CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
INTERSTATE PROJECTSI-4739 113065 72928
UNDER CONSTRUCTION - DESIGN BUILD PROJECT - COORDINATE WITH I-5111
ACCESS IMPROVEMENTS IN THE VICINITY OF EXISTING I-40/NC 42 INTERCHANGE (EXIT 312).
2SW H090031
NHP C 40137
JOHNSTONI-40
I-5506 25333 25333
UNDER CONSTRUCTION
SR 1002 (AVIATION PARKWAY) INTERCHANGE. IMPROVE INTERCHANGE AND CONSTRUCT AUXILIARY LANE ON I-40 WESTBOUND FROM SR 1002 TO SR 3015 (AIRPORT BOULEVARD).
0.42SW H128080WAKE
I-40
I-5111 455219 323026
UNDER CONSTRUCTION - DESIGN-BUILD PROJECT
I-440 / US 64 (EXIT 301) TO NC 42 (EXIT 312). ADD 2 GENERAL-PURPOSE LANES IN EACH DIRECTION.
10.7H090044
NHP C 23795 RE NHP C 108398 SW
JOHNSTONWAKE
I-40
REG WAKE COUNTY LINE TO NC 42.REG H090044-SW I-440 / US 64 (EXIT 301) TO JOHNSTON COUNTY LINE.SW H090044-
I-5700 53991 26914
RIGHT-OF-WAY IN PROGRESS; GARVEE BOND FUNDING: $10 MILLION FOR CONSTRUCTION - PAYBACK 2020-2034
SR 3015 (AIRPORT BOULEVARD). REVISE INTERCHANGE; CONSTRUCT AUXILIARY LANES ON I-40 EASTBOUND FROM I-540 TO SR 3015 (AIRPORT BOULEVARD) AND FROM SR 3015 TO SR 1002 (AVIATION PARKWAY), AND CONSTRUCT AUXILIARY LANE ON I-40 WESTBOUND FROM SR 3015 (AIRPORT BOULEVARD) TO I-540.
0.82
SW
H128081NHP 1716CG 858CG858CG858CG CG 858 CG 858 CG 858 CG 858 CG 858 CG 858 CG 858 CG 858 CG 858S(M) 1667C NHP 13398C
WAKE
I-40
I-5112 9310 8673
PROJECT COMPLETE - GARVEE BOND FUNDING $5.8 MILLION; CONSTRUCTION - PAYBACK FY 2009-2020
EAST OF I-540 TO WADE AVENUE (EXIT 289) INCLUDING RAMPS, AND SR 1728 (WADE AVENUE) FROM I-40 TO SR 3009 (EDWARDS MILL ROAD). MILL AND RESURFACE ROADWAY, SHOULDERS AND RAMPS.
7.5
TRN
NHP CG 592 BGANY CG 45
WAKE
I-40;SR 1728(WADE AVENUE)
I-5966 24000 500SR 1002 (AVIATION PARKWAY) TO SR 1652 (HARRISON AVENUE) IN CARY. CONSTRUCT AUXILIARY LANES IN BOTH DIRECTIONS.
2.3
SW
H150802NHP R 600 NHP U 100 NHP C 7600 C 7600 C 7600
WAKE
I-40
I-4744 73998 69363
PROJECT COMPLETE - GARVEE BOND FUNDING $42.2 MILLION; PAYBACK FY 2009 - FY 2020
SR 1728 (WADE AVENUE) TO I-440 / US 1 / US 64. WIDEN TO SIX LANES.
4TRN
NHP CG 4635
WAKEI-40
I-5703 158920 750
DESIGN-BUILD PROJECT - TO BE LET WITH I-5701
I-440 / US 1 / US 64 INTERCHANGE IN RALEIGH. RECONSTRUCT INTERCHANGE.
4
SW
H140771NHP R 27170 NHP U 1000 NHP C 6500 C 30875 C 30875 C 30875 C 30875
WAKE
I-40
I-5338 154031 154031
UNDER CONSTRUCTION - DESIGN-BUILD PROJECT; LET WITH I-5311
WEST OF SR 1319 (JONES-FRANKLIN ROAD) TO EAST OF I-440 / US 64 (EXIT 301). PAVEMENT REHABILITATION, INCLUDING WIDENING FOR MAINTENANCE OF TRAFFIC (NO ADDITIONAL TRAVEL LANES), AND ITS DEPLOYMENT ON ALTERNATE ROUTES FOR TRAFFIC MANAGEMENT.
9TRN WAKE
I-40 / US 64
A ITS DEPLOYMENT - COMPLETETRNPRE STIB WEST OF SR 1319 (JONES-FRANKLIN ROAD) TO EAST SR 1371 (LAKE WHEELER ROAD). CONVERT SHOULDER TO AUXILIARY LANE (COORDINATE WITH I-5338).TRNPRE STIC TRAFFIC MITIGATION MEASURES, TO INCLUDE NEW AND EXPANDED TRANSIT ROUTES, VANPOOLS, AND BICYCLE / PEDESTRIAN ELEMENTS. - IN PROGRESSTRNPRE STI
I-5873 4800 4800
UNDER CONSTRUCTION
NC 54 IN RALEIGH. INTERCHANGE IMPROVEMENTS.REG H128079WAKE
I-40
I-5996 6180SR 1002 (AVIATION PARKWAY) IN CARY TO SR 1728 (WADE AVENUE) IN RALEIGH. PAVEMENT REHABILITATION.
4.2SW
NHPIM C 6180
WAKEI-40
Page 1 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
INTERSTATE PROJECTSI-5995 5282 10EAST OF NC 147 TO SR 3015 (AIRPORT
BOULEVARD). PAVEMENT REHABILITATION.4
SW
NHPIM C 5272
DURHAMWAKE
I-40
I-6006 54560 10NC 54 (EXIT 273) TO SR 1728 (WADE AVENUE). CONVERT FACILITY TO A MANAGED FREEWAY WITH RAMP METERING AND OTHER ATM / ITS COMPONENTS.
15.8
SW
H172171NHP R 10 NHP U 10 NHP C 13633 C 13632 C 13633 C 13632
DURHAMWAKE
I-40
I-5943 5881 10SR 1728 (WADE AVENUE) TO I-440 / US 1 IN RALEIGH. PAVEMENT AND BRIDGE REHABILITATION.
3.8SW
NHPIM C 5871
WAKEI-40
I-5701 27250 750
DESIGN-BUILD PROJECT - TO BE LET WITH I-5703
I-440 / US 1 / US 64 TO SR 1370 (LAKE WHEELER ROAD) IN RALEIGH. ADD LANES.
4.4
SW
H090045NHP R 500 NHP U 500 NHP C 1275 C 8075 C 8075 C 8075
WAKE
I-40 / US 64
I-5942 9188 1
TO BE LET WITH I-5941
NORTH OF SR 1827 (MIDLAND TERRACE) IN DURHAM COUNTY TO NORTH OF NC 56 IN GRANVILLE COUNTY. PAVEMENT REHABILITATION.
6SW
NHPIM C 9187
DURHAMGRANVILLE
I-85 / US 15
I-6001 14000I-540 IN KNIGHTDALE TO NASH COUNTY LINE. PAVEMENT REHABILITATION.
19.5
SW
NHPIM C 7000 C 7000
FRANKLINWAKE
I-87 / FUTURE I-87 /US 64 / US 264
I-6005 59267 167US 64 BUSINESS (WENDELL BOULEVARD) TO US 264. WIDEN TO 6 LANES.
6.8
SW
H171573NHP R 4900 NHP U 500 NHP 13425C C 13425 C 13425 C 13425
WAKE
I-87 / US 64 / US 264
I-6007 7410 10SR 2233 (SMITHFIELD ROAD). CONVERT INTERCHANGE TO DIVERGING DIAMOND.
SW
H171559NHP R 1700 NHP U 500 NHP C 5200
WAKE
I-87 / US 64 / US 264
I-5944 8146 1I-440 IN RALEIGH TO I-540 IN KNIGHTDALE. PAVEMENT REHABILITATION.
4.1SW
NHPIM C 8145
WAKEI-87 / US 64 / US 264
I-5997 11132 10SR 1728 (WADE AVENUE) TO SR 2000 (WAKE FOREST ROAD) IN RALEIGH. PAVEMENT REHABILITATION.
5.7SW
NHPIM C 5561 C 5561
WAKEI-440 / US 1
I-5311 58268 58268
UNDER CONSTRUCTION - DESIGN-BUILD PROJECT; LET WITH I-5338
I-40 (EXIT 301) TO NORTH OF I-495 / US 64 / US 264 (KNIGHTDALE BYPASS). PAVEMENT REHABILITATION AND ITS DEPLOYMENT ON ALTERNATE ROUTES FOR TRAFFIC MANAGEMENT.
3.1TRN WAKE
I-440 / US 64
Page 2 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
INTERSTATE PROJECTSI-5870 225700 3000
DESIGN-BUILD PROJECT
US 70 (GLENWOOD AVENUE) IN RALEIGH. CONSTRUCT INTERCHANGE IMPROVEMENTS, REVISE US 70 INTERSECTION WITH SR 1670 (BLUE RIDGE ROAD) / SR 1820 (LEAD MINE ROAD), AND REPLACE BRIDGE 910494 ON SR 1670.
1.5
SW
H140788T R 1000 R 38000 R 38000 R 38000T U 300 U 300 U 300 U 300T 106500C
WAKE
I-440 / US 1
I-5970 131493 200US 401 (CAPITAL BOULEVARD) IN RALEIGH. INTERCHANGE IMPROVEMENTS.
4
SW
H150817NHP R 8115 R 24345 R 24345 R 24345NHP U 1443 NHP 48700C
WAKE
I-440 / US 1
I-5708 34426 7850
RIGHT-OF-WAY IN PROGRESS; GARVEE BONDS: $10 MILLION FOR RIGHT-OF-WAY - PAYBACK 2020 - 2033
SR 2000 (WAKE FOREST ROAD) IN RALEIGH. INTERCHANGE IMPROVEMENTS.
SW
H140761NHP 1716RGRG 858 858RG858RG858RG RG 858 RG 858 RG 858 RG 858 RG 858 RG 858 RG 858 RG 858 RG 858NHP R 4806 NHP C 8900
WAKE
I-440 / US 1
I-5998 3800
COORDINATE WITH I-5999 AND I-6000
I-40 IN DURHAM TO US 70 IN RALEIGH. PAVEMENT REHABILITATION.SW
NHPIM C 3800
DURHAMWAKE
I-540
I-5945 13601 1TRIANGLE TOWNE CENTER BOULEVARD IN RALEIGH TO I-495 / US 64 / US 264 IN KNIGHTDALE. PAVEMENT REHABILITATION.
9SW
NHPIM C 6800 C 6800
WAKEI-540
I-6000 4551 10
COORDINATE WITH I-5998 AND I-5999
I-40 IN DURHAM TO US 1 IN RALEIGH. BRIDGE PRESERVATION / REHABILITATION.
16.3SW
NHPIM C 4541
DURHAMWAKE
I-540
I-5999 10400
COORDINATE WITH I-5998 AND I-6000
US 70 (GLENWOOD AVENUE) TO US 1 IN RALEIGH. PAVEMENT REHABILITATION.
12SW
NHPIM C 3467 C 3467 C 3466
WAKEI-540
I-5968 7091 1140US 70 TO SR 1829 (LEESVILLE ROAD) IN RALEIGH. CONSTRUCT EASTBOUND AUXILIARY LANE.
2.5
SW
H140672NHP R 51 NHP U 100 NHP C 2900 C 2900
WAKE
I-540
RURAL PROJECTSR-5887 67010 10NC 751. CONVERT AT-GRADE INTERSECTION
TO INTERCHANGE.
REG
H150762NHP R 2500 R 2500 NHP U 1000 U 1000 NHP 30000C C 15000 C 15000
CHATHAMWAKE
US 64
Page 3 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
RURAL PROJECTSR-2814 222191 132392
GARVEE BOND FUNDING: PART B $15.8 MILLION FOR RIGHT-OF-WAY - PAYBACK FY 2009 - FY 2020 AND $21.5 MILLION FOR CONSTRUCTION - PAYBACK FY 2011 - FY 2022; PART C $33 MILLION FOR CONSTRUCTION - PAYBACK FY 2018 - FY 2032
NORTH OF SR 2044 (LIGON MILL ROAD) TO NC 39 IN LOUISBURG. WIDEN TO FOUR-LANE MEDIAN DIVIDED FACILITY, SOME NEW LOCATION.
