F ixing A merica’s S urface T ransportation
FAST ACT
Statewide Planning MeetingJanuary 20, 2016Thomas Nelson, Jr. FHWA-KYKYOVA Freight Summit
February 17, 2016Bernadette Dupont, FHWA-KY
$305 B (all modes) over FY2016-2020Program 5-Year Funding
(billions)
Federal Highway Administration $ 226.3Federal Transit Administration 61.1
Federal Motor Carrier Safety Administration 3.2
Pipeline and Hazardous Materials Administration 0.4
National Highway Traffic Safety Administration 4.7
Federal Railroad Administration 10.3
Total 305.0
2
3
2015: $ 421,797,542 (Actual)2016: $ 443,288,929 (Estimate)2017: $ 452,422,922 (Estimate)2018: $ 462,220,829 (Estimate)2019: $ 472,653,435 (Estimate)2020: $ 487,973,279 (Estimate) $2,314,579,394 TOTAL
FAST ACT: WV’s Apportionment
2015 2016 2017 2018 2019 2020 $1,100,000,000
$1,150,000,000
$1,200,000,000
$1,250,000,000
$1,300,000,000
$1,350,000,000
$1,400,000,000
$1,450,000,000
$1,500,000,000
$1,550,000,000
4
2015: $ 641,292,458 (Actual)2016: $ 673,966,719 (Estimate)2017: $ 687,884,265 (Estimate)2018: $ 702,750,398 (Estimate)2019: $ 718,611,920 (Estimate)2020: $ 735,822,382 (Estimate) $3,519,035,684 TOTAL
FAST ACT: KY’s Apportionment
2015 2016 2017 2018 2019 2020$580,000,000
$600,000,000
$620,000,000
$640,000,000
$660,000,000
$680,000,000
$700,000,000
$720,000,000
$740,000,000
$760,000,000
5
2015: $1,293,739,008 (Actual)2016: $1,259,663,237 (Estimate)2017: $1,387,740,399 (Estimate)2018: $1,417,731,235 (Estimate)2019: $1,449,730,162 (Estimate)2020: $1,484,450,429 (Estimate)
FAST ACT: OH’s Apportionment
2015 2016 2017 2018 2019 2020 $1,100,000,000
$1,150,000,000
$1,200,000,000
$1,250,000,000
$1,300,000,000
$1,350,000,000
$1,400,000,000
$1,450,000,000
$1,500,000,000
$1,550,000,000
FAST ACT AND FREIGHT
6
7
FAST ACT: Freight Freight is a primary focus:
1) Expands Freight Network
2) Adds a new Freight Formula (Natl Highway Freight Program)
3) Adds a new Discretionary Program -nationally significant freight and highway projects
1. Expands Freight Network• National MULTIMODAL Freight Network
• National HIGHWAY Freight Network
FAST ACT: 1. Expands Freight Network
8
National MULTIMODAL Freight Network
• Interim right now
• Effective 180 days after enactment
FAST ACT: 1. Expands Freight Network
9
National MULTIMODAL Freight NetworkIncludes:• National HIGHWAY Freight Network (NHFN)• Freight Rail Systems of Class I Railroads• Public Ports of the US• US Inland and Intracoastal Waterways• Great Lakes, St. Lawrence Seaway, and coastal and ocean
routes along which domestic freight is transported• 50 US airports• Other strategic assets, intermodal facilities, Class II & III
railroads
FAST ACT: 1. Expands Freight Network
10
National HIGHWAY Freight Network
• Effective since 10/01/15
• Section 1116 of FAST Act
• Includes:• Primary Highway Freight System (PHFS)• Portions of the Interstate System NOT designated as
part of the PHFS• Critical Urban Freight Corridors• Critical Rural Corridors
FAST ACT: 1. Expands Freight Network
11
Primary Highway Freight System
• Effective since 09/30/15
• Includes:o 41,518 centerline miles o 37,436 miles of interstateo 4,082 miles of non-interstates
• Must be re-designated every 5 years
FAST ACT: 1. Expands Freight Network
12
$1.2 B/yr (avg), apportioned to States by formula
Eligible activities include:• Construction• Operational improvements• Freight planning and performance measures
NOTE: Starting in FFY 2018 a Freight Plan is Required
No State Freight Plan = No Freight Formula $
FAST ACT: National Highway Freight Program 2. Freight Formula Funds
13
• Nationally significant freight and highway projects
• $900 M/yr (avg) available for competitive grants or TIFIA loans for projects > $100 M
NOTE: There will be set-asides for:• projects below cost threshold,• rural areas
FAST ACT: 3. Discretionary Program
14
Eligible activities include:
Highway freight projects on Nat’l Highway Freight Network
NHS highway/bridge projects, projects in National Scenic Areas
Freight rail/intermodal projects• < $500 M over 5-year period
Rail-highway grade crossing or grade separation projects
15
FAST ACT: 3. Discretionary Program
APPORTIONED PROGRAMS
16
(FORMULA FUNDS)
17
FAST ACT: CMAQ & Freight Eligibilities
• V2I communication equipment
• Port-related equipment and vehicle o under PM2.5 set-aside
Bernadette Dupont U.S. Department of Transportation
Federal Highway Administration - KY330 West Broadway
Frankfort, KY 40601-1981Land Line: (502) 223-6729Fax Line: (502) 223-6735
FAST ACT: Freight18