Bitumen Trading in India
Introduction
Indian Road Network Indian road network of 33 lakh Km.is second largest in the world and consists of :
Length(In Km)
Expressways 200
National Highways 92,851.07
State Highways 1,31,899
Major District Roads 4,67,763
Rural and Other Roads 26,50,000
Total Length 33 Lakhs Kms(Approx)
Recent survey by NHDP has shown the Indian Road Network length is around 4.80 million Kilometres.
Scope of Bitumen Trading
National Highway Development Project (NHDP) is Centre’s flagship company envisages development of existing National Highways in to world class roads in different phases. Recently NHDP unfolds 20000 KM of NHDP length with total investment of $45 Billion.
Bharatmala Road Project is 6000 KMs Road for connecting 123 district head quarters.
Char Dham connectivity 2500 Kms.
Strong network of of Road in North East and Border are.
NHDP intends to award 10000 KM of road in this financial year itself.
NHAI has granted 1. Rs. 35,000 Crore for 2000 KM road development in Odisha.2. Rs.25,000/- Crore form around 1000 KM road development to
Haryanam including new expressway between Haryana – Punjab- Jammu.
3. Rs. 15000 Cr Projects for North East this Year
Requirement of Bitumen:
Bitumen required per Cubic Meter = 1 X 2.3 X 4.5% X 1000
= 103 KG per Cubic Meter
Normally National Highway is 7 Meter in width and formula is as mention below:
Bitumen required for 1 KM road of 7 M width and 60mm or 0.06 M in thickness is approximately around:
= 7M X 1000 M X 0.06 X 103= 43.26 MT
So approximately 450000 MT Bitumen will be required for New NHAI projects. The quantity is considered only for 2 lane Highway. The requirement will more than double in case of 4 lane with service road both sides.
In State Highways Width is around 4 Meter and Bitumen Required Per Cubic Meter is
= 4 M X 1000 M X 0.02 M X 103 =8.24 MT
The Below table shows that Balance work in state Highways:
Sr.No. District No. of Roads
Road Length No. of
Roads
Road Length No. of Roads
Road Length No. of Roads
Road Length in KM
No. of Roads
Road Length
1 Andhra Pradesh 547 1,924.625 981 2,695.110 1,528 4,619.735 370 1,055.880 964 2,618.4702 Bihar 5,405 15,944.312 208 1,775.767 5,613 17,720.079 2,881 9,454.946 164 1,360.7663 Chhattisgarh 3,208 14,355.243 254 1,364.945 3,462 15,720.188 2,537 11,342.118 218 1,230.3954 Jharkhand 3,667 13,895.762 314 1,374.446 3,981 15,270.208 1,869 7,512.592 84 474.1045 Madhya Pradesh 3,103 12,695.988 918 5,346.975 4,021 18,042.963 2,431 10,254.279 903 5,129.100
6 Maharashtra 115 365.100 615 2,616.972 730 2,982.072 94 257.300 584 2,432.8027 Odisha 6,829 25,544.145 798 4,684.376 7,627 30,228.521 4,660 16,438.341 733 4,298.8218 Telangana 531 1,733.332 939 3,084.573 1,470 4,817.905 398 1,380.730 904 2,974.2059 Uttar Pradesh 518 1,155.992 208 1,367.235 726 2,523.227 407 871.977 181 1,136.01010 West Bengal 1,450 7,333.393 51 479.084 1,501 7,812.477 697 4,125.893 31 255.967
Grand Total 25,373 94,947.892 5,286 24,789.483 30,659 1,19,737.375 16,344 62,694.056 4,766 21,910.640Balance 9,029 32,253.836 520 2,878.843
Sanctioned CompletedNew Connectivity Upgradation Total New Connectivity Upgradation
Total Balance Road in State Highways in KMs = 32253.84 KM
Bitumen will be required =8.24 MT X 32253.89=258031.12 MT Approx.
The above figures does not include the Bitumen required for Sanctioned and ongoing projects in NHAI.
Under ongoing NHDP project approximately 14000 KM of Road is yet to be made and approximate requirement of Bitumen will be:
= 14000 KM X 43.26 MT = 605640 MT
Apart from the above projects many ongoing ADB, World Bank, BOT and NABARD sanctioned roads are also under implementation:
Bitumen Suppliers in India:
In India presently Bitumen is supplied by the following companies from their respective refinery location and also from depots across the country:
1. HPCL-Mumbai, Vishakapatnam2. BPCL- Mumbai, Kochi3. IOC- Koyali, Mathura, Panipat, Haldia, Chennai, Barauni.4. MRPL- Mangalore5. Essar- Jamnagar
Apart from above Imported Bulk Bitumen is being supplied from
1. Kharwar2. Kakinada3. Mundra4. Haldia
Scope of Import Bulk and Packed Bitumen in India
Major Ongoing Road Projects : As Per Annexure –I
Recently Proposed Road Projects : As Per Annexure-II
Previous year has went in lot of dismay due to many changes in Govt. Policies and delay in allocation of funds for Infrastructure development.
Recent action by Ministry of Surface Transport and launching many schemes for road development is going to result in substantial increase in demand for Bitumen in India.
Corporate customers like L&T, GMR etc. get in to agreement with oil companies and prefer to take from Oil Companies reason being in Govt. Road works Imported Bitumen is not accepted . They Look at Importers for Credit supply, sometimes it is unsecured credit. Customers who are near to port or refineries also prefer to buy Bulk Bitumen.
Small customers who are very large in Number and doing very small roads works prefer to take Bitumen in Drums. Such customers mostly buy 10 to 20 drums at a time.
Our Target Customers:
1. ALL BOT, DBOT, DBFOT, AND and World bank customers as for them using Oil Company Bitumen is not mandatory.
2. Small Road works Customer by appointing franchisee working through these franchisee for day to day demand at district level.
3. Presently Customers in States like Karnataka, MP, Maharashtra, Rajasthan, West Bengol, Odisha, Jharkhand, Delhi, AP & Telangana are using Imported Bitumen.