18.5 BGANY RG 1727 B BGANY CG 2361 B 2361CG B2361CG B BGLT5 CG 2831 C 2831CG C2831CG C2831CG C CG 2831 C CG 2831 C CG 2831 C CG 2831 C CG 2831 C CG 2831 C CG 2831 C CG 2831 C CG 2831 CBGLT5 R 729 D R 2187 D BGLT5 U 318 D U 952 D BGLT5 20000C D C 10000 D C 10000 D
FRANKLINWAKE
US 401
A SR 2044 (LIGON MILL ROAD) TO NORTH OF SR 2225 (LOUISBURY ROAD) - COMPLETEB ROLESVILLE BYPASS, NORTH OF SR 2225 (LOUISBURY ROAD) TO NC 96 ON NEW LOCATION - COMPLETETRNPRE STIC NC 96 TO SR 1103 (FLAT ROCK CHURCH ROAD / CLIFTON POND ROAD) - UNDER CONSTRUCTIONDIV H090195-P3.0 COMMITTEDD SR 1103 (FLAT ROCK CHURCH ROAD / CLIFTON POND ROAD) TO SR 1700 (FOX PARK ROAD) SOUTH OF LOUISBURGDIV H090195-P4.0 COMMITTEDE SR 1700 (FOX PARK ROAD) SOUTH OF LOUISBURG TO NC 39 IN LOUISBURG - COMPLETE
R-3825 116010 45594US 70 TO SR 1003 (BUFFALOE ROAD). WIDEN TO MULTI-LANES.
6.1 T 1393CB BCB 2786 B 1393CB B1393CB B1393CB B CB 1393 B CB 1393 B CB 1393 B CB 1393 B CB 1393 B CB 1393 B CB 1393 B CB 1393 B CB 1393 BT 6975CB B 2325CB B2325CB B2325CB B CB 2325 B CB 2325 B CB 2325 B CB 2325 B CB 2325 B CB 2325 B CB 2325 B CB 2325 B CB 2325 BT C 7323 B 7323C B
JOHNSTON
NC 42
A US 70 AT CLAYTON TO EAST OF SR 1902 (GLEN LAUREL ROAD). - COMPLETEB EAST OF SR 1902 (GLEN LAUREL ROAD) TO SR 1003 (BUFFALOE ROAD). - UNDER CONSTRUCTION. BUILD NC BOND FUNDING: $16,239,286.10 FOR CON PAYBACK 2019 - 2033 (FY 2019 / YR 1 SALE);
$27,100,000 FOR CON PAYBACK 2021 - 2035 (FY 2021 / YR 2&3 SALE).DIV H090262-P3.0 COMMITTED
R-3410 78559 2500NC 50 TO US 70 BUSINESS. WIDEN TO MULTI-LANES.
8.6
REG
H090227BGANY R 7348 R 7348 BGANY U 1763 BGANY C 12000 C 23800 C 23800
JOHNSTON
NC 42
R-5705 130996 3663JUST SOUTH OF SR 1532 (OAK GROVE CHURCH ROAD) TO NC 42 IN FUQUAY-VARINA. WIDEN TO MULTI-LANES. PART ON NEW LOCATION.
10 T 5918R A5917R A T 840U A T 8580CB A 1716CB A CB 1716 A CB 1716 A CB 1716 A CB 1716 A CB 1716 A CB 1716 A CB 1716 A CB 1716 A CB 1716 AT 5700C A C 5700 A T 5086R B5086R B T 490U B T 9850C B C 9850 B C 9850 B C 9850 B T 1386U C T 8170R C T 17900C C
HARNETTWAKE
NC 55
A JUST SOUTH OF SR 1532 (OAK GROVE CHURCH ROAD) TO NC 210. PART ON NEW LOCATION. - BUILD NC BOND FUNDING: $20M FOR CON PAYBACK 2023 – 2037 (FY 2023 / YR 5 SALE)DIV H090123-P3.0 COMMITTEDB NC 210 TO SR 4809 (JICARILLA LANE). PART ON NEW LOCATION.REG H090123-P3.0 COMMITTEDC SR 4809 (JICARILLA LANE) TO NC 42 IN FUQUAY-VARINA.H090123-
R-5707 5869
UNDER CONSTRUCTION; BUILD NC BONDS: $2.681 MILLION FOR CONSTRUCTION - PAYBACK 2019-2033, $768,000 FOR PRELIMINARY ENGINEERING AND $840,000 FOR CONSTRUCTION - PAYBACK 2021-2035
US 15 AND NC 50 IN CREEDMOOR. REALIGN INTERSECTIONS.
REG
H090902T 197PE 66PE66PE66PE PE 66 PE 66 PE 66 PE 66 PE 66 PE 66 PE 66 PE 66 PE 66T 448CBCB 460 302CB302CB302CB CB 302 CB 302 CB 302 CB 302 CB 302 CB 302 CB 302 CB 302 CB 302T C 174 174C
GRANVILLE
NC 56
R-2721 623995 387067
COORDINATE WITH U-5746; NORTH CAROLINA TURNPIKE AUTHORITY DESIGN-BUILD PROJECT; GARVEE BOND FUNDING FOR CONSTRUCTION: PART A $72 MILLION AND PART B $72 MILLION - PAYBACK FY 2019-2033
SOUTHERN WAKE FREEWAY / TRIANGLE EXPRESSWAY SOUTHEAST EXTENSION (RALEIGH OUTER LOOP), NC 55 (SOUTH) TO EAST OF US 401 SOUTH. FREEWAY ON NEW LOCATION.
7.8
SW
H129615NHP 6178CG ACG 6178 A 6178CG A6178CG A6178CG A CG 6178 A CG 6178 A CG 6178 A CG 6178 A CG 6178 A CG 6178 A CG 6178 A CG 6178 A CG 6178 AS(M) C 6000 A 6000C A6000C A NHP C 5063 A 5062C A5062C A NHP 6178CG BCG 6178 B 6178CG B6178CG B6178CG B CG 6178 B CG 6178 B CG 6178 B CG 6178 B CG 6178 B CG 6178 B CG 6178 B CG 6178 B CG 6178 BS(M) C 6000 B 6000C B6000C B NHP C 4253 B 4252C B4252C B
WAKE
NEW ROUTE(FUTURE NC 540)
A NC 55 BYPASS TO EAST OF SR 1152 (HOLLY SPRINGS ROAD). CONSTRUCT FREEWAY ON NEW LOCATION. - UNDER CONSTRUCTIONSWB EAST OF SR 1152 (HOLLY SPRINGS ROAD) TO EAST OF US 401. CONSTRUCT FREEWAY ON NEW LOCATION. - UNDER CONSTRUCTIONSW
Page 4 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
RURAL PROJECTSR-2828 600938 424467
UNDER CONSTRUCTION; COORDINATE WITH I-5111; NORTH CAROLINA TURNPIKE AUTHORITY DESIGN-BUILD PROJECT; GARVEE BOND FUNDING: $99 M FOR CONSTRUCTION - PAYBACK IN FY 2019-2033
SOUTHERN WAKE FREEWAY / TRIANGLE EXPRESSWAY SOUTHEAST EXTENSION (RALEIGH OUTER LOOP), EAST OF US 401 TO I-40. CONSTRUCT FREEWAY ON NEW LOCATION.
8.7
SW
H129616NHP 8494CGCG 8494 8494CG8494CG8494CG CG 8494 CG 8494 CG 8494 CG 8494 CG 8494 CG 8494 CG 8494 CG 8494 CG 8494S(M) C 8250 8250C8250C NHP C 10935 10935C10935C
JOHNSTONWAKE
NEW ROUTE(FUTURE NC 540)
R-2829 665845 12945
NORTH CAROLINA TURNPIKE AUTHORITY DESIGN-BUILD PROJECT
EASTERN WAKE FREEWAY / TRIANGLE EXPRESSWAY SOUTHEAST EXTENSION (RALEIGH OUTER LOOP), I-40 TO US 64 / US 264 BYPASS. FREEWAY ON NEW LOCATION.
10.8
SW
H129617BOND R R 94415 BOND R U 3680 BOND R C 479805 T C 3750 C 17812 C 17813 C 17812 C 17813
JOHNSTONWAKE
NEW ROUTE(FUTURE NC 540)
R-5785 5017 4517
IN PROGRESS; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
DIVISION 5 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400 S C 100
DURHAMFRANKLINGRANVILLEPERSONVANCEWAKEWARREN
VARIOUS
URBAN PROJECTSU-6101 130303 10I-40 FROM SR 1728 (WADE AVENUE) TO NC
42, I-440, I-87 FROM I-40 TO I-540, US 1 FROM NC 540 TO I-40. CONVERT FACILITIES TO MANAGED FREEWAYS, TO INCLUDE RAMP METERING.
53.2
SW
H172036NHP R 10 NHP U 10 NHP 65136C C 32569 C 32568
JOHNSTONWAKE
I-40;I-87;I-440;US 1 / US 64
U-2719 394823 262047
UNDER CONSTRUCTION; GARVEE BONDS: $30 MILLION FOR CONSTRUCTION - PAYBACK 2019-2033
SOUTH OF SR 1313 (WALNUT STREET) TO NORTH OF SR 1728 (WADE AVENUE) IN RALEIGH. WIDEN FROM FOUR TO SIX LANES, IMPROVE STORAGE AT LAKE BOONE TRAIL INTERCHANGE AND INSTALL RAMP
3.5
SWH090358
NHP 2574CGCG 5148 2574CG2574CG2574CG CG 2574 CG 2574 CG 2574 CG 2574 CG 2574 CG 2574 CG 2574 CG 2574 CG 2574NHP C 94166
WAKE
I-440/US-1
U-6066 62889 10
COORDINATE WITH U-5825
NC 55 IN APEX TO US 64 IN CARY. ADD LANES.
3.1
SW
H111022-CT R 3000 R 3000 T U 2540 U 2539 T 12950C C 12950 C 12950 C 12950
WAKE
US 1
Page 5 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
URBAN PROJECTSU-5307 474100 1000I-540 IN RALEIGH TO SR 1909 (PURNELL
ROAD) / SR 1931 (HARRIS ROAD) IN WAKE FOREST. UPGRADE ROADWAY TO CONTROLLED ACCESS FACILITY.
10 T R 37600 A T U 4500 A T C 4130 A C 26157 A C 26157 A C 26156 A T R 25000 B T U 2700 B T C 23100 B C 23100 B C 23100 B C 23100 B T R 30000 C T U 3000 C T C 23775 C C 23775 C C 23775 C C 23775 C T R 10025 D R 10025 D R 10025 D R 10025 DT U 925 D U 925 D U 925 D U 925 DT 56400C D
WAKE
US 1
A I-540 TO NORTH OF SR 2006 (DURANT ROAD) IN RALEIGH. - DESIGN-BUILD PROJECTSW H090967-P4.0 COMMITTEDB NORTH OF SR 2006 (DURANT ROAD) IN RALEIGH TO NORTH OF SR 2045 (BURLINGTON MILLS ROAD) IN WAKE FOREST.REG H090967-P4.0 COMMITTEDC NORTH OF SR 2045 (BURLINGTON MILLS ROAD) TO SOUTH OF NC 98 BUSINESS IN WAKE FOREST.REG H090967-P4.0 COMMITTEDD SOUTH OF NC 98 BUSINESS TO SR1909 (PURNELL ROAD) / SR 1931 (HARRIS ROAD) IN WAKE FOREST.REG H151040P5.0 COMMITTED
U-6095 1024 512
IN PROGRESS
FREEDOM DRIVE TO PATRIOT DRIVE IN RALEIGH. ADD LANE IN EASTBOUND DIRECTION.
0.1
REG
BGDA 90R L 22R BGDA 320C L 80C
WAKE
US 64 BUSINESS(NEW BERN AVENUE)
U-5301 177416 1000WEST OF SR 1308 (LAURA DUNCAN ROAD) TO US 1 IN APEX AND CARY. CORRIDOR UPGRADE AND IMPROVEMENTS.
