Exercise: Identify at what stage the following Engineering documents are first issued:

Discipline Deliverable/activity FEED DETAILHAZOP reportQRAHazardous area classification drawingsFire & Gas detection layoutSafety philosophyEnvironment impact AssessmentP&IDsProcess description & operating philosophyOperating manualEquipment Process Data SheetsInstrument Process Data SheetsPackaged units functional specificationsEmergency shutdown philosophyCauses & Effects diagramsFlare studyEquipment general specificationsEquipment Data SheetRequisitionTechnical Bid TabulationVendor follow-upGeneral Plot PlanUnit Plot PlanGeneral Arrangement drawingsIsometric drawingsPiping Line DiagramsGeneral specification for piping materialsSpecial piping items specificationPiping Material Class SpecificationsStandard drawingsPiping MTOPiping stress design basisPiping stress calculation notesPiping support drawings and listInstruments general specificationInstrument data sheetsSystems specificationsSystems architectural drawingsSystems I/O countRequisitionsBulk Material Take OffLoop diagramsHook-up drawingsEquipment Arrangement drawingsCable routing drawingsSoil investigation specificationUnderground networks drawingsDesign specificationsSpecifications for civil worksSteel and concrete structures design drawingsEquipment foundation drawingsCalculation notesConcrete/steel standard drawingsBuildings architectural drawingsMaterial take-offOne Line DiagramElectrical consumers listEquipment general specificationEquipment data sheetRequisitionStandard drawingsSpecification for bulkBulk MTOEquipment arrangement drawingsCable routing drawingsCalculationsSpecificationStandard drawings

Safety

Process

Mechanical

Plant Layout

Piping/Installation

Civil

Electrical

Painting, Coating

Piping/Material

Piping/Stress

Intrumentation & Control

Recommended