4. In Future Customers of other state will also start using the Import Bitumen.5. There is Lot of demand for water proofing sheets made by using Bitumen.6. Producers of Emulsion of various Grade.
When customer will buy from us?
1. If we offer better price then oil companies.2. If we extend credit facility and supply on delivered basis.3. If our material is approved by R &B, Respective Project consultant. Customers of ADB and
World Bank, are required to take source approval in advance with complete documents like MTC etc.
4. Guarantee of quality and quantity.
It is required to put lot of efforts at ground Level by making group of small customers and supply full truck load and distribute according to their requirement. If we provide door delivery to small customers and making arrangement to receive payment according to their choice it is possible to gain substantial margin. The Group KRUSH is operating in South Karnataka and many dealers are making huge profit by catering to small customers in their region.
Form of Bitumen:
1. Packed Bitumen: Mostly used by small customers.2. Bulk Bitumen: Used by most of the customers. Mostly customers prefer to take bulk
bitumen only. Bulk bitumen is preferred as it is readily available and can be used immediately.
Our Target Sales Plan (Packed)
1. Our initial target customers should be small customers from Villages or small towns who can afford to buy on cash. Since these customer do not put much efforts to deal with direct supplier as their requirement is small. They in turn depend on Local dealers who is ready to supply small quantity also. We can target such group of customers, synchronise their requirement with others and supply according to their requirement by hiring a transporter who can accomplish the entire supply by carrying full truck load.
2. Most of the small customers are not aware of that hey can procure on B.G. Encouraging such customers to buy directly by issuing BG. We may be required to co-ordinate with their Bankers.
3. Dealers who buy either on advance payment or on BG.
Region/Place Monthly Qty in MT
From October2015 to May2016Qty in MT
Mumbai- Maharashtra
300 MT 2000 MT
Hyderabad-Telangana 300 MT 2000 MTKarnataka 300 MT 2000 MT
Target Sales Plan (Bulk)
This is pure advance payment sales as most of the customers do the payment in advance. The customers around 300 kms around ports like Kharwar, Kakinada, Mundra and Haldia to be targeted.
Port Monthly Qty in MT
From October2015 to May2016Qty in MT
Kharwar 1200 MT 9000 MTKakinada 1500 MT 12000 MTHaldia 1000 MT 9000 MTMundra 1000 MT 9000 MT
The storage tanker should be taken on co-bonding base as this will reduce our cost of operations.
Bulk Bitumen (By Decanting Packed Bitumen)
We have observed that certain reason in MP, AP, customers demanding that bitumen should be supplied in packed and it should be decanted in their premises and supplied. They are ready to provide place for decanting unit.
Bulk Bitumen supply by decanting packed can be most beneficial once the following is addressed effectively:
1. Cost of heating increases if the unit is not operated continuously. We should ensure that once unit started it is given optimum quantity to heat.
2. Unit should be nearby to unloading location or else it will add further transportation cost.3. In Most of the decanting units it is found the complete product could not be drained out
from drums and to tune of 1 to 2 kg material remains stuck back to drum.
There is one option that the decanting should be out sourced to one independent agency and cost can be negotiated to benefit all.
Requirement of Man Power:
1. Bhubneshwer -1 CRM2. Kolkota -1 CRM3. Karnataka -2 CRM4. Maharashtra -1 CRM5. AP/ Telangana -1 CRM each6. Vadodara -1 CRM7. Indore -1 CRM
Note : Detail sales plan can be given once customer are contacted directly.
Projects Under Implementation as on 30th June 2015
NHDP Wise Details S.no Stretch NH
No. Length(Km)
On North South & East West Corridor Phase I
East-West
1 Lucknow - Kanpur (EW/3B) 25 16.2
On North South & East West Corridor Phase II
2 Ganga Bridge to Rama Devi Crossing (UP-6) 25 5.63 Kotwa to Dewapur (LMNHP-10) 28 384 Guwahat i to Na lbar i (AS-4 ) 31 285 N a l b a r i t o B i j n i ( A S - 6 ) 31 256 N a l b a r i t o B i j n i ( A S - 7 ) 31 27.37 Brahmputra Br idge (AS-28 ) 31 58 Bijni to Assam/WB Border (AS-12) 31C 309 Bijni to Assam/WB Border (AS-11) 31C 30
10 Bijni to Assam/WB Border (AS-10) 31C 33