3.2
SW
H090524-ET R 6724 R 26896 R 26896 T U 500 T 25965C C 11540 C 25965 C 25965 C 25965
WAKE
US 64
U-5323 180 180
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY BY TOWN OF WENDELL - IN PROGRESS
SR 1003 (ROLESVILLE ROAD-EAGLE ROCK ROAD) IN WENDELL. CONNECTIVITY AND ACCESS IMPROVEMENTS AND SAFETY ENHANCEMENTS.REG WAKE
US 64 BUSINESS(WENDELL BOULEVARD)
U-5744 17890 1700SR 2026 (HAMMOND ROAD) / SR 2812 (TIMBER DRIVE) IN GARNER. CONVERT AT-GRADE INTERSECTION TO INTERCHANGE.REG
H090321-ET R 2190 T C 14000
WAKE
US 70 / NC 50
U-5518 405050 12447
COORDINATE WITH U-2823 AND U-5720; DESIGN BUILD PROJECT; GARVEE BOND FUNDING: $111 MILLION FOR RIGHT OF WAY AND $114 MILLION FOR CONSTRUCTION - PAYBACK 2025-2039
WEST OF SR 3067 (T.W. ALEXANDER DRIVE) TO I-540 IN RALEIGH. UPGRADE ROADWAY TO IMPROVE CAPACITY, SAFETY AND TRAFFIC OPERATIONS INCLUDING INTERCHANGES AT VARIOUS LOCATIONS.
2.7
SW
NHP 66665RG RG 9524 RG 9524 RG 9524 RG 9524 RG 9524 RG 9524 RG 9524 RG 9524S(M) R 18500 R 18500 NHP R 2604 R 2604 NHP U 12720 NHP 68470CG CG 9781 CG 9781 CG 9781 CG 9781 CG 9781 CG 9781 CG 9781 CG 9781S(M) C 9500 C 9500 C 9500 C 9500 NHP C 2525 C 2525 C 2525 C 2525
DURHAMWAKE
US 70(GLENWOOD AVENUE)
U-2823 81330 3775I-540 TO HILLBURN DRIVE IN RALEIGH. ADD LANES AND CONVERT TO SUPERSTREET.
4.1
SW
H129026T R 11571 R 11570 R 11571 T U 543 T 31725C C 10575
WAKE
US 70
Page 6 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
URBAN PROJECTSU-6113 56010 10GREENFIELD PARKWAY TO NC 42. UPGRADE
ROADWAY TO SUPERSTREET.7.1
REG
H171592T R 2000 R 8000 R 8000 T U 1500 U 1500 T 11666C C 11667 C 11667
JOHNSTONWAKE
US 70 BUSINESS
U-6116 48410 10SR 1375 (SIMPKINS ROAD) TO SR 2538 (MECHANICAL BOULEVARD) IN GARNER. WIDEN TO 6 LANES AND CONVERT TO SUPERSTREET.
2
REG
H171582T R 3900 R 3900 R 3900 R 3900T U 550 U 550 U 550 U 550T 30600C
WAKE
US 401
U-5751 54520 700NC 55 / NC 42 IN FUQUAY-VARINA. IMPROVE US 401 INTERSECTION WITH NC 55 / NC 42. PROJECT WILL INCLUDE IMPROVEMENTS TO NC 55 INTERSECTION WITH NC 42, AND CONSTRUCTION OF CONNECTOR FROM NC 55 TO SR 5056 (JUDD PARKWAY).
3
REG
H141642T R 8674 R 8674 R 8674 R 8674T U 624 T 18500C
WAKE
US 401
U-5748 33171 2133
BUILD NC BONDS: $1.497 MILLION FOR PE AND $1.556 MILLION FOR RIGHT-OF-WAY - PAYBACK 2019-2033, $12 MILLION FOR CONSTRUCTION - PAYBACK 2023-2037
SR 2044 (LIGON MILL ROAD) / SR 2224 (MITCHELL MILL ROAD) AND SR 2006 (PERRY CREEK ROAD) IN RALEIGH. INTERSECTION IMPROVEMENTS.
1.5
REG
H110995T 128PEPE 257 128PE128PE128PE PE 128 PE 128 PE 128 PE 128 PE 128 PE 128 PE 128 PE 128 PE 128T 133RBRB 267 133RB133RB133RB RB 133 RB 133 RB 133 RB 133 RB 133 RB 133 RB 133 RB 133 RB 133T 1565R T 212U T 5144CB 1030CB CB 1030 CB 1030 CB 1030 CB 1030 CB 1030 CB 1030 CB 1030 CB 1030 CB 1030T 9900C
WAKE
US 401
U-5746 8076 4276
RIGHT-OF-WAY IN PROGRESS
SR 1467 / SR 2839 (ALLEN STREET) TO SR 1010 (TEN-TEN ROAD). ADD LANES.
0.5REG H111020-C
T 3800C
WAKEUS 401
U-6112 24510 10
COORDINATE WITH R-2721 AND U-5746
SR 1010 (TEN-TEN ROAD). CONVERT EXISTING SIGNALIZED INTERSECTION TO SQUARE-LOOP INTERCHANGE.
REG
H171600T R 5000 T U 500 T 4750C C 4750 C 4750 C 4750
WAKE
US 401
U-5302 26869 3345
RIGHT-OF-WAY IN PROGRESS; BUILD NC BOND: $1.404 MILLION FOR PE AND $3.207 MILLION FOR RIGHT-OF-WAY - PAYBACK 2019-2033, $10 MILLION FOR CONSTRUCTION - PAYBACK 2022-2036
SOUTH OF SR 1006 (OLD STAGE ROAD) TO SOUTH OF SR 2538 (MECHANICAL BOULEVARD) / GARNER STATION BOULEVARD IN GARNER. CONVERT TO SUPERSTREET.
1.4
REG
H090526T 121PEPE 240 120PE120PE120PE PE 120 PE 120 PE 120 PE 120 PE 120 PE 120 PE 120 PE 120 PE 120T 278RBRB 275 275RB275RB275RB RB 275 RB 275 RB 275 RB 275 RB 275 RB 275 RB 275 RB 275 RB 275T 3432CB 858CB858CB CB 858 CB 858 CB 858 CB 858 CB 858 CB 858 CB 858 CB 858 CB 858T 2500C2500C
WAKE
US 401
U-5998 16607 10SR 1003 (BUFFALO ROAD) TO WILSON COUNTY LINE. MODERNIZE ROADWAY.
11.4
DIV
H141828T R 713 R 713 T U 171 T C 7500 C 7500
JOHNSTON
NC 42
U-5891 96332 300I-540 TO NORTH OF NC 98. WIDEN TO MULTILANE DIVIDED ROADWAY.
5.5
REG
H090577T R 10058 R 10058 R 10058 R 10058T U 325 U 325 U 325 U 325T 54500C
WAKE
NC 50(CREEDMOOR ROAD)
Page 7 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
URBAN PROJECTSU-5747 53642 1800
COORDINATE WITH U-5750; BUILD NC BONDS: $2.332M FOR PE - PAYBACK 2019-2033
SR 1635 (MCCRIMMON PARKWAY) FROM WEST OF SR 1613 (DAVIS DRIVE) TO NORTH OF SR 1637 (CHURCH STREET); NC 54 AT SR 1635 (MCCRIMMON PARKWAY) IN MORRISVILLE. WIDEN SR 1635 AND CONVERT NC 54 AT-GRADE INTERSECTION TO GRADE SEPARATION, INCLUDING GRADE SEPARATION
2H090435
T 200PEPE 400 200PE200PE200PE PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PE 200 PE 200T 3000R A T 500U A T 3432CB A 858CB A858CB A CB 858 A CB 858 A CB 858 A CB 858 A CB 858 A CB 858 A CB 858 A CB 858 A CB 858 AT 2650C A2650C A T 7RB BRB 5 B 5RB B5RB B5RB B RB 5 B RB 5 B RB 5 B RB 5 B RB 5 B RB 5 B RB 5 B RB 5 B RB 5 BT R 6230 B T U 500 B T 3432CB B 858CB B858CB B CB 858 B CB 858 B CB 858 B CB 858 B CB 858 B CB 858 B CB 858 B CB 858 B CB 858 BT 3750C B3750C B
WAKE
NC 54;SR 1635(MCCRIMMONPARKWAY)
A SR 1613 (DAVIS DRIVE) TO NORTH OF SR 1637 (CHURCH STREET) IN MORRISVILLE. WIDEN TO 4-LANE DIVIDED FACILITY. - COORDINATE WITH U-5966; BUILD NC BONDS: $10 MILLION FOR CONSTRUCTION - PAYBACK 2022-2036
DIV H090435-P4.0 COMMITTED
B SR 1635 (MCCRIMMON PARKWAY) IN MORRISVILLE. CONVERT AT-GRADE INTERSECTION TO GRADE SEPARATION, INCLUDING GRADE SEPARATION OF NORTH CAROLINA RAILROAD. - BUILD NC BONDS: $60,000 FOR RIGHT-OF-WAY - PAYBACK 2019-2033, $10 MILLION FOR CONSTRUCTION - PAYBACK 2022-2036
REG H090435-P4.0 COMMITTED
U-5750 30531 1100
COORDINATE WITH U-5747; BUILD NC BONDS: $1.574 MILLION FOR PE AND $3,371 FOR RIGHT-OF-WAY - PAYBACK 2019-2033, $10 MILLION FOR CONSTRUCTION - PAYBACK 2022-2036
NC 540 TO PERIMETER PARK DRIVE IN MORRISVILLE. ADD LANES.
1.3
REG
H090575-CT 135PEPE 270 135PE135PE135PE PE 135 PE 135 PE 135 PE 135 PE 135 PE 135 PE 135 PE 135 PE 135T RB 3 T 8997R T 236U T 3432CB 858CB858CB CB 858 CB 858 CB 858 CB 858 CB 858 CB 858 CB 858 CB 858 CB 858T 5300C
WAKE
NC 54
U-2901 57224 4860
PROJECTS U-2901AA AND AB COMPLETE
US 1 TO NORTH OF SR 1160 (OLIVE CHAPEL ROAD) IN APEX. WIDEN TO A MULTILANE CURB AND GUTTER FACILITY.
2.8 T R 6024 B R 6023 B R 6024 B T U 93 B T 11400C B C 11400 B C 11400 B
WAKE
NC 55(WILLIAMS STREET)
B US 1 TO NORTH OF SR 1160 (OLIVE CHAPEL ROAD). CONVERT EXISTING MULTILANES TO MEDIAN DIVIDED SECTION AND WIDEN REMAINING 2-LANE SECTIONS TO MULTILANES.REG H090373-P3.0 COMMITTED
U-6222 1222 150
"S" FUNDING REFLECTS SPOT SAFETY PROGRAM MATCH
CAMP KANATA RD AND NC 98 IN WAKE FOREST. IMPROVE INTERSECTION, ADD TURN LANES ON NC 98.
EX
BGDA R 18 S R 4 BGDA 840C S 210C
WAKE
NC 98
U-6203 39065 10NC 50 TO SR 1330 (RALEIGH ROAD). UPGRADE TO SUPERSTREET.
2.1
DIV
H170918T R 4000 R 4000 T U 1055 T C 7500 C 7500 C 7500 C 7500
JOHNSTON
NC 210
U-5825 95200 3000
COORDINATE WITH U-6066; BUILD NC BONDS: $30 MILLION FOR RIGHT-OF-WAY - PAYBACK 2027-2041
APEX PEAKWAY IN APEX TO SR 1300 (KILDARE FARM ROAD) IN CARY. WIDEN TO MULTILANES.
3.3
DIV
T 23166RB RB 2574 RB 2574 RB 2574 RB 2574 RB 2574 RB 2574T R 3369 R 3369 T U 576 U 576 T 11425C C 11425 C 11425 C 11425
WAKE
SR 1010(TEN-TEN ROAD)
U-6216 36001NC 42 TO SR 1555 (BARBER MILL ROAD). WIDEN TO MULTI-LANES.
5.1
DIV
H170716T R 7000 T U 1000 T C 9333 C 9334 C 9334
JOHNSTON
SR 1010(CLEVELAND ROAD)
U-5529 2260 2260
UNDER CONSTRUCTION BY TOWN OF HOLLY SPRINGS
WEST OF SR 1101 (PINEY GROVE - WILBON ROAD) TO VILLAGE WALK DRIVE IN HOLLY SPRINGS. OPERATIONAL IMPROVEMENTS.
0.3
DIV WAKE
SR 1115(AVENT FERRY ROAD)
Page 8 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
URBAN PROJECTSU-6243 18000FLINT POINT LANE TO SR 1301 (SUNSET
LAKE ROAD) IN HOLLY SPRINGS. WIDEN TO A FOUR-LANE MEDIAN-DIVIDED FACILITY AND CONSTRUCT SIDEWALK.DIV
BGDA 3600C L 14400C
WAKE
SR 1152(HOLLY SPRINGS ROAD)
U-6217 11510 10SR 1010 (TEN-TEN ROAD) TO SR 3977 (CARY PARKWAY). IMPROVE INTERSECTIONS AT SR 1010, SR 1379 (PENNY ROAD), AND SR 3977.
