COURSE OBJECTIVES

A. Environmental impact of construction

B. Integrated approach

C. Construction practices on a green building

To understand:

Page 1

Page 3: C ons truction Management

G|PRO

GPRO Certificate Holders

Page 4: C ons truction Management

G|PRO

CONSTRUCTION MANAGEMENT & GREEN BUILDING

1

Page 2

Page 5: C ons truction Management

G|PROLEED Gold Building, NY

A green building is designed, constructed and maintained to minimize adverse environmental impacts and to reduce energy consumption, while contributing to the health and productivity of its occupants.  

A key component is consideration of the building's impacts and performance over its entire life.

What is Green Building? Page 2

A Green Building

Page 6: C ons truction Management

G|PRO What is Green Building? Page 2

LEED Credit Categories: Prerequisites for LEED

1. Sustainable Sites p1: CAPP

2. Water Efficiency p1: Water Use Reduction – 20%

3. Energy & Atmosphere p1: Fundamental Commissioning

p2: Minimum Energy Performance

p3: Fundamental Refrigerant Management

4. Materials & Resources p1: Storage/Collection of Recyclables

5. Indoor Environmental p1: Min. Indoor Air Quality Performance

Quality p2: Environmental Tobacco Smoke Control

Page 7: C ons truction Management

G|PRO

Design, construction, and operation are integrated.

What is a Green Building? Pages 2-3

Whole Building Approach

Page 8: C ons truction Management

G|PROSolar panels

A green project has:• New technologies• Improved construction

practices• Added verification • Greater coordination• Stronger relationships

between CM, Subs & end users

Applying Best Practices and Leadership Pages 2-4

Leadership in Green Design

Page 9: C ons truction Management

G|PRO

CLASS DISCUSSION:

What green or sustainable practices are you already doing on your projects?

Page 10: C ons truction Management

G|PRO Page 4

CM/GC's Roles Relating to Sustainability

Page 11: C ons truction Management

G|PRO

TEST YOURSELF:

1. How does the sustainability concept of integration affect the construction process and the CM/GC's role?

Page 4

Page 12: C ons truction Management

G|PRO

PRE-CON SERVICES: Sustainability Planning in the Design Phase

2

Page 5

Page 13: C ons truction Management

G|PRO Establishing the Sustainability Team Pages 5-6

The Sustainability Team

Page 14: C ons truction Management

G|PRO Classroom Exercise #1 Pages 57-58

Case Study: Fort Hamilton Historic Society Maritime Museum, Brooklyn, NY

Page 15: C ons truction Management

G|PRO

Case Study: Fort Hamilton Historic Society Maritime Museum, Brooklyn, NY

Owner's Priorities:• Eliminate stormwater runoff• Reduce water consumption• Reuse materials from existing warehouse structure• Use salvaged materials from decommissioned ships• Provide daylit gallery spaces

Classroom Exercise #1 Pages 57-58

Page 16: C ons truction Management

G|PRO 16

Define priorities & goals in context of project requirements.

Defining the Sustainability Goals Pages 6-7

Defining Sustainability Goals

Page 17: C ons truction Management

G|PRO 17

Schematic Design Phase

Establishing Goals & Identifying LEED Credits:

1. Assess project potential for LEED certification

2. Identify possible measures & credits

3. Establish proposed sustainability measures

4. Determine feasible LEED credits

5. Confirm goals and credits

Schematic Design Phase Page 7

Page 18: C ons truction Management

G|PRO Classroom Exercise #2 Pages 59-62

Case Study: Potential LEED Points andProposed LEED Points

Review potential LEED points to determine which are feasible to proceed with.

Page 19: C ons truction Management

G|PRO

Simple Payback Analysis:

Payback Period = (Total Cost) / (Annual Savings)The shorter, the better!

