Transcript

Scale:

Project:

Drawing:

Date:

Drg No rev

drawn checked

Scale:

Project:

Drawing:

Date:

Drg No rev

drawn checked

Kyle Smart AssociatesChartered Architects & Building ConsultantsThe Barn, Butchers Wick, Sewell, Nr Dunstable, Beds LU6 1RP

tel 01582 690222 fax 01582 690333email [email protected]

Scale:

Project:

Drawing:

Date:

Drg No rev

drawn checked

Kyle Smart AssociatesChartered Architects & Building ConsultantsThe Barn, Butchers Wick, Sewell, Nr Dunstable, Beds LU6 1RP

tel 01582 690222 fax 01582 690333email [email protected]

House Type CJ - Plans

08046wd2.0261:50@A1

Apr-10

SC

P2

F O R P L A N N I N G

-

NHH Kimpton

2B4P 4B6P

0 1 2 3 4 5 M

Windows and DoorsTimber from proven sustainable source.Paint finished to a RAL colour. Exactcolour to be confirmed. Glazed elementsthermally broken and fitted with Low Edouble glazing.Fitted with Laminated and or Toughened Glasswhere required in accordance with therequirements of Building Regulations andSecured By Design.

Rainwater GoodsBlack UPVC downpipes and gutters.Black UPVC rainwater collection butts wallmounted 100L.Soffits, Fascias and Eaves White UPVC.

Solar Water Heating / PV PanelsInset inline with the roof and exacttype subject to SAP calculationrequirements.

Canopies and DormersZinc clad flat roof at shallow pitch (no shallowerthan 3 degrees).Colour: Zinc Preweathered Blue Grey (basedon Rheinzink)Materials Legend

BrickworkColour and Manufacturer to be confirmed.Airbricks, where required, to close colourmatch the brickwork.

Through Colour RenderWhite.Ventilation extract points, where required,to close colour match the render.

Concrete Roof TileColour and Manufacturer to be confirmed.Roof top ventilation points, where required,to be through inline tile vents, colour matchedto the roof tiles.

Windows and DoorsTimber from proven sustainable source.Paint finished to a RAL colour. Exactcolour to be confirmed. Glazed elementsthermally broken and fitted with Low Edouble glazing.Fitted with Laminated and or Toughened Glasswhere required in accordance with therequirements of Building Regulations andSecured By Design.

Canopies and DormersZinc clad flat roof at shallow pitch (no shallowerthan 3 degrees).Colour: Zinc Preweathered Blue Grey (basedon Rheinzink)

House Type CJRoof Plan

House Type CJFirst Floor Plan

House Type CJGround Floor Plan

Base 600Vol=0.20m

3

Base 600Vol=0.20m

3

Base 600Vol=0.20m

3

Base 600Vol=0.20m

3

Base 600Vol=0.20m

3

F/F

svp

Store

Lounge

WC

Kitchen

1

2

3

4

5

6

7

8

9

10

11

12

13

30 li

Rec

yclin

g

TallStore

Hall

ss

DiningArea

WM

futurelift installation

Terry liftharmony

860 x 1265

Sto

rage

uni

ts 5

p-6p

kitc

hen

whe

elch

air

activ

ity z

one

1400

x 1

700

Tabl

e 5p

desk

Armch

air

3seat settee

2sea

t set

tee

tv

vischair

OccTable

Focal PointFire vis

chair

Boi

ler

CoffeeTable

radi

ator

living space activity zone4p and above dwelling2000 x 2500

Base 600Vol=0.20m

3

926

dr

1

2

3

4

5

6

8

9

10

11

12

13

7

1

vischair Lounge/

dining

stor

age

units

4p

side

boar

d 4p

Hall

TallStore

Tabl

e 4p

futurelift installation

Terry liftharmony

860 x 1265

WC

vischair

svp

kitchen wheelchair

activity zone1400 x 1700

Kitchen

broomunit

Broom UnitVol=0.51m3

F/F

Base 500Vol=0.17m

3

WM 30 li

Rec

yclin

g

Base 300Vol=0.10m3

Boi

ler

Base corner 1030Vol=0.23m3

Base 600Vol=0.20m3

Base 600Vol=0.20m3

Base corner 930Vol=0.20m3

Base 400Vol=0.13m3

Wall 400Vol=0.06m3

Wall 400Vol=0.06m3

Wall 400Vol=0.06m

3

Wall 600Vol=0.08m3

Wall 600Vol=0.08m3

Wall 300Vol=0.04m3

vOLUME CAPACITY = 2.12m (min requirement = 2.1m )LENGTH OF BASE UNITS = 2600mm (min requirement = 1600mm)

33

tray

spac

e

926

dr

desk

CoffeeTable

Armchair

tv

Home Office1800mm

Focal PointFire

livin

g sp

ace

activ

ity z

one

4p a

nd a

bove

dw

ellin

g20

00 x

250

0

3sea

t set

tee

radi

ator

RW

P 160l

iW

ater

But

tRWP

doub

lew

ardr

obe

1

2

3

4

5

6

7

8

9

10

11

12

13

A/C

Store

doublew

ardrobe

desk

chest ofdraw

ers

doublewardrobe

chest ofdrawers

double bed

Bedroom 2

Bedroom 1

Landing

single bed

knock-out panel

Bathroom

futurelift installation

Terry liftharmony

860 x 1265

hom

e of

fice

svp

single bed

LoftHatch

1

2

3

4

5

6

7

8

9

10

11

12

13

Bedroom 1

Bathroom

AC

futurelift installation

Terry liftharmony

860 x 1265

Lin. svp

Bedroom 2

Bedroom 3

Bedroom 4

Landing

916

916

916

916

835

Full heightknock-out panel

1100

doub

le b

ed

doub

lew

ardr

obe

ches

t of

draw

ers

desk

single bed

sing

lew

ardr

obe

ches

t of

draw

ers

single beddesk

sing

lew

ardr

obe

ches

t of

draw

ers

sing

le b

edsi

ngle

bed

ches

t of

draw

ers

desk

dres

sing

tabl

e

wheelchair activity zone1500 x 1500

P2 10.07.29 Summary- Planning stage CDM Review notes added.

P1 10.06.15 Summary- Bedroom layouts revised and additional furniture indicated.- Staircase position adjusted.- Furniture layout in kitchens and lounge adjusted.- Home Office location for ENE9 revised.

CDM DESIGN REVIEWDate Held: 2010.07.29Significant risks identified which are either:1. Not likely to be obvious to a competent Contractor:None

2. Unusual risks:

3. Likely to be difficult to manage effectively:

None

None

Recommended