BS1192
• The BS was developed and published from practical application of the processes known as Avanti.
• It has been implemented on a number of projects of various value and the savings of 10% have been sustained on all projects.
• This is 50% of the target set by the BIM Strategy.
1976 Building Research EstablishmentA discrepancy of 10mmin one dimension cost £3,000and seriously affectedthe contractors programme.
Lack of coordination demonstratesWaste at 10-20%
Waste
• The UK Government construction total expenditure per annum is £80bn. (2005)
• Possible min £20bn of waste
• The European Construction Institute 2003 stated that non-quality in European construction represents E80bn of waste per annum.
Waste
The Client buys risk every time he accepts non quality information from his
supply teams
Waste
Waste
• The BIM Strategy has set its target at 20-25% of construction cost that is generated because information for construction is: – Inaccurate– Incomplete – And Ambiguous
• The use of CAD solutions has perpetuated the problem even though it had the capacity to solve the problem.
Level 2 Maturity for BIM
PAS 1192-2
The CPIx Protocol PIP
Project Implementation Plan
Assess your IT and your Resource capabilityto deliver the employers requirements
CPIx Execution Plan
• Building Information Model and
Management (BIM(M))
• Agreed Supply Chain Execution Plan(SCEP)
Produce you delivery plan and agree with your supply chain and the second and third tiers
CIC Scope of works:2012
• Alignment of the Industry Institutional deliverables .
• Levels of Model Detail appropriate for the purpose NOT high detail because we can.
• Levels of Information appropriate to the scope stages and the Employers Information Requirements (EIR).
Supply Chain- Client
Questions