11 4 Laning of NH-31D from Ghoshpukur - Salsalabari ( km 0.00 to Km . 83.785) 31-D 83.785
12 Dharamtul to Sonapur (AS-20) 37 2213 Sonapur to Guwahati (AS-3) 37 1914 Nagaon to Dharmatul (AS-2) 37 2515 Maibang to Lumding (AS-27) 54 2116 Maibang to Lumding (AS-24) 54 1517 Maibang to Lumding (AS-26) 54 2318 Harangajo to Maibang (AS-23) 54 1619 Harangajo to Maibang (AS-22) 54 2420 Harangajo to Maibang (AS-21) 54 2621 Maibang to Lumding (AS-25) 54 2822 Forbesgan j -S imrah i (B R -3 ) 57 34.8723 Kota Bypass (RJ-4) 76 26.4224 Chambal Bridge (RJ-5) 76 1.4
North-South 25 Jammu – Udhampur 1A 6526 Srinagar to Banihal 1A 67.7627 Chenani-Nashri 1A 1228 Quazigund-Banihal 1A 15.25
29 New 4 laning Agra Bypass (NS-1/UP-1) 2,3 32.8
30Dholpur - Morena Section (including chambal bridge) NS-1/RJ-MP/1
3 10
31 Six lanning of Vadakkancherry - Thrissuresection 47 30
32Chengapalli to Coimbatore Bypass and End of Coimbatore Bypass to TN/Kerala Border
47 54.83
33 Four lanning of Walayar - Vadakkancherry section 47 54
34 Wadner-Devdhari (NS-60/MH) 7 29
35Four laning from MP/Maharashtra border to Nagpur I/C Kamptee Kanoon and Nagpur bypass
7 95
36 Kelapur-Pimpalkhatti (NS-62) 7 2237 Gwalior – Jhansi 75 80
On Port Connectivity Port Connectivity
38Development of Adiquate Road Connectivity to Chennai -Ennore
Port ConnectivitySR 30.2
Other Phase II Projects 39 Jalandhar - Amritsar 1 20
NHDP Phase III 40 Four laning of Hospet -
Chitradurga 13 120
41 Four Laning of Solapur - Bijapur 13 109.0842 Four laning of Parwanoo -Solan 22 39.14
43Four Laning of Madurai - Ramanathapuram (km 5. to km 81) and Two laning with PS km 81 to km 120
49 115
NHDP PHASE III 44 4 laning of Ambala - Kaithal -
Package -1 65 50.86
45 4 laning of Ambala - Kaithal - Package -2 65 44.5
46 Two Laning with PS of Nagapattinam - Thanjavur 67 78.53
NHDP Phase III 47
UP/Haryana border - Yamuna Nagar -Saha- Barwala - Panchkula ( PKG - 1)
73 44.57
48UP/Haryana border - Yamuna Nagar -Saha- Barwala - Panchkula( PKG - 2)
73 41.79
49 Four laning of Patna - Gaya - Dhobi section of NH-83 83 127.2
50 Ludhiana – Talwandi 95 6.02NHDP Phase IIIA
51 Delhi/Haryana Border to Rohtak 10 63.49
52 Jaipur-Reengus(Approved Length 52.65 Km ) 11 54
53 Reengus – Sikar 11 43.887
54 Jaipur-Tonk - Deoli(Approved Length 148.77 Km ) 12 148.92
55 Deoli – Kota 12 83
56 Kundapur-Surathkal & Mangalore-KNT/Kerala Border 17 90
57 Patna- Muzzaffarpur 19 & 77 63
58 Bhubneshwar-Puri(Approved Length 59 Km) 203 67
59Tirupati -Tiruthani - Chennai(Approved Length 125.5 Km)
205 124.7
602 laning with paved shoulder of Karaikudi - Ramanathapuram section of NH-210 including 500 m on SH-35 section of Madurai road
210 80
61Two Laning of Trichy - Karaikudi and Trichy Bypass(Approved Length 100 Km)
210 & 67 110.372
62Rimoli - Roxy - Rajamunda(Approved Length 163Km)
215 96
63 Panikholi-Rimoli (Approved Length 106 Km) 215 163
64
2/4 Laning of Talchar -Dubari-Chandikhole section of NH-200 from Km 301.89 to Km 427.85 including km 8.5 to Km 14.86 of NH-23
23 &200 132.35
65 Pimpalgaon - Nasik - Gonde 3 6066 Patna – Bakhtiarpur 30 50.667 Krishnanagar - Berhampore 34 7868 Barasat – Krishnanagar 34 84
69 Devihalli-Hassan(Approved Length 73 Km) 48 77.23
70
4 Laning of Belgaum-Khanpur Section(Km 0.00 to Km 30.00) and 2 Laning with paved sholuders of khanpur-Knt/Goa border.(Km 30.00 to Km 84.120)
4A 81.89
71 Muzaffarnagar - Haridwar (Approved Length 77 ) 58, 72 80
72 Nagpur-Wainganga Bridge (Approved Length - 60 Km) 6 45.43
73 Nagpur – kondhali 6 40
742-Laning of Krishnagiri-Tindivanam (Approved Length 170 Km.)
66 176.51
75 Trichy – Karur 67 79.7
76 Rohtak - Bawal(Approved Length 97 Km) 71 83.65
77 Haridwar - Dehradun (Approved Length 69) 72 39
78 Kandla - Mundra Port(Approved Length 73 Km) 8A 71.4
79 4-Laning of Rohtak - Hissar Section 10 98.81
80 Beawar-Pali-Pindwara (Approved Length - 246 Km) 14 244.12
81 Panvel-Indapur 17 8482 Kudapa-Mydukur-Kurnool 18 188.752
83 4 Laning of Chappra-Hajipur(Approved Length 153 Km) 19 65
84 Four Laning of Kiratpur-Ner Chowk Section 21 84.32
85 2 Laning of Dindigul-Perigulam-Theni-Kumili 220 134
86 Muradabad-Bareily (Approved Length 112) 24 121
87 Bareily - Sitapur(Approved Length 24 151.2
134 Km)88 2-Laning with PS Motihari-Raxaul
(Approved Length 67 Km) 28A 68.79
89 2-Laning with PS khagaria - Purnea 31 140
90 Ranchi - Rargaon - Jamshedpur 33 163.591 4 Laning of Raiganj-Dalkola 34 5092 4 Laning of Faraka-Raiganj 34 10393 4 Laning of Brahampore-Faraka 34 103