3.4
DIV
H171607T R 1500 R 1500 T U 750 U 750 T 7000C
WAKE
SR 1152(HOLLY SPRINGSROAD)
U-6094 3026 1505
RIGHT OF WAY IN PROGRESS BY TOWN OF HOLLY SPRINGS
EAST OF NC 55 TO FLINT POINT LANE IN HOLLY SPRINGS. WIDEN FROM 2 TO 4 LANES.
0.8
DIV
BGDA 1217C L 304C
WAKE
SR 1152(HOLLY SPRINGS ROAD)
U-5537 2121 1286
UNDER CONSTRUCTION BY TOWN OF APEX
WIDEN TO 3 LANES - NORTH OF MACGREGOR PINES ROAD TO NORTH OF VERSAILLES DRIVE. INCL. 10 FT MULTIUSE PATH EAST SIDE; 5 FT SIDEWALK WEST SIDE.
0.25
DIV
BGDA 668C L 167C
WAKE
SR 1521(LAKE PINE DRIVE)
U-6227 5629NC 55 TO CAMERON POND DR. IN CARY. WIDEN TO MULTI LANES.
DIV
BGDA R 2533 L R 3096
WAKE
SR 1624(CARPENTER FIRE STARD)
U-5827 12878 2267
UNDER CONSTRUCTION; BUILD NC BONDS: $946,000 FOR PE, $1.041 MILLION FOR RIGHT OF WAY, AND $2.313 MILLION FOR CONSTRUCTION - PAYBACK 2019-2033, $23,000 FOR PRELIMINARY ENGINEERING AND $3.928 MILLION FOR CONSTRUCTION - PAYBACK 2021-2035
POPLAR PIKE LANE IN MORRISVILLE TO SR 2153 (LITTLE DRIVE) IN RESEARCH TRIANGLE PARK. CONSTRUCT ROADWAY ON NEW LOCATION.
0.5
DIV
H141162T 83PEPE 162 81PE81PE81PE PE 81 PE 81 PE 81 PE 81 PE 81 PE 81 PE 81 PE 81 PE 81T 5PE 2PE2PE2PE PE 2 PE 2 PE 2 PE 2 PE 2 PE 2 PE 2 PE 2 PE 2T RB 170 89RB89RB89RB RB 89 RB 89 RB 89 RB 89 RB 89 RB 89 RB 89 RB 89 RB 89T 94RB T 205CBCB 397 198CB198CB198CB CB 198 CB 198 CB 198 CB 198 CB 198 CB 198 CB 198 CB 198 CB 198T 1011CB 337CB337CB337CB CB 337 CB 337 CB 337 CB 337 CB 337 CB 337 CB 337 CB 337 CB 337
WAKE
SR 1632(LOUIS STEPHENS DRIVE)
U-5501 7707 7707
UNDER CONSTRUCTION BY TOWN OF CARY
NC 54 (NE MAYNARD ROAD) TO SR 1652 (HARRISON AVENUE) IN CARY. WIDEN FROM 2 TO 3 LANES, TO INCLUDE ROUNDABOUTS, AS WELL AS PEDESTRIAN AND BICYCLE ENHANCEMENTS.
1.2
DIV WAKE
SR 1650(REEDY CREEKROAD)
U-6242 13948SR 2015 / SR 2041 (SPRING FOREST ROAD) TO US 1 (CAPITAL BOULEVARD) IN RALEIGH, UPGRADE TO A COMPLETE STREET.
1.4
DIV
BGDA 11158C L 2790C
WAKE
SR 2015(DIXIE FOREST ROAD) SR 3555(OLD WAKE FORESTROAD)
Page 9 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
URBAN PROJECTSU-6093 14183 1230
DESIGN-BUILD PROJECT - TO BE LET WITH I-5111 AND I-4739
OLDE BIRCH ROAD TO SR 2544 (SUNNYBROOK ROAD) IN RALEIGH. WIDEN TO 4-LANE DIVIDED FACILITY.
0.8
DIV
BGDA R 1324 L R 567 BGDA 7743C L 3319C
WAKE
SR 2542(ROCK QUARRYROAD)
U-6096 1142 1142
UNDER CONSTRUCTION
INTERSECTION OF OLD HONEYCUTT ROAD (SR 2763) AND PURFOY ROAD (SR 1301) IN FUQUAY-VARINA. INTERSECTION IMPROVEMENTS.
DIV WAKE
SR 2763(OLD HONEYCUTT ROAD)SR 1301(PURFOY ROAD)
U-5618 15378 8344
UNDER CONSTRUCTION BY TOWN OF MORRISVILLE
SR 1613 (DAVIS DRIVE) TO WEST OF NC 54 IN MORRISVILLE. WIDEN TO 4-LANE DIVIDED FACILITY.
1.3
DIV
STBGDA C 4924 L C 2110
WAKE
SR 3014(MORRISVILLE-CARPENTER ROAD)
U-6099 5100 5100
UNDER CONSTRUCTION; ECONOMIC DEVELOPMENT PROJECT
SR 1004 (EAST GARNER ROAD) TO I-40 IN GARNER. WIDEN ROADWAY FROM SOUTH OF SR 2585 (WILMINGTON ROAD) TO I-40, INCLUDING ACCESS POINT IMPROVEMENTS, AND CONSTRUCT IMPROVEMENTS AT SR 1004 INTERSECTION AND I-40 INTERCHANGE.
1
DIV WAKE
SR 5220(JONES SAUSAGEROAD)
U-6208 24384 10SR 1010 (CLEVELAND ROAD) TO NC 42. CONSTRUCT ROADWAY ON NEW LOCATION.
0.8
DIV
H172054T R 3000 T U 7974 T C 6700 C 6700
JOHNSTON
NEW ROUTE
U-5966 63539 750
NORTH CAROLINA TURNPIKE AUTHORITY PROJECT; COORDINATE WITH U-5747A
SR 1613 (MCCRIMMON PARKWAY) TO NC 540 IN MORRISVILLE. CONSTRUCT MULTILANE FACILITY ON NEW LOCATION.
1.5
REG
H150807T R 5000 T U 100 T 14422C C 14423 C 14422 C 14422
WAKE
NEW ROUTE
U-6023 3331 451TOWN OF WAKE FOREST. CONSTRUCT TOWNWIDE ITS / SIGNAL SYSTEM.
DIVH150747
BGANY 131U BGANY 2749C
WAKE
VARIOUS
U-6022 3286 325TOWN OF FUQUAY-VARINA. CONSTRUCT TOWNWIDE ITS / SIGNAL SYSTEM.
REGH150789
BGANY 218U BGANY 2743C
WAKE
VARIOUS
U-6218 10400CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO) TRANSPORTATION ALTERNATIVES DIRECT ATTRIBUTABLE (DA) FUNDS - RESERVED FOR FUTURE PROGRAMMING.
DIV
TADA C 34 C 1885 C 1885 C 1885 C 1885 C 942 C 942 C 942
FRANKLINGRANVILLEHARNETTJOHNSTONWAKE
VARIOUS
Page 10 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
URBAN PROJECTSU-4850 7089 7089
FORMERLY U-9999B - IN PROGRESS
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO) PLANNING (PL) SUPPLEMENT.DIV FRANKLIN
GRANVILLEHARNETTJOHNSTONWAKE
VARIOUS
U-4735 119731CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO) SURFACE TRANSPORTATION BLOCK GRANT DIRECT ATTRIBUTABLE (DA) FUNDS - RESERVED FOR FUTURE PROGRAMMING.
DIV
BGDA C 0 C 0 C 0 C 24865 C 27105 C 27105 C 13552 C 13552 C 13552
FRANKLINGRANVILLEHARNETTJOHNSTONWAKE
VARIOUS
U-5967 1000 163TOWN OF MORRISVILLE. CONSTRUCT TOWNWIDE ITS / SIGNAL SYSTEM.
REG
H150787BGANY U 25 T U 8 BGANY C 603 T C 201
WAKE
VARIOUS
U-6026 1848 324
FINAL COST SHARE TO BE DETERMINED ON BASIS OF FUNCTIONAL CLASSIFICATION
TOWN OF KNIGHTDALE. CONSTRUCT TOWNWIDE ITS / SIGNAL SYSTEM.
DIVH150746
BGANY 174U BGANY 1350C
WAKE
VARIOUS
U-5118 24920 21170
PLANNING, DESIGN, RIGHT-OF-WAY AND CONSTRUCTION BY OTHERS - IN PROGRESS.
OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION.
DIV
BGDA C 3000 L C 750
FRANKLINGRANVILLEHARNETTJOHNSTONWAKE
VARIOUS
U-6117 2402APEX TOWNWIDE SIGNAL SYSTEM. UPGRADE EXISTING INFRASTRUCTURE AND INSTALL NEW FIBER, CONTROLLERS, SIGNALS, AND OTHER EQUIPMENT AS NECESSARY.
REG
H172069BGANY R 100 BGANY U 100 BGANY C 1101 C 1101
WAKE
VARIOUS
U-6119 3750RALEIGH CITYWIDE SIGNAL SYSTEM. UPGRADE SOFTWARE FOR EXISTING ITS SYSTEM.
REG
H172070BGANY R 100 BGANY U 100 BGANY C 1184 C 1183 C 1183
WAKE
VARIOUS
U-6194 2529GARNER CITYWIDE SIGNAL SYSTEM
DIV
H172067BGANY R 100 BGANY U 145 BGANY C 2284
WAKE
VARIOUS
U-5889 2556 10SR 1116 (CASS HOLT ROAD) TO NC 55 BYPASS IN HOLLY SPRINGS. WIDEN TO MULTILANES, WITH INTERSECTION IMPROVEMENTS AT SR 1116 (CASS HOLT ROAD), SR 1101 (PINEY GROVE-WILBON ROAD) AND NC 55 BYPASS.
1.32
DIV
H090908T R 1139 T U 137 T C 1270
WAKE
SR 1115(AVENT FERRY ROAD)
Page 11 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
URBAN PROJECTSU-5811 36681 2000NC 54 TO I-40 IN MORRISVILLE. WIDEN TO
MULTILANES WITH INTERCHANGE MODIFICATIONS AT I-40.
2.4
DIV
H090392T R 2105 R 6314 T U 953 U 2858 T C 11226 C 11225
WAKE
SR 1002(AVIATION PARKWAY)
U-6193 17200SR 3009 (EDWARDS MILL ROAD) IN RALEIGH.
DIV
H172307T R 3350 R 3350 T U 300 T C 10200
WAKE
SR 1664(DURALEIGH ROAD)
U-5826 7500 1000
RIGHT-OF-WAY IN PROGRESS
I-540 TO SR 2006 (DURANT ROAD). ADD LANES.
0.9
DIV
H140401T 6500C
WAKE
SR 2000(FALLS OF NEUSE ROAD)
U-6223 8419
“S” FUNDING REFLECTS LEGISLATIVE CONTINGENCY FUNDS.
US 70 BUSINESS/NC 42 TO SR 1560 (RANCH ROAD) IN CLAYTON. NEW LOCATION EXTENSION OF RANCH ROAD.
DIV
BGDA 1735R S 434R BGDA C 5000 S C 1250
JOHNSTON
SR 1560(RANCH ROAD EXTENSION)
U-5936 47461 500I-40 TO I-440 IN RALEIGH. ADD LANES. 3.1
SW
H140408T R 1120 T U 441 T 11350C C 11350 C 11350 C 11350
WAKE
SR 1728(WADE AVENUE)
U-6244 580SR 1007 (WENDELL FALLS PARKWAY) IN WENDELL. IMPROVE INTERSECTION AND INCLUDE CLOSURE OF WALL STREET.
EX
BGDA 118R L 39R BGDA 317C L 106C
WAKE
US 64 BUSINESS(WENDELL BOULEVARD)WENDELL BOULEVARD)
U-5515 8251 8251
UNDER CONSTRUCTION BY TOWN OF WAKE FOREST
SR 1930 (STADIUM DRIVE), US 1 TO SR 1954 (NORTH WINGATE STREET) IN WAKE FOREST. COMPLETE STREETS IMPROVEMENTS TO INCLUDE: WIDEN TO THREE-LANE CURB AND GUTTER SECTION, CONSTRUCT SIDEWALK, MULTIUSE PATH, BICYCLE LANES, AND PEDESTRIAN / TRANSIT AMENITIES.
