Lessons Learned
PDF created with pdfFactory Pro trial version www.pdffactory.com
§ 'Efl 12;i-.-----I
Fout.u1luanl.I
IouIe1I1aIafl- I
iuiin- ifl
I )R1Ii*S1ii1fl
J--- 4OiO
I8i5O
251 * 350
o1 -
71-l0)
- FjoI_11r
ระดับน้ําโขง196-211
182
108
160
Potential Water DiversionPotential Water Diversion
20
Gravity Gravity /Pumping
Gravity /Pumping
PDF created with pdfFactory Pro trial version www.pdffactory.com
+190.00
+195.00
+200.00
+205.00
+210.00
+215.00
+220.00
+225.00
+230.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
ระยะทางจากปากน้ําเลย (ก.ม.)
ระดับ
(ม.รท
ก.)
ตล่ิงซาย(TBL)
ทองนํ้า (B)
ตล่ิงขวา (TBR)
สูงสุดเฉล่ีย
ตํ่าสุดเฉล่ีย
เฉล่ียทั้งป
รูปตัดตามยาวปากน้ําเลยและระดับน้ําโขง
191.70191.70
PDF created with pdfFactory Pro trial version www.pdffactory.com
8595
105115125135145155165175185195205215
0 100 200 300 400 500 600 700 800
DATUMMAXMINAVGAVG APR
อ.เชียงคาน
อ.เชียงคาน
อ.เมือง ห
นองคาย
อ.เมือง ห
นองคาย
อ.เมืองนครพน
มอ.เมืองนครพน
ม
อ.เมืองมุกดาหาร
อ.เมืองมุกดาหาร
อ.เขมราฐ
อ.เขมราฐ
อ.โขงเจียม
อ.โขงเจียม
ระดับน้ําสูงสุด (ม.รทก.)เฉลี่ย สูงสุด ตํ่าสุด
208.10 211.24 203.78204.03 206.77 199.76
ระดับน้ําตํ่าสุด (ม.รทก.)ระดับน้ําเฉลีย (ม.
รทก.)เฉลี่ย สูงสุด ตํ่าสุด ท้ังป เมษายน
196.63 197.38 195.90 200.65 196.99191.32 192.95 189.22 196.90 192.45
ระดับน้ําโขงสูงสุด
Long Profile of Mekong River
PDF created with pdfFactory Pro trial version www.pdffactory.com
Daily Mekong Water Level at Daily Mekong Water Level at ChiengChieng Khan, Khan, LoeiLoei
1966- 1994 – 38 years 1966- 1994 – 38 years
แมน้ําโขง ที่ อ.เชียงคาน จ.เลย ( 020105 )
190
192
194
196
198
200
202
204
206
208
210
212
2141/
1/09
1/1/
101/
1/11
1/1/
121/
1/13
1/1/
141/
1/15
1/1/
161/
1/17
1/1/
181/
1/19
1/1/
201/
1/21
1/1/
221/
1/23
1/1/
241/
1/25
1/1/
261/
1/27
1/1/
281/
1/29
1/1/
301/
1/31
1/1/
321/
1/33
1/1/
341/
1/35
1/1/
361/
1/37
1/1/
381/
1/39
1/1/
401/
1/41
1/1/
421/
1/43
1/1/
441/
1/45
1/1/
461/
1/47
1/1/
48
เวลา (วันที่/เดือน/พ.ศ.)
ระดับน้ํา
( ม.รทก
.)
197197ระดับทองนํ้าปากนํ้าเลย ประมาณ +197.00 ม.รทก.
PDF created with pdfFactory Pro trial version www.pdffactory.com
การเปรียบเทียบปริมาณน้ําทาในแมน้ําโขงและชี-มูล ป 45-46
0
5000
10000
15000
20000
25000
30000
35000
1 เม
.ย. 4
511
เม.ย
. 45
21 เม
.ย. 4
51 พ
.ค. 4
511
พ.ค
. 45
21 พ
.ค. 4
531
พ.ค
. 45
10 มิ.ย
. 45
20 มิ.ย
. 45
30 มิ.ย
. 45
10 ก
.ค. 4
520
ก.ค
. 45
30 ก
.ค. 4
59 ส.ค
. 45
19 ส
.ค. 4
529
ส.ค
. 45
8 ก
.ย. 4
518
ก.ย
. 45
28 ก
.ย. 4
58 ต
.ค. 4
518
ต.ค
. 45
28 ต
.ค. 4
57 พ
.ย. 4
517
พ.ย
. 45
27 พ
.ย. 4
57 ธ.ค
. 45
17 ธ
.ค. 4
527
ธ.ค
. 45
6 ม.ค
. 46
16 ม
.ค. 4
626
ม.ค
. 46
5 ก
.พ. 4
615
ก.พ
. 46
25 ก
.พ. 4
67 มี.ค
. 46
17 มี.ค
. 46
27 มี.ค
. 46
ชวงเวลา(วัน-เดือน-ป)
ปริม
าณน้ํา
ทา(ลบ
.ม/ว
ินาที
) อ.เชียงคาน จ.เลย(020105) 292,000 ตร.กม.