944 Laning of Mulbagal - Karnataka / AP border-Approved Length (11 Km)
4 22.18
95 Indore-Jhabua-Gujrat/MP (Approved Length 168) 59 155.15
964 Laning of Godhara to Gujarat /MP Border(Approved Length 210 Km)
59 87.285
974 Laning of Ahmedabad to Godhara (Approved Length 210 Km)
59 117.6
98 Gujarat/Maharashtra Border-Surat - Hazira Port Section 6 132.9
99 Talegaon-Amravat(Approved Length 58Km) 6 67.8
100 Sambalpur-Baragarh-Chattisgarh/Orrisa Border 6 88
101 4 Laning of Obedullaganj-Betul Section 69 125
102 4-Laning of Rohtak-Jind (Approved Length 45 Km) 71 48.6
103 4-Laning of Punjab/Haryana Border-Jind 71 68
1042 Laning of Muzaffarpur - Sonbarsa(Approved Length 89 Km)
77 86
105 Kishangarh-Ajmer-Beawar 8 93.56
106 2 Laning of Mokama-Munger(Approved Length 70 Km) 80 69.27
1074 laning of Jetpur-Somnath section of NH-8D (approved length 127.6)
8D 123.45
108 MH/ KNT Border Sangareddy 9 145
109 4-Laning of Solapur - Maharashtra/ Karnatka Section 9 100.06
110 Pune-Sholapur Pkg-II(Approved Length I & II 170 Km) 9 105
111 Ghaziabad-Aligarh (Approved Length 106 ) 91 126
112 Four lanning of Ludhiyana- Talwandi section 95 78
NHDP Phase V 113 Panipat - Jalandhar (Six lane) 1 291
114 Delhi - Agra(Approved Length 180.3 Km) 2 179.5
115 Varanasi-Aurangabad 2 192.4116 Etawah -Chakeri (Kanpur) 2 160.2
117 Six-laning of Barwa Adda-Panagarh 2 122.88
118 Indore-Dewas(Approved Length 55 Km) 3 45.05
119 Belgaum-Dharwad(Approved Length 111 Km) 4 80
120 Pune – Satara(Approved Length 145) 4 140.35
121 Walajapet-Poonamalee 46 93
122 Six Laning of Krishnagiri-walajhapet section 46 148.3
123 Chennai - Tada (Six lane) 5 43.4
124Six Laning of Chandikhol-Jagatpur-Bhubaneswar(Approved Length 61 Km)
5 67
125 Vijayawada-Gundugolanu Section 5 103.59126 Six Laning of Nellore-Chilkaluripet 5 183.52
127 Chilkaluripet - Vijayawada (Six lane) 5 82.5
128 6-Laning of Dhankuni-Khargpur Section 6 111.4
129 Six Laning of Hosur-Krishnagiri 7 59.87
130 Six Laninig of Kishangarh – Udaipur-Ahmedabad
79A, 79 ,76
& 8555.5
131 Gurgaon - Kotputli - Jaipur (Six lane) 8 225.6
132 Ahmedabad to Vadodara Section 8 102.3133 Vadodara-Surat Section 8 6.74134 Surat - Dahisar (Six lane) 8 239135 Samaikhiali-Gandhidham 8A 56.16
NHDP Pahse III 136 4 laning of Kazhakkottam to
Mukkola section of NH-47 47 26.5
NHDP Phase IV 137 Four Laning of Hisar - Dabwali
section with PS - Package -I 10 57
138 Four Laning of Hisar - Dabwali section with PS - Package -2 10 87.66
139 Jodhpur - Barmer section of Package -II 112 74.1
140 Jodhpur - Barmer section of Package -I 112 85.61
141 Padi – Dahod 113 85.58
142Two lane with paved shoulders of Jodhpur - Pokaran section of NH-114 ( New NH No -50)
114 139.33
143 Two laning with Paved shoulder of KarauIi - Dholpur 11B 100.9
144 2-Laning with PS of Jhalawar-Rajasthan/M.P.Border 12 62.16
1452 laning with paved shoulder of Sitarganj - Tanakur section of NH-125
125 52
146 2 Laning with PS of Gulabpura - Uniara 148-D 203.97
147Bikaner - Phalodi section to Four laning from km.4.200 to km 55.25 and Two-lane paved shoulder from 55.25 to km.163.500
15 160.3
148 Phalodi -Jaisalmer section of NH-15 to two/four lane with PS 15 160.45
149Two laning with paved shoulder Barmer - Sanchor - Gujarat boder ( up to Gandhav Bridge) section of NH-15
15 106.3
150 Jaisalmer – Barmer 15 131.41
151 4-Laning of Goa/Karnataka Border-Kundapur Section 17 187.24
152 4-Laning of Hoskote-Dobbaspet 207 80.02
153 Four Laning of Aurangabad - Yedishi 211 190.2
154 4-Laning of Solapur - Yedishi 211 100
section of NH-211
155Two lane with paved shoulders of Bijapur - Gulbarga - Homnabad - section of NH-218 ( New NH No -50)
218 220.1
156 Thirumayam - Manamadurai section 226 77.72
157 Thanjavur - Pudukottai section of NH-226 226 55.22
158 Two lane with paved shoulders of Chas -Ramgarh section of NH-23 23 78.19
159 2-Laning with paved shoulder of Raebareli to Jaunpur 231 165.5
160 4-laning of Ghaghra bridge to Varansi ( Package -I) 233 58.62
161 2-Laning with paved shoulder of Muzaffarpur - Barauni 28 107.56
162 Four laning of Varanasi Bypass 29&56 16.55
163 4 Laning of Guna to Biaora 3 93.5
164 Four Laning of Shivpuri - Guna Package - I 3 97.7
165 Four laning of Gwalior-Shivpuri 3 125.03166 4 laning of Biaora - Dewas 3 141.26
167Widening & strengthening to 2-Lane with PS of Nimbi Jodha-Degana-Merta City Section
458 139.9
168 2-Laning with PS of Lambia-Jaitran-Raipur 458 52.8
169 4-Laning of Khed - Sinnar Section 50 137.946
170 Four laning of Orissa/Chattisgarh Border - Aurang section 6 150.4