1.3
DIV WAKE
SR 1930(STADIUM DRIVE)SR 1933(WEST NORTH AVENUE)
U-6225 2183 28
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF GARNER
SR 2709 (ACKERMAN RD), SR 2547 (HEBRON CHURCH RD) AND SR 2700 (WHITE OAK RD) IN GARNER IMPROVE INTERSECTION AND ADD MULTILANE ROUNDABOUT.
DIV
BGDA R 56 L R 19 BGDA 1560C L 520C
WAKE
SR 2700(WHITE OAK RD)
U-5928 25000 12500
IN PROGRESS
JAMES STREET TO TOWHEE DRIVE. CONSTRUCT GRADE SEPARATED INTERCHANGE FOR APEX PEAKWAY AT SOUTH SALEM STREET AND CSX RR.
0.3
DIV
BGDA 2500C L 10000C
WAKE
APEX PEAKWAY
Page 12 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
URBAN PROJECTSU-5943 2533 328CLAYTON SIGNAL SYSTEM. 6.2
REG
H150788BGANY 120U BGANY 100R BGANY C 1985
JOHNSTON
CLAYTON
U-5828 14032 10935
UNDER CONSTRUCTION; BUILD NC BONDS: $2.406 MILLION FOR CONSTRUCTION - PAYBACK 2019-2033
SR 3015 (AIRPORT BOULEVARD) TO SR 1002 (AVIATION PARKWAY) IN MORRISVILLE. WIDEN TO MULTILANES, PART ON NEW LOCATION.
1.4
DIVH090435
T 213CBCB 412 206CB206CB206CB CB 206 CB 206 CB 206 CB 206 CB 206 CB 206 CB 206 CB 206 CB 206
WAKE
MCCRIMMON PARKWAY
U-5315 27649 19749
PART C CONSTRUCTION BY TOWN OF CARY
SR 1600 / SR 1625 (GREEN LEVEL CHURCH ROAD) TO EAST OF NC 55 IN CARY. MULTILANE FACILITY ON NEW LOCATION, INCLUDING INTERCHANGE AT NC 540 (TRIANGLE EXPRESSWAY / WESTERN WAKE FREEWAY).
1.83 L 7900C C
WAKE
MORRISVILLE PARKWAYEXTENSION
A WEST OF HIGHCROFT DRIVE TO EAST OF MILLS PARK DRIVE IN CARY. CONSTRUCT 2-LANE FACILITY ON 4-LANE RIGHT OF WAY. - UNDER CONSTRUCTIONDIVB NC 540 (TRIANGLE EXPRESSWAY / WESTERN WAKE FREEWAY). CONSTRUCT INTERCHANGE. - UNDER CONSTRUCTIONDIVC SR 1600 / SR 1625 (GREEN LEVEL CHURCH ROAD) TO EAST OF NC 55 IN CARY. WIDEN TO 4 LANES WITH LANDSCAPED MEDIAN.
U-5317 25112 25112
UNDER CONSTRUCTION BY TOWN OF FUQUAY-VARINA
NC 55 (NORTH BROAD STREET) TO NC 42 (WEST ACADEMY STREET) IN FUQUAY-VARINA, WAKE COUNTY. MULTILANE FACILITY ON NEW LOCATION.
2.3
DIV WAKE
NORTH JUDD PARKWAY
U-6241 6048SR 2051 (BURLINGTON MILLS ROAD), EAST OF ROLESVILLE MIDDLE SCHOOL TO US 401 BUSINESS (SOUTH MAIN STREET) IN ROLESVILLE. REALIGN ROADWAY AND CONSTRUCT NEW INTERSECTION WITH SOUTH MAIN STREET. US 401 BUSINESS (SOUTH MAIN STREET), SR 2051 (BURLINGTON MILLS ROAD) TO NORTH OF SR 1003 (EAST YOUNG STREET) / SR 1945 (WEST YOUNG STREET) IN ROLESVILLE. CONSTRUCT SIDEWALK EXTENSIONS AND COMPLETE STREET IMRPOVEMENTS.
DIV
BGDA 4838C L 1210C
WAKE
SR 2051(BURLINGTON MILLSROAD)
U-4437 69748 69748
UNDER CONSTRUCTION; DESIGN-BUILD PROJECT - LET WITH U-2719; INCLUDES $19.9 MILLION FEDERAL TIGER GRANT
SR 1664 / SR 3074 (BLUE RIDGE ROAD) IN VICINITY OF NC RAILROAD (CSX CORPORATION AND NORFOLK SOUTHERN) IN RALEIGH. CONSTRUCT GRADE SEPARATIONS AND ACCESS ROAD BETWEEN NC 54 AND SR 1664 / SR 3074.
3
DIV
H090472
WAKE
NC 54(HILLSBOROUGHSTREET)
U-5521
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY BY CITY OF RALEIGH - IN PROGRESS
CABARRUS STREET TO MARTIN STREET IN RALEIGH. EXTEND WEST STREET ON NEW LOCATION, WITH GRADE SEPARATION AT NORTH CAROLINA RAILROAD / NORFOLK SOUTHERN "H" LINE.
0.2DIV WAKE
WEST STREET
BRIDGE PROJECTSB-5317
SCOPE AND COST INCLUDED IN B-5121
REPLACE BRIDGE 910213 OVER US 401 (CAPITAL BOULEVARD) IN RALEIGH.
REG WAKE
US 70 WESTBOUND /NC 50 NORTHBOUND
B-5987 18290 110REPLACE BRIDGES 910115 AND 910117 OVER NORFOLK SOUTHERN RAILROAD AND AN UNNAMED CREEK.
REG
NHPB 640R NHPB 640U NHPB C 8450 C 8450
WAKE
US 401
Page 13 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
BRIDGE PROJECTSB-5684 9137 100REPLACE BRIDGE 910146 OVER CRABTREE
CREEK IN RALEIGH.
REG
NHPB 430R NHPB 8607C
WAKE
US 401(CAPITALBOULEVARD)
B-5986 3385 110REPLACE BRIDGE 910034 OVER NORFOLK SOUTHERN RAILROAD IN WENDELL.
REG
NHPB 164R NHPB 163U NHPB 2948C
WAKE
NC 231
B-4655 1498 1498
UNDER CONSTRUCTION
REPLACE BRIDGE 910277 OVER BLACK CREEK.
HF WAKE
SR 1006(OLD STAGEROAD)
B-5130 4139 489
RIGHT-OF-WAY IN PROGRESS
REPLACE BRIDGE 910318 OVER LAKE JOHNSON IN RALEIGH.
DIV
NHPB C 3650
WAKE
SR 1321(AVENT FERRY ROAD)
B-5997 935 935
UNDER CONSTRUCTION
REPLACE BRIDGE 500277 OVER POLECAT BRANCH.
DIV JOHNSTON
SR 1399(ZACK'S MILL ROAD)
B-5673 4874 194REPLACE BRIDGE 910061 OVER KIT CREEK IN CARY.
DIV
BGOFF 130R BGOFF C 4550
WAKE
SR 1630(GREEN LEVELCHURCH ROAD)
B-5318 6577 1477
RIGHT OF WAY IN PROGRESS
REPLACE BRIDGE 910126 OVER SMITHS CREEK IN WAKE FOREST.
DIV
BGANY C 2550 C 2550
WAKE
SR 2044(LIGON MILL ROAD)
B-5326 6001 1101
RIGHT-OF-WAY IN PROGRESS
REPLACE BRIDGE 910247 OVER WHITE OAK CREEK IN GARNER.
DIV
BGOFF C 2450 C 2450
WAKE
SR 2555(RAYNOR ROAD)
B-5161 4056 4056
UNDER CONSTRUCTION
REPLACE BRIDGE 910362 OVER BEAVER CREEK IN APEX.
DIV WAKE
SR 1162(APEX BARBECUEROAD)
B-6003 4655 200REPLACE BRIDGE 340078 OVER TAR RIVER
DIV
BGOFF R 405 BGOFF C 4050
FRANKLIN
SR 1609(BAPTIST CHURCHROAD)
Page 14 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
BRIDGE PROJECTSB-5664 4946 4946
UNDER CONSTRUCTION
REPLACE BRIDGE 500145 OVER SWIFT CREEK.
DIV JOHNSTON
SR 1555(BARBOUR MILLROAD)
B-5414 1075 1075
UNDER CONSTRUCTION
REPLACE BRIDGE 420195 OVER BRANCH OF UPPER LITTLE RIVER.
DIV HARNETT
SR 1234(LEAFLET CHURCHROAD)
B-5121 87843 87843
UNDER CONSTRUCTION; PARTICIPATION BY CITY OF RALEIGH; INCLUDES B-5317
REPLACE BRIDGE 910227 OVER PEACE STREET AND BRIDGE 910213 OVER US 401 (CAPITAL BOULEVARD) IN RALEIGH AND REVISE INTERCHANGE AT PEACE STREET.
REG WAKE
US 70/US 401/NC 50(CAPITALBOULEVARD)
B-5237 2703
BUILD NC BONDS: $2.1 MILLION FOR CONSTRUCTION - PAYBACK 2021-2035
REPLACE BRIDGE 910248 OVER MAHLER'S CREEK IN GARNER.
DIV
T 543CB 180CB180CB180CB CB 180 CB 180 CB 180 CB 180 CB 180 CB 180 CB 180 CB 180 CB 180
WAKE
SR 2703(NEW BETHEL CHURCHROAD)
MITIGATION PROJECTSEE-4905 20302 20302
IN PROGRESS
ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 5 PROJECT MITIGATION.DURHAM
FRANKLINGRANVILLEPERSONVANCEWAKEWARREN
VARIOUS
HIGHWAY SAFETY PROJECTSW-5522 5637 5637
UNDER CONSTRUCTION
SR 1658 (YOUTH CENTER DRIVE) INTERSECTION IN RALEIGH. CONSTRUCT PEDESTRIAN TUNNEL UNDER SR 1656 (TRINITY ROAD).DIV WAKE
SR 1656(TRINITY ROAD)
HS-2005
PROGRAMMED FOR PRELIMINARY ENGINEERING ONLY. INDIVIDUAL PROJECTS AND FUNDING TO BE REQUESTED IN THE FUTURE AS NEEDED.
SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 5.DIV DURHAM
FRANKLINGRANVILLEPERSONVANCEWAKEWARREN
VARIOUS
Page 15 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
HIGHWAY SAFETY PROJECTSW-5805 6100
INDIVIDUAL PROJECTS AND FUNDING TO BE REQUESTED IN THE FUTURE AS NEEDED.
SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 5
HSIP 235R A HSIP C 725 A HSIP 40C B HSIP 85C C HSIP 60C D HSIP 100R E HSIP C 1230 E HSIP 2550C F HSIP 45R G HSIP 955C G HSIP 75C H
DURHAMFRANKLINGRANVILLEPERSONVANCEWAKEWARREN
VARIOUS
A SR 1101 (PINEY GROVE - WILBON ROAD) INTERSECTION. CONSTRUCT ROUNDABOUT.REGALTERNATE CRITERIAB US 1, CLOVERLEAF DRIVE, AND RETAIL DRIVE / HAMPTON WAY IN WAKE FOREST. REVISE TRAFFIC SIGNALS.REGALTERNATE CRITERIAC SR 1827 (LYNN ROAD) INTERSECTION IN RALEIGH. CONSTRUCT PEDESTRIAN REFUGE ISLANDS, AND REVISE CURB RAMPS, CROSSWALKS, AND OTHER PAVEMENT MARKINGS.DIVALTERNATE CRITERIAD BRIDGE 910023 OVER MIDDLE CREEK. INSTALL GUARDRAIL.REGALTERNATE CRITERIAE SR 2057 / SR 4465 (MOORES POND ROAD)REGALTERNATE CRITERIAF INSTALL LONG-LIFE PAVEMENT MARKINGSDIVALTERNATE CRITERIAG SR 1113 (LAKE LODGE ROAD) INTERSECTION. CONVERT FULL-MOVEMENT INTERSECTION TO UNSIGNALIZED SUPERSTREET.SWALTERNATE CRITERIAH SR 2539 (YEARGAN ROAD), SR 2564 (CREECH ROAD), AND SHENSTONE BOULEVARD INTERSECTIONS IN GARNER. UPGRADE TRAFFIC SIGNALSDIVALTERNATE CRITERIA
W-5205 10184 10184
UNDER CONSTRUCTION
DIVISION 5 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.DURHAM
FRANKLINGRANVILLEPERSONVANCEWAKEWARREN
VARIOUS
DIV DIVISION 5 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS - DIVISION NEEDS CATEGORYDIVALTERNATE CRITERIAREG DIVISION 5 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS - REGIONAL IMPACT CATEGORYREGALTERNATE CRITERIA
W-5705 6851 6001
IN PROGRESS; $150K NHP FUNDING APPLIED TO W-5705S
SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 5.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW NHP C 150
DURHAMFRANKLINGRANVILLEPERSONVANCEWAKEWARREN
VARIOUS
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVALTERNATE CRITERIAREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGALTERNATE CRITERIASW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SWALTERNATE CRITERIA
CONGESTION MITIGATION PROJECTSC-5166 4991 4991
UNDER CONSTRUCTION BY TOWN OF CREEDMOOR; LET WITH EB-5513
GREENWAY IN CREEDMOOR. CONSTRUCT BIKE-PEDESTRIAN TRAIL SYSTEM.EX GRANVILLE
NC 56
A GREENWAY IN CREEDMOOR - EASTERN SECTION - UNDER CONSTRUCTIONEXALTERNATE CRITERIAB GREENWAY IN CREEDMOOR - WESTERN SECTION - UNDER CONSTRUCTIONEXALTERNATE CRITERIA
C-5165 4408 4408
UNDER CONSTRUCTION BY TOWN OF CARY
SR 3112 (CARY PARKWAY) IN CARY. INTERSECTION IMPROVEMENTS.