Life-Cycle Cost Assessment:

A more complete analysis, includes:

•Maintenance

•Future decommissioning

•System replacement

•Opportunity costs

Financial Evaluation of Sustainability Measures Pages 8-10

Evaluating Costs to Prioritize Scope

Page 20: C ons truction Management

G|PRO

÷

Financial Evaluation of Sustainability Measures Page 8

Simple Payback Analysis

Page 21: C ons truction Management

G|PRO Financial Evaluation of Sustainability Measures Pages 8-9

Payback Analysis Comparison

ITEM (Column 1)

COST OF BASE DESIGN (Column 2)

ADDITIONAL COST OF THE UPGRADE(Column 3)

INCENTIVE OR SUBSIDY(Column 4)

NET CAPITAL INVESTMENT(Column 5)

ANTICIPATED ANNUAL OPERATIONAL SAVINGS (Column 6)

PAYBACK PERIOD (YEARS) (Column 7)

Chiller Variable Frequency Drive

$500,000 $75,000 $7,500 $67,500 $20,000 3.4

Air Handler Fan Variable Frequency Drive

$100,000 $15,000 $1,500 $13,500 $6,000 2.2

Pumps- Variable Frequency Drive

$50,000 $7,500 $750 $6,750 $6,000 1.1

Built-up Roofing Project (3,000 sf) with Sedum Green Roof

$200,000 $100,000 $0 $100,000 $1,000 100

Photovoltaic Roof System (50 kW)

$0 $450,000 $275,000 $175,000 $17,000 10

Solar Thermal System

$75,000 $50,000 $20,000 $30,000 $4,500 6.6

High-Efficiency Lighting Upgrade (10,000 sf)

$200,000 $200,000 $20,000 $180,000 $50,000 3.6

Page 22: C ons truction Management

G|PRO Value Engineering Page 11

Value Engineering

Green projects have less wiggle room.

Substitutions with lower "first costs" may cost a lot more in the long run.

Page 23: C ons truction Management

G|PRO

• Primary responsibility by owner or A/E

• Funding can come from local, state, federal or utilities

• Factor funding into payback analysis process

• A/E will rely on CM/GC for data and scheduling info

Analyzing Sustainability Incentives Page 11

Incentives Analysis

Page 24: C ons truction Management

G|PRO

TEST YOURSELF:

1. What is the CM/GC's role on the Sustainability Team (ST)?

2. How is the CM/GC involved in identifying sustainability goals and target LEED credits?

3. Why and how do you conduct and evaluate a simple payback analysis?

4. What is the CM/GC's role in analyzing sustainability incentives?

Page 11

Page 25: C ons truction Management

G|PRO

SUSTAINABILITY MANAGEMENT PLAN

3

Page 12

Page 26: C ons truction Management

G|PRO 26

Credit Types

The Sustainability Management Plan (SMP) Page 12

TYPE 1: Mostly design team’s responsibility and design team verifies.

TYPE 2: Shared design team and construction team responsibility with construction team responsible for verification.

Page 27: C ons truction Management

G|PRO

Clarify the following:

•Who is responsible for what?

•What trades are affected?

•What are the documentation requirements and how will they be met?

•What work practices are required and how will they be verified?

Create your Sustainability Management Plan

The Sustainability Management Plan (SMP) Pages 12-14

Page 28: C ons truction Management

G|PRO Classroom Exercise #3 Page 63

CLASSROOM EXERCISE:Sustainability Management Plan

The CM generates the SMP to coordinate the execution of the sustainability measures.

Page 29: C ons truction Management

G|PRO

CLASSROOM EXERCISE:

Now make the argument to the Owner about how you plan to achieve each credit.