1712-Lane with paved shoulder with provision of Capacity Augmentation of Rajasthan Border-Fatehpur-Salasar Section
65 154.141
172 Four laning of Kaithal - Rajasthan border 65 166.25
173 4 Laning of Nagpur Betul 69 176.3
174 Four Laning of Rewa - Katni - Jabalpur - Package -IV 7 68.26
175 Four Laning of Rewa - Katni - Jabalpur - Package -II 7 69.07
176 Four Laning of Rewa - Katni - Jabalpur - Package -I 7 69.19
177 Four Laning of Jabalpur - Lakhnadon 7 80.92
178 4-Laning of Kashipur-Sitarganj Section 74 77.2
179 2-Laning with PS Sitarganj Bareily Section 74 74.46
180 2-Laning with PS of Bhilwara-Ladpura section 758 67.75
181 4-Laning of Rajsamand-Gangapur-Bhilwara 758 87.25
182 4 Laning of Gomti Chauraha - Udaipur 8 79.31
183 2-Laning with PS Kanpur - Kabrai 86 123
184 2-Laning with PS Raibariely to Allahabad 24B 119
NHDP Phase VII 185 New 4-Lane Elevated Road from
Chennai Port - Maduravoyal 4 19
Others(Misc.) 186 Construction of Flyover at
Bahalgarh ch.41.210 and 1 0
construction of additional 2-lane bridge near Rasoi Ch.32.28 on NH-1 in the state of Haryana
1872-laning with paved shoulders of Bheem to Parasoli section (Package-I)
148D 33
1882-laning with paved shoulders of Bheem to Parasoli section (Package-II)
148D 36.267
1892-laning with paved shoulders of Raebareli - Banda section of NH-232
232 133.28
190 2-laning with paved shoulders of Tanda -Raebareli 232 155.9
191 Bhatinda-Suratgarh (ROB) 32-B 0192 Dalkola Bypass 34 5.5
193 NH Connectivity to ICTT Vallarpadam 47C 17.2
SARDP 194 Jorbat-Barapani 40 61.8
Grand Total: 16975.61 KM
List of Contractors & Nationality of National Highways Developement Project - 30th June 2015
S.no
Stretch NH No
Length
Contractor & Nationality
(Km)1 2-Laning with PS Gopalganj-Chappra 85 92 Abhijeet Infrastructure Ltd.-Indian2 4 Laning of Barhi - Hazaribagh(Approved Length
40 Km)33 41.314
3 4-Laning of Angul - Sambalpur 42 1534 Sambalpur-Baragarh-Chattisgarh/Orrisa Border 6 88 Ashoka Buildcon Ltd-(Ashoka Sambalpur
Baragarh Expressway Pvt. Ltd.)-Indian
5 6-Laning of Dhankuni-Khargpur Section 6 111.46 4-Laning of Cuttak - Angul 42 1127 Belgaum-Dharwad(Approved Length 111 Km) 4 80
8 Nagpur - kondhali 6 40 Atlanta - SREI Consortium (JV)-Indian
9 Patna - Bakhtiarpur 30 50.6 BSC-C & C (JV)-Indian10 2 Laning of Mokama-Munger(Approved Length
70 Km)80 69.27
11 Four laning of Orissa/Chattisgarh Border - Aurang section
6 150.4
12 2 Laning of Muzaffarpur - Sonbarsa(Approved Length 89 Km)
77 86
13 4 Laning of Godhara to Gujarat /MP Border(Approved Length 210 Km)
59 87.285
14 Four laning of Meerut Bulandshahar 235 66.482 C & C Constructions Limited-Indian15 New 4-Lane Elevated Road from Chennai Port -
Maduravoyal4 19 Chennai Elevated Tollway Ltd-Indian
16 Development of Adiquate Road Connectivity to Chennai -Ennore Port Connectivity
SR 30.2 Coastal-SPL(JV)-Indian
17 4-Laning of Solapur - Maharashtra/ Karnatka Section
9 100.06
18 Phalodi -Jaisalmer section of NH-15 to two/four lane with PS
15 160.45 Corson Coriviam Construction S.A-Indian
19 2/4 Laning of Talchar -Dubari-Chandikhole section of NH-200 from Km 301.89 to Km 427.85 including km 8.5 to Km 14.86 of NH-23
23 &200
132.35
20 2-Laning with PS of Jhalawar-Rajasthan/M.P.Border
12 62.16 Dilip Buildcon Limited-Indian
21 4 laning of Ambala - Kaithal - Package -1 65 50.86
22 4-laning of Ghaghra bridge to Varansi ( Package -I)
233 58.62
23 Thirumayam - Manamadurai section 226 77.7224 Two laning with Paved shoulder of KarauIi -
Dholpur11B 100.9
25 Padi - Dahod 113 85.58 Dinesh Chandra Aggarwal-Indian26 Widening & strengthening to 2-Lane with PS of
Nimbi Jodha-Degana-Merta City Section458 139.9
27 Nalbari to Bijni (AS-6) 31 25
28 Jalandhar - Amritsar 1 20
29 Indore-Dewas(Approved Length 55 Km) 3 45.05 DLF-Gayatri-Indian30 Gwalior - Jhansi 75 80 DSC - Apollo consortium-Indian - UK JV
31 Gurgaon - Kotputli - Jaipur (Six lane) 8 225.6 Emirates Trading Agency LLC - KMC Construction Ltd.-Dubai - Indian
32 Haridwar - Dehradun (Approved Length 69) 72 39 ERA - SIBMOST(JV)-Indian - Russian
33 Rampur - Kathgodam 87 93.226
34 Muzaffarnagar - Haridwar (Approved Length 77 )
58, 72
80
35 Bareily - Sitapur(Approved Length 134 Km) 24 151.2
36 4-Laning of Lucknow - Sultanpur 56 125.9 ESSAR - Atlanta (JV)-Indian37 4 Laning of Ahmedabad to Godhara (Approved
Length 210 Km)59 117.6 ESSEL Infra & CR-18 Consortium-Indian-
china38 Four lanning of Ludhiyana- Talwandi section 95 78