EX WAKE
SR 1615(HIGH HOUSE ROAD)
Page 16 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
CONGESTION MITIGATION PROJECTSC-5604 23159 18097
IN PROGRESS
PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE CAPITAL AREA MPO.
EX
CMAQ PE 317 L PE 79 CMAQ R 317 L R 79 CMAQ C 2212 L C 1266 CMAQ O 317 L O 79 CMAQ I 317 L I 79
FRANKLINGRANVILLEJOHNSTONWAKE
VARIOUS
C-5168 4247 4247
UNDER CONSTRUCTION BY TOWN OF MORRISVILLE
CONSTRUCT GREENWAY CONNECTING EXISTING GREENWAY IN CARY THROUGH MORRISVILLE, INCLUDING REPLACEMENT OF TRAIN TRESTLE.
EX WAKE
CRABTREE CREEK GREENWAY
C-4924 8400 8400TRIANGLE J COUNCIL OF GOVERNMENTS (COG). TRANSPORTATION DEMAND MANAGEMENT PROGRAM FOR ORGANIZATIONS IN TRIANGLE OZONE NON-ATTAINMENT AREA.EX DURHAM
ORANGEWAKE
TRIANGLE JCOUNCIL OFGOVERNMENTS
A TRANSPORTATION DEMAND MANAGEMENT PROGRAM FOR ORGANIZATIONS IN CAPITAL AREA MPO (CAMPO) - IN PROGRESSEXALTERNATE CRITERIAB TRANSPORTATION DEMAND MANAGEMENT PROGRAM FOR ORGANIZATIONS IN DURHAM-CHAPEL HILL-CARRBORO (DCHC) - IN PROGRESSEXALTERNATE CRITERIA
AVIATION PROJECTSAV-5700 100000RECONSTRUCT RUNWAY 5L-23R.
SW
A130117T 500C O 99500C
WAKE
RALEIGH DURHAMINTERNATIONALAIRPORT (RDU)
AV-5819 12200CONSTRUCT RUNWAY EXTENSION, TO INCLUDE RELOCATION OF UTILITIES, NAVAID AND ROADWAYS.
DIV
A130115T R 530 T C 3890 C 3890 C 3890
FRANKLIN
TRIANGLE NORTHEXECUTIVE AIRPORT(LHZ)
BICYCLE AND PEDESTRIAN PROJECTSEB-5513 875 875
UNDER CONSTRUCTION BY CITY OF CREEDMOOR; LET WITH C-5166A AND C-5166B
SR 1110 IWEST HILLSBORO STREET) TO NC 56 IN CREEDMOOR. CONSTRUCT SIDEWALK / PATH.
0.7TRN GRANVILLE
US 15
EB-5718 4000
COORDINATE WITH B-5675 (NON-STIP PROJECT) AND TO-6166
CONSTRUCT BICYCLE / PEDESTRIAN TUNNEL IMMEDIATELY WEST OF SR 1321 (AVENT FERRY ROAD) IN RALEIGH.
DIV
B141188TAANY 3200C L 800C
WAKE
SR 1012(WESTERN BOULEVARD)
EB-6019 563 9
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF APEX
APEX COMMUNITY PARK AND NORTH SALEM STREET IN APEX. IMPROVE SAFETY OF PEDESTRIAN CROSSING.
DIV
BGDA 388C L 166C
WAKE
SR 1306(LAURA DUNCAN ROAD)
Page 17 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
BICYCLE AND PEDESTRIAN PROJECTSEB-6020 1782NORTH WILLOW STREET, EAST JULIA
STREET TO JUNNY ROAD; JUNNY ROAD, EAST JULIA STREET TO GLEN MEADOW DRIVE; AND WEST LILLINGTON STREET, SOUTH PARK STREET TO NC 210, IN ANGIER. CONSTRUCT SIDEWALK EXTENSIONS.
DIV
BGDA 140PE L 35PE BGDA 120R L 30R BGDA 1166C L 291C
HARNETT
SR 1501 (JUNNY ROADNORTH WILLOW STREET;WEST LILLINGTON STREET
EB-5838 2000 300SR 3014 (MORRISVILLE-CARPENTER ROAD) TO DURHAM COUNTY LINE IN MORRISVILLE. CONSTRUCT SIDEWALKS TO FILL IN GAPS.
3
DIVB150629
TAANY 1360C L 340C
WAKE
SR 1637(CHURCH STREET)
EB-5814 325 65MCCRIMMON PARKWAY TO FACTORY SHOPPES ROAD IN MORRISVILLE. CONSTRUCT SIDEWALK.
DIV
B141383TAANY 208C L 52C
WAKE
SR 3015(AIRPORT BOULEVARD)
EL-5100 22332 22332PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO).
DIV FRANKLINGRANVILLEHARNETTJOHNSTONWAKE
VARIOUS
U-5530 16455 12955CAPITAL AREA MPO: BICYCLE, PEDESTRIAN, TRANSIT, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP)-ELIGIBLE PROJECTS.
DIV
TADA C 800 L C 200 BGDA C 2000 L C 500
FRANKLINGRANVILLEHARNETTJOHNSTONWAKE
VARIOUS
EB-6047 3688SR 2051 (BURLINGTON MILLS ROAD) TO NORTH OF SR 1003 (EAST YOUNG STREET) / SR 1945 (WEST YOUNG STREET) IN ROLESVILLE. CONSTRUCT SIDEWALK EXTENSIONS AND COMPLETE STREET IMRPOVEMENTS.
DIV
BGDA 2950C L 738C
WAKE
US 401 BUSINESS(SOUTH MAIN STREET
EB-6048 783NORTH OF SR 2346 (HANOR LANE) TO EAST OF SR 2353 (OLD WILSON ROAD) IN WENDELL. CONSTRUCT GEOMETRIC IMPROVEMENTS, SIDEWALK EXTENSION AND INSTALL PEDESTRIAN CROSSING AT SR 2329 (MARSHBURN ROAD).DIV
BGDA 319R L 80R BGDA 307C L 77C
WAKE
US 64 BUSINESSWENDELL BOULEVARD(WENDELL BOULEVARD)
EB-6049 1250COTTEN LANE TO WEST BALLANTINE STREET AND CONNECTING FROM THE SOUTH / EAST SIDE OF AVENT FERRY ROAD TO STINSON AVENUE VIA PINE AVENUE IN HOLLY SPRINGS. CONSTRUCT SIDEWALK EXTENSIONS.
0.3
DIV
BGDA 1000C L 250C
WAKE
AVENT FERRY ROAD
Page 18 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
BICYCLE AND PEDESTRIAN PROJECTSEB-6016 1510SR 2851 (EAST FRONT STREET) TO SR 1902
(GLEN LAUREL ROAD). CONSTRUCT GREENWAY.
1.1
DIV
B171999L PE 52 TAANY PE 206 L R 2 TAANY R 8 L C 248 TAANY C 994
JOHNSTON
EAST CLAYTONCONNECTOR GREENWAY
EB-6021 6565KELLY ROAD PARK TO APEX NATURE PARK IN APEX. GREENWAY EXTENSION. REALIGN ADJACENT SEGMENT OF EXISTING BEAVER CREEK GREENWAY.DIV
TADA 1053C L 5512C
WAKE
BEAVER CREEK GREENWAYEXTENSION
EB-5894 6241 10PHASES I, II AND V, WEST DYNASTY DRIVE TO OLD REEDY CREEK ROAD IN CARY. CONSTRUCT GREENWAY.
2.7
DIV
B150598TAANY 4000C L 1000C CMAQ 985C L 246C
WAKE
BLACK CREEKGREENWAY
EB-6017 497FOX RIDGE ROAD TO NEUSE RIVER BRIDGE. CONSTRUCT GREENWAY.
0.5
DIV
B171998L PE 17 TAANY PE 66 L C 96 TAANY C 318
JOHNSTON
MOUNTAINS TO SEATRAIL
EB-5895 700 100
RIGHT-OF-WAY IN PROGRESS
SR 1301 (SUNSET LAKE ROAD) TO NC 55 IN HOLLY SPRINGS. CONSTRUCT SIDEWALK.
0.9
DIV
B150665TAANY R 80 L R 20 TAANY 400C L 100C
WAKE
NC 55(EAST WILLIAMSSTREET)
EB-6046 953HUNTER STREET TO SAUNDER STREET IN APEX. CONSTRUCT SIDEWALK EXTENSIONS AND IMPROVE SAFETY OF PEDESTRIAN CROSSING.DIV
BGDA 572C L 381C
WAKE
(SR 1307)WEST CHATHAM STREET
PUBLIC TRANSPORTATION PROJECTSTD-5307 3500TRIANGLE TOWN CENTER. CONSTRUCT
TRANSIT CENTER AND PARK-AND-RIDE FACILITY.DIV
T172244T C 875 C 875 O C 875 C 875
WAKE
VARIOUS
TO-6166 115001BUS RAPID TRANSIT SERVICE, MORRISVILLE TO CLAYTON. CONSTRUCT INFRASTRUCTURE, PURCHASE VEHICLES, AND ESTABLISH SERVICE.
REG
T171930T R 5100 R 5100 R 5100 L R 900 R 900 R 900 T U 1417 U 1417 U 1417 L U 250 U 250 U 250 T C 19550 C 19550 C 19550 C 19550 L C 3450 C 3450 C 3450 C 3450
JOHNSTONWAKE
VARIOUS
Page 19 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
PUBLIC TRANSPORTATION PROJECTSTA-5123A 19270 16028
FUNDS AUTHORIZED IN PROGRESS
EXPANSION BUS
PT
5307 CP 1351 1351CP L CP 135 135CP S CP 135 135CP
WAKE
TRIANGLE TRANSITAUTHORITY
TA-4818A 7410 6448EXPANSION BUS
PT
5307 962CP 5339
WAKE
TRIANGLE TRANSITAUTHORITY
TP-4732B 8429 5477
FUNDS AUTHORIZED IN PROGRESS
PLANNING ASSISTANCE
PT
5307 PL 590 590PL590PL590PL L PL 74 74PL74PL74PL S PL 74 74PL74PL74PL
WAKE
TRIANGLE TRANSITAUTHORITY
TQ9037 295 230
FUNDS AUTHORIZED IN PROGRESS
5310 ADMINISTRATION
PT
5310 AD 65
WAKE
CAPITAL AREA TRANSIT
TA-5140 15200 12910
FUNDS AUTHORIZED IN PROGRESS
BUS REPLACEMENT
PT
5307 CP 1750 L L 270 S S 270
WAKE
CAPITAL AREA TRANSIT
TA-5202 3800 2944
FUNDS AUTHORIZED IN PROGRESS
ADA EXPANSION BUS
PT
5307 CP 240 5339 CP 240 L CP 376
WAKE
CAPITAL AREA TRANSIT
TA-4903A 11452 10326PURCHASE REPLACEMENT HYBRID BUSES
PT
5307 CP 900 CMAQ L CP 113 S CP 113
WAKE
CAPITAL AREA TRANSIT
TG-4792B 8227 7102
FUNDS AUTHORIZED IN PROGRESS
ADA PARATRANSIT SERVICE
PT
5307 O 900 L O 225
WAKE
CAPITAL AREA TRANSIT
TO-5128 40308 28308
FUNDS AUTHORIZED IN PROGRESS
OPERATING ASSISTANCE
PT
SMAP O 3000 3000O3000O3000O
WAKE
CAPITAL AREA TRANSIT
TP-5100A 5575 3703
FUNDS AUTHORIZED IN PROGRESS
PLANNING ASSISTANCE - 5303
PT
5303 PL 375 375PL375PL375PL L PL 47 47PL47PL47PL S PL 46 46PL46PL46PL
WAKE
CAPITAL AREA TRANSIT
TP-5100B 7106 5106
FUNDS AUTHORIZED IN PROGRESS
PLANNING ASSISTANCE - 5307
PT
5307 PL 400 400PL400PL400PL L PL 50 50PL50PL50PL S PL 50 50PL50PL50PL
WAKE
CAPITAL AREA TRANSIT
Page 20 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
PUBLIC TRANSPORTATION PROJECTSTQ-9037 2301 1832
FUNDS AUTHORIZED IN PROGRESS
5310 CAPITAL
PT
5310 CP 375 L CP 94
WAKE
CAPITAL AREA TRANSIT
TQ-7006 295 2305310 ADMIN.
