Fill in your own data and see what Ellipse Planni
Follow the indications for each step and see for yourself the savings
Note: Only yellow cells can be edited
Part I - Lower your engineering costs (Spend less in surv
Step #1
Engineering costs
Cost of Path survey 800.00
Cost of Link engneering 150.00
#Links designed per year 300
Step #2
Network Description
Network Urban
Links to be designed 400 150 200 750
green field 196 95 166
existing networks 204 56 34
% green field 49% 63% 83%
% existing networks 51% 37% 17%
1) Input Path Survey Cost
2) Input Link Engineering Cost
3) Input the number of links designed per year
1) Fill the number of links to be designed (yellow cells)
Very majorcities
Nonurban
This Business Case intends to guide you through the savings youMicrowave.
The benefits are twofold :
Lowered engineering costs (Spend less in surveys)
Unrivaled computation engine along with Hi-Res geodata reduce the nuto find the right spot for your MW links. The first part of this Business Caimpact of using Ellipse with different resolutions of geodata.
Improved efficiency (Time is Money)
Administrative tasks and data exchange with suppliers or contractors adtedious. Therefore the less time you spend on this, the more efficient youbusiness case will show you how much time you save while using our DGeneration / One-Click Excel / ... features.
8/14/2019 Bc Ellipse Mw
2/20
49 63 83
Step #3
Current Geodata Description
Geodata Area (km) 1M 5M 20M+
500
Urban / average topo 5000
Non Urban / simple topo 200000
Note :
No Clutter Data (No CD) means that only paper maps or GIS terrain is used
Simple Topology is defined as small town, rural area, desert area,
Average Topology is found in most cities around the world
Difficult Topology is found in densely populated areas such as downtown Ma
Step #4
Geodata Description
Geodata area Area (km) 1M 5M 20M+
500
Urban / average topo 5000
Non Urban / simple topo 200000
COST SAVINGS ARE COMPUTED IN REAL-TIME AND ARE DISPLAYED I
Savings and Path surveys and Path engineering
without ELLIPSE with ELLIPSE
Cost of Path surveys 1,864,400.00 1,305,600.00
Cost of Path Engineering 349,575.00 215,400.00
Cost of Geodata - 13,750.00
Total 2,213,975.00 1,534,750.00
Cost Savings with ELLIPSE (in ) 679,225.00
Part II - Improve you efficiency (Time is Money)
Step #5
1) Input the Area of your field of study according to the suggested segmenta
2) Check the radio buttons to select the resolution of your current geodata
Very major cities / difficultTopo
1) Check the radio buttons to select the resolution of geodata you may want
Very major cities / difficultTopo
1) Input the estimated duration for each task (yellow cells)2) Check or uncheck the boxes of the task you want to include in the calcula
8/14/2019 Bc Ellipse Mw
3/20
TIME SAVINGS ARE COMPUTED IN REAL-TIME AND ARE DISPLAYED IN
Time Savings
Unit
FALSETime to setup a link during the design phas min / link 0
Reports (duration / link)
TRUE Frequency application min / link 1 1
TRUE Link budget reportmin / link 1
TRUE Physical description for deploymentmin / link 1
TRUE Work ordermin / link 1 1
TRUE Bill of Materials min / link 1
TRUE Data exchange with LOS suppliers min / link 1
FALSE Data exchange within company min / link 0 2
TRUE Data exchange with outsourced suppliers min / link 1 3
TRUE Access to documents within deployment min / link 1 1
FALSE Data management hr / month 0 3Savings in ELLIPSE (Man days)
Description of the tasks
Time to setup a link during the design phase This time includes: sit
interference analysisReports (duration / link)
Frequency application This report is generall
Link budget report Link budget report is
Physical description for deployment Document given to th
Work order Internal document iss
Bill of Materials Exhaustive list of equ
Data exchange with LOS suppliers Based on planning co
Data exchange within company Exchange of informati
Data exchange with outsourced suppliers Exchange of informati
Access to documents within deployment Field engineering co
Data management Retrieving, sorting, a
DurationELLI
This Business Case takes into account tangible earnings.deliver also true benefits difficult to model, such as:
* Optimisation of frequency re-use leads to a better spectrumprice for spectrum, maintenance, spares,...* Significant reduction of interferences leads to higher Qualitythe loyalty of the customers* Detailed cost description of your transmission links (CapEx /accurate financial view of operating your network
* The Network Audit Wizard can select the optimum leased lina cost effective manner while maintainin our oS
8/14/2019 Bc Ellipse Mw
4/20
8/14/2019 Bc Ellipse Mw
5/20
g can save your company
.