Classroom Exercise #3 Page 63

Page 30: C ons truction Management

G|PRO

Sometimes Points are Eliminated

Delete Solar Thermal System:

Financial criteria: Proposed solar system will have a long payback period (increasing water efficiency means less hot water being used)

Site logistics: Turns out that the solar thermal system doesn't have adequate southern exposure

Page 31: C ons truction Management

G|PRO

Green building practices can impact schedule, budget, purchasing, and coordination:

31

Additional Complexities

• Installation sequences• Building reuse• Availability of green-skilled trades• Schedule implications: Flush-out,

erosion control, ductwork protection, long-lead-time items

• Availability of green materials• Documentation requirements• Logstics and site plan issues• Waste sorting

The Sustainability Management Plan (SMP) Pages 12-14

Page 32: C ons truction Management

G|PRO

List green strategies from your experience for waste management, IAQ flush out, HVAC retrofits, Cx, etc.

Include an organization chart showing team members with LEED AP or GPRO certificate.

Preparing Qualifications…Present Your Competitive Edge

Responding to an Owner's RFP Pages 14-15

Page 33: C ons truction Management

G|PRO

TEST YOURSELF:

1. What elements should you include in your Sustainability Management Plan?

2. When updating your Sustainability Management Plan, what critical elements need to be confirmed?

Page 15

Page 34: C ons truction Management

G|PRO

TRADE BID & AWARD: Incorporating Sustainability Strategies

4

Page 16

Page 35: C ons truction Management

G|PRO

• Dispelling the myth of LEED record keeping

• Regional, recycled, and FSC certified requirements

• Issues that may involve more than one credit

• Building flush-out schedule

• Cx (commissioning) milestones & inspections

Bid Issues to Explain to Subs

Vetting Bids to Ensure Sustainability Scope is Covered Page 18

Page 36: C ons truction Management

G|PRO Creating a Bid List with Green-Qualified Contractors Pages 16-17

Things to Look for in Selecting Green Subs

Page 37: C ons truction Management

G|PRO

• Project sustainability goals and LEED credit scorecard

• Clarity on shop drawings and submittals & LEED template letters

• Sort & salvage requirements

• VOC caps

• Collaboration expectations

• Work practice & documentation requirements

Developing Bid Documents to Support Sustainability Goals Page 17

Developing Bid Documents to Support Sustainability Goals

Page 38: C ons truction Management

G|PRO

• Participation on Sustainability Team• Time for flush-out & testing• Cx schedule impacts • Local materials acquisition• C&D Waste• Recycled content verification

Vetting Bids to Ensure Sustainability Scope is Covered Pages 17-18

Vetting Bids to Ensure Sustainability Scope is Covered

Page 39: C ons truction Management

G|PRO

CLASS DISCUSSION:

What questions would you ask the trades to ensure that they understand the sustainable requirements?

Use the SMP as your guide.

Page 40: C ons truction Management

G|PRO 40Handoff to Mobilization Page 18

Finally, we're ready to start construction!

Do all trades and vendors have the information they need to build a green project?

Handoff to Mobilization

Page 41: C ons truction Management

G|PRO

TEST YOURSELF:1. What should the CM/GC consider when

selecting green subcontractors?

2. What are the unique elements of bid documents on a green project?

3. How does the vetting of green bids differ from standard practice?

4. What are the green issues that the CM/GC is responsible for in preparing for mobilization?

Page 18

Page 42: C ons truction Management

G|PRO

MOBILIZATION5

Page 19

Page 43: C ons truction Management

G|PRO

Core Sustainability Activity Areas

Mobilization Page 19

Page 44: C ons truction Management

G|PRO

LEED Prerequisite (SSp1)

Intent: Reduce pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust generation

Contractor Requirements: Erosion & Sedimentation Control Plan (ESC) that includes:

1. Construction Activities Pollution Prevention (CAPP) Pages 20-21

•Temporary seed/mulch•Concrete wash-out•Dust watering

•Silt fences•Sedimentation traps•Earth dikes

Construction Activity Pollution Prevention (CAPP)

Page 45: C ons truction Management

G|PRO

CAPP Compliance Responsibilities

• Develop & adhere to ESC Plan

• Know NPDES and SPDES (National and State Pollutant Discharge Elimination System) requirements