PT
5310 AD 65
WAKE
CAPITAL AREA TRANSIT
TQ-6953 2972 2372
FUNDS AUTHORIZED IN PROGRESS
5310 OPERATING
PT
5310 O 300 L O 300
WAKE
CAPITAL AREA TRANSIT
TS-5104 1208 784
FUNDS AUTHORIZED IN PROGRESS
SAFETY & SECURITY - MIN. 1% SET ASIDE
PT
5307 CP 85 85CP85CP85CP L CP 21 21CP21CP21CP
WAKE
CAPITAL AREA TRANSIT
TD-5264B 7088 88CONSTRUCT BUS MAINTENANCE FACILITY AT TOWERVIEW COURT IN CARY.
DIV
T130016FEDT C 5600 T C 700 L C 700
WAKE
CARY TRANSIT /C-TRAN
TG-4806 3395 2780
FUNDS AUTHORIZED IN PROGRESS
PREVENTIVE MAINTENANCE, BUS FACILITIES, SUPPORT EQUIPMENT, AND SOFTWARE
PT
5307 CP 300 5339 CP 190 L CP 125
WAKE
CARY TRANSIT/C-TRAN
TG-4935A 78490 44215
FUNDS AUTHORIZED IN PROGRESS
ROUTINE CAPITAL - COST OF CONTRACTING
PT
5307 O 2000 2200O2200O2000O O 2200 O 2300 5339 O 190 L O 3485 3520O3520O3520O O 3520 O 3620
WAKE
CARY TRANSIT/C-TRAN
TO-5129 3726 2276
FUNDS AUTHORIZED IN PROGRESS
OPERATING ASSISTANCE
PT
5307 O 50 L O 50 SMAP O 210 230O220O220O O 230 O 240
WAKE
CARY TRANSIT/C-TRAN
TP-5112 2989 1153
FUNDS AUTHORIZED IN PROGRESS
PLANNING ASSISTANCE
PT
5307 PL 230 260PL250PL240PL PL 270 PL 280 5311 L PL 46 52PL50PL48PL PL 54 PL 56 S
WAKE
CARY TRANSIT/C-TRAN
TA-5186 2610 2610
ACQUISITION IN PROGRESS BY GO RALEIGH
SIX EXPANSION BUSES FOR ADDING ROUTE EXPANSION SERVICE.DIV WAKE
GO RALEIGH
TP-5160 25004 4316ALTERNATIVES REFINEMENT AND PROJECT DEVELOPMENT
PT
L 510R L PL 322 510PL L 9673C9673C
WAKE
GO RALEIGH
Page 21 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
PUBLIC TRANSPORTATION PROJECTSTD-5309 752DESIGN, RIGHT OF WAY, AND
CONSTRUCTION OF UP TO 100 NEW BUS STOP SITES IN THE CITY OF RALEIGH. SITES WILL BE BUILT FOR ADA ACCESSIBILITY AS WELL AS PASSENGER AMENITIES WHEN APPROPRIATE. PHASE PE
PT
BGDA PE 601 L PE 151
WAKE
GO RALEIGH TRANSIT
TD-4912 880 880
UNDER CONSTRUCTION BY GO RALEIGH
US 64 BUSINESS (NEW HOPE ROAD) IN RALEIGH. CONSTRUCT TRANSFER FACILITY.DIV T141692WAKE
GO RALEIGH TRANSIT
TD-5272
UNDER CONSTRUCTION BY GO RALEIGH
SOUTH WILMINGTON STREET AT PECAN ROAD IN RALEIGH. CONSTRUCT OFF-STREET TRANSFER FACILITY.DIV T141691WAKE
GO RALEIGH TRANSIT
TD-5309A 250DESIGN, RIGHT OF WAY, AND CONSTRUCTION OF UP TO 100 NEW BUS STOPS IN THE CITY OF RALEIGH. SITES WILL BE BUILT FOR ADA ACCESSIBILITY AS WELL AS PASSENGER AMENITIES WHEN APPROPRIATE. PHASE ROW
PT
5307 R 200 L R 50
WAKE
GO RALEIGH TRANSIT
TD-5309B 1500DESIGN, RIGHT OF WAY, AND CONSTRUCTION OF UP TO 100 NEW BUS STOP SIGHTS IN THE CITY OF RALEIGH. SITES WILL BE BUILT FOR ADA ACCESSIBILITY AS WELL AS PASSENGER AMENITIES WHEN APPROPRIATE. PHASE CON
PT
BGDA C 1200 L C 300
WAKE
GO RALEIGH TRANSIT
TD-5287 720 720
IN PROGRESS
PARK AND RIDE LOT AT SR 1774 (DISTRICT DRIVE). ADD SPACES, IMPROVE LIGHTING AND CONSTRUCT SHELTERS.REG T150812WAKE
GO TRIANGLE
TD-5293 44 44
UNDER CONSTRUCTION BY GO TRIANGLE
INTERSECTION OF SR 2298 (EDENTON STREET) AND NORTH SALISBURY STREET IN RALEIGH. CONSTRUCT BUS STOP SHELTER.REG T130031WAKE
GO TRIANGLE
TD-5269 53160
"O" FUNDING REFLECTS WAKE COUNTY TAX DISTRICT FUNDS AND GO TRIANGLE FUNDS; "DP" FUNDING REFLECTS "BUILD" DISCRETIONARY AWARD; "T" FUNDING REFLECTS REIMBURSEMENT TO CITY OF RALEIGH
UNION STATION IN RALEIGH. CONSTRUCT BUS COMPONENT.
DIV
T142099DP C 20000 T C 2215 C 2215 C 2215 C 2215 O C 24300
WAKE
GO TRIANGLE
TD-5285 15300 15300
IN PROGRESS
EXPAND EXISTING GARAGE FACILITY IN MORRISVILLE.REG T150813WAKE
GO TRIANGLE
TA-6669 2431 2431
IN ACQUISITION
PURCHASE EXPANSION VEHICLES FOR CRX ROUTE.REG T150454ORANGE
WAKE
GOTRIANGLE TRANSIT
TA-6668 2431 2431
IN ACQUISITION
PURCHASE EXPANSION VEHICLES FOR DRX ROUTE.REG T150797DURHAM
WAKE
GOTRIANGLE TRANSIT
Page 22 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
PUBLIC TRANSPORTATION PROJECTSTA-6720 330PURCHASE EXPANSION VEHICLES.
DIV
T1706825311 C 264 L C 33 T C 33
JOHNSTON
JOHNSTON COUNTY
TK-6170 5422 3842
FUNDS AUTHORIZED IN PROGRESS
ADMINISTRATION
PT
5311 O 111 111O111O111O 5311 L O 59 59O59O59O S O 225 225O225O225O
WAKE
WAKE COORDINATEDTRANSPORTATION SERVICE
TE-4903A 1502000 2000FIXED GUIDEWAY - LIGHT RAIL SERVICE- CARY/RALEIGH
PT
FED C 500000 500000C500000C
DURHAMORANGEWAKE
TRIANGLE TRANSITAUTHORITY
TE-4903B 666 444FIXED GUIDEWAY - COMMUTER RAIL SERVICE- DURHAM/RALEIGH
PT
FED C 222
WAKE
TRIANGLE TRANSITAUTHORITY
TG-4821B 24490 16614
FUNDS AUTHORIZED IN PROGRESS
ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC INCLUDES ADA, PM AND SERVICE VEHICLES
PT
5307 CP 1575 1575CP1575CP1575CP L CP 394 394CP394CP394CP
DURHAMORANGEWAKE
TRIANGLE TRANSITAUTHORITY
TO-5131 27619 19811
FUNDS AUTHORIZED IN PROGRESS
OPERATING ASSISTANCE
PT
SMAP O 1952 1952O1952O1952O
WAKE
TRIANGLE TRANSITAUTHORITY
FREIGHT RAIL PROJECTSM-0509 5696 5696
UNDER CONSTRUCTION
EXTEND CAPITAL YARD LEAD TRACKS IN RALEIGH TO REMOVE FREIGHT CONFLICTS.EX WAKE
CSX
P-5718 60171 3681
"O"FUNDING REFLECTS PARTICIPATION BY CSX CORPORATION; TO BE LET WITH P-5734
CROSSING 643351A AT SR 1415 (NORTHEAST MAYNARD ROAD) IN CARY. CONSTRUCT GRADE SEPARATION.
REG
R150273T R 9782 R 9782 R 9781 T U 1115 U 1115 U 1115 T C 11305 C 11305 O C 1190
WAKE
CSX
P-5720 20735 5635
RIGHT-OF-WAY IN PROGRESS; COORDINATE WITH U-5307; "O" FUNDING REFLECTS PARTICIPATION BY CSX CORPORATION
CROSSING 630601X AT SR 2006 (DURANT ROAD) IN RALEIGH. CONSTRUCT GRADE SEPARATION.REG
R150049T 7310C7310C O 480C
WAKE
CSX
P-5715 17545 4646
RIGHT-OF-WAY IN PROGRESS; "O" FUNDING REFLECTS PARTICIPATION BY CSX CORPORATION
CROSSING 630607N AT NEW HOPE CHURCH ROAD IN RALEIGH. CONSTRUCT GRADE SEPARATION.REG
R150714T 3916C618C C 3915 C 3915 O 535C
WAKE
CSX
P-5707 26920 3420
RIGHT-OF-WAY IN PROGRESS
CONSTRUCT GRADE SEPARATION AT SR 2052 (ROGERS ROAD EXTENSION) CROSSING (633905Y) IN WAKE FOREST.REG R140025
T 7833C7834C C 7833
WAKECSX S LINE
Page 23 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
FREIGHT RAIL PROJECTSP-5737 18930 1100
"DP" FUNDING REFLECTS CONSOLIDATED RAIL INFRASTRUCTURE AND SAFETY IMPROVEMENTS (CRISI) PROGRAM AWARD; "O" FUNDING REFLECTS PARTICIPATION BY CSX CORPORATION
SR 2108 (MILLBROOK ROAD) IN RALEIGH. CONSTRUCT GRADE SEPARATION AND CLOSE CROSSING 630605A.
SW
R150279T 3700R DP 10000C T 3620C O 510C
WAKE
CSX S LINE
P-5739 18040 1440
"O" FUNDING REFLECTS PARTICIPATION BY CSX CORPORATION
SR 1415 (WEST MAYNARD ROAD) IN CARY. CONSTRUCT GRADE SEPARATION AND CLOSE CROSSING 643400U.
SW
R171528T R 2200 T C 4560 C 4560 C 4560 O C 720
WAKE
CSX S LINE
P-5753
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY
CSX S-LINE FROM RALEIGH TO VIRGINIA STATE LINE AND CSX SA-LINE FROM RALEIGH TO WELDON. AQUIRE RIGHT OF WAY, UPGRADE EXISTING TRACK AND CONSTRUCT NEW TRACK.