อ.โขงเจียม จ.อุบลฯ(020139) 419,000 ตร.กม.
M. 7(สะพานเสรีประชาธิปไตย) 106,673 ตร.กม.
M.5(อ.ราษีไศล จ.ศรีสะเกษ) 44,275 ตร.กม.
E.20A(อ.มหาชนะชัย จ.ยโสธร) 47,818 ตร.กม.
12 ก.ย. (E20A)
1 ต.ค. (M.7)
20 ส.ค. (เชียงคาน)
24 ส.ค.(โขงเจียม)
24 ก.ค.
10 ก.ย.25 ก.ย.
ปริมาณน้ําโขงจะสูงสุดในเดือนสิงหาคม ซึ่งในชวงกรกฎาคม-
สิงหาคมจะเปนชวงฝนทิ้งชวงในภาค
ตะวันออกเฉียงเหนือ หากผันเขาไดก็จะชวยแกไขปญหาฝนทิ้งชวง
Time lag of peaks in Mekong river and Mun River PDF created with pdfFactory Pro trial version www.pdffactory.com
Mekong Water uses in Lower Mekong Region
PDF created with pdfFactory Pro trial version www.pdffactory.com
PDF created with pdfFactory Pro trial version www.pdffactory.com
A
LEG ND
MYANMAR
r.I55..II. huurj-- SI..... 'Ir
Up I..i.0 SI4
La.t r'i ..th ?C)
(9) 4I hi thr ..u.Id
..4 Flew LSt*
iJ
The Mekong River Basin
Characteristics.
THAILAND
G4Jt., Q TPA&Nc1
CHINA
C
VIET NAM
CAM8OD
II TU
.4
1
GULF OF
wSI GflY
i
Upper Mekong (18%)China-16%Myanmar-2%
Lower Mekong (82%)Cambodia - 18%
Lao PDR 35%Thailand-18%VietNam-11%
Area: 7J 000 (21)
Lonrth of mnstre.m. 4.900km ff2)
A verg. 15.000m'/s (8)
Runoff
พื้นที่ลุมน้ําโขง ประมาณ 795,000 ตร.กมปริมาณน้ําทาเฉลี่ย 475,000 ลานลบ.ม.
PDF created with pdfFactory Pro trial version www.pdffactory.com
Land Cover Lao PDR Cambodia Thailand Viet Nam Viet Nam
(%) Delta Highlands
Forest 41.22 56.18 15.74 109 47.46
Woodland
grass1and 42.07 15 3.47 0.34 22.65
Agriculture 14.01 23.41 79.28 83.99 29.46
(% Irrigation) (8) (10) (8) (87) (36)
Wetland/water 0.96 5.15 1.4 10.34 0.27
Other 1.74 0.26 0.12 4.24 0.16
. 100 100 100 100 100
Mekong Water Uses for Irrigation
PDF created with pdfFactory Pro trial version www.pdffactory.com
!nrnfflthfimI
ffl1JTITh
2,532
1Uiil(1000 W) 1,401
uiiJi' (1000 Uj)950
QJ
U1t1H13(1000 !') 0V t V
dê4 omirniiuirniic+ (nJwn1.iclJ.)
uiil(1000 1) 3,943
rnili'i (1000 "L) 544V I
U111TI3(1000 !'$) 0
1Li (1000 W) 4,488
FMI1(1000 nfl.) 2,094
N(flfl.Oli) 467
iiI1U (Th)
8,764 1,012
4,800
451
0
30,000
862
0
30,081
9,507
315
1
85
1,555 "10,519
1,134 8,860
0 2,197
L11,538 9,063
1,456 12,088
0 3,769
12,994 r 24,9194,041 116281310 653
Agriculture and IrrigaionLaos Thailand (NE) Laos VN (Delta)Irrigation
No. of projects
1st : Wet season paddy (1000 rai) 2nd crop : Dry season paddy (1000 rai)
3ed crop (1000 rai)
PDF created with pdfFactory Pro trial version www.pdffactory.com
AGREEMENTON
THE COOPERATIONFOR THE
SUSTAINABLEDEVELOPMENT OF
THE MEKONGRIVERBASIN
S APRIL 1995
PDF created with pdfFactory Pro trial version www.pdffactory.com
มาตรา 5 การใชน้ําอยางสมเหตุสมผลและเปนธรรม
การแจง ขอตกลงnotifiction Agreement
1. ลํานํ้าสาขาและทะเลสาบในกัมพูชา /2. แมน้ําโขงสายประธาน 2.1 ฤดูน้ํามาก 2.1.1 ใชในลุมนํ้าแมโขง / 2.1.2 ผันน้ําขามลุมน้ํา 2.1 ฤดูแลง 2.2.1 ใชในลุมนํ้าแมโขง 2.2.2 ผันน้ําขามลุมน้ํา /
/
การใชน้ํา
/
การปรึกษาหารือลวงหนาPrior Consultation
Article 5
Tributary and Tonele SapMekong
Wet Season
Dry Season
Within Mekong Basin Other Basin
Other Basin Within Mekong Basin
PDF created with pdfFactory Pro trial version www.pdffactory.com
Upstream Mekong – Dam Construction in China
PDF created with pdfFactory Pro trial version www.pdffactory.com
400)
$0)
C
Ui
Mekong River Profile from Headwaters to Mouth
45Upper Me Or Baslni
67 LowirMe
Ditnce frcm Heiweder5 ($m)Ii I i I 4 1 1 I I I I
0 500 0OO 15CC 2000 2500 )00 35CC
tH irt - _I.AO Pq±
1 - Gcinjui:iqi a' 17511 MV')2 - X1ac',ai [42OO \1'V'3 - Manwari (1 ,5 i:o MV'f4 - Dschao:har ( 350 MW)5 - (Ei .511)11 Mi'Vu
- Jinghiin (1 5C10 FIV')7 - Grni'a (-1 O MW)
- Mon sono (600 Iv1/')
Hydropower Dams in Upstream Mekong - China
PDF created with pdfFactory Pro trial version www.pdffactory.com
1
11 4Lfln1 flO1t1Th14
V
iThiinii It IS 0
It U-£I4ii? iuth'hiiF i.Imm ii¶0 fl13Nfll )flflllUJIJ 1
tfllJfU)I
(MW) (fl3J2)(GWh/ye&) (114 3?) (3/U1c) (.F'1.)
