Transcript

Cricket

Discus

Shot Put

Rounders

Rounders

400m Athletics

A B

C

D

F

G H

JK

L

M

E

O

P

Rugby

FootballHockey

Redfern Avenue

E

N

Healthfield recreation ground

Sempevirens Nursery

Hospital Bridge R

oad

J

J

I

KEY

Bowmer and Kirkland

Illustrative Masterplan

EFATH-ALA-00-XX-DR-L-0003

A1

02.03.2018

SUITABILITY

DRAWING NUMBER :

DRAWING SCALE :

PAPER SIZE :

DRAWING TITLE :

REVISION :

DRAWN BY :

CLIENT :

PROJECT TITLE :

DRAWN DATE :

APPROVED BY :

APPROVEDBYREV DRAWN

BYDESCRIPTION OF REVISIONDATE

REVISIONS

1:1000 EC

LA

P09

DateMitigatedID RISK

RESIDUAL PROJECT RISKSMITIGATION

SUITABILITY :

S2

SUITABILITY

Ares Landscape Architects LTDGatecrasher51 Eyre LaneSheffieldS1 4RB

t: 0114 276 2000e: [email protected]: ares.eu.com

S2 - For Planning

A

B

C

D

E

F

G

H

J

Entrance Plaza

New Site Entrance

Car Parking45no. Total Spaces3 Disabled Bays10 Active Electric Charging Points10 Passive Electric Charging PointsDeliveries / Coach Bay

Pedestrian Boulevard

K

6th Form External Social Space

L

M

N

O

Turing House School

Deliveries and Maintenance Gate

Habitat Area Planting species designed to encourage insect and bird habitats and enhance the ecological corridor. Indicative design intent shown for illustrative purposes only.

Hard Informal Social Area

I External Canopy

3 Court MUGA

Playing/Sports FieldA Space design to maximise the amount of sports played by the school. The North/South orientation results in 3no. pitches

Boundary Fencea 2.4m boundary fence with hedge planting to provide screening

Grassland & Habitat CreationArea seeded with species rich grass and planting with trees to create habitat zones and habitat creation. Indicative design intent shown for illustrative purposes only

Habitat CorridorThe existing avenue of trees retained and grassland managed to reinforce the habitat corridor, providing habitat corridor between the rail line, cemetary and retained fallow land

P Pupil AccessPropsoed pupil access from Heathfield Recreation Ground. A low lit self bind gravel path weaving through the habitat area to the school.

Cycle Parking136no. Pupil Spaces10no. Visitor Spaces10no. Staff Spaces

0 10 20 50 100

SCALE BAR 1:500

0 10 20 50 100

SCALE BAR 1:500

0 10 20 50 100

SCALE BAR 1:500

Notes1. Drawing not to be scaled for construction or setting out purposes'.2. To be read in conjunction with Project Risk Register REF: XXX3. To be read in conjunction with all other Landscape Architect''s drawings

LAP02 HTHighways entrance and adjacent area updated13.11.18 S2

LAP03 HTRed Line Amended07.02.19 S2

LAP04 LACar parking and tree removal strategy amended to reflect updated tree survey and bin store and substation moved to accomodate ecology comments

02.04.19 S2

LAP05 LAMUGA and pitches relocated to allow for 10m habitat corridor to the northern boundary

14.05.19 S2

LAP06 LARed line amended at 116 Redfern Ave.Parking Spaces amended22.05.19 S2

LAP07 LAMUGA surface colour chaged to green30.05.19 S2

RAP08 EZFence line amended to protect Habitat Corridor26.06.19 S2LAP09 LAAmendments to redline10.07.19 S2

Recommended