39 Walajapet-Poonamalee 46 9340 Four laning of Gwalior-Shivpuri 3 125.0341 Jodhpur - Barmer section of Package -II 112 74.1 G R Infra Projects Ltd-Indian42 Reengus - Sikar 11 43.88743 4-Laning of Kashipur-Sitarganj Section 74 77.2 Galfar Engineering and Contracting SAOG-
Oman44 2-Lane with paved shoulder with provision of
Capacity Augmentation of Rajasthan Border-Fatehpur-Salasar Section
65 154.141
45 2-Laning with paved shoulder of Rehabitation and augmentation of the Gulabpur-Uniara Section
148D 214 Gammon India Limited-Indian
46 Ganga Bridge to Rama Devi Crossing (UP-6) 25 5.6
47 Brahmputra Bridge (AS-28) 31 548 Forbesganj-Simrahi (BR-3) 57 34.8749 Patna- Muzzaffarpur 19 &
7763
50 Rehabitation and Upgradation to Birmitrapur to Barkote (4 Lane-75.66 Km)-(2 Lane-49.955 Km)
23 125.615
51 4 Laning of UP/Haryana Border-Yamunanagar-Saha-Barwala- Panchkula
73 107
52 Vijayawada-Gundugolanu Section 5 103.59
53 Patna - Buxar 30 & 84
124.85
54 Jabalpur to Lakhanadone 7 80.82 Gannon Dunkerley & Co. Ltd.-Indian55 Maibang to Lumding (AS-27) 54 21 Gayatri -ECI (JV)-Indian56 Panikholi-Rimoli (Approved Length 106 Km) 215 163
57 Thanjavur - Pudukottai section of NH-226 226 55.2258 Six Laninig of Kishangarh – Udaipur-Ahmedabad 79A,
79 ,76 & 8
555.5 GMR Infrastructure Ltd.-Indian
59 Bijni to Assam/WB Border (AS-10) 31C 33 GPL-ECI (JV)-Indian60 Bijni to Assam/WB Border (AS-11) 31C 3061 2 Laning of Forbesganj-Jogwani(Approved
Length 13 Km)57A 9.258 GPT-RDS Consortium Ltd-Indian
62 Widening & strengthening to 2-Laning with PS of Raipur-Jassa Khera
458 32.36 GR Infra Projects Limited-Indian
63 2-Laning with PS of Lambia-Jaitran-Raipur 458 52.864 Four laning of Parwanoo -Solan 22 39.1465 Four Laning of Hisar - Dabwali section with PS -
Package -210 87.66
66 Four Laning of Hisar - Dabwali section with PS - Package -I
10 57
67 Jaisalmer - Barmer 15 131.4168 Deoli - Kota 12 83 GVK Development Projects Pvt Ltd-Indian
69 Four laning of Shivpuri-Dewas 3 330.21 GVK Transportations Network Ltd.-Indian
70 4 Laning of Belgaum-Khanpur Section(Km 0.00 to Km 30.00) and 2 Laning with paved sholuders of khanpur-Knt/Goa border.(Km 30.00 to Km 84.120)
4A 81.89 GVR Infra Projects-RMN Infrastructure Ltd-Indian
71 2 laning with paved shoulder of Sitarganj - Tanakur section of NH-125
125 52 H.G. Infra Engineering (P) Ltd-Indian
72 Harangajo to Maibang (AS-23) 54 16 Hindustan Construction Company Ltd.-Indian
73 4 Laning of Faraka-Raiganj 34 103
74 4 Laning of Brahampore-Faraka 34 103
75 4 Laning of Raiganj-Dalkola 34 50
76 Chambal Bridge (RJ-5) 76 1.4 Hyundai eng. Cons. Co. Ltd. - M/s Gammon India Ltd.-Korean - Indian JV
77 4 laning of Jetpur-Somnath section of NH-8D (approved length 127.6)
8D 123.45 IDFC-PLUS Expessway Berhad Consortium-Indian-Malaysian (JV)
78 Chilkaluripet - Vijayawada (Six lane) 5 82.5 IJM Corporation Berhad - IDFC Ltd.-Malaysian - Indian
79 Muradabad-Bareily (Approved Length 112) 24 121 IL & FS Transportation Ltd.-Indian
80 Pune-Sholapur Pkg-II(Approved Length I & II 170 Km)
9 105
81 Four Laning of Kiratpur-Ner Chowk Section 21 84.32
82 Chenani-Nashri 1A 12
83 Four laning of Patna - Gaya - Dhobi section of NH-83
83 127.2
84 Maibang to Lumding (AS-25) 54 28
85 4-Laning of Khed - Sinnar Section 50 137.946
86 Six-laning of Barwa Adda-Panagarh 2 122.88
87 4-Laning of Solapur - Yedishi section of NH-211 211 100 IRB Infra-Indian
88 Surat - Dahisar (Six lane) 8 239 IRB Infrastructure Developers Ltd.- Deutsche Bank AG-Indian - Singapore
89 4-Laning of Goa/Karnataka Border-Kundapur Section
17 187.24
90 Four laning of Kaithal - Rajasthan border 65 166.25
91 Four Laning of Aurangabad - Yedishi 211 190.2
92 Ahmedabad to Vadodara Section 8 102.393 Jaipur-Tonk - Deoli(Approved Length 148.77 Km
)12 148.92
94 Talegaon-Amravat(Approved Length 58Km) 6 67.8
95 Panji-Goa/Karnatka Border 4A 6996 Bikaner - Phalodi section to Four laning from
km.4.200 to km 55.25 and Two-lane paved shoulder from 55.25 to km.163.500
15 160.3 IRCON International Limited-Indian
97 Four Laning of Shivpuri - Guna Package - I 3 97.7
98 Panipat - Jalandhar (Six lane) 1 291 Isolux Corsan Concesionnes Sa - Corsan Corviam Constructions SA - Soma
Enterprise Ltd-Spain - Indian99 Gujarat/Maharashtra Border-Surat - Hazira Port
Section6 132.9
100 Kishangarh-Ajmer-Beawar 8 93.56
101 Varanasi-Aurangabad 2 192.4
102 Charthalai-ochira 47 83.6103 Kota Bypass (RJ-4) 76 26.42 ITD- CemIndia (JV)-Thailand - Indian JV
104 Six-Laning of Gundugolanu Rajamundry 5 120.741 IVRCL Assests & Holding Limited-Indian