Gongguoqiao 750 4,670 510 97,300 985
Xiaowan 4,200 18,540 15,130 113,300 1,220 2010-12
1,500 7,870 920 114,500 1,230 1993
1,350 7,090 880 121,000 1,230 2001
Nuozliactu 5,500 22,670 24,670 144,700 1,750 2013-16
ingbong 1,500 8,470 1,040 149,100 1,840 201243
Ganlanba 150 1,010 151,800 1,880
Mengsong 600 3,740 160,000 2,020
Hydropower Dams in Upstream Mekong - China
Storage Capacity
(mcm)
Drainage Area (km2)
Power (Gwh/
year)
PDF created with pdfFactory Pro trial version www.pdffactory.com
fl1fl1J1l1)1VI1Baseline (Seenano B)nItivihAssured Dam (Scenario A) Manwan, Dachaosan Xiaowan
Foreseeable Dam (Scenario F) A Nuozhadu
Simulation of BDP Phase 1
PDF created with pdfFactory Pro trial version www.pdffactory.com
Simulation BDP Phase 1 –
Change of Water Level Downstram
การเปลี่ยนแปลงปริมาณนํ้าโขงท่ี อ.เชียงแสน จากการกอสรางเข่ือนในจีน
0
1,000
2,000
3,000
4,000
5,000
6,000
ธ.ค. ม.ค. ก.พ. มี.ค. เม.ย. พ.ค. มิ.ย. ก.ค. ส.ค. ก.ย. ต.ค. พ.ย.
cumec
Baseline(ไมมีเข่ือนในจีน)ScenarioA(มีเข่ือนManwan,Dachaosan,Xiaowan)ScenarioF(มีเข่ือนManwan,Dachaosan,Xiaowan,Nuozhadu)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Opportunities / Risks and Lesson
Learned•Opportunities and Risks
•Lessons Learned
PDF created with pdfFactory Pro trial version www.pdffactory.com
The Khong Chi Mun Development Project
PDF created with pdfFactory Pro trial version www.pdffactory.com
Development Plan of the Khong Chi Mun Project
Pumping from
Main Mekong River
At Udon hani and Loeitprovince
3 Phases Development Plans
PDF created with pdfFactory Pro trial version www.pdffactory.com
แม่น้ำชี
Present Development of Present Development of KhongKhong Chi Chi MunMun ProjectProject
On going irrigation development
ฝายเซบาย
With irrigation system
Current development –partial Phase I development
(internal water utilization)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Lessons Learned and Ways Moving Towards• Diversion after intra basin • Energy saving• Gravity• Integrated planning upstream/downstream• Incremental Steps of Development • Land and Water resource Planning• Shifting crop calendar to water availability• Water Saving strategies
• improving irrigation efficiencies• More upland crop
• People Participation • Transboundary water – MRC BDP 1 & II• Diversion through tributaries
PDF created with pdfFactory Pro trial version www.pdffactory.com
Gravity Diversion At Tributary level - Huai Luang
PDF created with pdfFactory Pro trial version www.pdffactory.com
Gravity Diversion At Tributary level - Huai Luang River
PDF created with pdfFactory Pro trial version www.pdffactory.com
:*O
U
Mekong water level 196-211 m.MSL
182
164
108
197
Gravity Diversion Gravity Diversion -- Tributary Level Tributary Level -- LoeiLoei River River
PDF created with pdfFactory Pro trial version www.pdffactory.com
itThe End
Thank you for your Attention
PDF created with pdfFactory Pro trial version www.pdffactory.com