“Broadband Projects for Greece”
CHRISTOS MOSCHONASTelecom Projects DirectorInformation Society S.A.
“Speeding up NGN ubiquity : a pillar for digital growth”
13-14 February 2014
Athens, Greece
Zappeion Megaron
Strategy
Closing the digital divide should be done both ways :
1.Broadband access for citizens and business
&2.Broadband access for the Greek
State
Rural Broadband
“enabling broadband access in Rural
White Areas of Greece”
Owner -> Ministry of Infrastructure, Transport and
Networks
Objective and design of the Project
The project intends to:
• close the ‘broadband gap’ between remote / most disadvantageous ‘traditional white’ rural areas of Greece (600.000 inhabitants 5.000 sites)
• deals with the combination of two negative co-existing conditions: the ‘lack of infrastructure’ and the ‘lack of commercial interest’ in these areas.
Public intervention should be able to achieve the following goals:
• Sufficient broadband coverage in Rural areas,
• Provision of reliable and affordable connectivity services to the end users (in terms of speed, quality and price) (enabling 30Mbps per user)
• Deployment of a powerful and future-proof network infrastructure that can support medium and long term penetration targets
• The ability to foster real competition and prevent any single operator from gaining special advantages against others
• Support and facilitate existing network operators to choose and implement their own strategy, concerning potential private (add-on) investments in these territories.
Project’s principles
1) Public-Private Partnership Project (PPP)
2) The targeted areas are divided in three lots of equal weight in terms of population size
3) The contractors will act as wholesale providers
4) Implementation into two stages • Phase A (development : 2 years) and • Phase B (operation : 15 years)
5) Network open for use by all Telecom Service Providers, in order to offer broadband services to end users (citizens & enterprises).
6) Public ownership of the network infrastructure. After the termination of the 15-year operational period, Greek authorities (who retain network’s ownership) may proceed with a new awarding procedure, in order to choose a new administrator.
2
Project Budget
Phase A: 161 M€ - covered through EU Funding
Phase B: covered through Private Funding (Operation and Network Expansion in order to increase the population coverage from 85% to at least 95%)
SYZEFXIS II
“Greek Broadband Public Administration Network”
“Enabling e-governement”
Owner -> Ministry of Administrative Reform & e-gov
Current Network : SYZEFXIS I 2006-2014
National IP network connecting 6.000 Greek Agencies since 2006
9
MAIN GOALS OF THE NEWSYZEFXIS II PROJECT
o Participation of all Greek Agencies (34.000 actors)
o More Broadband (extensive use of optical access)
o Use of 68 MANs (Metropolitan Area Networks)
o Upgraded/updated services
o New value added services – emphasis on security - video – collaboration – mobility of users
o Maximization of “aggregation of demand” in telecom services for greek public sector
5 SYZEFXIS II main entities
1. Broadband connectivity and voice services to every Greek public agency (34.000 actors) – 8 telecom Islands – most important public State actors will operate at 100Mbps or even 1Gbps
2. Public Sector Mobility service – wireless island
3. Distributed Infrastructure (security/access devices – telephony & teleconference equipment- cabling)
4. Core Service (SIX) + Central Data Centers
5. ISP & SLA Service
Project Budget
616 M€ covering three years operational phase
172 M€ covered through EU Funding (mainly infrastructure) 148 M€ per year covered by National Funding (operational costs)
Benefits
1)Broadband Government (fixed and mobile)
2)Safer electronic services - quality
3)A network that is “E-government enabler”
4)Reduction of total public telecommunication costs, by 50%.
Metropolitan Area Networks (MANs)
“Integration of Public State owned Metro Optical rings with
Greek National Networks”
Owner -> Ministry of Infrastructure, Transport and
Networks
Objective and design of the Project
The project intends to:
• Interconnect the MAN networks that have been developed in 68 Municipalities throughout Greece with the Public Administration Network (SYZEFXIS) and the National School Network, in order to offer telecommunication services (data, voice and video) to almost 4,000 public state actors over broadband optical access circuits.
Budget: 7 million € (EU funding)
Duration: 2 years
Budget: 7 million € (EU funding)
Duration: 2 years
Project’s implementation
1)12 lots.
2)Implementation into four stages: • Phase A (Site Survey)• Phase B (Recovery actions)• Phase C (Integration)• Phase D (operation)
3)The project is closely associated with two backhauls for each city:
• 1 Gbps SYZEFXIS backhaul• 1 Gbps School Network backhaul
Network’s Architecture
PoP OTE
MAN Switch
Router ΣΥΖΕΥΞΙΣ Ι
Router ΣΥΖΕΥΞΙΣ Ι
MAN Switch
Router ΣΥΖΕΥΞΙΣ Ι
SHDSL modemπρόσβασης
Κόμβος Πρόσβασης ΜΑΝ
ΜΑΝ
PBX
PBX
PBX
Kύριος κόμβος ΜΑΝ (ΚΚ)
Κόμβος ΜΑΝ πλησιέστερος στον ΟΤΕ
FE
FE
FE
PRA
PRA
PRA
GE
GE
GE
2Mbps
X.21
X.21
2Mbps
X.21
Router ΣΥΖΕΥΞΙΣ Ι
PBX
PRA
Κόμβος Πρόσβασης ΜΑΝ
2Mbps
FE
2Mbps
X.21
MAN Switch
PoP OTE
MAN Switch
Router ΣΥΖΕΥΞΙΣ Ι
Router ΣΥΖΕΥΞΙΣ Ι
MAN Switch
Router ΣΥΖΕΥΞΙΣ Ι
SHDSL modemπρόσβασης
Κόμβος Πρόσβασης ΜΑΝ
ΜΑΝ
PBX
PBX
PBX
Kύριος κόμβος ΜΑΝ (ΚΚ)
Κόμβος ΜΑΝ πλησιέστερος στον ΟΤΕ
FE
FE
FE
PRA
PRA
PRA
GE
GE
GE
2Mbps
X.21
X.21
Router ΣΥΖΕΥΞΙΣ Ι
PBX
PRA
Κόμβος Πρόσβασης ΜΑΝ
FEGE ή FE
MAN Switch
FE
FE
FE
BeforeBefore
AfterAfter
Benefits
1)100 / 1000 Mbps access links for 4,000 public state actors.
2)Reduction in public telecommunication costs, by utilizing the public MAN infrastructure rather than other private networks.
3)1300 broadband schools and 2700 broadband agencies
4)A ready to use network for the implementation of SYZEFXIS II network.
5)A fully operational, high-value Layer 1 / Layer 2 network infrastructure waiting for the Public/Private Sector to invest in the near future