105 4-Laning of Raipur - Bilaspur 200 126.525106 Chengapalli to Coimbatore Bypass and End of
Coimbatore Bypass to TN/Kerala Border47 54.83
107 4/6 Laning of Maharastra/Goa Border - Panaji Goa/KNT Border
17 139
108 Indore-Jhabua-Gujrat/MP (Approved Length 168) 59 155.15
109 4 Laning of Mulbagal - Karnataka / AP border-Approved Length (11 Km)
4 22.18 J.S.R. Construction Pvt Ltd-Indian
110 Nagpur-Wainganga Bridge (Approved Length - 60 Km)
6 45.43 JMC Projects India Ltd.-Indian
111 Rohtak - Bawal(Approved Length 97 Km) 71 83.65112 Delhi/Haryana Border to Rohtak 10 63.49 KCT - ERA consortium-Indian113 Kota - Jhalawar 12 88.09 Keti Constructions Ltd.-Indian114 Kudapa-Mydukur-Kurnool 18 188.752 KMC Construction Ltd. - IVRCL Consortium-
Indian115 Six lanning of Vadakkancherry -
Thrissuresection47 30
116 Nalbari to Bijni (AS-7) 31 27.3117 Dharamtul to Sonapur (AS-20) 37 22118 4-lanning of Kannur Vengalem Kuttipuram
(Package -I)17 83.2
119 4-lanning of Kannur Vengalem Kuttipuram (Package -II)
17 81.5
120 Six-Laning of Aurangabad-Barwa Adda 2 221.346121 Six Laning of Nellore-Chilkaluripet 5 183.52 KMC-BSCPL Consortium-Indian122 Four Laning of Madurai - Ramanathapuram (km
5. to km 81) and Two laning with PS km 81 to km 120
49 115 KNR Construction Ltd-Indian
123 Four lanning of Walayar - Vadakkancherry section
47 54
124 4 laning of Kazhakkottam to Mukkola section of NH-47
47 26.5
125 2-Laning with paved shoulder of Muzaffarpur - Barauni
28 107.56
126 Bhubneshwar-Puri(Approved Length 59 Km) 203 67 KSS-Valecha (Bhubneshwar Expressway Pvt. Ltd.)-Indian
127 4 Laning of NH-31D from Ghoshpukur - Salsalabari ( km 0.00 to Km . 83.785)
31-D 83.785 L & T Ltd-Indian
128 MH/ KNT Border Sangareddy 9 145
129 Beawar-Pali-Pindwara (Approved Length - 246 Km)
14 244.12
130 4-Laning of Amravati-Jalgaon 6 275.225
131 4-Laning of Jalgaon-Maharashtra/Gujrat Border 6 208.844
132 2-Laning with PS Aligarh - Kanpur 91 268 Lanco Infratech Ltd.-Indian133 Pimpalgaon - Nasik - Gonde 3 60 Larsen & Toubro Ltd. - ABL Consortium-
Indian134 Devihalli-Hassan(Approved Length 73 Km) 48 77.23
135 Samaikhiali-Gandhidham 8A 56.16136 Chennai - Tada (Six lane) 5 43.4137 Six Laning of Krishnagiri-walajhapet section 46 148.3
138 Vadodara-Surat Section 8 6.74139 Four Laning of Rewa - Katni - Jabalpur - Package
-IV7 68.26
140 Four Laning of Rewa - Katni - Jabalpur - Package -I
7 69.19
141 Four Laning of Jabalpur - Lakhnadon 7 80.92142 Four Laning of Rewa - Katni - Jabalpur - Package
-II7 69.07
143 Four laning of Varanasi Bypass 29&56
16.55 M/s Apco Infratech Privste Ltd-Indian
144 Ludhiana - Talwandi 95 6.02 M/s Ceigall India Ltd-Indian145 2 Laning with PS of Gulabpura - Uniara 148-D 203.97 M/s Dilip Buildcon Ltd - Ramjit Buildcon
Ltd-Indian146 4 Laning of Guna to Biaora 3 93.5147 Two lane with paved shoulders of Chas -
Ramgarh section of NH-2323 78.19
148 Two lane with paved shoulders of Jodhpur - Pokaran section of NH-114 ( New NH No -50)
114 139.33 M/s G R Infraprojects Ltd-Indian
149 Two lane with paved shoulders of Bijapur - Gulbarga - Homnabad - section of NH-218 ( New NH No -50)
218 220.1 M/s Larsen & Toubro Ltd-Indian
150 Two laning with paved shoulder Barmer - Sanchor - Gujarat boder ( up to Gandhav Bridge) section of NH-15
15 106.3 M/s Montecarlo Ltd-Indian
151 4 laning of Biaora - Dewas 3 141.26 M/s Oriental Structural Engineers Pvt Ltd-Indian
152 Nagaon to Dharmatul (AS-2) 37 25 Madhucon Projects Ltd.-Indian153 Barasat - Krishnanagar 34 84
154 Vijayawada-Machhlipatnam 9 64.611155 Ranchi - Rargaon - Jamshedpur 33 163.5156 Two Laning with PS of Nagapattinam -
Thanjavur67 78.53
157 4 Laning of Chappra-Hajipur(Approved Length 153 Km)
19 65
158 Sonapur to Guwahati (AS-3) 37 19 Maheshwari Brothers Ltd.-Telecommunication Consultant India Ltd.-Indian
159 Rimoli - Roxy - Rajamunda(Approved Length 163Km)
215 96 MBL-SREI-Indian
160 Harangajo to Maibang (AS-22) 54 24 N.K.C - JKM (JV)-Indian161 Harangajo to Maibang (AS-21) 54 26162 Maibang to Lumding (AS-24) 54 15163 Kundapur-Surathkal & Mangalore-KNT/Kerala
Border17 90 Navayuga - KPCL Consortium-Indian
164 4 Laning of Khagaria-Bakhtiarpur 31 112.982 Navayuga Engineering Company Ltd.-Indian
165 Quazigund-Banihal 1A 15.25166 Lucknow - Kanpur (EW/3B) 25 16.2 Neeraj Cement Structural Ltd-Indian167 Four laning from MP/Maharashtra border to
Nagpur I/C Kamptee Kanoon and Nagpur bypass
7 95 Oriental Structural Engineers Ltd.-Indian
168 Etawah -Chakeri (Kanpur) 2 160.2
169 4 Laning of Nagpur Betul 69 176.3
