• BUILD A BUILDING THAT WORKS -
• GET PAID FOR IT -
• AND GO ON TO THE NEXT PROJECT.
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• MANAGE THE BUILDING PROCESS
• MANAGE THE PEOPLE INVOLVED WITH THE PROCESS
• IF IT DOESN’T WORK – DON’T DO IT THAT WAY!!!!
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• EXTREME – TO THE NTH POWER – DOCUMENTATION
• EXTRA EYES ON THE PROCESS AND THE INSTALLATION
• SPECIALIZED KNOWLEDGE – BEEN THERE, DONE THAT
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
WHAT CAN COMMISSIONING BRING TO THE PARTY?
YOU HAVE TO UNDERSTAND THE PROCESS -
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
IT’S ALL ABOUT THE
TEAM!
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• GUIDELINE 0 – THE COMMISSIONING PROCESS
• A RIGOROUS FORMAL PROCESS OF VERIFYING THAT A PROJECT MEETS THE OWNER’S REQUIREMENTS.
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• THE PROCESS HAS ALREADY BEEN DETERMINED
• DON’T WORRY ABOUT THE PROCESS
• LET THE COMMISSIONING AGENT WORRY ABOUT THAT
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• HVAC SYSTEMS
• ELECTRICAL
• ENVELOPE
• WINDOWS
• AIR BARRIER
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
ASHRAE Guideline 0-2005: The Commissioning ProcessASHRAE Guideline 0-2005: The Commissioning Process
ASHRAE Guideline 1.1-2007 HVAC&RTechnical Requirements for The Commissioning Process
ASHRAE Guideline 1.1-2007 HVAC&RTechnical Requirements for The Commissioning Process
NIBSGuideline 3-2006 Exterior EnclosureTechnical Requirements for The Commissioning Process
NIBSGuideline 3-2006 Exterior EnclosureTechnical Requirements for The Commissioning Process
Guidelines2-200X & 4-200Xthrough 14-200X Technical commissioning guidelines dealing with structure, electrical, lighting, interiors, plumbing, etc.
Guidelines2-200X & 4-200Xthrough 14-200X Technical commissioning guidelines dealing with structure, electrical, lighting, interiors, plumbing, etc.
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• OWNER’S GOALS FOR NEW FACILITY
• GUIDANCE FOR THE DESIGN TEAM– DEVELOPED BY OWNER– USER REQUIREMENTS– LIVING DOCUMENT - EVOLVES
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• DEVELOPED BY DESIGN TEAM
• FULFILLS OPR INTENT
• VERIFIED/SOMETIMES ASSISTED BY CxA
• FOCUSED DESIGN REVIEWS
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
SO! WHERE DO WE GO FROM HERE!!
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
UNDERSTAND THECOMMISSIONING
PROCESS
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
The Commissioning Process involves steps that are integrated into every phase of the project:
Commissioning is NOT
just testing at the end!
PRE-DESIGN DESIGN CONSTRUCTION OCCUPANCY & OPS
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
THE SIMPLIFIED PROCESS
• DESIGN :– WORK WITH DESIGNERS– COMMISSIONING DESIGN REVIEW – COMMENT ON DESIGN– FOLLOW UP ON DESIGN CHANGES
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
THE SIMPLIFIED PROCESS
• CONSTRUCTION - SYSTEMS– COMMISSIONING PLAN– SUBMITTAL REVIEW– PRE-STARTUP CHECKLISTS– FUNCTIONAL PERFORMANCE TESTS
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
THE SIMPLIFIED PROCESS
• CONSTRUCTION: ENVELOPE– COMMISSIONING PLAN– DESIGN REVIEW– SITE VISIT SCHEDULE (MILESTONES)– OBSERVATIONS AND TESTING
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
THE SIMPLIFIED PROCESS
• TURNOVER – TRAINING– SYSTEMS MANUAL– WARRANTIES– ACCEPTANCE– O&M MANUALS
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
THE SIMPLIFIED PROCESS
• OCCUPANCY (OPERATIONS)– WARRANTY– DEFERRED TESTING– OFF SEASON TESTING– TEN MONTH VISIT
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
IF THIS IS THE PROCESS – WHAT CAN A PROJECT MANAGER DO TO TAKE ADVANTAGE OF IT?
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• TEAM MEETINGS
• ARRANGE AN “ALL TEAM MEMBER MEETING” EARLY
• A “MEET AND GREET” MEETING– COULD BE A LUNCH MEETING– NOT A WORKING MEETING
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• COPY THE COMMISSIONING TEAM WITH ANYTHING CONCERNING THE COMMISSIONED SYSTEMS
• PROVIDE AN UP-TO-DATE CONTACT LIST
• IF POSSIBLE – PROVIDE A TELECON DIAL IN NUMBER FOR Cx TEAM USE
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• REGULAR SCHEDULED TELECONS IN THE TURNOVER PHASE
• COPY EVERYONE WITH COMMISSIONING REPORTS
• MAKE COMMUNICATION EASY
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
PROJECT RESOLUTION
• RESOLVE ISSUES AT THE LOWEST LEVEL
• RESOLVE THEM DURING INSPECTIONS IF POSSIBLE
• HANDLE Cx ISSUES IMMEDIATELY
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
MOCKUPS
• USE MOCKUPS WHERE POSSIBLE
• TRAIN DESIGNATED INSTALLERS ON MOCKUPS – THE “A” “B” AND “C” TEAMS
• DO TEST INSTALLATIONS ON HIGH QUANTITY EQUIPMENT
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• TEAM MEETINGS
• KEEP CXA IN THE LOOP
• RESPOND TO ISSUE REPORTS PROMPTLY
• SOLVE ISSUES AT THE LOWEST LEVEL
• USE MOCK-UPS
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• ONE PAGE COMMISSIONING PLAN
SUMMARY
• ONE PAGE MILESTONE LOG
• PRE-STARTUPS – FACTORY IS GOOD!
• INSPECTIONS – AS SOON AS
COMMISSIONED WORK STARTS
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
THE DELIVERY PROCESS
• ROLES AND RESPONSIBILITIES
• CHECKLIST ADMINISTRATION
• PRE-STARTUP CHECKLIST PAPERWORK
• ISSUES LOG PROCESS AND REVIEW
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• FACILITATE MEETINGS
• SET TONE FOR CX
• COMMUNICATE WITH TEAM
• DO MOCK UPS
• USE THE CxA AS YOUR CONSULTANT
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• GET CX, TAB, AND CONTROLS ON
SAME PAGE – EARLY !!!!
• REVIEW CONTROLS EARLY!
• PLAN FOR COMMISSIONING
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
• LEED – CLEAR DEFINITION OF CxA ROLE
• DON’T DELAY IN HIRING CX
• IF ENHANCED – DESIGN REVIEWS
• COMMISSIONING BY QUALIFIED CxA
• CONCURRENT SUBMITTAL REVIEW – PLAN
FOR IT
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11
SERBCA Fall Conference
Building Diagnostics & Property Science5217 5th Avenue SouthBirmingham, AL 35212
Phone: [email protected]