50
FRANKLINHALIFAXVANCEWAKEWARREN
CSX S-LINECSX SA-LINE
Y-4805F 1600FAYETTEVILLE STREET AND THE CAROLINA COASTAL RAILWAY TRACKS CROSSING CLOSURE IN KNIGHTDALE.DIV
RR C 1600
WAKE
FAYETTEVILLE STREE(SR 2513)
P-5708 22600
"O" FUNDING REFLECTS PARTICIPATION BY NORFOLK SOUTHERN RAILROAD
CONSTRUCT GRADE SEPARATION AT HARRISON AVENUE CROSSING (734755X) IN CARY.
REG
R141697T R 3000 R 3000 T C 5258 C 5258 C 5258 O C 826
WAKE
NORFOLK SOUTHERNH LINE
P-5738 14500 1200
"O" FUNDING REFLECTS PARTICIPATION BY NORFOLK SOUTHERN CORPORATION
SR 2713 (VANDORA SPRINGS ROAD) IN GARNER. CONSTRUCT GRADE SEPARATION AND CLOSE CROSSING 735324J.
SW
R171513T R 1800 T C 3642 C 3642 C 3641 O C 575
WAKE
NORTH CAROLINARAILROAD /NORFOLK SOUTHERNH LINE
P-5736 3500 300
"O" FUNDING REFLECTS PARTICIPATION BY NORFOLK SOUTHERN CORPORATION
BERYL ROAD CROSSING IN RALEIGH. EXTEND BERYL ROAD TO ROYAL AVENUE, AND CLOSE CROSSING 630647L.
SW
R150275T R 200 T C 2996 O C 4
WAKE
NORTH CAROLINARAILROAD;NORFOLK SOUTHERNH LINE;CSX S LINE
P-5734 40700 3000
TO BE LET WITH P-5718
SR 1655 (TRINITY ROAD) IN CARY. CONSTRUCT GRADE SEPARATION AND CLOSE CROSSING 630657S.
SW
R150272T R 7000 R 7000 R 7000 T C 5289 C 5288 C 5288 O C 835
WAKE
NORTH CAROLINARAILROAD /NORFOLK SOUTHERNH LINE /CSX S LINE
Page 24 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
PASSENGER RAIL PROJECTSP-4405 10291 10291
IN PROGRESS
PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN RALEIGH AND CHARLOTTE.
TRN ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGEROWANWAKE
VARIOUS
RC-2005
PROGRAMMED FOR PRELIMINARY ENGINEERING ONLY. INDIVIDUAL PROJECTS AND FUNDING TO BE REQUESTED IN THE FUTURE AS NEEDED.
TRAFFIC SEPARATION STUDY IMPLEMENTATION AND CLOSURES IN DIVISION 5.DIV DURHAM
FRANKLINGRANVILLEPERSONVANCEWAKEWARREN
VARIOUS
RX-2005
PROGRAMMED FOR PRELIMINARY ENGINEERING ONLY. INDIVIDUAL PROJECTS AND FUNDING TO BE REQUESTED IN THE FUTURE AS NEEDED.
HIGHWAY-RAIL GRADE CROSSING SAFETY IMPROVEMENTS IN DIVISION 5.DIV DURHAM
FRANKLINGRANVILLEPERSONVANCEWAKEWARREN
VARIOUS
U-4716 36062 31776VARIOUS ROUTES AND NORFOLK SOUTHERN RAILROAD-NORTH CAROLINA RAILROAD IN DURHAM AND MORRISVILLE, SOUTH OF I-40 TO NORTH OF MCCRIMMON PARKWAY. CONSTRUCT A GRADE SEPARATION AT SR 1978 (HOPSON ROAD), EXTEND CHURCH STREET TO HOPSON ROAD, CLOSE CHURCH STREET C
O 1126R D O 3160C D
DURHAMWAKE
VARIOUSPIEDMONT CORRIDOR
A NORFOLK SOUTHERN RAILROAD-NORTH CAROLINA RAILROAD. CONSTRUCT RAILROAD GRADE SEPARATION AND SHIFT RAIL LINE - PROJECT COMPLETEB NORFOLK SOUTHERN RAILROAD / NC RAILROAD TO SR 1978 (HOPSON ROAD) REALIGN AND CLOSE CROSSING 734 748M OF THE NORFOLK SOUTHERN-NORTH CAROLINA RAILROAD - PROJECT
COMPLETETRNPRE STI
C CLEGG TO NELSON. CONSTRUCT PASSING SIDING - UNDER CONSTRUCTIOND SR 1978 (HOPSON ROAD), EAST OF SR 1999 (DAVIS DRIVE) TO NC 54, WIDEN TO MULTILANES
Y-5805
INDIVIDUAL PROJECTS AND FUNDING TO BE REQUESTED IN THE FUTURE AS NEEDED.
TRAFFIC SEPARATION STUDY IMPLEMENTATION AND CLOSURES IN DIVISION 5.DIV DURHAM
FRANKLINGRANVILLEPERSONVANCEWAKEWARREN
VARIOUS
Page 25 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDEDFUTURE YEARS
FY 2020
STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
COMMITED / NON
FY 2030 FY 2031 FY 2032
PASSENGER RAIL PROJECTSZ-5805
INDIVIDUAL PROJECTS AND FUNDING TO BE REQUESTED IN THE FUTURE AS NEEDED.
HIGHWAY-RAIL GRADE CROSSING SAFETY IMPROVEMENTS IN DIVISION 5.DIV DURHAM
FRANKLINGRANVILLEPERSONVANCEWAKEWARREN
VARIOUS
P-5005 26561 26561
IN PROGRESS
CONGESTION MITIGATION CROSSOVERS.EDGECOMBEHALIFAXNASHWAKE
CSXT RR
A CAROLINIAN CORRIDOR - CSXT MP A 101.0 (ENFIELD CROSSING).TRNPRE STIB CAROLINIAN CORRIDOR - CSXT MP A 115.9 (ARMSTRONG CROSSING).TRNPRE STIC CAROLINIAN CORRIDOR - CSXT MP A 86.4 (SOUTH WELDON CROSSING).TRNPRE STID BOYLAN CROSSOVER IN RALEIGH. - UNDER CONSTRUCTIONTRNPRE STI
P-5500 39875 39875
DP FUNDS - FEDERAL TIGER GRANT; O FUNDS - STATE LEGISLATIVE ALLOCATION FOR RAIL; PROJECT INCLUDES IN-KIND PROPERTY CONTRIBUTION BY TRIANGLE TRANSIT (CONTINGENT ON TT BOARD OF TRUSTEES APPROVAL) - 4 PARCELS TOTALING 3.5 ACRES WITH TAX VALUE OF $2.9 MILLION
RALEIGH UNION STATION PROJECT - PHASE I. CONSTRUCT RALEIGH TRAIN STATION AND ASSOCIATED RAIL TRACK AND SIDING IMPROVEMENTS TO INCREASE PASSENGER AND FREIGHT CAPACITY.
TRN WAKENCRR
A CSXT S-LINE, TRACK AND SIGNAL IMPROVEMENTS - BOYLAN WYE CROSSOVER - DELETED - WORK TO BE ACCOMPLISHED UNDER P-5005D.B STATION SITE WORK - UNDER CONSTRUCTIONTRNPRE STIC TRACK IMPROVEMENTS - UNDER CONSTRUCTIONTRNPRE STI
P-5743 14752 652
OTHER FUNDS PROVIDED BY NS.
CONSTRUCT GRADE SEPARATION AT SR 1553 (SHOTWELL ROAD). CLOSE EXISTING AT-GRADE CROSSING IN CLAYTON.
REG
R171518T R 3000 O C 530 T C 5285 C 5285
JOHNSTON
NS/NCRR H LINE
P-5719 45277 45277PURCHASE AND REFURBISH RAIL CARS FOR PIEDMONT SERVICE EXPANSION.R150274ALAMANCE
CABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
PIEDMONT CORRIDOR
A ACQUIRE AND REBUILD 2 ADDITIONAL LOCOMOTIVES - IN PROGRESSEXB ACQUIRE AND REFURBISH 2 COACH AND 1 LOUNGE/BAGGAGE RAIL CARS - IN PROGRESSEXC ACQUIRE AND REFURBISH 8 RAIL CARS - IN PROGRESSREG
P-2918 174422 174422TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.EX ALAMANCE
CABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
PIEDMONT CORRIDOR
A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESSB PURCHASE 2 USED LOCOMOTIVES - COMPLETEC EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESSD EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETEE PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESSF CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESSG PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESSH CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESSI EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS
Page 26 of 26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, August 19, 2020
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
FY 2020-2029 Transportation Improvement Program - Amendment #3 5
Phase Source Prior Years FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 Future Year Total (100%)CON FBUS 2,776,000$ CON StateCON L 2,575,000$ Operating FUZ 2,000,000$
TG-6791 Operating L 500,000$
Operating FUZ 2,500,000$ TG-4792B Operating L 2,500,000$
Planning FUZ 1,000,000$ TP-5100B Planning L 250,000$
Capital FUZ 174,000$ TS-5104 Capital L 44,000$
Capital FUZ 3,560,000$ TG-0013 Capital L 890,000$
Capital FUZ 2,560,000$ TC-0015 Capital L 640,000$
Capital FUZ 547,000$ TO-0002 Capital L 137,000$
TA-4903GoRaleigh
Replacement Bus and Bus Facilities
Bus and bus facilites porjects. Move funding previously programmed to FY20 to FY21.
GoRaleigh Capital Cost of Contracting
GoRaleigh capital cost of contracting. Move funding previously programmed to FY20 to FY21.
GoRaleigh ADA Paratransit Service
GoRaleigh ADA Paratransit service. Move funding previously programmed to FY20 to FY21.
GoRaleigh Planning Assistance
GoRaleigh Planning Assistance. Move funding previously programmed to FY20 to FY21.
GoRaleigh Safety and Security
GoRaleigh Safety and Security 1% minimum set-aside. Move funding previously programmed to FY20 to FY21.
GoRaleigh Fixed Route Preventative
MaintainenceGoRaleigh fixed route preventative maintainence. Move funding
previously programmed to FY20 to FY21.GoRaleigh capital projects (passenger amenities, pedestrian connections,
facility maintenance, upgrades and upkeeps, etc). Move funding previously programmed to FY20 to FY21.
GoRaleigh Capital Projects
GoRaleigh Access ADA Paratransit
FacilityGoRaleigh Access/ADA Paratransit Facility. Move funding previously
programmed to FY20 to FY21.
ID Project DescriptionAs Currently Programmed
Page 1 of 2 10/1/2020
FY 2020-2029 Transportation Improvement Program - Amendment #3 5
TG-6791
TG-4792B
TP-5100B
TS-5104
TG-0013
TC-0015
TO-0002
TA-4903GoRaleigh
Replacement Bus and Bus Facilities
Bus and bus facilites porjects. Move funding previously programmed to FY20 to FY21.
GoRaleigh Capital Cost of Contracting
GoRaleigh capital cost of contracting. Move funding previously programmed to FY20 to FY21.
GoRaleigh ADA Paratransit Service
GoRaleigh ADA Paratransit service. Move funding previously programmed to FY20 to FY21.
GoRaleigh Planning Assistance
GoRaleigh Planning Assistance. Move funding previously programmed to FY20 to FY21.
GoRaleigh Safety and Security
GoRaleigh Safety and Security 1% minimum set-aside. Move funding previously programmed to FY20 to FY21.
GoRaleigh Fixed Route Preventative
MaintainenceGoRaleigh fixed route preventative maintainence. Move funding
previously programmed to FY20 to FY21.GoRaleigh capital projects (passenger amenities, pedestrian connections,
facility maintenance, upgrades and upkeeps, etc). Move funding previously programmed to FY20 to FY21.
GoRaleigh Capital Projects
GoRaleigh Access ADA Paratransit
FacilityGoRaleigh Access/ADA Paratransit Facility. Move funding previously
programmed to FY20 to FY21.
ID Project Description Phase Source FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 POST YR Total (100%)CON FBUS 2,776,000$ CON StateCON L 2,575,000$
Operating FUZ 2,000,000$ Operating L 500,000$
Operating FUZ 2,500,000$ Operating L 2,500,000$
Planning FUZ 1,000,000$ Planning L 250,000$
Capital FUZ 174,000$ Capital L 44,000$
Capital FUZ 3,560,000$ Capital L 890,000$
Capital FUZ 2,560,000$ Capital L 640,000$
Capital FUZ 547,000$ Capital L 137,000$
TIP Amendment #3
Page 2 of 2 10/1/2020