FIXING BIG SUBURBAN ROADS
Oregon Active Transportation Summit
March 30, 2015
Overview
Pedestrian crossing treatments on busy streets
Retrofitting large streets for Bus Rapid Transit Projects already constructed West Eugene EmX Moving Ahead Corridor Studies
How to balance tradeoffs amongst modes
Pedestrian Hybrid Beacon
Pedestrian Hybrid Beacon
Pedestrian Hybrid Beacon
Rectangular Rapid Flashing Beacon
Rectangular Rapid Flashing Beacon
Rectangular Rapid Flashing Beacon
Rectangular Rapid Flashing Beacon
EmX Bus Rapid Transit
EmX Bus Rapid Transit
EmX Bus Rapid Transit
EmX Bus Rapid Transit
Franklin Boulevard Multiway Boulevard Proposal
EmX Bus Rapid Transit
West Eugene EmX
West 11th Avenue
West 11th Avenue
West Eugene EmX
Before
West Eugene EmX
After
West Eugene EmX
Before
West Eugene EmX
After
West Eugene EmX
Moving Ahead Corridor Study
Planning future bus rapid transit and frequent transit corridors in Eugene and Springfield
Considering all active transportation modes from the beginning
Four corridors will be chosen for NEPA studies
Pedestrian and bicycle capital projects will be identified in all corridors
Pavement Preservation Projects
Rob InerfeldTransportation Planning Manager
Public Works Engineering
[email protected]
www.eugene-or.gov/transportation
Example Projects in Eugene
Bailey Hill Road - Before
Bailey Hill Road - After