• Inform subs of responsibilities

• Conduct inspections with a checklist

• Document mitigation procedures

• Log problems & solutions

1. CAPP Pages 20-21

Concrete wash-out

Page 46: C ons truction Management

G|PRO

CONSTRUCTION ACTIVITY POLLUTION PREVENTION (CAPP) INSPECTION CHECKLIST To be Performed Weekly and after Major Rain Events

Control Measure Condition Project Name:

YES

NO

NEED ATTN

N/A Project Number: Inspector: Inspection Date:

1.0 VEHICLE EMISSIONS REDUCTION 1.1 All equipment with engines larger than 50 HP are listed on Trades’

Equipment Checklist for compliance with LMCCC Vehicle Emissions requirements. Inspection Observations:

1.2 All trade contractors submitted ULSD slips this week. Inspection Observations:

1.3 If grid power is available, electrical equipment is being used in lieu of diesel powered equipment, where available. Inspection Observations:

1.4 Trade contractors are complying with idling restrictions. Equipment is not unnecessarily idling longer than three (3) minutes and trades are enforcing the requirements with their subs. Inspection Observations:

Sample CAPP Inspection Checklist

Page 47: C ons truction Management

G|PRO

LEED Credit (MRc2)

Intent:

To divert construction and demolition debris from landfills and incinerators

Contractor Requirements:

Management plan based on established diversion goals

Close-out documentation:

Verifying quantity of materials diverted, recycled, or re-used on-site

2. Construction Waste Management (CWM) Page 21

Construction Waste Management (CWM)

Page 48: C ons truction Management

G|PRO

• Develop Diversion Plan

• Select hauler that meets Plan requirements

• Determine if project will sort on- or off-site

• Monitor subs

• Obtain diversion tallies

• Provide documentation to Sustainability Manager

2. CWM Page 21

CWM Compliance Responsibilities

Page 49: C ons truction Management

G|PRO

Sample CWM Waste Reporting Form

Page 50: C ons truction Management

G|PRO

LEED Credit (IEQc3.1 and IEQc3.2)

Intent:

To protect the workforce during construction and ensure clean environment for future occupants and to reduce indoor air quality problems resulting form the construction or renovation process

Contractor Requirements:

Develop a CIAQ Plan addressing one or both credits

3. Construction Indoor Air Quality (CIAQ) Pages 21-22

Construction Indoor Air Quality (CIAQ)

Page 51: C ons truction Management

G|PRO 51

CIAQ Strategies

• Good housekeeping

• Ductwork protection

• Controlling pollutants

• Preventing pollution pathways

• Construction sequences to avoid pollutant contamination such as keeping absorptive materials clean and dry

• Flush-out (can take several weeks)

3. CIAQ Pages 21-22

Page 52: C ons truction Management

G|PRO 52

CIAQ Compliance Considerations

• CxA will require documentation

• Work with subs to develop creative solutions

• Protect all HVAC equipment

• Allow time for flush-out

• Test air at close-out

3. CIAQ Pages 21-22

Page 53: C ons truction Management

G|PRO

Sample CIAQ Inspection Checklist

Page 54: C ons truction Management

G|PRO 54

Commissioning (Cx)

4. Commissioning (Cx) Pages 22-23

LEED Prerequisite (EAp1) and credit (EAc3) for fundamental and enhanced commissioning.

Intent:

To verify that the building’s energy-related systems are installed, calibrated, and perform according to the project’s requirements

Contractor Requirements:

1.Ensure subs conform to installation requirements

2.Assist in testing activities

Page 55: C ons truction Management

G|PRO

Insufficient supervision or inadequate communication may prevent you from reaching your sustainability goals.

What Can Go Wrong on a Green Project?

Page 56: C ons truction Management

G|PRO

TEST YOURSELF:

1. What is the intent of each of the four core sustainable construction activity areas?

2. What are the CM/GC’s primary compliance considerations for each core area?

Page 23