BEACH SAND NOURISHMENT IN THE
OCEANSIDE LITTORAL CELL
AERYN DONNELLY-TERREY
PARK + ENVIRONMENTAL PLANNER
CITY OF CARLSBAD
OCEANSIDE LITTORAL CELL
CITY OF SAN CLEMENTE - REACH 9
CITY OF CARLSBAD - REACH 6
COUNTY OF ORANGELOWER SANTA ANA RIVER PROJECT PROVIDES FLOOD PROTECTION
TO COMMUNITIES IN ORANGE, RIVERSIDE, AND SAN BERNADINO COUNTIES
THE LOWER SANTA ANA RIVER MOUTH MEETS THE PACIFIC OCEAN AT THE BORDER
OF HUNTINGTON BEACH AND NEWPORT BEACH
CITY OF SAN CLEMENTE NORTH BEACH
OPPORTUNISTIC BEACH REPLENISHMENT PROJECT
12,000 CUBIC YARDS OF SAND
2.2 MILLION VISITORS TO THE BEACH ANNUALLY
WINTER SAND PUSHING
HTTP://ABC7.COM/NEWS/TRUCKLOADS-OF-SAND-BROUGHT-TO-SAN-CLEMENTES-NORTH-BEACH-TO-COUNTER-EROSION/1635667/
TWO MONTHS AFTER SAN CLEMENTE IMPORTED 12,000 CUBIC YARDS OF SAND TO NORTH BEACH
AT A COST OF $626,195, LOCAL OFFICIALS ESTIMATE ABOUT HALF THE SAND IS STILL THERE.
AGUA HEDIONDA LAGOON CABRILLO POWER PLANT MAINTENANCE DREDGE PROJECT
CITY OF CARLSBAD
Environmental Resource Protection
BATIQUITOS LAGOON DREDGE &
BEACH NOURISHMENTPROJECT
CITY OF CARLSBAD, CA
PERMITTED FOR 118,000 CUBIC YARDS
ANTICIPATED TIME FRAME FOR PROJECT
•START DATE: SEPTEMBER 1ST, 2018
•END DATE: FEBRUARY 28TH, 2019
DREDGE SITE
DEPOSIT SITE
PIPE LOCATION
FUNDING
•SANDAG & CALTRANS
•SAN DIEGO FOUNDATION
•EST. COST $1.5 MILLION – $2 MILLION
PERMITS OBTAINED
• COASTAL COMMISSION • ARMY CORPS OF ENGINEERS• REGIONAL WATER QUALITY CONTROL BOARD• CA DEPARTMENT OF PARKS & RECREATION • STATE LANDS COMMISSION
AERYN DONNELLY TERREYPARK + ENVIRONMENTAL PLANNER
CITY OF [email protected]