170 4-Laning of Hospet-Bellary-Karnataka/AP Border 63 95.44 PNC Infratech Ltd.- BF Utility Ltd. ConsortiumL-Indian
171 New 4 laning Agra Bypass (NS-1/UP-1) 2,3 32.8172 2-Laning with paved shoulder of Raebareli to
Jaunpur231 165.5
173 2-Laning with PS Kanpur - Kabrai 86 123174 Dholpur - Morena Section (including chambal
bridge) NS-1/RJ-MP/13 10
175 Kelapur-Pimpalkhatti (NS-62) 7 22 Prasad-MKS Constro (JV)-Indian176 Bhopal-Sanchi(Approved Length 40 Km) 86Ex 53.78 Pratibha Industries-Abhyuday Housing
Construction Ltd-Indian177 Kotwa to Dewapur (LMNHP-10) 28 38 Progressive Construction Ltd. - MVR (JV)-
Indian178 Deewapur to UP/Bihar Border (LMNHP-9) 28 41.085179 Bijni to Assam/WB Border (AS-12) 31C 30180 2-Laning with PS khagaria - Purnea 31 140 Punj Lloyd Infrastructure Ltd.-Indian181 Guwahati to Nalbari (AS-4) 31 28182 Srinagar to Banihal 1A 67.76 Ramkey Infra and JPTEG-Indian-China (JV)
183 Hospet - Chitradurga 13 120.03184 Agra-Etawah Bypass 2 124.52185 Trichy - Karur 67 79.7 Reliance Energy Limited-Indian186 Kandla - Mundra Port(Approved Length 73 Km) 8A 71.4
187 Pune – Satara(Approved Length 145) 4 140.35
188 Six Laning of Hosur-Krishnagiri 7 59.87189 Delhi - Agra(Approved Length 180.3 Km) 2 179.5190 Jaipur-Reengus(Approved Length 52.65 Km ) 11 54
191 Wadner-Devdhari (NS-60/MH) 7 29 Roman Tarmat Ltd.-Indian192 4-Laning of Rohtak - Hissar Section 10 98.81 Sadbhav Engg. Limited-Indian
193 4 Laning of Solapur - Bijapur 13 110.542194 4 Laning of Gomti Chauraha - Udaipur 8 79.31195 4-Laning of Rajsamand-Gangapur-Bhilwara 758 87.25
196 UP/Haryana border - Yamuna Nagar -Saha- Barwala - Panchkula ( PKG - 1)
73 44.57
197 UP/Haryana border - Yamuna Nagar -Saha- Barwala - Panchkula( PKG - 2)
73 41.79
198 4 laning of Ambala - Kaithal - Package -2 65 44.5199 Jodhpur - Barmer section of Package -I 112 85.61200 Krishnanagar - Berhampore 34 78 SEW Infra.-Indian201 Jammu - Udhampur 1A 65 Shaboorji & Palonji Co. Ltd.-Indian202 Maibang to Lumding (AS-26) 54 23 Simplex Infrastructure Ltd.-Indian203 2 Laning of Jowai -Meghalaya/Assam Border
(Approved length 109 Km)44 102
204 4-Laning of Mahulia to Behragora to Kharagpur 33 & 6
127
205 Four laning of Jabalpur-Katni-Rewa Section 7 225.686 SOMA Tollways Pvt. Ltd.-Indian
206 Ghaziabad-Aligarh (Approved Length 106 ) 91 126 SREI - PNC - GALFAR Consortium-Indian - Dubai
207 Six Laning of Chandikhol-Jagatpur-Bhubaneswar(Approved Length 61 Km)
5 67 SREI-Simplex-Galfar Consortium(Shree Jagannath Expressway pvt.ltd.)-Indian-Dubai
208 Panvel-Indapur 17 84 Supreme Infrastructure India Ltd.-Mahavir Road & Infrastructure Pvt. Ltd.-China State Construction Engg. Hongkong Ltd.-Indian-China
209 2 Laning with paved shoulder of Chhapra - Rewaghat - Muzaffarpur section of NH-102
102 73.08 Supreme Infrastructure India Ltd-Indian
210 2-Laning with PS Motihari-Raxaul (Approved Length 67 Km)
28A 68.79 Tantia-Jiangsu (JV)-Indian-China (JV)
211 2-Laning of Krishnagiri-Tindivanam (Approved Length 170 Km.)
66 176.51 Transstroy (I) Ltd. - Corporation Transstroy OJSC Consortium-Indian - Russian
212 4 Laning of Obedullaganj-Betul Section 69 125 Transstroy (India) Ltd.-Indian213 Six-Laning of Anandapuram-Visakapatnam-
Anakapalli5 58.222 Transstroy (India) Ltd.-OJSC Corporation
Transstroy-Cosortium-Indian
214 Two Laning of Trichy - Karaikudi and Trichy Bypass(Approved Length 100 Km)
210 & 67
110.372 Transstroy Ltd-OJSC Consortium-Indian-Russian
215 Tirupati -Tiruthani - Chennai(Approved Length 125.5 Km)
205 124.7
216 2 Laning of Dindigul-Perigulam-Theni-Kumili 220 134
217 4 Laning of Coimbatore-Mettupalayam 67 53.93218 4-Laning of Hoskote-Dobbaspet 207 80.02219 KNT/Kerala Border to Kanuur Section(Approved
Length 286.3)17 126.6
220 2 laning with paved shoulder of Karaikudi - Ramanathapuram section of NH-210 including 500 m on SH-35 section of Madurai road
210 80
221 Four laning of Hospet - Chitradurga 13 120 TRIL Roads Pvt Ltd-Indian222 Four Laning of Solapur - Bijapur 13 109.08 Uniquest Infra Ventures Pvt Ltd-Indian
223 4-Laning of Punjab/Haryana Border-Jind 71 68 Unity Infraprojects Ltd.-Indian224 4-Laning of Rohtak-Jind (Approved Length 45
Km)71 48.6 Vijai Infrastructure Ltd.-Indian
225 2-Laning with PS Raibariely to Allahabad 24B 119 Vijay Infrastructure Ltd-Vijay Construction(JV)-Indian
226 2-Laning with PS Sitarganj Bareily Section 74 74.46 VIL Ltd.-Indian
227 2-Laning with PS of Bhilwara-Ladpura section 758 67.75 Zignego Company Inc-GHV (India) Pvt. Ltd.(JV)-USA-Indian