BEER Pef pilot: Motivations to participate
We did a lot already
Lack of “transparency” from supply chain partners
Lack of agreed Calculation Method
We need alignment between brewers
& related beverage industry
And of course also: Confusion on “labels” , LCA studies, environmental claims, greenwashing?
We joined together: Beer pilot Technical Secretariat (TS)
TS Members (per. 23.09.2014)
Consultants
Why we are in? Beer brewers and BIER,..• Share same sustainability agenda; there is a sense of
urgency to improve performance
• “Transparency is a necessity to be
able to improve Supply Chains”
• We can best improve together
with supply chain partners
• The PEF defines 1 language and
one calculation methodology
• PEF is linked to circular economy
• Consumer labels “not unlikely”
And we need an answer to COP 21; Scope 1 & 2 & 3:“50% less in 10 years?”
We need an “harmonized-fact based-stakeholder accepted methodology” as a solid baseline as basis for well defined “Science Based Targets”.
Where are we now?
• With BEER PEFCR done:
� Methodology updated and agreed upon
� Secondary data sets
� Primary data is used
• In process of harmonization with:
• Beverage Industry Environmental
Roundtable
• Useful tool to quantify our carbon
Impact and drive improvements**** Data covers 85% of our beverage volume
****
Action on Carbon Emissions“Drop The C”
In preparation Water Strategy“Every Drop”
• PEFCR is used by us in BtB context
• Primary Data drives improvement
The journey and outcomes
• Good cooperation between Brewers of Europe and
• Good support from Beverage industry (environmental roundtable)
• PEF outcome seen by brewing industry as “global standard”
also
• Data transparency and data availability for key hots pots needed to “reward green
brewers”, and “green suppliers”
main outcomes
• Primary data recognized as important driver for improvement (BtB)
• Secondary data sets come available for pilot participants
• Pending: SME tool
• And??? Policy Evaluation??