ys)
2) Adjust with thescroll bars theproportion betweenGreen Field andExisting Network
an make using Ellipse
ber of sites surveys to completee will show you the economic
limited value and often areget. The second part of theta Management / Report
8/14/2019 Bc Ellipse Mw
6/20
Current Geodata Description
No CDGeodata area 1M 5M
Very major cities / dif 0 0
Urban / average topo 0 0
Non Urban / symple t 0 0
hattan, Rio de Janeiro, Hong Kong
Geodata Description
No CDGeodata area 1M 5M
Very major cities / dif 0 1
Urban / average topo 0 0
Non Urban / symple t 0 0
RED IN THE TABLE BELOW
tion (yellow cells)
to work with
ion
8/14/2019 Bc Ellipse Mw
7/20
RED IN THE TABLE BELOW
-45
0 1
1
1
0 1
1
1
5 1
0 1
0 5
2 0106
e positionning, LOS clearance, link budget, station positionning, equiment, antennae
for the link and the network
y handed to the Regulation Authority for compliance with the spectrum usage
used internally to keep a track of the specs of the link. It can be the base document
e deployment team. It compiles power data as well as equipment descriptions and s
ued by the purchasing department based on planning recommendations
ipment to power up the link
mputations, site surveys must be done in the field and the results shall be logged int
ion between planning and other departments within the company
ion between the company and the contractors/suppliers,
pares theoritical results with in the field measurements, and feed the database with
chiving, editing ... files
withoutPSE
Duration withELLIPSE
Some built-in features can
fficiency, thus reducing the
f Service (QoS), improving
OpEx) provides you with an
s to be replaced by MW in
8/14/2019 Bc Ellipse Mw
8/20
8/14/2019 Bc Ellipse Mw
9/20
8/14/2019 Bc Ellipse Mw
10/20
20M CD
0 1 4
0 1 4
0 1 4
20M CD
0 0 2
1 0 3
0 1 4
8/14/2019 Bc Ellipse Mw
11/20
, frequency allocation,
for a site survey
etup paramaters for the link
o the network database
relevent comments
8/14/2019 Bc Ellipse Mw
12/20
8/14/2019 Bc Ellipse Mw
13/20
New
Cost of path survey 800.00
Cost of Path engineering 150.00
Geodata area 1m 5m 20m No CDVery major cities / difficult Topo 500 0 1 0 0
Urban / average topo 5000 0 0 1 0
Non Urban / symple topo 200000 0 0 0 1
9 10 11 12
5 6 7 8
1 2 3 4
Network Urban Non urban Network
Links to be designed 400 150 200 Links to be d% green field 49% 63% 83%
% existing networks 51% 37% 17% exist
Path sur
Path en
Very majorcities
8/14/2019 Bc Ellipse Mw
14/20
Green Field existing network
path suvey link engineeringpath suvey link engineering
2 1 2 2OK 2 2 2 2
OK 3 3 1 1
OK
10
7
4
Urban Non urban
signed 400 150 200green field 196.00 94.50 166.00
ng networks 204.00 55.50 34.00
ey costs 1,305,600.00
ineering 215,400.00
1,521,000.00
Very majorcities
8/14/2019 Bc Ellipse Mw
15/20
Current
Cost of path survey 800.00
Cost of Path engineering 150.00
Geodata area 1m 5m 20m No CD
Very major cities / difficult Topo 500 0 0 0 1
Urban / average topo 5000 0 0 0 1
Non Urban / symple topo 200000 0 0 0 1
9 10 11 12
5 6 7 8
1 2 3 4
Network Urban Non urban Network
Links to be designed 400 150 200 Links to be d
% green field 49% 63% 83%
% existing networks 51% 37% 17% exist
Path sur
Path en
Very majorcities
8/14/2019 Bc Ellipse Mw
16/20
Green Field existing network
path suvey link engineeringpath suvey link engineering
3 3 4 4
OK 3 3 2 2
OK 3 3 1 1
OK
12
8
4
Very major cities Urban Non urban
signed 0 0 0
green field 196.00 94.50 166.00
ng networks 204.00 55.50 34.00
ey costs 1,864,400.00
ineering 349,575.00
2,213,975.00
8/14/2019 Bc Ellipse Mw
17/20
Simple Topology Average Topology Difficult Topology
1mR
esolu
tionCD
5mR
esolu
tionCD
20mR
esolutionCD
NoC
D
1mR
esolu
tionCD
5mR
esolu
tionCD
20mR
esolutionCD
NoC
D
1mR
esolu
tionCD
5mR
esolu
tionCD
20mR
esolutionCD
NoC
D
1 2 3 4 5 6 7 8 9 10 11 12
1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 2 2 1 2 3 4
1 1 1 1 1 1 2 2 1 2 3 4
NOTES
Microwave Hops are in a higher frequency bands and relatively short (1-6 km).
Number of SiteSurveys per Hop(two sites per Hop)
Number of PathSurveys per Hop
Path Engineeringper Hop
"No Clutter Data" means that only paper maps or GIS terrain data is used.
Simple topology is defined as a small town or rural area, desert area, etc.
Average topology is found in most cities around the world.
Difficult topology is found in densly populated areas areas like downtown Manhattan, Rio De Janeiro, Ho
8/14/2019 Bc Ellipse Mw
18/20
g-Kong, et.
8/14/2019 Bc Ellipse Mw
19/20
Simple Topology Average Topology Difficult Top
1mR
esolu
tionCD
5mR
esolu
tionCD
20mR
esolutionCD
NoC
D
1mR
esolu
tionCD
5mR
esolu
tionCD
20mR
esolutionCD
NoC
D
1mR
esolu
tionCD
5mR
esolu
tionCD
20mR
esolutionCD
1 2 3 4 5 6 7 8 9 10 11
1 1 1 1 1 1 1 1 1 1 1
1 1 2 3 1 1 2 3 1 2 2
1 1 2 3 1 1 2 3 1 1 2
NOTE: Although new cell-site may initially have up to 15 candidates, microwave path surveys are usu
Number of SiteSurveys per Hop(two sites per Hop)
Number of PathSurveys per Hop
Path Engineering
per Hop
8/14/2019 Bc Ellipse Mw
20/20
logy
NoC
D
12
1
3
3
ally limited to top three candidates.